Regulatory Guide 1.94: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(12 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML13350A297
| number = ML003740305
| issue date = 04/30/1975
| issue date = 04/30/1976
| title = Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants
| title = Rev 1 Quality Assurance Requirements for Installation, Inspection & Testing of Structural Concrete & Structural Steel During the Construction Phase of Nuclear Power Plants
| author name =  
| author name =  
| author affiliation = NRC/OSD
| author affiliation = NRC/RES
| addressee name =  
| addressee name =  
| addressee affiliation =  
| addressee affiliation =  
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = RG-1.094
| document report number = RG-1.94, Rev 1
| document type = Regulatory Guide
| document type = Regulatory Guide
| page count = 2
| page count = 2
}}
}}
{{#Wiki_filter:_____UU.S. NUCLEAR REGULATORY COMMISSIONApril 1975REGULATORY GUIDEOFFICE OF STANDARDS DEVELOPMENTREGULATORY GUIDE 1.94.QUALITY ASSURANCE REQUIREMENTS FOR INSTALLATION,INSPECTION, AND TESTING OF STRUCTURAL CONCRETE ANDSTRUCTURAL STEEL DURING THE CONSTRUCTION PHASE OF NUCLEAR POWER PLANTS
{{#Wiki_filter:U.S. NUCLEAR REGULATORY COMMISSION
Revision 1 April 1976 REGULATORY GUIDE
OFFICE OF STANDARDS DEVELOPMENT
REGULATORY GUIDE 1.94 QUALITY ASSURANCE REQUIREMENTS FOR INSTALLATION,  
INSPECTION, AND TESTING OF STRUCTURAL CONCRETE AND
STRUCTURAL STEEL DURING THE CONSTRUCTION PHASE OF NUCLEAR POWER PLANTS


==A. INTRODUCTION==
==A. INTRODUCTION==
Appendix B, "Quality Assurance Criteria for NuclearPower: Plants. and Fuel Reprocessing Plants." to 10 CFRPart 50, "Licensing of Production and UtilizationFacilities," establishes overall quality assurance require-mcnts for the design, construction, and operation ofsafety-related structures, systems, and components ofnuclear power plants. This guide describes a methodacceptable to the NRC staff for complying with theCommission's regulations with regard to quality assur-ance requirements for installation, inspection, and test-ing of structural concrete and structural steel during theconstruction phasc of nuclear puwer plants. ThLi guideapplies to all types of nuclear power plants.
Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," to 10 CFR
Part 50, "Licensing of Production and Utilization Facilities," establishes overall quality assurance require ments for the design, construction, and operation of safety-related structures, syste-ris, and components of nuclear power plants. This guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to quality assur ance requirements for installation, inspection, and test ing of structural concrete and structural steel during the construction phase of nuclear power plants. This guide applies to all types of nuclear power plants. The Advisory Committee on Reactor Safeguards has been consulted concerning this guide and has concurred in the regulatory position.


==B. DISCUSSION==
==B. DISCUSSION==
Working Group N45.2.5 of tile American NationalStandards Committee N45, Reactor Plants and TheirMaintenance, has prepared a standard that includesquality assurance requirements for installation, inspec-tion, and testing of structural concrete and structuralsteel during the construction phase of nuclear powcrplants. This standard was approved by SubcommitteeN45-2, Nuclear Quality Assurance Standards, of theAmerican National Standards Committee N45, and thefull committee. It was subsequently approved anddesignated N45.2.5.19741 by the American NationalStandards Institute on July 8, 1974.[ANSI N45.2.S-1974. "Supplementary Quality Assurance Re-quirements for Installation, Inspection, and Testing of StructuralConcrete and Structural Steel During the Construction Phase ofNuclear Power Plants.- Copics may be obtained from theAmerican Society of Mechanical Engineers. 345 East 47thStreet, New York. New York 10017.
Working Group N45.2.5 of the American National Standards Committee N45, Reactor Plants and Their Maintenance, has prepared a standard that includes quality assurance requirements for installation, inspec tion, and testing of structural concrete and structural steel during the construction phase of nuclear power plants. This standard was approved by Subcommittee N45-2, Nuclear Quality Assurance Standards, of the American National Standards Committee N45, and the full committee.
 
It was subsequently approved and designated N45.2.5-19741 by the American National Standards Institute on July 8, 1974.
 
*Lines indicate substantive changes from previous issue.
 
'ANSI N45.2.5-1974, "Supplementary Quality Assurance Re quirements for Installation, Inspection, and Testing of Struc tural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants." Copies may be obtained from  
ý1'the Ame'ican Society of Mechanical Engineers, 345 East 47th Street, New York, New York 10017.


==C. REGULATORY POSITION==
==C. REGULATORY POSITION==
The requirements and guidelines that ate includedin ANSI N45.2.5-1974 for installation, inspection, andtesting of structural concrete and structural steel duringthe construction phase of nuclear power plants aregenerally acceptable to the NRC sta,'f and providean adequate basis for complying with the pertinentquality assurance requirements of Appendix B to 10CFR Part 50. subject to the following:I. Subdivision 1.5 of ANSI N45.2.5-1974 states:"Othet documents that are required to be includedas a part of this standard are identified at the pointof reference and listed in Section 8 and the Appendix ofthis Standard." The specific applicability cr accepta-bility of documents listed in Section 8 has been coveredseparatcly in other regulatory guides. Other standardsand codes listed in ANSI N45.2.5-1974 provide usefulguidance for the installation, inspection, and testing ofstructural concrete and structural steel. Prior to use ofthese other referenced codes and standards, however,the suitability of the standard or code should be reviewedfor the particular application under consideration.2. Subdivision 2.1 of ANSI N45.2.5-1974 includesgeneral provisions for planning the installation, inspec-tion, and testing of structural concrete and structuralsteel. In this regard the provisions of Subdivision 2.1 ofANSI N45.2.5'-1974 should be used in conjunction withRegulatory Guide 1.55, "Concrete Placement in Cate-gory I Structures."3. Subdivision 4.5 of ANSI N45.2.5-1974 provides, inpart, that inspection of concrete placement shall beperformed to verify the adequacy of concrete consolida-tion equipment and technique of operation. AC! 309-72,USNRC REGULATORY GUIDS Comments should be sent to the Secretary of the Commi,sson. U.S. NuclearRegulatory Guides are issued to describe and make available to the public Regulatory Commrssron. Washington. 0 C 70.S. Attention Docketing andmethods acceptable to the NRC staff of implementing specific parts of the Seraice SectionCommissoon t reguletons, to delineate techniques used by the staff in ewalu The guides are issued in ha following teon broad divsoionssling spectic problems or postulated accidents, or to provide guidance to appltcants Regulatory Guides ate not substitutes tfo regulations, and compliance I Power Reactots 6 Productswith thenm is not required. Methods and solutions difterent from those set out in 2 Research and Test Reactors 7 Ttansporilstonthe guides will be acceptable it they provide a basis for the findings requisite to 3 Fuels and Materials Facilities a. Occupmrtonal Healththe issuance or continuance of a permit or license by the Commission 4 Environmental and Siting 9 Antitrust ReviewComments and suggestion% lot impiovementin in these guides are 5 Melreils and Plant Protection 10. Generalat all times. and guides will he revised. a) Appropriate. to accomnrodate con.erants and to reflect new information or erperience However. comments on Copies of published guides may be obtained by written request indiclting thethis guide. It received within about two months alfter its isluance. will be par divisions desired to the U.S, Nuclear Regulatory Commission. Washington, OC.ticularly useful in evaluating the need for an eatly revision 20%5, Attenlion. ODlector. Office of Standards OevelopmrntS
The requirements and guidelines that are included in ANSI N45.2.5-1974 for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants are generally acceptable to the NRC staff and provide an adequate basis for complying with the pertinent quality assurance requirements of Appendix B to 10 CFR Part  
"Recommended Practice for Consolidation of Con-crete," should be used as a basis for determining tieadequacy of tht. equipment for concrete consolidationand of the technique of operation.4. Subdivision 4.10 of ANSI N45.2.S-1974 states:"Welded reinforcing bar splices shall be subject to therequirements of Section 5.5, except that provisions ofAWS D 12.1 shall apply." The provisions of ArticlesCC-4334 and CC-4330 of the "Proposed Standard Codefor Concrete Reactor Vessels and Containments" (Pro-posed ASME Boiler and Pressure Code Section III,Division 2, through Committee Addenda 6)2 for testingof welded reinforcing bar splices should be used asinterim guidance pending issuance of ASME Section III2Copies bc obtained 'roi;1 The American ConcreteInstitute, P.O. Box 4754. Detroit, Michigan 48219.Division 2 as an approved Code and appropriate endorse.ment by the NRC staff.
50, subject to the following:  
1. Subdivision 1.5 of ANSI N45.2.5-19.74 states:  
"Other documents that are required to be included as a part of this standard are identified at the point of reference and listed in Section 8 and the Appendix of this Standard." The specific applicability or acceptabil ity of documents listed in Section 8 has been covered separately in other regulatory guides. Other standards and codes listed in ANSI N45.2.5-1974 provide useful guidance for the installation, inspection, and testing of structural concrete and structural steel. Prior to use of these other referenced codes and standards, however, the suitability of the standard or code should be reviewed for the particular application under consideration.
 
2. Subdivision 2.1 of ANSI N45.2.5-1974 includes general provisions for planning the installation, inspec tion, and testing of structural concrete and structural steel. In this regard the provisions of Subdivision 2.1 of ANSI N45.2.5-1974 should be used in conjunction with Regulatory Guide 1.55, "Concrete Placement in Cate gory I Structures."  
3. Subdivision 4.5 of ANSI N45.2.5-1974 provides, in part, that inspection of concrete placement shall be performed to verify the adequacy of concrete consolida tion equipment and technique of operation. ACI 309-72, USNRC REGULATORY GUIDES
Comments should be sent to the Secretary of the Commission. U.S. Nuclear Regulatory Commission. Washington, D.C. 20555. Attention: Docketing and Regulatory Guides are issued to describe and make available to the public Service Section.
 
methods acceptable to the NRC staff of implementing specific parts of the Commission's regulations, to delineate techniques used by the staff in evalu.
 
The guides are issued in the following ten broad divisions Sting specific problems or postulated accidents. or to provide guidance to appli cants Regulatory Guides are not substitutes for regulations, and compliance  
 
===1. Power Reactors ===
6 Products with them is not required Methods and solutions different from those set out in  
2. Research and Test Reactors  
7. Transportation the guides will be acceptable if they provide a basis for the findings requisite to  
3 Fuels and Materials Facilities  
0 Occupational Health the issuance or continuance of a permit or license by the Commission  
4. Environmental and Siting S Antitrust Review Comments and suggestions for improvements in these guides are encouraged
5 Materials and Plant Protection  
10. General at all times. and guides will be revised, as appropriate, to accommodate com ments rnd to reflect new information or experience This guide was revised as a Copies of published guides may be obtained by written request indicating the result of substantive comments received from the public and additional staff divisions desired to the U.S Nuclear Regulatory Commission. Washington, D C
review
20555. Attention Director. Office of Standards Development
 
"Recommended Practice for Consolidation of Con crete," 2 should be used as a basis for determining the adequacy of the equipment for concrete consolidation and of the technique of operation.
 
4. Subdivision 4.10 of ANSI N45.2.5-1974 states:  
"Welded reinforcing bar splices shall be-subject to the requirements of Section 5.5, except that provisions of AWS D 12.1 shall apply." In addition, the provisions of Articles CC4334 and CC4330 of the "Code for Concrete Reactor Vessels and Containments" (ASME Boiler and Pressure Vessel Code, Section III, Division 2, 1975 Edition)3 for testing of welded reinforcing bar splices  
2Copies may be obtained from The American Concrete Institute, P.O. Box 4754, Detroit, Michigan 48219.
 
3Copies may be obtained from the American Society of Mechanical Engineers, 345 East 47th Street, New York, N.Y.
 
10017.
 
should be used as guidance pending endorsement of that Code by the NRC staff.


==D. IMPLEMENTATION==
==D. IMPLEMENTATION==
The purpose of this section is to provide gbidance toapplicants and licensees regarding the NRC staffs' plansfor utilizing this regulatory guide.Except in those cases in which the applicant proposesan acceptable alternative method for complying with thespecified portions of the Commission's regulations, themethod described herein will be used in the evaluationof construction pzrnit submittals for applications dock-eted after May 1, 1975. If an applicant whose applica.tion for a construction permit is docketed on or beforeMay I, 1975 wishes to use this regulatory, guide indeveloping submittals for applications, the pertinentportions of the application will be evaluated on the basisof this guide.9iZZ0<mC000 0z -'i0-a00J1.94-2}}
The purpose of this section is to provide information to applicants regarding the NRC staff's plans for using this regulatory guide.
 
Except in those cases in which the applicant proposes an acceptable alternative method for complying with specified portions of the Commission's regulations, the method described herein will be used in the evaluation of construction permit applications docketed after October
15, 1976. The methods described herein will continue to be used until this guide is revised as a result of suggestions from the public or additional staff review.
 
(n. 0
W Z
*z z 0
0
U)
0
LIn Cni O0
D
Un) UN
wL
0
~>
th Z
ou -J
.
0 Z
LA
0I
W
z z}}


{{RG-Nav}}
{{RG-Nav}}

Latest revision as of 02:05, 17 January 2025

Rev 1 Quality Assurance Requirements for Installation, Inspection & Testing of Structural Concrete & Structural Steel During the Construction Phase of Nuclear Power Plants
ML003740305
Person / Time
Issue date: 04/30/1976
From:
Office of Nuclear Regulatory Research
To:
References
RG-1.94, Rev 1
Download: ML003740305 (2)


U.S. NUCLEAR REGULATORY COMMISSION

Revision 1 April 1976 REGULATORY GUIDE

OFFICE OF STANDARDS DEVELOPMENT

REGULATORY GUIDE 1.94 QUALITY ASSURANCE REQUIREMENTS FOR INSTALLATION,

INSPECTION, AND TESTING OF STRUCTURAL CONCRETE AND

STRUCTURAL STEEL DURING THE CONSTRUCTION PHASE OF NUCLEAR POWER PLANTS

A. INTRODUCTION

Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," to 10 CFR

Part 50, "Licensing of Production and Utilization Facilities," establishes overall quality assurance require ments for the design, construction, and operation of safety-related structures, syste-ris, and components of nuclear power plants. This guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to quality assur ance requirements for installation, inspection, and test ing of structural concrete and structural steel during the construction phase of nuclear power plants. This guide applies to all types of nuclear power plants. The Advisory Committee on Reactor Safeguards has been consulted concerning this guide and has concurred in the regulatory position.

B. DISCUSSION

Working Group N45.2.5 of the American National Standards Committee N45, Reactor Plants and Their Maintenance, has prepared a standard that includes quality assurance requirements for installation, inspec tion, and testing of structural concrete and structural steel during the construction phase of nuclear power plants. This standard was approved by Subcommittee N45-2, Nuclear Quality Assurance Standards, of the American National Standards Committee N45, and the full committee.

It was subsequently approved and designated N45.2.5-19741 by the American National Standards Institute on July 8, 1974.

  • Lines indicate substantive changes from previous issue.

'ANSI N45.2.5-1974, "Supplementary Quality Assurance Re quirements for Installation, Inspection, and Testing of Struc tural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants." Copies may be obtained from

ý1'the Ame'ican Society of Mechanical Engineers, 345 East 47th Street, New York, New York 10017.

C. REGULATORY POSITION

The requirements and guidelines that are included in ANSI N45.2.5-1974 for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants are generally acceptable to the NRC staff and provide an adequate basis for complying with the pertinent quality assurance requirements of Appendix B to 10 CFR Part

50, subject to the following:

1. Subdivision 1.5 of ANSI N45.2.5-19.74 states:

"Other documents that are required to be included as a part of this standard are identified at the point of reference and listed in Section 8 and the Appendix of this Standard." The specific applicability or acceptabil ity of documents listed in Section 8 has been covered separately in other regulatory guides. Other standards and codes listed in ANSI N45.2.5-1974 provide useful guidance for the installation, inspection, and testing of structural concrete and structural steel. Prior to use of these other referenced codes and standards, however, the suitability of the standard or code should be reviewed for the particular application under consideration.

2. Subdivision 2.1 of ANSI N45.2.5-1974 includes general provisions for planning the installation, inspec tion, and testing of structural concrete and structural steel. In this regard the provisions of Subdivision 2.1 of ANSI N45.2.5-1974 should be used in conjunction with Regulatory Guide 1.55, "Concrete Placement in Cate gory I Structures."

3. Subdivision 4.5 of ANSI N45.2.5-1974 provides, in part, that inspection of concrete placement shall be performed to verify the adequacy of concrete consolida tion equipment and technique of operation. ACI 309-72, USNRC REGULATORY GUIDES

Comments should be sent to the Secretary of the Commission. U.S. Nuclear Regulatory Commission. Washington, D.C. 20555. Attention: Docketing and Regulatory Guides are issued to describe and make available to the public Service Section.

methods acceptable to the NRC staff of implementing specific parts of the Commission's regulations, to delineate techniques used by the staff in evalu.

The guides are issued in the following ten broad divisions Sting specific problems or postulated accidents. or to provide guidance to appli cants Regulatory Guides are not substitutes for regulations, and compliance

1. Power Reactors

6 Products with them is not required Methods and solutions different from those set out in

2. Research and Test Reactors

7. Transportation the guides will be acceptable if they provide a basis for the findings requisite to

3 Fuels and Materials Facilities

0 Occupational Health the issuance or continuance of a permit or license by the Commission

4. Environmental and Siting S Antitrust Review Comments and suggestions for improvements in these guides are encouraged

5 Materials and Plant Protection

10. General at all times. and guides will be revised, as appropriate, to accommodate com ments rnd to reflect new information or experience This guide was revised as a Copies of published guides may be obtained by written request indicating the result of substantive comments received from the public and additional staff divisions desired to the U.S Nuclear Regulatory Commission. Washington, D C

review

20555. Attention Director. Office of Standards Development

"Recommended Practice for Consolidation of Con crete," 2 should be used as a basis for determining the adequacy of the equipment for concrete consolidation and of the technique of operation.

4. Subdivision 4.10 of ANSI N45.2.5-1974 states:

"Welded reinforcing bar splices shall be-subject to the requirements of Section 5.5, except that provisions of AWS D 12.1 shall apply." In addition, the provisions of Articles CC4334 and CC4330 of the "Code for Concrete Reactor Vessels and Containments" (ASME Boiler and Pressure Vessel Code,Section III, Division 2, 1975 Edition)3 for testing of welded reinforcing bar splices

2Copies may be obtained from The American Concrete Institute, P.O. Box 4754, Detroit, Michigan 48219.

3Copies may be obtained from the American Society of Mechanical Engineers, 345 East 47th Street, New York, N.Y.

10017.

should be used as guidance pending endorsement of that Code by the NRC staff.

D. IMPLEMENTATION

The purpose of this section is to provide information to applicants regarding the NRC staff's plans for using this regulatory guide.

Except in those cases in which the applicant proposes an acceptable alternative method for complying with specified portions of the Commission's regulations, the method described herein will be used in the evaluation of construction permit applications docketed after October

15, 1976. The methods described herein will continue to be used until this guide is revised as a result of suggestions from the public or additional staff review.

(n. 0

W Z

  • z z 0

0

U)

0

LIn Cni O0

D

Un) UN

wL

0

~>

th Z

ou -J

.

0 Z

LA

0I

W

z z