IR 05000324/1988018: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
. . . ,
.
'
..,
AllG 11 1989 Carolina Power and Light Company ATTH: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551     l Raleigh, NC 27602 Gentlemen:
'
SUBJECT: REPORT N05. 50-325/88-18 AND 50-324/68-18 Thank you for your response of July 27, 1988, to our Notice of Violation issued on June 29, 1988, concerning activities conducted at your Brunswick facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implernntation of your corrective actions during future inspection We appreciate your cooperation in this matte
AllG 11 1989 Carolina Power and Light Company ATTH: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 l
Raleigh, NC 27602 Gentlemen:
SUBJECT:
REPORT N05. 50-325/88-18 AND 50-324/68-18 Thank you for your response of July 27, 1988, to our Notice of Violation issued on June 29, 1988, concerning activities conducted at your Brunswick facility.


Sincerely, own: ","
We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.
p . . , .' "
 
    . ..
We will examine the implernntation of your corrective actions during future inspections.
David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects cc: P. W. Howe, Vice President Brunswick Nuclear Project J. L. Harness, Plant General Manager bec: NRC Resident Inspector DRS, Technical Assistant Document Control Desk State of North Carolina RII RI RII -11 RCa'rroll PFredrickson LVerrelli CH l 08//D/88 08/t)/88 08/ /88 08 88 I
 
SBAagggggggagg4 }
We appreciate your cooperation in this matter.
o     i e i
 
.__ . _ . __    _ XU I Y
Sincerely, p..,.' "
_
","
own:
.
..
David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects cc:
P. W. Howe, Vice President Brunswick Nuclear Project J. L. Harness, Plant General Manager bec: NRC Resident Inspector DRS, Technical Assistant Document Control Desk State of North Carolina RII RI RII-11 RCa'rroll PFredrickson LVerrelli CH l 08//D/88 08/t)/88 08/ /88
 
88 I
SBAagggggggagg4
}
o i e i
.
.
.
XU I Y
}}
}}

Latest revision as of 17:41, 23 May 2025

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/88-18 & 50-325/88-18
ML20207H319
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/11/1988
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8808250129
Download: ML20207H319 (1)


Text

-

.

..,

'

AllG 11 1989 Carolina Power and Light Company ATTH: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 l

Raleigh, NC 27602 Gentlemen:

SUBJECT:

REPORT N05. 50-325/88-18 AND 50-324/68-18 Thank you for your response of July 27, 1988, to our Notice of Violation issued on June 29, 1988, concerning activities conducted at your Brunswick facility.

We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.

We will examine the implernntation of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely, p..,.' "

","

own:

.

..

David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects cc:

P. W. Howe, Vice President Brunswick Nuclear Project J. L. Harness, Plant General Manager bec: NRC Resident Inspector DRS, Technical Assistant Document Control Desk State of North Carolina RII RI RII-11 RCa'rroll PFredrickson LVerrelli CH l 08//D/88 08/t)/88 08/ /88

88 I

SBAagggggggagg4

}

o i e i

.

.

.

XU I Y