Regulatory Guide 1.125: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(15 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML13350A272
| number = ML003739388
| issue date = 03/31/1977
| issue date = 10/31/1978
| title = Physical Models for Design and Operation of Hydraulic Structures and Systems for Nuclear Power Plants
| title = Rev 1,Physical Models for Design and Operation of Hydraulic Structures and Systems for Nuclear Power Plants
| author name =  
| author name =  
| author affiliation = NRC/OSD
| author affiliation = NRC/RES
| addressee name =  
| addressee name =  
| addressee affiliation =  
| addressee affiliation =  
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = RG-1.125
| document report number = RG-1.125, Rev 1
| document type = Regulatory Guide
| document type = Regulatory Guide
| page count = 3
| page count = 3
}}
}}
{{#Wiki_filter:t yR REG&, 90U.S. NUCLEAR REGULATORY COMMISSIONMarch 1977REGULATORY GUIDEOFFICE OF STANDARDS DEVELOPMENTREGULATORY GUIDE 1.125PHYSICAL MODELS FOR DESIGN AND OPERATIONOF HYDRAULIC STRUCTURES AND SYSTEMS FOR NUCLEARPOWER PLANTS
{{#Wiki_filter:U.S. NUCLEAR REGULATORY COMMISSION
Revision I
October 1978 REGULATORY GUIDE
OFFICE OF STANDARDS DEVELOPMENT
REGULATORY GUIDE 1.125 PHYSICAL MODELS FOR DESIGN AND OPERATION
OF HYDRAULIC STRUCTURES AND SYSTEMS FOR NUCLEAR
POWER PLANTS


==A. INTRODUCTION==
==A. INTRODUCTION==
Paragraph (a) (3) (ii) of §50.34, "Contents of Ap-plications; Technical Information," of 10 CFR Part50, "Licensing of Production and UtilizationFacilities," requires that the Preliminary SafetyAnalysis Report (PSAR) include information on thedesign bases of the facility and the relation of thedesign bases to the principal design criteria.Paragraph (a) (4) of §50.34 requires, in part, a pre-liminary analysis of the adequacy of structures,systems, and comnonents orovided for the preventionExamples of types of physical modeling studies in-clude, but are not confined to, the following:I. Intake structures.2. Discharge structures.3. Energy dissipation structures.4. Spillway and tailwater ratings for (dWrs (water-level discharge relations).5. Release of water resulting from daiii'lures.6. Wave runup, including ounaAi',effect'7. Erosion from waves..and,.rtbilaotin therefrom.8. Erosion and deppo8io'n in.i and othersysems and component prvie for. --.h- .. .....'-. ..... aenb desadtrt toohenoof accidents and the mwttgation of the consequences ...... and ..r: , *th eerom .of accidents. mittonfts 9. Flow pattersand d(pettion of heated or con-taminated i&"recci'6ing water bodies.10. Heat'Al'sý IK n-" receiving water bodies.This guide describes the desired coordination of an 10. Ha .rapplicant with the NRC staff and the detail and ex eerience of the NRC staff thatdocumentation of data and studies that. an applicant sozpe ' ican6 have not furnished sufficientlyshould include in the PSAR to support the use of detidic "'i.r' mation on physical hydraulic modelphysical hydraulic model testing for predicting per the staff to perform an adequate review. Informance of hydraulic structures and systems t.so~,-4instances, staff involvement in the early plan-nuclear power plants. The regulatory position of i~is "T,%ing of a mcdel study would have resulted in savingsguide is applicable only to physical mo~elt"Osedlo, gOf both NRC and applicant funds and time in thepredict the action or interaction of su .Uce waterV` review and acceptance of the results.with features located outside of contaiihtent.1Therecommendations of this guide are not ppo a e to Accordingly, the regulatory position details theinternal plant systems or stuctures. documentation that should be furnished and the typeof coordination between the staff and the applicantthat should minimize the time necessary for accep-,,.tance of the results of model studies.Physical hydr 1i ml els' te often used to predict The information described in the regulatory posi-prototype o nce. hey are particularly useful tion should be incorporated in the PSAR. However,where h a res and systems are of un- the staff recognizes that it will not always be possibleusual de or configuration and hydraulic to incorporate such information in the initial applica-parameters not be adequately evaluated by state- tion for a construction permit since studies of thisof-the-art analytical methods. Hydraulic models may type may not be undertaken until after the PSAR isalso be used to establish conservative and reasonable submitted. Such information may, therefore, be add-design or operating bases for sites, structures, or ed to the PSAR by amendment, either by reference tosystems involving thermal and erosional problems. separate reports or by insertion into the PSAR.USNRC RE.GUL.ATORY GUIDES Cotenmeeet. %hureild bee wnt to t he S--Cletry eII IIe- Creen,e,,eoy.ree US. Ni.1a -,ijRegutlatory Guidieae d.C twed to iesvrilte antd malte availablte to the, ptublic method, Ilaoty Ce,e .... ...awo. Vi,)Ii tee,', D.C. 7D~bV,. Ate .,I,ete L)-e 1e,nel, Ntn eedacceptable to the NRC staff ol imtlementie'j uiiecetec parts of the Cenlor,$inss~~, feeeregulIatieons, to deliea~tetdt Ichetetteecl ,tivdl Ityth! stalfi cc tvalai nat stjwtecol c problemees Theuiesa sejtc t. ttecvt eeteetlIvieccor postolittO accidenti. or itt ittovde! guitdance to .tttttlicints. R. rgulatory Guide% h-qi.sie"uII n ol~- eareC not substnlesu for *eifulmitons. and ConneteleieCe Withe them, is not triltuirtd. I Pectvt Iie-ectnr G midc,ele;roMetthods atot solntlotv' dillefecnt from lholit, set ou!to i c M jetguide% will hee Ancmil- Ffesi,...icnited Tot tetecci 1. ' awer~ltcable .1 they ttoe idt, a1 btasis It the. findeings rentuisite In, the ifsueinci!et Col co~ntnance. V fl Ite ,ecc.1,,!mt lst F.1,tcttin, w% Qe8 ccttet I t.01throf a Petmit or license by the Comcmission. .1, Erivifortcnce-mtit ctl adSt tnq f) ete t lc,-"e5r Mate, e.0,ine Ptan)t NolvotC "~Cormnians antd suggestions for itilltrnvetntent% in theso (euieetle ntt! etcncuraged at ;,I[gitime's, .ntrw goiei "Melt It evi"Icl .s in te, ltnuette.tt, to atcecrtto,ilitt ctttlflenrtt and~t tle4tectt Iwe lecele ccitfe te seee Mteej, t4erhe cee.e hi.e~eeute or let, tela,;'to rei edl fee. intotint Ieon ot et !I net'C,, Hoeweve~r, cornenerreot th!itts luetle., it eeee~t 'ten tee iutomtmtc n:e dt ieteeul etetetlee I ecte Cite'! ' tet leeee! n.e'ett lt itne , eefiteceivedl vvethin abeout ty. ioi ,,~hs titer its oletincc. vvil lee ttaelicntar,tl eestt~le to tleeeetoet quittet Itw netteo in eteteti tee tte U S. ~tel-ec.,,, tllqeetdnty CetettcowaeeeeevileeetetIltnatl It e *.tyttefUt Vdtlitnhmtttt, D.C. 205fbh. At t,-niut .e Deeq fe or. Dionuienr etf Uttinpritn Cultecto
Paragraph (a) (3) (ii) of §50.34, "Contents of Applications; Technical Information," of 10 CFR  
Part 50, "Domestic Licensing of Production and Utilization Facilities," requires that the Preliminary Safety Analysis Report (PSAR) include information on the design bases of the facility and the relation of the design bases to the principal design criteria.
 
Paragraph (a) (4) of §50.34 requires, in part, a preliminary analysis of the adequacy of structures, systems, and components provided for the prevention of accidents and the mitigation of the consequences of accidents.
 
This guide describes the desired coordination of an applicant with the NRC staff and the detail and documentation of data and studies that an applicant should include in the PSAR to support the use of physical hydraulic model testing for predicting per S
formance of safety-related hydraulic structures and systems for nuclear power plants. The regulatory position of this guide is applicable only to physical models used to predict the action or interaction of surface waters with features located outside of con tainment. The recommendations of this guide are not applicable to internal plant systems or structures.
 
The Advisory Committee on Reactor Safeguards has been consulted concerning this guide and has concurred in the regulatory position.
 
==B. DISCUSSION==
Physical hydraulic models are often used to predict prototype performance. They are particularly useful where hydraulic structures and systems are of unusual
* Lines indicate substantive changes from previous issue.
 
design or configuration and hydraulic parameters cannot be adequately evaluated by state-of-the-art analytical methods. Hydraulic models may also be used to establish conservative and reasonable design or operating bases for sites, structures, or systems involving thermal and erosional problems.
 
Examples of types of physical modeling studies include, but are not confined to, the following:  
1. Intake structures.
 
2. Discharge structures.
 
3. Energy dissipation structures.
 
4. Spillway and tailwater ratings for dams (waterlevel discharge relations).
5. Release of water resulting from dam failures..
6. Wave runup, including tsunami effects.
 
7. Stability of structure when exposed to waves and protection therefrom.
 
8. Erosion and deposition in streams and other water bodies and protection therefrom.
 
9. Flow patterns and dispersion of heated or'  
contaminated effluents in receiving water bodies.
 
10. Heat dissipation in receiving water bodies.
 
11. Response of moored floating bodies to incident wave systems.
 
12. Response of harbors to waves.
 
It has been the experience of the NRC staff that some applicants have not furnished sufficiently de tailed information on physical hydraulic model studies for.the staff to perform an adequate review. In some instances, staff involvement in the early plan ning of a model study would have resulted in savings.
 
of both NRC and applicant'funds and time in the review and acceptance of the results.
 
Accordingly, the regulatory position describes the USNRC REGULATORY GUIDES
Comments abould be sent to the Secreta*y of the Commison, U.S Nuc USNC
RGUATOY
GIDS
Rguatoy Cmrssan.Washington. D.C. 205 Attention: Dockein and Regulatory Guides are issued to describe and make available to -te public Servic Zranc
 
====h. m alVwDC ====
0%
At~dn r
methods acceptable to the NRC staff of implementing specific peats of the"
Commission's regulations, to delineate techniques usd by the staff in evalu- The guides are issued In the following ten broad divisions:
st specific Woblems oF postulated accidents, of to provide guidance to appelcantL Regulatmy Guides are not substitutes for regulations, and cor-
 
===1. Power ===
. Products plieance with them Is not required. Methods arnd solutions differntfro ths
 
===2. p RHebedTetRatr ===
7 rn r
atitn set out in the guides will be accepta"l if they provide a basis for the findinrs
3. Fuels and Materials Facilities
8 requisite to the issuance or cotnuance of a permit or licens by the
4. Environmental and Siting
9. Antitrust and Financial Review Commistion.
 
5.
 
& Materals Plant Protoctlot
10. Gnerwal Requests for single copie of Issued guides (which may be repoduced) or for Comments and suggestions for improvements in theae guides eae encouraged at placement on an automatic distribution list for single copias of future guides all times, and guides will be revised, as appropriate, to accommodate comrnents in specific divisions should be made in writing to the US. Nucla egulamry and to reflect new information or exaperience. This guide was revisd as a result Commission, Washington, D.C.
 
201.
 
Attention: Director, Division of of substantive comments received from the public and additional staff review.
 
Technical Information and Document Control.
 
I
 
documentation that should be furnished and the type of coordination bfveen the staff and the applicant that should minimize the time necessary for accept ance of the results of model studies.
 
The information described in the regulatory posi tion should be incorporated in the PSAR. However, the staff recognizes that it will not always be possible to incorporate such information in the initial applica tion for a construction permit since studies of this type may not be undertaken until after the PSAR is submitted. Such information may, therefore, be added to the PSAR by amendment, either by refer ence to separate reports or by insertion into the PSAR.


==C. REGULATORY POSITION==
==C. REGULATORY POSITION==
Because all hydraulic design problems cannot beresolved by the mechanics of similitude and becausethere are limitations to hydraulic modeling.'the NRCstaff should be furnished with certain documentation* for any structural, thermal, erosional,I or otherphysicalhydraulic models used by the applicant to es-tablish design or operating bases. The regulatory* position contained in this guide applies only to'physical models used to predict the action or interac-tion of surface waters with features located outside ofcontainment.Generally, regulatory positions I and 3 describe in-formation that should be furnished prior to actualmodel testing., and regulatory positions 4 through 6describe information needed after testing is com-pleted. Additionally, partial test results should be* provided for staff review and acceptance during the* course of testing to ensure reconsideration of* parameters whose importance becomes apparent onthe basis of partial data collection. After completingthe entire study, all the information should be con-solidated either (1) as a separate report with ap-* propriate reference added in the PSAR or (2) for in-sertion into the PSAR.1. Prior to construction of the model, the appli-* cant should submit information outlining (a) the* problem to be resolved, (b) reasons for selecting thehydraulic model chosen to resolve the problem, (c)* expected results to be obtained, (d) a detailed descrip-tion of the model, including a description of.materials, methods used to measure parameters, scalerelations, and other physical characteristics of themodel, (e) methods that will be used to analyze the* data obtained from the model studies, and (0 aschedule of expected tests, proposed completiondates, and estimated dates for submittal of informa-* tion for NRC staff review.2. Staff views and recommendations should besolicited prior to model construction and followingor coincident with the submittal of the information* listed in regulatory position 1, and arrangementsshould also be made for appropriate members of thestaff to be present periodically during model opera-tion to observe the actual performance of the model.3. Documentation should be furnished on how thevarious conditions of geometric, kinematic, dynamic,and thermodynamic.similitude that take into account.the physical properties and flow state of the fluid (i.e,.Froude, Reynolds, Euler, Cauchy, Weber, and otherrelated numbers) have been considered. Because-cer-tain forces may act differently in a model than in aprototype, documentation should be provided tojustify the neglect of any forces by showing that theseforces (a) are of negligible magnitude, (b) compensatefor other neglected forces in such a manner that theeffects of both are negligible, or (c) are such that theirneglect leads to conservative model results and es-tablishmen.t of conservative 'design or operatingbases.Documentation should be furnished on themethods used to satisfy the equations of similitude inthe model. The effects of scale distortions on data ob-tained from the model studies should be documented.Where applicable, model adjustment and verificationprocedures should be described, and informationshould be furnished on the validity of the model overa range of likely flow conditions, heat regimes, at-mospheric conditions, and other physical parameters.Where applicable, it should be demonstrated that themodel will simulate known flow conditions; this ver-ification should be provided when historical data areavailable.4. Where full-scale structures or systems havingcharacteristics similar to those being modeled existand information relative to the observed or measuredperformance of the existingstructures or systems isavailable, the physical model results should be com-pared with the available information generated by theexisting structures. Testing performed on existingfull-scale structures or systems and the results ofthese tests should be described. The applicability ofsuch tests to the problem in question should bedocumented, and any conclusions derived from thetests should be discussed. If the results of other modeltests are used by the applicant, justification for theuse of these results and verification of the ability ofthese other models to reproduce or predict prototypeperformance should also be provided.Detailed documentation of data obtained fromexisting full-scale structures and systems should beprovided, including (a) instrumentation used, (b)description of the data collection network, (c) fre-quency of collection,. (d) methods of collection, and(e) physical parameters existing at the time of collec-tion, such as heat regimes, flow conditions, and at-mospheric conditions.5. Any changes to the original design of theprototypes as a result of the model test should be dis-cussed. The designs that were modeled and the basisfor modifying the design should be documented.Undesirable flow characteristics or failure modes forthe design tested, as well as any oiihcr problems,should be discussed.-6. Figures. drawings, photographs, and text sub-mitted as documentation for regulatory positions 3,4, and 5 should be provided in sufficient detail to al-low the staff to evaluate independently the ap-plicability of the model to the design problem inquestion. (A typical model investigation report aspublished by the U.S. Army Waterways ExperimentStation has been found acceptable in the past.) Bases01.125-2 for the interpretation of model results and for anyconclusions reached should be provided. In many in-stances, it may be advisable to provide partial testresults for review. The models should not be dis-mantled until the staff has reviewed the submittals.
Because not all hydraulic design problems can be resolved by the mechanics of similitude and because there are limitations to hydraulic modeling, the NRC
staff should be furnished. With certain documentation for any structural, thermal, erosional, or other physi cal hydraulic models used by the applicant to estab lish design or operating bases. The regulatory position contained in this guide *applies only to physical models used to predict the action or interaction of surface waters with safety-related features located outside of containment.
 
Generally, regulatory positions 1 and 3 describe information that should be furnished prior to actual model testing, and regulatory positions 4 through 6 describe information needed after testing' is com pleted. Additionally, partial test results should be provided for staff review and acceptance during the course of testing to ensure reconsideration of parameters whose importance emerges after partial data collection. After completing the entire study, all the information should be consolidated either (1) as a separate report with appropriate reference added in the PSAR or (2) for insertion into the PSAR.
 
1. Prior to construction of the model, the applicant should submit information outlining (a) the problem to be resolved, (b) reasons for selecting the hydraulic model chosen to resolve the problem, (c) expected results to be obtained, (d) a detailed description of the model,' including a description of materials, methods used to measure parameters, scale relations, and other physical characteristics of the model, (e)  
methods that will be used to analyze the data obtained from the model studies, and (f) a schedule of expected tests, proposed completion dates, and estimated dates for submittal of information for NRC  
staff review.
 
2. It is desirable that staff views and recommenda tions be solicited prior to model construction and following ot coincident with the submittal of the information listed in regulatory position 1 and that arrangements also be made for appropriate members of the staff to be present periodically during model operation to observe the actual performance of the model.
 
'3. Furnish documentation on how the various con ditions of geometric, kinematic, dynamic, and ther modynamic similitude that take into account the physical properties and flow state of the fluid (i.e.,  
Froude, Reynolds, Euler, Cauchy, Weber, and other related numbers) have been considered. Because certain forces may act differently in a model than in a prototype, documentation should be provided to jus tify the neglect of any forces by showing that these forces (a) are of negligible magnitude, (b) compen sate for other neglected forces in such a manner that the effects of both are negligible, or (c) are such that their neglect leads to conservative model results and establishment of conservative design or operating bases.
 
Documentation should be furnished on the methods used to satisfy the equations of similitude in the model. Also document the effects of scale distortions on data obtained from the model studies. Where applicable, model adjustment and verification proce dures should be described, and information should be furnished on the validity of the model over a range of likely flow conditions, heat regimes, atmospheric conditions, and other physical parameters. Where applicable, demonstrate that the model will simulate known flow conditions, and provide this verification when historical data are available.
 
4. Where full-scale structures or systems having characteristics similar to those being modeled exist and information relative to the observed or measured performance of the existing structures or systems is available, the physical model results should be com pared with the available information generated by the existing structures. If testing is or has been per formed on existing full-scale structures or systems, such tests and their results should be described.
 
Document the applicability of such tests to the prob lem in question, and discuss any conclusions derived from the tests. If the results of other model tests are used by the applicant, justify the use of these results and verify the ability of these other models to reproduce or predict prototype performance.
 
Detailed documentation of data obtained from existing full-scale structures and systems should be provided, including (a) instrumentation used, (b)  
description of the data collection network, (c) fre quency of collection, (d) methods of collection, and (e) physical parameters existing at the time of collection, such as heat regimes, flow conditions, and atmospheric conditions.
 
5. Any changes to the original design of the prototypes as a result of the model test should be discussed. Document the designs that were modeled and the basis for modifying the desig
 
====n. Undesirable====
1.125-2
 
flow characteristics or failure modes for the design tested, as well as any other problems, should be discussed.
 
6. The report covering the completed model tests should include (a) instrumentation used, (b) descrip tion of the data collection network, (c) frequency of collection, and (d) method of collection. Figures, drawings, photographs, and text submitted as documentation for regulatory positions 3, 4, and 5 should be provided in sufficient detail to allow the staff to evaluate independently the applicability of the model to the design problem in question. (A typical model investigation reportI as published by the U.S.
 
Army Waterways Experiment Station has been found acceptable in the past.) Provide bases for the 'in terpretation of model results and for any conclusions
'Further information may be obtained by writing to the Com mander and Director, U.S. Army Engineer Waterways Experi ment Station, Corps of Engineers, P.O. Box 631, Vicksburg, Mississippi 39180.
 
reached. In many instances, it may be advisable to provide partial test results for review. The models should not be dismantled 2 until the staff has re viewed the submittals.


==D. IMPLEMENTATION==
==D. IMPLEMENTATION==
The purpose of this section is to provide informa-tion to license applicants regarding the NRC staff'splans for implementing this regulatory guide.Except in those cases in which the applicantproposes an acceptable alternative method for com-plying with specified portions of the Commission'sregulations, the method described herein will be usedin the evaluation of submittals for construction per-mit applications docketed after November 1, 1977. Ifan applicant wishes to use this regulatory guide indeveloping submittals for construction permit ap-plications docketed on or before November 1, 1977,the pertinent portions of the application will beevaluated on the basis of this guide.1.125-3}}
The purpose of this section is to provide informa tion to applicants regarding the NRC staff's plans for using this regulatory guide.
 
This guide reflects current NRC practice. There fore, except in those cases in which the, applicant proposes an acceptable alternative method for :com plying with specified portions of the Commission's regulations, the method described herein will be used in the evaluation of submittals for construction permit applications until this guide is revised as a result 9f suggestions from the public or additional staff review.
 
2 Preserving the model for a maximum of one year will be acceptable in most cases.
 
1.125-3 I}}


{{RG-Nav}}
{{RG-Nav}}

Latest revision as of 02:10, 17 January 2025

Rev 1,Physical Models for Design and Operation of Hydraulic Structures and Systems for Nuclear Power Plants
ML003739388
Person / Time
Issue date: 10/31/1978
From:
Office of Nuclear Regulatory Research
To:
References
RG-1.125, Rev 1
Download: ML003739388 (3)


U.S. NUCLEAR REGULATORY COMMISSION

Revision I

October 1978 REGULATORY GUIDE

OFFICE OF STANDARDS DEVELOPMENT

REGULATORY GUIDE 1.125 PHYSICAL MODELS FOR DESIGN AND OPERATION

OF HYDRAULIC STRUCTURES AND SYSTEMS FOR NUCLEAR

POWER PLANTS

A. INTRODUCTION

Paragraph (a) (3) (ii) of §50.34, "Contents of Applications; Technical Information," of 10 CFR

Part 50, "Domestic Licensing of Production and Utilization Facilities," requires that the Preliminary Safety Analysis Report (PSAR) include information on the design bases of the facility and the relation of the design bases to the principal design criteria.

Paragraph (a) (4) of §50.34 requires, in part, a preliminary analysis of the adequacy of structures, systems, and components provided for the prevention of accidents and the mitigation of the consequences of accidents.

This guide describes the desired coordination of an applicant with the NRC staff and the detail and documentation of data and studies that an applicant should include in the PSAR to support the use of physical hydraulic model testing for predicting per S

formance of safety-related hydraulic structures and systems for nuclear power plants. The regulatory position of this guide is applicable only to physical models used to predict the action or interaction of surface waters with features located outside of con tainment. The recommendations of this guide are not applicable to internal plant systems or structures.

The Advisory Committee on Reactor Safeguards has been consulted concerning this guide and has concurred in the regulatory position.

B. DISCUSSION

Physical hydraulic models are often used to predict prototype performance. They are particularly useful where hydraulic structures and systems are of unusual

  • Lines indicate substantive changes from previous issue.

design or configuration and hydraulic parameters cannot be adequately evaluated by state-of-the-art analytical methods. Hydraulic models may also be used to establish conservative and reasonable design or operating bases for sites, structures, or systems involving thermal and erosional problems.

Examples of types of physical modeling studies include, but are not confined to, the following:

1. Intake structures.

2. Discharge structures.

3. Energy dissipation structures.

4. Spillway and tailwater ratings for dams (waterlevel discharge relations).

5. Release of water resulting from dam failures..

6. Wave runup, including tsunami effects.

7. Stability of structure when exposed to waves and protection therefrom.

8. Erosion and deposition in streams and other water bodies and protection therefrom.

9. Flow patterns and dispersion of heated or'

contaminated effluents in receiving water bodies.

10. Heat dissipation in receiving water bodies.

11. Response of moored floating bodies to incident wave systems.

12. Response of harbors to waves.

It has been the experience of the NRC staff that some applicants have not furnished sufficiently de tailed information on physical hydraulic model studies for.the staff to perform an adequate review. In some instances, staff involvement in the early plan ning of a model study would have resulted in savings.

of both NRC and applicant'funds and time in the review and acceptance of the results.

Accordingly, the regulatory position describes the USNRC REGULATORY GUIDES

Comments abould be sent to the Secreta*y of the Commison, U.S Nuc USNC

RGUATOY

GIDS

Rguatoy Cmrssan.Washington. D.C. 205 Attention: Dockein and Regulatory Guides are issued to describe and make available to -te public Servic Zranc

h. m alVwDC

0%

At~dn r

methods acceptable to the NRC staff of implementing specific peats of the"

Commission's regulations, to delineate techniques usd by the staff in evalu- The guides are issued In the following ten broad divisions:

st specific Woblems oF postulated accidents, of to provide guidance to appelcantL Regulatmy Guides are not substitutes for regulations, and cor-

1. Power

. Products plieance with them Is not required. Methods arnd solutions differntfro ths

2. p RHebedTetRatr

7 rn r

atitn set out in the guides will be accepta"l if they provide a basis for the findinrs

3. Fuels and Materials Facilities

8 requisite to the issuance or cotnuance of a permit or licens by the

4. Environmental and Siting

9. Antitrust and Financial Review Commistion.

5.

& Materals Plant Protoctlot

10. Gnerwal Requests for single copie of Issued guides (which may be repoduced) or for Comments and suggestions for improvements in theae guides eae encouraged at placement on an automatic distribution list for single copias of future guides all times, and guides will be revised, as appropriate, to accommodate comrnents in specific divisions should be made in writing to the US. Nucla egulamry and to reflect new information or exaperience. This guide was revisd as a result Commission, Washington, D.C.

201.

Attention: Director, Division of of substantive comments received from the public and additional staff review.

Technical Information and Document Control.

I

documentation that should be furnished and the type of coordination bfveen the staff and the applicant that should minimize the time necessary for accept ance of the results of model studies.

The information described in the regulatory posi tion should be incorporated in the PSAR. However, the staff recognizes that it will not always be possible to incorporate such information in the initial applica tion for a construction permit since studies of this type may not be undertaken until after the PSAR is submitted. Such information may, therefore, be added to the PSAR by amendment, either by refer ence to separate reports or by insertion into the PSAR.

C. REGULATORY POSITION

Because not all hydraulic design problems can be resolved by the mechanics of similitude and because there are limitations to hydraulic modeling, the NRC

staff should be furnished. With certain documentation for any structural, thermal, erosional, or other physi cal hydraulic models used by the applicant to estab lish design or operating bases. The regulatory position contained in this guide *applies only to physical models used to predict the action or interaction of surface waters with safety-related features located outside of containment.

Generally, regulatory positions 1 and 3 describe information that should be furnished prior to actual model testing, and regulatory positions 4 through 6 describe information needed after testing' is com pleted. Additionally, partial test results should be provided for staff review and acceptance during the course of testing to ensure reconsideration of parameters whose importance emerges after partial data collection. After completing the entire study, all the information should be consolidated either (1) as a separate report with appropriate reference added in the PSAR or (2) for insertion into the PSAR.

1. Prior to construction of the model, the applicant should submit information outlining (a) the problem to be resolved, (b) reasons for selecting the hydraulic model chosen to resolve the problem, (c) expected results to be obtained, (d) a detailed description of the model,' including a description of materials, methods used to measure parameters, scale relations, and other physical characteristics of the model, (e)

methods that will be used to analyze the data obtained from the model studies, and (f) a schedule of expected tests, proposed completion dates, and estimated dates for submittal of information for NRC

staff review.

2. It is desirable that staff views and recommenda tions be solicited prior to model construction and following ot coincident with the submittal of the information listed in regulatory position 1 and that arrangements also be made for appropriate members of the staff to be present periodically during model operation to observe the actual performance of the model.

'3. Furnish documentation on how the various con ditions of geometric, kinematic, dynamic, and ther modynamic similitude that take into account the physical properties and flow state of the fluid (i.e.,

Froude, Reynolds, Euler, Cauchy, Weber, and other related numbers) have been considered. Because certain forces may act differently in a model than in a prototype, documentation should be provided to jus tify the neglect of any forces by showing that these forces (a) are of negligible magnitude, (b) compen sate for other neglected forces in such a manner that the effects of both are negligible, or (c) are such that their neglect leads to conservative model results and establishment of conservative design or operating bases.

Documentation should be furnished on the methods used to satisfy the equations of similitude in the model. Also document the effects of scale distortions on data obtained from the model studies. Where applicable, model adjustment and verification proce dures should be described, and information should be furnished on the validity of the model over a range of likely flow conditions, heat regimes, atmospheric conditions, and other physical parameters. Where applicable, demonstrate that the model will simulate known flow conditions, and provide this verification when historical data are available.

4. Where full-scale structures or systems having characteristics similar to those being modeled exist and information relative to the observed or measured performance of the existing structures or systems is available, the physical model results should be com pared with the available information generated by the existing structures. If testing is or has been per formed on existing full-scale structures or systems, such tests and their results should be described.

Document the applicability of such tests to the prob lem in question, and discuss any conclusions derived from the tests. If the results of other model tests are used by the applicant, justify the use of these results and verify the ability of these other models to reproduce or predict prototype performance.

Detailed documentation of data obtained from existing full-scale structures and systems should be provided, including (a) instrumentation used, (b)

description of the data collection network, (c) fre quency of collection, (d) methods of collection, and (e) physical parameters existing at the time of collection, such as heat regimes, flow conditions, and atmospheric conditions.

5. Any changes to the original design of the prototypes as a result of the model test should be discussed. Document the designs that were modeled and the basis for modifying the desig

n. Undesirable

1.125-2

flow characteristics or failure modes for the design tested, as well as any other problems, should be discussed.

6. The report covering the completed model tests should include (a) instrumentation used, (b) descrip tion of the data collection network, (c) frequency of collection, and (d) method of collection. Figures, drawings, photographs, and text submitted as documentation for regulatory positions 3, 4, and 5 should be provided in sufficient detail to allow the staff to evaluate independently the applicability of the model to the design problem in question. (A typical model investigation reportI as published by the U.S.

Army Waterways Experiment Station has been found acceptable in the past.) Provide bases for the 'in terpretation of model results and for any conclusions

'Further information may be obtained by writing to the Com mander and Director, U.S. Army Engineer Waterways Experi ment Station, Corps of Engineers, P.O. Box 631, Vicksburg, Mississippi 39180.

reached. In many instances, it may be advisable to provide partial test results for review. The models should not be dismantled 2 until the staff has re viewed the submittals.

D. IMPLEMENTATION

The purpose of this section is to provide informa tion to applicants regarding the NRC staff's plans for using this regulatory guide.

This guide reflects current NRC practice. There fore, except in those cases in which the, applicant proposes an acceptable alternative method for :com plying with specified portions of the Commission's regulations, the method described herein will be used in the evaluation of submittals for construction permit applications until this guide is revised as a result 9f suggestions from the public or additional staff review.

2 Preserving the model for a maximum of one year will be acceptable in most cases.

1.125-3 I