Inspection Plan  DISTRIBUTION w/encl:  DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS SKennedy, DRP SShaffer, DRP MHenrion, DRP SElkhiamy, DRP APatel, DRP, SRI EAndrews, DRP, RI JDeVries, DRP, AA JBowen, RI, OEDO RidsNrrPMOysterCreek Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource  RMcKinley, DRS JNoggle, DRS MGray, DRS PKrohn, DRS CCahill, DRS DJackson, DRS NMcNamara, RI, SLO DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource      DOCUMENT NAME: S:\ROP Assessment Meetings\ROP-17 Mid-Cycle Review\Branch 6\Oyster Creek\OC ROP-17 Mid-Cycle Letter Final.docx  ADAMS ML16235A079    SUNSI Review  Non-Sensitive  Sensitive  Publicly Available  Non-Publicly Available  OFFICE RI/DRP RI/DRP RI/DRP  NAME SRKennedy/SWR for  SShaffer/SWR MLScott/MLScott  DATE 08/17/16 08/17/16 08/19/16  OFFICIAL RECORD COPY Page 1 of 207/18/201613:25:13Report 22UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteOyster CreekInspection / Activity Plan07/01/2016-06/30/20187111121-CDBI61 IPComponent Design Bases Inspection711112106/27/201607/01/20161 IPComponent Design Bases Inspection711112107/11/201607/15/201695001-FOLLOW UP FOR WHITE NOV (FLEX HOSE-EDG)21 IPSupplemental Inspection for One or Two White Inputs in a Strategic Performance Area9500107/25/201607/29/2016PI&R-BULK DRYWELL TEMPERATURE11 IPIn-depth Reviews71152-Reviews08/22/201608/24/201671124-01 EXPOSURE CONTROL11 IPRadiological Hazard Assessment and Exposure Controls71124.0108/29/201609/01/201671124-02 ALARA11 IPOccupational ALARA Planning and Controls71124.0208/29/201609/01/20167111108G-INSERVICE INSPECTION11 IPInservice Inspection Activities - BWR7111108G09/26/201609/30/2016EP-EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140209/26/201609/30/20161 IPEmergency Preparedness Organization Staffing and Augmentation System711140309/26/201609/30/20161 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140509/26/201609/30/201671124-01EXPOCONTROL02 ALARA 03 AIRBORNE04 DOSE11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/26/201609/30/20161 IPOccupational ALARA Planning and Controls71124.0209/26/201609/30/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/26/201609/30/20161 IPOccupational Dose Assessment71124.0409/26/201609/30/201671152BI-PI&R BIENNIAL41 IPProblem Identification and Resolution71152B10/31/201611/04/20161 IPProblem Identification and Resolution71152B11/14/201611/18/201671124-71151 PI VERIFY 71124.01 .02 .03 .0411 IPRadiological Hazard Assessment and Exposure Controls71124.0111/07/201611/11/20161 IPOccupational ALARA Planning and Controls71124.0211/07/201611/11/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/07/201611/11/20161 IPOccupational Dose Assessment71124.0411/07/201611/11/20161 IPOccupational Exposure Control Effectiveness71151-OR0111/07/201611/11/20161 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/07/201611/11/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Inspection Plan  DISTRIBUTION w/encl:  DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS SKennedy, DRP SShaffer, DRP MHenrion, DRP SElkhiamy, DRP APatel, DRP, SRI EAndrews, DRP, RI JDeVries, DRP, AA JBowen, RI, OEDO RidsNrrPMOysterCreek Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource  RMcKinley, DRS JNoggle, DRS MGray, DRS PKrohn, DRS CCahill, DRS DJackson, DRS NMcNamara, RI, SLO DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource      DOCUMENT NAME: S:\ROP Assessment Meetings\ROP-17 Mid-Cycle Review\Branch 6\Oyster Creek\OC ROP-17 Mid-Cycle Letter Final.docx  ADAMS ML16235A079    SUNSI Review  Non-Sensitive  Sensitive  Publicly Available  Non-Publicly Available  OFFICE RI/DRP RI/DRP RI/DRP  NAME SRKennedy/SWR for  SShaffer/SWR MLScott/MLScott  DATE 08/17/16 08/17/16 08/19/16  OFFICIAL RECORD COPY Page 1 of 207/18/201613:25:13Report 22UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteOyster CreekInspection / Activity Plan07/01/2016-06/30/20187111121-CDBI61 IPComponent Design Bases Inspection711112106/27/201607/01/20161 IPComponent Design Bases Inspection711112107/11/201607/15/201695001-FOLLOW UP FOR WHITE NOV (FLEX HOSE-EDG)21 IPSupplemental Inspection for One or Two White Inputs in a Strategic Performance Area9500107/25/201607/29/2016PI&R-BULK DRYWELL TEMPERATURE11 IPIn-depth Reviews71152-Reviews08/22/201608/24/201671124-01 EXPOSURE CONTROL11 IPRadiological Hazard Assessment and Exposure Controls71124.0108/29/201609/01/201671124-02 ALARA11 IPOccupational ALARA Planning and Controls71124.0208/29/201609/01/20167111108G-INSERVICE INSPECTION11 IPInservice Inspection Activities - BWR7111108G09/26/201609/30/2016EP-EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140209/26/201609/30/20161 IPEmergency Preparedness Organization Staffing and Augmentation System711140309/26/201609/30/20161 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140509/26/201609/30/201671124-01EXPOCONTROL02 ALARA 03 AIRBORNE04 DOSE11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/26/201609/30/20161 IPOccupational ALARA Planning and Controls71124.0209/26/201609/30/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/26/201609/30/20161 IPOccupational Dose Assessment71124.0409/26/201609/30/201671152BI-PI&R BIENNIAL41 IPProblem Identification and Resolution71152B10/31/201611/04/20161 IPProblem Identification and Resolution71152B11/14/201611/18/201671124-71151 PI VERIFY 71124.01 .02 .03 .0411 IPRadiological Hazard Assessment and Exposure Controls71124.0111/07/201611/11/20161 IPOccupational ALARA Planning and Controls71124.0211/07/201611/11/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/07/201611/11/20161 IPOccupational Dose Assessment71124.0411/07/201611/11/20161 IPOccupational Exposure Control Effectiveness71151-OR0111/07/201611/11/20161 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/07/201611/11/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 207/18/201613:25:13Report 22UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteOyster CreekInspection / Activity Plan07/01/2016-06/30/201871124-71124.01 RAD EXPOSURE CONTROL11    IPRadiological Hazard Assessment and Exposure Controls71124.0103/06/201703/09/20177111105T-TRIENNIAL FIRE PROTECTION41    IPFire Protection [Triennial]7111105T03/20/201703/24/20171    IPFire Protection [Triennial]7111105T04/03/201704/07/20177111111B-OYSTER CREEK REQUAL INSP W/ P/F RESULTS21    IPLicensed Operator Requalification Program7111111B06/05/201706/09/201771124-RAD ENV TEAM INSPECT 71124.05 06 0731    IPRadiation Monitoring Instrumentation71124.0506/19/201706/23/20171    IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/19/201706/23/20171    IPRadiological Environmental Monitoring Program71124.0706/19/201706/23/2017EP-EP EXERCISE EVALUATION41    IPExercise Evaluation711140109/25/201709/29/20171    IPPerformance Indicator Verification7115109/25/201709/29/201771124-71151PI VERIFY71124.01RADEXP 05 RAD MONT11    IPRadiological Hazard Assessment and Exposure Controls71124.0111/06/201711/09/20171    IPRadiation Monitoring Instrumentation71124.0511/06/201711/09/20171    IPOccupational Exposure Control Effectiveness71151-OR0111/06/201711/09/20171    IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/06/201711/09/201771124.08-RADWASTE11    IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/05/201802/09/20187111117T-PERMANENT PLANT MODIFICATIONS31    IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T01/29/201802/02/20181    IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T02/12/201802/16/2018HEAT-TRIENNIAL HEAT SINK11    IPHeat Sink Performance7111107T03/19/201803/23/201871124.01-01 EXPOSURE CONTROL11    IPRadiological Hazard Assessment and Exposure Controls71124.0105/21/201805/24/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.  
Page 2 of 207/18/201613:25:13Report 22UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteOyster CreekInspection / Activity Plan07/01/2016-06/30/201871124-71124.01 RAD EXPOSURE CONTROL11    IPRadiological Hazard Assessment and Exposure Controls71124.0103/06/201703/09/20177111105T-TRIENNIAL FIRE PROTECTION41    IPFire Protection [Triennial]7111105T03/20/201703/24/20171    IPFire Protection [Triennial]7111105T04/03/201704/07/20177111111B-OYSTER CREEK REQUAL INSP W/ P/F RESULTS21    IPLicensed Operator Requalification Program7111111B06/05/201706/09/201771124-RAD ENV TEAM INSPECT 71124.05 06 0731    IPRadiation Monitoring Instrumentation71124.0506/19/201706/23/20171    IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/19/201706/23/20171    IPRadiological Environmental Monitoring Program71124.0706/19/201706/23/2017EP-EP EXERCISE EVALUATION41    IPExercise Evaluation711140109/25/201709/29/20171    IPPerformance Indicator Verification7115109/25/201709/29/201771124-71151PI VERIFY71124.01RADEXP 05 RAD MONT11    IPRadiological Hazard Assessment and Exposure Controls71124.0111/06/201711/09/20171    IPRadiation Monitoring Instrumentation71124.0511/06/201711/09/20171    IPOccupational Exposure Control Effectiveness71151-OR0111/06/201711/09/20171    IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/06/201711/09/201771124.08-RADWASTE11    IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/05/201802/09/20187111117T-PERMANENT PLANT MODIFICATIONS31    IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T01/29/201802/02/20181    IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T02/12/201802/16/2018HEAT-TRIENNIAL HEAT SINK11    IPHeat Sink Performance7111107T03/19/201803/23/201871124.01-01 EXPOSURE CONTROL11    IPRadiological Hazard Assessment and Exposure Controls71124.0105/21/201805/24/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.}}
}}

Revision as of 05:35, 19 May 2018

Oyster Creek Mid Cycle Assessment Letter 2016-005
ML16235A079
Person / Time
Site: Oyster Creek
Issue date: 08/31/2016
From: Scott M L
Division Reactor Projects I
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Kennedy S
References
Download: ML16235A079 (6)


Text

[Type here] UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA 19406-2713 August 31, 2016 Mr. Bryan Hanson Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd. Warrenville, IL 60555

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR OYSTER CREEK NUCLEAR GENERATING STATION (REPORT 05000219/2016005)

Dear Mr. Hanson:

On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Oyster Creek Nuclear Generating Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined the performance at Oyster Creek Nuclear Generating Station during the most recent quarter was within the Regulatory Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because one finding of White significance, associated with the Mitigating Systems cornerstone, was identified in the first quarter 2016 integrated inspection report (ADAMS Accession No. ML16132A436). The finding was associated with inadequate work instruction to replace the Emergency Diesel Generator (EDG) cooling flexible coupling hoses as specified by Exelon's procedure and vendor information. The final significance determination and follow-up assessment letter for this finding was issued on July 6, 2016 (ML16188A014). In that letter we informed you that Oyster Creek had transitioned to the Regulatory Response Column of the ROP Action Matrix retroactive to the first quarter of 2016. On June 14, 2016, your staff notified the NRC of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the performance issues. Therefore, in addition to ROP baseline inspections, the NRC conducted a supplemental inspection in accordance with Inspection Procedure (IP) 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," during the week of July 25, 2016. The objectives of the 95001 inspection were to provide assurance that the root cause and contributing causes of risk significant performance issues were understood, the extent of condition and extent of cause were understood, and the corrective actions were sufficient to address the root and contributing causes and prevent recurrence. The NRC determined that Exelon met the objectives of IP 95001. The NRC closed the White finding and notified you of the results of this inspection via follow-up assessment letter and Inspection Report 05000219/2016011 dated August 10, 2016, (ML16228A053) which also informed Exelon that Oyster Creek will remain in the Regulatory Response Column for a full four quarters following the identification of the White finding in January 2016.

B. Hanson The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last half of the inspection period in the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Final Safety Evaluation for Oyster Creek. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities," (ADAMS Accession # ML16104A158) the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue end-of-cycle assessment letters.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

B. Hanson Please contact Silas Kennedy at (610) 337-5046 with any questions you have regarding this letter. Sincerely, /RA/ Michael L. Scott, Director Division of Reactor Projects Docket No. 50-219 License No. DPR-16

Enclosure:

Inspection Plan B. Hanson Please contact Silas Kennedy at (610) 337-5046 with any questions you have regarding this letter. Sincerely, /RA/

Michael L. Scott, Director Division of Reactor Projects Docket No. 50-219 License No. DPR-16

Enclosure:

Inspection Plan DISTRIBUTION w/encl: DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS SKennedy, DRP SShaffer, DRP MHenrion, DRP SElkhiamy, DRP APatel, DRP, SRI EAndrews, DRP, RI JDeVries, DRP, AA JBowen, RI, OEDO RidsNrrPMOysterCreek Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource RMcKinley, DRS JNoggle, DRS MGray, DRS PKrohn, DRS CCahill, DRS DJackson, DRS NMcNamara, RI, SLO DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource DOCUMENT NAME: S:\ROP Assessment Meetings\ROP-17 Mid-Cycle Review\Branch 6\Oyster Creek\OC ROP-17 Mid-Cycle Letter Final.docx ADAMS ML16235A079 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SRKennedy/SWR for SShaffer/SWR MLScott/MLScott DATE 08/17/16 08/17/16 08/19/16 OFFICIAL RECORD COPY Page 1 of 207/18/201613:25:13Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteOyster CreekInspection / Activity Plan07/01/2016-06/30/20187111121-CDBI61 IPComponent Design Bases Inspection711112106/27/201607/01/20161 IPComponent Design Bases Inspection711112107/11/201607/15/201695001-FOLLOW UP FOR WHITE NOV (FLEX HOSE-EDG)21 IPSupplemental Inspection for One or Two White Inputs in a Strategic Performance Area9500107/25/201607/29/2016PI&R-BULK DRYWELL TEMPERATURE11 IPIn-depth Reviews71152-Reviews08/22/201608/24/201671124-01 EXPOSURE CONTROL11 IPRadiological Hazard Assessment and Exposure Controls71124.0108/29/201609/01/201671124-02 ALARA11 IPOccupational ALARA Planning and Controls71124.0208/29/201609/01/20167111108G-INSERVICE INSPECTION11 IPInservice Inspection Activities - BWR7111108G09/26/201609/30/2016EP-EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140209/26/201609/30/20161 IPEmergency Preparedness Organization Staffing and Augmentation System711140309/26/201609/30/20161 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140509/26/201609/30/201671124-01EXPOCONTROL02 ALARA 03 AIRBORNE04 DOSE11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/26/201609/30/20161 IPOccupational ALARA Planning and Controls71124.0209/26/201609/30/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/26/201609/30/20161 IPOccupational Dose Assessment71124.0409/26/201609/30/201671152BI-PI&R BIENNIAL41 IPProblem Identification and Resolution71152B10/31/201611/04/20161 IPProblem Identification and Resolution71152B11/14/201611/18/201671124-71151 PI VERIFY 71124.01 .02 .03 .0411 IPRadiological Hazard Assessment and Exposure Controls71124.0111/07/201611/11/20161 IPOccupational ALARA Planning and Controls71124.0211/07/201611/11/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/07/201611/11/20161 IPOccupational Dose Assessment71124.0411/07/201611/11/20161 IPOccupational Exposure Control Effectiveness71151-OR0111/07/201611/11/20161 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/07/201611/11/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 207/18/201613:25:13Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteOyster CreekInspection / Activity Plan07/01/2016-06/30/201871124-71124.01 RAD EXPOSURE CONTROL11 IPRadiological Hazard Assessment and Exposure Controls71124.0103/06/201703/09/20177111105T-TRIENNIAL FIRE PROTECTION41 IPFire Protection [Triennial]7111105T03/20/201703/24/20171 IPFire Protection [Triennial]7111105T04/03/201704/07/20177111111B-OYSTER CREEK REQUAL INSP W/ P/F RESULTS21 IPLicensed Operator Requalification Program7111111B06/05/201706/09/201771124-RAD ENV TEAM INSPECT 71124.05 06 0731 IPRadiation Monitoring Instrumentation71124.0506/19/201706/23/20171 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/19/201706/23/20171 IPRadiological Environmental Monitoring Program71124.0706/19/201706/23/2017EP-EP EXERCISE EVALUATION41 IPExercise Evaluation711140109/25/201709/29/20171 IPPerformance Indicator Verification7115109/25/201709/29/201771124-71151PI VERIFY71124.01RADEXP 05 RAD MONT11 IPRadiological Hazard Assessment and Exposure Controls71124.0111/06/201711/09/20171 IPRadiation Monitoring Instrumentation71124.0511/06/201711/09/20171 IPOccupational Exposure Control Effectiveness71151-OR0111/06/201711/09/20171 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/06/201711/09/201771124.08-RADWASTE11 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/05/201802/09/20187111117T-PERMANENT PLANT MODIFICATIONS31 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T01/29/201802/02/20181 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T02/12/201802/16/2018HEAT-TRIENNIAL HEAT SINK11 IPHeat Sink Performance7111107T03/19/201803/23/201871124.01-01 EXPOSURE CONTROL11 IPRadiological Hazard Assessment and Exposure Controls71124.0105/21/201805/24/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.