IR 05000324/1986025: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
(No difference)

Latest revision as of 11:45, 23 May 2025

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-325/86-24 & 50-324/86-25
ML20212B473
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/22/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8612290258
Download: ML20212B473 (1)


Text

IE k

d

&

/arolina Power and Light Company C

ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

REPORT N05. 50-325/86-24 AND 50-324/86-25 Thank you for your response of November 26, 1986, to our notice of Violation, issued on October-31, 1986, concerning activities conducted at your Brunswick facility.

We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.

We will examine the -implementation of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely, ORIGtNAL SMEU "Y DAVID M. VERRELLI David M. Verrelli, Chief Reactor Projects Branch 2 cc:

. W. Howe, Vice President Brunswick Nuclear Project

/.R.Dietz,PlantGeneralManager bcc:VNRC Resident Inspector Document Control Desk State of South Carolina 8612290258 861222 ADOCK0500g4 DR

%

k (ASMelTen:jd g Pfredrickson DVerrelli 12/5/86 12/15/86 12/(f/86

10 ZEO/