{{#Wiki_filter:June 17, 2021
{{#Wiki_filter:Mr. Rod Penfield
Mr. Rod Penfield
Site Vice President
Site Vice President
Energy Harbor Nuclear Corp.
Energy Harbor Nuclear Corp.
Perry Nuclear Power Plant
Perry Nuclear Power Plant
10 Center Road,
10 Center Road,
Perry, OH 44081
Perry, OH 44081
SUBJECT: PERRY NUCLEAR POWER PLANTNOTIFICATION OF NRC FIRE
SUBJECT: PERRY NUCLEAR POWER PLANTNOTIFICATION OF NRC FIRE  
            PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;
PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;  
            INSPECTION REPORT 05000440/2021010
INSPECTION REPORT 05000440/2021010
Dear Mr. Penfield:
Dear Mr. Penfield:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
Region III staff will conduct a Fire Protection Team Inspection at your Perry Nuclear Power
Region III staff will conduct a Fire Protection Team Inspection at your Perry Nuclear Power  
Plant beginning September 13, 2021. The inspection will be conducted in accordance with
Plant beginning September 13, 2021. The inspection will be conducted in accordance with  
Inspection Procedure 71111.21N.05, Fire Protection Team Inspection, dated June 12, 2019.
Inspection Procedure 71111.21N.05, Fire Protection Team Inspection, dated June 12, 2019.
The inspection will verify that plant SSCs and/or administrative controls credited in the approved
The inspection will verify that plant SSCs and/or administrative controls credited in the approved  
Fire Protection Program can perform their licensing basis function.
Fire Protection Program can perform their licensing basis function.
The schedule for the inspection is as follows:
The schedule for the inspection is as follows:
      Preparation week (R-III office): September 6 - 10, 2021
 
      Week 1 of onsite inspection:         September 13 - 17, 2021
Preparation week (R-III office): September 6 - 10, 2021
      Week 2 of onsite inspection:         September 27 - October 1, 2021
 
Experience has shown that the baseline fire protection team inspections are extremely resource
Week 1 of onsite inspection:
intensive, both for the NRC inspectors and the licensee staff. In order to minimize the
September 13 - 17, 2021
inspection impact on the site and to ensure a productive inspection for both organizations, we
 
have enclosed a request for documents needed for the inspection. These documents have
Week 2 of onsite inspection:
September 27 - October 1, 2021
Experience has shown that the baseline fire protection team inspections are extremely resource  
intensive, both for the NRC inspectors and the licensee staff. In order to minimize the  
inspection impact on the site and to ensure a productive inspection for both organizations, we  
have enclosed a request for documents needed for the inspection. These documents have  
been divided into three groups.
been divided into three groups.
      The first group lists information necessary to aid the inspection team in choosing specific
        focus areas for the inspection and to ensure that the inspection team is adequately
        prepared for the inspection. It is requested that this information be provided to the lead
        inspector via mail or electronically no later than August 20, 2021.
      The second group of requested documents consists of those items that the team will
        review, or need access to, during the inspection. Please have this information available
        by the first day of the first onsite inspection week September 13, 2021.


R. Penfield                                       -2-
The first group lists information necessary to aid the inspection team in choosing specific
      The third group lists the information necessary to aid the inspection team in tracking
focus areas for the inspection and to ensure that the inspection team is adequately
        issues identified as a result of the inspection. It is requested that this information be
prepared for the inspection.  It is requested that this information be provided to the lead
        provided to the lead inspector as the information is generated during the inspection. It is
inspector via mail or electronically no later than August 20, 2021.
        important that all of these documents are up to date and complete in order to minimize
 
        the number of additional documents requested during the preparation and/or the onsite
The second group of requested documents consists of those items that the team will
        portions of the inspection.
review, or need access to, during the inspection.  Please have this information available
The lead inspector for this inspection is Mr. A. Dahbur. We understand that our regulatory
by the first day of the first onsite inspection week September 13, 2021.
contact for this inspection is Mr. G. Dujanevic of your organization. If there are any questions
June 17, 2021
about the inspection or the material requested, please contact the lead inspector at
 
R. Penfield
-2-
 
The third group lists the information necessary to aid the inspection team in tracking  
issues identified as a result of the inspection. It is requested that this information be  
provided to the lead inspector as the information is generated during the inspection. It is  
important that all of these documents are up to date and complete in order to minimize  
the number of additional documents requested during the preparation and/or the onsite  
portions of the inspection.
The lead inspector for this inspection is Mr. A. Dahbur. We understand that our regulatory  
contact for this inspection is Mr. G. Dujanevic of your organization. If there are any questions  
about the inspection or the material requested, please contact the lead inspector at  
630-829-9810 or via e-mail at Alan.Dahbur@nrc.gov.
630-829-9810 or via e-mail at Alan.Dahbur@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, Control Number
requirements were approved by the Office of Management and Budget, Control Number  
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,  
a request for information or an information collection requirement unless the requesting
a request for information or an information collection requirement unless the requesting  
document displays a currently valid Office of Management and Budget Control Number.
document displays a currently valid Office of Management and Budget Control Number.
This letter and its enclosure will be made available for public inspection and copying at
This letter and its enclosure will be made available for public inspection and copying at  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,  
Exemptions, Requests for Withholding.
Exemptions, Requests for Withholding.
                                                Sincerely,
Sincerely,
                                                /RA/
/RA/
                                                Alan Dahbur, Senior Reactor Inspector
Alan Dahbur, Senior Reactor Inspector
                                                Engineering Branch 3
Engineering Branch 3
                                                Division of Reactor Safety
Division of Reactor Safety
Docket No. 50-440
Docket No. 50-440
License No. NPF-58
License No. NPF-58
Enclosure:
Enclosure:
Fire Protection Team Inspection
Fire Protection Team Inspection
Supporting Documentation
  Supporting Documentation
cc: Distribution via LISTSERV
cc: Distribution via LISTSERV


R. Penfield                                   -3-
R. Penfield
-3-
Letter to Rod Penfield from Alan Dahbur dated June 17, 2021.
Letter to Rod Penfield from Alan Dahbur dated June 17, 2021.
SUBJECT: PERRY NUCLEAR POWER PLANTNOTIFICATION OF NRC FIRE
SUBJECT: PERRY NUCLEAR POWER PLANTNOTIFICATION OF NRC FIRE  
            PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;
PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;  
            INSPECTION REPORT 05000440/2021010
INSPECTION REPORT 05000440/2021010
DISTRIBUTION:
DISTRIBUTION:
Jessie Quichocho
Jessie Quichocho
Line 101: Line 111:
DRPIII
DRPIII
DRSIII
DRSIII
ADAMS Accession Number: ML21168A066
ADAMS Accession Number: ML21168A066
    Publicly Available       Non-Publicly Available       Sensitive Non-Sensitive
Publicly Available
OFFICE       RIII
Non-Publicly Available
NAME         ADahbur:mb
Sensitive
DATE         06/17/2021
Non-Sensitive
                                  OFFICIAL RECORD COPY
OFFICE
RIII
NAME
ADahbur:mb
DATE
06/17/2021
OFFICIAL RECORD COPY


        FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
I. Information Requested prior to the Inspection Preparation Week
Enclosure
  The following information is requested by August 20, 2021. If you have any questions
I.
  regarding this request, please call the lead inspector as soon as possible. All information
Information Requested prior to the Inspection Preparation Week
  should be sent to Alan Dahbur (e-mail address Alan.Dahbur@nrc.gov). Electronic media is
The following information is requested by August 20, 2021. If you have any questions  
  preferred. The preferred file format is a searchable pdf or Microsoft Excel file on a
regarding this request, please call the lead inspector as soon as possible. All information  
  compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if
should be sent to Alan Dahbur (e-mail address Alan.Dahbur@nrc.gov). Electronic media is  
  possible. Please provide three copies of each CD submitted (one for each inspector).
preferred. The preferred file format is a searchable pdf or Microsoft Excel file on a  
  1. One set of hard-copy documents for facility layout drawings which identify plant fire area
compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if  
      delineation; areas protected by automatic fire suppression and detection; and locations
possible. Please provide three copies of each CD submitted (one for each inspector).
      of fire protection equipment.
1.
  2. Licensing Information:
One set of hard-copy documents for facility layout drawings which identify plant fire area  
      a. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs)
delineation; areas protected by automatic fire suppression and detection; and locations  
            applicable to fire protection (specifically including those SERs referenced by the
of fire protection equipment.
            plant fire protection license condition) and all licensing correspondence referenced
2.
            by the SERs;
Licensing Information:
      b. All licensing correspondence associated with the comparison to Standard Review
a.
            Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;
All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs)  
      c. Exemptions from Title 10 of the Code of Federal Regulations (CFR), Part 50.48 and
applicable to fire protection (specifically including those SERs referenced by the  
            10 CFR Part 50, Appendix R, and associated licensing correspondence;
plant fire protection license condition) and all licensing correspondence referenced  
      d. For pre-1979 plants, all licensing correspondence associated with those sections of
by the SERs;
            10 CFR Part 50, Appendix R, that are not applicable to the plant under
b.
            10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with
All licensing correspondence associated with the comparison to Standard Review  
            those fire protection features proposed or implemented by the licensee that have
Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;
            been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch
c.
            Technical Position APCSB 9.5-1 reflected in the NRC fire protection SERs issued
Exemptions from Title 10 of the Code of Federal Regulations (CFR), Part 50.48 and  
            before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection features,
10 CFR Part 50, Appendix R, and associated licensing correspondence;
            which were accepted by the NRC staff in comprehensive fire protection SERs issued
d.
            before Appendix A to Branch Technical Position APCSB 9.5-1 was published in
For pre-1979 plants, all licensing correspondence associated with those sections of  
            August 1976 (10 CFR 50.48(b)(1)(ii)); and
10 CFR Part 50, Appendix R, that are not applicable to the plant under  
      e. The final safety analysis report sections applicable to fire protection, FHA, and SSA
10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with  
            in effect at the time of original licensing.
those fire protection features proposed or implemented by the licensee that have  
  3. Fire Protection Program:
been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch  
      a. A listing of changes made to the Fire Protection Program since the last triennial fire
Technical Position APCSB 9.5-1 reflected in the NRC fire protection SERs issued  
            protection inspection;
before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection features,  
      b. For pre-1979 plants, a listing of the protection methodologies identified under
which were accepted by the NRC staff in comprehensive fire protection SERs issued  
            10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for
before Appendix A to Branch Technical Position APCSB 9.5-1 was published in  
            fire zones/areas. That is, please specify whether 3-hour rated fire barriers;
August 1976 (10 CFR 50.48(b)(1)(ii)); and
            (Section III.G.2.a), 20-foot separation along with detection and suppression;
e.
            (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;
The final safety analysis report sections applicable to fire protection, FHA, and SSA  
                                                                                          Enclosure
in effect at the time of original licensing.
3.
Fire Protection Program:
a.
A listing of changes made to the Fire Protection Program since the last triennial fire  
protection inspection;
b.
For pre-1979 plants, a listing of the protection methodologies identified under  
10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for  
fire zones/areas. That is, please specify whether 3-hour rated fire barriers;  
(Section III.G.2.a), 20-foot separation along with detection and suppression;  
(Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;  


      FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
        (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a
2
        strategy for each selected fire zone/area;
(Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a  
  c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe shutdown
strategy for each selected fire zone/area;
        evaluations);
c.
  d. A list of applicable codes and standards related to the design of plant fire protection
A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe shutdown  
        features. The list should include National Fire Protection Association (NFPA) code
evaluations);
        versions committed to (i.e., the NFPA Codes of Record);
d.
  e. List of plant deviations from code commitments and associated evaluations;
A list of applicable codes and standards related to the design of plant fire protection  
  f.   Fire Protection Program and/or Fire Protection Plan document;
features. The list should include National Fire Protection Association (NFPA) code  
  g. (If available) Fire Probabilistic Risk Assessment (PRA) Summary Report or full PRA
versions committed to (i.e., the NFPA Codes of Record);
        document (if summary document not available);
e.
  h. List of the top 25 highest fire CDF scenarios for each unit;
List of plant deviations from code commitments and associated evaluations;
  i.   List of Fire Areas/Zones ranked by contribution to CDF, (i.e., ranking of highest to
f.
        lowest risk fire areas/zones);
Fire Protection Program and/or Fire Protection Plan document;
  j.   List of the top 25 highest fire LERF scenarios for each unit; and
g.
  k. Risk ranking of operator actions and/or recovery actions from your site-specific PRA
(If available) Fire Probabilistic Risk Assessment (PRA) Summary Report or full PRA  
        sorted by RAW and human reliability worksheets for these items.
document (if summary document not available);
4. Facility Information:
h.
  a. Piping and instrumentation (flow) diagrams showing the components used to achieve
List of the top 25 highest fire CDF scenarios for each unit;
        and maintain hot standby and cold shutdown for fires outside the control room, and
i.
        those components used for those areas requiring alternative shutdown capability;
List of Fire Areas/Zones ranked by contribution to CDF, (i.e., ranking of highest to  
  b. One-line schematic drawings of the electrical distribution system for 4160 Volts
lowest risk fire areas/zones);
        alternating current (Vac) down to 480 Vac;
j.
  c. One-line schematic drawings of the electrical distribution system for 250 Volts direct
List of the top 25 highest fire LERF scenarios for each unit; and
        current (Vdc) and 125 Vdc systems as applicable;
k.
  d. Logic diagrams showing the components used to achieve and maintain hot standby
Risk ranking of operator actions and/or recovery actions from your site-specific PRA  
        and cold shutdown; and
sorted by RAW and human reliability worksheets for these items.
  e. Safe shutdown cable routing database (requested electronically, such as on compact
4.
        disc, if available).
Facility Information:
5. Operations Response for Fire Protection:
a.
  a. Pre-fire plans for fire zones/areas; and
Piping and instrumentation (flow) diagrams showing the components used to achieve  
                                              2
and maintain hot standby and cold shutdown for fires outside the control room, and  
those components used for those areas requiring alternative shutdown capability;
b.
One-line schematic drawings of the electrical distribution system for 4160 Volts  
alternating current (Vac) down to 480 Vac;
c.
One-line schematic drawings of the electrical distribution system for 250 Volts direct  
current (Vdc) and 125 Vdc systems as applicable;
d.
Logic diagrams showing the components used to achieve and maintain hot standby  
and cold shutdown; and
e.
Safe shutdown cable routing database (requested electronically, such as on compact  
disc, if available).
5.
Operations Response for Fire Protection:
a.
Pre-fire plans for fire zones/areas; and


          FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
        b. Plant operating procedures which specify the initial operations response to a fire
3
            alarm or annunciator.
b.
    6. Corrective Actions:
Plant operating procedures which specify the initial operations response to a fire  
        a. Listing of open and closed fire protection condition reports (i.e., problem identification
alarm or annunciator.
            forms and their resolution reports) since the date of the last triennial fire protection
6.
            inspection; and
Corrective Actions:
        b.     List of current fire impairments, including duration.
a.
    7. General Information:
Listing of open and closed fire protection condition reports (i.e., problem identification  
        a. A listing of abbreviations and/or designators for plant systems;
forms and their resolution reports) since the date of the last triennial fire protection  
        b. Organization charts of site personnel down to the level of fire protection staff
inspection; and
            personnel; and
b.
        c. A phone list for onsite licensee personnel.
List of current fire impairments, including duration.
II. Information Requested to Be Available on First Day of the FIRST ONSITE Inspection
7.
    Week (SEPTEMBER 13, 2021)
General Information:
    The following information is requested to be provided on the first day of inspection. It is
a.
    requested that this information be provided on three sets of CDs (searchable, if possible).
A listing of abbreviations and/or designators for plant systems;
    1. Program Procedures:
b.
        a. Procedures for:
Organization charts of site personnel down to the level of fire protection staff  
              i. Administrative controls (such as allowed out of service times and compensatory
personnel; and
                  measures) for fire protection systems and components;
c.
            ii. Control of transient combustibles; and
A phone list for onsite licensee personnel.
            iii. Control of hot work.
II.
        b. List of maintenance and surveillance testing procedures for alternative shutdown
Information Requested to Be Available on First Day of the FIRST ONSITE Inspection  
            capability and fire barriers, detectors, pumps, and suppression systems; and
Week (SEPTEMBER 13, 2021)
        c. List of maintenance procedures which routinely verify fuse breaker coordination in
The following information is requested to be provided on the first day of inspection. It is  
            accordance with the post-fire safe shutdown coordination analysis.
requested that this information be provided on three sets of CDs (searchable, if possible).
    2. Design and Equipment Information (for only selected fire zone/area(s) and/or SSCs
1.
        to be determined during inspection preparation week):
Program Procedures:
        a. Coordination calculations and/or justifications that verify fuse/breaker coordination for
a.
            SSCs that are fed off of the same electrical buses as components in the protected
Procedures for:
            safe shutdown train;
i.
                                                    3
Administrative controls (such as allowed out of service times and compensatory  
measures) for fire protection systems and components;
ii.
Control of transient combustibles; and
iii.
Control of hot work.
b.
List of maintenance and surveillance testing procedures for alternative shutdown  
capability and fire barriers, detectors, pumps, and suppression systems; and
c.
List of maintenance procedures which routinely verify fuse breaker coordination in  
accordance with the post-fire safe shutdown coordination analysis.
2.
Design and Equipment Information (for only selected fire zone/area(s) and/or SSCs  
to be determined during inspection preparation week):
a.
Coordination calculations and/or justifications that verify fuse/breaker coordination for  
SSCs that are fed off of the same electrical buses as components in the protected  
safe shutdown train;


      FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
  b. Copies of significant fire protection and post-fire safe shutdown related design
4
        change package descriptions (including their associated 10 CFR 50.59 evaluations)
b.
        and Generic Letter 86-10 (or adverse to safe shutdown) evaluations;
Copies of significant fire protection and post-fire safe shutdown related design  
  c. Gaseous suppression system pre-operational testing, if applicable, for selected fire
change package descriptions (including their associated 10 CFR 50.59 evaluations)  
        zones/areas;
and Generic Letter 86-10 (or adverse to safe shutdown) evaluations;
  d. Hydraulic calculations and supporting test data which demonstrate operability for
c.
        water suppression systems;
Gaseous suppression system pre-operational testing, if applicable, for selected fire  
  e. Alternating current (ac) coordination calculations for 4160 Vac down to 480 Vac
zones/areas;
        electrical systems; and
d.
  f.   List of all fire protection or Appendix R calculations.
Hydraulic calculations and supporting test data which demonstrate operability for  
3. Assessment and Corrective Actions:
water suppression systems;
  The three most recent fire protection Quality Assurance audits and/or fire protection
e.
  self-assessments.
Alternating current (ac) coordination calculations for 4160 Vac down to 480 Vac  
4. Any updates to information previously provided.
electrical systems; and
5. Classic Fire Protection (for only selected fire zone/area(s) and/or SSCs to be
f.
  determined during inspection preparation week):
List of all fire protection or Appendix R calculations.
  a. Copy of fire protection program implementing procedures (e.g., administrative
3.
        controls, surveillance testing, and fire brigade);
Assessment and Corrective Actions:
  b. Pre-fire plans for selected fire area(s); and
The three most recent fire protection Quality Assurance audits and/or fire protection  
  c. List of fire protection system design changes completed in the last 3 years.
self-assessments.
6. Electrical (for only selected fire zone/area(s) and/or SSCs to be determined during
4.
  inspection preparation week):
Any updates to information previously provided.
  a. Nuclear safety circuit coordination analysis for fuse and breaker coordination of safe
5.
        shutdown components;
Classic Fire Protection (for only selected fire zone/area(s) and/or SSCs to be  
  b. Administrative or configuration control procedures that govern fuse replacement
determined during inspection preparation week):
        (e.g., fuse control procedures);
a.
  c. Maintenance procedures that verify breaker over-current trip settings to ensure
Copy of fire protection program implementing procedures (e.g., administrative  
        coordination remains functional, for post-fire nuclear safety capability components;
controls, surveillance testing, and fire brigade);
  d. Last surveillance demonstrating operability of those components operated from the
b.
        primary control stations;
Pre-fire plans for selected fire area(s); and
  e. Schematic or elementary diagrams for circuits (only for selected SSCs) to be
c.
        reviewed (C-size paper drawings);
List of fire protection system design changes completed in the last 3 years.
                                                4
6.
Electrical (for only selected fire zone/area(s) and/or SSCs to be determined during  
inspection preparation week):
a.
Nuclear safety circuit coordination analysis for fuse and breaker coordination of safe  
shutdown components;
b.
Administrative or configuration control procedures that govern fuse replacement  
(e.g., fuse control procedures);
c.
Maintenance procedures that verify breaker over-current trip settings to ensure  
coordination remains functional, for post-fire nuclear safety capability components;
d.
Last surveillance demonstrating operability of those components operated from the  
primary control stations;
e.
Schematic or elementary diagrams for circuits (only for selected SSCs) to be  
reviewed (C-size paper drawings);


            FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
        f.   Cable routing for components and equipment credited for post-fire nuclear safety
5
              capability systems and components;
f.
        g. List of post-fire nuclear safety capability system and component design changes
Cable routing for components and equipment credited for post-fire nuclear safety  
              completed, in the last 3 years; and
capability systems and components;
        h. List of identified fire induced circuit failure analyses.
g.
    7. Operations:
List of post-fire nuclear safety capability system and component design changes  
        a. List of procedures that implement Cold Shutdown Repairs (if applicable for selected
completed, in the last 3 years; and
              fire area);
h.
        b. For Cold Shutdown Repairs, provide the following:
List of identified fire induced circuit failure analyses.
                i. Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
7.
                ii. Most recent inspection and inventory results.
Operations:
        c. List of licensed operator Job Performance Measures for operator actions required to
a.
              achieve and maintain post-fire nuclear safety performance criteria (for selected SSCs
List of procedures that implement Cold Shutdown Repairs (if applicable for selected  
              and fire area);
fire area);
        d. For Radio communications, provide the following:
b.
                i. Communications Plan for firefighting and post-fire safe shutdown manual actions;
For Cold Shutdown Repairs, provide the following:
                ii. Repeater locations;
i.
              iii. Cable routing for repeater power supply cables;
Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
              iv.   Radio coverage test results; and
ii.
              v.   Radio Dead Spot locations in the plant.
Most recent inspection and inventory results.
        e. Environmental and habitability evaluations for post-fire operator actions
c.
              (temperature, smoke, humidity, SCBAs, etc.).
List of licensed operator Job Performance Measures for operator actions required to  
    8. Administrative Control, Oversight, and Corrective Action Programs:
achieve and maintain post-fire nuclear safety performance criteria (for selected SSCs  
        a. Self-assessments, peer assessments, and audits of fire protection activities for the
and fire area);
              last 3 years;
d.
        b. Self-assessments, peer assessments, and audits of post-fire nuclear safety
For Radio communications, provide the following:
              capability methodology for the last 3 years; and
i.
        c. List of fire event analysis reports for the last 3 years.
Communications Plan for firefighting and post-fire safe shutdown manual actions;
    9. Any updates to information previously provided.
ii.
Repeater locations;
iii.
Cable routing for repeater power supply cables;
iv.
Radio coverage test results; and
v.
Radio Dead Spot locations in the plant.
e.
Environmental and habitability evaluations for post-fire operator actions  
(temperature, smoke, humidity, SCBAs, etc.).
8.
Administrative Control, Oversight, and Corrective Action Programs:
a.
Self-assessments, peer assessments, and audits of fire protection activities for the  
last 3 years;
b.
Self-assessments, peer assessments, and audits of post-fire nuclear safety  
capability methodology for the last 3 years; and
c.
List of fire event analysis reports for the last 3 years.
9.
Any updates to information previously provided.
III. Information Requested to Be Provided Throughout the Inspection
III. Information Requested to Be Provided Throughout the Inspection
    1. Copies of any corrective action documents generated as a result of the inspection
1.
        teams questions or queries during this inspection.
Copies of any corrective action documents generated as a result of the inspection  
                                                    5
teams questions or queries during this inspection.


    FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION
2. Copies of the list of questions submitted by the inspection team members and the
6
  status/resolution of the information requested (provided daily during the inspection
2.
  to each inspection team member).
Copies of the list of questions submitted by the inspection team members and the  
                                            6
status/resolution of the information requested (provided daily during the inspection  
to each inspection team member).
}}
}}

Latest revision as of 03:24, 16 March 2025

Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000440/2021010
ML21168A066
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/17/2021
From: Alan Dahbur
Engineering Branch 3
To: Penfield R
Energy Harbor Nuclear Corp
References
IR 2021010
Download: ML21168A066 (9)


See also: IR 05000440/2021010

Text

Mr. Rod Penfield

Site Vice President

Energy Harbor Nuclear Corp.

Perry Nuclear Power Plant

10 Center Road,

Perry, OH 44081

SUBJECT: PERRY NUCLEAR POWER PLANTNOTIFICATION OF NRC FIRE

PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;

INSPECTION REPORT 05000440/2021010

Dear Mr. Penfield:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region III staff will conduct a Fire Protection Team Inspection at your Perry Nuclear Power

Plant beginning September 13, 2021. The inspection will be conducted in accordance with

Inspection Procedure 71111.21N.05, Fire Protection Team Inspection, dated June 12, 2019.

The inspection will verify that plant SSCs and/or administrative controls credited in the approved

Fire Protection Program can perform their licensing basis function.

The schedule for the inspection is as follows:

Preparation week (R-III office): September 6 - 10, 2021

Week 1 of onsite inspection:

September 13 - 17, 2021

Week 2 of onsite inspection:

September 27 - October 1, 2021

Experience has shown that the baseline fire protection team inspections are extremely resource

intensive, both for the NRC inspectors and the licensee staff. In order to minimize the

inspection impact on the site and to ensure a productive inspection for both organizations, we

have enclosed a request for documents needed for the inspection. These documents have

been divided into three groups.

The first group lists information necessary to aid the inspection team in choosing specific

focus areas for the inspection and to ensure that the inspection team is adequately

prepared for the inspection. It is requested that this information be provided to the lead

inspector via mail or electronically no later than August 20, 2021.

The second group of requested documents consists of those items that the team will

review, or need access to, during the inspection. Please have this information available

by the first day of the first onsite inspection week September 13, 2021.

June 17, 2021

R. Penfield

-2-

The third group lists the information necessary to aid the inspection team in tracking

issues identified as a result of the inspection. It is requested that this information be

provided to the lead inspector as the information is generated during the inspection. It is

important that all of these documents are up to date and complete in order to minimize

the number of additional documents requested during the preparation and/or the onsite

portions of the inspection.

The lead inspector for this inspection is Mr. A. Dahbur. We understand that our regulatory

contact for this inspection is Mr. G. Dujanevic of your organization. If there are any questions

about the inspection or the material requested, please contact the lead inspector at

630-829-9810 or via e-mail at Alan.Dahbur@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA/

Alan Dahbur, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure:

Fire Protection Team Inspection

Supporting Documentation

cc: Distribution via LISTSERV

R. Penfield

-3-

Letter to Rod Penfield from Alan Dahbur dated June 17, 2021.

SUBJECT: PERRY NUCLEAR POWER PLANTNOTIFICATION OF NRC FIRE

PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;

INSPECTION REPORT 05000440/2021010

DISTRIBUTION:

Jessie Quichocho

Aaron McCraw

RidsNrrPMPerry Resource

RidsNrrDorlLpl3

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML21168A066

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

ADahbur:mb

DATE

06/17/2021

OFFICIAL RECORD COPY

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

Enclosure

I.

Information Requested prior to the Inspection Preparation Week

The following information is requested by August 20, 2021. If you have any questions

regarding this request, please call the lead inspector as soon as possible. All information

should be sent to Alan Dahbur (e-mail address Alan.Dahbur@nrc.gov). Electronic media is

preferred. The preferred file format is a searchable pdf or Microsoft Excel file on a

compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if

possible. Please provide three copies of each CD submitted (one for each inspector).

1.

One set of hard-copy documents for facility layout drawings which identify plant fire area

delineation; areas protected by automatic fire suppression and detection; and locations

of fire protection equipment.

2.

Licensing Information:

a.

All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs)

applicable to fire protection (specifically including those SERs referenced by the

plant fire protection license condition) and all licensing correspondence referenced

by the SERs;

b.

All licensing correspondence associated with the comparison to Standard Review

Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;

c.

Exemptions from Title 10 of the Code of Federal Regulations (CFR), Part 50.48 and

10 CFR Part 50, Appendix R, and associated licensing correspondence;

d.

For pre-1979 plants, all licensing correspondence associated with those sections of

10 CFR Part 50, Appendix R, that are not applicable to the plant under

10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with

those fire protection features proposed or implemented by the licensee that have

been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch

Technical Position APCSB 9.5-1 reflected in the NRC fire protection SERs issued

before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection features,

which were accepted by the NRC staff in comprehensive fire protection SERs issued

before Appendix A to Branch Technical Position APCSB 9.5-1 was published in

August 1976 (10 CFR 50.48(b)(1)(ii)); and

e.

The final safety analysis report sections applicable to fire protection, FHA, and SSA

in effect at the time of original licensing.

3.

Fire Protection Program:

a.

A listing of changes made to the Fire Protection Program since the last triennial fire

protection inspection;

b.

For pre-1979 plants, a listing of the protection methodologies identified under

10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for

fire zones/areas. That is, please specify whether 3-hour rated fire barriers;

(Section III.G.2.a), 20-foot separation along with detection and suppression;

(Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

2

(Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a

strategy for each selected fire zone/area;

c.

A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe shutdown

evaluations);

d.

A list of applicable codes and standards related to the design of plant fire protection

features. The list should include National Fire Protection Association (NFPA) code

versions committed to (i.e., the NFPA Codes of Record);

e.

List of plant deviations from code commitments and associated evaluations;

f.

Fire Protection Program and/or Fire Protection Plan document;

g.

(If available) Fire Probabilistic Risk Assessment (PRA) Summary Report or full PRA

document (if summary document not available);

h.

List of the top 25 highest fire CDF scenarios for each unit;

i.

List of Fire Areas/Zones ranked by contribution to CDF, (i.e., ranking of highest to

lowest risk fire areas/zones);

j.

List of the top 25 highest fire LERF scenarios for each unit; and

k.

Risk ranking of operator actions and/or recovery actions from your site-specific PRA

sorted by RAW and human reliability worksheets for these items.

4.

Facility Information:

a.

Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdown for fires outside the control room, and

those components used for those areas requiring alternative shutdown capability;

b.

One-line schematic drawings of the electrical distribution system for 4160 Volts

alternating current (Vac) down to 480 Vac;

c.

One-line schematic drawings of the electrical distribution system for 250 Volts direct

current (Vdc) and 125 Vdc systems as applicable;

d.

Logic diagrams showing the components used to achieve and maintain hot standby

and cold shutdown; and

e.

Safe shutdown cable routing database (requested electronically, such as on compact

disc, if available).

5.

Operations Response for Fire Protection:

a.

Pre-fire plans for fire zones/areas; and

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

3

b.

Plant operating procedures which specify the initial operations response to a fire

alarm or annunciator.

6.

Corrective Actions:

a.

Listing of open and closed fire protection condition reports (i.e., problem identification

forms and their resolution reports) since the date of the last triennial fire protection

inspection; and

b.

List of current fire impairments, including duration.

7.

General Information:

a.

A listing of abbreviations and/or designators for plant systems;

b.

Organization charts of site personnel down to the level of fire protection staff

personnel; and

c.

A phone list for onsite licensee personnel.

II.

Information Requested to Be Available on First Day of the FIRST ONSITE Inspection

Week (SEPTEMBER 13, 2021)

The following information is requested to be provided on the first day of inspection. It is

requested that this information be provided on three sets of CDs (searchable, if possible).

1.

Program Procedures:

a.

Procedures for:

i.

Administrative controls (such as allowed out of service times and compensatory

measures) for fire protection systems and components;

ii.

Control of transient combustibles; and

iii.

Control of hot work.

b.

List of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps, and suppression systems; and

c.

List of maintenance procedures which routinely verify fuse breaker coordination in

accordance with the post-fire safe shutdown coordination analysis.

2.

Design and Equipment Information (for only selected fire zone/area(s) and/or SSCs

to be determined during inspection preparation week):

a.

Coordination calculations and/or justifications that verify fuse/breaker coordination for

SSCs that are fed off of the same electrical buses as components in the protected

safe shutdown train;

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

4

b.

Copies of significant fire protection and post-fire safe shutdown related design

change package descriptions (including their associated 10 CFR 50.59 evaluations)

and Generic Letter 86-10 (or adverse to safe shutdown) evaluations;

c.

Gaseous suppression system pre-operational testing, if applicable, for selected fire

zones/areas;

d.

Hydraulic calculations and supporting test data which demonstrate operability for

water suppression systems;

e.

Alternating current (ac) coordination calculations for 4160 Vac down to 480 Vac

electrical systems; and

f.

List of all fire protection or Appendix R calculations.

3.

Assessment and Corrective Actions:

The three most recent fire protection Quality Assurance audits and/or fire protection

self-assessments.

4.

Any updates to information previously provided.

5.

Classic Fire Protection (for only selected fire zone/area(s) and/or SSCs to be

determined during inspection preparation week):

a.

Copy of fire protection program implementing procedures (e.g., administrative

controls, surveillance testing, and fire brigade);

b.

Pre-fire plans for selected fire area(s); and

c.

List of fire protection system design changes completed in the last 3 years.

6.

Electrical (for only selected fire zone/area(s) and/or SSCs to be determined during

inspection preparation week):

a.

Nuclear safety circuit coordination analysis for fuse and breaker coordination of safe

shutdown components;

b.

Administrative or configuration control procedures that govern fuse replacement

(e.g., fuse control procedures);

c.

Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional, for post-fire nuclear safety capability components;

d.

Last surveillance demonstrating operability of those components operated from the

primary control stations;

e.

Schematic or elementary diagrams for circuits (only for selected SSCs) to be

reviewed (C-size paper drawings);

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

5

f.

Cable routing for components and equipment credited for post-fire nuclear safety

capability systems and components;

g.

List of post-fire nuclear safety capability system and component design changes

completed, in the last 3 years; and

h.

List of identified fire induced circuit failure analyses.

7.

Operations:

a.

List of procedures that implement Cold Shutdown Repairs (if applicable for selected

fire area);

b.

For Cold Shutdown Repairs, provide the following:

i.

Procedure for inventory and inspection (i.e., needed tools, material, etc.); and

ii.

Most recent inspection and inventory results.

c.

List of licensed operator Job Performance Measures for operator actions required to

achieve and maintain post-fire nuclear safety performance criteria (for selected SSCs

and fire area);

d.

For Radio communications, provide the following:

i.

Communications Plan for firefighting and post-fire safe shutdown manual actions;

ii.

Repeater locations;

iii.

Cable routing for repeater power supply cables;

iv.

Radio coverage test results; and

v.

Radio Dead Spot locations in the plant.

e.

Environmental and habitability evaluations for post-fire operator actions

(temperature, smoke, humidity, SCBAs, etc.).

8.

Administrative Control, Oversight, and Corrective Action Programs:

a.

Self-assessments, peer assessments, and audits of fire protection activities for the

last 3 years;

b.

Self-assessments, peer assessments, and audits of post-fire nuclear safety

capability methodology for the last 3 years; and

c.

List of fire event analysis reports for the last 3 years.

9.

Any updates to information previously provided.

III. Information Requested to Be Provided Throughout the Inspection

1.

Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during this inspection.

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

6

2.

Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection

to each inspection team member).