{{#Wiki_filter:  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA  19406-2713  June 2, 2017 MEETING SUMMARY 
LICENSEE: EXELON GENERATION CO., LLC. FACILITY: LIMERICK GENERATING STATION, UNITS 1 AND 2
==SUBJECT:==
SUMMARY OF PUBLIC MEETING On May 22, 2017, at 4:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Temporary Office Location of the Limerick Township Municipal Building in Limerick, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Limerick Generating Station (LGS), Units 1 and 2 for 2016. A notice of the open house was issued on April 5, 2017, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML17090A167. ADAMS is accessible from the NRC Web page at:  http://www.nrc.gov/reading-rm/adams.html. The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of LGS Units 1 and 2 for the period of January 1 through December 31, 2016, as documented in our letter dated March 1, 2017 (ADAMS Accession No. ML17055C205). The NRC poster boards presented included background on the Reactor Oversight Process and LGS performance highlights. Additional information relative to the NRC's Annual Assessment Process and the safety performance of LGS Units 1 and 2 can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Members of the public, Federal and local officials, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding LGS performance and the role of the agency in ensuring safe plant operations.
_______/RA/______________ Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects 
==Enclosure:==
Attendee List (ML17152A169)
==SUBJECT:==
SUMMARY OF PUBLIC MEETING FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 HELD ON MAY 22, 2017 (DATED JUNE 2, 2017)  DISTRIBUTION: (via email) DSchroeder, DRP SBarber, DRP ATurilin, DRP SRutenkroger, DRP, SRI MFannon, DRP, RI RidsNRRPMLimerick Resource
DOCUMENT NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2017\2017 LIM Annual Assessment Meeting Summary .docx ADAMS ACCESSION NUMBER:  ML17153A077  SUNSI Review  Non-Sensitive  Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP    NAME ATurilin DSchroeder    DATE 6/1/17 6/2/17    OFFICIAL RECORD COPY   
}}
}}

Revision as of 09:34, 27 April 2018

Summary of Annual Assessment Meeting for Limerick Generating Station Held on May 22, 2017
ML17153A077
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/02/2017
From: Schroeder D L
Reactor Projects Region 1 Branch 4
To:
Schroeder D L
References
Download: ML17153A077 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 June 2, 2017 MEETING SUMMARY

LICENSEE: EXELON GENERATION CO., LLC. FACILITY: LIMERICK GENERATING STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY OF PUBLIC MEETING On May 22, 2017, at 4:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Temporary Office Location of the Limerick Township Municipal Building in Limerick, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Limerick Generating Station (LGS), Units 1 and 2 for 2016. A notice of the open house was issued on April 5, 2017, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML17090A167. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of LGS Units 1 and 2 for the period of January 1 through December 31, 2016, as documented in our letter dated March 1, 2017 (ADAMS Accession No. ML17055C205). The NRC poster boards presented included background on the Reactor Oversight Process and LGS performance highlights. Additional information relative to the NRC's Annual Assessment Process and the safety performance of LGS Units 1 and 2 can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Members of the public, Federal and local officials, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding LGS performance and the role of the agency in ensuring safe plant operations.

_______/RA/______________ Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

Attendee List (ML17152A169)

SUBJECT:

SUMMARY OF PUBLIC MEETING FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 HELD ON MAY 22, 2017 (DATED JUNE 2, 2017) DISTRIBUTION: (via email) DSchroeder, DRP SBarber, DRP ATurilin, DRP SRutenkroger, DRP, SRI MFannon, DRP, RI RidsNRRPMLimerick Resource

DOCUMENT NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2017\2017 LIM Annual Assessment Meeting Summary .docx ADAMS ACCESSION NUMBER: ML17153A077 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ATurilin DSchroeder DATE 6/1/17 6/2/17 OFFICIAL RECORD COPY