{{#Wiki_filter:April 16, 2002 MEMORANDUM TO: Richard J. Laufer, Acting Section Chief, Section 1 Project Directorate II Division of Licensing Project Management FROM:                   Gordon E. Edison, Senior Project Manager, Section 1/RA/
{{#Wiki_filter:April 16, 2002 MEMORANDUM TO: Richard J. Laufer, Acting Section Chief, Section 1 Project Directorate II Division of Licensing Project Management FROM:
Gordon E. Edison, Senior Project Manager, Section 1/RA/
Project Directorate II Division of Licensing Project Management
Project Directorate II Division of Licensing Project Management


Line 31: Line 32:
As stated
As stated


MEMORANDUM TO: Richard J. Laufer, Acting Section Chief, Section 1 April 16, 2002 Project Directorate II Division of Licensing Project Management FROM:                   Gordon E. Edison, Senior Project Manager, Section 1/RA/
MEMORANDUM TO: Richard J. Laufer, Acting Section Chief, Section 1 April 16, 2002 Project Directorate II Division of Licensing Project Management FROM:
Gordon E. Edison, Senior Project Manager, Section 1/RA/
Project Directorate II Division of Licensing Project Management
Project Directorate II Division of Licensing Project Management


Line 43: Line 45:
==Attachment:==
==Attachment:==
As stated Distribution:
As stated Distribution:
PUBLIC                   EDunnnigton           SBloom PDII-1 Reading           KKarwoski GEdison                 RLaufer Accession Number: ML020920429 OFFICE PM:PDII-1             LA:PDII-2         (A)SC:PDII-1 NAME GEdison                 EDunnington       RLaufer DATE       04/05/2002       04/04/2002         04/05/2002 OFFICIAL RECORD COPY
PUBLIC EDunnnigton SBloom PDII-1 Reading KKarwoski GEdison RLaufer Accession Number: ML020920429 OFFICE PM:PDII-1 LA:PDII-2 (A)SC:PDII-1 NAME GEdison EDunnington RLaufer DATE 04/05/2002 04/04/2002 04/05/2002 OFFICIAL RECORD COPY


PARTICIPATION IN MARCH 28, 2002 RELATED TO REACTOR VESSEL HEAD INSPECTION AT SURRY, UNIT 2 NAME                     ORGANIZATION Gordon E. Edison         NRC/NRR Stephanie Coffin         NRC/NRR Ken Karwoski             NRC/NRR Jerry Blake             NRC/Region II Gerry McCoy             NRC/Region II Larry Garner             NRC/Region II Leslie Hartz             VEPCO (Dominion)
PARTICIPATION IN MARCH 28, 2002 RELATED TO REACTOR VESSEL HEAD INSPECTION AT SURRY, UNIT 2 NAME ORGANIZATION Gordon E. Edison NRC/NRR Stephanie Coffin NRC/NRR Ken Karwoski NRC/NRR Jerry Blake NRC/Region II Gerry McCoy NRC/Region II Larry Garner NRC/Region II Leslie Hartz VEPCO (Dominion)
William Matthews         VEPCO Richard Blount           VEPCO David Heacock           VEPCO Toby Sowers             VEPCO Bryan Foster             VEPCO Jerry Bischof           VEPCO Steve Sarver             VEPCO Ron Berryman             VEPCO Matt Adams               VEPCO John Swientoniewski     VEPCO Les Spain               VEPCO David Sommers           VEPCO Ed Brennan               VEPCO Michal Small             VEPCO Gary Miller             VEPCO Jim Bennetch             VEPCO Keshab Dwivedy           VEPCO}}
William Matthews VEPCO Richard Blount VEPCO David Heacock VEPCO Toby Sowers VEPCO Bryan Foster VEPCO Jerry Bischof VEPCO Steve Sarver VEPCO Ron Berryman VEPCO Matt Adams VEPCO John Swientoniewski VEPCO Les Spain VEPCO David Sommers VEPCO Ed Brennan VEPCO Michal Small VEPCO Gary Miller VEPCO Jim Bennetch VEPCO Keshab Dwivedy VEPCO}}

Latest revision as of 19:17, 16 January 2025

Conference Call with VEPCO Reactor Vessel Head Inspection
ML020920429
Person / Time
Site: Surry Dominion icon.png
Issue date: 04/16/2002
From: Edison G
NRC/NRR/DLPM/LPD2
To: Richard Laufer
NRC/NRR/DLPM/LPD2
Edison G E, NRR/DLPM, 415--1448
References
TAC MB4584
Download: ML020920429 (4)


Text

April 16, 2002 MEMORANDUM TO: Richard J. Laufer, Acting Section Chief, Section 1 Project Directorate II Division of Licensing Project Management FROM:

Gordon E. Edison, Senior Project Manager, Section 1/RA/

Project Directorate II Division of Licensing Project Management

SUBJECT:

CONFERENCE CALL WITH VEPCO RE: REACTOR VESSEL HEAD INSPECTION (TAC NO. MB4584)

On March 28, 2002, a conference call was held with Virginia Electric and Power Company (VEPCO). The purpose of the call was to discuss their plans for an inspection of the Surry Unit 2 reactor vessel head during their spring 2002, refueling outage. Participants in the call are listed in the Enclosure. The licensee had previously inspected the head in late November 2001, for evidence of nozzle leakage as a result of NRC Bulletin 2001-01.

The licensee stated they planned to do a 100% qualified visual bare metal inspection of the top of the head within the control rod drive mechanism ventilation shroud in early April 2002. This inspection would assess the general condition of the head and whether the vessel head penetration nozzles had through-wall degradation. They indicated they did not expect to see evidence of leakage (boric acid deposits) on the top of the head because they had inspected the head 4 months earlier and found the head relatively clean.

No ultrasonic or other nondestructive testing is planned unless evidence of leakage is observed. Based on corrosion rate estimates from the Davis-Besse head corrosion, VEPCO projected no significant head corrosion over the next operating cycle (about 18 months) even if leakage began after restart from this outage. The NRC staff had no objections to the licensees testing plans as described; however, the staff indicated that a visual exam for leaking nozzles will only indicate if a nozzle has a through-wall flaw, but will not indicate if a deep partial through-wall flaw exists. VEPCO agreed to hold another conference call after the inspection and prior to restart, to discuss the inspection results with NRC.

Docket No. 50-281

Attachment:

As stated

MEMORANDUM TO: Richard J. Laufer, Acting Section Chief, Section 1 April 16, 2002 Project Directorate II Division of Licensing Project Management FROM:

Gordon E. Edison, Senior Project Manager, Section 1/RA/

Project Directorate II Division of Licensing Project Management

SUBJECT:

CONFERENCE CALL WITH VEPCO RE: REACTOR VESSEL HEAD INSPECTION (TAC NO. MB4584)

On March 28, 2002, a conference call was held with Virginia Electric and Power Company (VEPCO). The purpose of the call was to discuss their plans for an inspection of the Surry Unit 2 reactor vessel head during their spring 2002, refueling outage. Participants in the call are listed in the Enclosure. The licensee had previously inspected the head in late November 2001, for evidence of nozzle leakage as a result of NRC Bulletin 2001-01.

The licensee stated they planned to do a 100% qualified visual bare metal inspection of the top of the head within the control rod drive mechanism ventilation shroud in early April 2002. This inspection would assess the general condition of the head and whether the vessel head penetration nozzles had through-wall degradation. They indicated they did not expect to see evidence of leakage (boric acid deposits) on the top of the head because they had inspected the head 4 months earlier and found the head relatively clean.

No ultrasonic or other nondestructive testing is planned unless evidence of leakage is observed. Based on corrosion rate estimates from the Davis-Besse head corrosion, VEPCO projected no significant head corrosion over the next operating cycle (about 18 months) even if leakage began after restart from this outage. The NRC staff had no objections to the licensees testing plans as described; however, the staff indicated that a visual exam for leaking nozzles will only indicate if a nozzle has a through-wall flaw, but will not indicate if a deep partial through-wall flaw exists. VEPCO agreed to hold another conference call after the inspection and prior to restart, to discuss the inspection results with NRC.

Docket No. 50-281

Attachment:

As stated Distribution:

PUBLIC EDunnnigton SBloom PDII-1 Reading KKarwoski GEdison RLaufer Accession Number: ML020920429 OFFICE PM:PDII-1 LA:PDII-2 (A)SC:PDII-1 NAME GEdison EDunnington RLaufer DATE 04/05/2002 04/04/2002 04/05/2002 OFFICIAL RECORD COPY

PARTICIPATION IN MARCH 28, 2002 RELATED TO REACTOR VESSEL HEAD INSPECTION AT SURRY, UNIT 2 NAME ORGANIZATION Gordon E. Edison NRC/NRR Stephanie Coffin NRC/NRR Ken Karwoski NRC/NRR Jerry Blake NRC/Region II Gerry McCoy NRC/Region II Larry Garner NRC/Region II Leslie Hartz VEPCO (Dominion)

William Matthews VEPCO Richard Blount VEPCO David Heacock VEPCO Toby Sowers VEPCO Bryan Foster VEPCO Jerry Bischof VEPCO Steve Sarver VEPCO Ron Berryman VEPCO Matt Adams VEPCO John Swientoniewski VEPCO Les Spain VEPCO David Sommers VEPCO Ed Brennan VEPCO Michal Small VEPCO Gary Miller VEPCO Jim Bennetch VEPCO Keshab Dwivedy VEPCO