{{#Wiki_filter:a-01150 HEATING THE CONDENSATE STORAGE TANKS
{{#Wiki_filter:a-01150 HEATING THE CONDENSATE STORAGE TANKS DOCUMENT TYPE:
°° "*1 DOCUMENT TYPE: Technical CLASSIFICATION:         Safety Related REVISION:     2 2002    t-C, EFFECTIVE DATE: "October 21, REVIEWER:     Qualified Reviewer APPROVAL AUTHORITY:             Department Manager Group Head PROCEDURE OWNER (title):
CLASSIFICATION:
OWNER GROUP: Operations Verified Current Copy:                                               Date        Time Signature List pages used for Partial Performance               Controlling Work Document Numbers P . ýýq
REVISION:
EFFECTIVE DATE:
REVIEWER:
APPROVAL AUTHORITY:
PROCEDURE OWNER (title):
OWNER GROUP:
Verified Current Copy:
Technical Safety Related 2
"October 21, 2002 t-C, Qualified Reviewer Department Manager Group Head Operations Signature List pages used for Partial Performance Date Time
°° "*1 Controlling Work Document Numbers P  
.ýýq


POEL'T'BEACH NUCLEAR PLAN 1                                             1:AU RE OPERATING INSTRUCTIONS                                               SAFETY RELATED Revision 2 HEATLNG THE CONDENSATE STORAGE TANKS                                 October 21. 2002 INITIALS 1.0   PURPOSE This procedure provides instruction for filling the Condensate Storage Tank, T-24A or T-24B from the opposite units Condensate Feedwater System or Waste Condensate System to provide approximately 42,000 gallons of water at a temperature of 95 0 F (80 OF to I10OF) to fill the Steam Generator and Main Steam line.
POEL'T'BEACH NUCLEAR PLAN 1 RE 1:AU OPERATING INSTRUCTIONS SAFETY RELATED Revision 2 HEATLNG THE CONDENSATE STORAGE TANKS October 21. 2002 INITIALS 1.0 PURPOSE This procedure provides instruction for filling the Condensate Storage Tank, T-24A or T-24B from the opposite units Condensate Feedwater System or Waste Condensate System to provide approximately 42,000 gallons of water at a temperature of 95 0F (80 OF to I10 OF) to fill the Steam Generator and Main Steam line.
2.0   PREREOUISrTES The IT-300/305 transfer hose (rated at greater than 2000 psig) is available for use.
2.0 PREREOUISrTES The IT-300/305 transfer hose (rated at greater than 2000 psig) is available for use.
3.0   PRECAUTIONS AND LfD\ITATIONS 3.1   Do NOT allow CST temperature to exceed 120 Degrees F during the fill with a final target temperature of approximately 110 degrees F.
3.0 PRECAUTIONS AND LfD\\ITATIONS 3.1 Do NOT allow CST temperature to exceed 120 Degrees F during the fill with a final target temperature of approximately 110 degrees F.
3.2   Observe appropriate safety precautions when IT-300/305 transfer hose is pressurized. The temperature and pressure could be approximately 210 OF and approximately 400 psig.
3.2 Observe appropriate safety precautions when IT-300/305 transfer hose is pressurized. The temperature and pressure could be approximately 210 OF and approximately 400 psig.
4.0   INITIAL CONDITIONS 4.1   Ensure greater than 13,000 gallons usable condensate volume in each CST if required by current plant conditions per TS 3.7.6.
4.0 INITIAL CONDITIONS 4.1 Ensure greater than 13,000 gallons usable condensate volume in each CST if required by current plant conditions per TS 3.7.6.
4.2   Permission to Perform Evolution The conditions required by this evolution are consistent with required plant conditions including equipment operability. Permission is granted to perform this evolution.
4.2 Permission to Perform Evolution The conditions required by this evolution are consistent with required plant conditions including equipment operability. Permission is granted to perform this evolution.
DSS                         Time                     Date Page 2 of 24                         CONTLNUOUS USE
DSS Time Date CONTLNUOUS USE Page 2 of 24


01150 POINT BEACH NUCLEAR PLAINT                                       SAFETY RELATED OPERATD-NG DýSTRUCTIONS                                         Revision 2 October 21. 2002 HEATING THE CONDENSATE STORAGE TANKS                                                    hNITLALS 5.0   PROCEDURE I      NOTE:   If both Units are in MODE 5, 6, or defueled then heat the CSTs using Waste Heating Returns per section 5.3 or 5.4 as applicable.
POINT BEACH NUCLEAR PLAINT OPERATD-NG DýSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 2 October 21. 2002 hNITLALS 5.0 PROCEDURE NOTE:
NOTE:   Approximately 42,000 gallons of water will be needed to fill the Steam Generator and Main Steam line. This will require multiple filling of the target CST.
If both Units are in MODE 5, 6, or defueled then heat the CSTs using Waste Heating Returns per section 5.3 or 5.4 as applicable.
NOTE:   Maintain a minimum of 13,000 gallons of water in the target CST to satisfy the on-line units technical specification for Auxiliary Feedwater source volume.
NOTE:
to.
Approximately 42,000 gallons of water will be needed to fill the Steam Generator and Main Steam line. This will require multiple filling of the target CST.
NOTE:   It'Will be necessary to perform this pcoceduie morc than once fill the SG and MS line and maintain the minimum CST TS required level.
NOTE:
NOTE:     Each section of the procedure stands alone. Perform only the section(s) required.
Maintain a minimum of 13,000 gallons of water in the target CST to satisfy the on-line units technical specification for Auxiliary Feedwater source volume.
Unit 2
NOTE:
-,- -          5.1 Heat T-24A (South) CST to between 80 and 110 degrees F. using 2A Feedwater Heater.
It'Will be necessary to perform this pcoceduie morc than once to.
CAUTION AT LEAST ONE CST WITH SUFFICIENT VOLUME TO COMPLY WITH TS 3.7.6 MUST ALWAYS BE ALIGNED TO THE AFW PUMPS Per TLB-34, 7.399ft is required in One Tank for One Unit 5.1.1        Split the CST's with T-24A aligned to AFW and Unit I and T-24B aligned to Unit 2 as follows:
fill the SG and MS line and maintain the minimum CST TS required level.
: a. Ensure the following valves are locked open AF-2, T-24A Recirc Isolation       LOCKED OPEN LOCKED OPEN AF-3, T-24A Service Outlet AF-5. T-24A Outlet to AFW Pumps LOCKED OPEN AF-8, T-24B Service Outlet         LOCKED OPEN Page 3 of 24                       CONTINUOUS USE
NOTE:
Each section of the procedure stands alone. Perform only the section(s) required.
5.1 Heat T-24A (South) CST to between 80 and 110 degrees F. using Unit 2 2A Feedwater Heater.
5.1.1 CAUTION AT LEAST ONE CST WITH SUFFICIENT VOLUME TO COMPLY WITH TS 3.7.6 MUST ALWAYS BE ALIGNED TO THE AFW PUMPS Per TLB-34, 7.399ft is required in One Tank for One Unit Split the CST's with T-24A aligned to AFW and Unit I and T-24B aligned to Unit 2 as follows:
: a. Ensure the following valves are locked open AF-2, T-24A Recirc Isolation AF-3, T-24A Service Outlet LOCKED OPEN LOCKED OPEN AF-5. T-24A Outlet to AFW Pumps LOCKED OPEN AF-8, T-24B Service Outlet LOCKED OPEN CONTINUOUS USE I
Page 3 of 24


Ul 1OU PO1LTNBEACH NUCLEAR PLAN-I                                       SAFETY RELATED OPERATDNG INSTRUCTIONS                                           Revision 2 October 21. 2002 HEAT-NG THE CONDENSATE STORAGE TANKS                                                   LNITIALS INITIALS
PO1LTNBEACH NUCLEAR PLAN-I OPERATDNG INSTRUCTIONS HEAT-NG THE CONDENSATE STORAGE TANKS Ul 1OU SAFETY RELATED Revision 2 October 21. 2002 INITIALS
: b. Ensure Open AF-7A, T-24B Supply from Water Treatment                                 OPEN
: b. Ensure Open AF-7A, T-24B Supply from Water Treatment
: c. Shut the following valves to split the CST's AF-4A, T-24A Supply from Water Treatment             SHUT SHUT AF-6, T-24B Outlet to AFW Pumps SHUT AF-9, T-24B Recirc Isolation Install IT-300/305 transfer hose by:
: c.
                                                                                                --- 111
Shut the following valves to split the CST's AF-4A, T-24A Supply from Water Treatment AF-6, T-24B Outlet to AFW Pumps AF-9, T-24B Recirc Isolation Install IT-300/305 transfer hose by:
: a. Connect one end of IT-300/305 transfer hose to 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN.
a.
OPEN SHUT SHUT SHUT Connect one end of IT-300/305 transfer hose to 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN.
: b. Connect the other end of IT-300/305 transfer hose to AF-13, T-24A CST Drain.
: b. Connect the other end of IT-300/305 transfer hose to AF-13, T-24A CST Drain.
CAUTION Feedwater outlet temperature is approximately 210 OF and approximately 400 psig. When the transfer hose between Unit 2 2A FW Heater and T-24A is used, AF-13 is to be opened before throttling open 2CS-107C and 2CS-107C is to be shut before shutting AF-13 to minimize the pressure on the transfer hose.
Hang Temporary Information tags containing the information in the Caution above on:
5.1.3      Hang Temporary Information tags containing the information in the Caution above on:
: a. AF-13, T-24A CST Drain.
: a. AF-13, T-24A CST Drain.
: b. 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN.
: b. 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN.
t 5.1.4      Open AF- 13, T-24A CST Drain.
Open AF-13, T-24A CST Drain.
Pagye 4 of 24                         CONTINUOUS USE
CONTINUOUS USE CAUTION Feedwater outlet temperature is approximately 210 OF and approximately 400 psig. When the transfer hose between Unit 2 2A FW Heater and T-24A is used, AF-13 is to be opened before throttling open 2CS-107C and 2CS-107C is to be shut before shutting AF-13 to minimize the pressure on the transfer hose.
5.1.3 t
5.1.4 Pagye 4 of 24 LNITIALS
-- - 1 11


POENT BEACH NUCLEAR PLANT                                     01150 SAFETY RELATED OPERATIIýG ENSTRUCTIONS Revision 2 HEATING THE CONDENSATE STORAGE TANKS                         October 21. 2002 INýITIALS NOTE:     2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN, may be throttled open or closed to vary fill or rate of temperature change.
POENT BEACH NUCLEAR PLANT 01150 OPERATIIýG ENSTRUCTIONS SAFETY RELATED Revision 2 HEATING THE CONDENSATE STORAGE TANKS October 21. 2002 INýITIALS NOTE:
NOTE:     Steps 5.1.5 and 5.1.6 or 5.1.7 may be performed concurrently.
2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN, may be throttled open or closed to vary fill or rate of temperature change.
5.1.5     Using the tool provided, throttle open 2CS-107C, HX-17A LP FWH 2A Outlet to HX- I 9A LP FWH 3A DRN AND check hose for leaks.
NOTE:
5.1.6   IF it is desired to cool T-24A (South) CST water volume, AND there is sufficient level in the T-24B (North) CST,
Steps 5.1.5 and 5.1.6 or 5.1.7 may be performed concurrently.
                  -    ENT
5.1.5 Using the tool provided, throttle open 2CS-107C, HX-17A LP FWH 2A Outlet to HX-I 9A LP FWH 3A DRN AND check hose for leaks.
                      '111
5.1.6 IF it is desired to cool T-24A (South) CST water volume, AND there is sufficient level in the T-24B (North) CST,  
                      -    -  prfoirm the f!owi..w, n-g:
'111 ENT p prfo irm the f!owi..w, n-g:
p (Otherwise mark this step as N/A)
(Otherwise mark this step as N/A)
: a. Throttle open AF-6, T-24B CST Outlet To Aux Feed Pumps, to sluice water from T-24B to T-24A.
: a. Throttle open AF-6, T-24B CST Outlet To Aux Feed Pumps, to sluice water from T-24B to T-24A.
: b. WHEN the CST water volume has cooled to 95 OF (80 F-1 10 OF),
: b. WHEN the CST water volume has cooled to 95 OF (80 F-1 10 OF),
THEN Close AF-6, T-24B CST Outlet To Aux Feed Pumps.
THEN Close AF-6, T-24B CST Outlet To Aux Feed Pumps.
5.1.7   IF it is desired to cool T-24A (South) CST water volume, AND there is NOT sufficient level in the T-24B (North) CST, THEN perform the following:
5.1.7 IF it is desired to cool T-24A (South) CST water volume, AND there is NOT sufficient level in the T-24B (North) CST, THEN perform the following:
(Otherwise mark this step as NIA)
(Otherwise mark this step as NIA)
: a. Open AF-4A, T-24A CST Inlet From Water Treatment.
: a. Open AF-4A, T-24A CST Inlet From Water Treatment.
: b. WHEN the CST water volume has cooled to 95 OF (80F 110 OF),
: b. WHEN the CST water volume has cooled to 95 OF (80F 110 OF),
THEN close AF-4A, T-24A CST Inlet From Water Treatment.
THEN close AF-4A, T-24A CST Inlet From Water Treatment.
Page 5 of 24                     CONTLNUOUS USE
CONTLNUOUS USE Page 5 of 24


QPERATol\ 1I bL.A..-f...l P0h\            'G N.STRUCTIONS
P0h\\ 1 bL.A..-f...l.-' i.,L..c.-lIx L l.,
                          .-' i.,L..c.-lIx L l.,     A SAFETY RELATED Revision 2 October 21, 2002 HEAT]3NG THE CONDENSATE STORAGE TANKS I4ITIALS CST 5.1.8           IF necessary to temporarily stop heating T-24A (South) water volume, THEN perform the following:
A QPERATol\\
'G I
N.STRUCTIONS SAFETY RELATED Revision 2 HEAT]3NG THE CONDENSATE STORAGE TANKS October 21, 2002 I4ITIALS 5.1.8 IF necessary to temporarily stop heating T-24A (South) CST water volume, THEN perform the following:
(Otherwise mark this step as N/A)
(Otherwise mark this step as N/A)
: a. Shut 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRIN.
: a. Shut 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRIN.
be
: b. WHEN heating T-24A (South) CST water volume is to be restarted,  
: b. WHEN heating T-24A (South) CST water volume is to restarted,
-THEN go to step 5.1.10:.
                            -                -THEN go to step 5.1.10:.
5.1.9 WHEN T-24A (South) CST level is at the level desired by Shift Management,  
5.1.9           WHEN T-24A (South) CST level is at the level desired by Shift Management,
-7  
                          -7               .AND erriperafuwe is a'9i         "- T- lo, (30 THEN shut 2CS-107C,       HX-17A   LP FWH 2A Outlet to HX-19A LP FWH 3A DRN.
.AND erriperafuwe is a'9i (30
NOTE:             It maybe necessary to repeats steps that refill and reheat T-24A (South) CST as the Steam Generator(s) and Main Steam Line(s) are filled.
"- T-lo, THEN shut 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN.
5.1.10           IF it is necessary to refill and reheat T-24A (South) CST, THEN repeat steps 5.1.5 through steps 5.1.9, AND document steps performed below.
NOTE:
It maybe necessary to repeats steps that refill and reheat T-24A (South) CST as the Steam Generator(s) and Main Steam Line(s) are filled.
5.1.10 IF it is necessary to refill and reheat T-24A (South) CST, THEN repeat steps 5.1.5 through steps 5.1.9, AND document steps performed below.
(Mark step not performed N/A).
(Mark step not performed N/A).
Page 6 of 24                         CONTEhNUOUS USE
CONTEhNUOUS USE Page 6 of 24


POINT BEACH NUCLEAR PLANT                                     01150 POILNT BEACH NUCLEAR PLANT SAFETY RELATED OPERATING INSTRUCTIONS                                        Revision 2 October 21,2002 HEATING THE CONDENSATE STORAGE TANKS                                                  KT'TT . I UNI I L\L.)
POINT BEACH NUCLEAR PLANT POILNT BEACH NUCLEAR PLANT OPERATING INSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 2 October 21,2002
UN\I I  I..---
.A CONTINUOUS USE
CAUTION AT LEAST ONE CST WITH SUFFICIENT VOLUME TO COMPLY WITH TS 3.7.6 MUST ALWAYS BE ALIGNED TO THE AFW PUMPS Per TLB-34, 7.399ft is required in One Tank for One Unit NOTE:     If T-24B (North) CST level is lower than T-24A (South)
KT'TT  
CST then water will transfer from T-24A to T-24B. If this.
. I UNI I L\\L.)
iS'nloI accep-abA, equal to T-24A prior to shifting tanks.
CAUTION AT LEAST ONE CST WITH SUFFICIENT VOLUME TO COMPLY WITH TS 3.7.6 MUST ALWAYS BE ALIGNED TO THE AFW PUMPS Per TLB-34, 7.399ft is required in One Tank for One Unit NOTE:
NOTE:    The following steps will cause the CST's to equalize in level.
NOTE:
5.1.11    WHEN a heated water source to the AFW Pumps is no longer required, THEN align T-24B (North) CST to AFW Pumps as follows:
5.1.11 Page 7 of 24 UN\\I I I..---
: a. Ensure Locked Open the following valves AF-8, T-24B Service Outlet.         LOCKED OPEN AF-6, T-24B Outlet to Auxiliary Feed Pumps                         LOCKED OPEN AF-9, T-24B Recirc Isolation,       LOCKED OPEN
If T-24B (North) CST level is lower than T-24A (South)
CST then water will transfer from T-24A to T-24B. If this iS'nloI accep-abA, equal to T-24A prior to shifting tanks.
The following steps will cause the CST's to equalize in level.
WHEN a heated water source to the AFW Pumps is no longer
: required, THEN align T-24B (North) CST to AFW Pumps as follows:
: a. Ensure Locked Open the following valves AF-8, T-24B Service Outlet.
LOCKED OPEN AF-6, T-24B Outlet to Auxiliary Feed Pumps LOCKED OPEN AF-9, T-24B Recirc Isolation, LOCKED OPEN
: b. Ensure Open AF-7A T-24B Supply from Water Treatment
: b. Ensure Open AF-7A T-24B Supply from Water Treatment
: c. Perform Independent verification of the following valves:
: c. Perform Independent verification of the following valves:
AF-8, T-24B Service Outlet         LOCKED OPEN AF-6, T-24B Outlet to Auxiliary Feed Pumps                         LOCKED OPEN AF-9, T-24B, Recirc Isolation       LOCKED OPEN
AF-8, T-24B Service Outlet LOCKED OPEN AF-6, T-24B Outlet to Auxiliary Feed Pumps LOCKED OPEN AF-9, T-24B, Recirc Isolation LOCKED OPEN
.A Page 7 of 24                        CONTINUOUS USE


POINT BEACH NUCLEAR PLANT                                     01 150 POIN<T BEACH NUCLEAR PLANT SAFETY RELATED OPERATING LNSTRUCTIONS                                        Revision 2 October 21. 2002 HEATUMG THE CONDENSATE STORAGE TANKS LN111AL EN l I ALS
POINT BEACH NUCLEAR PLANT POIN<T BEACH NUCLEAR PLANT OPERATING LNSTRUCTIONS HEATUMG THE CONDENSATE STORAGE TANKS 01 150 SAFETY RELATED Revision 2 October 21. 2002
: d. Isolate T-24A (South) CST by Shutting the following valves:
: d. Isolate T-24A (South) CST by Shutting the following valves:
AF-3, T-24A Service Outlet.                       SHUT SHUT AF-4A, T-24A Supply from Water Treatment.
AF-3, T-24A Service Outlet.
SHUT AF-2, T-24A Recirc Isolation 5.1.12   Notify the Control Room that T-24B (North) CST is aligned to AFW pumps and Condenser makeup.
AF-4A, T-24A Supply from Water Treatment.
Pe,-f-rM !he next thr-e-ensihu TNQ-T'-                                          l~yimF.
AF-2, T-24A Recirc Isolation 5.1.12 TNQ-T'-
2CS-107C,   HX-17A     LP FWH   2A Outlet To HX-19A LP FWH 3A DRN leaks by.
SHUT SHUT SHUT Notify the Control Room that T-24B (North) CST is aligned to AFW pumps and Condenser makeup.
5.1.13   Using the tool provided, shut 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN.
Pe,-f-rM !he next thr-e-ensihu l~yimF.
IV 5.1.14     Shut AF-13, T-24A CST Drain.
2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN leaks by.
IV 5.1.15   Remove IT-300/305 transfer hose from AF-13, T-24A CST Drain AND route to a floor drain.
5.1.13 Using the tool provided, shut 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN.
I 5.1.16   Remove IT-300/305 transfer hose from 2CS-107C, HX-17A LP F'WH 2A Outlet To HX-19A LP FWH 3A DRN AND drain hose into floor drain.
5.1.14 Shut AF-13, T-24A CST Drain.
5.1.17   Cap 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN.
IV IV 5.1.15 Remove IT-300/305 transfer hose from AF-13, T-24A CST Drain AND route to a floor drain.
IV Page 8 of 24                       CONTLNUOUS USE
5.1.16 Remove IT-300/305 transfer hose from 2CS-107C, HX-17A LP F'WH 2A Outlet To HX-19A LP FWH 3A DRN AND drain hose into floor drain.
5.1.17 Cap 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN.
IV CONTLNUOUS USE LN111AL
Page 8 of 24 EN l I ALS I


PONT BEACH NUCLEAR PLANT                                         01150 SAFETY RELATED OPERATLNG LN'STRUCTIONS Revision 2 October 21. 2002 HEATING THE CONDENSATE STORAGE TANKS LNII IALS IN1ITIALS 5.1.18     Remove the Temporary Information tags hung during step 5.1.3 on AF-13, T-24A CST Drain AND 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN.
PONT BEACH NUCLEAR PLANT OPERATLNG LN'STRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 2 October 21. 2002 LNII IALS 5.1.18 Remove the Temporary Information tags hung during step 5.1.3 on AF-13, T-24A CST Drain AND 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN.
5.1.19     Allow the IT-300/305 transfer hbse to cool to approximately ambient temperature while continuing with the balance of this section.
5.1.19 Allow the IT-300/305 transfer hbse to cool to approximately ambient temperature while continuing with the balance of this section.  
        -5.1.20         Store the IT-300/305 transfer hose as designated by the DSS.
-5.1.20 Store the IT-300/305 transfer hose as designated by the DSS.
NOTE:       Entry into TSAC 3.7.6.A is not required for one CST inoperable Provided the aligned CST has sufficient               volume
NOTE:
                      '"tu *b~l       it;LC_ 3 7-6~-:...              .. -...............
Entry into TSAC 3.7.6.A is not required for one CST inoperable Provided the aligned CST has sufficient volume  
5.1.21     Declare T-24A CST inoperable.
'"tu *b~l it;LC_ 3 7-6~-:...
5.1.22     Tag Shut the following T-24A valves to prevent use.
5.1.21 Declare T-24A CST inoperable.
5.1.22 Tag Shut the following T-24A valves to prevent use.
AF-3, T-24A Service Outlet AF-4A, T-24A Supply from Water Treatment.
AF-3, T-24A Service Outlet AF-4A, T-24A Supply from Water Treatment.
AF-2, T-24A Recirc Isolation.
AF-2, T-24A Recirc Isolation.
5.1.23     Notify Chemistry to Sample T-24A for discharge.
5.1.23 Notify Chemistry to Sample T-24A for discharge.
Permit Required           Yes           No (circle one)
Permit Required Yes No (circle one) 5.1.24 Discharge/Drain T-24A (South) CST by throttling open AF-13, T-24A Drain. Maintain drain rate within the limits of L
CAUTION DO NOT Exceed the pumping capacity of the Turbine Bldg Sump Pumps when draining the CST.
the Turbine Bldg Sump Pump(s).
5.1.24     Discharge/Drain T-24A (South) CST by throttling open AF- 13, T-24A Drain. Maintain drain rate within the limits of L         the Turbine Bldg Sump Pump(s).
5.1.25 WHEN T-24A (South) CST has finished draining, THEN Shut and Cap AF-13. T-24A (South) CST Drain.
5.1.25     WHEN T-24A (South) CST has finished draining, THEN Shut and Cap AF-13. T-24A (South) CST Drain.
CONTINUOUS USE CAUTION DO NOT Exceed the pumping capacity of the Turbine Bldg Sump Pumps when draining the CST.
IV Page 9 of 24                                   CONTINUOUS USE
IV IN1ITIALS Page 9 of 24


POLNT BEACH NUCLEAR PLAN I                                       Ul IDU SAFETY RELATED OPERATLNG INSTRUCTIONS Revision 2 October 21. 2002 HEATING THE CONDENSATE STORAGE TANKS IN&#xfd;ITIALS CAUTION MAINTAIN SUFFICIENT VOLUME ALIGNED TO AFW PUMPS TO COMPLY WITH TS 3.7.6 AT ALL TIMES Per TLB-34, 7.399ft is required in One Tank for One Unit NOTE:     Remove Tags on T-24A (South) CST while performing the following steps.
POLNT BEACH NUCLEAR PLAN I OPERATLNG INSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS Ul IDU SAFETY RELATED Revision 2 October 21. 2002 IN&#xfd;ITIALS NOTE:
5.1.26   Begin Refill of T-24A, (South) by opening AF-4A, T-24A Supply from Water Treatment.
Remove Tags on T-24A (South) CST while performing the following steps.
---. - - -&#xfd;- 11
5.1.26 Begin Refill of T-24A, (South) by opening AF-4A, T-24A Supply from Water Treatment.
              - - -- - &#xfd;-- 11 CAUTION MAINTAIN SUFFICIENT VOLUME ALIGNED TO AFW PUMPS TO COMPLY WITH TS 3.7.6 AT ALL TIMES Per TLB-34, 7.399ft is required in One Tank for One Unit NOTE:     T-24A and T-24B will equalize in the following step. It may be necessary to allow T-24A to fill partially from Water Treatment before proceeding.
CAUTION MAINTAIN SUFFICIENT VOLUME ALIGNED TO AFW PUMPS TO COMPLY WITH TS 3.7.6 AT ALL TIMES Per TLB-34, 7.399ft is required in One Tank for One Unit NOTE:
5.1.27     Throttle Open AF-3, T-24 Service Outlet to equalize T-24A and T-24B.
T-24A and T-24B will equalize in the following step. It may be necessary to allow T-24A to fill partially from Water Treatment before proceeding.
5.1.28   Align Both CST's T-24A and T-24B to normal as follows:
5.1.27 Throttle Open AF-3, T-24 Service Outlet to equalize T-24A and T-24B.
AF-3, T-24A Service Outlet.             LOCKED OPEN IV AF-8, T-24B Service Outlet               LOCKED OPEN IV AF-5, T-24A Outlet to AFW Pumps         LOCKED OPEN IV AF-6. T-24B Outlet to AFW Pumps         LOCKED OPEN IV Pag~e 10 of 24                       CONTINUOUS USE
5.1.28 Align Both CST's T-24A and T-24B to normal as follows:
AF-3, T-24A Service Outlet.
AF-8, T-24B Service Outlet AF-5, T-24A Outlet to AFW Pumps AF-6. T-24B Outlet to AFW Pumps LOCKED OPEN LOCKED OPEN LOCKED OPEN LOCKED OPEN CONTINUOUS USE CAUTION MAINTAIN SUFFICIENT VOLUME ALIGNED TO AFW PUMPS TO COMPLY WITH TS 3.7.6 AT ALL TIMES Per TLB-34, 7.399ft is required in One Tank for One Unit IV IV IV IV
---. - - -&#xfd; - 11
- - -- - &#xfd; -- 11 Pag~e 10 of 24


01 150 POLNT BEACH NUCLEAR PLANT SAFETY RELATED OPERATING L'STRUCTIONS Revision 2 HEATflG THE CONDENSATE STORAGE TANKS                         October 21.2002 INITIALS AF-2, T-24A Recirc Isolation             LOCKED OPEN IV AF-9, T-24B Recirc Isolation             LOCKED OPEN IV AF-4A, T-24A Supply from Water Treatment OPEN AF-7A, T-24B Supply from Water Treatment               OPEN 5.1.29   Declare T-24A CST returned to service.
POLNT BEACH NUCLEAR PLANT 01 150 OPERATING L'STRUCTIONS SAFETY RELATED Revision 2 HEATflG THE CONDENSATE STORAGE TANKS October 21.2002 INITIALS AF-2, T-24A Recirc Isolation LOCKED OPEN IV AF-9, T-24B Recirc Isolation LOCKED OPEN IV AF-4A, T-24A Supply from Water Treatment OPEN AF-7A, T-24B Supply from Water Treatment OPEN 5.1.29 Declare T-24A CST returned to service.
Unit I 2B Feedwater 5.2 Heat T-24B (North) CST to between 80 and 110 dearees F. using the 5.2.1     Record the As-Found position AND position the valves to required position to Split the North and South CSTs.
5.2 Heat T-24B (North) CST to between 80 and 110 dearees F. using Unit I 2B Feedwater 5.2.1 Record the As-Found position AND position the valves to the required position to Split the North and South CSTs.
Valve                                       As-found   Required T-24B CST Recirc Isolation                     OPEN AF-9 T-24A Mini Recirc Isolation                     SHUT AF-2 T-24A Service Outlet                           OPEN AF-3 T-24B Service Outlet                           OPEN AF-8 AF-6     T-24B CST Outlet To Aux Feed Pumps                                     OPEN AF-5     T-24A CST Outlet To Aux Feed Pumps                                     SHUT AF-4A T-24A CST Inlet From Water Treatment                                       OPEN' AF-7A T-24B CST Inlet From Water Treatment                                     SHUT 5.2.2     Install IT-300/305 transfer hose by:
Valve As-found Required AF-9 T-24B CST Recirc Isolation OPEN AF-2 T-24A Mini Recirc Isolation SHUT AF-3 T-24A Service Outlet OPEN AF-8 T-24B Service Outlet OPEN AF-6 T-24B CST Outlet To Aux Feed Pumps OPEN AF-5 T-24A CST Outlet To Aux Feed Pumps SHUT AF-4A T-24A CST Inlet From Water Treatment OPEN' AF-7A T-24B CST Inlet From Water Treatment SHUT 5.2.2 Install IT-300/305 transfer hose by:
: a. Connect one end of IT-300/305 transfer hose to ICS-99C, HX-17B LP FWH 2B Outlet Drain.
: a. Connect one end of IT-300/305 transfer hose to ICS-99C, HX-17B LP FWH 2B Outlet Drain.
: b. Connect the other end of IT-300/305 transfer hose to AF-14, T-24B CST Drain.
: b. Connect the other end of IT-300/305 transfer hose to AF-14, T-24B CST Drain.
Pagce I11 of 24                     CONTLNUOUS USE
CONTLNUOUS USE Pagce I11 of 24


POICNT BEACH NUCLEAR PLAN F                                       %-)I 1.,V QPERATE*G LNSTRUCTIONS                                           SAFETY- RELATED Revision 2 HEATING THE CONDENSATE STORAGE TANKS                             October 21,2002       rQITLLS CAUTION Feedwater outlet temperature is approximately 210 Degrees F and approximately 400 psig. When the transfer hose between Unit 1 2B FW Heater and T-24B is used, AF-14 is to be Opened before Throttling Open with 1CS-99C and ICS-99C is to be Shut before Shutting AF-14 to minimize the pressure on the transfer hose.
POICNT BEACH NUCLEAR PLAN F  
5.2.3     Hang temporary information tags containing the information in the Caution on above on:
%-)I 1.,V QPERATE*G LNSTRUCTIONS SAFETY-RELATED Revision 2 HEATING THE CONDENSATE STORAGE TANKS October 21,2002 rQITLLS CAUTION Feedwater outlet temperature is approximately 210 Degrees F and approximately 400 psig. When the transfer hose between Unit 1 2B FW Heater and T-24B is used, AF-14 is to be Opened before Throttling Open with 1CS-99C and ICS-99C is to be Shut before Shutting AF-14 to minimize the pressure on the transfer hose.
              --..-- ,AF&#xfd;-1-T-4B CST Drain.
5.2.3 Hang temporary information tags containing the information in the Caution on above on:  
,AF&#xfd;-1-T-4B CST Drain.
1CS-99C, HX-17B LP FWH 2B Outlet Drain.
1CS-99C, HX-17B LP FWH 2B Outlet Drain.
5.2.4       Open AF-14, T-24B CST Drain.
5.2.4 Open AF-14, T-24B CST Drain.
NOTE:     1CS-99C, HX-17B LP FWH 2B Outlet Drain, may be throttled open or closed to vary fill or rate of temperature change.
NOTE:
NOTE:     Steps 5.2.5 and 5.2.6 or 5.2.7 may be performed concurrently.
1CS-99C, HX-17B LP FWH 2B Outlet Drain, may be throttled open or closed to vary fill or rate of temperature change.
5.2.5       Using the tool provided, throttle open ICS-99C, HX-17B LP FWH 2B Outlet Drain, AND check hose for leaks 5.2.6       IF it is desired to cool T-24B (North) CST water volume, AND there is sufficient level in thie T-24A (South) CST, THEN perform the following:
NOTE:
Steps 5.2.5 and 5.2.6 or 5.2.7 may be performed concurrently.
5.2.5 Using the tool provided, throttle open ICS-99C, HX-17B LP FWH 2B Outlet Drain, AND check hose for leaks 5.2.6 IF it is desired to cool T-24B (North) CST water volume, AND there is sufficient level in thie T-24A (South) CST, THEN perform the following:
(Otherwise mark this step as NIA)
(Otherwise mark this step as NIA)
: a. Throttle open AF-5, T-24A CST Outlet To Aux Feed Pumps, to sluice water from T-24A to T-24B.
: a. Throttle open AF-5, T-24A CST Outlet To Aux Feed Pumps, to sluice water from T-24A to T-24B.
: b. WHEN       the CST water volume has cooled to 95 OF (80 OF-1I10 OF),
: b. WHEN the CST water volume has cooled to 95 OF (80 OF-1I10 OF),
THEN Close AF-5, T-24A CST Outlet To Aux Feed Pumps.
THEN Close AF-5, T-24A CST Outlet To Aux Feed Pumps.
Page 12 of 24                     CONTINqUOUS USE
CONTINqUOUS USE Page 12 of 24


01150 POINT BEACH NUCLEAR PLANT SAFETY RELATED "OPERATING INSTRUCTIONS                                       Revision 2 TANKS              October 21, 2002 HEATL&#xfd;G THE CONDENSATE STORAGE                                                         IINITIALS volume.
POINT BEACH NUCLEAR PLANT 01150 "OPERATING INSTRUCTIONS SAFETY RELATED Revision 2 HEATL&#xfd;G THE CONDENSATE STORAGE TANKS October 21, 2002 IINITIALS 5.2.7 IF it is desired to cool T-24B (North) CST water volume.
5.2.7   IF it is desired to cool T-24B (North) CST water AN.D there is NO.T sufficient level in the T-24A (South) CST, THEN perform the following:
AN.D there is NO.T sufficient level in the T-24A (South) CST, THEN perform the following:
(Otherwise mark this step as N/A)
(Otherwise mark this step as N/A)
Treatment.
: a.
: a. Open AF-7A, T-24B CST Inlet From Water
Open AF-7A, T-24B CST Inlet From Water Treatment.
                                                                          'F (80 F
: b. WHEN the CST water volume has cooled to 95 'F (80 F 110 uF),
: b. WHEN the CST water volume has cooled to 95 110 uF),
THEN close AF-7A, T-24B CST Inlet From Water Treatment.
Water THEN close AF-7A, T-24B CST Inlet From Treatment.
5.2.8 IF necessary to temporarily stop heating T-24B (North) CST THEN perform the following:
(North) CST 5.2.8   IF necessary to temporarily stop heating T-24B THEN perform the following:
(Otherwise mark this step as N/A)
(Otherwise mark this step as N/A)
Outlet Drain.
: a. Shut ICS-99C, HX-17B LP FWH 2B Outlet Drain.
: a. Shut ICS-99C, HX-17B LP FWH 2B volume is to be
: b. WHEN heating T-24B (North) CST water volume is to be restarted, THEN go to step 5.1.10.
: b. WHEN heating T-24B (North) CST water restarted, THEN go to step 5.1.10.
5.2.9 W&#xa5;HEN 24B (North) CST level is at the level desired by Shift Management, AND temperature is at 95 OF (80 OF-1 10 OF),
desired by Shift 5.2.9     W&#xa5;HEN 24B (North) CST level is at the level Management, AND temperature is at 95 OF (80 OF-1 10 OF),
THEN shut ICS-99C, HX-17B LP FWH 2B Outlet Drain.
2B Outlet Drain.
CONTINUOUS USE Pa2e 13 of 24
THEN shut ICS-99C, HX-17B LP FWH CONTINUOUS USE Pa2e 13 of 24


PODNT BEACH NUCLEAR PLANT                                       ul U pPERATING INSTRUCTIONS                                         Revision RELATED SAFETY 2
PODNT BEACH NUCLEAR PLANT ul U
HEATING THE CONDENSATE STORAGE TANKS                             October 21. 2002 JNITIALS NOTE:   It maybe necessary to repeats steps that refill and reheat 24B (North) CST as the Steam Generator(s) and Main Steam Line(s) are filled.
pPERATING INSTRUCTIONS SAFETY RELATED Revision 2 HEATING THE CONDENSATE STORAGE TANKS October 21. 2002 JNITIALS NOTE:
5.2.10   IF it is necessary to refill and reheat 24B (North) CST, THEN repeat steps 5.2.5 through steps 5.2.9, AND document steps performed below.
It maybe necessary to repeats steps that refill and reheat 24B (North) CST as the Steam Generator(s) and Main Steam Line(s) are filled.
5.2.10 IF it is necessary to refill and reheat 24B (North) CST, THEN repeat steps 5.2.5 through steps 5.2.9, AND document steps performed below.
(Mark step not performed NIA).
(Mark step not performed NIA).
1st                     2nd STEP NO.       PERFORMANCE                 PERFORMANCE 5.2.5
1st 2nd STEP NO.
                          .5:2 .6                             .-.----._      , .
PERFORMANCE PERFORMANCE 5.2.5
5.2.7 5.2.8 5.2.9 NOTE:     Perform the next three steps without delay in case 1CS-99C, HX-17B LP FWH 2B Outlet Drain leaks by.
.5 :2.6 5.2.7 5.2.8 5.2.9 NOTE:
5.2.11   Using the tool provided, shut 1CS-99C, HX-17B LP FWH 2B Outlet Drain.
Perform the next three steps without delay in case 1CS-99C, HX-17B LP FWH 2B Outlet Drain leaks by.
IV 5.2.12   Shut AF-14, T-24B CST Drain.
5.2.11 Using the tool provided, shut 1CS-99C, HX-17B LP FWH 2B Outlet Drain.
IV 5.2.13   Remove IT-300!305 transfer hose from AF-14, T-24B CST Drain AND ROUTE to a floor drain.
IV 5.2.12 Shut AF-14, T-24B CST Drain.
5.2.14   Cap AF-14, T-24B CST Drain.
IV 5.2.13 Remove IT-300!305 transfer hose from AF-14, T-24B CST Drain AND ROUTE to a floor drain.
IV 5.2.15   Remove IT-300/305 transfer hose from 1CS-99C, HX-17B LP FWH 2B Outlet Drain AND drain hose into floor drain.
5.2.14 Cap AF-14, T-24B CST Drain.
5.2.16   Cap ICS-99C, HX-17B LP FWH 2B Outlet Drain.
IV 5.2.15 Remove IT-300/305 transfer hose from 1CS-99C, HX-17B LP FWH 2B Outlet Drain AND drain hose into floor drain.
t                                                                           IV Page 14 of 24                         CONTINUOUS USE
5.2.16 Cap ICS-99C, HX-17B LP FWH 2B Outlet Drain.
t IV CONTINUOUS USE Page 14 of 24


01150 POE*T BEACH NUCLEAR PLANT                                           SAFETY RELATED OPERATING D'-STRUCTIONS                                             Revision 2 October 21, 2002 HEATENG THE CONDENSATE STORAGE TANKS B'QTIALS 5.2.17   Remove the Temporary Information tags hung during step 5.2.3 on AF-14, T-24B CST Drain AND 1CS-99C, HX-17B LP FWH 2B Outlet Drain.
POE*T BEACH NUCLEAR PLANT OPERATING D'-STRUCTIONS HEATENG THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 2 October 21, 2002 5.2.17 Remove the Temporary Information tags hung during step 5.2.3 on AF-14, T-24B CST Drain AND 1CS-99C, HX-17B LP FWH 2B Outlet Drain.
5.2.18   Allow the IT-300/305 transfer hose to cool to approximately ambient temperature while continuing with the balance of this section.
5.2.18 Allow the IT-300/305 transfer hose to cool to approximately ambient temperature while continuing with the balance of this section.
5.2.19   Place the following valves to the original as-found position recorded in step 5.2.1 or as directed by the DSS.
5.2.19 Place the following valves to the original as-found position recorded in step 5.2.1 or as directed by the DSS.
As-found
As-found  
                                                                                    /DSS
/DSS
      'C . ..- '-t   - ,.. a AF-9     T-24B CST Recirc Isolation______                       _____
'C  
AF-2     T-24A Mini Recirc Isolation AF-3     T-24A Service Outlet I
'-t a
AF-8     T-24B Service Outlet AF-6     T-24B CST Outlet To Aux Feed Pumps AF-5     T-24A CST Outlet To Aux Feed Pumps AF-7A     T-24B CST Inlet From Water Treatment AF-4A     T-24A CST Inlet From Water Treatment L~
AF-9 T-24B CST Recirc Isolation______
-Il Page 15 of 24                         CONTINUOUS USE
AF-2 T-24A Mini Recirc Isolation AF-3 T-24A Service Outlet AF-8 T-24B Service Outlet AF-6 T-24B CST Outlet To Aux Feed Pumps AF-5 T-24A CST Outlet To Aux Feed Pumps AF-7A T-24B CST Inlet From Water Treatment AF-4A T-24A CST Inlet From Water Treatment L~
-Il CONTINUOUS USE I
B'QTIALS Page 15 of 24


                                                                ',I I .JJ PoL\N t-I l t.I'N..LtAK
',I I.JJ PoL\\N t-I  
            ,t        K l-   .',
,t l t.I'N..LtAK K l-OPERATING DNSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS D,7IT1ALS 5.2.20 Provide Independent Verification of the Redlocked valves listed below.
OPERATING DNSTRUCTIONS                                         SAFETY RELATED Revision 2 October 21. 2002 HEATING THE CONDENSATE STORAGE TANKS D,7IT1ALS 5.2.20     Provide Independent Verification of the Redlocked valves listed below.
Valve Required IV AF-2 T-24A Mini Recirc Isolation LO AF-9 T-24B CST Recirc isolation LO AF-3 T-24A Service Outlet LO AF-8 T-24B Service Outlet LO AF-5 T-24A CST Outlet To Aux Feed Pumps LO AF-6 T-24B CST Outlet To Aux Feed Pumps LO 5.2.21 Store the IT-300/305 transfer hose as designated by Shift management.
Valve                                               Required       IV AF-2       T-24A Mini Recirc Isolation                   LO AF-9       T-24B CST Recirc isolation                   LO AF-3       T-24A Service Outlet                         LO AF-8       T-24B Service Outlet                         LO AF-5       T-24A CST Outlet To Aux Feed Pumps           LO AF-6       T-24B CST Outlet To Aux Feed Pumps           LO 5.2.21     Store the IT-300/305 transfer hose as designated by Shift management.
5.3 "T"eat 1-24A'(SoutW)CSTatiina Waste Heating Returns.'..
5.3                         "T"eat 1-24A'(SoutW)CSTatiina   Waste Heating Returns.'..                              r-,. ..
5.3.1 Align the Waste Heating Returns to the South CST as follows:
5.3.1       Align the Waste Heating Returns to the South CST as follows:
: a. AF-67, Heating Boiler Feedwater Pump Suction.
: a. AF-67, Heating Boiler Feedwater Pump Suction.       SHUT
SHUT
: b. AF-10, T-24 A/B CST heating Return Header Isolation.                                         OPEN
: b. AF-10, T-24 A/B CST heating Return Header Isolation.
: c. AF-69, Heating Boiler Condensate Return.           OPEN
OPEN
: d. AF-68, Heating Boiler Feedwater and Condensate Crossover.                               SHUT Pagle 16 of 24                       CONTINUOUS USE
: c.
AF-69, Heating Boiler Condensate Return.
OPEN
: d. AF-68, Heating Boiler Feedwater and Condensate Crossover.
SHUT r-,.
.. 
CONTINUOUS USE Pagle 16 of 24 SAFETY RELATED Revision 2 October 21. 2002


POLNT BEACH NUCLEAR PLANT 01150 SAFETY RELATED OPERATDNG DNSTRUCTIONS                                        Revision 2 October 21, 2002 HEATING THE CONDENSATE STORAGE TANKS I.11.1I I Lo_3l..
POLNT BEACH NUCLEAR PLANT OPERATDNG DNSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 2 October 21, 2002 Record the As-Found position AND position the valves to the required position to Split the North and South CSTs.
5.3.2    Record the As-Found position AND position the valves to the required position to Split the North and South CSTs.
Valve A.ss Found Required AF-2 AF-9 T-24A Mini Recirc Isolation T-24B CST Recirc isolation AF-3 T-24A Service Outlet AF-8 T-24B Service Outlet AF-5 T-24A CST outlet to Aux  
Valve                                       A.ss   Required Found AF-2         T-24A Mini Recirc Isolation                               OPEN AF-9        T-24B CST Recirc SHUT isolation                               OPEN AF-3         T-24A Service Outlet                     OPEN AF-8         T-24B Service Outlet AF-5         T-24A CST outlet to Aux                   OPEN  -.
. F,'Punips.
                  -.-. -  ..-... . F,'Punips.            ... .
AF-6 T-24B CST outlet to Aux Feed Pumps AF-7A T-24B CST inlet from Water Treatment AF-4A T-24A CST inlet from "Water Treatment 5.3.3 OPEN SHUT OPEN OPEN OPEN SHUT OPEN SHUT IF it is desired to cool T-24A (South) CST water volume, AND there is sufficient level in the T-24B (North) CST, THEN perform the following:
AF-6         T-24B CST outlet to Aux                   SHUT Feed Pumps AF-7A         T-24B CST inlet from                     OPEN Water Treatment AF-4A         T-24A CST inlet from                     SHUT "WaterTreatment 5.3.3     IF it is desired to cool T-24A (South) CST water volume, AND there is sufficient level in the T-24B (North) CST, THEN perform the following:
(Otherwise mark this step as N/A)
(Otherwise mark this step as N/A)
: a. Throttle open AF-6, T-24B CST Outlet To Aux Feed Pumps, to sluice water from T-24B to T-24A.
: a. Throttle open AF-6, T-24B CST Outlet To Aux Feed Pumps, to sluice water from T-24B to T-24A.
: b. WHEN the CST water volume has cooled to 95 OF (80 "F-110 OF),
: b. WHEN the CST water volume has cooled to 95 OF (80 "F-110 OF),
THEN Close AF-6, T-24B CST Outlet To Aux Feed Pumps.
THEN Close AF-6, T-24B CST Outlet To Aux Feed Pumps.
Page 17 of 24                     CONTINUOUS USE
CONTINUOUS USE 5.3.2 I.11.1 I I Lo_3l..
Page 17 of 24


POE&#xfd;T BEACH NUCLEAR PLA-NT                                     Ul IV SAFETY-RELATED lPERATLNG INSTRUCTIONS                                      Revision 2 HEATIN-G THE CONDENSATE STORAGE         TANKS SE]N1TL*LS               October 21. 2002 5.3.4 IF it is desired to cool T-24A (South) CST water volume, CST, AND there is NOT sufficient level in the T-24B (North)
POE&#xfd;T BEACH NUCLEAR PLA-NT Ul IV lPERATLNG INSTRUCTIONS SAFETY-RELATED Revision 2 HEATIN-G THE CONDENSATE STORAGE TANKS October 21. 2002 SE]N1TL*LS 5.3.4 IF it is desired to cool T-24A (South) CST water volume, AND there is NOT sufficient level in the T-24B (North) CST, THEN perform the following:
THEN perform the following:
(Otherwise mark this step as N/A)
(Otherwise mark this step as N/A)
: a. Open AF-4A, T-24A CST Inlet From Water Treatment.
: a. Open AF-4A, T-24A CST Inlet From Water Treatment.
95 )F (80 'F
: b. WHEN the CST water volume has cooled to 95 )F (80 'F 110 _F),
: b. WHEN the CST water volume has cooled to 110 _F),
THEN close AF-4A, T-24A CST Inlet From Water Treatment.
THEN close AF-4A, T-24A CST Inlet From Water Treatment.
desired by 5.3.5 WHEN T-24A (South) CST level is at the level S... Shift Maagement, AND temperature is at95   0F   (o80*j-j 0 "C$-F,"
5.3.5 WHEN T-24A (South) CST level is at the level desired by S...
concurrence,    continue    with THE-N with Shift Management Step 5.3.6. to stop heating T-24A (South) CST.
Shift Maagement, AND temperature is at95 0F (o80 *j-j 0 "C$-F,"
position 5.3.6   Place the following valves to the original As-Found recorded in step 5.3.2 or as directed by the DSS.
THE-N with Shift Management concurrence, continue with Step 5.3.6. to stop heating T-24A (South) CST.
As-found
5.3.6 Place the following valves to the original As-Found position recorded in step 5.3.2 or as directed by the DSS.
                                                                                /DSS AF-9         T-24B CST Recirc isolation AF-2         T-24A Mini Recirc Isolation AF-3         T-24A Service Outlet AF-8       T-24B Service Outlet AF-6         T-24B CST outlet to Aux Feed Pumps AF-5         T-24A CST outlet to Aux Feed Pumps AF-7A       T-24B CST inlet from Water Treatment AF-4A       T-24A CST inlet from Water Treatment CONTINUOUS USE Page 18 of 24
As-found  
/DSS AF-9 T-24B CST Recirc isolation AF-2 T-24A Mini Recirc Isolation AF-3 T-24A Service Outlet AF-8 T-24B Service Outlet AF-6 T-24B CST outlet to Aux Feed Pumps AF-5 T-24A CST outlet to Aux Feed Pumps AF-7A T-24B CST inlet from Water Treatment AF-4A T-24A CST inlet from Water Treatment CONTINUOUS USE Page 18 of 24


01150 POIN"T BEACH NUCLEAR PLANT                                   SAFETY RELATED OPERATING I-NSTRUCTIONS                                     Revision 2 October 21, 2002 HEATING THE CONDENSATE STORAGE TANKS Nr ITIALS 5.3.7   Provide Independent Verification of the Redlocked valves listed below.
POIN"T BEACH NUCLEAR PLANT OPERATING I-NSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 5.3.7 01150 SAFETY RELATED Revision 2 October 21, 2002 Nr ITIALS Provide Independent Verification of the Redlocked valves listed below.
Valve                                               Required        Iv LO AF-2     T-24A Mini Recirc Isolation                     LO AF-9    T-24B CST Recirc isolation                     LO AF-3    T-24A Service Outlet                           LO AF-8    T-24B Service Outlet                           LO AF-5    T-24A CST Outlet To Aux Feed Pumps             LO AF-6    T-24B CST Outlet To Aux Feed Pumps 5.3.8  Align the Waste Heating Returns as follows:
Valve AF-2 AF-9 AF-3 AF-8 AF-5 AF-6 5.3.8 T-24A Mini Recirc Isolation T-24B CST Recirc isolation T-24A Service Outlet T-24B Service Outlet T-24A CST Outlet To Aux Feed Pumps T-24B CST Outlet To Aux Feed Pumps Required LO LO LO LO LO LO Iv Align the Waste Heating Returns as follows:
                    .a. AF--67; Heating'Boiler Feed~vatci P     S.,c-i.n-.
.a.
ump
AF--67; Heating'Boiler Feed~vatci P ump S.,c-i.n-.
: b. HV-68, Heating Boiler Feedwater and Condensate Cross-Connect.                                         OPEN
: b. HV-68, Heating Boiler Feedwater and Condensate Cross-Connect.
: c. AF-10, T-24 A/B CST heating Return Header Isolation. SHUT OPEN
: c. AF-10, T-24 A/B CST heating Return Header Isolation.
: d. AF-69, Heating Boiler Condensate Return.
: d. AF-69, Heating Boiler Condensate Return.
I-Page 19 of 24                         CONTINUOUS USE
OPEN SHUT OPEN I-CONTINUOUS USE Page 19 of 24


POINT BEACH NUCLEAR PLANT                                     01150.
POINT BEACH NUCLEAR PLANT POIINT BEACHN NUCLEAR PLANT  
POIINT BEACHNNUCLEAR PLANT SAFETY RELATED
,OPERATING ENSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150.
,OPERATING ENSTRUCTIONS                                         Revision 2 October 21. 2002 HEATING THE CONDENSATE STORAGE TANKS                                                      LNITIALS INITIALS INITIALS 5.4 Heat T-24B (North) CST using Waste Heating Returns.
SAFETY RELATED Revision 2 October 21. 2002 INITIALS 5.4 Heat T-24B (North) CST using Waste Heating Returns.
5.4.1     Align the Waste Heating Returns to the North CST as follows:
5.4.1 Align the Waste Heating Returns to the North CST as follows:
: a. AF-67, Heating Boiler Feedwater Pump Suction.       SHUT
: a. AF-67, Heating Boiler Feedwater Pump Suction.
: b. AF-10, T-24 A/B CST heating Return Header Isolation.                                         SHUT
SHUT
: c. HV-68, Heating Boiler Feedwater and Condensate Cross-Connect.                                       OPEN
: b. AF-10, T-24 A/B CST heating Return Header Isolation.
: d. AF-69, Heating Boiler Condensate Return.             OPEN 5.4.2     Record the As-Found position AND position the valves to the required position to Split the North and South CSTs.
SHUT
Valve                                           As     Requ ired Found AF-9       T-24B CST Recirc Isolation                     OPEN SHUT AF-2      T-24A Mini recirc isolation OPEN AF-3      T-24A Service Outlet OPEN AF-8      T-24B Service Outlet AF-6      T-24B CST Outlet To Aux Feed Pumps                                         OPEN AF-5      T-24A CST Outlet To Aux SHUT Feed Pumps AF-4A      T-24A CST Inlet From Water OPEN Treatment AF-7A      T-24B CST Inlet From Water SHUT Treatment Pag~e 20 of 24                       CONTINUOUS USE
: c. HV-68, Heating Boiler Feedwater and Condensate Cross-Connect.
OPEN
: d. AF-69, Heating Boiler Condensate Return.
OPEN 5.4.2 Record the As-Found position AND position the valves to the required position to Split the North and South CSTs.
Valve As Requ Found AF-9 AF-2 AF-3 AF-8 AF-6 AF-5 AF-4A AF-7A T-24B CST Recirc Isolation T-24A Mini recirc isolation T-24A Service Outlet T-24B Service Outlet T-24B CST Outlet To Aux Feed Pumps T-24A CST Outlet To Aux Feed Pumps T-24A CST Inlet From Water Treatment T-24B CST Inlet From Water Treatment ired OPEN SHUT OPEN OPEN OPEN SHUT OPEN SHUT CONTINUOUS USE Pag~e 20 of 24 LNITIALS INITIALS


POLNT BEACH NUCLEAR PLANT                                           01 lsO OPERATING INSTRUCTIONS                                               SAFETY RELATED Revision 2 HEATRhG THE CONDENSATE STORAGE TANKS                                 October 21. 2002 TNITIALS 5.4.3     IF it is desired to cool T-24B (North) CST water volume.
POLNT BEACH NUCLEAR PLANT 01 lsO OPERATING INSTRUCTIONS SAFETY RELATED Revision 2 HEATRhG THE CONDENSATE STORAGE TANKS October 21. 2002 TNITIALS 5.4.3 IF it is desired to cool T-24B (North) CST water volume.
AND there is sufficient level in the T-24A (South) CST.
AND there is sufficient level in the T-24A (South) CST.
THEN perform the following:
THEN perform the following:
(Otherwise mark this step as N/A)
(Otherwise mark this step as N/A)
: a. Throttle open AF-5. T-24A CST Outlet         To Aux Feed Pumps, to sluice Nv   ater from T-24A to T-24B.
: a. Throttle open AF-5. T-24A CST Outlet To Aux Feed Pumps, to sluice Nv ater from T-24A to T-24B.
: b. WHEN the CST w%,ater volume has cooled to 95 OF (80 "F-I 10 OF),
: b. WHEN the CST w%,ater volume has cooled to 95 OF (80 "F-I 10 OF),
THEN Close AF-5, T-24A CST Outlet To Aux Feed Pumps.
THEN Close AF-5, T-24A CST Outlet To Aux Feed Pumps.
        . 5.4.4 .... i* "t "is"dsiretd co'cool ...... "... L1~   T.wa...r....u........
5.4.4....
i* "t "is"dsiretd co'cool...... " L1~
T.wa...r....u........
AND there is NOT sufficient level in the T-24A (South) CST, THEN perform the following:
AND there is NOT sufficient level in the T-24A (South) CST, THEN perform the following:
(Otherwise mark this step as N/A)
(Otherwise mark this step as N/A)
: a. Open AF-7A, T-24B CST Inlet From Water Treatment.
: a.
                      "b. WHEN the CST water volume has cooled to 95 OF (80 FT- 1100OF),
Open AF-7A, T-24B CST Inlet From Water Treatment.  
"b. WHEN the CST water volume has cooled to 95 OF (80 FT-110 0OF),
THEN close AF-7A, T-24B CST Inlet From Water Treatment.
THEN close AF-7A, T-24B CST Inlet From Water Treatment.
5.4.5     WHEN T-24B (North) CST level is at the level desired by Shift Management, AND temperature is at 95 OF (80 'F-110 OF),
5.4.5 WHEN T-24B (North) CST level is at the level desired by Shift Management, AND temperature is at 95 OF (80 'F-110 OF),
THEN with Shift Management concurrence, continue with Step 5.4.6 to stop heating T-24A (South) CST.
THEN with Shift Management concurrence, continue with Step 5.4.6 to stop heating T-24A (South) CST.
Pagie 21 of 24                           CONTLNUOUS USE
CONTLNUOUS USE Pagie 21 of 24


POINT 3EAk- kiUL.LzAK -VLA."*.                                   SAFETY RELATED OPERATrNG INSTRUCTIONS                                          Revision 2 October 21, 2002 HEATRhNG THE CONDENSATE STORAGE TANKS                                                      ENITIALS IN&#xfd;ITIALS 5.4.6   Place the following valves to the original As-Found position recorded in step 5.4.2 or as directed by the DSS.
POINT 3EAk-kiUL.LzAK -VLA."*.
As-found JDS S AF-9       T-24B CST Recirc Isolation AF-2       T-24A Mini Recirc I'olation AF-3       T-24A Service Outlet AF-8       T-24B Service Outlet AF-6       T-24B CST Outlet To Aux Feed Pumps AF-5       T-24A CST Outlet To Aux Feed Pumps AF-7A       T-24B CST Inlet From Water Treatment AF-4A     T-24A CST Inlet From Water Treatment listed below.
OPERATrNG INSTRUCTIONS HEATRhNG THE CONDENSATE STORAGE TANKS SAFETY RELATED Revision 2 October 21, 2002 IN&#xfd;ITIALS 5.4.6 Place the following valves to the original As-Found position recorded in step 5.4.2 or as directed by the DSS.
5.4.7   Provide Independent Verification of the Redlocked valves Required         IV Valve T-24A Mini Recirc Isolation                     LO AF-2 T-24B CST Recirc isolation                       LO AF-9 T-24A Service Outlet                             LO AF-3 T-24B Service Outlet                             LO AF-8 T-24A CST Outlet To Aux Feed Pumps               LO AF-5 T-24B CST Outlet To Aux Feed Pumps               LO AF-6 5.4.8   Align the Waste Heating Returns to the North CST as follows:
As-found JDS S AF-9 T-24B CST Recirc Isolation AF-2 T-24A Mini Recirc I'olation AF-3 T-24A Service Outlet AF-8 T-24B Service Outlet AF-6 T-24B CST Outlet To Aux Feed Pumps AF-5 T-24A CST Outlet To Aux Feed Pumps AF-7A T-24B CST Inlet From Water Treatment AF-4A T-24A CST Inlet From Water Treatment 5.4.7 Provide Independent Verification of the Redlocked valves listed below.
Valve Required IV AF-2 T-24A Mini Recirc Isolation LO AF-9 T-24B CST Recirc isolation LO AF-3 T-24A Service Outlet LO AF-8 T-24B Service Outlet LO AF-5 T-24A CST Outlet To Aux Feed Pumps LO AF-6 T-24B CST Outlet To Aux Feed Pumps LO 5.4.8 Align the Waste Heating Returns to the North CST as follows:
: a. AF-67, Heating Boiler Feedwater Pump Suction.
SHUT
SHUT
: a. AF-67, Heating Boiler Feedwater Pump Suction.
: b. HV-68, Heating Boiler Feedwater and Condensate Cross-Connect.
: b. HV-68, Heating Boiler Feedwater and Condensate OPEN Cross-Connect.
OPEN
: c.
AF-69, Heating Boiler Condensate Return.
OPEN
OPEN
: c. AF-69, Heating Boiler Condensate Return.
: d. AF-10, T-24 A/B CST heating Return Header Isolation. SHUT CONTILNUOUS USE ENITIALS Page 22 of 24
SHUT
: d. AF-10, T-24 A/B CST heating Return Header Isolation.
Page 22 of 24                         CONTILNUOUS USE


NUCLEAR PLANT                               01150 POINT BEACHINSTRUCTIONS                                    SAFETY RELATED OPERATING Revision 2 October 21. 2002 HEATING THE CONDENSATE STORAGE TANKS Remarks t
POINT BEACH NUCLEAR PLANT 01150 OPERATING INSTRUCTIONS SAFETY RELATED Revision 2 HEATING THE CONDENSATE STORAGE TANKS October 21. 2002 Remarks t
Performed By Date Time              Initials Per-former (Print and Sign)
Performed By Per-former (Print and Sign)
                                                                /       tnSg (P ientil  )_aei Date  Time              Initials Performer (Print and Sign)
Date Time Initials
Date Time               Initials Performer (Print and Sign)
/ (P i tnSg )_aei entil Performer (Print and Sign)
Performer (Print and Sign)
Date Time Initials Performer (Print and Sign)
                                                                /  (Pinadig)_atTmeIntil Date Time               Initials Performer (Print and Sign)
Date Time Initials
                                                                /
/ (Pinadig)_atTmeIntil Performer (Print and Sign)
Date ByTime              Initials
Date Time Initials  
                                                          - Date Time                 Initials Performer (Print and Sign)
/ By Performer (Print and Sign)
Reviewed By Date Time                 Initials Reviewer (Print and Sign)
Date Time Initials Performer (Print and Sign)  
Page 23 of 24                       CONTLNUOUS USE
- Date Time Initials Reviewed By Reviewer (Print and Sign)
Date Time Initials Page 23 of 24 CONTLNUOUS USE


POINT BEACH NUCLEAR PLANT                                 01 150, SAFETY RELATED OPERATING MNSTRUCTIONS Revision 2 October 21. 2002 HEATING THE CONDENSATE STORAGE TANKS
POINT BEACH NUCLEAR PLANT OPERATING MNSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS


==6.0 REFERENCES==
==6.0 REFERENCES==
 
6.1 Technical Specifications:
6.1 Technical Specifications:
* TS: 3.7.6 Condensate Storage Tank (CST).
* TS: 3.7.6 Condensate Storage Tank (CST).
6.2 FSAR:
6.2 FSAR:
* Section 10.0, Steam and Power Conversion System.
* Section 10.0, Steam and Power Conversion System.
6.3 P.&IDs:
6.3 P.&IDs:  
              "* M-217, Sheet 1, Auxiliary Feedwater System.
"* M-217, Sheet 1, Auxiliary Feedwater System.  
              "* M-202, Sheet 1, Condensate System.
"* M-202, Sheet 1, Condensate System.  
- ~ ~       ~     -M 2202, -She--t-1, CondznsatcSze   m       ....      .
~  
6.4 Tank Level Book:
~  
              "* Condensate Storage Tank (T-24 A/B).
~  
              "* Calculation - N97-155, PBNPIC-42.
-M 2202, -She--t-1, CondznsatcSze m
6.5 OM 5.4.4 Control of Posted Plant Information Page 24 of 24                 CONTINUOUS USE}}
6.4 Tank Level Book:  
"* Condensate Storage Tank (T-24 A/B).  
"* Calculation - N97-155, PBNPIC-42.
6.5 OM 5.4.4 Control of Posted Plant Information CONTINUOUS USE Page 24 of 24 01 150, SAFETY RELATED Revision 2 October 21. 2002}}

Latest revision as of 11:47, 16 January 2025

OI 150 Heating the Condensate Storage Tanks, Revision 2
ML030770811
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/21/2002
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0094
Download: ML030770811 (24)


Text

a-01150 HEATING THE CONDENSATE STORAGE TANKS DOCUMENT TYPE:

CLASSIFICATION:

REVISION:

EFFECTIVE DATE:

REVIEWER:

APPROVAL AUTHORITY:

PROCEDURE OWNER (title):

OWNER GROUP:

Verified Current Copy:

Technical Safety Related 2

"October 21, 2002 t-C, Qualified Reviewer Department Manager Group Head Operations Signature List pages used for Partial Performance Date Time

°° "*1 Controlling Work Document Numbers P

.ýýq

POEL'T'BEACH NUCLEAR PLAN 1 RE 1:AU OPERATING INSTRUCTIONS SAFETY RELATED Revision 2 HEATLNG THE CONDENSATE STORAGE TANKS October 21. 2002 INITIALS 1.0 PURPOSE This procedure provides instruction for filling the Condensate Storage Tank, T-24A or T-24B from the opposite units Condensate Feedwater System or Waste Condensate System to provide approximately 42,000 gallons of water at a temperature of 95 0F (80 OF to I10 OF) to fill the Steam Generator and Main Steam line.

2.0 PREREOUISrTES The IT-300/305 transfer hose (rated at greater than 2000 psig) is available for use.

3.0 PRECAUTIONS AND LfD\\ITATIONS 3.1 Do NOT allow CST temperature to exceed 120 Degrees F during the fill with a final target temperature of approximately 110 degrees F.

3.2 Observe appropriate safety precautions when IT-300/305 transfer hose is pressurized. The temperature and pressure could be approximately 210 OF and approximately 400 psig.

4.0 INITIAL CONDITIONS 4.1 Ensure greater than 13,000 gallons usable condensate volume in each CST if required by current plant conditions per TS 3.7.6.

4.2 Permission to Perform Evolution The conditions required by this evolution are consistent with required plant conditions including equipment operability. Permission is granted to perform this evolution.

DSS Time Date CONTLNUOUS USE Page 2 of 24

POINT BEACH NUCLEAR PLAINT OPERATD-NG DýSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 2 October 21. 2002 hNITLALS 5.0 PROCEDURE NOTE:

If both Units are in MODE 5, 6, or defueled then heat the CSTs using Waste Heating Returns per section 5.3 or 5.4 as applicable.

NOTE:

Approximately 42,000 gallons of water will be needed to fill the Steam Generator and Main Steam line. This will require multiple filling of the target CST.

NOTE:

Maintain a minimum of 13,000 gallons of water in the target CST to satisfy the on-line units technical specification for Auxiliary Feedwater source volume.

NOTE:

It'Will be necessary to perform this pcoceduie morc than once to.

fill the SG and MS line and maintain the minimum CST TS required level.

NOTE:

Each section of the procedure stands alone. Perform only the section(s) required.

5.1 Heat T-24A (South) CST to between 80 and 110 degrees F. using Unit 2 2A Feedwater Heater.

5.1.1 CAUTION AT LEAST ONE CST WITH SUFFICIENT VOLUME TO COMPLY WITH TS 3.7.6 MUST ALWAYS BE ALIGNED TO THE AFW PUMPS Per TLB-34, 7.399ft is required in One Tank for One Unit Split the CST's with T-24A aligned to AFW and Unit I and T-24B aligned to Unit 2 as follows:

a. Ensure the following valves are locked open AF-2, T-24A Recirc Isolation AF-3, T-24A Service Outlet LOCKED OPEN LOCKED OPEN AF-5. T-24A Outlet to AFW Pumps LOCKED OPEN AF-8, T-24B Service Outlet LOCKED OPEN CONTINUOUS USE I

Page 3 of 24

PO1LTNBEACH NUCLEAR PLAN-I OPERATDNG INSTRUCTIONS HEAT-NG THE CONDENSATE STORAGE TANKS Ul 1OU SAFETY RELATED Revision 2 October 21. 2002 INITIALS

b. Ensure Open AF-7A, T-24B Supply from Water Treatment
c.

Shut the following valves to split the CST's AF-4A, T-24A Supply from Water Treatment AF-6, T-24B Outlet to AFW Pumps AF-9, T-24B Recirc Isolation Install IT-300/305 transfer hose by:

a.

OPEN SHUT SHUT SHUT Connect one end of IT-300/305 transfer hose to 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN.

b. Connect the other end of IT-300/305 transfer hose to AF-13, T-24A CST Drain.

Hang Temporary Information tags containing the information in the Caution above on:

a. AF-13, T-24A CST Drain.
b. 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN.

Open AF-13, T-24A CST Drain.

CONTINUOUS USE CAUTION Feedwater outlet temperature is approximately 210 OF and approximately 400 psig. When the transfer hose between Unit 2 2A FW Heater and T-24A is used, AF-13 is to be opened before throttling open 2CS-107C and 2CS-107C is to be shut before shutting AF-13 to minimize the pressure on the transfer hose.

5.1.3 t

5.1.4 Pagye 4 of 24 LNITIALS

-- - 1 11

POENT BEACH NUCLEAR PLANT 01150 OPERATIIýG ENSTRUCTIONS SAFETY RELATED Revision 2 HEATING THE CONDENSATE STORAGE TANKS October 21. 2002 INýITIALS NOTE:

2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN, may be throttled open or closed to vary fill or rate of temperature change.

NOTE:

Steps 5.1.5 and 5.1.6 or 5.1.7 may be performed concurrently.

5.1.5 Using the tool provided, throttle open 2CS-107C, HX-17A LP FWH 2A Outlet to HX-I 9A LP FWH 3A DRN AND check hose for leaks.

5.1.6 IF it is desired to cool T-24A (South) CST water volume, AND there is sufficient level in the T-24B (North) CST,

'111 ENT p prfo irm the f!owi..w, n-g:

(Otherwise mark this step as N/A)

a. Throttle open AF-6, T-24B CST Outlet To Aux Feed Pumps, to sluice water from T-24B to T-24A.
b. WHEN the CST water volume has cooled to 95 OF (80 F-1 10 OF),

THEN Close AF-6, T-24B CST Outlet To Aux Feed Pumps.

5.1.7 IF it is desired to cool T-24A (South) CST water volume, AND there is NOT sufficient level in the T-24B (North) CST, THEN perform the following:

(Otherwise mark this step as NIA)

a. Open AF-4A, T-24A CST Inlet From Water Treatment.
b. WHEN the CST water volume has cooled to 95 OF (80F 110 OF),

THEN close AF-4A, T-24A CST Inlet From Water Treatment.

CONTLNUOUS USE Page 5 of 24

P0h\\ 1 bL.A..-f...l.-' i.,L..c.-lIx L l.,

A QPERATol\\

'G I

N.STRUCTIONS SAFETY RELATED Revision 2 HEAT]3NG THE CONDENSATE STORAGE TANKS October 21, 2002 I4ITIALS 5.1.8 IF necessary to temporarily stop heating T-24A (South) CST water volume, THEN perform the following:

(Otherwise mark this step as N/A)

a. Shut 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRIN.
b. WHEN heating T-24A (South) CST water volume is to be restarted,

-THEN go to step 5.1.10:.

5.1.9 WHEN T-24A (South) CST level is at the level desired by Shift Management,

-7

.AND erriperafuwe is a'9i (30

"- T-lo, THEN shut 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN.

NOTE:

It maybe necessary to repeats steps that refill and reheat T-24A (South) CST as the Steam Generator(s) and Main Steam Line(s) are filled.

5.1.10 IF it is necessary to refill and reheat T-24A (South) CST, THEN repeat steps 5.1.5 through steps 5.1.9, AND document steps performed below.

(Mark step not performed N/A).

CONTEhNUOUS USE Page 6 of 24

POINT BEACH NUCLEAR PLANT POILNT BEACH NUCLEAR PLANT OPERATING INSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 2 October 21,2002

.A CONTINUOUS USE

KT'TT

. I UNI I L\\L.)

CAUTION AT LEAST ONE CST WITH SUFFICIENT VOLUME TO COMPLY WITH TS 3.7.6 MUST ALWAYS BE ALIGNED TO THE AFW PUMPS Per TLB-34, 7.399ft is required in One Tank for One Unit NOTE:

NOTE:

5.1.11 Page 7 of 24 UN\\I I I..---

If T-24B (North) CST level is lower than T-24A (South)

CST then water will transfer from T-24A to T-24B. If this iS'nloI accep-abA, equal to T-24A prior to shifting tanks.

The following steps will cause the CST's to equalize in level.

WHEN a heated water source to the AFW Pumps is no longer

required, THEN align T-24B (North) CST to AFW Pumps as follows:
a. Ensure Locked Open the following valves AF-8, T-24B Service Outlet.

LOCKED OPEN AF-6, T-24B Outlet to Auxiliary Feed Pumps LOCKED OPEN AF-9, T-24B Recirc Isolation, LOCKED OPEN

b. Ensure Open AF-7A T-24B Supply from Water Treatment
c. Perform Independent verification of the following valves:

AF-8, T-24B Service Outlet LOCKED OPEN AF-6, T-24B Outlet to Auxiliary Feed Pumps LOCKED OPEN AF-9, T-24B, Recirc Isolation LOCKED OPEN

POINT BEACH NUCLEAR PLANT POIN<T BEACH NUCLEAR PLANT OPERATING LNSTRUCTIONS HEATUMG THE CONDENSATE STORAGE TANKS 01 150 SAFETY RELATED Revision 2 October 21. 2002

d. Isolate T-24A (South) CST by Shutting the following valves:

AF-3, T-24A Service Outlet.

AF-4A, T-24A Supply from Water Treatment.

AF-2, T-24A Recirc Isolation 5.1.12 TNQ-T'-

SHUT SHUT SHUT Notify the Control Room that T-24B (North) CST is aligned to AFW pumps and Condenser makeup.

Pe,-f-rM !he next thr-e-ensihu l~yimF.

2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN leaks by.

5.1.13 Using the tool provided, shut 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN.

5.1.14 Shut AF-13, T-24A CST Drain.

IV IV 5.1.15 Remove IT-300/305 transfer hose from AF-13, T-24A CST Drain AND route to a floor drain.

5.1.16 Remove IT-300/305 transfer hose from 2CS-107C, HX-17A LP F'WH 2A Outlet To HX-19A LP FWH 3A DRN AND drain hose into floor drain.

5.1.17 Cap 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN.

IV CONTLNUOUS USE LN111AL

Page 8 of 24 EN l I ALS I

PONT BEACH NUCLEAR PLANT OPERATLNG LN'STRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 2 October 21. 2002 LNII IALS 5.1.18 Remove the Temporary Information tags hung during step 5.1.3 on AF-13, T-24A CST Drain AND 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN.

5.1.19 Allow the IT-300/305 transfer hbse to cool to approximately ambient temperature while continuing with the balance of this section.

-5.1.20 Store the IT-300/305 transfer hose as designated by the DSS.

NOTE:

Entry into TSAC 3.7.6.A is not required for one CST inoperable Provided the aligned CST has sufficient volume

'"tu *b~l it;LC_ 3 7-6~-:...

5.1.21 Declare T-24A CST inoperable.

5.1.22 Tag Shut the following T-24A valves to prevent use.

AF-3, T-24A Service Outlet AF-4A, T-24A Supply from Water Treatment.

AF-2, T-24A Recirc Isolation.

5.1.23 Notify Chemistry to Sample T-24A for discharge.

Permit Required Yes No (circle one) 5.1.24 Discharge/Drain T-24A (South) CST by throttling open AF-13, T-24A Drain. Maintain drain rate within the limits of L

the Turbine Bldg Sump Pump(s).

5.1.25 WHEN T-24A (South) CST has finished draining, THEN Shut and Cap AF-13. T-24A (South) CST Drain.

CONTINUOUS USE CAUTION DO NOT Exceed the pumping capacity of the Turbine Bldg Sump Pumps when draining the CST.

IV IN1ITIALS Page 9 of 24

POLNT BEACH NUCLEAR PLAN I OPERATLNG INSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS Ul IDU SAFETY RELATED Revision 2 October 21. 2002 INýITIALS NOTE:

Remove Tags on T-24A (South) CST while performing the following steps.

5.1.26 Begin Refill of T-24A, (South) by opening AF-4A, T-24A Supply from Water Treatment.

CAUTION MAINTAIN SUFFICIENT VOLUME ALIGNED TO AFW PUMPS TO COMPLY WITH TS 3.7.6 AT ALL TIMES Per TLB-34, 7.399ft is required in One Tank for One Unit NOTE:

T-24A and T-24B will equalize in the following step. It may be necessary to allow T-24A to fill partially from Water Treatment before proceeding.

5.1.27 Throttle Open AF-3, T-24 Service Outlet to equalize T-24A and T-24B.

5.1.28 Align Both CST's T-24A and T-24B to normal as follows:

AF-3, T-24A Service Outlet.

AF-8, T-24B Service Outlet AF-5, T-24A Outlet to AFW Pumps AF-6. T-24B Outlet to AFW Pumps LOCKED OPEN LOCKED OPEN LOCKED OPEN LOCKED OPEN CONTINUOUS USE CAUTION MAINTAIN SUFFICIENT VOLUME ALIGNED TO AFW PUMPS TO COMPLY WITH TS 3.7.6 AT ALL TIMES Per TLB-34, 7.399ft is required in One Tank for One Unit IV IV IV IV

---. - - -ý - 11

- - -- - ý -- 11 Pag~e 10 of 24

POLNT BEACH NUCLEAR PLANT 01 150 OPERATING L'STRUCTIONS SAFETY RELATED Revision 2 HEATflG THE CONDENSATE STORAGE TANKS October 21.2002 INITIALS AF-2, T-24A Recirc Isolation LOCKED OPEN IV AF-9, T-24B Recirc Isolation LOCKED OPEN IV AF-4A, T-24A Supply from Water Treatment OPEN AF-7A, T-24B Supply from Water Treatment OPEN 5.1.29 Declare T-24A CST returned to service.

5.2 Heat T-24B (North) CST to between 80 and 110 dearees F. using Unit I 2B Feedwater 5.2.1 Record the As-Found position AND position the valves to the required position to Split the North and South CSTs.

Valve As-found Required AF-9 T-24B CST Recirc Isolation OPEN AF-2 T-24A Mini Recirc Isolation SHUT AF-3 T-24A Service Outlet OPEN AF-8 T-24B Service Outlet OPEN AF-6 T-24B CST Outlet To Aux Feed Pumps OPEN AF-5 T-24A CST Outlet To Aux Feed Pumps SHUT AF-4A T-24A CST Inlet From Water Treatment OPEN' AF-7A T-24B CST Inlet From Water Treatment SHUT 5.2.2 Install IT-300/305 transfer hose by:

a. Connect one end of IT-300/305 transfer hose to ICS-99C, HX-17B LP FWH 2B Outlet Drain.
b. Connect the other end of IT-300/305 transfer hose to AF-14, T-24B CST Drain.

CONTLNUOUS USE Pagce I11 of 24

POICNT BEACH NUCLEAR PLAN F

%-)I 1.,V QPERATE*G LNSTRUCTIONS SAFETY-RELATED Revision 2 HEATING THE CONDENSATE STORAGE TANKS October 21,2002 rQITLLS CAUTION Feedwater outlet temperature is approximately 210 Degrees F and approximately 400 psig. When the transfer hose between Unit 1 2B FW Heater and T-24B is used, AF-14 is to be Opened before Throttling Open with 1CS-99C and ICS-99C is to be Shut before Shutting AF-14 to minimize the pressure on the transfer hose.

5.2.3 Hang temporary information tags containing the information in the Caution on above on:

,AFý-1-T-4B CST Drain.

1CS-99C, HX-17B LP FWH 2B Outlet Drain.

5.2.4 Open AF-14, T-24B CST Drain.

NOTE:

1CS-99C, HX-17B LP FWH 2B Outlet Drain, may be throttled open or closed to vary fill or rate of temperature change.

NOTE:

Steps 5.2.5 and 5.2.6 or 5.2.7 may be performed concurrently.

5.2.5 Using the tool provided, throttle open ICS-99C, HX-17B LP FWH 2B Outlet Drain, AND check hose for leaks 5.2.6 IF it is desired to cool T-24B (North) CST water volume, AND there is sufficient level in thie T-24A (South) CST, THEN perform the following:

(Otherwise mark this step as NIA)

a. Throttle open AF-5, T-24A CST Outlet To Aux Feed Pumps, to sluice water from T-24A to T-24B.
b. WHEN the CST water volume has cooled to 95 OF (80 OF-1I10 OF),

THEN Close AF-5, T-24A CST Outlet To Aux Feed Pumps.

CONTINqUOUS USE Page 12 of 24

POINT BEACH NUCLEAR PLANT 01150 "OPERATING INSTRUCTIONS SAFETY RELATED Revision 2 HEATLýG THE CONDENSATE STORAGE TANKS October 21, 2002 IINITIALS 5.2.7 IF it is desired to cool T-24B (North) CST water volume.

AN.D there is NO.T sufficient level in the T-24A (South) CST, THEN perform the following:

(Otherwise mark this step as N/A)

a.

Open AF-7A, T-24B CST Inlet From Water Treatment.

b. WHEN the CST water volume has cooled to 95 'F (80 F 110 uF),

THEN close AF-7A, T-24B CST Inlet From Water Treatment.

5.2.8 IF necessary to temporarily stop heating T-24B (North) CST THEN perform the following:

(Otherwise mark this step as N/A)

a. Shut ICS-99C, HX-17B LP FWH 2B Outlet Drain.
b. WHEN heating T-24B (North) CST water volume is to be restarted, THEN go to step 5.1.10.

5.2.9 W¥HEN 24B (North) CST level is at the level desired by Shift Management, AND temperature is at 95 OF (80 OF-1 10 OF),

THEN shut ICS-99C, HX-17B LP FWH 2B Outlet Drain.

CONTINUOUS USE Pa2e 13 of 24

PODNT BEACH NUCLEAR PLANT ul U

pPERATING INSTRUCTIONS SAFETY RELATED Revision 2 HEATING THE CONDENSATE STORAGE TANKS October 21. 2002 JNITIALS NOTE:

It maybe necessary to repeats steps that refill and reheat 24B (North) CST as the Steam Generator(s) and Main Steam Line(s) are filled.

5.2.10 IF it is necessary to refill and reheat 24B (North) CST, THEN repeat steps 5.2.5 through steps 5.2.9, AND document steps performed below.

(Mark step not performed NIA).

1st 2nd STEP NO.

PERFORMANCE PERFORMANCE 5.2.5

.5 :2.6 5.2.7 5.2.8 5.2.9 NOTE:

Perform the next three steps without delay in case 1CS-99C, HX-17B LP FWH 2B Outlet Drain leaks by.

5.2.11 Using the tool provided, shut 1CS-99C, HX-17B LP FWH 2B Outlet Drain.

IV 5.2.12 Shut AF-14, T-24B CST Drain.

IV 5.2.13 Remove IT-300!305 transfer hose from AF-14, T-24B CST Drain AND ROUTE to a floor drain.

5.2.14 Cap AF-14, T-24B CST Drain.

IV 5.2.15 Remove IT-300/305 transfer hose from 1CS-99C, HX-17B LP FWH 2B Outlet Drain AND drain hose into floor drain.

5.2.16 Cap ICS-99C, HX-17B LP FWH 2B Outlet Drain.

t IV CONTINUOUS USE Page 14 of 24

POE*T BEACH NUCLEAR PLANT OPERATING D'-STRUCTIONS HEATENG THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 2 October 21, 2002 5.2.17 Remove the Temporary Information tags hung during step 5.2.3 on AF-14, T-24B CST Drain AND 1CS-99C, HX-17B LP FWH 2B Outlet Drain.

5.2.18 Allow the IT-300/305 transfer hose to cool to approximately ambient temperature while continuing with the balance of this section.

5.2.19 Place the following valves to the original as-found position recorded in step 5.2.1 or as directed by the DSS.

As-found

/DSS

'C

'-t a

AF-9 T-24B CST Recirc Isolation______

AF-2 T-24A Mini Recirc Isolation AF-3 T-24A Service Outlet AF-8 T-24B Service Outlet AF-6 T-24B CST Outlet To Aux Feed Pumps AF-5 T-24A CST Outlet To Aux Feed Pumps AF-7A T-24B CST Inlet From Water Treatment AF-4A T-24A CST Inlet From Water Treatment L~

-Il CONTINUOUS USE I

B'QTIALS Page 15 of 24

',I I.JJ PoL\\N t-I

,t l t.I'N..LtAK K l-OPERATING DNSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS D,7IT1ALS 5.2.20 Provide Independent Verification of the Redlocked valves listed below.

Valve Required IV AF-2 T-24A Mini Recirc Isolation LO AF-9 T-24B CST Recirc isolation LO AF-3 T-24A Service Outlet LO AF-8 T-24B Service Outlet LO AF-5 T-24A CST Outlet To Aux Feed Pumps LO AF-6 T-24B CST Outlet To Aux Feed Pumps LO 5.2.21 Store the IT-300/305 transfer hose as designated by Shift management.

5.3 "T"eat 1-24A'(SoutW)CSTatiina Waste Heating Returns.'..

5.3.1 Align the Waste Heating Returns to the South CST as follows:

a. AF-67, Heating Boiler Feedwater Pump Suction.

SHUT

b. AF-10, T-24 A/B CST heating Return Header Isolation.

OPEN

c.

AF-69, Heating Boiler Condensate Return.

OPEN

d. AF-68, Heating Boiler Feedwater and Condensate Crossover.

SHUT r-,.

.. 

CONTINUOUS USE Pagle 16 of 24 SAFETY RELATED Revision 2 October 21. 2002

POLNT BEACH NUCLEAR PLANT OPERATDNG DNSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 2 October 21, 2002 Record the As-Found position AND position the valves to the required position to Split the North and South CSTs.

Valve A.ss Found Required AF-2 AF-9 T-24A Mini Recirc Isolation T-24B CST Recirc isolation AF-3 T-24A Service Outlet AF-8 T-24B Service Outlet AF-5 T-24A CST outlet to Aux

. F,'Punips.

AF-6 T-24B CST outlet to Aux Feed Pumps AF-7A T-24B CST inlet from Water Treatment AF-4A T-24A CST inlet from "Water Treatment 5.3.3 OPEN SHUT OPEN OPEN OPEN SHUT OPEN SHUT IF it is desired to cool T-24A (South) CST water volume, AND there is sufficient level in the T-24B (North) CST, THEN perform the following:

(Otherwise mark this step as N/A)

a. Throttle open AF-6, T-24B CST Outlet To Aux Feed Pumps, to sluice water from T-24B to T-24A.
b. WHEN the CST water volume has cooled to 95 OF (80 "F-110 OF),

THEN Close AF-6, T-24B CST Outlet To Aux Feed Pumps.

CONTINUOUS USE 5.3.2 I.11.1 I I Lo_3l..

Page 17 of 24

POEýT BEACH NUCLEAR PLA-NT Ul IV lPERATLNG INSTRUCTIONS SAFETY-RELATED Revision 2 HEATIN-G THE CONDENSATE STORAGE TANKS October 21. 2002 SE]N1TL*LS 5.3.4 IF it is desired to cool T-24A (South) CST water volume, AND there is NOT sufficient level in the T-24B (North) CST, THEN perform the following:

(Otherwise mark this step as N/A)

a. Open AF-4A, T-24A CST Inlet From Water Treatment.
b. WHEN the CST water volume has cooled to 95 )F (80 'F 110 _F),

THEN close AF-4A, T-24A CST Inlet From Water Treatment.

5.3.5 WHEN T-24A (South) CST level is at the level desired by S...

Shift Maagement, AND temperature is at95 0F (o80 *j-j 0 "C$-F,"

THE-N with Shift Management concurrence, continue with Step 5.3.6. to stop heating T-24A (South) CST.

5.3.6 Place the following valves to the original As-Found position recorded in step 5.3.2 or as directed by the DSS.

As-found

/DSS AF-9 T-24B CST Recirc isolation AF-2 T-24A Mini Recirc Isolation AF-3 T-24A Service Outlet AF-8 T-24B Service Outlet AF-6 T-24B CST outlet to Aux Feed Pumps AF-5 T-24A CST outlet to Aux Feed Pumps AF-7A T-24B CST inlet from Water Treatment AF-4A T-24A CST inlet from Water Treatment CONTINUOUS USE Page 18 of 24

POIN"T BEACH NUCLEAR PLANT OPERATING I-NSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 5.3.7 01150 SAFETY RELATED Revision 2 October 21, 2002 Nr ITIALS Provide Independent Verification of the Redlocked valves listed below.

Valve AF-2 AF-9 AF-3 AF-8 AF-5 AF-6 5.3.8 T-24A Mini Recirc Isolation T-24B CST Recirc isolation T-24A Service Outlet T-24B Service Outlet T-24A CST Outlet To Aux Feed Pumps T-24B CST Outlet To Aux Feed Pumps Required LO LO LO LO LO LO Iv Align the Waste Heating Returns as follows:

.a.

AF--67; Heating'Boiler Feed~vatci P ump S.,c-i.n-.

b. HV-68, Heating Boiler Feedwater and Condensate Cross-Connect.
c. AF-10, T-24 A/B CST heating Return Header Isolation.
d. AF-69, Heating Boiler Condensate Return.

OPEN SHUT OPEN I-CONTINUOUS USE Page 19 of 24

POINT BEACH NUCLEAR PLANT POIINT BEACHN NUCLEAR PLANT

,OPERATING ENSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150.

SAFETY RELATED Revision 2 October 21. 2002 INITIALS 5.4 Heat T-24B (North) CST using Waste Heating Returns.

5.4.1 Align the Waste Heating Returns to the North CST as follows:

a. AF-67, Heating Boiler Feedwater Pump Suction.

SHUT

b. AF-10, T-24 A/B CST heating Return Header Isolation.

SHUT

c. HV-68, Heating Boiler Feedwater and Condensate Cross-Connect.

OPEN

d. AF-69, Heating Boiler Condensate Return.

OPEN 5.4.2 Record the As-Found position AND position the valves to the required position to Split the North and South CSTs.

Valve As Requ Found AF-9 AF-2 AF-3 AF-8 AF-6 AF-5 AF-4A AF-7A T-24B CST Recirc Isolation T-24A Mini recirc isolation T-24A Service Outlet T-24B Service Outlet T-24B CST Outlet To Aux Feed Pumps T-24A CST Outlet To Aux Feed Pumps T-24A CST Inlet From Water Treatment T-24B CST Inlet From Water Treatment ired OPEN SHUT OPEN OPEN OPEN SHUT OPEN SHUT CONTINUOUS USE Pag~e 20 of 24 LNITIALS INITIALS

POLNT BEACH NUCLEAR PLANT 01 lsO OPERATING INSTRUCTIONS SAFETY RELATED Revision 2 HEATRhG THE CONDENSATE STORAGE TANKS October 21. 2002 TNITIALS 5.4.3 IF it is desired to cool T-24B (North) CST water volume.

AND there is sufficient level in the T-24A (South) CST.

THEN perform the following:

(Otherwise mark this step as N/A)

a. Throttle open AF-5. T-24A CST Outlet To Aux Feed Pumps, to sluice Nv ater from T-24A to T-24B.
b. WHEN the CST w%,ater volume has cooled to 95 OF (80 "F-I 10 OF),

THEN Close AF-5, T-24A CST Outlet To Aux Feed Pumps.

5.4.4....

i* "t "is"dsiretd co'cool...... " L1~

T.wa...r....u........

AND there is NOT sufficient level in the T-24A (South) CST, THEN perform the following:

(Otherwise mark this step as N/A)

a.

Open AF-7A, T-24B CST Inlet From Water Treatment.

"b. WHEN the CST water volume has cooled to 95 OF (80 FT-110 0OF),

THEN close AF-7A, T-24B CST Inlet From Water Treatment.

5.4.5 WHEN T-24B (North) CST level is at the level desired by Shift Management, AND temperature is at 95 OF (80 'F-110 OF),

THEN with Shift Management concurrence, continue with Step 5.4.6 to stop heating T-24A (South) CST.

CONTLNUOUS USE Pagie 21 of 24

POINT 3EAk-kiUL.LzAK -VLA."*.

OPERATrNG INSTRUCTIONS HEATRhNG THE CONDENSATE STORAGE TANKS SAFETY RELATED Revision 2 October 21, 2002 INýITIALS 5.4.6 Place the following valves to the original As-Found position recorded in step 5.4.2 or as directed by the DSS.

As-found JDS S AF-9 T-24B CST Recirc Isolation AF-2 T-24A Mini Recirc I'olation AF-3 T-24A Service Outlet AF-8 T-24B Service Outlet AF-6 T-24B CST Outlet To Aux Feed Pumps AF-5 T-24A CST Outlet To Aux Feed Pumps AF-7A T-24B CST Inlet From Water Treatment AF-4A T-24A CST Inlet From Water Treatment 5.4.7 Provide Independent Verification of the Redlocked valves listed below.

Valve Required IV AF-2 T-24A Mini Recirc Isolation LO AF-9 T-24B CST Recirc isolation LO AF-3 T-24A Service Outlet LO AF-8 T-24B Service Outlet LO AF-5 T-24A CST Outlet To Aux Feed Pumps LO AF-6 T-24B CST Outlet To Aux Feed Pumps LO 5.4.8 Align the Waste Heating Returns to the North CST as follows:

a. AF-67, Heating Boiler Feedwater Pump Suction.

SHUT

b. HV-68, Heating Boiler Feedwater and Condensate Cross-Connect.

OPEN

c.

AF-69, Heating Boiler Condensate Return.

OPEN

d. AF-10, T-24 A/B CST heating Return Header Isolation. SHUT CONTILNUOUS USE ENITIALS Page 22 of 24

POINT BEACH NUCLEAR PLANT 01150 OPERATING INSTRUCTIONS SAFETY RELATED Revision 2 HEATING THE CONDENSATE STORAGE TANKS October 21. 2002 Remarks t

Performed By Per-former (Print and Sign)

Date Time Initials

/ (P i tnSg )_aei entil Performer (Print and Sign)

Date Time Initials Performer (Print and Sign)

Date Time Initials

/ (Pinadig)_atTmeIntil Performer (Print and Sign)

Date Time Initials

/ By Performer (Print and Sign)

Date Time Initials Performer (Print and Sign)

- Date Time Initials Reviewed By Reviewer (Print and Sign)

Date Time Initials Page 23 of 24 CONTLNUOUS USE

POINT BEACH NUCLEAR PLANT OPERATING MNSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS

6.0 REFERENCES

6.1 Technical Specifications:

  • TS: 3.7.6 Condensate Storage Tank (CST).

6.2 FSAR:

  • Section 10.0, Steam and Power Conversion System.

6.3 P.&IDs:

"* M-217, Sheet 1, Auxiliary Feedwater System.

"* M-202, Sheet 1, Condensate System.

~

~

~

-M 2202, -She--t-1, CondznsatcSze m

6.4 Tank Level Book:

"* Condensate Storage Tank (T-24 A/B).

"* Calculation - N97-155, PBNPIC-42.

6.5 OM 5.4.4 Control of Posted Plant Information CONTINUOUS USE Page 24 of 24 01 150, SAFETY RELATED Revision 2 October 21. 2002