ML042960382: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Aif .tooq vOe7 | {{#Wiki_filter:Aif.tooq vOe7 | ||
Requester | -V13 Action # | ||
Residents 77 | NRC PV Respondent Request Closed With Request Status Requester Date 59 McConnell Smyors Game Plan and any results for Ul ADV 185 Game plan provided. Results and 06117/2004 OPEN apaetcuse needed. Residents 73 McConnell Bolt Letdown line isolation failure 201 P/Q Radspinner held meeting with McConnell 06/17/2004 OPEN on 6/17/2004 Need evaluation of softparts subjected to high temperatures. | ||
I am curious to find out if a power/load unbalance signal occurred, and it the system | Residents 77 McConnell Holmes Magna Blast Breakers S05D/S06K Apparent Schroeder Residents 06/17/2004 OPEN cause of failure 93 Paulk Schroeder Effect and evaluation of components that were AIT Team 06/18/2004 OPEN connected & subjected to 67 Hz and plan to evaluate the equipment 107 Gody Straka Provide latest version of RFI List to AIT Team, called AIT - Gody on 6/28/2004 left voice 06/24/2004 OPEN conduct call to re-zero list of action items mall Review @1230 612912004 suagele 109 McConnell Hypso FSAR 10.2.2.3.1.4 Power/Load Unbalance. | ||
06/24/2004 OPEN Associated with the load control unit is a rate sensitive power/load unbalance circuit whose purpose Is to initiate control valve fast closing action under load rejection conditions that might lead to rapid rotor acceleration and consequent over speed. | |||
111 | I am curious to find out if a power/load unbalance signal occurred, and it the system reacted as expected per the FSAR. | ||
111 Skinner Straka e-mail GEORGESGlcs.COM system e-mail George a copy of the STM on 06/24/2004 OPEN description of main generator protective relaying 6'24/2004 -waiting to see If this meets scheme his needs 117 McConnell Holmes-Samuels Procedure 4OEP-9EO10, Appendix 52, page 3 After researching various documents and 06/25/2004 OPEN of 23, states 'The GTGs can not supply Units 2 then talking to John Holmes I was and 3 simultaneously but can supply Units 1 prepared to give my answer to Dave and 2 or Units 1 and 3." Tim requested Loveless, however, I was unable to clarification of this statement. | |||
contact him. I left him a voicemail with my name and phone number and that I will contact him on Tuesday(6/29/2004) with the answer to this question. | |||
(T)}} | |||
Latest revision as of 00:31, 16 January 2025
| ML042960382 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/08/2004 |
| From: | - No Known Affiliation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2004-0307 | |
| Download: ML042960382 (1) | |
Text
Aif.tooq vOe7
-V13 Action #
NRC PV Respondent Request Closed With Request Status Requester Date 59 McConnell Smyors Game Plan and any results for Ul ADV 185 Game plan provided. Results and 06117/2004 OPEN apaetcuse needed. Residents 73 McConnell Bolt Letdown line isolation failure 201 P/Q Radspinner held meeting with McConnell 06/17/2004 OPEN on 6/17/2004 Need evaluation of softparts subjected to high temperatures.
Residents 77 McConnell Holmes Magna Blast Breakers S05D/S06K Apparent Schroeder Residents 06/17/2004 OPEN cause of failure 93 Paulk Schroeder Effect and evaluation of components that were AIT Team 06/18/2004 OPEN connected & subjected to 67 Hz and plan to evaluate the equipment 107 Gody Straka Provide latest version of RFI List to AIT Team, called AIT - Gody on 6/28/2004 left voice 06/24/2004 OPEN conduct call to re-zero list of action items mall Review @1230 612912004 suagele 109 McConnell Hypso FSAR 10.2.2.3.1.4 Power/Load Unbalance.
06/24/2004 OPEN Associated with the load control unit is a rate sensitive power/load unbalance circuit whose purpose Is to initiate control valve fast closing action under load rejection conditions that might lead to rapid rotor acceleration and consequent over speed.
I am curious to find out if a power/load unbalance signal occurred, and it the system reacted as expected per the FSAR.
111 Skinner Straka e-mail GEORGESGlcs.COM system e-mail George a copy of the STM on 06/24/2004 OPEN description of main generator protective relaying 6'24/2004 -waiting to see If this meets scheme his needs 117 McConnell Holmes-Samuels Procedure 4OEP-9EO10, Appendix 52, page 3 After researching various documents and 06/25/2004 OPEN of 23, states 'The GTGs can not supply Units 2 then talking to John Holmes I was and 3 simultaneously but can supply Units 1 prepared to give my answer to Dave and 2 or Units 1 and 3." Tim requested Loveless, however, I was unable to clarification of this statement.
contact him. I left him a voicemail with my name and phone number and that I will contact him on Tuesday(6/29/2004) with the answer to this question.
(T)