IR 05000324/1987010: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 21: | Line 21: | ||
=Text= | =Text= | ||
{{#Wiki_filter:l | {{#Wiki_filter:l | ||
. | |||
,. | ,. | ||
JUN O 31987 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 | JUN O 31987 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 | ||
. | |||
Gentlemen: | Gentlemen: | ||
SUBJECT: NRC INSPECTION REPORT NOS. 50-325/87-10 AND 50-324/87-10 Thank you for your response of May 26, 1987, to our Notice of Violation issued on April 27, 1987, concerning activities conducted at your Brunswick | SUBJECT: NRC INSPECTION REPORT NOS. 50-325/87-10 AND 50-324/87-10 Thank you for your response of May 26, 1987, to our Notice of Violation issued on April 27, 1987, concerning activities conducted at your Brunswick facility. | ||
We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspections. | |||
We appreciate your cooperation in this matter. | |||
Sincerely, J. Philip Stohr, Director Division of Radiation Safety and Safeguards cc: | |||
P. W. Howe, Vice President Brunswick Nuclear Project C. R. Dietz, Plant General Manager bec: NRR/DRIS/SB Document Control Desk (RIDS IE04), 016 NRC Resident Inspector State of North Carolina | |||
& | |||
_ | _ | ||
f// | |||
.Y ATillman 1re | |||
~ A011 e Fredrickson | |||
06/fd87 06/ /87 06/ | |||
87 06/) /87 8706100323 870603 | |||
- | |||
DR ADOCK 0500 | DR ADOCK 0500 | ||
{ | |||
g | |||
_ | , | ||
I) | |||
- | |||
_ | |||
J | |||
}} | }} | ||
Latest revision as of 07:43, 23 May 2025
| ML20214T570 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 06/03/1987 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20214T573 | List: |
| References | |
| NUDOCS 8706100323 | |
| Download: ML20214T570 (1) | |
Text
l
.
,.
JUN O 31987 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602
.
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-325/87-10 AND 50-324/87-10 Thank you for your response of May 26, 1987, to our Notice of Violation issued on April 27, 1987, concerning activities conducted at your Brunswick facility.
We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, J. Philip Stohr, Director Division of Radiation Safety and Safeguards cc:
P. W. Howe, Vice President Brunswick Nuclear Project C. R. Dietz, Plant General Manager bec: NRR/DRIS/SB Document Control Desk (RIDS IE04), 016 NRC Resident Inspector State of North Carolina
&
_
f//
.Y ATillman 1re
~ A011 e Fredrickson
06/fd87 06/ /87 06/
87 06/) /87 8706100323 870603
-
DR ADOCK 0500
{
g
,
I)
-
_
J