June 6, 1997
                                                                                                                                  !
l
                                                                                                                                  !
Mr. H. G. Stanley
                                                            June 6, 1997                                                         l
Site Vice President
      Mr. H. G. Stanley
Braidwood Nuclear Power Station
      Site Vice President
'
      Braidwood Nuclear Power Station                                                                                             '
Commonwealth Edison Company
      Commonwealth Edison Company
R.R. #1, Box 84
      R.R. #1, Box 84                                                                                                             i
i
      Braceville,IL 60407
Braceville,IL 60407
      SUBJECT:           NOTICE OF VIOLATION (NRC INSPECTION REPORT 50-456/96016(DRS);
SUBJECT:
                        50-457/96016(DRS))
NOTICE OF VIOLATION (NRC INSPECTION REPORT 50-456/96016(DRS);
      Dear Mr. Stanley:                                                                                                           ,
50-457/96016(DRS))
                                                                                                                                  l
Dear Mr. Stanley:
              This will acknowledge receipt of your April 28,1997 letter in response to our
,
      March 31,1997 letter transmitting a Notice of Violation associated with the above
l
      mentioned inspection report. This report summarized the results of the fire protection
This will acknowledge receipt of your April 28,1997 letter in response to our
                                                                                                                                  ,
March 31,1997 letter transmitting a Notice of Violation associated with the above
      inspection at your Braidwood Plant. We have reviewed your corrective actions and have
mentioned inspection report. This report summarized the results of the fire protection
      no further questions at this time. These corrective actions will be examined during future
,
      inspections.
inspection at your Braidwood Plant. We have reviewed your corrective actions and have
                                                        Sincerely,
no further questions at this time. These corrective actions will be examined during future
                                                        /s/ J. A. Grobe                                                         ,
inspections.
                                                                                                                                  t
Sincerely,
                                      "
/s/ J. A. Grobe
  9706110017 970606                                     John A. Grobe, A-ting Director                                           ;
,
  gDR   ADOCK 0500             6                       Division of Reactor Safety
t
      Docket No. 50-456
9706110017 970606
                                                                                                                            (
John A. Grobe, A-ting Director
      Docket No. 50-457                       11000u-                                                                           (
;
                                                                                                        .__
"
      Enclosure:         Ltr dtd 04/28/97, H. G. Stanley,
gDR
                          Comed, to US NRC w/ encl                                {{\,\hf\hlk}llhk!,!!! i, i
ADOCK 0500
                                                                                              ,
6
      See Attached Distribution
Division of Reactor Safety
                                            SEE ATTACHED CONCURRENCE _S
Docket No. 50-456
      DOCUMENT NAME: G:                                                                                                           !
Docket No. 50-457
      To receive a copy of this document, indicate in the box "C" = Copy w/o attach /enct T = Copy w/ attach /erycl *N' = No copy
11000u-
        OFFICE       Rlli:DRS                   Rill:DRS         l     Rill:DRP             l   ./ fl@{tS JV
(
        NAME         Schrum/kjc                 Westberg                 Lanksbury                 J $ $ (6r/Grobe
(
      ]] DATE         06/ /97                     06/     /97             06/     /97               9 6/,{   /9 A/             !
.__
                                                  OFFICIAL RECOR D COPY                               /'                         :
Enclosure:
Ltr dtd 04/28/97, H. G. Stanley,
{{\\,\\hf\\hlk}llhk!,!!! i, i
Comed, to US NRC w/ encl
,
See Attached Distribution
SEE ATTACHED CONCURRENCE _S
DOCUMENT NAME: G:
!
To receive a copy of this document, indicate in the box "C" = Copy w/o attach /enct T = Copy w/ attach /erycl *N' = No copy
OFFICE
Rlli:DRS
Rill:DRS
l
Rill:DRP
l
./ fl@{tS JV
NAME
Schrum/kjc
Westberg
Lanksbury
J $ $ (6r/Grobe
]] DATE
06/
/97
06/
/97
06/
/97
9 6/,{ /9 A/
!
OFFICIAL RECOR D COPY
/'
:


          a
a
  .
.
                EA 97-110
EA 97-110
                Mr. H. G'. Stanley
Mr. H. G'. Stanley
                Site Vice President
Site Vice President
                Braidwood Nuclear Power Station
Braidwood Nuclear Power Station
                Commonwealth Edison Company                                                                                                           ;
Commonwealth Edison Company
                R.R. #1, Box 84
;
                Braceville,IL 60407                                                                                                                   j
R.R. #1, Box 84
                SUBJECT:         NOTICE OF VIOLATION (NRC INSPECTION REPORT 50-456/96016(DRS);
Braceville,IL 60407
                                  50-457/96016(DRS))                                                                                                   l
j
                Dear Mr. Stanley:
SUBJECT:
                                                                                                                                                        :
NOTICE OF VIOLATION (NRC INSPECTION REPORT 50-456/96016(DRS);
                          This will acknowledge receipt of your April 28,1997 letter in response to our
50-457/96016(DRS))
                March 31,1997 letter transmitting a Notice of Violation associated with the above
l
                mentioned inspection report. This report summarized the results of the fire protection
Dear Mr. Stanley:
                                                                                                                                                        !
:
,                inspection at your Braidwood Plant. We have reviewed your corrective actions and have                                                 i
This will acknowledge receipt of your April 28,1997 letter in response to our
                no further questions at this time. These corrective actions will be examined during future
March 31,1997 letter transmitting a Notice of Violation associated with the above
                inspections.
mentioned inspection report. This report summarized the results of the fire protection
                                                                    Sincerely,
inspection at your Braidwood Plant. We have reviewed your corrective actions and have
                                                                    John A. Grobe, Acting Director
i
                                                                    Division of Reactor Safety
,
                Docket No. 50-456
no further questions at this time. These corrective actions will be examined during future
                Docket No. 50-457                                                                                                                       l
inspections.
                                                                                                                                                        !
Sincerely,
                Enclosure:         Ltr dtd 04/28/97, H. G. Stanley,                                                                                     I
John A. Grobe, Acting Director
                                    Comed, to US NRC w/ encl                                                                                           i
Division of Reactor Safety
                See Attached Distribution
Docket No. 50-456
    DOCUMENT NAME: G:\DRS\ BRA 060_7.DRS
Docket No. 50-457
  ; Ts receive e copy of this document, indicate in the box: *C" = Copy w/o attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy
Enclosure:
                                                                                                                                                        j
Ltr dtd 04/28/97, H. G. Stanley,
    OFFICE       Rlil:DRS           l 1:_     Rill:DRS         l9     Rill:DRP           lg       RMylCS f                   NS ng
Comed, to US NRC w/ encl
    NAME         Schrum/kjc ha h4 Westberg g                           Lanksbury O n L             ClaytoX                   Uac@Yptrobe
i
    DATE         06/01/97                     06/03/97                 06/ tl /97                 07 /97 N                   06/ fly                 l
See Attached Distribution
                                                                                                  "
DOCUMENT NAME: G:\\DRS\\ BRA 060_7.DRS
                                                              OFFICIAL RECORD COPY                                                                     i
; Ts receive e copy of this document, indicate in the box:
                                                                                                                                                        I
*C" = Copy w/o attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy
j
OFFICE
Rlil:DRS
l 1:_
Rill:DRS
l9
Rill:DRP
lg
RMylCS f
NS ng
NAME
Schrum/kjc ha h4 Westberg g
Lanksbury O n L
ClaytoX
Uac@Yptrobe
DATE
06/01/97
06/03/97
06/ tl /97
07 /97 N 06/ fly
OFFICIAL RECORD COPY
i
"


                _     . . _ _ _ . _ _ _ . _ _ _ . .     _ _ _ _ . _ _ _ _ _ _ _ _ .           . _ .             _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _
_
                                                                                                                                        _
. . _ _ _ . _ _ _ . _ _ _ . .
    >                                                                                                                                                   :
_ _ _ _ . _ _ _ _ _ _ _ _ .
  *
. _ .
l                                                                                                                                                        \
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _
                                                                                                                                                        i
_
                                                                                                                                                        !
>
        h. G. Stanley                                                           2                           June 6, 1997                               !
:
                                                                                                                                                        ,
l
                                                                                                                                                        !
\\
                                                                                                                                                        :
*
        cc w/o encl: T. J. Maiman, Senior Vice President,
i
                              Nuclear Operations Division
!
                          D. A. Sager, Vice President,
h. G. Stanley
                              Generation Support
2
June 6, 1997
,
!
:
cc w/o encl: T. J. Maiman, Senior Vice President,
Nuclear Operations Division
D. A. Sager, Vice President,
Generation Support
l
l
                          H. W. Keiser, Chief Nuclear
H. W. Keiser, Chief Nuclear
l
l
                              Operating Officer
Operating Officer
T. Tulon, Station Manager
~'
~'
                          T. Tulon, Station Manager
T. Simpken, Regulatory Assurance
                          T. Simpken, Regulatory Assurance
Supervisor
                              Supervisor                                                                                                               i
i
                          1. Johnson, Acting Nuclear-
1. Johnson, Acting Nuclear-
                              Regulatory Services Manager                                                                                               *
Regulatory Services Manager
                          Document Control Desk - Licensing
*
        cc w/ encl:       Richard Hubbard
Document Control Desk - Licensing
                          Nathan Sch!oss, Economist,
cc w/ encl:
                              Office of the Attorney General                                                                                           ;
Richard Hubbard
                          State Liaison Officer                                                                                                         i
Nathan Sch!oss, Economist,
                          Chairman, Illinois Commerce Commission
Office of the Attorney General
        Distribution:
;
        Docket File.w/ encl _.,7f                   SRis, Braidwood, Byron,~           R. A. Capra, NRR w/enci
State Liaison Officer
l      W'IE-01 w/enell2'
i
      .
Chairman, Illinois Commerce Commission
                                                      Zion w/enci                       TSS w/enci
Distribution:
        OC/LFDCB w/ encl                           LPM, NRR w/ encl
Docket File.w/ encl _.,7f
        DRP w/ encl                                 A. B. Beach, Rill w/ encl
SRis, Braidwood, Byron,~
        DRS w/ enc!                                 J.' L. Caldwell, Rlll w/ encl
R. A. Capra, NRR w/enci
        Rll! PRR w/ encl                           Rill Enf. Coordinator w/enci
W'IE-01 w/enell2'
.
Zion w/enci
TSS w/enci
l
OC/LFDCB w/ encl
LPM, NRR w/ encl
DRP w/ encl
A. B. Beach, Rill w/ encl
DRS w/ enc!
J.' L. Caldwell, Rlll w/ encl
Rll! PRR w/ encl
Rill Enf. Coordinator w/enci
l
l
t
t
Line 148: Line 226:
2
2
!
!
                                                                                      _
_
                                                                                          ...     . _ - . - - - -                           -       .
...
. _ - . - - - -
-
.


                              .                                       -
.
      . * * , *          Lomnuinu ralth 1 divin Gimpam
-
*
. * * ,
Lomnuinu ralth 1 divin Gimpam
'
'
    ,
liraidwond Generating Nat on
                          liraidwond Generating Nat on
,
                          Route a l . Itos H e
Route a l . Itos H e
                          lirat es ille.11. 60 sO*Mi! 9
lirat es ille.11. 60 sO*Mi! 9
                        'Irl 814-a5M 'Mol
'Irl 814-a5M 'Mol
                        April 28,1997
April 28,1997
                        Document Control Desk
Document Control Desk
                        U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission
                        Washington, D.C. 20555
Washington, D.C. 20555
                        Subject:               Reply to Notice of Violation
Subject:
                                                NRC Inspection Report 50-456(457)/96016
Reply to Notice of Violation
                                                Braidwood Nuclear Power Station Units 1 and 2
NRC Inspection Report 50-456(457)/96016
                                                NRC Docket Numbers 50-456 and 50-457
Braidwood Nuclear Power Station Units 1 and 2
                        Reference:             G. E. Grant letter to H.G. Stanley dated March 31,1997, transmitting
NRC Docket Numbers 50-456 and 50-457
                                                Notice of Violation from NRC Inspection Report 50-456(457)/96016
Reference:
<-                      The Inspection Report referenced above contains details from a Fire Protection Inspection
G. E. Grant letter to H.G. Stanley dated March 31,1997, transmitting
                        which began in October,1996. A Notice of Violation was transmitted with this report and
Notice of Violation from NRC Inspection Report 50-456(457)/96016
                        included one Severity Level IV violation associated with hot work permit usage.
The Inspection Report referenced above contains details from a Fire Protection Inspection
                        Braidwood recognizes the safety significance related to fire protection issues, including         i
<-
                        the use of hot work permits. Although Maintenance and Construction personnel did not               !
which began in October,1996. A Notice of Violation was transmitted with this report and
                        satisfy Station expectations related to adhering to the administrative requirements for hot
included one Severity Level IV violation associated with hot work permit usage.
                        work permits, workers did satisfy expectations related to safety. Revisions to the hot
Braidwood recognizes the safety significance related to fire protection issues, including
                        work prccedure and permit are expected to resolve the identified administrative concerns.
the use of hot work permits. Although Maintenance and Construction personnel did not
                        If your staff has any questions or co nments concerning this letter, please refer them to
satisfy Station expectations related to adhering to the administrative requirements for hot
                        Terrence Simpkin, Braidwood Regulatory Assurance Supervisor, at (815) 458-2801,                   i
work permits, workers did satisfy expectations related to safety. Revisions to the hot
                        extension 2980.
work prccedure and permit are expected to resolve the identified administrative concerns.
                        r
If your staff has any questions or co nments concerning this letter, please refer them to
                                                          -
Terrence Simpkin, Braidwood Regulatory Assurance Supervisor, at (815) 458-2801,
                        I      ene Stanley
                            ite Vice Presiden
                        Braidwood Nuclear Generating Station
                        Attachment
                        cc:          A.B. Beach, NRC Regional Administrator, Region III
                                      G.F. Dick, Jr., Project Manager, NRR
                                      C.J. Phillips, Senior Resident Inspector
                                      F. Niziolek, Division of Engineering, Office of Nuclear Safety, IDNS
l                        owonfid sitevp conesp 1997 97040 du
                                                                      -
i
i
                        A i ok om o.mpam                                                                         MAY 01 W
extension 2980.
    R%5& C,00 l 'l-
r
  _______-_____-_-_____-__b.p>,
I
ene Stanley
-
ite Vice Presiden
Braidwood Nuclear Generating Station
Attachment
cc:
A.B. Beach, NRC Regional Administrator, Region III
G.F. Dick, Jr., Project Manager, NRR
C.J. Phillips, Senior Resident Inspector
F. Niziolek, Division of Engineering, Office of Nuclear Safety, IDNS
l
owonfid sitevp conesp 1997 97040 du
-
i
A i ok om o.mpam
MAY 01 W
R%5& C,00 l 'l-
_______-_____-_-_____-__b.p>,


            - _                                         _   _                             _     - . _ - -
-
    .. .~
_
  '
_
          ATTACHMENT 1
_
          REPLY TO NOTICE OF VIOLATION
_
          VIOLATION (50-456(457)/96016-05)
-
!                Braidwood Technical Specification 6.8.1.a requires, in pan, that procedures be
. _ - -
                  established, implemented, and maintained for activities covered in Appendix A of
.. .~
                  Regulatory Guide 1.33.
                  Appendix A of Regulatory Guide 1.33 included fire protection program
'
'
                  implementation.
ATTACHMENT 1
                  Braidwood Procedure (BwAP) 1100-15, " Fire Prevention When Welding, Cutting,
REPLY TO NOTICE OF VIOLATION
l                 Grinding, or Performing Open Flame Work (Hot Work)," Revision 6, dated July 8,
VIOLATION (50-456(457)/96016-05)
                  1996, requires that applicable portions of the hot work permit be filled out and
!
                  signed prior to work.
Braidwood Technical Specification 6.8.1.a requires, in pan, that procedures be
                  Contrary to the above, from January 16 to September 26,1996, applicable
established, implemented, and maintained for activities covered in Appendix A of
                  portions of numerous Braidwood Station Hot Work Permits were not filled
Regulatory Guide 1.33.
                  out as required by BwAP 1100-15.
Appendix A of Regulatory Guide 1.33 included fire protection program
          REASON FOR THE VIOLATION
implementation.
          During an inspection of the Fire Protection Program, it was determined that Maintenance /
'
          Construction personnel did not always complete hot work permits in accordance with the
Braidwood Procedure (BwAP) 1100-15, " Fire Prevention When Welding, Cutting,
          procedure, BwAP 1100-15, " Fire Prevention when Welding, Cutting, Grinding, or
l
          Performing Open Flame Work (Hot Work)." This procedure allowed supervisors in
Grinding, or Performing Open Flame Work (Hot Work)," Revision 6, dated July 8,
          charge of work to determine which precautions were applicable.           These individuals
1996, requires that applicable portions of the hot work permit be filled out and
          understood the safety significance of working on jobs requiring hot work permits,
signed prior to work.
          however they found the hot work permit process to be cumbersome and did not recognize
Contrary to the above, from January 16 to September 26,1996, applicable
          the imponance of filling out all of the information on the permit. As a result, some of the
portions of numerous Braidwood Station Hot Work Permits were not filled
          permits did not satisfy the procedure requirements.
out as required by BwAP 1100-15.
          CORRECTIVE ACTIONS TAKEN AND RESULTS ACHIEVED
REASON FOR THE VIOLATION
          The problem was identified during an evaluation of hot work permits that were completed
During an inspection of the Fire Protection Program, it was determined that Maintenance /
          between May and October,1996. The permits were individually reviewed and most of the
Construction personnel did not always complete hot work permits in accordance with the
          noncompliances were found to be administrative in nature and none would have impacted
procedure, BwAP 1100-15, " Fire Prevention when Welding, Cutting, Grinding, or
          the safety in the plant. The Fire Marshal discussed the problem with Maintenance
Performing Open Flame Work (Hot Work)." This procedure allowed supervisors in
          Supervision.
charge of work to determine which precautions were applicable.
These individuals
understood the safety significance of working on jobs requiring hot work permits,
however they found the hot work permit process to be cumbersome and did not recognize
the imponance of filling out all of the information on the permit. As a result, some of the
permits did not satisfy the procedure requirements.
CORRECTIVE ACTIONS TAKEN AND RESULTS ACHIEVED
The problem was identified during an evaluation of hot work permits that were completed
between May and October,1996. The permits were individually reviewed and most of the
noncompliances were found to be administrative in nature and none would have impacted
the safety in the plant. The Fire Marshal discussed the problem with Maintenance
Supervision.
l
l
l
l
i
i
;
;
                                                        1
1


    .,s
.,s
  '
'
'
'
        ATTACHMENT 1
ATTACHMENT 1
        REPLY TO NOTICE OF VIOLATION
REPLY TO NOTICE OF VIOLATION
        VIOLATION (50-456(457)/96016-05)
VIOLATION (50-456(457)/96016-05)
        ACTIONS TAKEN TO PREVENT RECURRENCE
ACTIONS TAKEN TO PREVENT RECURRENCE
        BwAP 1100-15 was revised to clarify the requirements associated with using hot work
BwAP 1100-15 was revised to clarify the requirements associated with using hot work
        permits. In particular, worker responsibilities are more clearly delineated. In addition to
permits. In particular, worker responsibilities are more clearly delineated. In addition to
        the procedure, the hot work permit (BwAP 1100-15Tl) was also revised.
the procedure, the hot work permit (BwAP 1100-15Tl) was also revised.
        Maintenance and Construction personnel have been trained on the requirements associated
Maintenance and Construction personnel have been trained on the requirements associated
        with properly completing hot work permits.
with properly completing hot work permits.
        Station personnel attended awareness sessions where Station expectations related to
Station personnel attended awareness sessions where Station expectations related to
        procedure adherence were communicated.
procedure adherence were communicated.
        DATE WHEN FULL COMPLIANCE WAS ACHIEVED
DATE WHEN FULL COMPLIANCE WAS ACHIEVED
        Compliance was achieved once BwAP 1100-15 and the associated hot work permit were
Compliance was achieved once BwAP 1100-15 and the associated hot work permit were
        revised and appropriate personnel were trained on these revisions.
revised and appropriate personnel were trained on these revisions.
                                                      2
2
}}
}}

Latest revision as of 18:01, 24 May 2025

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-456/96-16 & 50-457/96-16 Issued on 970331.Corrective Actions Will Be Reviewed During Future Insps
ML20148H663
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 06/06/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stanley H
COMMONWEALTH EDISON CO.
References
50-456-96-16, 50-457-96-16, EA-97-110, NUDOCS 9706110017
Download: ML20148H663 (3)


See also: IR 05000456/1996016

Text

{{#Wiki_filter:1 o i - June 6, 1997 l Mr. H. G. Stanley Site Vice President Braidwood Nuclear Power Station ' Commonwealth Edison Company R.R. #1, Box 84 i Braceville,IL 60407 SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT 50-456/96016(DRS); 50-457/96016(DRS)) Dear Mr. Stanley: , l This will acknowledge receipt of your April 28,1997 letter in response to our March 31,1997 letter transmitting a Notice of Violation associated with the above mentioned inspection report. This report summarized the results of the fire protection , inspection at your Braidwood Plant. We have reviewed your corrective actions and have no further questions at this time. These corrective actions will be examined during future inspections. Sincerely, /s/ J. A. Grobe , t 9706110017 970606 John A. Grobe, A-ting Director

" gDR ADOCK 0500 6 Division of Reactor Safety Docket No. 50-456 Docket No. 50-457 11000u- ( ( .__ Enclosure: Ltr dtd 04/28/97, H. G. Stanley, {{\\,\\hf\\hlk}llhk!,!!! i, i Comed, to US NRC w/ encl , See Attached Distribution SEE ATTACHED CONCURRENCE _S DOCUMENT NAME: G: ! To receive a copy of this document, indicate in the box "C" = Copy w/o attach /enct T = Copy w/ attach /erycl *N' = No copy OFFICE Rlli:DRS Rill:DRS l Rill:DRP l ./ fl@{tS JV NAME Schrum/kjc Westberg Lanksbury J $ $ (6r/Grobe ]] DATE 06/ /97 06/ /97 06/ /97 9 6/,{ /9 A/ ! OFFICIAL RECOR D COPY /'

a . EA 97-110 Mr. H. G'. Stanley Site Vice President Braidwood Nuclear Power Station Commonwealth Edison Company

R.R. #1, Box 84 Braceville,IL 60407 j SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT 50-456/96016(DRS); 50-457/96016(DRS)) l Dear Mr. Stanley:

This will acknowledge receipt of your April 28,1997 letter in response to our March 31,1997 letter transmitting a Notice of Violation associated with the above mentioned inspection report. This report summarized the results of the fire protection inspection at your Braidwood Plant. We have reviewed your corrective actions and have i , no further questions at this time. These corrective actions will be examined during future inspections. Sincerely, John A. Grobe, Acting Director Division of Reactor Safety Docket No. 50-456 Docket No. 50-457 Enclosure: Ltr dtd 04/28/97, H. G. Stanley, Comed, to US NRC w/ encl i See Attached Distribution DOCUMENT NAME: G:\\DRS\\ BRA 060_7.DRS

Ts receive e copy of this document, indicate in the box
  • C" = Copy w/o attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy

j OFFICE Rlil:DRS l 1:_ Rill:DRS l9 Rill:DRP lg RMylCS f NS ng NAME Schrum/kjc ha h4 Westberg g Lanksbury O n L ClaytoX Uac@Yptrobe DATE 06/01/97 06/03/97 06/ tl /97 07 /97 N 06/ fly OFFICIAL RECORD COPY i "

_ . . _ _ _ . _ _ _ . _ _ _ . . _ _ _ _ . _ _ _ _ _ _ _ _ . . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ >

l \\

i ! h. G. Stanley 2 June 6, 1997 , !

cc w/o encl: T. J. Maiman, Senior Vice President, Nuclear Operations Division D. A. Sager, Vice President, Generation Support l H. W. Keiser, Chief Nuclear l Operating Officer T. Tulon, Station Manager ~' T. Simpken, Regulatory Assurance Supervisor i 1. Johnson, Acting Nuclear- Regulatory Services Manager

Document Control Desk - Licensing cc w/ encl: Richard Hubbard Nathan Sch!oss, Economist, Office of the Attorney General

State Liaison Officer i Chairman, Illinois Commerce Commission Distribution: Docket File.w/ encl _.,7f SRis, Braidwood, Byron,~ R. A. Capra, NRR w/enci W'IE-01 w/enell2' . Zion w/enci TSS w/enci l OC/LFDCB w/ encl LPM, NRR w/ encl DRP w/ encl A. B. Beach, Rill w/ encl DRS w/ enc! J.' L. Caldwell, Rlll w/ encl Rll! PRR w/ encl Rill Enf. Coordinator w/enci l t 4 2 ! _ ... . _ - . - - - - - .

. -

. * * , Lomnuinu ralth 1 divin Gimpam ' liraidwond Generating Nat on , Route a l . Itos H e lirat es ille.11. 60 sO*Mi! 9 'Irl 814-a5M 'Mol April 28,1997 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Subject: Reply to Notice of Violation NRC Inspection Report 50-456(457)/96016 Braidwood Nuclear Power Station Units 1 and 2 NRC Docket Numbers 50-456 and 50-457 Reference: G. E. Grant letter to H.G. Stanley dated March 31,1997, transmitting Notice of Violation from NRC Inspection Report 50-456(457)/96016 The Inspection Report referenced above contains details from a Fire Protection Inspection <- which began in October,1996. A Notice of Violation was transmitted with this report and included one Severity Level IV violation associated with hot work permit usage. Braidwood recognizes the safety significance related to fire protection issues, including the use of hot work permits. Although Maintenance and Construction personnel did not satisfy Station expectations related to adhering to the administrative requirements for hot work permits, workers did satisfy expectations related to safety. Revisions to the hot work prccedure and permit are expected to resolve the identified administrative concerns. If your staff has any questions or co nments concerning this letter, please refer them to Terrence Simpkin, Braidwood Regulatory Assurance Supervisor, at (815) 458-2801, i extension 2980. r I ene Stanley - ite Vice Presiden Braidwood Nuclear Generating Station Attachment cc: A.B. Beach, NRC Regional Administrator, Region III G.F. Dick, Jr., Project Manager, NRR C.J. Phillips, Senior Resident Inspector F. Niziolek, Division of Engineering, Office of Nuclear Safety, IDNS l owonfid sitevp conesp 1997 97040 du - i A i ok om o.mpam MAY 01 W R%5& C,00 l 'l- _______-_____-_-_____-__b.p>,

- _ _ _ _ - . _ - - .. .~ ' ATTACHMENT 1 REPLY TO NOTICE OF VIOLATION VIOLATION (50-456(457)/96016-05) ! Braidwood Technical Specification 6.8.1.a requires, in pan, that procedures be established, implemented, and maintained for activities covered in Appendix A of Regulatory Guide 1.33. Appendix A of Regulatory Guide 1.33 included fire protection program implementation. ' Braidwood Procedure (BwAP) 1100-15, " Fire Prevention When Welding, Cutting, l Grinding, or Performing Open Flame Work (Hot Work)," Revision 6, dated July 8, 1996, requires that applicable portions of the hot work permit be filled out and signed prior to work. Contrary to the above, from January 16 to September 26,1996, applicable portions of numerous Braidwood Station Hot Work Permits were not filled out as required by BwAP 1100-15. REASON FOR THE VIOLATION During an inspection of the Fire Protection Program, it was determined that Maintenance / Construction personnel did not always complete hot work permits in accordance with the procedure, BwAP 1100-15, " Fire Prevention when Welding, Cutting, Grinding, or Performing Open Flame Work (Hot Work)." This procedure allowed supervisors in charge of work to determine which precautions were applicable. These individuals understood the safety significance of working on jobs requiring hot work permits, however they found the hot work permit process to be cumbersome and did not recognize the imponance of filling out all of the information on the permit. As a result, some of the permits did not satisfy the procedure requirements. CORRECTIVE ACTIONS TAKEN AND RESULTS ACHIEVED The problem was identified during an evaluation of hot work permits that were completed between May and October,1996. The permits were individually reviewed and most of the noncompliances were found to be administrative in nature and none would have impacted the safety in the plant. The Fire Marshal discussed the problem with Maintenance Supervision. l l i

1

.,s ' ' ATTACHMENT 1 REPLY TO NOTICE OF VIOLATION VIOLATION (50-456(457)/96016-05) ACTIONS TAKEN TO PREVENT RECURRENCE BwAP 1100-15 was revised to clarify the requirements associated with using hot work permits. In particular, worker responsibilities are more clearly delineated. In addition to the procedure, the hot work permit (BwAP 1100-15Tl) was also revised. Maintenance and Construction personnel have been trained on the requirements associated with properly completing hot work permits. Station personnel attended awareness sessions where Station expectations related to procedure adherence were communicated. DATE WHEN FULL COMPLIANCE WAS ACHIEVED Compliance was achieved once BwAP 1100-15 and the associated hot work permit were revised and appropriate personnel were trained on these revisions. 2 }}