ML030760057: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 23: Line 23:


==Dear Mr. Killar:==
==Dear Mr. Killar:==
This letter documents our approval of your request to receive a copy of the final interim compensatory measures (ICMs) for Category III fuel cycle facilities for the purpose of coordinating the preparation of an implementation guidance document for the industry. We concluded that you are serving as an agent for the Category III fuel cycle licensees and you have a need to know the information. The ICMs have been prepared for pick up at our office per your request.
This letter documents our approval of your request to receive a copy of the final interim compensatory measures (ICMs) for Category III fuel cycle facilities for the purpose of coordinating the preparation of an implementation guidance document for the industry. We concluded that you are serving as an agent for the Category III fuel cycle licensees and you have a need to know the information. The ICMs have been prepared for pick up at our office per your request.
The ICMs are safeguards information and must be protected pursuant to the requirements in 10 CFR Part 73.21. Violation of the protection requirements is subject to civil and criminal penalties.
The ICMs are safeguards information and must be protected pursuant to the requirements in 10 CFR Part 73.21. Violation of the protection requirements is subject to civil and criminal penalties.
Line 29: Line 28:
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely,
                                                        /RA/
/RA/
Robert C. Pierson, Director Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards
Robert C. Pierson, Director Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards


Line 40: Line 39:


==Dear Mr. Killar:==
==Dear Mr. Killar:==
This letter documents our approval of your request to receive a copy of the final interim compensatory measures (ICMs) for Category III fuel cycle facilities for the purpose of coordinating the preparation of an implementation guidance document for the industry. We concluded that you are serving as an agent for the Category III fuel cycle licensees and you have a need to know the information. The ICMs have been prepared for pick up at our office per your request.
This letter documents our approval of your request to receive a copy of the final interim compensatory measures (ICMs) for Category III fuel cycle facilities for the purpose of coordinating the preparation of an implementation guidance document for the industry. We concluded that you are serving as an agent for the Category III fuel cycle licensees and you have a need to know the information. The ICMs have been prepared for pick up at our office per your request.
The ICMs are safeguards information and must be protected pursuant to the requirements in 10 CFR Part 73.21. Violation of the protection requirements is subject to civil and criminal penalties.
The ICMs are safeguards information and must be protected pursuant to the requirements in 10 CFR Part 73.21. Violation of the protection requirements is subject to civil and criminal penalties.
Line 46: Line 44:
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely,
                                                                /RA/
/RA/
Robert C. Pierson, Director Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards Distribution:                                                         Accession #:ML030760057 FCFB r/f     ARayland, NSIR C:\ORPCheckout\FileNET\ML030760057.wpd OFC       FCFB*         FCFB             OGC             NSIR       FCFB       FCFB       FCSS NAME     KRamsey       JMuszkiewicz     JGoldberg       MWeber     LRoché       DGillen RPierson DATE     03/10/03     03/10/03         03/11/03       03/12/03   03/13/03   03/13/03   03/14 /03
Robert C. Pierson, Director Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards Distribution:
  *See previous concurrence               OFFICIAL RECORD COPY}}
Accession #:ML030760057 FCFB r/f ARayland, NSIR C:\\ORPCheckout\\FileNET\\ML030760057.wpd OFC FCFB*
FCFB OGC NSIR FCFB FCFB FCSS NAME KRamsey JMuszkiewicz JGoldberg MWeber LRoché DGillen RPierson DATE 03/10/03 03/10/03 03/11/03 03/12/03 03/13/03 03/13/03 03/14 /03
*See previous concurrence OFFICIAL RECORD COPY}}

Latest revision as of 11:51, 16 January 2025

Final Interim Compensatory Measures for Category III Fuel Cycle Facilities
ML030760057
Person / Time
Issue date: 03/14/2003
From: Pierson R
NRC/NMSS/FCSS
To: Killar F
Nuclear Energy Institute
References
Download: ML030760057 (2)


Text

March 14, 2003 Mr. Felix M. Killar, Jr.

Director, Materials Licensees Nuclear Energy Institute 1776 I St. N.W.

Suite 400 Washington, DC 20006

SUBJECT:

FINAL INTERIM COMPENSATORY MEASURES FOR CATEGORY III FUEL CYCLE FACILITIES

Dear Mr. Killar:

This letter documents our approval of your request to receive a copy of the final interim compensatory measures (ICMs) for Category III fuel cycle facilities for the purpose of coordinating the preparation of an implementation guidance document for the industry. We concluded that you are serving as an agent for the Category III fuel cycle licensees and you have a need to know the information. The ICMs have been prepared for pick up at our office per your request.

The ICMs are safeguards information and must be protected pursuant to the requirements in 10 CFR Part 73.21. Violation of the protection requirements is subject to civil and criminal penalties.

If you have any questions regarding this matter, please contact Kevin Ramsey of my staff at (301) 415-7887 or email at kmr@nrc.gov.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert C. Pierson, Director Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards

March 14, 2003 Mr. Felix M. Killar, Jr.

Director, Materials Licensees Nuclear Energy Institute 1776 I St. N.W.

Suite 400 Washington, DC 20006

SUBJECT:

FINAL INTERIM COMPENSATORY MEASURES FOR CATEGORY III FUEL CYCLE FACILITIES

Dear Mr. Killar:

This letter documents our approval of your request to receive a copy of the final interim compensatory measures (ICMs) for Category III fuel cycle facilities for the purpose of coordinating the preparation of an implementation guidance document for the industry. We concluded that you are serving as an agent for the Category III fuel cycle licensees and you have a need to know the information. The ICMs have been prepared for pick up at our office per your request.

The ICMs are safeguards information and must be protected pursuant to the requirements in 10 CFR Part 73.21. Violation of the protection requirements is subject to civil and criminal penalties.

If you have any questions regarding this matter, please contact Kevin Ramsey of my staff at (301) 415-7887 or email at kmr@nrc.gov.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert C. Pierson, Director Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards Distribution:

Accession #:ML030760057 FCFB r/f ARayland, NSIR C:\\ORPCheckout\\FileNET\\ML030760057.wpd OFC FCFB*

FCFB OGC NSIR FCFB FCFB FCSS NAME KRamsey JMuszkiewicz JGoldberg MWeber LRoché DGillen RPierson DATE 03/10/03 03/10/03 03/11/03 03/12/03 03/13/03 03/13/03 03/14 /03

  • See previous concurrence OFFICIAL RECORD COPY