ML041350486: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:iv SOUTHERN CALIFORNIA                                                 A. Edward Scherer EDISON'                                                              Manager of Nuclear Regulatory Affairs An EDISON INTERNATIONALi Company May 13, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
{{#Wiki_filter:SOUTHERN CALIFORNIA i v EDISON' An EDISON INTERNATIONALi Company A. Edward Scherer Manager of Nuclear Regulatory Affairs May 13, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555


==Subject:==
==Subject:==
Line 22: Line 22:
The number of hours in the reporting period and other affected parts of this report have been appropriately adjusted for the change to Daylight Saving Time at 0200 PST on April 4, 2004.
The number of hours in the reporting period and other affected parts of this report have been appropriately adjusted for the change to Daylight Saving Time at 0200 PST on April 4, 2004.
If you have any questions, please contact Mr. C. E. Williams at (949) 368-6707.
If you have any questions, please contact Mr. C. E. Williams at (949) 368-6707.
Sincerely, Attachments 1 & 2 cc:     B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San C]emente, CA 92674-0128 949-368-7501 Fax 949-368-7575
Sincerely, Attachments 1 & 2 cc:
::Z:Jjj
B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San C]emente, CA 92674-0128 949-368-7501 Fax 949-368-7575
::Z:Jjj Monthly Operating Report, April 2004 San Onofre Nuclear Generating Station, Unit 2


Attachment 1 Monthly Operating Report, April 2004 San Onofre Nuclear Generating Station, Unit 2
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 April 2004 Docket No:
 
Unit Name:
MONTHLY OPERATING REPORT                   Docket No:        50-361 SAN ONOFRE NUCLEAR GENERATING STATION               Unit Name:         SONGS - 2 UNIT 2                        Date:              May 13, 2004 April 2004                      Completed by:      C. E. Williams Telephone:        (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT 1
Date:
Design Electrical Rating (Net MWe)                                     7       1070 2 Maximum Dependable Capacity (Net MWe)                                         1070 This Month     Yr-to-Date     Cumulative 3 Number of Hours in Period                     719           2,903         181,488 4   Number of Hours Reactor Was Critical*         628           1,606         147,378 5 Hours Generator On-line*                       527           1,475         145,405 6   Unit Reserve Shutdown Hours                     0             0               0 7 Net Electrical Energy Generated (MWh)*       527,254       1,589,662     155,705,618
Completed by:
Telephone:
50-361 SONGS - 2 May 13, 2004 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT l 1 Design Electrical Rating (Net MWe) 7 1070 2
Maximum Dependable Capacity (Net MWe) 1070 This Month Yr-to-Date Cumulative 3
Number of Hours in Period 719 2,903 181,488 4
Number of Hours Reactor Was Critical*
628 1,606 147,378 5
Hours Generator On-line*
527 1,475 145,405 6
Unit Reserve Shutdown Hours 0
0 0
7 Net Electrical Energy Generated (MWh)*
527,254 1,589,662 155,705,618
* Rounded
* Rounded


MONTHLY OPERATING REPORT                                 Docket No:        50-361 SAN ONOFRE NUCLEAR GENERATING STATION                               Unit Name:         SONGS - 2 UNIT 2                                Date:              May 13, 2004 April 2004                              Completed by:      C. E. Williams Telephone:        (949) 3686707 Page 3 of 4 UNIT SHUTDOWNS Number                                                                         2004-01 Date (YY/MM/DD)                                                                 04/02/09 Type (1)                                                                           S Duration (Hours)*                                                                 135.8 Reason (2)                                                                         C Method of Shutting Down the Reactor (3)                                             4 Cause/Corrective Actions/Comments                                   Continuation of Scheduled Unit 2 (Include LER number, if any)                                           Cycle 13 Refueling Outage Number                                                                         2004-02 Date (YY/MM/DD)                                                                 04/04/10 Type (1)                                                                           F Duration (Hours)*                                                                 56.0 Reason (2)                                                                         A Method of Shutting Down the Reactor (3)                                             2 Cause/Corrective Actions/Comments                               Manually tripped reactor in response to (Include LER number, if any)                                   a loss of Main Feedwater. This event will be reported in LER 2004-002 on or before June 9, 2004.
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 April 2004 Docket No:
* Rounded (1) F-Forced S-Scheduled (2) Reason:     A-Equipment Failure (Explain)
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 May 13, 2004 C. E. Williams (949) 3686707 Page 3 of 4 UNIT SHUTDOWNS Number 2004-01 Date (YY/MM/DD) 04/02/09 Type (1)
S Duration (Hours)*
135.8 Reason (2)
C Method of Shutting Down the Reactor (3) 4 Cause/Corrective Actions/Comments Continuation of Scheduled Unit 2 (Include LER number, if any)
Cycle 13 Refueling Outage Number 2004-02 Date (YY/MM/DD) 04/04/10 Type (1)
F Duration (Hours)*
56.0 Reason (2)
A Method of Shutting Down the Reactor (3) 2 Cause/Corrective Actions/Comments Manually tripped reactor in response to (Include LER number, if any) a loss of Main Feedwater. This event will be reported in LER 2004-002 on or before June 9, 2004.
* Rounded (1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-OperatorTraining & Ucense Examination F-Administrative G-Operational Error (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-OperatorTraining & Ucense Examination F-Administrative G-Operational Error (Explain)
                --Other (Explain)
--Other (Explain)
(3) Method:     1-Manual 2-Manual Trip/Scram 3-Autornatic TrkpScram 4-Continuation from Previous Month (Explain) 54Other (Explain)
(3) Method:
1-Manual 2-Manual Trip/Scram 3-Autornatic TrkpScram 4-Continuation from Previous Month (Explain) 54Other (Explain)


MONTHLY OPERATING REPORT                           Docket No:        50-361 SAN ONOFRE NUCLEAR GENERATING STATION                       Unit Name:       SONGS - 2 UNIT 2                                Date:            May 13, 2004 April 2004                              Completed by:    C. E. Williams Telephone:        (949) 368-6707 Page 4 of 4
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 April 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 May 13, 2004 C. E. Williams (949) 368-6707 Page 4 of 4


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH Date     Time 04101/04   0000     Unit in Mode 5.
OF OPERATING EXPERIENCE FOR THE MONTH Date Time 04101/04 0000 Unit in Mode 5.
04101/04   1622     Unit entered Mode 4.
04101/04 1622 Unit entered Mode 4.
04/02104   1432     Unit entered Mode 3.
04/02104 1432 Unit entered Mode 3.
04/03/04   1233     Unit entered Mode 2.
04/03/04 1233 Unit entered Mode 2.
04/03104   1320     Reactor critical.
04/03104 1320 Reactor critical.
04/03/04   2347     Unit entered Mode 1.
04/03/04 2347 Unit entered Mode 1.
04/04/04   0546     Unit returned to Mode 2.
04/04/04 0546 Unit returned to Mode 2.
04/04/04   1104     Unit entered Mode 1.
04/04/04 1104 Unit entered Mode 1.
04/04/04   1404     Turbine and Main Generator tripped while synchronizing to the grid.
04/04/04 1404 Turbine and Main Generator tripped while synchronizing to the grid.
04/06/04   1648     Turbine and Main Generator synchronized to the grid.
04/06/04 1648 Turbine and Main Generator synchronized to the grid.
04/10/04   1150     Manually tripped reactor in response to a loss of Main Feedwater.
04/10/04 1150 Manually tripped reactor in response to a loss of Main Feedwater.
Auxiliary Feedwater started automatically. Unit entered Mode 3.
Auxiliary Feedwater started automatically. Unit entered Mode 3.
04/11/04   1628     Unit entered Mode 2.
04/11/04 1628 Unit entered Mode 2.
04/11/04   1737     Reactor critical.
04/11/04 1737 Reactor critical.
04/12/04   1157     Unit entered Mode 1.
04/12/04 1157 Unit entered Mode 1.
04/12/04   1952     Turbine and Main Generator synchronized to the grid.
04/12/04 1952 Turbine and Main Generator synchronized to the grid.
04/13/04   1502     Unit returned to essentially full power.
04/13/04 1502 Unit returned to essentially full power.
04/30/04   2400     Unit in Mode 1.
04/30/04 2400 Unit in Mode 1.
Note: There were no challenges to the pressurizer safety valves during the month.
Note: There were no challenges to the pressurizer safety valves during the month.
Monthly Operating Report, April 2004 San Onofre Nuclear Generating Station, Unit 3


Attachment 2 Monthly Operating Report, April 2004 San Onofre Nuclear Generating Station, Unit 3
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 April 2004 Docket No:
 
Unit Name:
MONTHLY OPERATING REPORT                   Docket No:        50-362 SAN ONOFRE NUCLEAR GENERATING STATION               Unit Name:         SONGS - 3 UNIT 3                        Date:              May 13, 2004 April 2004                      Completed by:      C. E. Williams Telephone:        (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I Design Electrical Rating (Net MWe)                                             1080 2 Maximum Dependable Capacity (Net MWe)                                         1080 This Month     Yr-to-Date     Cumulative 3 Number of Hours in Period                     719           2,903         176,039 4   Number of Hours Reactor Was Critical*         719           2,742         146,089 5 Hours Generator On-line*                       719         2,732         143,952 6 Unit Reserve Shutdown Hours                     0             0               0 7 Net Electrical Energy Generated (MWh)*       806,143       3,042,007     152,574,217
Date:
Completed by:
Telephone:
50-362 SONGS - 3 May 13, 2004 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I
Design Electrical Rating (Net MWe) 1080 2
Maximum Dependable Capacity (Net MWe) 1080 This Month Yr-to-Date Cumulative 3
Number of Hours in Period 719 2,903 176,039 4
Number of Hours Reactor Was Critical*
719 2,742 146,089 5
Hours Generator On-line*
719 2,732 143,952 6
Unit Reserve Shutdown Hours 0
0 0
7 Net Electrical Energy Generated (MWh)*
806,143 3,042,007 152,574,217
* Rounded
* Rounded


MONTHLY OPERATING REPORT                               Docket No:    50-362 SAN ONOFRE NUCLEAR GENERATING STATION                           Unit Name:     SONGS - 3 UNIT 3                            Date:          May 13, 2004 April 2004                            Completed by:  C. E. Williams Telephone:    (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number                                                                       N/A Date (YYIMM/DD)                                                             N/A Type (1)                                                                     N/A Duration (Hours)*                                                           NIA Reason (2)                                                                   N/A Method of Shutting Down the Reactor (3)                                     N/A Cause/Corrective Actions/Comments                                           N/A (Include LER number, if any)                                 ___
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 April 2004 Docket No:
I Rounded (1) F-Forced S-Scheduled (2) Reason:     A-Equipment Failure (Explain)
Unit Name:
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training &License Examination F-Administrative G-Operational Error (Explain)
Date:
Completed by:
Telephone:
50-362 SONGS - 3 May 13, 2004 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YYIMM/DD)
N/A Type (1)
N/A Duration (Hours)*
NIA Reason (2)
N/A Method of Shutting Down the Reactor (3)
N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)
I Rounded (1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
Hi-Other (Explain)
Hi-Other (Explain)
(3) Method:     1-Manual 2-Manual Trip/Scram 3-Automatic TriplScram 4-Continuation from Previous Month (Explain) 5-Other (Explain)
(3) Method:
1-Manual 2-Manual Trip/Scram 3-Automatic TriplScram 4-Continuation from Previous Month (Explain) 5-Other (Explain)


MONTHLY OPERATING REPORT                         Docket No:        50-362 SAN ONOFRE NUCLEAR GENERATING STATION                     Unit Name:         SONGS - 3 UNIT 3                              Date:              May 13, 2004 April 2004                            Completed by:      C. E. Williams Telephone:        (949) 368-6707 Page 4 of 4
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 April 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 May 13, 2004 C. E. Williams (949) 368-6707 Page 4 of 4 f
Date 04/01/04 04/30104


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH Date    Time f04/01/04 I 0000 04/30104    2400 Unit in Model.
OF OPERATING EXPERIENCE FOR THE MONTH Time I 0000 Unit in Model.
Unit in Mode 1.
2400 Unit in Mode 1.
Note: There were no challenges to the pressurizer safety valves during the month.}}
Note: There were no challenges to the pressurizer safety valves during the month.}}

Latest revision as of 03:00, 16 January 2025

April 2004 Monthly Operating Report for San Onofre, Units 2 and 3
ML041350486
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/13/2004
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML041350486 (9)


Text

SOUTHERN CALIFORNIA i v EDISON' An EDISON INTERNATIONALi Company A. Edward Scherer Manager of Nuclear Regulatory Affairs May 13, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for April 2004 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-1 0 and NPF-1 5, this letter provides the Monthly Operating Reports for April 2004 for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments I and 2, respectively.

The number of hours in the reporting period and other affected parts of this report have been appropriately adjusted for the change to Daylight Saving Time at 0200 PST on April 4, 2004.

If you have any questions, please contact Mr. C. E. Williams at (949) 368-6707.

Sincerely, Attachments 1 & 2 cc:

B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San C]emente, CA 92674-0128 949-368-7501 Fax 949-368-7575

Z:Jjj Monthly Operating Report, April 2004 San Onofre Nuclear Generating Station, Unit 2

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 April 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 May 13, 2004 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT l 1 Design Electrical Rating (Net MWe) 7 1070 2

Maximum Dependable Capacity (Net MWe) 1070 This Month Yr-to-Date Cumulative 3

Number of Hours in Period 719 2,903 181,488 4

Number of Hours Reactor Was Critical*

628 1,606 147,378 5

Hours Generator On-line*

527 1,475 145,405 6

Unit Reserve Shutdown Hours 0

0 0

7 Net Electrical Energy Generated (MWh)*

527,254 1,589,662 155,705,618

  • Rounded

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 April 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 May 13, 2004 C. E. Williams (949) 3686707 Page 3 of 4 UNIT SHUTDOWNS Number 2004-01 Date (YY/MM/DD) 04/02/09 Type (1)

S Duration (Hours)*

135.8 Reason (2)

C Method of Shutting Down the Reactor (3) 4 Cause/Corrective Actions/Comments Continuation of Scheduled Unit 2 (Include LER number, if any)

Cycle 13 Refueling Outage Number 2004-02 Date (YY/MM/DD) 04/04/10 Type (1)

F Duration (Hours)*

56.0 Reason (2)

A Method of Shutting Down the Reactor (3) 2 Cause/Corrective Actions/Comments Manually tripped reactor in response to (Include LER number, if any) a loss of Main Feedwater. This event will be reported in LER 2004-002 on or before June 9, 2004.

  • Rounded (1) F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-OperatorTraining & Ucense Examination F-Administrative G-Operational Error (Explain)

--Other (Explain)

(3) Method:

1-Manual 2-Manual Trip/Scram 3-Autornatic TrkpScram 4-Continuation from Previous Month (Explain) 54Other (Explain)

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 April 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 May 13, 2004 C. E. Williams (949) 368-6707 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 04101/04 0000 Unit in Mode 5.

04101/04 1622 Unit entered Mode 4.

04/02104 1432 Unit entered Mode 3.

04/03/04 1233 Unit entered Mode 2.

04/03104 1320 Reactor critical.

04/03/04 2347 Unit entered Mode 1.

04/04/04 0546 Unit returned to Mode 2.

04/04/04 1104 Unit entered Mode 1.

04/04/04 1404 Turbine and Main Generator tripped while synchronizing to the grid.

04/06/04 1648 Turbine and Main Generator synchronized to the grid.

04/10/04 1150 Manually tripped reactor in response to a loss of Main Feedwater.

Auxiliary Feedwater started automatically. Unit entered Mode 3.

04/11/04 1628 Unit entered Mode 2.

04/11/04 1737 Reactor critical.

04/12/04 1157 Unit entered Mode 1.

04/12/04 1952 Turbine and Main Generator synchronized to the grid.

04/13/04 1502 Unit returned to essentially full power.

04/30/04 2400 Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.

Monthly Operating Report, April 2004 San Onofre Nuclear Generating Station, Unit 3

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 April 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 May 13, 2004 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I

Design Electrical Rating (Net MWe) 1080 2

Maximum Dependable Capacity (Net MWe) 1080 This Month Yr-to-Date Cumulative 3

Number of Hours in Period 719 2,903 176,039 4

Number of Hours Reactor Was Critical*

719 2,742 146,089 5

Hours Generator On-line*

719 2,732 143,952 6

Unit Reserve Shutdown Hours 0

0 0

7 Net Electrical Energy Generated (MWh)*

806,143 3,042,007 152,574,217

  • Rounded

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 April 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 May 13, 2004 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YYIMM/DD)

N/A Type (1)

N/A Duration (Hours)*

NIA Reason (2)

N/A Method of Shutting Down the Reactor (3)

N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)

I Rounded (1) F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

Hi-Other (Explain)

(3) Method:

1-Manual 2-Manual Trip/Scram 3-Automatic TriplScram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 April 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 May 13, 2004 C. E. Williams (949) 368-6707 Page 4 of 4 f

Date 04/01/04 04/30104

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Time I 0000 Unit in Model.

2400 Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.