{{#Wiki_filter:April 17, 2003 LICENSEE:             Exelon Generation Company, LLC FACILITY:             Byron Station, Units 1 and 2
{{#Wiki_filter:April 17, 2003 LICENSEE:
Exelon Generation Company, LLC FACILITY:
Byron Station, Units 1 and 2


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF THE APRIL 4, 2003, MEETING WITH EXELON GENERATION COMPANY, LLC TO DISCUSS BYRON PERFORMANCE On April 4, 2003, a public meeting was held at the Jarrett Prairie Center in Byron, Illinois, between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company staff.
OF THE APRIL 4, 2003, MEETING WITH EXELON GENERATION COMPANY, LLC TO DISCUSS BYRON PERFORMANCE On April 4, 2003, a public meeting was held at the Jarrett Prairie Center in Byron, Illinois, between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company staff.
Line 24: Line 25:
During the NRC presentation, an overall assessment of Byron performance was provided. As explained in the Annual Assessment letter from NRC to Mr. J. Skolds, President, Exelon Nuclear, dated March 4, 2003, reference ADAMS accession number ML030640285, Byron Station, Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. The slides presented that evening by the NRC and the licensee are available in ADAMS (accession numbers ML030920491 and ML031060189).
During the NRC presentation, an overall assessment of Byron performance was provided. As explained in the Annual Assessment letter from NRC to Mr. J. Skolds, President, Exelon Nuclear, dated March 4, 2003, reference ADAMS accession number ML030640285, Byron Station, Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. The slides presented that evening by the NRC and the licensee are available in ADAMS (accession numbers ML030920491 and ML031060189).
Before adjourning the meeting the NRC provided the opportunity for members of the public to ask questions. There were no questions.
Before adjourning the meeting the NRC provided the opportunity for members of the public to ask questions. There were no questions.
                                            /RA/
/RA/
Ann Marie Stone, Chief Branch 3 Division of Reactor Projects cc:     J. Dyer, Regional Administrator J. Caldwell, Deputy Regional Administrator G. Grant, Director, DRP S. Reynolds, Deputy Director, DRP A. Stone, Chief, Branch 3, DRP T. Tongue, Project Engineer, DRP R. Skokowski, SRI, Byron P. Snyder, RI, Byron
Ann Marie Stone, Chief Branch 3 Division of Reactor Projects cc:
J. Dyer, Regional Administrator J. Caldwell, Deputy Regional Administrator G. Grant, Director, DRP S. Reynolds, Deputy Director, DRP A. Stone, Chief, Branch 3, DRP T. Tongue, Project Engineer, DRP R. Skokowski, SRI, Byron P. Snyder, RI, Byron


DOCUMENT NAME: G:\Branch TSS\EOC Ltrs\eoc 030403\Mtg.
DOCUMENT NAME: G:\\Branch TSS\\EOC Ltrs\\eoc 030403\\Mtg.
Summaries\ML031250195.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE           RIII NAME             AMStone/co DATE             04/17/03 OFFICIAL RECORD COPY}}
Summaries\\ML031250195.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII NAME AMStone/co DATE 04/17/03 OFFICIAL RECORD COPY}}

Latest revision as of 10:07, 16 January 2025

Summary of Meeting with Exelon Generation Co., LLC to Discuss Byron End of Cycle Plant Performance Assessment
ML031250195
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/17/2003
From: Ann Marie Stone
NRC/RGN-III/DRP/RPB3
To:
References
Download: ML031250195 (2)


Text

April 17, 2003 LICENSEE:

Exelon Generation Company, LLC FACILITY:

Byron Station, Units 1 and 2

SUBJECT:

SUMMARY

OF THE APRIL 4, 2003, MEETING WITH EXELON GENERATION COMPANY, LLC TO DISCUSS BYRON PERFORMANCE On April 4, 2003, a public meeting was held at the Jarrett Prairie Center in Byron, Illinois, between the Nuclear Regulatory Commission (NRC) and Exelon Generation Company staff.

The purpose of the meeting was to discuss NRCs assessment of Byrons performance for the period of January 1, 2002, through December 31, 2002.

During the NRC presentation, an overall assessment of Byron performance was provided. As explained in the Annual Assessment letter from NRC to Mr. J. Skolds, President, Exelon Nuclear, dated March 4, 2003, reference ADAMS accession number ML030640285, Byron Station, Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. The slides presented that evening by the NRC and the licensee are available in ADAMS (accession numbers ML030920491 and ML031060189).

Before adjourning the meeting the NRC provided the opportunity for members of the public to ask questions. There were no questions.

/RA/

Ann Marie Stone, Chief Branch 3 Division of Reactor Projects cc:

J. Dyer, Regional Administrator J. Caldwell, Deputy Regional Administrator G. Grant, Director, DRP S. Reynolds, Deputy Director, DRP A. Stone, Chief, Branch 3, DRP T. Tongue, Project Engineer, DRP R. Skokowski, SRI, Byron P. Snyder, RI, Byron

DOCUMENT NAME: G:\\Branch TSS\\EOC Ltrs\\eoc 030403\\Mtg.

Summaries\\ML031250195.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII NAME AMStone/co DATE 04/17/03 OFFICIAL RECORD COPY