| number = ML041310222
| number = ML041310222
| issue date = 05/07/2004
| issue date = 05/07/2004
| title = Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss Nrc'S Assessment of Perry'S Performance for Period of 01/01/2003 Through 12/31/2003
| title = Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss NRCs Assessment of Perrys Performance for Period of 01/01/2003 Through 12/31/2003
| author name = Ring M
| author name = Ring M
| author affiliation = NRC/RGN-III/DRP/RPB1
| author affiliation = NRC/RGN-III/DRP/RPB1
Line 18: Line 18:


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF THE PERRY NUCLEAR POWER PLANT PERFORMANCE ASSESSMENT MEETING ON APRIL 20, 2004
OF THE PERRY NUCLEAR POWER PLANT PERFORMANCE ASSESSMENT MEETING ON APRIL 20, 2004


==Dear Mr. Kanda:==
==Dear Mr. Kanda:==
On April 20, 2004, a public meeting was held at the Quail Hollow Resort in Painesville, Ohio, between the Nuclear Regulatory Commission (NRC) and FirstEnergy Nuclear Operating Company (FENOC). The purpose of the meeting was to discuss the NRCs assessment of Perry's performance for the period of January 1, 2003, through December 31, 2003.
On April 20, 2004, a public meeting was held at the Quail Hollow Resort in Painesville, Ohio, between the Nuclear Regulatory Commission (NRC) and FirstEnergy Nuclear Operating Company (FENOC). The purpose of the meeting was to discuss the NRCs assessment of Perry's performance for the period of January 1, 2003, through December 31, 2003.
Overall, as discussed in the Perry Annual Assessment letter dated March 4, 2004 (ADAMS accession number ML040641205), Perry operated in a manner that preserved public health and safety. Plant performance for the most recent quarter was within the Degraded Cornerstone Column of the NRCs Action Matrix, based on two White findings in the mitigating systems cornerstone. The White findings were associated with the failure of the high pressure core spray system pump to start on October 23, 2002, and the failure of the division 1 emergency service water pump during a routine run on September 1, 2003. During the meeting, a third White finding in the mitigating systems cornerstone associated with the air binding of the division 1 waterleg pump on August 14, 2003, was also discussed. Although the issue was not finalized prior to the issuance of the Annual Assessment letter, the finding was entered into the action matrix in the fourth quarter of 2003 and was discussed to present a complete and accurate representation of plant performance for 2003. Also discussed was a White finding in the emergency preparedness cornerstone and a White performance indicator in the occupational radiation exposure cornerstone. The emergency preparedness issue involved the failure to make a timely alert declaration on April 24, 2003, after a fuel pin was damaged during inspection activities in the fuel handling building. The White performance indicator was due to three performance deficiencies which occurred during the second quarter 2003 refueling outage. Although the individual events were determined to be of very low safety significance, collectively the green/white threshold was crossed.
Overall, as discussed in the Perry Annual Assessment {{letter dated|date=March 4, 2004|text=letter dated March 4, 2004}} (ADAMS accession number ML040641205), Perry operated in a manner that preserved public health and safety. Plant performance for the most recent quarter was within the Degraded Cornerstone Column of the NRCs Action Matrix, based on two White findings in the mitigating systems cornerstone. The White findings were associated with the failure of the high pressure core spray system pump to start on October 23, 2002, and the failure of the division 1 emergency service water pump during a routine run on September 1, 2003. During the meeting, a third White finding in the mitigating systems cornerstone associated with the air binding of the division 1 waterleg pump on August 14, 2003, was also discussed. Although the issue was not finalized prior to the issuance of the Annual Assessment letter, the finding was entered into the action matrix in the fourth quarter of 2003 and was discussed to present a complete and accurate representation of plant performance for 2003. Also discussed was a White finding in the emergency preparedness cornerstone and a White performance indicator in the occupational radiation exposure cornerstone. The emergency preparedness issue involved the failure to make a timely alert declaration on April 24, 2003, after a fuel pin was damaged during inspection activities in the fuel handling building. The White performance indicator was due to three performance deficiencies which occurred during the second quarter 2003 refueling outage. Although the individual events were determined to be of very low safety significance, collectively the green/white threshold was crossed.
Following the presentation of our assessment, you and members of your staff discussed efforts taken or planned to improve plant performance. Prior to the conclusion of the meeting, our staff responded to several questions from members of the public.
Following the presentation of our assessment, you and members of your staff discussed efforts taken or planned to improve plant performance. Prior to the conclusion of the meeting, our staff responded to several questions from members of the public.
W. Kanda The meeting attendance list is enclosed. The slides presented by the NRC are available in ADAMS (accession number ML041280061). The slides presented by FirstEnergy are available in ADAMS (accession number ML041260257). Please contact me if there are any questions you have about this meeting at (630) 829-9703.
W. Kanda The meeting attendance list is enclosed. The slides presented by the NRC are available in ADAMS (accession number ML041280061). The slides presented by FirstEnergy are available in ADAMS (accession number ML041260257). Please contact me if there are any questions you have about this meeting at (630) 829-9703.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely,
                                            /RA/
/RA/
Mark Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-440 License No. NPF-58
Mark Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-440 License No. NPF-58


==Enclosure:==
==Enclosure:==
Attendance List cc:     G. Leidich, President - FENOC L. Myers, Chief Operating Officer, FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC W. OMalley, Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health
Attendance List cc:
G. Leidich, President - FENOC L. Myers, Chief Operating Officer, FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC W. OMalley, Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health


W. Kanda                                                   The meeting attendance list is enclosed. The slides presented by the NRC are available in ADAMS (accession number ML041280061). The slides presented by FirstEnergy are available in ADAMS (accession number ML041260257). Please contact me if there are any questions you have about this meeting at (630) 829-9703.
W. Kanda The meeting attendance list is enclosed. The slides presented by the NRC are available in ADAMS (accession number ML041280061). The slides presented by FirstEnergy are available in ADAMS (accession number ML041260257). Please contact me if there are any questions you have about this meeting at (630) 829-9703.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely,
                                                        /RA/
/RA/
Mark Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-440 License No. NPF-58
Mark Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-440 License No. NPF-58


==Enclosure:==
==Enclosure:==
Attendance List cc:     G. Leidich, President - FENOC L. Myers, Chief Operating Officer, FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC W. OMalley, Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health DOC UMEN T NAM E: G:\Branch TSS\EOC Ltrs\Mtg Notices 2004\ML041310222.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE           RIII                       RIII NAME             PPelke/co                   MRing DATE             05/07/04                   05/07/04 OFFICIAL RECORD COPY
Attendance List cc:
G. Leidich, President - FENOC L. Myers, Chief Operating Officer, FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC W. OMalley, Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health DOCUMENT NAME: G:\\Branch TSS\\EOC Ltrs\\Mtg Notices 2004\\ML041310222.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII NAME PPelke/co MRing DATE 05/07/04 05/07/04 OFFICIAL RECORD COPY


W. Kanda                                 ADAMS Distribution:
W. Kanda ADAMS Distribution:
AJM DFT SPS1 RidsNrrDipmIipb GEG HBC RJP C. Ariano (hard copy)
AJM DFT SPS1 RidsNrrDipmIipb GEG HBC RJP C. Ariano (hard copy)
C. Pederson, DRS (hard copy - IRs only)
C. Pederson, DRS (hard copy - IRs only)
DRPIII DRSIII PLB1 JRK1
DRPIII DRSIII PLB1 JRK1


Attendance List Perry Plant Performance Assessment Meeting April 20, 2004 Name                             Organization Barry Blair                       FirstEnergy Nuclear Operating Company (FENOC)
Attendance List Perry Plant Performance Assessment Meeting April 20, 2004 Name Organization Barry Blair FirstEnergy Nuclear Operating Company (FENOC)
Henry Hegrat                     FENOC Tim Rausch                       FENOC Gary Leidich                     FENOC Suzanne Russell P. Kenneth Russell               FENOC Adi Donato                       Cleveland Electric Illuminating Company Mary OReilly                     FENOC J. J. Hagan                       FENOC George Brewer                     FENOC Susan Hiatt                       Ohio Citizens for Responsible Energy, Inc. (OCRE)
Henry Hegrat FENOC Tim Rausch FENOC Gary Leidich FENOC Suzanne Russell P. Kenneth Russell FENOC Adi Donato Cleveland Electric Illuminating Company Mary OReilly FENOC J. J. Hagan FENOC George Brewer FENOC Susan Hiatt Ohio Citizens for Responsible Energy, Inc. (OCRE)
Michael Blair                     New s-Herald Dale Miller                       FENOC Connie Kline                     Ohio Care - Citizens Against a Radioactive Environment Dan Gallo                         FENOC Ale xander Velyko vic George A. Zo kle                  Capri Cafaro for Congress Paul Bordley                     FENOC Bill Kanda                       FENOC Jeff Mc Guire                    FENOC Lew M yers                        FENOC Peter Robe rts                    FENOC Frank Ross                       FENOC George D uja novic                FENOC Neal Bonner                       FENOC Rodney Nespeca                   Capri Cafaro for Congress Capri S. Cafa ro                  Dem ocratic Nominee for Congress - 14th Dis trict - O hio David Truman                     New s-Herald Diane Flowe rs                    U. S. Nuclear Regulatory Commission (NRC)
Michael Blair News-Herald Dale Miller FENOC Connie Kline Ohio Care - Citizens Against a Radioactive Environment Dan Gallo FENOC Alexander Velykovic George A. Zokle Capri Cafaro for Congress Paul Bordley FENOC Bill Kanda FENOC Jeff McGuire FENOC Lew Myers FENOC Peter Roberts FENOC Frank Ross FENOC George Dujanovic FENOC Neal Bonner FENOC Rodney Nespeca Capri Cafaro for Congress Capri S. Cafaro Democratic Nominee for Congress - 14th District - Ohio David Truman News-Herald Diane Flowers U. S. Nuclear Regulatory Commission (NRC)
Liliana Ramadan                   NRC Jam es Ca ldw ell                NRC Mark Ring                         NRC Ray Pow ell                      NRC Jan Strasma                       NRC Jeffrey Lausberg                 FENOC Joe Mosbrook                     FENOC Vernon K. Higaki                 FENOC David A. Bowen                   FENOC Pat Duszynski                     FENOC Tony Duszynski                   FENOC Robert Coad                       FENOC Dan Gallagher                     FENOC Ed Root                   FENOC Adam Turinsky                     Sargent & Lundy Name                             Organization
Liliana Ramadan NRC James Caldwell NRC Mark Ring NRC Ray Powell NRC Jan Strasma NRC Jeffrey Lausberg FENOC Joe Mosbrook FENOC Vernon K. Higaki FENOC David A. Bowen FENOC Pat Duszynski FENOC Tony Duszynski FENOC Robert Coad FENOC Dan Gallagher FENOC Ed Root FENOC Adam Turinsky Sargent & Lundy Name Organization


Ronald Rosel   FENOC Mike McFarland FENOC M. Schimm el    FENOC D on T im m s  FENOC To m Len tz    FENOC John Messina   FENOC John La ituri Fred von Ahn   FENOC Peter Author   FENOC Brenda Alvord   FENOC Bill OMalley   FENOC Ke nny Fe rrell FENOC Russ Kearney   FENOC An dy Kolarcik FENOC Darlene Kearney public}}
Ronald Rosel FENOC Mike McFarland FENOC M. Schimmel FENOC Don Timms FENOC Tom Lentz FENOC John Messina FENOC John Laituri Fred von Ahn FENOC Peter Author FENOC Brenda Alvord FENOC Bill OMalley FENOC Kenny Ferrell FENOC Russ Kearney FENOC Andy Kolarcik FENOC Darlene Kearney public}}

Latest revision as of 03:06, 16 January 2025

Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss NRCs Assessment of Perrys Performance for Period of 01/01/2003 Through 12/31/2003
ML041310222
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/07/2004
From: Ring M
NRC/RGN-III/DRP/RPB1
To: Kanda W
FirstEnergy Nuclear Operating Co
References
Download: ML041310222 (6)


Text

May 7, 2004 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company P. O. Box 97, A210 10 Center Road Perry, OH 44081

SUBJECT:

SUMMARY

OF THE PERRY NUCLEAR POWER PLANT PERFORMANCE ASSESSMENT MEETING ON APRIL 20, 2004

Dear Mr. Kanda:

On April 20, 2004, a public meeting was held at the Quail Hollow Resort in Painesville, Ohio, between the Nuclear Regulatory Commission (NRC) and FirstEnergy Nuclear Operating Company (FENOC). The purpose of the meeting was to discuss the NRCs assessment of Perry's performance for the period of January 1, 2003, through December 31, 2003.

Overall, as discussed in the Perry Annual Assessment letter dated March 4, 2004 (ADAMS accession number ML040641205), Perry operated in a manner that preserved public health and safety. Plant performance for the most recent quarter was within the Degraded Cornerstone Column of the NRCs Action Matrix, based on two White findings in the mitigating systems cornerstone. The White findings were associated with the failure of the high pressure core spray system pump to start on October 23, 2002, and the failure of the division 1 emergency service water pump during a routine run on September 1, 2003. During the meeting, a third White finding in the mitigating systems cornerstone associated with the air binding of the division 1 waterleg pump on August 14, 2003, was also discussed. Although the issue was not finalized prior to the issuance of the Annual Assessment letter, the finding was entered into the action matrix in the fourth quarter of 2003 and was discussed to present a complete and accurate representation of plant performance for 2003. Also discussed was a White finding in the emergency preparedness cornerstone and a White performance indicator in the occupational radiation exposure cornerstone. The emergency preparedness issue involved the failure to make a timely alert declaration on April 24, 2003, after a fuel pin was damaged during inspection activities in the fuel handling building. The White performance indicator was due to three performance deficiencies which occurred during the second quarter 2003 refueling outage. Although the individual events were determined to be of very low safety significance, collectively the green/white threshold was crossed.

Following the presentation of our assessment, you and members of your staff discussed efforts taken or planned to improve plant performance. Prior to the conclusion of the meeting, our staff responded to several questions from members of the public.

W. Kanda The meeting attendance list is enclosed. The slides presented by the NRC are available in ADAMS (accession number ML041280061). The slides presented by FirstEnergy are available in ADAMS (accession number ML041260257). Please contact me if there are any questions you have about this meeting at (630) 829-9703.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

Attendance List cc:

G. Leidich, President - FENOC L. Myers, Chief Operating Officer, FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC W. OMalley, Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health

W. Kanda The meeting attendance list is enclosed. The slides presented by the NRC are available in ADAMS (accession number ML041280061). The slides presented by FirstEnergy are available in ADAMS (accession number ML041260257). Please contact me if there are any questions you have about this meeting at (630) 829-9703.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

Attendance List cc:

G. Leidich, President - FENOC L. Myers, Chief Operating Officer, FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC W. OMalley, Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health DOCUMENT NAME: G:\\Branch TSS\\EOC Ltrs\\Mtg Notices 2004\\ML041310222.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII NAME PPelke/co MRing DATE 05/07/04 05/07/04 OFFICIAL RECORD COPY

W. Kanda ADAMS Distribution:

AJM DFT SPS1 RidsNrrDipmIipb GEG HBC RJP C. Ariano (hard copy)

C. Pederson, DRS (hard copy - IRs only)

DRPIII DRSIII PLB1 JRK1

Attendance List Perry Plant Performance Assessment Meeting April 20, 2004 Name Organization Barry Blair FirstEnergy Nuclear Operating Company (FENOC)

Henry Hegrat FENOC Tim Rausch FENOC Gary Leidich FENOC Suzanne Russell P. Kenneth Russell FENOC Adi Donato Cleveland Electric Illuminating Company Mary OReilly FENOC J. J. Hagan FENOC George Brewer FENOC Susan Hiatt Ohio Citizens for Responsible Energy, Inc. (OCRE)

Michael Blair News-Herald Dale Miller FENOC Connie Kline Ohio Care - Citizens Against a Radioactive Environment Dan Gallo FENOC Alexander Velykovic George A. Zokle Capri Cafaro for Congress Paul Bordley FENOC Bill Kanda FENOC Jeff McGuire FENOC Lew Myers FENOC Peter Roberts FENOC Frank Ross FENOC George Dujanovic FENOC Neal Bonner FENOC Rodney Nespeca Capri Cafaro for Congress Capri S. Cafaro Democratic Nominee for Congress - 14th District - Ohio David Truman News-Herald Diane Flowers U. S. Nuclear Regulatory Commission (NRC)

Liliana Ramadan NRC James Caldwell NRC Mark Ring NRC Ray Powell NRC Jan Strasma NRC Jeffrey Lausberg FENOC Joe Mosbrook FENOC Vernon K. Higaki FENOC David A. Bowen FENOC Pat Duszynski FENOC Tony Duszynski FENOC Robert Coad FENOC Dan Gallagher FENOC Ed Root FENOC Adam Turinsky Sargent & Lundy Name Organization

Ronald Rosel FENOC Mike McFarland FENOC M. Schimmel FENOC Don Timms FENOC Tom Lentz FENOC John Messina FENOC John Laituri Fred von Ahn FENOC Peter Author FENOC Brenda Alvord FENOC Bill OMalley FENOC Kenny Ferrell FENOC Russ Kearney FENOC Andy Kolarcik FENOC Darlene Kearney public