{{#Wiki_filter:Joseph A. Widay                                             1503 Lake Road Plant Manager                                                Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC October 12, 2004 Mr. Robert L. Clark Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001
{{#Wiki_filter:Joseph A. Widay Plant Manager 1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC October 12, 2004 Mr. Robert L. Clark Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C. 20555-0001


==Subject:==
==Subject:==
Line 22: Line 23:


==Dear Mr. Clark:==
==Dear Mr. Clark:==
The attached Reportable Safeguards Event LER 2004-SOI is submitted in accordance with 10 CFR 73.71 and Section I(c) of Appendix G, Reportable Safeguards Events.
The attached Reportable Safeguards Event LER 2004-SOI is submitted in accordance with 10 CFR 73.71 and Section I(c) of Appendix G, Reportable Safeguards Events.
Very truly yours, J eph A. Widay
Very truly yours, J eph A. Widay
                                                                                                  --,2E'- U lonI/4-h5
--,2E'- U lonI/4-h5


xc: Mr. Robert Clark (Mail Stop 0-8-C2)
xc:
Mr. Robert Clark (Mail Stop 0-8-C2)
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Mr. James M. Petro Jr., Esquire Counsel Constellation Energy 750 East Pratt Street, 5th Floor Baltimore, MD 21202
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Mr. James M. Petro Jr., Esquire Counsel Constellation Energy 750 East Pratt Street, 5th Floor Baltimore, MD 21202


NRC FORM 366                             U.S. NUCLEAR REGULATORY COMMISSION             APPROVED BY OMB: NO. 3150-0104                           EXPIRES 06/3012007 6-2004)
NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES 06/3012007 6-2004)
Estimated burden per response to comply with this mandatory collection request 50 hours. Reported lessons learned are Incorporated Into the licensing process and fed back to Industry. Send comments regarding burden estimate to the Records and FOIAPrivacy Service Branch (T-5 F52), U.S.
Estimated burden per response to comply with this mandatory collection request 50 hours. Reported lessons learned are Incorporated Into the licensing process and fed back to Industry. Send comments regarding burden estimate to the Records and FOIAPrivacy Service Branch (T-5 F52), U.S.
LICENSEE EVENT REPORT (LER)                                             Nuclear Regulatory Commission. Washington. DC 20555-0001 or b( Internet e-mail to inocollects@nrc.gov, and to the Desk Officer, Office of Iniormation
LICENSEE EVENT REPORT (LER)
                                                                                          ;and Regulatory Affairs, NEOB-10202. (3150-0104), Office of Management and Budget. Washington. DC 20503. If a means used to Impose an information (See reverse for required number of                                 collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the digits/characters for each block)                                 information collection.
Nuclear Regulatory Commission. Washington. DC 20555-0001 or b( Internet e-mail to inocollects@nrc.gov, and to the Desk Officer, Office of Iniormation
: 1. FACILITY NAME                                                                         2. DOCKET NUMBER                       3. PAGE R. E. Ginna Nuclear Power Plant                                                               05000 244                                   1 OF 3
;and Regulatory Affairs, NEOB-10202. (3150-0104), Office of Management and Budget. Washington. DC 20503. If a means used to Impose an information (See reverse for required number of collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the digits/characters for each block) information collection.
: 1. FACILITY NAME
: 2. DOCKET NUMBER
: 3. PAGE R. E. Ginna Nuclear Power Plant 05000 244 1 OF 3
: 4. TITLE Safeguards event
: 4. TITLE Safeguards event
: 5. EVENT DATE                 6. LER NUMBER                 7. REPORT DATE                               8. OTHER FACILITIES INVOLVED SEUNIA E                                     ACILITY NAME                                         DOCKET NUMBER MONTH       DAY     YEAR     YEAR     S   EQUENTIALREV     MONTH       DAY       YEAR                                                               05000 FACILITYNAME                                          DOCKET NUMBER 08       13     2004 2004 - SOl - 00                     10         12       2004                                                               05000
: 5. EVENT DATE
: 9. OPEATING MODE               ,    11 THIS REPORT IS SUBMITUED PURSUANT TO THE REQUIREMENTS OF 10 CFR§: (Checkal that apply)
: 6. LER NUMBER
El 20.2201(b)                       a 20.2203(a)(3)(i)               0   50.73(a)(2)(i)(C)               El 50.73(a)(2)(vii) 1             0 20.2201(d)                       El 20.2203(a)(3)(ii)             0 50.73(a)(2)(ii)(A)                 0 50.73(a)(2)(viii)(A)
: 7. REPORT DATE
El 20.2203(a)(1)                   0 20.2203(a)(4)                 a   50.73(a)(2)(ii)(B)               D   50.73(a)(2)(viii)(B) o 20.2203(a)(2)(i)                 0 50.36(c)(1)(i)(A)             0 50.73(a)(2)(iii)                   0   50.73(a)(2)(ix)(A)
: 8. OTHER FACILITIES INVOLVED SEUNIA E
: 10. POWER LEVEL               0 20.2203(a)(2)(ii)                 El 50.36(c)(1)(ii)(A)             0 50.73(a)(2)(iv)(A)                 E 50.73(a)(2)(x) ol 20.2203(a)(2)(iii)               0 50.36(c)(2)                   0 50.73(a)(2)(v)(A)                 E 73.71(a)(4)
ACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR S
El 20.2203(a)(2)(iv)               0 50.46(a)(3)(ii)               0 50.73(a)(2)(v)(B)                 0 73.71 (a)(5) 100               0l 20.2203(a)(2)(v)               0 50.73(a)(2)(i)(A)             E 50.73(a)(2)(v)(C)                 E OTHER 0 20.2203(a)(2)(vi)                 0   50.73(a)(2)(i)(B)             E 50.73(a)(2)(v)(D)                     Specify InAbstract below
EQUENTIALREV MONTH DAY YEAR 05000 FACILITY NAME DOCKET NUMBER 08 13 2004 2004 - SOl -
_____  ____  ____  ____or                                                                                 In NRC Form 366A
00 10 12 2004 05000
: 9. OPEATING MODE 11 THIS REPORT IS SUBMITUED PURSUANT TO THE REQUIREMENTS OF 10 CFR§: (Checkal that apply)
El 20.2201(b) a 20.2203(a)(3)(i) 0 50.73(a)(2)(i)(C)
El 50.73(a)(2)(vii) 1 0 20.2201(d)
El 20.2203(a)(3)(ii) 0 50.73(a)(2)(ii)(A) 0 50.73(a)(2)(viii)(A)
El 20.2203(a)(1) 0 20.2203(a)(4) a 50.73(a)(2)(ii)(B)
D 50.73(a)(2)(viii)(B) o 20.2203(a)(2)(i) 0 50.36(c)(1)(i)(A) 0 50.73(a)(2)(iii) 0 50.73(a)(2)(ix)(A)
: 10. POWER LEVEL 0 20.2203(a)(2)(ii)
El 50.36(c)(1)(ii)(A) 0 50.73(a)(2)(iv)(A)
E 50.73(a)(2)(x) ol 20.2203(a)(2)(iii) 0 50.36(c)(2) 0 50.73(a)(2)(v)(A)
E 73.71(a)(4)
El 20.2203(a)(2)(iv) 0 50.46(a)(3)(ii) 0 50.73(a)(2)(v)(B) 0 73.71 (a)(5) 100 0l 20.2203(a)(2)(v) 0 50.73(a)(2)(i)(A)
E 50.73(a)(2)(v)(C)
E OTHER 0 20.2203(a)(2)(vi) 0 50.73(a)(2)(i)(B)
E 50.73(a)(2)(v)(D)
Specify In Abstract below
____or In NRC Form 366A
: 12. LICENSEE CONTACT FOR THIS LER
: 12. LICENSEE CONTACT FOR THIS LER
-ACILITY NAME                                                                                                                 TELEPHONE NUMBER (Inctude Area Code)
-ACILITY NAME TELEPHONE NUMBER (Inctude Area Code)
Ronald C. Teed - Director Nuclear Security                                                                                 1(585)     771-3232
Ronald C. Teed - Director Nuclear Security 1(585) 771-3232
: 13. COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT CAUSE                 l         NNT     MANU-         REPORTABLE             CAUSE           SYSTEM COMPONENT                 MANU-         REPORTABLE SYTMCMOETFACTURER                       TO EPIX                                         jCMO               FACTURER             TO EPIX
: 13. COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT CAUSE l
: 14. SUPPLEMENTAL REPORT EXPECTED                                                 15. EXPECTED               MONTH         DAY         YEAR SUBMISSION o   YES (Ifyes, complete 15. EXPECTED SUBMISSION DATE)                             E NO                     DATE ABSTRACT (Limit to 1400 spaces, I.e., approximately 15 single-spaced typewritten lines)
NNT MANU-REPORTABLE CAUSE SYSTEM COMPONENT MANU-REPORTABLE SYTMCMOETFACTURER TO EPIX jCMO FACTURER TO EPIX
: 14. SUPPLEMENTAL REPORT EXPECTED
: 15. EXPECTED MONTH DAY YEAR SUBMISSION o YES (If yes, complete 15. EXPECTED SUBMISSION DATE)
E NO DATE ABSTRACT (Limit to 1400 spaces, I.e., approximately 15 single-spaced typewritten lines)
On August 13, 2004, at approximately 0832 EDT, Ginna Nuclear Power Plant Security management was informed of the discovery of the mishandling of Safeguards Information. The address labels for two packages (one containing Safeguards Information and the other containing commercial documents) had been inadvertently switched during the shipping process at Ginna, and the two packages were mistakenly shipped to the wrong addressees. The Safeguards Information material was promptly resealed and packaged by the recipient who had mistakenly received the material, and was shipped back to Ginna. Upon receipt at Ginna, the Safeguards Information material was inventoried and all material was accounted for.
On August 13, 2004, at approximately 0832 EDT, Ginna Nuclear Power Plant Security management was informed of the discovery of the mishandling of Safeguards Information. The address labels for two packages (one containing Safeguards Information and the other containing commercial documents) had been inadvertently switched during the shipping process at Ginna, and the two packages were mistakenly shipped to the wrong addressees. The Safeguards Information material was promptly resealed and packaged by the recipient who had mistakenly received the material, and was shipped back to Ginna. Upon receipt at Ginna, the Safeguards Information material was inventoried and all material was accounted for.
This event was determined to be reportable to the Nuclear Regulatory Commission in accordance with 10 CFR 73.71 and 10 CFR 73 Appendix G.
This event was determined to be reportable to the Nuclear Regulatory Commission in accordance with 10 CFR 73.71 and 10 CFR 73 Appendix G.
Corrective actions included debriefing the individual who had mistakenly received the Safeguards Information concerning prohibition of disclosure of Safeguards Information. The shipping process was changed at Ginna, such that shipping of all Safeguards Information will be processed only by designated Security personnel. Ginna personnel were notified of these changes by e-mail messages and messages attached to their security access badges.
Corrective actions included debriefing the individual who had mistakenly received the Safeguards Information concerning prohibition of disclosure of Safeguards Information. The shipping process was changed at Ginna, such that shipping of all Safeguards Information will be processed only by designated Security personnel. Ginna personnel were notified of these changes by e-mail messages and messages attached to their security access badges.
NRC FORM 366 (6-2004)                                                                                                                     PRINTED ON RECYCLED PAPER
NRC FORM 366 (6-2004)
PRINTED ON RECYCLED PAPER


NRC FORM 366A                                                                                     U.S. NUCLEAR REGULATORY COMMISSION (1.2001)
NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION (1.2001)
LICENSEE EVENT REPORT (LER)
LICENSEE EVENT REPORT (LER)
: 1. FACILITY NAME                         2. DOCKET             6. LER NUMBER                   3. PAGE YEAR       SEQUENTIAL   I REVISION NUMBER         NUMBER R.E. Ginna Nuclear Power Plant                                 05000244                                               2 OF     3 2004   --    S01     --    00
: 1. FACILITY NAME
: 2. DOCKET
: 6. LER NUMBER
: 3. PAGE YEAR SEQUENTIAL I REVISION NUMBER NUMBER R.E. Ginna Nuclear Power Plant 05000244 2
OF 3
2004 S01 00
: 17. NARRATIVE (If more space is required, use additional copies of NRC Form 366A)
: 17. NARRATIVE (If more space is required, use additional copies of NRC Form 366A)
: 1.       PRE-E VENT PLANT CONDITIONS The plant was in Mode 1, at approximately 100% steady state reactor power.
: 1.
: 11.     DESCRIPTION OF EVENT Address labels for two packages (one containing Safeguards Information and the other containing commercial documents) had been inadvertently switched during the shipping process at Ginna Nuclear Power Plant (NPP), and the two packages were mistakenly shipped to the wrong addressees.
PRE-E VENT PLANT CONDITIONS The plant was in Mode 1, at approximately 100% steady state reactor power.
III. EVENT  
: 11.
DESCRIPTION OF EVENT Address labels for two packages (one containing Safeguards Information and the other containing commercial documents) had been inadvertently switched during the shipping process at Ginna Nuclear Power Plant (NPP), and the two packages were mistakenly shipped to the wrong addressees.
III.
EVENT  


==SUMMARY==
==SUMMARY==
 
On August 1 1, 2004, a package containing Safeguards Information (SI) material was properly packaged for transmittal as SI from an engineer at Ginna NPP to an engineer at another power plant in New York, and was delivered to the Ginna Warehouse via normal shipping procedures for overnight shipping by that engineer (who is a person authorized for SI). Later that day, another package was delivered to the warehouse. This package contained a commercial document and a piece of cable, to be shipped to a company in North Carolina. Because of packaging requirements, the package containing SI material, as sent to the warehouse, was not different from any commercial package, and was ready for processing via the mail or overnight delivery service. The warehouse worker has no information as to whether he is processing SI or commercial information.
On August 11, 2004, a package containing Safeguards Information (SI) material was properly packaged for transmittal as SI from an engineer at Ginna NPP to an engineer at another power plant in New York, and was delivered to the Ginna Warehouse via normal shipping procedures for overnight shipping by that engineer (who is a person authorized for SI). Later that day, another package was delivered to the warehouse. This package contained a commercial document and a piece of cable, to be shipped to a company in North Carolina. Because of packaging requirements, the package containing SI material, as sent to the warehouse, was not different from any commercial package, and was ready for processing via the mail or overnight delivery service. The warehouse worker has no information as to whether he is processing SI or commercial information.
The warehouse worker judged that the packaging for the piece of cable was not robust, and should be packaged more securely. He then removed the internal tracking labels from both packages (the commercial package and the other package, which he did not know contained SI) and put both packages into more secure boxes. He then placed the external shipping labels on the packages, but had inadvertently switched the packages. Therefore, the label for the commercial information was placed on the package containing SI material, and vice-versa. The packages were then shipped via overnight delivery service later that day to their respective addressees.
The warehouse worker judged that the packaging for the piece of cable was not robust, and should be packaged more securely. He then removed the internal tracking labels from both packages (the commercial package and the other package, which he did not know contained SI) and put both packages into more secure boxes. He then placed the external shipping labels on the packages, but had inadvertently switched the packages. Therefore, the label for the commercial information was placed on the package containing SI material, and vice-versa. The packages were then shipped via overnight delivery service later that day to their respective addressees.
On August 12, 2004, the individual in North Carolina received his expected package from Ginna NPP.
On August 12, 2004, the individual in North Carolina received his expected package from Ginna NPP.
Line 69: Line 100:
NRC FORM 366A (1 2001)
NRC FORM 366A (1 2001)


                                                                                                                                    -'N\
-'N\\
NRC FORM 366A                                                                                   U.S. NUCLEAR REGULATORY COMMISSION (1.2001)
NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION (1.2001)
LICENSEE EVENT REPORT (LER)
LICENSEE EVENT REPORT (LER)
: 1. FACILITY NAME                         2. DOCKET             6. LER NUMBER                   3. PAGE yEAR     SEQUENTIAL   I REVISION NUMBER     l NUMBER R.E. Ginna Nuclear Power Plant                               05000244                       -        .          3   OF     3 2004   --  S01     -    00
: 1. FACILITY NAME
: 17. NARRATIVE (ifmore space Is required, use additional copies of NRC Form 366A)
: 2. DOCKET
: 6. LER NUMBER
: 3. PAGE yEAR SEQUENTIAL I REVISION NUMBER l NUMBER R.E. Ginna Nuclear Power Plant 05000244 3
OF 3
2004 S01 00
: 17. NARRATIVE (if more space Is required, use additional copies of NRC Form 366A)
On August 13, 2004, the Ginna engineer informed his supervisor (who had not been on site the day before) of this event. At approximately 0832 EDT, Ginna NPP Security management was informed of the discovery of the mishandling of SI by the supervisor. This event was determined to be reportable to the Nuclear Regulatory Commission. The NRC Operations Center was notified of this event, per 10 CFR 73.71 and 10 CFR 73 Appendix G, at approximately 0925 EDT on August 13, 2004.
On August 13, 2004, the Ginna engineer informed his supervisor (who had not been on site the day before) of this event. At approximately 0832 EDT, Ginna NPP Security management was informed of the discovery of the mishandling of SI by the supervisor. This event was determined to be reportable to the Nuclear Regulatory Commission. The NRC Operations Center was notified of this event, per 10 CFR 73.71 and 10 CFR 73 Appendix G, at approximately 0925 EDT on August 13, 2004.
The initial security investigation consisted of interviews with all personnel that may have been involved.
The initial security investigation consisted of interviews with all personnel that may have been involved.
Security personnel confirmed that the package containing SI had been shipped to the wrong address, and interviewed the individual who opened the package in North Carolina.
Security personnel confirmed that the package containing SI had been shipped to the wrong address, and interviewed the individual who opened the package in North Carolina.
On August 13, 2004, at approximately 1025 EDT, the package containing SI material was received back at Ginna. The Ginna engineer inventoried the materials and confirmed that the document was complete.
On August 13, 2004, at approximately 1025 EDT, the package containing SI material was received back at Ginna. The Ginna engineer inventoried the materials and confirmed that the document was complete.
IV.     CORRECTIVE ACTION On August 13, 2004, at approximately 1320 EDT, the individual in North Carolina who had mistakenly received the package of SI material was interviewed by a Ginna Security Supervisor. The individual stated that he did not recall any details about the document he had opened, and that no one else had access to this material. He was informed of a directive prohibiting the unauthorized disclosure of SI, and agreed to this directive.
IV.
CORRECTIVE ACTION On August 13, 2004, at approximately 1320 EDT, the individual in North Carolina who had mistakenly received the package of SI material was interviewed by a Ginna Security Supervisor. The individual stated that he did not recall any details about the document he had opened, and that no one else had access to this material. He was informed of a directive prohibiting the unauthorized disclosure of SI, and agreed to this directive.
The shipping process was changed at Ginna. Procedures were changed to require that shipping of all SI will be processed only by designated Security personnel, to ensure proper packaging and shipping requirements are met. Ginna personnel were notified of this event and these changes by e-mail messages. A note was attached to each security access badge for personnel at Ginna NPP, informing them of this event and of the need to promptly report any compromise of SI, and announcing this change in the process for shipping SI.
The shipping process was changed at Ginna. Procedures were changed to require that shipping of all SI will be processed only by designated Security personnel, to ensure proper packaging and shipping requirements are met. Ginna personnel were notified of this event and these changes by e-mail messages. A note was attached to each security access badge for personnel at Ginna NPP, informing them of this event and of the need to promptly report any compromise of SI, and announcing this change in the process for shipping SI.
The warehouse worker involved and the other warehouse workers were counseled by supervision following this incident.
The warehouse worker involved and the other warehouse workers were counseled by supervision following this incident.
NRC FORM 366A (1-2001)}}
NRC FORM 366A (1-2001)}}

Latest revision as of 00:39, 16 January 2025

LER 04-S01-00 for R. E. Ginna Regarding Safeguards Event
ML042940376
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/12/2004
From: Widay J
Constellation Energy Group
To: Clark R
Document Control Desk, Office of Nuclear Reactor Regulation
References
LER 04-S01-00
Download: ML042940376 (5)


Text

Joseph A. Widay Plant Manager 1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC October 12, 2004 Mr. Robert L. Clark Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C. 20555-0001

Subject:

Reportable Safeguards Event LER 2004-S01, Safeguards Event R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

The attached Reportable Safeguards Event LER 2004-SOI is submitted in accordance with 10 CFR 73.71 and Section I(c) of Appendix G, Reportable Safeguards Events.

Very truly yours, J eph A. Widay

--,2E'- U lonI/4-h5

xc:

Mr. Robert Clark (Mail Stop 0-8-C2)

Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Mr. James M. Petro Jr., Esquire Counsel Constellation Energy 750 East Pratt Street, 5th Floor Baltimore, MD 21202

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES 06/3012007 6-2004)

Estimated burden per response to comply with this mandatory collection request 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />. Reported lessons learned are Incorporated Into the licensing process and fed back to Industry. Send comments regarding burden estimate to the Records and FOIAPrivacy Service Branch (T-5 F52), U.S.

LICENSEE EVENT REPORT (LER)

Nuclear Regulatory Commission. Washington. DC 20555-0001 or b( Internet e-mail to inocollects@nrc.gov, and to the Desk Officer, Office of Iniormation

and Regulatory Affairs, NEOB-10202. (3150-0104), Office of Management and Budget. Washington. DC 20503. If a means used to Impose an information (See reverse for required number of collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the digits/characters for each block) information collection.
1. FACILITY NAME
2. DOCKET NUMBER
3. PAGE R. E. Ginna Nuclear Power Plant 05000 244 1 OF 3
4. TITLE Safeguards event
5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED SEUNIA E

ACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR S

EQUENTIALREV MONTH DAY YEAR 05000 FACILITY NAME DOCKET NUMBER 08 13 2004 2004 - SOl -

00 10 12 2004 05000

9. OPEATING MODE 11 THIS REPORT IS SUBMITUED PURSUANT TO THE REQUIREMENTS OF 10 CFR§: (Checkal that apply)

El 20.2201(b) a 20.2203(a)(3)(i) 0 50.73(a)(2)(i)(C)

El 50.73(a)(2)(vii) 1 0 20.2201(d)

El 20.2203(a)(3)(ii) 0 50.73(a)(2)(ii)(A) 0 50.73(a)(2)(viii)(A)

El 20.2203(a)(1) 0 20.2203(a)(4) a 50.73(a)(2)(ii)(B)

D 50.73(a)(2)(viii)(B) o 20.2203(a)(2)(i) 0 50.36(c)(1)(i)(A) 0 50.73(a)(2)(iii) 0 50.73(a)(2)(ix)(A)

10. POWER LEVEL 0 20.2203(a)(2)(ii)

El 50.36(c)(1)(ii)(A) 0 50.73(a)(2)(iv)(A)

E 50.73(a)(2)(x) ol 20.2203(a)(2)(iii) 0 50.36(c)(2) 0 50.73(a)(2)(v)(A)

E 73.71(a)(4)

El 20.2203(a)(2)(iv) 0 50.46(a)(3)(ii) 0 50.73(a)(2)(v)(B) 0 73.71 (a)(5) 100 0l 20.2203(a)(2)(v) 0 50.73(a)(2)(i)(A)

E 50.73(a)(2)(v)(C)

E OTHER 0 20.2203(a)(2)(vi) 0 50.73(a)(2)(i)(B)

E 50.73(a)(2)(v)(D)

Specify In Abstract below

____or In NRC Form 366A

12. LICENSEE CONTACT FOR THIS LER

-ACILITY NAME TELEPHONE NUMBER (Inctude Area Code)

Ronald C. Teed - Director Nuclear Security 1(585) 771-3232

13. COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT CAUSE l

NNT MANU-REPORTABLE CAUSE SYSTEM COMPONENT MANU-REPORTABLE SYTMCMOETFACTURER TO EPIX jCMO FACTURER TO EPIX

14. SUPPLEMENTAL REPORT EXPECTED
15. EXPECTED MONTH DAY YEAR SUBMISSION o YES (If yes, complete 15. EXPECTED SUBMISSION DATE)

E NO DATE ABSTRACT (Limit to 1400 spaces, I.e., approximately 15 single-spaced typewritten lines)

On August 13, 2004, at approximately 0832 EDT, Ginna Nuclear Power Plant Security management was informed of the discovery of the mishandling of Safeguards Information. The address labels for two packages (one containing Safeguards Information and the other containing commercial documents) had been inadvertently switched during the shipping process at Ginna, and the two packages were mistakenly shipped to the wrong addressees. The Safeguards Information material was promptly resealed and packaged by the recipient who had mistakenly received the material, and was shipped back to Ginna. Upon receipt at Ginna, the Safeguards Information material was inventoried and all material was accounted for.

This event was determined to be reportable to the Nuclear Regulatory Commission in accordance with 10 CFR 73.71 and 10 CFR 73 Appendix G.

Corrective actions included debriefing the individual who had mistakenly received the Safeguards Information concerning prohibition of disclosure of Safeguards Information. The shipping process was changed at Ginna, such that shipping of all Safeguards Information will be processed only by designated Security personnel. Ginna personnel were notified of these changes by e-mail messages and messages attached to their security access badges.

NRC FORM 366 (6-2004)

PRINTED ON RECYCLED PAPER

NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION (1.2001)

LICENSEE EVENT REPORT (LER)

1. FACILITY NAME
2. DOCKET
6. LER NUMBER
3. PAGE YEAR SEQUENTIAL I REVISION NUMBER NUMBER R.E. Ginna Nuclear Power Plant 05000244 2

OF 3

2004 S01 00

17. NARRATIVE (If more space is required, use additional copies of NRC Form 366A)
1.

PRE-E VENT PLANT CONDITIONS The plant was in Mode 1, at approximately 100% steady state reactor power.

11.

DESCRIPTION OF EVENT Address labels for two packages (one containing Safeguards Information and the other containing commercial documents) had been inadvertently switched during the shipping process at Ginna Nuclear Power Plant (NPP), and the two packages were mistakenly shipped to the wrong addressees.

III.

EVENT

SUMMARY

On August 1 1, 2004, a package containing Safeguards Information (SI) material was properly packaged for transmittal as SI from an engineer at Ginna NPP to an engineer at another power plant in New York, and was delivered to the Ginna Warehouse via normal shipping procedures for overnight shipping by that engineer (who is a person authorized for SI). Later that day, another package was delivered to the warehouse. This package contained a commercial document and a piece of cable, to be shipped to a company in North Carolina. Because of packaging requirements, the package containing SI material, as sent to the warehouse, was not different from any commercial package, and was ready for processing via the mail or overnight delivery service. The warehouse worker has no information as to whether he is processing SI or commercial information.

The warehouse worker judged that the packaging for the piece of cable was not robust, and should be packaged more securely. He then removed the internal tracking labels from both packages (the commercial package and the other package, which he did not know contained SI) and put both packages into more secure boxes. He then placed the external shipping labels on the packages, but had inadvertently switched the packages. Therefore, the label for the commercial information was placed on the package containing SI material, and vice-versa. The packages were then shipped via overnight delivery service later that day to their respective addressees.

On August 12, 2004, the individual in North Carolina received his expected package from Ginna NPP.

When he opened it, it did not appear to be the material he was expecting. He quickly scanned the pages (without reading the information) and verified that this material was not intended for him. He promptly resealed the materials, and had the package shipped back to Ginna NPP. Later that day, the engineer at the New York power plant opened his package and realized it was not the SI material that he had been expecting. He contacted the Ginna engineer. The Ginna engineer and warehouse worker investigated and determined that the shipping labels had been switched on the two packages the day before. They were not able to personally contact any individuals in North Carolina who may have received the package containing SI materials, but left messages for them to contact Ginna.

NRC FORM 366A (1 2001)

-'N\\

NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION (1.2001)

LICENSEE EVENT REPORT (LER)

1. FACILITY NAME
2. DOCKET
6. LER NUMBER
3. PAGE yEAR SEQUENTIAL I REVISION NUMBER l NUMBER R.E. Ginna Nuclear Power Plant 05000244 3

OF 3

2004 S01 00

17. NARRATIVE (if more space Is required, use additional copies of NRC Form 366A)

On August 13, 2004, the Ginna engineer informed his supervisor (who had not been on site the day before) of this event. At approximately 0832 EDT, Ginna NPP Security management was informed of the discovery of the mishandling of SI by the supervisor. This event was determined to be reportable to the Nuclear Regulatory Commission. The NRC Operations Center was notified of this event, per 10 CFR 73.71 and 10 CFR 73 Appendix G, at approximately 0925 EDT on August 13, 2004.

The initial security investigation consisted of interviews with all personnel that may have been involved.

Security personnel confirmed that the package containing SI had been shipped to the wrong address, and interviewed the individual who opened the package in North Carolina.

On August 13, 2004, at approximately 1025 EDT, the package containing SI material was received back at Ginna. The Ginna engineer inventoried the materials and confirmed that the document was complete.

IV.

CORRECTIVE ACTION On August 13, 2004, at approximately 1320 EDT, the individual in North Carolina who had mistakenly received the package of SI material was interviewed by a Ginna Security Supervisor. The individual stated that he did not recall any details about the document he had opened, and that no one else had access to this material. He was informed of a directive prohibiting the unauthorized disclosure of SI, and agreed to this directive.

The shipping process was changed at Ginna. Procedures were changed to require that shipping of all SI will be processed only by designated Security personnel, to ensure proper packaging and shipping requirements are met. Ginna personnel were notified of this event and these changes by e-mail messages. A note was attached to each security access badge for personnel at Ginna NPP, informing them of this event and of the need to promptly report any compromise of SI, and announcing this change in the process for shipping SI.

The warehouse worker involved and the other warehouse workers were counseled by supervision following this incident.

NRC FORM 366A (1-2001)