{{#Wiki_filter:Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1395 INDIANA MICHIGAN POWER December 13, 2002                                             AEP:NRC:2691-25 Docket Nos.      50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for November 2002 is submitted.
{{#Wiki_filter:Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1395 INDIANA MICHIGAN POWER December 13, 2002 Docket Nos.
AEP:NRC:2691-25 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for November 2002 is submitted.
Sincerely, Scot A. Greenlee Director, Nuclear Technical Services BWO/jen Attachments
Sincerely, Scot A. Greenlee Director, Nuclear Technical Services BWO/jen Attachments


U. S. Nuclear Regulatory Commission   AEP:NRC:2691-25 Page 2 c: ANI Nuclear Engineering Department A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk
U. S. Nuclear Regulatory Commission Page 2 c: ANI Nuclear Engineering Department A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk AEP:NRC:2691-25


N.R.C. OPERATING DATA REPORT DOCKET NO.       50-315 DATE     12/10/02 COMPLETED BY RAF Harris TELEPHONE 269-465-5901 OPERATING STATUS
N.R.C. OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name         D.C. Cook Unit 1                                       Notes:
50-315 DATE 12/10/02 COMPLETED BY RAF Harris TELEPHONE 269-465-5901 OPERATING STATUS
: 2. Reporting Period                                   Nov-02
: 1. Unit Name D.C. Cook Unit 1 Notes:
: 3. Licensed Thermal Power (MWt)                         3250
: 2. Reporting Period Nov-02
: 4. Name Plate Rating (Gross MWe)                         1152
: 3. Licensed Thermal Power (MWt) 3250
: 5. Design Electrical Rating (Net MWe)                     1020
: 4. Name Plate Rating (Gross MWe) 1152
: 6. Maximum Dependable Capacity(GROSS MWe)                 1056
: 5. Design Electrical Rating (Net MWe) 1020
: 7. Maximum Dependable Capacity (Net MWe)                 1000
: 6. Maximum Dependable Capacity(GROSS MWe) 1056
: 7. Maximum Dependable Capacity (Net MWe) 1000
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
: 9. Power Level To Which Restricted. If Any (Net MWe)
: 9. Power Level To Which Restricted. If Any (Net MWe)
: 10. Reasons For Restrictions.
: 10. Reasons For Restrictions.
This Mo.                 Yr. to Date               Cumm.
This Mo.
: 11. Hours in Reporting Period                         720.0                     8016.0              244704.0
Yr. to Date
: 12. No. of Hrs. Reactor Was Critical                   720.0                     7083.3             166604.6
: 11. Hours in Reporting Period 720.0 8016.0
: 13. Reactor Reserve Shutdown Hours                       0.0                       0.0               463.0
: 12. No. of Hrs. Reactor Was Critical 720.0 7083.3
: 14. Hours Generator on Line                           720.0                     7039.5             163944.9
: 13. Reactor Reserve Shutdown Hours 0.0 0.0
: 15. Unit Reserve Shutdown Hours                           0.0                       0.0                321.0
: 14. Hours Generator on Line 720.0 7039.5
: 16. Gross Therm. Energy Gen. (MWH)               2304291.6                 22419735.0            487925042.0
: 15. Unit Reserve Shutdown Hours 0.0 0.0
: 17. Gross Elect. Energy Gen. (MWH)                 751750.0                   7241800.0          158474620.0
: 16. Gross Therm. Energy Gen. (MWH) 2304291.6 22419735.0
: 18. Net Elect. Energy Gen. (MWH)                   726636.0                   6999120.6           152533414.5
: 17. Gross Elect. Energy Gen. (MWH) 751750.0 7241800.0
: 19. Unit Service Factor                               100.0                       87.8                 67.5
: 18. Net Elect. Energy Gen. (MWH) 726636.0 6999120.6
: 20. Unit Availability Factor                           100.0                       87.8                 67.5
: 19. Unit Service Factor 100.0 87.8
: 21. Unit Capacity Factor (MDC Net)                     100.9                       87.3                 63.8
: 20. Unit Availability Factor 100.0 87.8
: 22. Unit Capacity Factor (DER Net)                       98.9                       85.6                 62.5
: 21. Unit Capacity Factor (MDC Net) 100.9 87.3
: 23. Unit Forced Outage Rate                               0.0                       1.4                 19.2
: 22. Unit Capacity Factor (DER Net) 98.9 85.6
: 23. Unit Forced Outage Rate 0.0 1.4
: 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
: 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
: 25. If Shut Down At End of Report Period, Est'd Date of Startup:
: 25. If Shut Down At End of Report Period, Est'd Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast                 Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Cumm.
244704.0 166604.6 463.0 163944.9 321.0 487925042.0 158474620.0 152533414.5 67.5 67.5 63.8 62.5 19.2


AVERAGE DAILY POWER LEVEL (MWe-Net)
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO. 50-315 UNIT            ONE DATE          02-Dec-02 COMPLETED BY    RAF Harris TELEPHONE      269-465-5901 MONTH     Nov-02 AVERAGE DAILY                           AVERAGE DAILY DAY    POWER LEVEL                 DAY       POWER LEVEL
DOCKET NO.
.11/1/02     1031                    11/17/02       1021 11/2/02     1031                    11/18/02       1030 11/3/02     1033                    11/19/02       1037 11/4/02     1032                    11/20/02       1027 11/5102    1030                    11/21/02       1032 11/6/02     1032                    11/22/02       1033 11/7/02     1027                    11/23/02       1031 11/8/02     1031                    11/24/02       1026 11/9/02     1034                    11/25/02       1028 11110/02    1036                    11/26/02       1031 11/11/02     466                    11/27/02       1029 11/12/02     934                    11/28/02       1032 11/13/02     1030                    11/29/02       1033 11/14/02     1038                    11/30/02       1033 11/15/02     1027 11/16/02     1041
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 02-Dec-02 RAF Harris 269-465-5901 MONTH Nov-02 AVERAGE DAILY POWER LEVEL 1031 1031 1033 1032 1030 1032 1027 1031 1034 1036 466 934 1030 1038 1027 1041 DAY 11/17/02 11/18/02 11/19/02 11/20/02 11/21/02 11/22/02 11/23/02 11/24/02 11/25/02 11/26/02 11/27/02 11/28/02 11/29/02 11/30/02 AVERAGE DAILY POWER LEVEL 1021 1030 1037 1027 1032 1033 1031 1026 1028 1031 1029 1032 1033 1033 DAY
.11/1/02 11/2/02 11/3/02 11/4/02 11/5102 11/6/02 11/7/02 11/8/02 11/9/02 11110/02 11/11/02 11/12/02 11/13/02 11/14/02 11/15/02 11/16/02


DOCKET NO.           50-315 UNIT NAME            D.C. Cook Unit 1 DATE                December 3, 2002 COMPLETED BY        B. O'Rourke TELEPHONE            269-465-5901 PAGE                1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2002 METHOD OF SHUTTING       LICENSEE DURATION                   DOWN           EVENT         SYSTEM     COMPONENT             CAUSE AND CORRECTIVE ACTION NO.   'DATE TYPE1     HOURS         REASON 2   REACTOR 3      REPORT NO. CODE 4    CODE 5                    TO PREVENT RECURRENCE 344   021110   S         0             B         4               n/a         AB         P                   Unit 1 power reduced to 30% to allow containment entry to add oil to the #14 Reactor Coolant Pump.
DOCKET NO.
1 TYPE:             2 REASON:                              3 METHOD:                  4 SYSTEM:                                  5 COMPONENT:
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit 1 December 3, 2002 B. O'Rourke 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.  
F: Forced          A: Equipment Failure (Explain)           1: Manual                Exhibit G - Instructions                  Exhibit I: Same Source S: Scheduled        B: Maintenance or Test                 2:  Manual Scram          for preparation of data C: Refueling                           3:  Automatic Scram        entry sheets for Licensee D: Regulatory Restriction               4:  Other (Explain)        Event Report (LER) File E: Operator Training and                                           (NUREG 0161)
'DATE TYPE1 HOURS REASON 2 REACTOR3 REPORT NO.
License Examination F: Administrative G: Operational Error (Explain)
CODE4 CODE5 TO PREVENT RECURRENCE 344 021110 S
H: Other (Explain)
0 B
4 n/a AB P
Unit 1 power reduced to 30% to allow containment entry to add oil to the #14 Reactor Coolant Pump.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source


N.R.C. OPERATING DATA REPORT DOCKET NO.       50-316 DATE     1212/02 COMPLETED BY RAF Harris TELEPHONE 269-465-5901 OPERATING STATUS
N.R.C. OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name         D. C. Cook Unit 2                                       Notes:
50-316 DATE 1212/02 COMPLETED BY RAF Harris TELEPHONE 269-465-5901 OPERATING STATUS
: 2. Reporting Period                                     Nov-02
: 1. Unit Name D. C. Cook Unit 2 Notes:
: 3. Licensed Thermal Power (MWt)                           3411
: 2. Reporting Period Nov-02
: 4. Name Plate Rating (Gross MWe)                           1133
: 3. Licensed Thermal Power (MWt) 3411
: 5. Design Electrical Rating (Net MWe)                     1090
: 4. Name Plate Rating (Gross MWe) 1133
: 6. Maximum Dependable Capacity(GROSS MWe)                 1100
: 5. Design Electrical Rating (Net MWe) 1090
: 7. Maximum Dependable Capacity (Net MWe)                   1060
: 6. Maximum Dependable Capacity(GROSS MWe) 1100
: 7. Maximum Dependable Capacity (Net MWe) 1060
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
: 9. Power Level To Which Restricted. If Any (Net MWe)
: 9. Power Level To Which Restricted. If Any (Net MWe)
: 10. Reasons For Restrictions.
: 10. Reasons For Restrictions.
This Mo.                 Yir. to Date              Cumm.
This Mo.
: 11. Hours in Reporting Period                           720.0                      8016.0              218850.0
Yi
: 12. No. of Hrs. Reactor Was Critical                     720.0                     6719.1              140824.1
: 11. Hours in Reporting Period 720.0
: 13. Reactor Reserve Shutdown Hours                         0.0                          0.0                  0.0
: 12. No. of Hrs. Reactor Was Critical 720.0
: 14. Hours Generator on Line                             720.0                     6594.6              136996.5
: 13. Reactor Reserve Shutdown Hours 0.0
: 15. Unit Reserve Shutdown Hours                           0.0                          0.0                  0.0
: 14. Hours Generator on Line 720.0
: 16. Gross Therm. Energy Gen. (MWH)                 2454561.1                 21860422.3            428687771.6
: 15. Unit Reserve Shutdown Hours 0.0
: 17. Gross Elect. Energy Gen. (MWH)                   816920.0                  7100040.0            138926550.0
: 16. Gross Therm. Energy Gen. (MWH) 2454561.1 21
: 18. Net Elect. Energy Gen. (MWH)                     791251.0                   3867170.4            133932224.3
: 17. Gross Elect. Energy Gen. (MWH) 816920.0
: 19. Unit Service Factor                                 100.0                         82.3                63.3
: 18. Net Elect. Energy Gen. (MWH) 791251.0
: 20. Unit Availability Factor                             100.0                         82.3                63.3
: 19. Unit Service Factor 100.0
: 21. Unit Capacity Factor (MDC Net)                       103.7                         80.8                58.9
: 20. Unit Availability Factor 100.0
: 22. Unit Capacity Factor (DER Net)                       100.8                         78.6                57.3
: 21. Unit Capacity Factor (MDC Net) 103.7
: 23. Unit Forced Outage Rate                                 0.0                         6.5                23.9
: 22. Unit Capacity Factor (DER Net) 100.8
: 24. Shutdowns Scheduled over Next Six Months       (Type,Date,and Duration):
: 23. Unit Forced Outage Rate 0.0
Refuelina Outaoe scheduled for Aoril 2003 Refuelino Outaae scheduled for ADril 2003
: 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
: 25. IfShut Down At End of Report Period, Est'ed Date of Startup:
Refuelina Outaoe scheduled for Aoril 2003
: r. to Date 8016.0 6719.1 0.0 6594.6 0.0 860422.3 7100040.0 3867170.4 82.3 82.3 80.8 78.6 6.5
: 25. If Shut Down At End of Report Period, Est'ed Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast                   Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Cumm.
218850.0 140824.1 0.0 136996.5 0.0 428687771.6 138926550.0 133932224.3 63.3 63.3 58.9 57.3 23.9 Refuelino Outaae scheduled for ADril 2003


AVERAGE DAILY POWER LEVEL (MWe-Net)
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.       50-316 UNIT            TWO DATE            2-Dec-02 COMPLETED BY    RAF Harris TELEPHONE        269-465-5901 MONTH     Nov-02 AVERAGE DAILY                             AVERAGE DAILY DAY    POWER LEVEL                   DAY       POWER LEVEL 11/1/02     1090                    11/17/02         1098 11/2/02      1106                    11118/02         1095 11/3/02       1096                    11/19102        1098 11/4/02       1090                    11/20/02         1100 11/5/02     1096                    11/21/02         1104 11/6/02     1093                    11/22/02         1099 11/7/02     1095                    11/23/02         1107 11/8/02     1098                    11/24/02         1100 11/9/02     1101                    11/25/02         1099 11/10/02     1097                    11/26/02       1097 11/11/02     1098                    11/27/02       1103 11/12/02     1093                    11/28/02       1109 11/13/02     1100                    11/29/02       1103 11/14/02     1098                    11/30/02       1110 11/15/02     1098 11/16/02     1098
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 2-Dec-02 RAF Harris 269-465-5901 MONTH Nov-02 AVERAGE DAILY POWER LEVEL 1090 1106 1096 1090 1096 1093 1095 1098 1101 1097 1098 1093 1100 1098 1098 1098 DAY 11/17/02 11118/02 11/19102 11/20/02 11/21/02 11/22/02 11/23/02 11/24/02 11/25/02 11/26/02 11/27/02 11/28/02 11/29/02 11/30/02 AVERAGE DAILY POWER LEVEL 1098 1095 1098 1100 1104 1099 1107 1100 1099 1097 1103 1109 1103 1110 DAY 11/1/02 11/2/02 11/3/02 11/4/02 11/5/02 11/6/02 11/7/02 11/8/02 11/9/02 11/10/02 11/11/02 11/12/02 11/13/02 11/14/02 11/15/02 11/16/02


DOCKET NO.       50-316 UNIT NAME        D.C. Cook Unit 2 DATE              December 3, 2002 COMPLETED BY      B. O'Rourke TELEPHONE          269-465-5901 PAGE              lofl UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2002 METHOD OF SHUTTING     LICENSEE DURATION                   DOWN         EVENT         SYSTEM     COMPONENT               CAUSE AND CORRECTIVE ACTION NO. DATE TYPE 1    HOURS         REASON 2    REACTOR 3     REPORT NO. CODE4     CODE 5                    TO PREVENT RECURRENCE None 1 TYPE:             2 REASON:                              3  METHOD:                4 SYSTEM:                                5 COMPONENT:
DOCKET NO.
F: Forced          A: Equipment Failure (Explain)         1: Manual                Exhibit G - Instructions                Exhibit I: Same Source S: Scheduled        B: Maintenance or Test                 2: Manual Scram          for preparation of data C: Refueling                           3: Automatic Scram        entry sheets for Licensee D: Regulatory Restriction               4: Other (Explain)        Event Report (LER) File E: Operator Training and                                         (NUREG 0161)
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 December 3, 2002 B. O'Rourke 269-465-5901 lofl UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
License Examination F: Administrative G: Operational Error (Explain)
DATE TYPE1 HOURS REASON2 REACTOR 3 REPORT NO.
H: Other (Explain)}}
CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source}}

Latest revision as of 13:39, 16 January 2025

November 2002 Monthly Operating Report for Donald C. Cook Units 1 & 2
ML023520033
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/13/2002
From: Greenlee S
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-25
Download: ML023520033 (8)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1395 INDIANA MICHIGAN POWER December 13, 2002 Docket Nos.

AEP:NRC:2691-25 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for November 2002 is submitted.

Sincerely, Scot A. Greenlee Director, Nuclear Technical Services BWO/jen Attachments

U. S. Nuclear Regulatory Commission Page 2 c: ANI Nuclear Engineering Department A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk AEP:NRC:2691-25

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 12/10/02 COMPLETED BY RAF Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D.C. Cook Unit 1 Notes:
2. Reporting Period Nov-02
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date

11. Hours in Reporting Period 720.0 8016.0
12. No. of Hrs. Reactor Was Critical 720.0 7083.3
13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator on Line 720.0 7039.5
15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2304291.6 22419735.0
17. Gross Elect. Energy Gen. (MWH) 751750.0 7241800.0
18. Net Elect. Energy Gen. (MWH) 726636.0 6999120.6
19. Unit Service Factor 100.0 87.8
20. Unit Availability Factor 100.0 87.8
21. Unit Capacity Factor (MDC Net) 100.9 87.3
22. Unit Capacity Factor (DER Net) 98.9 85.6
23. Unit Forced Outage Rate 0.0 1.4
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Cumm.

244704.0 166604.6 463.0 163944.9 321.0 487925042.0 158474620.0 152533414.5 67.5 67.5 63.8 62.5 19.2

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 02-Dec-02 RAF Harris 269-465-5901 MONTH Nov-02 AVERAGE DAILY POWER LEVEL 1031 1031 1033 1032 1030 1032 1027 1031 1034 1036 466 934 1030 1038 1027 1041 DAY 11/17/02 11/18/02 11/19/02 11/20/02 11/21/02 11/22/02 11/23/02 11/24/02 11/25/02 11/26/02 11/27/02 11/28/02 11/29/02 11/30/02 AVERAGE DAILY POWER LEVEL 1021 1030 1037 1027 1032 1033 1031 1026 1028 1031 1029 1032 1033 1033 DAY

.11/1/02 11/2/02 11/3/02 11/4/02 11/5102 11/6/02 11/7/02 11/8/02 11/9/02 11110/02 11/11/02 11/12/02 11/13/02 11/14/02 11/15/02 11/16/02

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit 1 December 3, 2002 B. O'Rourke 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

'DATE TYPE1 HOURS REASON 2 REACTOR3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE 344 021110 S

0 B

4 n/a AB P

Unit 1 power reduced to 30% to allow containment entry to add oil to the #14 Reactor Coolant Pump.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 1212/02 COMPLETED BY RAF Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 2 Notes:
2. Reporting Period Nov-02
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yi

11. Hours in Reporting Period 720.0
12. No. of Hrs. Reactor Was Critical 720.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator on Line 720.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Therm. Energy Gen. (MWH) 2454561.1 21
17. Gross Elect. Energy Gen. (MWH) 816920.0
18. Net Elect. Energy Gen. (MWH) 791251.0
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (MDC Net) 103.7
22. Unit Capacity Factor (DER Net) 100.8
23. Unit Forced Outage Rate 0.0
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Refuelina Outaoe scheduled for Aoril 2003

r. to Date 8016.0 6719.1 0.0 6594.6 0.0 860422.3 7100040.0 3867170.4 82.3 82.3 80.8 78.6 6.5
25. If Shut Down At End of Report Period, Est'ed Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Cumm.

218850.0 140824.1 0.0 136996.5 0.0 428687771.6 138926550.0 133932224.3 63.3 63.3 58.9 57.3 23.9 Refuelino Outaae scheduled for ADril 2003

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 2-Dec-02 RAF Harris 269-465-5901 MONTH Nov-02 AVERAGE DAILY POWER LEVEL 1090 1106 1096 1090 1096 1093 1095 1098 1101 1097 1098 1093 1100 1098 1098 1098 DAY 11/17/02 11118/02 11/19102 11/20/02 11/21/02 11/22/02 11/23/02 11/24/02 11/25/02 11/26/02 11/27/02 11/28/02 11/29/02 11/30/02 AVERAGE DAILY POWER LEVEL 1098 1095 1098 1100 1104 1099 1107 1100 1099 1097 1103 1109 1103 1110 DAY 11/1/02 11/2/02 11/3/02 11/4/02 11/5/02 11/6/02 11/7/02 11/8/02 11/9/02 11/10/02 11/11/02 11/12/02 11/13/02 11/14/02 11/15/02 11/16/02

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 December 3, 2002 B. O'Rourke 269-465-5901 lofl UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON2 REACTOR 3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source