ML022830369: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:LCO Applicability3.0 3.0   LCO APPLICABILITY   (continued)
{{#Wiki_filter:LCO Applicability 3.0 3.0 LCO APPLICABILITY (continued)
(continued) 3.0  LCO APPLICABILITY LCO   3.0.7         Special Operations LCOs in Section 3.10 allow specified to be changed Technical Specifications (TS) requirements to operations. Unless permit performance"of special tests'and remain otherwise specified, all other TS requirements
LCO 3.0.7 Special Operations LCOs in Section 3.10 allow specified Technical Specifications (TS) requirements to be changed to permit performance"of special tests'and operations.
                  ,unchanged. Compliancewith Special Operations LCOs.'is be optional. When~a Special Operations LCO is desired to Operations met but is not met, the ACTIONS of'the Special When a Special Operations   LCO is not LCO shall be met.
Unless otherwise specified, all other TS requirements remain
into a MODE or other specified desired to be met, entry made in condition in the Applicability shall only be accordance with the other ap'plicable Specifications.
,unchanged.
Amendment No. 4497-69,180 1' Columbia Generating Station           3.0-3
Compliancewith Special Operations LCOs.'is optional.
When~a Special Operations LCO is desired to be met but is not met, the ACTIONS of'the Special Operations LCO shall be met.
When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other ap'plicable Specifications.
Amendment No. 4497-69,180 1'
Columbia Generating Station 3.0 LCO APPLICABILITY (continued) 3.0-3


SR Applicability. 3.0 APPLICABILITY 3.0- SURVEILLANCE REQUIREMENT (SR) specified SR - 3.0.1        SRs shall be met during the MODES or other for   individual         LCOs, unless conditions in the Applicability otherwise stated in the SR.       Failure to meet a Surveillance, whether such failure is     experienced     during the performance between   performances         of the.
SR Applicability.
of the Surveillance or to meet     the   LCO.     Failure to Surveillance, shall be failure Frequency shall perform a Surveillance within the specified as   provided       in SR 3.0.3.
3.0 3.0- SURVEILLANCE REQUIREMENT (SR)
be failure to meet the LCO except on  inoperable Surveillances do not have to be performed equipment or variables outside specified limits.
APPLICABILITY SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR.
SR  3.0.2          The specified Frequency for each SR is met if the the interval Surveillance is performed within 1.25 times from    the previous specified in the Frequency, as measured time    a  specified performance or as measured from the condition of the Frequency is met.
Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the.
interval For Frequencies specified as "once," the above extension does not apply.
Surveillance, shall be failure to meet the LCO.
on a If a Completion Time requires periodic performance "once per     . ." basis, the above Frequency extension performance.
Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3.
applies to each performance after the initial in the Exceptions to this Specification are stated individual Specifications.
Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.
not performed SR  3.0.3          If it is discovered that a Surveillance was then    compliance        with the within its specified Frequency.                                           from LCO not   met   may   be   delayed.
The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.
requirement to declare the the limit of the time of discovery, up to 24 hours or up to is greater.         This delay the specified Frequency, whichever of  the period is permitted to allow performance Surveillance. A risk evaluation shall be performed for any the risk Surveillance delayed greater than 24 hours and impact shall be managed.
For Frequencies specified as "once," the above interval extension does not apply.
the delay If the Surveillance is not performed within be   declared       not met, and period, the LCO must immediately the applicable Condition(s)     must   be   entered.
If a Completion Time requires periodic performance on a "once per  
                                                                                        -(continued)
." basis, the above Frequency extension applies to each performance after the initial performance.
Amendment No.       +49-,169,180 Columbia Generating Station             3.0-4
Exceptions to this Specification are stated in the individual Specifications.
If it is discovered that a Surveillance was not performed within its specified Frequency. then compliance with the requirement to declare the LCO not met may be delayed. from the time of discovery, up to 24 hours or up to the limit of the specified Frequency, whichever is greater.
This delay period is permitted to allow performance of the Surveillance.
A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours and the risk impact shall be managed.
If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.  
-(continued)
Amendment No.  
+49-,169,180 Columbia Generating Station SR - 3.0.1 SR 3.0.2 SR 3.0.3 3.0-4


SR Applicability 3.0 3.0   SR APPLICABILITY SR 3.0.3           When the Surveillance is performed within the delay period (continued)      and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
SR Applicability 3.0 3.0 SR APPLICABILITY SR 3.0.3 (continued)
SR  3.0.4          Entry into a MODE or other specified condition in the Applicability of an LCO shall not be made unless the LCO's Surveillances have been met within their specified Frequency. This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
SR 3.0.4 When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
Entry into a MODE or other specified condition in the Applicability of an LCO shall not be made unless the LCO's Surveillances have been met within their specified Frequency.
This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
SR 3.0.4 is only applicable for entry into a MODE or other specified condition in the Applicability in MODES 1, 2, and 3.
SR 3.0.4 is only applicable for entry into a MODE or other specified condition in the Applicability in MODES 1, 2, and 3.
Columbia Generating Station           3.0-5                Amendment No. 149 169 180}}
Columbia Generating Station Amendment No.
149 169 180 3.0-5}}

Latest revision as of 15:34, 16 January 2025

Technical Specification Pages (2 Sided) Amendment No. 180, Technical Specification Changes Re Missed Surveillances Using Consolidated Line Item Improvement Program
ML022830369
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/08/2002
From: Brian Benney
NRC/NRR/DLPM
To:
Benney B, NRR/DLPM, 415-3764
Shared Package
ml List:
References
TAC MB5788
Download: ML022830369 (3)


Text

LCO Applicability 3.0 3.0 LCO APPLICABILITY (continued)

LCO 3.0.7 Special Operations LCOs in Section 3.10 allow specified Technical Specifications (TS) requirements to be changed to permit performance"of special tests'and operations.

Unless otherwise specified, all other TS requirements remain

,unchanged.

Compliancewith Special Operations LCOs.'is optional.

When~a Special Operations LCO is desired to be met but is not met, the ACTIONS of'the Special Operations LCO shall be met.

When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other ap'plicable Specifications.

Amendment No. 4497-69,180 1'

Columbia Generating Station 3.0 LCO APPLICABILITY (continued) 3.0-3

SR Applicability.

3.0 3.0- SURVEILLANCE REQUIREMENT (SR)

APPLICABILITY SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR.

Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the.

Surveillance, shall be failure to meet the LCO.

Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3.

Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per

." basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

If it is discovered that a Surveillance was not performed within its specified Frequency. then compliance with the requirement to declare the LCO not met may be delayed. from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater.

This delay period is permitted to allow performance of the Surveillance.

A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

-(continued)

Amendment No.

+49-,169,180 Columbia Generating Station SR - 3.0.1 SR 3.0.2 SR 3.0.3 3.0-4

SR Applicability 3.0 3.0 SR APPLICABILITY SR 3.0.3 (continued)

SR 3.0.4 When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

Entry into a MODE or other specified condition in the Applicability of an LCO shall not be made unless the LCO's Surveillances have been met within their specified Frequency.

This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

SR 3.0.4 is only applicable for entry into a MODE or other specified condition in the Applicability in MODES 1, 2, and 3.

Columbia Generating Station Amendment No.

149 169 180 3.0-5