{{#Wiki_filter:October 1974-Nl U.S. ATOMIC ENERGY COMMISSION  
{{#Wiki_filter:October 1974
REGULATORY  
-Nl U.S. ATOMIC ENERGY COMMISSION  
GUIDE DIRECTORATE  
REGULATORY GUIDE
OF RIGULATORY  
DIRECTORATE OF RIGULATORY STANDARDS  
STANDARDS  
'REGULATORY GUIDE.9.3 INFORMATION NEEDED BY THE AEC REGULATORY STAFF IN CONNECTION  
'REGULATORY  
WITH ITS ANTITRUST REVIEW OF OPERATING LICENSE APPLICATIONS  
GUIDE.9.3 INFORMATION  
FOR NUCLEAR POWER PLANTS
NEEDED BY THE AEC REGULATORY  
STAFF IN CONNECTION  
WITH ITS ANTITRUST  
REVIEW OF OPERATING  
LICENSE APPLICATIONS  
FOR NUCLEAR POWER PLANTS  


==A. INTRODUCTION==
==A. INTRODUCTION==
As required by the December 19, 1970, amendments to the Atomic Energy Act of 1954, the Atomic Energy Commission conducts antitrust reviews with respect to construction permits and operating licenses it issues for commercial nuclear facilities.
As required by the December 19, 1970, amendments to the Atomic Energy Act of 1954, the Atomic Energy Commission conducts antitrust reviews with respect to construction permits and operating licenses it issues for commercial nuclear facilitie


The Commission must "under certain circumstances, make a finding as to whether the activities under the permit or license would create or maintain a situation inconsistent with the antitrust laws. An antitrust review at the operating license stage is not required unless the AEC determines such review is advisable on the ground that significant changes in the licensee's activities or proposed activities have occurred subsequent to the previous antitrust review conducted by the Attorney General and the Commission at the construction permit stage. This rejulatory guide identifies -the type of information that the Regulatory staff considers germane for a decision as to whether a second antitrust review is required at the operating license stage. B. INFORMATION  
====s. The Commission must ====
NEEDED BY THE AEC REGULATORY  
"under certain circumstances, make a finding as to whether the activities under the permit or license would create or maintain a situation inconsistent with the antitrust laws. An antitrust review at the operating license stage is not required unless the AEC determines such review is advisable on the ground that significant changes in the licensee's activities or proposed activities have occurred subsequent to the previous antitrust review conducted by the Attorney General and the Commission at the construction permit stage. This rejulatory guide identifies -the type of information that the Regulatory staff considers germane for a decision as to whether a second antitrust review is required at the operating license stage.
STAFF IN CONNECTION  
 
WITH ITS ANTITRUST  
B. INFORMATION NEEDED BY THE AEC  
REVIEW OF OPERATING  
REGULATORY STAFF IN CONNECTION  
LICENSE APPLICATIONS  
WITH ITS ANTITRUST REVIEW
FOR NUCLEAR POWER PLANTS 1. To assist the regulatory staff in Its review, an applicant for a license to operate a commercial nuclear power plant should consider the following items and any related changes that have occurred or are planned to occur since submission iof the construction permit application:  
OF OPERATING LICENSE APPLICATIONS  
FOR NUCLEAR POWER PLANTS  
1. To assist the regulatory staff in Its review, an applicant for a license to operate a commercial nuclear power plant should consider the following items and any related changes that have occurred or are planned to occur since submission iof the construction permit application:  
a. Anticipated excess or shortage in generating capacity resources not expected at the construc tion permit stage. Reasons for the excess or shortage along with data on how the excess will be allocated, distributed, or otherwise utiize4 or how the shortage will be obtained.
a. Anticipated excess or shortage in generating capacity resources not expected at the construc tion permit stage. Reasons for the excess or shortage along with data on how the excess will be allocated, distributed, or otherwise utiize4 or how the shortage will be obtained.


b. New power pools or coordinating groups or changes in structure, activities, policies, practices, or membership of power pools or coordinating groups in which the licensee was, is, or will be a participant.
b. New power pools or coordinating groups or changes in structure, activities, policies, practices, or membership of power pools or coordinating groups in which the licensee was, is, or will be a participant.


c. Changes in transmission with respect to!(l) the nuclear plant, (2) interconnections, or (3) connections to wholesale customers.
c. Changes in transmission with respect to!(l) the nuclear plant,  
(2)  
interconnections, or (3)  
connections to wholesale customers.
 
d. Changes in the ownership or contractual allocation of the output of the nuclear facility. Reasons and basis for such changes should be included.


d. Changes in the ownership or contractual allocation of the output of the nuclear facility.
e. Changes In design, provisions, or conditions of rate schedules and remasons for such changes. Rate increases or decreases are not necessary.


Reasons and basis for such changes should be included.
f. List of all (I) new wholesale customers, (2)
transfers from one rate schedule to another, including copies of schedules not previously furnished, (3) changes in licensee's service area, and (4) licensee's acquisitions or mergers.


e. Changes In design, provisions, or conditions of rate schedules and remasons for such changes. Rate increases or decreases are not necessary.
UWAEC REGULATORY GUIDES
Copin of aukle my be obtainpd by .q t kdImcl*m, b drivilom desird ,  
Wee US.Ammic Em p ComnrIAon. Vdngton. D9. 20564.
 
Adutsey GuOvld an ba m
to rlp med soke muitale w fte pub*ic Amne mn: Director O fRegulato*y Stuncdrd.
 
Comirmns ried ugagtiews for
"t06
1*mm s
010 AEC
New"tor s
t gmnphnutte g
e e
a Iuomw nU In pu fdds are Nrou-rage*
d shoavid be wit so Ow Secrmtmy d. C
=
a fuone ubtlon
 
====s. to isinete q ====
e by
=
d"
e10f 1In ohif.
 
Camnewluon. US. Atomic Energy orni*
 
====e. WinonW ====
oe on..C. 20645.
 
eSaletig dic problem. or poeulated aucidm, . w o
pro I-"
guidmiem g
Antion: Socketirel and Servim S ection.
 
sopme'S.


f. List of all (I) new wholesale customers, (2) transfers from one rate schedule to another, including copies of schedules not previously furnished, (3) changes in licensee's service area, and (4) licensee's acquisitions or merger
eieery Goultn an tt metlttuee for rqubtlom ened ecomnm wkj Uým b m 0qqied.


====s. UWAEC REGULATORY ====
@N;hd ed gluiee diffe fem in U out I
GUIDES Copin of aukle my be obtainpd by .q t b drivilom desird , Wee US.Ammic Em p ComnrIAon.
Mb pkln am Isied In ow lotowir "n bd brow om:
d.


Vdngton. D9. 20564.  Adutsey GuOvld an ba m to rlp med soke muitale w fte Amne mn: Director O
m *~ee~r
Stuncdrd.
.ahwnm t a p k
wor~* g tm*
by d. Cseum.


Comirmns ried ugagtiews for "t06 s 010 AEC New"tor s t gmnphnutte g e e a Iuomw nU In pu fdds are d shoavid be wit so Ow Secrmtmy d. C = a fuone ubtlons. to isinete q e by = d" e10f 1In ohif. Camnewluon.
010.


US. Atomic Energy WinonW oe on..C. 20645.  eSaletig dic problem. or poeulated aucidm, .w o pro I-" guidmiem g Antion: Socketirel and Servim S ection.  sopme'S. eieery Goultn an tt metlttuee for rqubtlom ened ecomnm wkj Uým b m 0qqied. @N;hd ed gluiee diffe fem in U out I Mb pkln am Isied In ow lotowir "n bd brow om: d. m .ahwnm t a p k g by d. Cseum. 010. eacm ators I. Poducw 2. neemrcd Wd Tom Rtaectors  
eacm ators I. Poducw  
2. neemrcd Wd Tom Rtaectors  


===7. lmmortatlose ===
===7. lmmortatlose ===
&3. F.k eMd e Its 0" L OW4etom Heah PAM"4. = bnv 9~010l. spl t w. Amttrnt eview omteesom 4s ml bl if t waitl w aW gepohm. IL Mie wd PaeM Portoal 5. I& eertw g List of those generating capacity additions committed for operation after the nuclear facility, including ownership rights or power output' allocations.
&3. F.k eMd e  
Its  
0"  
L OW4etom Heah PAM"4.
 
= bnv 9~010l.
 
spl t w.
 
Amttrnt eview omteesom 4s ml bl if t waitl w  
aW  
gepohm.
 
IL Mie wd PaeM Portoal  
5.
 
I&  
eertw
 
g List of those generating capacity additions committed for operation after the nuclear facility, including ownership rights or power output'  
allocations.
 
h. Sumrma'y of requests or indications of Interest by other electric power wholesale or retail dis tributors, and licensee's response, for any typ, of electric service or cooperative venture or study.
 
2. licensees whose construction permits Include con ditions pertaining to antitrust aspects should list and discuss those actions or policies which have been Implemented In accordance with such conditions.


h. Sumrma'y of requests or indications of Interest by other electric power wholesale or retail dis tributors, and licensee's response, for any typ, of electric service or cooperative venture or study.2. licensees whose construction permits Include con ditions pertaining to antitrust aspects should list and discuss those actions or policies which have been Implemented In accordance with such conditions.
3. Fve copies of a separate document entitled
"Information for Antitrust Review of Operating License Application"
and containing the above requested information should be submitted when the operating license application documents are sub mitted or a soon thereafter as possible.


3. Fve copies of a separate document entitled "Information for Antitrust Review of Operating License Application" and containing the above requested information should be submitted when the operating license application documents are sub mitted or a soon thereafter as possible.9.3-2 t}}
9.3-2 t}}


{{RG-Nav}}
{{RG-Nav}}

Latest revision as of 02:07, 17 January 2025

Information Needed by the AEC Regulatory Staff in Connection with Its Antitrust Review of Operating License Applications for Nuclear Power Plants
ML003740168
Person / Time
Issue date: 10/31/1974
From:
Office of Nuclear Regulatory Research
To:
References
RG-9.3
Download: ML003740168 (2)


October 1974

-Nl U.S. ATOMIC ENERGY COMMISSION

REGULATORY GUIDE

DIRECTORATE OF RIGULATORY STANDARDS

'REGULATORY GUIDE.9.3 INFORMATION NEEDED BY THE AEC REGULATORY STAFF IN CONNECTION

WITH ITS ANTITRUST REVIEW OF OPERATING LICENSE APPLICATIONS

FOR NUCLEAR POWER PLANTS

A. INTRODUCTION

As required by the December 19, 1970, amendments to the Atomic Energy Act of 1954, the Atomic Energy Commission conducts antitrust reviews with respect to construction permits and operating licenses it issues for commercial nuclear facilitie

s. The Commission must

"under certain circumstances, make a finding as to whether the activities under the permit or license would create or maintain a situation inconsistent with the antitrust laws. An antitrust review at the operating license stage is not required unless the AEC determines such review is advisable on the ground that significant changes in the licensee's activities or proposed activities have occurred subsequent to the previous antitrust review conducted by the Attorney General and the Commission at the construction permit stage. This rejulatory guide identifies -the type of information that the Regulatory staff considers germane for a decision as to whether a second antitrust review is required at the operating license stage.

B. INFORMATION NEEDED BY THE AEC

REGULATORY STAFF IN CONNECTION

WITH ITS ANTITRUST REVIEW

OF OPERATING LICENSE APPLICATIONS

FOR NUCLEAR POWER PLANTS

1. To assist the regulatory staff in Its review, an applicant for a license to operate a commercial nuclear power plant should consider the following items and any related changes that have occurred or are planned to occur since submission iof the construction permit application:

a. Anticipated excess or shortage in generating capacity resources not expected at the construc tion permit stage. Reasons for the excess or shortage along with data on how the excess will be allocated, distributed, or otherwise utiize4 or how the shortage will be obtained.

b. New power pools or coordinating groups or changes in structure, activities, policies, practices, or membership of power pools or coordinating groups in which the licensee was, is, or will be a participant.

c. Changes in transmission with respect to!(l) the nuclear plant,

(2)

interconnections, or (3)

connections to wholesale customers.

d. Changes in the ownership or contractual allocation of the output of the nuclear facility. Reasons and basis for such changes should be included.

e. Changes In design, provisions, or conditions of rate schedules and remasons for such changes. Rate increases or decreases are not necessary.

f. List of all (I) new wholesale customers, (2)

transfers from one rate schedule to another, including copies of schedules not previously furnished, (3) changes in licensee's service area, and (4) licensee's acquisitions or mergers.

UWAEC REGULATORY GUIDES

Copin of aukle my be obtainpd by .q t kdImcl*m, b drivilom desird ,

Wee US.Ammic Em p ComnrIAon. Vdngton. D9. 20564.

Adutsey GuOvld an ba m

to rlp med soke muitale w fte pub*ic Amne mn: Director O fRegulato*y Stuncdrd.

Comirmns ried ugagtiews for

"t06

1*mm s

010 AEC

New"tor s

t gmnphnutte g

e e

a Iuomw nU In pu fdds are Nrou-rage*

d shoavid be wit so Ow Secrmtmy d. C

=

a fuone ubtlon

s. to isinete q

e by

=

d"

e10f 1In ohif.

Camnewluon. US. Atomic Energy orni*

e. WinonW

oe on..C. 20645.

eSaletig dic problem. or poeulated aucidm, . w o

pro I-"

guidmiem g

Antion: Socketirel and Servim S ection.

sopme'S.

eieery Goultn an tt metlttuee for rqubtlom ened ecomnm wkj Uým b m 0qqied.

@N;hd ed gluiee diffe fem in U out I

Mb pkln am Isied In ow lotowir "n bd brow om:

d.

m *~ee~r

.ahwnm t a p k

wor~* g tm*

by d. Cseum.

010.

eacm ators I. Poducw

2. neemrcd Wd Tom Rtaectors

7. lmmortatlose

&3. F.k eMd e

Its

0"

L OW4etom Heah PAM"4.

= bnv 9~010l.

spl t w.

Amttrnt eview omteesom 4s ml bl if t waitl w

aW

gepohm.

IL Mie wd PaeM Portoal

5.

I&

eertw

g List of those generating capacity additions committed for operation after the nuclear facility, including ownership rights or power output'

allocations.

h. Sumrma'y of requests or indications of Interest by other electric power wholesale or retail dis tributors, and licensee's response, for any typ, of electric service or cooperative venture or study.

2. licensees whose construction permits Include con ditions pertaining to antitrust aspects should list and discuss those actions or policies which have been Implemented In accordance with such conditions.

3. Fve copies of a separate document entitled

"Information for Antitrust Review of Operating License Application"

and containing the above requested information should be submitted when the operating license application documents are sub mitted or a soon thereafter as possible.

9.3-2 t