ML15356A828: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000413/2016301]]
| number = ML15356A828
| issue date = 12/22/2015
| title = Catawba Nuclear Station - Notification of Licensed Operator Initial Examination 05000413/2016301 and 05000414/2016301
| author name = McCoy G J
| author affiliation = NRC/RGN-II/DRS
| addressee name = Henderson K
| addressee affiliation = Duke Energy Carolinas, LLC
| docket = 05000413, 05000414
| license number = NPF-035, NPF-052
| contact person =
| document report number = 50-413/16-301, 50-414/16-301
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 4
}}
See also: [[followed by::IR 05000413/2016301]]
 
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257  December 22, 2015 
Mr. Kelvin Henderson
Site Vice President
Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road
York, SC 29745  SUBJECT: CATAWBA NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION NOS. - 05000413/2016301 AND 05000414/2016301  Dear Mr. Henderson:  During a telephone conversation on December 16, 2015, between Mr. Bruce Boyette,
Operations Training Instructor, and Mr. Michael Meeks, Senior Operations Engineer,
arrangements were made for the administration of licensing examinations at Catawba Nuclear Station.  The operating test is scheduled to be administered during the week of May 16, 2016.  The written examination is scheduled to be administered the week of May 23, 2016.  The on-site preparatory week is scheduled for the week of April 18, 2016.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator
Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination. 
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by February 16, 2016.  Mr. Meeks provided the written examination outline to your staff in September, 2015.  The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by March 17, 2016.  Pursuant to Title
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use.     
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
K. Henderson 2  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by the OMB under approval number 3150-0018, which expires on April 30, 2016.  The public reporting burden for
this collection of information is estimated to average 2500 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, writing the
examinations, and completing and reviewing the collection of information.  Send comments on
any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). 
 
 
 
K. Henderson 3  Thank you for your cooperation in this matter.  Mr. Boyette has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Meeks at (404) 997-4467, (Internet E-mail: Michael.Meeks@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).    Sincerely,
/RA/ 
Gerald J. McCoy, Chief Operations Branch 1
Division of Reactor Safety 
Docket Nos.:  50-413, 50-414 License Nos.:  NPF-35, NPF-52 
cc:  Distribution via Listserv
 
_________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE GJM1 FOR MKM3 GJM1      NAME MMEEKS GMCCOY      DATE 12/22/2015 12/22/2015 12/    /201512/    /2015 12/    /2015 12/    /2015 12/    /2015 E-MAIL COPY?    YES NO      YES NO    YESN  YES NO      YES NO      YES NO      YES NO
}}

Revision as of 00:20, 6 June 2018