{{#Wiki_filter:June 3, 2020
{{#Wiki_filter:June 3, 2020  
Mr. Eric Larson, Site Vice President
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Mr. Eric Larson, Site Vice President  
Port Gibson, MS 39150
Entergy Operations, Inc.  
SUBJECT:           GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC
Grand Gulf Nuclear Station  
                  FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
P.O. Box 756  
                  REPORT 05000416/2020013) AND REQUEST FOR INFORMATION
Port Gibson, MS 39150  
Dear Mr. Larson:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
SUBJECT:  
Region IV staff will conduct a triennial fire protection baseline inspection at your Grand Gulf
GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC  
Nuclear Station in August 2020. The inspection team will be comprised of three reactor
FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION  
inspectors from the NRC Region IV office. The inspection will be conducted in accordance with
REPORT 05000416/2020013) AND REQUEST FOR INFORMATION  
Inspection Procedure 71111, Attachment 21N.05, Fire Protection Team Inspection, the NRCs
baseline fire protection inspection procedure.
Dear Mr. Larson:  
The schedule for the inspection is as follows:
    *   Information gathering visit: July 21 and 22, 2020
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),  
    *   Onsite inspection: August 10- 4 and August 24-28, 2020
Region IV staff will conduct a triennial fire protection baseline inspection at your Grand Gulf  
The purpose of the information gathering visit is to obtain information and documentation
Nuclear Station in August 2020. The inspection team will be comprised of three reactor  
needed to support the inspection and to become familiar with the fire protection program, fire
inspectors from the NRC Region IV office. The inspection will be conducted in accordance with  
protection features, post-fire safe shutdown capabilities and plant layout.
Inspection Procedure 71111, Attachment 21N.05, Fire Protection Team Inspection, the NRCs  
The team lead and one inspector will participate in the information gathering visit to select the
baseline fire protection inspection procedure.  
scope of structures, systems, and components for evaluation, identify additional documents
needed to support the inspection, obtain unescorted access, and meet with the key personnel
The schedule for the inspection is as follows:  
who will support the inspection. The fire inspection sample selection will require a walkdown of
fire areas in company with key personnel from your staff. The enclosure to this letter provides
*  
an initial list of the documents the team will need for their review. We request that your staff
Information gathering visit: July 21 and 22, 2020  
transmit copies of the documents listed in the enclosure to the NRC Region IV office in
*  
preparation for the inspection. Please send this information so that it will arrive in the NRC
Onsite inspection: August 10- 4 and August 24-28, 2020  
Region IV office by the dates listed in the enclosure.
During the information gathering visit, the team leader will also discuss the following inspection
The purpose of the information gathering visit is to obtain information and documentation  
support administrative details: (1) office space size and location; (2) specific documents
needed to support the inspection and to become familiar with the fire protection program, fire  
requested to be made available to the team in their office spaces; (3) arrangements for reactor
protection features, post-fire safe shutdown capabilities and plant layout.
The team lead and one inspector will participate in the information gathering visit to select the  
scope of structures, systems, and components for evaluation, identify additional documents  
needed to support the inspection, obtain unescorted access, and meet with the key personnel  
who will support the inspection. The fire inspection sample selection will require a walkdown of  
fire areas in company with key personnel from your staff. The enclosure to this letter provides  
an initial list of the documents the team will need for their review. We request that your staff  
transmit copies of the documents listed in the enclosure to the NRC Region IV office in  
preparation for the inspection. Please send this information so that it will arrive in the NRC  
Region IV office by the dates listed in the enclosure.  
During the information gathering visit, the team leader will also discuss the following inspection  
support administrative details: (1) office space size and location; (2) specific documents  
requested to be made available to the team in their office spaces; (3) arrangements for reactor  


E. Larson                                         2
E. Larson
site access (including radiation protection training, security, safety, and fitness for duty
2  
requirements); and (4) the availability of knowledgeable plant staff and licensing organization
site access (including radiation protection training, security, safety, and fitness for duty  
personnel to serve as points of contact during the inspection.
requirements); and (4) the availability of knowledgeable plant staff and licensing organization  
We request that during the on-site inspection weeks you ensure that copies of analyses,
personnel to serve as points of contact during the inspection.  
evaluations, or documentation regarding the implementation and maintenance of the station fire
protection program, including the success path necessary to achieve and maintain safe
We request that during the on-site inspection weeks you ensure that copies of analyses,  
shutdown conditions, be readily accessible to the team for their review. Of specific interest for
evaluations, or documentation regarding the implementation and maintenance of the station fire  
the fire protection portion of the inspection are those documents which establish that your fire
protection program, including the success path necessary to achieve and maintain safe  
protection program satisfies NRC regulatory requirements and conform to applicable NRC and
shutdown conditions, be readily accessible to the team for their review. Of specific interest for  
industry fire protection guidance (i.e., fire protection compliance assessment documents). Also,
the fire protection portion of the inspection are those documents which establish that your fire  
personnel should be available at the site during the inspection who are knowledgeable
protection program satisfies NRC regulatory requirements and conform to applicable NRC and  
regarding those plant systems required to achieve and maintain safe and stable plant
industry fire protection guidance (i.e., fire protection compliance assessment documents). Also,  
conditions, reactor plant fire protection systems and features, and the station fire protection
personnel should be available at the site during the inspection who are knowledgeable  
program and its implementation.
regarding those plant systems required to achieve and maintain safe and stable plant  
The team would like to perform a walkthrough of a sample of post-fire safe shutdown
conditions, reactor plant fire protection systems and features, and the station fire protection  
procedures with qualified operators in the plant during the week of August 10, 2020. Please put
program and its implementation.  
us in contact with the appropriate personnel for planning the walkthroughs during the onsite
information gathering trip. The team would like to observe an unannounced fire brigade drill in
The team would like to perform a walkthrough of a sample of post-fire safe shutdown  
the plant, if possible, during the week of August 24, 2020. Please put us in contact with the
procedures with qualified operators in the plant during the week of August 10, 2020. Please put  
appropriate personnel for planning fire brigade drills during the onsite information gathering trip.
us in contact with the appropriate personnel for planning the walkthroughs during the onsite  
PAPERWORK REDUCTION ACT STATEMENT
information gathering trip. The team would like to observe an unannounced fire brigade drill in  
This letter contains mandatory information collections that are subject to the Paperwork
the plant, if possible, during the week of August 24, 2020. Please put us in contact with the  
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
appropriate personnel for planning fire brigade drills during the onsite information gathering trip.  
approved these information collections (approval number 3150-0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
PAPERWORK REDUCTION ACT STATEMENT
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office
This letter contains mandatory information collections that are subject to the Paperwork  
of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)  
Budget, Washington, DC 20503.
approved these information collections (approval number 3150-0011). Send comments  
Public Protection Notification
regarding this information collection to the Information Services Branch, Office of the Chief  
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,  
for information or an information collection requirement unless the requesting document
DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office  
displays a currently valid OMB control number.
of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and  
This letter and its enclosure will be made available for public inspection and copying at
Budget, Washington, DC 20503.  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Public Protection Notification
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request  
for information or an information collection requirement unless the requesting document  
displays a currently valid OMB control number.  
This letter and its enclosure will be made available for public inspection and copying at  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.  


E. Larson                                     3
E. Larson
Your cooperation and support during this inspection will be appreciated. If you have questions
3  
concerning this inspection or the inspection teams information or logistical needs, please
Your cooperation and support during this inspection will be appreciated. If you have questions  
contact me in the Region IV office at (817) 200-1114 or Nnaerika.Okonkwo@nrc.gov.
concerning this inspection or the inspection teams information or logistical needs, please  
                                              Sincerely,
contact me in the Region IV office at (817) 200-1114 or Nnaerika.Okonkwo@nrc.gov.  
                                                Nnaerika Okonkwo
                                              Nnaerika Okonkwo, Reactor Inspector
Sincerely,
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket No. 05000416
License No. NPF-29
Enclosure:
Nnaerika Okonkwo, Reactor Inspector  
Triennial Fire Protection Inspection
Engineering Branch 2  
Document Request
Division of Reactor Safety  
cc w/ encl: Distribution via LISTSERV
Docket No. 05000416
License No. NPF-29  
Enclosure:
Triennial Fire Protection Inspection
Document Request  
cc w/ encl: Distribution via LISTSERV  
Nnaerika Okonkwo




ML20155K717
  ML20155K717  
  SUNSI Review           ADAMS:       Non-Publicly Available  Non-Sensitive Keyword:
  SUNSI Review  
  By: NPO               Yes  No    Publicly Available     Sensitive     NRC-002
ADAMS:  
OFFICE         RI:EB2
Non-Publicly Available  
  NAME          NOkonkwo
  Non-Sensitive  
  SIGNATURE      /RA/
Keyword:
  DATE          6/3/2020
By: NPO  
                                   
Yes     No
                    Triennial Fire Protection Inspection Document Request
  Publicly Available  
The documents and information requested in this enclosure should generally be made available
Sensitive
to the inspection team prior to the inspection. Electronic format is preferred, except where
NRC-002  
specifically noted. If electronic files are made available via a secure document management
OFFICE  
service, then the remote document access must allow inspectors to download, save, and print
RI:EB2  
the documents.
   
If a secure document management service is utilized, it is recommended that a separate folder
   
be used corresponding to each item listed below. It is recommended that multiple documents
   
within each folder be individually entered and combined into a compressed (ZIP) file which is
then uploaded into the same folder. Documents should be identified by both document number
and noun name. Electronic media on compact disc or paper records (hard copy) are also
NAME
acceptable.
NOkonkwo
Where ANSI C-size paper (17 X 22) drawings are requested, please prepare two copies.
Retain one copy on site for the teams use during the inspection weeks. Send one copy to the
team leader at the NRC Region IV office.
To allow review before the on-site information gathering visit, the documents requested in items
A.1 thru A.18 should be made available to the team no later than June 22, 2020.
Based on review of the documentation, the team leader will identify the scope for the inspection
SIGNATURE
prior to the end of the on-site information gathering visit or in-office review of the information
/RA/
obtained.
To allow review before the on-site inspection weeks, the remaining requested documents
should be made available to the team no later than August 3, 2020.
This document request is based on typical documents that a generic plant might have. As such,
this generic document request is not meant to imply that any specific plant is required to have all
the listed documents. It is recognized that some documents listed below may not be available
DATE
for your plant. In addition, the document titles listed below are based on typical industry
6/3/2020  
document names; your plant-specific document titles may vary.
                                                                                    Enclosure


A. DESIGN AND LICENSING BASIS DOCUMENTS
  A.1 The current version of the Fire Protection Program and Fire Hazards Analysis.
  A.2 Post-fire safe shutdown analysis and the supporting calculations that
   
        demonstrate acceptable plant response.
Enclosure
  A.3 The fire protection probabilistic risk assessment or portions of the plants
Triennial Fire Protection Inspection Document Request
        individual plant examination for external events (IPEEE) report addressing fire
   
        events. Also, include the results of any post-IPEEE reviews and listings of
The documents and information requested in this enclosure should generally be made available
        actions taken/plant modifications conducted in response to IPEEE information
to the inspection team prior to the inspection. Electronic format is preferred, except where
        that relate to fire risk.
specifically notedIf electronic files are made available via a secure document management
  A.4 Licensing basis documents for fire protection (safety evaluation reports, pertinent
service, then the remote document access must allow inspectors to download, save, and print
        sections of the final safety analysis report, exemptions, deviations, letters to/from
the documents.
        the NRC regarding fire protection/fire safe shutdown, etc.).
  A.5 List of post-fire safe shutdown systems and components (i.e., safe shutdown
If a secure document management service is utilized, it is recommended that a separate folder
        equipment list).
be used corresponding to each item listed belowIt is recommended that multiple documents  
  A.6 List of fire areas with automatic fire suppression systems. Include a description of
within each folder be individually entered and combined into a compressed (ZIP) file which is
        the suppression agent used.
then uploaded into the same folder.  Documents should be identified by both document number
  A.A list, with descriptions, of design change packages performed since the last fire
and noun name. Electronic media on compact disc or paper records (hard copy) are also
        protection team inspection associated with fire protection or post-fire safe
acceptable.  
        shutdown systems.
   
  A.8 A list, with descriptions, of any fire protection program changes and evaluations
Where ANSI C-size paper (17 X 22) drawings are requested, please prepare two copies.
        (not limited to Generic Letter 86-10 evaluations) performed since the last fire
Retain one copy on site for the teams use during the inspection weeks. Send one copy to the
        protection team inspection.
team leader at the NRC Region IV office.  
  A.9 Facility Operating License.
   
  A.10 Technical Specifications (electronic format only).
To allow review before the on-site information gathering visit, the documents requested in items
  A.11 Updated Final Safety Analysis Report (electronic format only).
A.1 thru A.18 should be made available to the team no later than June 22, 2020.
  A.12 Fire Protection System(s) Design Basis Document.
  A.13 A list of the ten most risk significant plant systems for core damage frequency
Based on review of the documentation, the team leader will identify the scope for the inspection  
        from the fire protection probabilistic risk assessment (if available) or the internal
prior to the end of the on-site information gathering visit or in-office review of the information
        events probabilistic risk assessment.
obtained.  
  A.14 A list of the ten most risk significant plant systems for large early release
   
        frequency from the fire protection probabilistic risk assessment (if available) or
To allow review before the on-site inspection weeks, the remaining requested documents
        the internal events probabilistic risk assessment.
should be made available to the team no later than August 3, 2020.  
                                            2
   
This document request is based on typical documents that a generic plant might have. As such,
this generic document request is not meant to imply that any specific plant is required to have all
the listed documents. It is recognized that some documents listed below may not be available
for your plant. In addition, the document titles listed below are based on typical industry
document names; your plant-specific document titles may vary.  


  A.15 Plant layout drawings which identify: (electronic format and ANSI C-size paper
        drawings)
        *    Plant fire area boundaries
2
        *    Combustible control zone drawings
A.  
        *    Areas protected by automatic fire suppression and detection
DESIGN AND LICENSING BASIS DOCUMENTS
  A.16 For local manual operator actions, provide the following:
        *    Manual Action Feasibility Study
A.1
        *    Operator Time Critical Action Program
The current version of the Fire Protection Program and Fire Hazards Analysis.
        *    Time lines for time-critical manual actions
        *    Time line validations
A.2
  A.17 Organization charts of site personnel down to the level of fire protection staff
Post-fire safe shutdown analysis and the supporting calculations that
        personnel.
demonstrate acceptable plant response.
  A.18 A contact list of key site personnel who will be supporting this inspection, giving
        the office location and phone number onsite.
A.3
B. GENERAL PLANT DESIGN DOCUMENTS
The fire protection probabilistic risk assessment or portions of the plants
  B.1 Piping and instrumentation diagrams (P&IDs) and legend list for components
individual plant examination for external events (IPEEE) report addressing fire
        used to achieve and maintain post-fire safe shutdown for the sample systems or
events.  Also, include the results of any post-IPEEE reviews and listings of
        fire areas selected (electronic format and C-size paper drawings).
actions taken/plant modifications conducted in response to IPEEE information
  B.2  Piping and instrumentation diagrams and legend list for fire protection systems,
that relate to fire risk.
        including the fire water supply; water suppression sprinklers; and deluge,
        gaseous suppression systems for the sample systems or fire areas selected
A.4
        (electronic format and C-size paper drawings).
Licensing basis documents for fire protection (safety evaluation reports, pertinent
  B.3 AC and DC electrical system single line diagrams, from off-site power down to
sections of the final safety analysis report, exemptions, deviations, letters to/from
        the highest safety-related bus level (typically 4kV, EDG bus) (electronic format
the NRC regarding fire protection/fire safe shutdown, etc.).
        and C-size paper drawings).
  B.4 Single line diagrams for motor control centers (MCCs) that supply post-fire
A.5
        nuclear safety component loads for the sample systems or fire areas selected
List of post-fire safe shutdown systems and components (i.e., safe shutdown
        (electronic format and C-size paper drawings).
equipment list).
  B.5 Equipment location drawings which identify the physical plant locations of post-
        fire safety shutdown equipment for the sample systems or fire areas selected
A.6
        (electronic format and C-size paper drawings).
List of fire areas with automatic fire suppression systems. Include a description of
C. CLASSIC FIRE PROTECTION
the suppression agent used.  
  C.1  Copy of fire protection program implementing procedures (e.g., administrative
   
        controls, surveillance testing, and fire brigade).
A.7
  C.2  List with descriptions of calculations and engineering analyses, studies, or
A list, with descriptions, of design change packages performed since the last fire
        evaluations for the fire protection system, including the fire water system.
protection team inspection associated with fire protection or post-fire safe  
                                            3
shutdown systems.
A.8
A list, with descriptions, of any fire protection program changes and evaluations
(not limited to Generic Letter 86-10 evaluations) performed since the last fire  
protection team inspection.
A.9
Facility Operating License.  
   
A.10
Technical Specifications (electronic format only).  
   
A.11
Updated Final Safety Analysis Report (electronic format only).  
   
A.12
Fire Protection System(s) Design Basis Document.  
A.13
A list of the ten most risk significant plant systems for core damage frequency
from the fire protection probabilistic risk assessment (if available) or the internal
events probabilistic risk assessment.  
A.14
A list of the ten most risk significant plant systems for large early release
frequency from the fire protection probabilistic risk assessment (if available) or
the internal events probabilistic risk assessment.  


C.3  Last two completed surveillances of fire protection features for the sample
    systems or fire areas selected (detection, suppression, damper inspections,
    damper tests, penetration inspections, barrier inspections, etc.).
3
C.4 List with descriptions of routine tests, surveillances, and preventive maintenance
A.15
    on fire pumps, including pump controllers and batteries.
Plant layout drawings which identify: (electronic format and ANSI C-size paper
C.5  Last two completed annual fire pump pressure and flow tests with a complete
drawings)  
    copy of the test procedure.
   
C.6  Last two completed monthly and/or quarterly fire pump tests with a complete
*
    copy of the test procedure.
Plant fire area boundaries
C.7  Last two completed fire water system flow tests and flushes with a complete copy
*
    of the test procedure.
Combustible control zone drawings
C.8  For fire brigade drills, provide the following:
*
    *   Last five fire brigade drill critiques
Areas protected by automatic fire suppression and detection
    *   Last drill critique for a drill with off-site fire department support
    *  Last unannounced drill critique
A.16
    *  Last back-shift drill critique
For local manual operator actions, provide the following:  
    *  Dates, shifts, and locations of unannounced drills for last three years
    *  Summary of any unsatisfactory drill performance items for last three years
*
    *  Last unannounced drill critique by a qualified individual independent of the
Manual Action Feasibility Study
        licensees staff
*  
C.9 For fire brigade equipment provide the following:
Operator Time Critical Action Program
    *  Procedure for inventory and inspection
*  
    *  Most recent inspection and inventory results
Time lines for time-critical manual actions
C.10 Fire Brigade Qualifications, including self-contained breathing apparatus, (SCBA)
*
    and training lesson plans.
Time line validations
C.11 Copy of the evaluation or analysis of the effects of fire suppression activities on
    the ability to achieve safe and stable conditions for the sample systems or fire
A.17
    areas selected demonstrating:
Organization charts of site personnel down to the level of fire protection staff
    *  The automatic or manual actuation of a suppression system, due to a fire in a
personnel.
        single location, will not indirectly cause damage to the success path
    *  The inadvertent actuation or rupture of a suppression system will not
A.18
        indirectly cause damage to the success path
A contact list of key site personnel who will be supporting this inspection, giving
    *  Adequate drainage for areas protected by water suppression systems
the office location and phone number onsite.
    *  The hydrostatic rating of any floor penetration seals installed within the fire
        areas that are credited with keeping water from leaking into fire areas below
B.
C.12 Pre-fire plans for all fire areas.
GENERAL PLANT DESIGN DOCUMENTS
                                            4
B.1
Piping and instrumentation diagrams (P&IDs) and legend list for components
used to achieve and maintain post-fire safe shutdown for the sample systems or
fire areas selected (electronic format and C-size paper drawings).  
   
B.2
Piping and instrumentation diagrams and legend list for fire protection systems,
including the fire water supply; water suppression sprinklers; and deluge,
gaseous suppression systems for the sample systems or fire areas selected
(electronic format and C-size paper drawings).
B.3
AC and DC electrical system single line diagrams, from off-site power down to
the highest safety-related bus level (typically 4kV, EDG bus) (electronic format
and C-size paper drawings).  
B.4
Single line diagrams for motor control centers (MCCs) that supply post-fire
nuclear safety component loads for the sample systems or fire areas selected
(electronic format and C-size paper drawings). 
B.5
Equipment location drawings which identify the physical plant locations of post-
fire safety shutdown equipment for the sample systems or fire areas selected  
(electronic format and C-size paper drawings).
C.
CLASSIC FIRE PROTECTION
C.1
Copy of fire protection program implementing procedures (e.g., administrative
controls, surveillance testing, and fire brigade).
C.2
List with descriptions of calculations and engineering analyses, studies, or
evaluations for the fire protection system, including the fire water system.  


  C.13 Impairment Log (at start of inspection) for fire protection features that are out of
        service.
  C.14 List of penetration seal work, re-work, or installation activities, in the last three
4
        years.
  C.15 List of fire wrap work, rework, or installation activities, in the last three years.
C.3
  C.16 Fire protection system health reports for the two most recent quarters.
Last two completed surveillances of fire protection features for the sample
  C.17 Fire protection program health reports for the two most recent quarters.
systems or fire areas selected (detection, suppression, damper inspections,
  C.18 Licensee evaluations of industry operating experience concerning fire protection
damper tests, penetration inspections, barrier inspections, etc.).
        issues completed in the last three years.
  C.19 List of fire event analysis reports for the last three years.
C.4
  C.20 Fire protection program requirements (e.g., limiting conditions for operation,
List with descriptions of routine tests, surveillances, and preventive maintenance
        surveillance test requirements) covered by technical specifications, the technical
on fire pumps, including pump controllers and batteries.  
        requirements manual, the updated final safety analysis report, procedures or
        similar documents.
C.5
  C.21 List of applicable NFPA codes and standards and issuance dates (i.e., codes of
Last two completed annual fire pump pressure and flow tests with a complete
        record).
copy of the test procedure.  
  C.22 A list or document identifying any deviations from the NFPA codes of record.
D. ELECTRICAL
C.6
  D.1  Electrical system health reports for the two most recent quarters.
Last two completed monthly and/or quarterly fire pump tests with a complete
  D.2 Surveillance procedures and last surveillance demonstrating operability of
copy of the test procedure.  
        components required for alternative shutdown.
E. OPERATIONS
C.7
  E.1  List with descriptions of licensed operator Job Performance Measures (JPMs) for
Last two completed fire water system flow tests and flushes with a complete copy
        operator actions required to achieve and maintain post-fire safe shutdown.
of the test procedure.  
  E.2  List with descriptions of non-licensed operator training associated with non-
        licensed operator actions to achieve and maintain post-fire nuclear safe
C.8
        shutdown (including JPMs, in-field training walkdowns, simulations, or initial
For fire brigade drills, provide the following:
        qualification).
  E.3  Lesson plans for post-fire safe shutdown training for licensed and non-licensed
*
        operators.
Last five fire brigade drill critiques
  E.4  Thermal hydraulic calculation or analysis that determines the time requirements
*
        for time-critical manual operator actions.
Last drill critique for a drill with off-site fire department support
                                          5
*
Last unannounced drill critique
*
Last back-shift drill critique
*
Dates, shifts, and locations of unannounced drills for last three years
*
Summary of any unsatisfactory drill performance items for last three years
*
Last unannounced drill critique by a qualified individual independent of the
licensees staff
C.9
For fire brigade equipment provide the following:
*
Procedure for inventory and inspection
*
Most recent inspection and inventory results
   
C.10
Fire Brigade Qualifications, including self-contained breathing apparatus, (SCBA)  
and training lesson plans.  
C.11
Copy of the evaluation or analysis of the effects of fire suppression activities on
the ability to achieve safe and stable conditions for the sample systems or fire  
areas selected demonstrating:
*
The automatic or manual actuation of a suppression system, due to a fire in a
single location, will not indirectly cause damage to the success path
*
The inadvertent actuation or rupture of a suppression system will not
indirectly cause damage to the success path
*
Adequate drainage for areas protected by water suppression systems
*
The hydrostatic rating of any floor penetration seals installed within the fire
areas that are credited with keeping water from leaking into fire areas below
C.12
Pre-fire plans for all fire areas.  


  E.5 Operating procedures to achieve and maintain post-fire safe shutdown from the
   
        control room and requiring a control room evacuation.
  E.6  For safe shutdown equipment and tools, provide the following:
5
        *  Procedure for inventory and inspection
C.13
        *  Most recent inspection and inventory results
Impairment Log (at start of inspection) for fire protection features that are out of
  E.List with descriptions of procedures that implement cold shutdown repairs, if
service.
        required.
  E.8 For cold shutdown repairs, if required, provide the following:
C.14
        *  Procedure for inventory and inspection (i.e., needed tools, material, etc.)
List of penetration seal work, re-work, or installation activities, in the last three
        *  Most recent inspection and inventory results
years.  
F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION
   
  PROGRAMS
C.15
  F.1  Copies of procedures that control the configuration of the fire protection program,
List of fire wrap work, rework, or installation activities, in the last three years.  
        features, and post-fire safe shutdown methodology and system design. Also,
        copies of procedures that govern the implementation of plant modifications,
C.16
        maintenance, and special operations and their impact on fire protection.
Fire protection system health reports for the two most recent quarters.  
  F.List of open and closed condition reports for the fire protection systems for the
        last three years.
C.17
  F.List of open and closed condition reports associated with the post-fire safe
Fire protection program health reports for the two most recent quarters.
        shutdown analysis for the last three years.
  F.4 List of open and closed condition reports associated with operator actions to
C.18
        achieve and maintain post-fire safe shutdown for the last three years.
Licensee evaluations of industry operating experience concerning fire protection  
  F.List of open and closed condition reports associated with the fire protection
issues completed in the last three years.  
        program including plant change evaluations, post-fire operating procedures
        and/or training, timeline evaluations for operator actions, and supporting
C.19
        engineering evaluations, analysis, or calculations for the last three years.
List of fire event analysis reports for the last three years.
  F.6 List of open and closed condition reports for emergency lighting units for the last
        three years.
C.20
  F.7  Self-assessments, peer assessments, and audits of fire protection activities for
Fire protection program requirements (e.g., limiting conditions for operation,
        the last three years.
surveillance test requirements) covered by technical specifications, the technical
  F.8 Self-assessments, peer assessments, and audits of post-fire nuclear safety
requirements manual, the updated final safety analysis report, procedures or
        capability methodology for the last three years.
similar documents.  
  F.9  Provide administrative procedures that control temporary modifications,
        permanent plant changes, design changes, procedure changes, ageing
C.21
                                          6
List of applicable NFPA codes and standards and issuance dates (i.e., codes of
record).
C.22
A list or document identifying any deviations from the NFPA codes of record.
D.
ELECTRICAL
D.1
Electrical system health reports for the two most recent quarters.
D.2
Surveillance procedures and last surveillance demonstrating operability of
components required for alternative shutdown.  
E.  
OPERATIONS
   
E.1
List with descriptions of licensed operator Job Performance Measures (JPMs) for
operator actions required to achieve and maintain post-fire safe shutdown.  
E.2
List with descriptions of non-licensed operator training associated with non-
licensed operator actions to achieve and maintain post-fire nuclear safe
shutdown (including JPMs, in-field training walkdowns, simulations, or initial
qualification).  
   
E.3
Lesson plans for post-fire safe shutdown training for licensed and non-licensed
operators.  
   
E.4
Thermal hydraulic calculation or analysis that determines the time requirements
for time-critical manual operator actions.


          management changes, equivalency evaluations, suitability analyses,
          calculations, commercial grade dedication, safety-security interface, and repairs.
  F.10   Provide procedures that control the following: combustible controls, hot work,
6
          monitoring, compensatory measures, and work-around.
E.5
  F.11   Last five hot work permits (at power).
Operating procedures to achieve and maintain post-fire safe shutdown from the
  F.12   Last five transient combustible permits (at power).
control room and requiring a control room evacuation.
G. Aging Management Program
  G.1   Copies of the aging management programs applicable to fire protection including
E.6
          but not limited to the following:
For safe shutdown equipment and tools, provide the following:
          *   Fire Protection
          *   Fire Water System
*
          *   Aboveground Metallic Tanks
Procedure for inventory and inspection
          *   Buried and Underground Piping and Tanks
*
  G.2   Copies of procedures, work orders, preventive maintenance tasks, or other
Most recent inspection and inventory results
          documents which implement the commitments made as part of the license
          extension related to fire protection.
E.7
  G.3   List of aging management activities related to fire protection performed to date.
List with descriptions of procedures that implement cold shutdown repairs, if
                                            7
required.
E.8
For cold shutdown repairs, if required, provide the following:
*
Procedure for inventory and inspection (i.e., needed tools, material, etc.)
*
Most recent inspection and inventory results
F.
ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION
PROGRAMS 
F.1
Copies of procedures that control the configuration of the fire protection program,
features, and post-fire safe shutdown methodology and system design.  Also,
copies of procedures that govern the implementation of plant modifications,
maintenance, and special operations and their impact on fire protection.
F.2
List of open and closed condition reports for the fire protection systems for the
last three years.
F.3
List of open and closed condition reports associated with the post-fire safe
shutdown analysis for the last three years.
F.4
List of open and closed condition reports associated with operator actions to
achieve and maintain post-fire safe shutdown for the last three years.
F.5
List of open and closed condition reports associated with the fire protection
program including plant change evaluations, post-fire operating procedures
and/or training, timeline evaluations for operator actions, and supporting
engineering evaluations, analysis, or calculations for the last three years.
F.6
List of open and closed condition reports for emergency lighting units for the last
three years.
F.7
Self-assessments, peer assessments, and audits of fire protection activities for
the last three years.
F.8
Self-assessments, peer assessments, and audits of post-fire nuclear safety
capability methodology for the last three years.
F.9
Provide administrative procedures that control temporary modifications,
permanent plant changes, design changes, procedure changes, ageing
 
7
management changes, equivalency evaluations, suitability analyses,  
calculations, commercial grade dedication, safety-security interface, and repairs.  
F.10  
Provide procedures that control the following: combustible controls, hot work,  
monitoring, compensatory measures, and work-around.  
F.11  
Last five hot work permits (at power).  
F.12  
Last five transient combustible permits (at power).  
G.  
Aging Management Program  
G.1  
Copies of the aging management programs applicable to fire protection including  
but not limited to the following:  
*  
Fire Protection  
*  
Fire Water System  
*  
Aboveground Metallic Tanks  
*  
Buried and Underground Piping and Tanks  
G.2  
Copies of procedures, work orders, preventive maintenance tasks, or other  
documents which implement the commitments made as part of the license  
extension related to fire protection.  
G.3  
List of aging management activities related to fire protection performed to date.
}}
}}

Latest revision as of 09:03, 24 May 2025

Notification of NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000416/2020013) and Request for Information
ML20155K717
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/03/2020
From: Nnaerika Okonkwo
NRC/RGN-IV/DRS/EB-2
To: Emily Larson
Entergy Operations
References
IR 2020013
Download: ML20155K717 (11)


See also: IR 05000416/2020013

Text

June 3, 2020

Mr. Eric Larson, Site Vice President

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT:

GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC

FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT 05000416/2020013) AND REQUEST FOR INFORMATION

Dear Mr. Larson:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at your Grand Gulf

Nuclear Station in August 2020. The inspection team will be comprised of three reactor

inspectors from the NRC Region IV office. The inspection will be conducted in accordance with

Inspection Procedure 71111, Attachment 21N.05, Fire Protection Team Inspection, the NRCs

baseline fire protection inspection procedure.

The schedule for the inspection is as follows:

Information gathering visit: July 21 and 22, 2020

Onsite inspection: August 10- 4 and August 24-28, 2020

The purpose of the information gathering visit is to obtain information and documentation

needed to support the inspection and to become familiar with the fire protection program, fire

protection features, post-fire safe shutdown capabilities and plant layout.

The team lead and one inspector will participate in the information gathering visit to select the

scope of structures, systems, and components for evaluation, identify additional documents

needed to support the inspection, obtain unescorted access, and meet with the key personnel

who will support the inspection. The fire inspection sample selection will require a walkdown of

fire areas in company with key personnel from your staff. The enclosure to this letter provides

an initial list of the documents the team will need for their review. We request that your staff

transmit copies of the documents listed in the enclosure to the NRC Region IV office in

preparation for the inspection. Please send this information so that it will arrive in the NRC

Region IV office by the dates listed in the enclosure.

During the information gathering visit, the team leader will also discuss the following inspection

support administrative details: (1) office space size and location; (2) specific documents

requested to be made available to the team in their office spaces; (3) arrangements for reactor

E. Larson

2

site access (including radiation protection training, security, safety, and fitness for duty

requirements); and (4) the availability of knowledgeable plant staff and licensing organization

personnel to serve as points of contact during the inspection.

We request that during the on-site inspection weeks you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the station fire

protection program, including the success path necessary to achieve and maintain safe

shutdown conditions, be readily accessible to the team for their review. Of specific interest for

the fire protection portion of the inspection are those documents which establish that your fire

protection program satisfies NRC regulatory requirements and conform to applicable NRC and

industry fire protection guidance (i.e., fire protection compliance assessment documents). Also,

personnel should be available at the site during the inspection who are knowledgeable

regarding those plant systems required to achieve and maintain safe and stable plant

conditions, reactor plant fire protection systems and features, and the station fire protection

program and its implementation.

The team would like to perform a walkthrough of a sample of post-fire safe shutdown

procedures with qualified operators in the plant during the week of August 10, 2020. Please put

us in contact with the appropriate personnel for planning the walkthroughs during the onsite

information gathering trip. The team would like to observe an unannounced fire brigade drill in

the plant, if possible, during the week of August 24, 2020. Please put us in contact with the

appropriate personnel for planning fire brigade drills during the onsite information gathering trip.

PAPERWORK REDUCTION ACT STATEMENT

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of the Chief

Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office

of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and

Budget, Washington, DC 20503.

Public Protection Notification

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

E. Larson

3

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection teams information or logistical needs, please

contact me in the Region IV office at (817) 200-1114 or Nnaerika.Okonkwo@nrc.gov.

Sincerely,

Nnaerika Okonkwo, Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket No. 05000416

License No. NPF-29

Enclosure:

Triennial Fire Protection Inspection

Document Request

cc w/ encl: Distribution via LISTSERV

Nnaerika Okonkwo

ML20155K717

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: NPO

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

RI:EB2

NAME

NOkonkwo

SIGNATURE

/RA/

DATE

6/3/2020

Enclosure

Triennial Fire Protection Inspection Document Request

The documents and information requested in this enclosure should generally be made available

to the inspection team prior to the inspection. Electronic format is preferred, except where

specifically noted. If electronic files are made available via a secure document management

service, then the remote document access must allow inspectors to download, save, and print

the documents.

If a secure document management service is utilized, it is recommended that a separate folder

be used corresponding to each item listed below. It is recommended that multiple documents

within each folder be individually entered and combined into a compressed (ZIP) file which is

then uploaded into the same folder. Documents should be identified by both document number

and noun name. Electronic media on compact disc or paper records (hard copy) are also

acceptable.

Where ANSI C-size paper (17 X 22) drawings are requested, please prepare two copies.

Retain one copy on site for the teams use during the inspection weeks. Send one copy to the

team leader at the NRC Region IV office.

To allow review before the on-site information gathering visit, the documents requested in items

A.1 thru A.18 should be made available to the team no later than June 22, 2020.

Based on review of the documentation, the team leader will identify the scope for the inspection

prior to the end of the on-site information gathering visit or in-office review of the information

obtained.

To allow review before the on-site inspection weeks, the remaining requested documents

should be made available to the team no later than August 3, 2020.

This document request is based on typical documents that a generic plant might have. As such,

this generic document request is not meant to imply that any specific plant is required to have all

the listed documents. It is recognized that some documents listed below may not be available

for your plant. In addition, the document titles listed below are based on typical industry

document names; your plant-specific document titles may vary.

2

A.

DESIGN AND LICENSING BASIS DOCUMENTS

A.1

The current version of the Fire Protection Program and Fire Hazards Analysis.

A.2

Post-fire safe shutdown analysis and the supporting calculations that

demonstrate acceptable plant response.

A.3

The fire protection probabilistic risk assessment or portions of the plants

individual plant examination for external events (IPEEE) report addressing fire

events. Also, include the results of any post-IPEEE reviews and listings of

actions taken/plant modifications conducted in response to IPEEE information

that relate to fire risk.

A.4

Licensing basis documents for fire protection (safety evaluation reports, pertinent

sections of the final safety analysis report, exemptions, deviations, letters to/from

the NRC regarding fire protection/fire safe shutdown, etc.).

A.5

List of post-fire safe shutdown systems and components (i.e., safe shutdown

equipment list).

A.6

List of fire areas with automatic fire suppression systems. Include a description of

the suppression agent used.

A.7

A list, with descriptions, of design change packages performed since the last fire

protection team inspection associated with fire protection or post-fire safe

shutdown systems.

A.8

A list, with descriptions, of any fire protection program changes and evaluations

(not limited to Generic Letter 86-10 evaluations) performed since the last fire

protection team inspection.

A.9

Facility Operating License.

A.10

Technical Specifications (electronic format only).

A.11

Updated Final Safety Analysis Report (electronic format only).

A.12

Fire Protection System(s) Design Basis Document.

A.13

A list of the ten most risk significant plant systems for core damage frequency

from the fire protection probabilistic risk assessment (if available) or the internal

events probabilistic risk assessment.

A.14

A list of the ten most risk significant plant systems for large early release

frequency from the fire protection probabilistic risk assessment (if available) or

the internal events probabilistic risk assessment.

3

A.15

Plant layout drawings which identify: (electronic format and ANSI C-size paper

drawings)

Plant fire area boundaries

Combustible control zone drawings

Areas protected by automatic fire suppression and detection

A.16

For local manual operator actions, provide the following:

Manual Action Feasibility Study

Operator Time Critical Action Program

Time lines for time-critical manual actions

Time line validations

A.17

Organization charts of site personnel down to the level of fire protection staff

personnel.

A.18

A contact list of key site personnel who will be supporting this inspection, giving

the office location and phone number onsite.

B.

GENERAL PLANT DESIGN DOCUMENTS

B.1

Piping and instrumentation diagrams (P&IDs) and legend list for components

used to achieve and maintain post-fire safe shutdown for the sample systems or

fire areas selected (electronic format and C-size paper drawings).

B.2

Piping and instrumentation diagrams and legend list for fire protection systems,

including the fire water supply; water suppression sprinklers; and deluge,

gaseous suppression systems for the sample systems or fire areas selected

(electronic format and C-size paper drawings).

B.3

AC and DC electrical system single line diagrams, from off-site power down to

the highest safety-related bus level (typically 4kV, EDG bus) (electronic format

and C-size paper drawings).

B.4

Single line diagrams for motor control centers (MCCs) that supply post-fire

nuclear safety component loads for the sample systems or fire areas selected

(electronic format and C-size paper drawings).

B.5

Equipment location drawings which identify the physical plant locations of post-

fire safety shutdown equipment for the sample systems or fire areas selected

(electronic format and C-size paper drawings).

C.

CLASSIC FIRE PROTECTION

C.1

Copy of fire protection program implementing procedures (e.g., administrative

controls, surveillance testing, and fire brigade).

C.2

List with descriptions of calculations and engineering analyses, studies, or

evaluations for the fire protection system, including the fire water system.

4

C.3

Last two completed surveillances of fire protection features for the sample

systems or fire areas selected (detection, suppression, damper inspections,

damper tests, penetration inspections, barrier inspections, etc.).

C.4

List with descriptions of routine tests, surveillances, and preventive maintenance

on fire pumps, including pump controllers and batteries.

C.5

Last two completed annual fire pump pressure and flow tests with a complete

copy of the test procedure.

C.6

Last two completed monthly and/or quarterly fire pump tests with a complete

copy of the test procedure.

C.7

Last two completed fire water system flow tests and flushes with a complete copy

of the test procedure.

C.8

For fire brigade drills, provide the following:

Last five fire brigade drill critiques

Last drill critique for a drill with off-site fire department support

Last unannounced drill critique

Last back-shift drill critique

Dates, shifts, and locations of unannounced drills for last three years

Summary of any unsatisfactory drill performance items for last three years

Last unannounced drill critique by a qualified individual independent of the

licensees staff

C.9

For fire brigade equipment provide the following:

Procedure for inventory and inspection

Most recent inspection and inventory results

C.10

Fire Brigade Qualifications, including self-contained breathing apparatus, (SCBA)

and training lesson plans.

C.11

Copy of the evaluation or analysis of the effects of fire suppression activities on

the ability to achieve safe and stable conditions for the sample systems or fire

areas selected demonstrating:

The automatic or manual actuation of a suppression system, due to a fire in a

single location, will not indirectly cause damage to the success path

The inadvertent actuation or rupture of a suppression system will not

indirectly cause damage to the success path

Adequate drainage for areas protected by water suppression systems

The hydrostatic rating of any floor penetration seals installed within the fire

areas that are credited with keeping water from leaking into fire areas below

C.12

Pre-fire plans for all fire areas.

5

C.13

Impairment Log (at start of inspection) for fire protection features that are out of

service.

C.14

List of penetration seal work, re-work, or installation activities, in the last three

years.

C.15

List of fire wrap work, rework, or installation activities, in the last three years.

C.16

Fire protection system health reports for the two most recent quarters.

C.17

Fire protection program health reports for the two most recent quarters.

C.18

Licensee evaluations of industry operating experience concerning fire protection

issues completed in the last three years.

C.19

List of fire event analysis reports for the last three years.

C.20

Fire protection program requirements (e.g., limiting conditions for operation,

surveillance test requirements) covered by technical specifications, the technical

requirements manual, the updated final safety analysis report, procedures or

similar documents.

C.21

List of applicable NFPA codes and standards and issuance dates (i.e., codes of

record).

C.22

A list or document identifying any deviations from the NFPA codes of record.

D.

ELECTRICAL

D.1

Electrical system health reports for the two most recent quarters.

D.2

Surveillance procedures and last surveillance demonstrating operability of

components required for alternative shutdown.

E.

OPERATIONS

E.1

List with descriptions of licensed operator Job Performance Measures (JPMs) for

operator actions required to achieve and maintain post-fire safe shutdown.

E.2

List with descriptions of non-licensed operator training associated with non-

licensed operator actions to achieve and maintain post-fire nuclear safe

shutdown (including JPMs, in-field training walkdowns, simulations, or initial

qualification).

E.3

Lesson plans for post-fire safe shutdown training for licensed and non-licensed

operators.

E.4

Thermal hydraulic calculation or analysis that determines the time requirements

for time-critical manual operator actions.

6

E.5

Operating procedures to achieve and maintain post-fire safe shutdown from the

control room and requiring a control room evacuation.

E.6

For safe shutdown equipment and tools, provide the following:

Procedure for inventory and inspection

Most recent inspection and inventory results

E.7

List with descriptions of procedures that implement cold shutdown repairs, if

required.

E.8

For cold shutdown repairs, if required, provide the following:

Procedure for inventory and inspection (i.e., needed tools, material, etc.)

Most recent inspection and inventory results

F.

ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION

PROGRAMS

F.1

Copies of procedures that control the configuration of the fire protection program,

features, and post-fire safe shutdown methodology and system design. Also,

copies of procedures that govern the implementation of plant modifications,

maintenance, and special operations and their impact on fire protection.

F.2

List of open and closed condition reports for the fire protection systems for the

last three years.

F.3

List of open and closed condition reports associated with the post-fire safe

shutdown analysis for the last three years.

F.4

List of open and closed condition reports associated with operator actions to

achieve and maintain post-fire safe shutdown for the last three years.

F.5

List of open and closed condition reports associated with the fire protection

program including plant change evaluations, post-fire operating procedures

and/or training, timeline evaluations for operator actions, and supporting

engineering evaluations, analysis, or calculations for the last three years.

F.6

List of open and closed condition reports for emergency lighting units for the last

three years.

F.7

Self-assessments, peer assessments, and audits of fire protection activities for

the last three years.

F.8

Self-assessments, peer assessments, and audits of post-fire nuclear safety

capability methodology for the last three years.

F.9

Provide administrative procedures that control temporary modifications,

permanent plant changes, design changes, procedure changes, ageing

7

management changes, equivalency evaluations, suitability analyses,

calculations, commercial grade dedication, safety-security interface, and repairs.

F.10

Provide procedures that control the following: combustible controls, hot work,

monitoring, compensatory measures, and work-around.

F.11

Last five hot work permits (at power).

F.12

Last five transient combustible permits (at power).

G.

Aging Management Program

G.1

Copies of the aging management programs applicable to fire protection including

but not limited to the following:

Fire Protection

Fire Water System

Aboveground Metallic Tanks

Buried and Underground Piping and Tanks

G.2

Copies of procedures, work orders, preventive maintenance tasks, or other

documents which implement the commitments made as part of the license

extension related to fire protection.

G.3