IR 05000309/2004002: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES ruary 1, 2005
{{#Wiki_filter:February 1, 2005


==SUBJECT:==
==SUBJECT:==
Line 34: Line 34:
/RA/
/RA/
Ronald R. Bellamy, Chief Decommissioning Branch Division of Nuclear Materials Safety Enclosure:
Ronald R. Bellamy, Chief Decommissioning Branch Division of Nuclear Materials Safety Enclosure:
1. Inspection Report No. 05000309/2004002
1.
 
Inspection Report No. 05000309/2004002


M
M
}}
}}

Latest revision as of 22:39, 15 January 2025

IR 05000309-04-002, on 05/24/2004 - 12/31/2004, Maine Yankee Atomic Power Company, Integrated Inspection
ML050320122
Person / Time
Site: Maine Yankee
Issue date: 02/01/2005
From: Ronald Bellamy
NRC/RGN-I/DNMS/DLB
To: Meisner M
Maine Yankee Atomic Power Co
References
Download: ML050320122 (17)


Text

February 1, 2005

SUBJECT:

INTEGRATED INSPECTION NO. 05000309/2004002

Dear Mr. Meisner:

On December 31, 2004, we completed an integrated inspection at your Maine Yankee reactor facility of activities authorized by the above listed NRC license. We discussed our findings with you, James Connell, William Henries and others via a telephone conference on January 27, 2005. The enclosed report presents the results of this inspection.

During this inspection period, we inspected your operations and maintenance, security and safeguards, and plant support programs through selective examinations of procedures and representative records, interviews with personnel, and observations by the inspectors. We consider the programs to be implemented appropriately.

In accordance with Section 2.390 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations (CFR), a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Please note that on October 25, 2004, the NRC suspended public access to ADAMS, and initiated an additional security review of publicly available documents to ensure that potentially sensitive information is removed from the ADAMS database accessible through the NRCs web site. Interested members of the public may obtain copies of documents that remain unavailable for review and/or copying by contacting the NRC Public Document Room pending resumption of public access to ADAMS. The NRC Public Document Room is located at NRC Headquarters in Rockville, MD, and can be contacted at 800-397-4209 or 301-415-4737 or pdr@nrc.gov.

We appreciate your cooperation with us during this inspection.

Sincerely,

/RA/

Ronald R. Bellamy, Chief Decommissioning Branch Division of Nuclear Materials Safety Enclosure:

1.

Inspection Report No. 05000309/2004002

M