ML042960382: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Aif .tooq vOe7       -V13 Action #   NRC           PV Respondent                       Request                                     Closed With                 Request     Status (T)
{{#Wiki_filter:Aif.tooq vOe7  
Requester                                                                                                                       Date 59   McConnell             Smyors     Game Plan and any results for Ul ADV 185           Game plan provided. Results and         06117/2004   OPEN apaetcuse needed. Residents 73     McConnell               Bolt         Letdown line isolation failure 201 P/Q     Radspinner held meeting with McConnell     06/17/2004   OPEN on 6/17/2004 Need evaluation of softparts subjected to high temperatures.
-V13 Action #
Residents 77     McConnell             Holmes     Magna Blast Breakers S05D/S06K Apparent                   Schroeder Residents               06/17/2004   OPEN cause of failure 93     Paulk             Schroeder   Effect and evaluation of components that were                     AIT Team                 06/18/2004   OPEN connected &subjected to 67 Hz and plan to evaluate the equipment 107     Gody                 Straka   Provide latest version of RFI List to AIT Team, called AIT - Gody on 6/28/2004 left voice 06/24/2004       OPEN conduct call to re-zero list of action items       mall Review @1230 612912004 suagele 109   McConnell             Hypso     FSAR 10.2.2.3.1.4 Power/Load Unbalance.                                                   06/24/2004   OPEN Associated with the load control unit is a rate sensitive power/load unbalance circuit whose purpose Isto initiate control valve fast closing action under load rejection conditions that might lead to rapid rotor acceleration and consequent over speed.
NRC PV Respondent Request Closed With Request Status Requester Date 59 McConnell Smyors Game Plan and any results for Ul ADV 185 Game plan provided. Results and 06117/2004 OPEN apaetcuse needed. Residents 73 McConnell Bolt Letdown line isolation failure 201 P/Q Radspinner held meeting with McConnell 06/17/2004 OPEN on 6/17/2004 Need evaluation of softparts subjected to high temperatures.
I am curious to find out if a power/load unbalance signal occurred, and it the system
Residents 77 McConnell Holmes Magna Blast Breakers S05D/S06K Apparent Schroeder Residents 06/17/2004 OPEN cause of failure 93 Paulk Schroeder Effect and evaluation of components that were AIT Team 06/18/2004 OPEN connected & subjected to 67 Hz and plan to evaluate the equipment 107 Gody Straka Provide latest version of RFI List to AIT Team, called AIT - Gody on 6/28/2004 left voice 06/24/2004 OPEN conduct call to re-zero list of action items mall Review @1230 612912004 suagele 109 McConnell Hypso FSAR 10.2.2.3.1.4 Power/Load Unbalance.
____________            reacted as expected per the FSAR.
06/24/2004 OPEN Associated with the load control unit is a rate sensitive power/load unbalance circuit whose purpose Is to initiate control valve fast closing action under load rejection conditions that might lead to rapid rotor acceleration and consequent over speed.
111     Skinner               Straka       e-mail GEORGESGlcs.COM system                 e-mail George a copy of the STM on       06/24/2004   OPEN description of main generator protective relaying 6'24/2004 -waiting to see If this meets scheme                                       his needs 117   McConnell     Holmes- Samuels Procedure 4OEP-9EO10, Appendix 52, page 3 After researching various documents and 06/25/2004               OPEN of 23, states 'The GTGs can not supply Units 2       then talking to John Holmes I was and 3 simultaneously but can supply Units 1       prepared to give my answer to Dave and 2 or Units 1 and 3." Tim requested           Loveless, however, I was unable to clarification of this statement.       contact him. I left him a voicemail with my name and phone number and that I will contact him on Tuesday(6/29/2004) with the answer to this question.}}
I am curious to find out if a power/load unbalance signal occurred, and it the system reacted as expected per the FSAR.
111 Skinner Straka e-mail GEORGESGlcs.COM system e-mail George a copy of the STM on 06/24/2004 OPEN description of main generator protective relaying 6'24/2004 -waiting to see If this meets scheme his needs 117 McConnell Holmes-Samuels Procedure 4OEP-9EO10, Appendix 52, page 3 After researching various documents and 06/25/2004 OPEN of 23, states 'The GTGs can not supply Units 2 then talking to John Holmes I was and 3 simultaneously but can supply Units 1 prepared to give my answer to Dave and 2 or Units 1 and 3." Tim requested Loveless, however, I was unable to clarification of this statement.
contact him. I left him a voicemail with my name and phone number and that I will contact him on Tuesday(6/29/2004) with the answer to this question.
(T)}}

Latest revision as of 00:31, 16 January 2025

AIT 2004 Open.Xls
ML042960382
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/08/2004
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0307
Download: ML042960382 (1)


Text

Aif.tooq vOe7

-V13 Action #

NRC PV Respondent Request Closed With Request Status Requester Date 59 McConnell Smyors Game Plan and any results for Ul ADV 185 Game plan provided. Results and 06117/2004 OPEN apaetcuse needed. Residents 73 McConnell Bolt Letdown line isolation failure 201 P/Q Radspinner held meeting with McConnell 06/17/2004 OPEN on 6/17/2004 Need evaluation of softparts subjected to high temperatures.

Residents 77 McConnell Holmes Magna Blast Breakers S05D/S06K Apparent Schroeder Residents 06/17/2004 OPEN cause of failure 93 Paulk Schroeder Effect and evaluation of components that were AIT Team 06/18/2004 OPEN connected & subjected to 67 Hz and plan to evaluate the equipment 107 Gody Straka Provide latest version of RFI List to AIT Team, called AIT - Gody on 6/28/2004 left voice 06/24/2004 OPEN conduct call to re-zero list of action items mall Review @1230 612912004 suagele 109 McConnell Hypso FSAR 10.2.2.3.1.4 Power/Load Unbalance.

06/24/2004 OPEN Associated with the load control unit is a rate sensitive power/load unbalance circuit whose purpose Is to initiate control valve fast closing action under load rejection conditions that might lead to rapid rotor acceleration and consequent over speed.

I am curious to find out if a power/load unbalance signal occurred, and it the system reacted as expected per the FSAR.

111 Skinner Straka e-mail GEORGESGlcs.COM system e-mail George a copy of the STM on 06/24/2004 OPEN description of main generator protective relaying 6'24/2004 -waiting to see If this meets scheme his needs 117 McConnell Holmes-Samuels Procedure 4OEP-9EO10, Appendix 52, page 3 After researching various documents and 06/25/2004 OPEN of 23, states 'The GTGs can not supply Units 2 then talking to John Holmes I was and 3 simultaneously but can supply Units 1 prepared to give my answer to Dave and 2 or Units 1 and 3." Tim requested Loveless, however, I was unable to clarification of this statement.

contact him. I left him a voicemail with my name and phone number and that I will contact him on Tuesday(6/29/2004) with the answer to this question.

(T)