ML032380086: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 20: Line 20:
Duke Energy Corporation
Duke Energy Corporation
ATTN: Mr. G. R. Peterson
ATTN: Mr. G. R. Peterson
        Vice President
Vice President
        McGuire Nuclear Station
McGuire Nuclear Station
12700 Hagers Ferry Road
12700 Hagers Ferry Road
Huntersville, NC 28078-8985
Huntersville, NC 28078-8985
SUBJECT:         REACTOR AND SENIOR REACTOR OPERATOR INITIAL RETAKE
SUBJECT:
                EXAMINATIONS - MCGUIRE NUCLEAR STATION 05000369/2003-302 AND
REACTOR AND SENIOR REACTOR OPERATOR INITIAL RETAKE
                05000370/2003-302
EXAMINATIONS - MCGUIRE NUCLEAR STATION 05000369/2003-302 AND
05000370/2003-302
Dear Mr. Peterson:
Dear Mr. Peterson:
In a telephone conversation on August 20, 2003, between Mr. Charles Sawyer, Operations
In a telephone conversation on August 20, 2003, between Mr. Charles Sawyer, Operations
Training, and Mr. George Hopper, Senior Operations Engineer, arrangements were made for
Training, and Mr. George Hopper, Senior Operations Engineer, arrangements were made for
the administration of a licensing retake written examination at the McGuire Nuclear Station on
the administration of a licensing retake written examination at the McGuire Nuclear Station on
October 21, 2003.
October 21, 2003.  
As agreed during this conversation, your staff will prepare the 25 point Senior Reactor Operator
As agreed during this conversation, your staff will prepare the 25 point Senior Reactor Operator
examination based on the guidelines in Draft Revision 9, of NUREG-1021, "Operator Licensing
examination based on the guidelines in Draft Revision 9, of NUREG-1021, "Operator Licensing
Examination Standards for Power Reactors." The facility has also agreed to make all
Examination Standards for Power Reactors." The facility has also agreed to make all
necessary copies of the examination prior to administration. The NRC regional office will
necessary copies of the examination prior to administration. The NRC regional office will
discuss with your staff any changes that might be necessary before the examination is
discuss with your staff any changes that might be necessary before the examination is
administered.
administered.
To meet the above schedule, Mr. Sawyer agreed that your staff will furnish the examination
To meet the above schedule, Mr. Sawyer agreed that your staff will furnish the examination
outline by September 8, 2003. The written examination and the supporting reference materials
outline by September 8, 2003. The written examination and the supporting reference materials
identified in Attachment 2 of ES-201 will be due by September 15, 2003. Pursuant to
identified in Attachment 2 of ES-201 will be due by September 15, 2003. Pursuant to
10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the
10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the
outline and examination before they are submitted to the NRC for review and approval. All
outline and examination before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use. Any delay in receiving the required examination
materials shall be complete and ready-to-use. Any delay in receiving the required examination
and reference materials, or the submittal of inadequate or incomplete materials, may cause the
and reference materials, or the submittal of inadequate or incomplete materials, may cause the
examination to be rescheduled.
examination to be rescheduled.
In order to conduct the requested written examination it will be necessary for your staff to
In order to conduct the requested written examination it will be necessary for your staff to
provide adequate space and accommodations in accordance with ES-402.
provide adequate space and accommodations in accordance with ES-402.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examination is being administered.
effect while the written examination is being administered.
Line 55: Line 56:
requests (if any) (OMB approval number 3150-0090) at least 30 days before the examination
requests (if any) (OMB approval number 3150-0090) at least 30 days before the examination


DEC                                               2
DEC
date. If the applications are not received at least 30 days before the examination date, a
2
postponement may be necessary. Signed applications certifying that all training has been
date. If the applications are not received at least 30 days before the examination date, a
postponement may be necessary. Signed applications certifying that all training has been
completed should be submitted at least 14 days before the examination date.
completed should be submitted at least 14 days before the examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2006. The public reporting burden for this collection of information is estimated to average 500
2006. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for reviewing instructions, gathering and maintaining the
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
Line 76: Line 78:
enclosures will be available electronically for public inspection in the NRC Public Document
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Sawyer has been advised of the policies and
Thank you for your cooperation in this matter. Mr. Sawyer has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact George Hopper at (404) 562-4645, (Internet E-mail:
procedures and guidelines, please contact George Hopper at (404) 562-4645, (Internet E-mail:
GTH1@NRC.GOV), or myself at (404) 562-4638, (Internet E-mail: MEE@NRC.GOV).
GTH1@NRC.GOV), or myself at (404) 562-4638, (Internet E-mail: MEE@NRC.GOV).
                                              Sincerely,
Sincerely,
                                              /RA/
/RA/
                                              Michael E. Ernstes, Chief
Michael E. Ernstes, Chief
                                              Operator Licensing and
Operator Licensing and
                                                Human Performance Branch
  Human Performance Branch
                                              Division of Reactor Safety
Division of Reactor Safety
Docket Nos. 50-369, 50-370
Docket Nos. 50-369, 50-370
License Nos. NPF-9, NPF-17
License Nos. NPF-9, NPF-17
cc: (See page 3)
cc: (See page 3)


DEC                                     3
DEC
3
cc contd:
cc contd:
C. J. Thomas
C. J. Thomas
Line 102: Line 105:
Duke Energy Corporation
Duke Energy Corporation
526 S. Church Street
526 S. Church Street
Charlotte, NC 28201-0006
Charlotte, NC 28201-0006
Lisa Vaughn
Lisa Vaughn
Legal Department (PB05E)
Legal Department (PB05E)
Line 108: Line 111:
422 South Church Street
422 South Church Street
P. O. Box 1244
P. O. Box 1244
Charlotte, NC 28201-1244
Charlotte, NC 28201-1244
Anne Cottingham
Anne Cottingham
Winston and Strawn
Winston and Strawn
Line 115: Line 118:
Division of Radiation Protection
Division of Radiation Protection
N. C. Department of Environmental
N. C. Department of Environmental
Health & Natural Resources
  Health & Natural Resources
Electronic Mail Distribution
Electronic Mail Distribution
County Manager of Mecklenburg County
County Manager of Mecklenburg County
720 East Fourth Street
720 East Fourth Street
Charlotte, NC 28202
Charlotte, NC 28202
Peggy Force
Peggy Force
Assistant Attorney General
Assistant Attorney General
Line 125: Line 128:
Electronic Mail Distribution
Electronic Mail Distribution
John W. Boyle, McGuire Training Manager
John W. Boyle, McGuire Training Manager
Maintenance Training Center
Maintenance Training Center  
Courier Mail Code MG03MT
Courier Mail Code MG03MT  
12700 Hagers Ferry Road
12700 Hagers Ferry Road  
Huntersville, NC 28037
Huntersville, NC 28037  


        DEC                                                       4
DEC
        Distribution:
4
        B. Martin, NRR
Distribution:
        C. Evans (Part 72 Only)
B. Martin, NRR
        L. Slack, RII EICS
C. Evans (Part 72 Only)
        RIDSNRRDIPMLIPB
L. Slack, RII EICS
        PUBLIC
RIDSNRRDIPMLIPB
OFFICE             RII:DRs               RII:DRS     RII:DRP
PUBLIC  
SIGNATURE         /RA By M. Ernstes for/ /RA/       /RA By R. Carroll for/
OFFICE
NAME               GHopper:pmd           MErnstes   BHaag
RII:DRs
DATE                     08/25/2003       08/25/2003     08/25/2003
RII:DRS
E-MAIL COPY?         YES           NO      YES NO     YES         NO       YES NO YES     NO YES NO
RII:DRP
PUBLIC DOCUMENT     YES           NO
SIGNATURE
        OFFICIAL RECORD COPY          DOCUMENT NAME: C:\ORPCheckout\FileNET\ML032380086.wpd
/RA By M. Ernstes for/
/RA/
/RA By R. Carroll for/
NAME
GHopper:pmd
MErnstes
BHaag
DATE
08/25/2003
08/25/2003
08/25/2003
E-MAIL COPY?
    YES
NO      YES NO     YES
NO     YES
NO     YES
NO     YES
NO  
PUBLIC DOCUMENT
    YES
NO  
OFFICIAL RECORD COPY          DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML032380086.wpd
}}
}}

Latest revision as of 08:03, 16 January 2025

Reactor and Senior Reactor Operator Initial Retake Examinations - McGuire Nuclear Station 50-369/03-302 and 50-370/03-302
ML032380086
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/25/2003
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Gordon Peterson
Duke Energy Corp
References
50-369/03-302, 50-370/03-302
Download: ML032380086 (5)


See also: IR 05000369/2003302

Text

August 25, 2003

Duke Energy Corporation

ATTN: Mr. G. R. Peterson

Vice President

McGuire Nuclear Station

12700 Hagers Ferry Road

Huntersville, NC 28078-8985

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL RETAKE

EXAMINATIONS - MCGUIRE NUCLEAR STATION 05000369/2003-302 AND

05000370/2003-302

Dear Mr. Peterson:

In a telephone conversation on August 20, 2003, between Mr. Charles Sawyer, Operations

Training, and Mr. George Hopper, Senior Operations Engineer, arrangements were made for

the administration of a licensing retake written examination at the McGuire Nuclear Station on

October 21, 2003.

As agreed during this conversation, your staff will prepare the 25 point Senior Reactor Operator

examination based on the guidelines in Draft Revision 9, of NUREG-1021, "Operator Licensing

Examination Standards for Power Reactors." The facility has also agreed to make all

necessary copies of the examination prior to administration. The NRC regional office will

discuss with your staff any changes that might be necessary before the examination is

administered.

To meet the above schedule, Mr. Sawyer agreed that your staff will furnish the examination

outline by September 8, 2003. The written examination and the supporting reference materials

identified in Attachment 2 of ES-201 will be due by September 15, 2003. Pursuant to

10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the

outline and examination before they are submitted to the NRC for review and approval. All

materials shall be complete and ready-to-use. Any delay in receiving the required examination

and reference materials, or the submittal of inadequate or incomplete materials, may cause the

examination to be rescheduled.

In order to conduct the requested written examination it will be necessary for your staff to

provide adequate space and accommodations in accordance with ES-402.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examination is being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior reactor operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) at least 30 days before the examination

DEC

2

date. If the applications are not received at least 30 days before the examination date, a

postponement may be necessary. Signed applications certifying that all training has been

completed should be submitted at least 14 days before the examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,

2006. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and

Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget,

Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Sawyer has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact George Hopper at (404) 562-4645, (Internet E-mail:

GTH1@NRC.GOV), or myself at (404) 562-4638, (Internet E-mail: MEE@NRC.GOV).

Sincerely,

/RA/

Michael E. Ernstes, Chief

Operator Licensing and

Human Performance Branch

Division of Reactor Safety

Docket Nos. 50-369, 50-370

License Nos. NPF-9, NPF-17

cc: (See page 3)

DEC

3

cc contd:

C. J. Thomas

Regulatory Compliance Manager (MNS)

Duke Energy Corporation

Electronic Mail Distribution

M. T. Cash, Manager

Regulatory Issues & Affairs

Duke Energy Corporation

526 S. Church Street

Charlotte, NC 28201-0006

Lisa Vaughn

Legal Department (PB05E)

Duke Energy Corporation

422 South Church Street

P. O. Box 1244

Charlotte, NC 28201-1244

Anne Cottingham

Winston and Strawn

Electronic Mail Distribution

Beverly Hall, Acting Director

Division of Radiation Protection

N. C. Department of Environmental

Health & Natural Resources

Electronic Mail Distribution

County Manager of Mecklenburg County

720 East Fourth Street

Charlotte, NC 28202

Peggy Force

Assistant Attorney General

N. C. Department of Justice

Electronic Mail Distribution

John W. Boyle, McGuire Training Manager

Maintenance Training Center

Courier Mail Code MG03MT

12700 Hagers Ferry Road

Huntersville, NC 28037

DEC

4

Distribution:

B. Martin, NRR

C. Evans (Part 72 Only)

L. Slack, RII EICS

RIDSNRRDIPMLIPB

PUBLIC

OFFICE

RII:DRs

RII:DRS

RII:DRP

SIGNATURE

/RA By M. Ernstes for/

/RA/

/RA By R. Carroll for/

NAME

GHopper:pmd

MErnstes

BHaag

DATE

08/25/2003

08/25/2003

08/25/2003

E-MAIL COPY?

YES

NO YES NO YES

NO YES

NO YES

NO YES

NO

PUBLIC DOCUMENT

YES

NO

OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML032380086.wpd