ML20211G174: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000445/1985014]]
{{Adams
| number = ML20211G174
| issue date = 02/19/1987
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/85-14 & 50-446/85-11
| author name = Johnson E
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee name = Counsil W
| addressee affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| docket = 05000445, 05000446
| license number =
| contact person =
| document report number = NUDOCS 8702250302
| title reference date = 01-19-1987
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000445/1985014]]
 
=Text=
{{#Wiki_filter:0 :: o
In Reply Refer To:
FEBl9IW
Dockets:
50-445/85-14
50-446/85-11
Texas Utilities Generating Company
ATTN: Mr. W. G. Counsil
Executive Vice President
400 North Olive, L.B. 81
Dallas, Texas
75201
Gentlemen:
Thank you for your letter of January 19, 1987, in response to our letter
dated December 30, 1986. We have reviewed your reply and find it responsive
to our concerns. We will review your corrective actions during a future
inspection to determine-that full compliance has been achieved and will be
maintained.
Sincerelg ,
,
#
It
hn
E. H. Johnson, Director
Division of Reactor Safety
and Projects
cc:
Texas Utilities Electric Company
ATTN:
G. S. Keeley, Manager
Licensing
Skyway Tower
400 North Olive Street
Lock Box 81
Dallas, Texas
75201
Juanita Ellis
President - CASE
1426 South Polk Street
Dallas, Texas
75224
RIV:CPTG ,,:Qf
CPTG
DRSP Y
PCWagner:gb
IBarnes
EHJohrtson
2. /// /87
2. A7 /87
L/@/87
,
07022503o2 870219
/@O
PDR
ADOCK 0500
5
_ .-
-. _ . , . . - - - _ _ - _ _ - _ .
. . _ _ _
_
. - -
- _ - - . _ _ _ . _ _ _ .
 
.2
e
-
_.
4 m
.,I
4
A
.m.m.x~
4
. . . = - -
.a.ya
.,c~
,
Texas Utilities Generating Company
.2
Renea Hicks
Assistant Attorney General
,
Environmental Protection Division
',
P. O. Box 12548
Austin, Texas
78711-2548
Administrative Judge Peter Bloch
U.S. Nuclear Regulatory Commission
,
Washington, D.C.
20555
Elizabeth B. Johnson
.
Administrative Judge
Oak Ridge National Laboratory
P. O. Box X, Building 3500
Oak Ridge, Tennessee
37830
,
Dr. Kenneth A. McCollom
1107 West Knapp
'
*
Stillwater, Oklahoma
74075
,
Dr. Walter H. Jordan
881 Outer Drive
,
Oak Ridge, Tennessee
37830
Anthony Roisman, Esq.
Executive Director
Trial Lawyers for Public Justice
;
2000 P. Street, N.W. Suite 611
Washington, D.C.
20036
:
Texas Radiation Control Program Director
:
bec to DMB'(IE01)
i
bec distrib. by RIV:
*RPB
* MIS System
'
*RRI-OFS
*RSTS Operator
*RRI-CONST
*R&SPB
*T. F. Westerman, RSB
DRSP
V. Noonan, NRR
R. Martin, RA
L. Chandler, 0GC
*RSB
,
*RIV File
J. Taylor, IE
*D. Weiss, RM/ALF
J. Conklin, IE
'
*I. Barnes, CPTG
* Project Inspector
*R. Hall
P. Wagner
,
l
*w/766
.
t
,
l
-- .- - -.
.-
..
- ... - . - . . -
- - . - . _-...,
-- -
 
_
_ _ _ _ _ - _ _ _ _ .
I~ *
Log # TXX-6212
File # 10130
'
IR 85-14
TEXAS UTILITIES GENERATING COMPANY
85-11
;
SKYWAY TOWER . 400 NORTH OR.IVE FIREET, t.B. 83 . DALLAS. TEXA8 7&303
January 19, 1987
4
-- 7
y;,F-
,
- t .~
q!
FA%"aJP.=L
4
B
JAN 2 b 1981
Mr. Eric H. Johnson, Director
th
J
Division of Reactor Safety and Projects
~ ~~
U. S. Nuclear Regulatory Commission
{_
.
_ _ . .
611 Ryan Plaza Drive, Suite 1000
Arlington, TX 76011
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446
INSPECTION REPORT NOS.: 50-445/85-14 AND 50-446/85-11
SUPPLEMENTAL REQUEST FOR INFORMATION TO NRC
NOTICE OF VIOLATION (N0V) ITEM D.
REF:
1) TUGC0 Letter TXX-4779 from W. G. Counsil to E. H. Johnson
dated May 16, 1986.
2) TUGC0 Letter TXX-4955 from W. G. Counsil to E. H. Johnson
dated August 14, 1986.
Dear Mr. Johnson:
We have reviewed your letter dated December 30, 1986, requesting additional
information to our responses referenced above regarding NOV 446/8511-V-03
(Item D). We hereby respond to the request for supplemental information in
the attachment to this letter.
Very truly yours,
17Z)
'
W. G. Counsil
RSB/amb:lw
Attachment
c - NRC Region IV (0 + 1 copy)
Director, Inspection and Enforcement (15 copies)
U. S. Nuclear Regulatory Commission
Washington, D. C.
20555
Mr. V. S. Noonan
Mr. D. L. Kelley
f
)c
"
gy
,4
.-,,,--,.
..-.-.-
 
-
** *
Attachment to TXX-6212
.
January 19, 1987
Page 1 of 1
,
NOTICE OF VIOLATION
ITEM (446/8511-V-03)
SUPPLEMENTAL REQUEST FOR INFORMATION
As a result of review made during followup inspection of your corrective
actions, we find that a clarification is required relative to your response to
Item D in the Notice of Violation.
Specifically, the stated reason for the
violation correctly indicated that TUGCo Nuclear Engineering (TNE) Procedure
TNE-AD-4 was not followed concerning maintenance of duplicate copies of
engineering documents. The response does not address or consider, however,
that the NRC inspector was informed by an engineering supervisor during the
inspection that, due to organizational changes, Procedure CP-EI-18.0-4,
Revision 0, had been deleted and shipment was made without a procedure being
in effect.
In that this information is believed to have a bearing on the
scope of required steps to avoid recurrence (i.e., was training given to
engineering personnel concerning procedures in existence in the organization
to which they transferred?)...
SUPPLEMENTAL RESPONSE TO ITEM D
In our previous response, we noted the creation of an engineering instruction,
TNE-AD-4-6, to specifically control the transmittal and duplicate retention of
pipe support calculations and measures to assure accountability.
These
actions have been completed. We have verified that the training of the
personnel who implemented TNE-AD-4-6 was conducted and covered the period of
implementation of the procedure.
We have verified that the training program of the SWEC pipe support
organization includes newly transferred employees.
In examining the
circumstances surrounding the statement by the engineering supervisor
interviewed by the NRC inspector, we have concluded the supervisor was not
trained in the requirements of TNE-AD-4 until December 1985 due to the period
of transition.
Subsequent corrective measures involving the specific
supervisor are no longer appropriate as the individual is no longer active
within the engineering organization.
}}

Latest revision as of 13:11, 23 May 2025

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/85-14 & 50-446/85-11
ML20211G174
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/19/1987
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 8702250302
Download: ML20211G174 (2)


See also: IR 05000445/1985014

Text

0 :: o

In Reply Refer To:

FEBl9IW

Dockets:

50-445/85-14

50-446/85-11

Texas Utilities Generating Company

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive, L.B. 81

Dallas, Texas

75201

Gentlemen:

Thank you for your letter of January 19, 1987, in response to our letter

dated December 30, 1986. We have reviewed your reply and find it responsive

to our concerns. We will review your corrective actions during a future

inspection to determine-that full compliance has been achieved and will be

maintained.

Sincerelg ,

,

It

hn

E. H. Johnson, Director

Division of Reactor Safety

and Projects

cc:

Texas Utilities Electric Company

ATTN:

G. S. Keeley, Manager

Licensing

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas

75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas

75224

RIV:CPTG ,,:Qf

CPTG

DRSP Y

PCWagner:gb

IBarnes

EHJohrtson

2. /// /87

2. A7 /87

L/@/87

,

07022503o2 870219

/@O

PDR

ADOCK 0500

5

_ .-

-. _ . , . . - - - _ _ - _ _ - _ .

. . _ _ _

_

. - -

- _ - - . _ _ _ . _ _ _ .

.2

e

-

_.

4 m

.,I

4

A

.m.m.x~

4

. . . = - -

.a.ya

.,c~

,

Texas Utilities Generating Company

.2

Renea Hicks

Assistant Attorney General

,

Environmental Protection Division

',

P. O. Box 12548

Austin, Texas

78711-2548

Administrative Judge Peter Bloch

U.S. Nuclear Regulatory Commission

,

Washington, D.C.

20555

Elizabeth B. Johnson

.

Administrative Judge

Oak Ridge National Laboratory

P. O. Box X, Building 3500

Oak Ridge, Tennessee

37830

,

Dr. Kenneth A. McCollom

1107 West Knapp

'

Stillwater, Oklahoma

74075

,

Dr. Walter H. Jordan

881 Outer Drive

,

Oak Ridge, Tennessee

37830

Anthony Roisman, Esq.

Executive Director

Trial Lawyers for Public Justice

2000 P. Street, N.W. Suite 611

Washington, D.C.

20036

Texas Radiation Control Program Director

bec to DMB'(IE01)

i

bec distrib. by RIV:

  • RPB
  • MIS System

'

  • RRI-OFS
  • RSTS Operator
  • RRI-CONST
  • R&SPB
  • T. F. Westerman, RSB

DRSP

V. Noonan, NRR

R. Martin, RA

L. Chandler, 0GC

  • RSB

,

  • RIV File

J. Taylor, IE

  • D. Weiss, RM/ALF

J. Conklin, IE

'

  • I. Barnes, CPTG
  • Project Inspector
  • R. Hall

P. Wagner

,

l

  • w/766

.

t

,

l

-- .- - -.

.-

..

- ... - . - . . -

- - . - . _-...,

-- -

_

_ _ _ _ _ - _ _ _ _ .

I~ *

Log # TXX-6212

File # 10130

'

IR 85-14

TEXAS UTILITIES GENERATING COMPANY

85-11

SKYWAY TOWER . 400 NORTH OR.IVE FIREET, t.B. 83 . DALLAS. TEXA8 7&303

January 19, 1987

4

-- 7

y;,F-

,

- t .~

q!

FA%"aJP.=L

4

B

JAN 2 b 1981

Mr. Eric H. Johnson, Director

th

J

Division of Reactor Safety and Projects

~ ~~

U. S. Nuclear Regulatory Commission

{_

.

_ _ . .

611 Ryan Plaza Drive, Suite 1000

Arlington, TX 76011

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446

INSPECTION REPORT NOS.: 50-445/85-14 AND 50-446/85-11

SUPPLEMENTAL REQUEST FOR INFORMATION TO NRC

NOTICE OF VIOLATION (N0V) ITEM D.

REF:

1) TUGC0 Letter TXX-4779 from W. G. Counsil to E. H. Johnson

dated May 16, 1986.

2) TUGC0 Letter TXX-4955 from W. G. Counsil to E. H. Johnson

dated August 14, 1986.

Dear Mr. Johnson:

We have reviewed your letter dated December 30, 1986, requesting additional

information to our responses referenced above regarding NOV 446/8511-V-03

(Item D). We hereby respond to the request for supplemental information in

the attachment to this letter.

Very truly yours,

17Z)

'

W. G. Counsil

RSB/amb:lw

Attachment

c - NRC Region IV (0 + 1 copy)

Director, Inspection and Enforcement (15 copies)

U. S. Nuclear Regulatory Commission

Washington, D. C.

20555

Mr. V. S. Noonan

Mr. D. L. Kelley

f

)c

"

gy

,4

.-,,,--,.

..-.-.-

-

    • *

Attachment to TXX-6212

.

January 19, 1987

Page 1 of 1

,

NOTICE OF VIOLATION

ITEM (446/8511-V-03)

SUPPLEMENTAL REQUEST FOR INFORMATION

As a result of review made during followup inspection of your corrective

actions, we find that a clarification is required relative to your response to

Item D in the Notice of Violation.

Specifically, the stated reason for the

violation correctly indicated that TUGCo Nuclear Engineering (TNE) Procedure

TNE-AD-4 was not followed concerning maintenance of duplicate copies of

engineering documents. The response does not address or consider, however,

that the NRC inspector was informed by an engineering supervisor during the

inspection that, due to organizational changes, Procedure CP-EI-18.0-4,

Revision 0, had been deleted and shipment was made without a procedure being

in effect.

In that this information is believed to have a bearing on the

scope of required steps to avoid recurrence (i.e., was training given to

engineering personnel concerning procedures in existence in the organization

to which they transferred?)...

SUPPLEMENTAL RESPONSE TO ITEM D

In our previous response, we noted the creation of an engineering instruction,

TNE-AD-4-6, to specifically control the transmittal and duplicate retention of

pipe support calculations and measures to assure accountability.

These

actions have been completed. We have verified that the training of the

personnel who implemented TNE-AD-4-6 was conducted and covered the period of

implementation of the procedure.

We have verified that the training program of the SWEC pipe support

organization includes newly transferred employees.

In examining the

circumstances surrounding the statement by the engineering supervisor

interviewed by the NRC inspector, we have concluded the supervisor was not

trained in the requirements of TNE-AD-4 until December 1985 due to the period

of transition.

Subsequent corrective measures involving the specific

supervisor are no longer appropriate as the individual is no longer active

within the engineering organization.