NG-05-0420, Inservice Inspection Report: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:N\i_
{{#Wiki_filter:N\\i_
Committed to Nuclear Excellence                                         Duane Arnold Energy Center Operated by Nuclear Management Company, LLC July 29, 2005                                                                           NG-05-0420 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 Inservice Inspection Report In accordance with the requirements of Paragraph IWA-6230 of ASME, Section Xl, 1989 Edition/No Addenda and 10 CFR Section 50.55a(g), Nuclear Management Company, LLC (NMC) herewith submits the Refueling Outage (RFO) 19 Inservice Inspection Summary Report (Enclosure 1). This report addresses examinations that were performed at the Duane Arnold Energy Center (DAEC) during the time period from April 21, 2003 through May 3, 2005. Information regarding augmented inspections performed during RFO 19 is included in Enclosure 2. Enclosure 3 provides amended information from previously submitted RFO 17 and RFO 18 Summary Reports. These pages are being provided to correct minor errors that were identified on three pages of these reports.
Committed to Nuclear Excellence Duane Arnold Energy Center Operated by Nuclear Management Company, LLC July 29, 2005 NG-05-0420 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 Inservice Inspection Report In accordance with the requirements of Paragraph IWA-6230 of ASME, Section Xl, 1989 Edition/No Addenda and 10 CFR Section 50.55a(g), Nuclear Management Company, LLC (NMC) herewith submits the Refueling Outage (RFO) 19 Inservice Inspection Summary Report (Enclosure 1). This report addresses examinations that were performed at the Duane Arnold Energy Center (DAEC) during the time period from April 21, 2003 through May 3, 2005. Information regarding augmented inspections performed during RFO 19 is included in Enclosure 2. Enclosure 3 provides amended information from previously submitted RFO 17 and RFO 18 Summary Reports. These pages are being provided to correct minor errors that were identified on three pages of these reports.
As noted on Form NIS-1 included in the RFO 19 Summary Report, the third ten-year interval began on November 1, 1996 and will end on October 31, 2006. This end date has been changed from that shown on Form NIS-1 included with the RFO 18 Summary Report. The second ten year interval began on November 1, 1985 and had been previously extended in accordance with IWA-2430(d), resulting in an eleven year second interval. IWA-2430(d) states that interval adjustments shall not cause successive intervals to be altered by more than 1 year from the original pattern of intervals. Ending the third interval on October 3 2006 meets this requirement and is therefore allowed by IWA-2430.
As noted on Form NIS-1 included in the RFO 19 Summary Report, the third ten-year interval began on November 1, 1996 and will end on October 31, 2006. This end date has been changed from that shown on Form NIS-1 included with the RFO 18 Summary Report. The second ten year interval began on November 1, 1985 and had been previously extended in accordance with IWA-2430(d), resulting in an eleven year second interval. IWA-2430(d) states that interval adjustments shall not cause successive intervals to be altered by more than 1 year from the original pattern of intervals. Ending the third interval on October 3 2006 meets this requirement and is therefore allowed by IWA-2430.
Ga       an Middlesworth Site Vice President, Duane Arnold Energy Center Nuclear Management Company, LLC Enclosures (3) cc:     Administrator, Region 1II, USNRC Project Manager, DAEC, USNRC Resident Inspector, DAEC, USNRC 3277 DAEC Road
Ga an Middlesworth Site Vice President, Duane Arnold Energy Center Nuclear Management Company, LLC Enclosures (3) cc:
* Palo, Iowa 52324-9785                         I     f4`7 Telephone: 319.851.7611
Administrator, Region 1II, USNRC Project Manager, DAEC, USNRC Resident Inspector, DAEC, USNRC 3277 DAEC Road
* Palo, Iowa 52324-9785 I
f4`7 Telephone: 319.851.7611


ENCLOSURE 1 TO NG-05-0420
ENCLOSURE 1 TO NG-05-0420
Line 29: Line 31:


==SUMMARY==
==SUMMARY==
REPORT April 21,2003 through May 3, 2005 Dated:     July 28, 2005 OWNER:
REPORT April 21,2003 through May 3, 2005 Dated:
ALLIANT ENERGY P.O. Box 351 Cedar Rapids, Iowa 52406 Prepared by-       =     )       %                                Date:
July 28, 2005 OWNER:
A§ME Section XI Administrator                               -7/?7 Reviewed by:       -1   g/Al ,/f"                       v           Date:
ALLIANT ENERGY P.O. Box 351 Cedar Rapids, Iowa 52406 Prepared by-  
Program Engineering Staff Reviewed by:                             bs                           Date:
=  
Inspct n and Matea             sor Concurred by-P gram Engine y
)
g Manager Date: ?-?-&-1)5--
Date:
A§ME Section XI Administrator Reviewed by:  
-1 g/Al,/f" v
Date:
Program Engineering Staff Reviewed by:
bs Date:
Inspct n and Matea sor Concurred by-y Date:
P gram Engine g Manager
-7/?7
?-?-& -1)5--


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 This page intentionally blank
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 This page intentionally blank


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 TABLE OF CONTENTS PART                                       DESCRIPTION                             PAGE NO.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 TABLE OF CONTENTS PART A
A        Form NIS-I                                                           Pages 1-2 B        Certificate of Inservice Inspection                                   Pages 1-3 C        Abstract                                                               Page 1 D        Table of Component and Weld Examination Identification Records         Pages 1-6 E        Table of Additional and Successive Examinations Identification Records Page I F        Abstract of ASME Section XI Repairs and Replacements                   Pages 1-3 G        Form NIS-2's                                                         Pages 1-75 H        Abstract of Conditions Noted and Corrective Measures Taken             Page I I        ISI Figures and Isometrics                                           Pages 1-41 Status of Work for Third Ten Year Interval                           Pages 1-5 K        Listing of Relief Requests and Code Cases Utilized                   Page 1-2
B C
D E
F G
H I
K DESCRIPTION Form NIS-I Certificate of Inservice Inspection Abstract Table of Component and Weld Examination Identification Records Table of Additional and Successive Examinations Identification Records Abstract of ASME Section XI Repairs and Replacements Form NIS-2's Abstract of Conditions Noted and Corrective Measures Taken ISI Figures and Isometrics Status of Work for Third Ten Year Interval Listing of Relief Requests and Code Cases Utilized PAGE NO.
Pages 1-2 Pages 1-3 Page 1 Pages 1-6 Page I Pages 1-3 Pages 1-75 Page I Pages 1-41 Pages 1-5 Page 1-2


THIRD TEN Y'EAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 This page intentionally blank
THIRD TEN Y'EAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 This page intentionally blank


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part A, Page I of 2 FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As Required by the Provisions of the ASME Code Rules I .Owner: Interstate Power and Light Company, an Alliant Company. P.O. Box 351 .Cedar Rapids, IA 52406 *
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part A, Page I of 2 FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As Required by the Provisions of the ASME Code Rules I.Owner: Interstate Power and Light Company, an Alliant Company. P.O. Box 351.Cedar Rapids, IA 52406 *
(Name and address of Owner)
(Name and address of Owner)
: 2. Plant: Duane Arnold Energy Center. 3277 DAEC Road. Palo, IA 52324 (Name and Address of Plant)
: 2. Plant: Duane Arnold Energy Center. 3277 DAEC Road. Palo, IA 52324 (Name and Address of Plant)
: 3. Plant Unit             1             4. Owner Certificate of Authorization (if required)                               N/A
: 3. Plant Unit 1
: 5. Commercial Service Date               02/01 n5           6. National Board Number of Unit                               N/A
: 4. Owner Certificate of Authorization (if required)
N/A
: 5. Commercial Service Date 02/01 n5
: 6. National Board Number of Unit N/A
: 7. Components Inspected This report includes a Table of Contents (P1), Part A (PPI-2), Part B (PPI-3), Part C (P1), Part D (PP1-6), Part E (P1),
: 7. Components Inspected This report includes a Table of Contents (P1), Part A (PPI-2), Part B (PPI-3), Part C (P1), Part D (PP1-6), Part E (P1),
Part F (PP1-3), Part G (PP1-75), Part H (P1), Part I (PP1-41),
Part F (PP1-3), Part G (PP1-75), Part H (P1), Part I (PP1-41),
Part J (PP 1-5), and Part K (PP 1-2).
Part J (PP 1-5), and Part K (PP 1-2).
Component or                   Manufacturer                 Manufacturer                     State or                           National Appurtenance   Appurtenanceor InstallerS                      orerial Installer N o._            _
Component or Manufacturer Manufacturer State or National Appurtenance or Installer Province No.
Province No.
Board No.
Board No.
Reactor Pressure               Chicago Bridge                       3-4833                         N/A                               3663 Vessel       (RPV)                   & Iron__                   _  _  _  _  _ _  _    _ _    _  _  _  _  _  _      _    _  _  _  _  _  _  _
A ppurtenance or InstallerS erial N o._
Refer to Part B, Pages 1-3, of this report for a continuation of components examined
Reactor Pressure Chicago Bridge 3-4833 N/A 3663 Vessel (RPV)  
_                                                                                          I       _          _      _
& Iron__
I                   1                             T 4                             4                           4                               4 4                             4                           4                               4 4                             4                           .4.                             .4.
Refer to Part B, Pages 1-3, of this report for a continuation of components examined I _
4                             4                           1                               4 4                             4                           1                               4 4                             4                           '1'                             +
I 1
4                             4                           4                               4 4                             4                           4                               4 4                             4                           4                               4 4                             4                           +                               4 4                             4                           +                               4 I                             1                           .1-                             4 I                             1                           4                               4 Note: Supplemental sheets in form of lists, sketches, ordrawings maybe used provided (I) size is 8.5 X II inches, (2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
T 4
4 4
4 4
4 4
4 4
4  
.4.  
.4.
4 4
1
4 4
4 1
4 4
4  
'1'  
+
4 4
4 4
4 4
4 4
4 4
4 4
4 4  
+
4 4
4  
+
4 I
1  
.1-4 I
1 4
4 Note: Supplemental sheets in form of lists, sketches, ordrawings maybe used provided (I) size is 8.5 X II inches, (2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10010
(12/82) This form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10010


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part A, Page 2 of 2 FORAM NIS-1 (back)
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part A, Page 2 of 2 FORAM NIS-1 (back)
: 8. Examination Dates         4/21/03     to   5/03/05       9. Inspection Interval from       11/01/96   to   10/31/06
: 8. Examination Dates 4/21/03 to 5/03/05
: 9. Inspection Interval from 11/01/96 to 10/31/06
: 10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.
: 10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.
Refer to Part C, Part D, and Part J.
Refer to Part C, Part D, and Part J.
Line 69: Line 119:
: 12. Abstract of Corrective Measures Recommended and Taken Refer to Part H.
: 12. Abstract of Corrective Measures Recommended and Taken Refer to Part H.
We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code, Section XI.
We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code, Section XI.
Date                 2             2005 Signed                                                           -      y G       lX tt~j       \LIN           Amp;- 4 Certificate of Authorization No. (if applicable)               N/A                       Expiration Date       N/A CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Iowa and employed by HSB CT of Hartford CT have inspected the components described in this Owner's Data Report during the period 4121/03 to 5/3/05 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code, Section XI.
Date 2
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Data Report. Furthermore, neither the Inspector, nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
2005 Signed y
Date     7     - 7                   2005.
l G tt~j X
          ? UCommissions                                                                         A/           1519 :
\\LIN Amp;- 4 Certificate of Authorization No. (if applicable)
Inspector's Signature                                                     National Board, State, Province and No.
N/A Expiration Date N/A CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Iowa and employed by HSB CT of Hartford CT have inspected the components described in this Owner's Data Report during the period 4121/03 to 5/3/05, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Data Report.
Furthermore, neither the Inspector, nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date 7  
- 7 2005.
? UCommissions A/
1519 :
Inspector's Signature National Board, State, Province and No.
* Note - Other owners ate Central Iowa Power Cooperative and Corn Belt Power Cooperative.
* Note - Other owners ate Central Iowa Power Cooperative and Corn Belt Power Cooperative.


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3,2005 Part B, page I of 3 I) Owners: Interstate Power and iUght Company,         Central Iowa Power Cooperative        Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                          Ilumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3,2005 Part B, page I of 3 I)
Owners: Interstate Power and iUght Company, Central Iowa Power Cooperative an Alliant Company Marion, IA.
P.O. Box 351 Cedar Rapids, IA. 52406
P.O. Box 351 Cedar Rapids, IA. 52406
: 2) Plant:   Duane Arnold Energy Center, Palo, IA. 52324                     3) Plant IUnit: #1
: 2)
: 4) Owners Certificate of Authorization (if required): N/A                     5) Commiercial Service Date: 02/01175
Plant:
: 6) National Board Number of Unit: N/A                                         Gross Ge nerating Capacity 614 MWE CERTIFICATE OF INSERVICE INSPECTION COMPONENTS EXAMINED:
Duane Arnold Energy Center, Palo, IA. 52324
: 3) Plant I
: 4)
Owners Certificate of Authorization (if required): N/A
: 5) Comm
: 6)
National Board Number of Unit: N/A Gross Ge Corn Belt Power Cooperative Ilumbolt, IA.
Unit: #1 iercial Service Date: 02/01175 nerating Capacity 614 MWE CERTIFICATE OF INSERVICE INSPECTION COMPONENTS EXAMINED:
Reactor Pressure Vessel:
Reactor Pressure Vessel:
Manufacturer:         Chicago Bridge and Iron Post Office Box 13308 Memphis, TN 38113 National Board Number 3663, Mfr. Serial Number 3-4833 Refer to Part A, Page 1, form NIS-1, Owners Data Report for Inservice Inspections.
Manufacturer:
Chicago Bridge and Iron Post Office Box 13308 Memphis, TN 38113 National Board Number 3663, Mfr. Serial Number 3-4833 Refer to Part A, Page 1, form NIS-1, Owners Data Report for Inservice Inspections.
Piping:
Piping:
Manufacturers, sizes, part numbers and locations are noted and traceable through the piping isometric and piping instrumentation drawings (P&ID). Installation contractor, fabricator, systems P&ID's and Isometric drawings are listed below.
Manufacturers, sizes, part numbers and locations are noted and traceable through the piping isometric and piping instrumentation drawings (P&ID). Installation contractor, fabricator, systems P&ID's and Isometric drawings are listed below.
Line 91: Line 157:
P.O. Box 9449 Houston, TX 77011
P.O. Box 9449 Houston, TX 77011


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3,2005 Part B, page 2 of 3 I)   Owners: Interstate Power and Light Company,         Central Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                          Ilumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3,2005 Part B, page 2 of 3 I)
P.O. Box 351 Cedar Rapids, IA. 52406
Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 2)   Plant: Duane Amold Energy Center, Palo, IA. 52324                       3) Plant Unit: #1
Corn Belt Power Cooperative Ilumbolt, IA.
: 4)   Owners Certificate of Authorization (if required): N/A                   5) Commercial Service Date: 02/01175
: 2)
: 6)   National Board Number of Unit: N/A                                       Gross Generating Capacity: 614 MWE CERTIFICATE OF INSERVICE INSPECTION COMPONENTS EXAMINED:
Plant:
CLASS I Component                                                                                 Iso No Reactor Vessel                                                                         1.1-0813 VS-01-06/-07/-08 VS-0 I -22/-23/4 1 VS-12-01/-02 VS-13-02/-03 Reactor Vessel Stabilizers                                                               1.1-10 Main Steam                                                                           1.2-03/-04 Feedwater                                                                           1.2-05/-06 Core Spray                                                                               1.2-07 High Pressure Coolant Injection                                                           1.2-09 Control Rod Drive Return                                                         1.2-12A&B Residual Heat Removal                                                                     1.2-16 Recirculation Pump 'A' Suction                                                         1.2-19A Recirculation Manifold 'A' and Risers 'F' & 'G'                                           1.2-20 Recirculation Drain 'A'                                                                 1.2-21 B Recirculation Manifold 'B' and Riser 'D'                                                   1.2-22 Jet Pump Instrumentation                                                                 1.2-26 Liquid Level Control                                                                     1.2-27 Reactor Vessel Instrumentation                                                           1.2-29 lVVI Component                                                                               Iso No Vessel Head                                                                          VS-01-06 Core Spray Brackets                                                                  VS-01-26 Feedwater Brackets                                                                  VS-01 -27 Guide Rod Brackets                                                                  VS-01-28 Steam Dryer Brackets                                                          VS-01-29/-30 Surveillance Specimen Brackets                                                      VS-01-31 Jet Pump Riser Support Pads                                                          VS-01-34
Duane Amold Energy Center, Palo, IA. 52324
: 4)
Owners Certificate of Authorization (if required): N/A
: 6)
National Board Number of Unit: N/A
: 3) Plant Unit: #1
: 5) Commercial Service Date: 02/01175 Gross Generating Capacity: 614 MWE CERTIFICATE OF INSERVICE INSPECTION COMPONENTS EXAMINED:
CLASS I Component Iso No Reactor Vessel 1.1-0813 VS-01-06/-07/-08 VS-0 I -22/-23/4 1 VS-12-01/-02 VS-13-02/-03 Reactor Vessel Stabilizers 1.1-10 Main Steam 1.2-03/-04 Feedwater 1.2-05/-06 Core Spray 1.2-07 High Pressure Coolant Injection 1.2-09 Control Rod Drive Return 1.2-12A&B Residual Heat Removal 1.2-16 Recirculation Pump 'A' Suction 1.2-19A Recirculation Manifold 'A' and Risers 'F' & 'G' 1.2-20 Recirculation Drain 'A' 1.2-21 B Recirculation Manifold 'B' and Riser 'D' 1.2-22 Jet Pump Instrumentation 1.2-26 Liquid Level Control 1.2-27 Reactor Vessel Instrumentation 1.2-29 lVVI
- Component Vessel Head Core Spray Brackets Feedwater Brackets Guide Rod Brackets Steam Dryer Brackets Surveillance Specimen Brackets Jet Pump Riser Support Pads Iso No VS-01-06 VS-01-26 VS-01 -27 VS-01-28 VS-01-29/-30 VS-01-31 VS-01-34


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part B, page 3 of 3 I)   Owners: Interstate Power and Light Company,         C entral Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                         M:arion, IA.                          Ilumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part B, page 3 of 3 I)
Owners: Interstate Power and Light Company, C
an Alliant Company M:
P.O. Box 351 Cedar Rapids, IA. 52406
P.O. Box 351 Cedar Rapids, IA. 52406
: 2)   Plant   Duane Amold Energy Center, Palo, IA. 52324                         3) Plant Unit: #1
: 2)
: 4)   Owners Certificate of Authorization (if required): N/A                     5) Commercial Service Date: 02/0 if5
Plant Duane Amold Energy Center, Palo, IA. 52324
: 6)   National Board Number of Unit: N/A                                         Gross Generating Capacity: 614 MAT'E CERTIFICATE 4OF INSERVICE INSPECTION COMPONENTS EXAMINED:
: 4)
I                                       IVVI Continued Component                                                                               Iso No Shroud Ledge                                                                         VS-02-1 I Peripheral Fuel Support Pieces                                                       VS-03-09 Top Guide                                                                           VS-04-01 Sample Holder                                                                       VS-10-02 Bottom Head CRD Housing Stub Tubes                                             VS-12-01/-02 CLASS 2 Component                                                                               Iso No There were no Class 2 component or weld examinations performed during this outage.
Owners Certificate of Authorization (if required): N/A
: 6)
National Board Number of Unit: N/A CERTIFICATE 4 entral Iowa Power Cooperative arion, IA.
Corn Belt Power Cooperative Ilumbolt, IA.
: 3) Plant Unit: #1
: 5) Commercial Service Date: 02/0 if5 Gross Generating Capacity: 614 MAT'E OF INSERVICE INSPECTION COMPONENTS EXAMINED:
I IVVI Continued Component Iso No Shroud Ledge VS-02-1 I Peripheral Fuel Support Pieces VS-03-09 Top Guide VS-04-01 Sample Holder VS-10-02 Bottom Head CRD Housing Stub Tubes VS-12-01/-02 CLASS 2 Component Iso No There were no Class 2 component or weld examinations performed during this outage.


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part C, page I of 1
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part C, page I of 1
: 1)   Owners: Interstate Power and Light Company,         Central Iowa Power Coopcrative      Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                          1lumbolt, 1A.
: 1)
P.O. Box 351 Cedar Rapids, IA. 52406
Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Coopcrative Marion, IA.
: 2)   Plant   Duane Arnold Energy Center, Palo, 1A. 52324                       3) Plant Unit #1
Corn Belt Power Cooperative 1lumbolt, 1A.
: 4)   Owners Certificate of Authorization (ifrequired): N/A                   5) Commercial Service Date: 02/01/75
: 2)
: 6)   National Board Number of Unit: N/A                                       Gross Generating Capacity 614 MWE CERTIFICATE OF INSERVICE INSPECTION ABSTRACT:
Plant Duane Arnold Energy Center, Palo, 1A. 52324
: 4)
Owners Certificate of Authorization (ifrequired): N/A
: 6)
National Board Number of Unit: N/A
: 3) Plant Unit #1
: 5) Commercial Service Date: 02/01/75 Gross Generating Capacity 614 MWE CERTIFICATE OF INSERVICE INSPECTION ABSTRACT:
The Inservice Inspection addressed in this report was performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI 1989 Edition, No Addenda, and the Duane Arnold Energy Center Updated Final Safety Analysis Report. The inspections were performed utilizing Non-Destructive Examination Techniques (i.e., UT, PT, MT, etc.). The examinations were conducted during the period of April 21, 2003 through May 3, 2005. The specific details and associated records of the examinations are on file at Duane Arnold Energy Center.
The Inservice Inspection addressed in this report was performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI 1989 Edition, No Addenda, and the Duane Arnold Energy Center Updated Final Safety Analysis Report. The inspections were performed utilizing Non-Destructive Examination Techniques (i.e., UT, PT, MT, etc.). The examinations were conducted during the period of April 21, 2003 through May 3, 2005. The specific details and associated records of the examinations are on file at Duane Arnold Energy Center.


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 This page intentionally blank
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 This page intentionally blank


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part D, page I of 6 I)   Owners: Interstate Power and Light Company,         Central Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                          Hlumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part D, page I of 6 Corn Belt Power Cooperative Hlumbolt, IA.
P.O. Box 351 Cedar Rapids, IA. 52406
I)
: 2)   Plant: Duane Arnold Energy Center, Palo, IA. 52324                       3) PlantUnit: #1
Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 4)   Owners Certificate of Authorization (if required): N/A                   5) Commercial Service Date: 02/01/75
: 2)
: 6)   National Board Number of Unit N/A                                         Gross Generating Capacity: 614 MWE COMPONENT AND WVELD EXAMINATION IDENTIFICATION RECORDS CLASS I
Plant: Duane Arnold Energy Center, Palo, IA. 52324
                                                            'SI                                           ASME XI Component                 Description                     Report     Examination         ISI Iso        Category            Results Reactor Vessel             IR215(02-19)                 105002         UT                   1.1-08          B-O          Accepted IR2 15(02-27)               105003         UT                   1.1-08           B-O         Accepted I R215(42-27)                105004        UT                  1.1-08           B-O         Accepted IR215(06-23)                105125        VT-I                1.1-08           B-G-2       Accepted IR215(10-1 1)                105146        VT-I                1.1-08           B-G-2       Accepted IR215(10-23)                105147        VT-I                1.1-08           B-G-2       Accepted IR215(14-07)                105128        VT-I                1.1-08           B-G-2       Accepted IR215(14- 1I)                105129        VT-I                1.1-08           B-G-2       Accepted IR215(18-31)                105131        VT-I                1.1-08           B-G-2       Accepted IR215(22-03)                105132        VT-I                  1.1-08         B-G-2       Accepted I R215(22-07)                105133        VT-I                  1.1-08         B-G-2       Accepted IR215(22-11)                105134        VT-I                1.1-08           B-G-2       Accepted IR215(26-11)                105136        VT-I                  1.1-08         B-G-2       Accepted IR215(26-31)                105137        VT-I                  1.1-08         B-G-2       Accepted IR215(30-15)                105138        VT-I                1.1-08           B-G-2       Accepted IR215(30-31)                105139        VT-I                1.1-08           B-G-2       Accepted I R215(30-39)                105140        VT-I                1.1-08           B-G-2       Accepted IR215(34-11)                105144        VT-I                  1.1-08         B-G-2       Accepted I R215(34-39)                105143        VT-I                  1.1-08         B-G-2       Accepted I R215(34-07)                105141        VT-I                  1.1-08         B-G-2       Accepted by Replacement CAP036901 HCC-B002                      105069        UT                VS-01-06           B-A         Accepted (HOLES 40-60)
: 4)
HMC-B0O1                     105070         UT                 VS-01 -06           B-A         Accepted HMC-B002                      105071        UT                VS-01 -06           B-A         Accepted HMC-B003                      105072        UT                VS-01 -06          B-A         Accepted HMC-B004                      105073        UT                 VS-01 -06          B-A         Accepted HMC-B005                      105074        UT                 VS-01-06            B-A         Accepted HMC-B006                      105075        UT                 VS-01 -06          B-A         Accepted HCC-C00I                      105076        UT                VS-01 -06          B-A         Accepted (HOLES 40-60)                                MT HCC-C001                      105076        UT                 VS-01-06            B-A         Accepted (HOLES 60-20)                                MT HCA-B001                      107078        UT                 VS-01 -07          B-A         Accepted HMA-B001                     105079        UT                 VS-01 -07          B-A         Accepted HMA-B002                     105080        UT                 VS-01 -07          B-A         Accepted HMA-B003                      105081        UT                 VS-01 -07          B-A         Accepted HMA-B004                      105082        UT                 VS-01 -07          B-A         Accepted HMA-B005                      105083        UT                VS-01 -07          B-A         Accepted HMA-B006                      105084        UT                 VS-01 -07          B-A        Accepted
Owners Certificate of Authorization (if required): N/A
: 6)
National Board Number of Unit N/A
: 3) PlantUnit: #1
: 5) Commercial Service Date: 02/01/75 Gross Generating Capacity: 614 MWE COMPONENT AND WVELD EXAMINATION IDENTIFICATION RECORDS CLASS I
'SI Component Description Report Examination Reactor Vessel IR215(02-19) 105002 UT ASME XI I R2 15(02-27)
I R215(42-27)
IR215(06-23)
IR215(10-1 1)
IR215(10-23)
IR215(14-07)
IR215(14-1I)
IR215(18-31)
IR215(22-03)
I R215(22-07)
IR215(22-11)
IR215(26-11)
IR215(26-31)
IR215(30-15)
IR215(30-31)
I R215(30-39)
IR215(34-11)
I R215(34-39)
I R215(34-07) 105003 105004 105125 105146 105147 105128 105129 105131 105132 105133 105134 105136 105137 105138 105139 105140 105144 105143 105141 UT UT VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I ISI Iso Category Results 1.1-08 B-O Accepted 1.1-08 B-O Accepted 1.1-08 B-O Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted by Replacement CAP036901 VS-01-06 B-A Accepted HCC-B002 (HOLES 40-60)
HMC-B0O1 HMC-B002 HMC-B003 HMC-B004 HMC-B005 HMC-B006 HCC-C00I (HOLES 40-60)
HCC-C001 (HOLES 60-20)
HCA-B001 HMA-B001 HMA-B002 HMA-B003 HMA-B004 HMA-B005 HMA-B006 105069 UT 105070 UT 105071 UT 105072 UT 105073 UT 105074 UT 105075 UT 105076 UT MT 105076 UT MT 107078 UT 105079 UT 105080 UT 105081 UT 105082 UT 105083 UT 105084 UT VS-01 -06 VS-01 -06 VS-01 -06 VS-01 -06 VS-01-06 VS-01 -06 VS-01 -06 B-A B-A B-A B-A B-A B-A B-A Accepted Accepted Accepted Accepted Accepted Accepted Accepted VS-01-06 B-A Accepted VS-01 -07 VS-01 -07 VS-01 -07 VS-01 -07 VS-01 -07 VS-01 -07 VS-01 -07 B-A B-A B-A B-A B-A B-A B-A Accepted Accepted Accepted Accepted Accepted Accepted Accepted
 
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part D, page 2 of 6 Corn Belt Power Cooperative Humbolt, IA.
I)
Owners: Interstate Power and light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 2)
Plant Duane Amold Energy Center, Palo, IA. 52324
: 4)
Owners Certificate of Authorization (if required): N/A
: 6)
National Board Number of Unit: N/A
: 3) Plant Unit: #1
: 5) Commercial Service Date: 02/01175 Gross Generating Capacity: 614 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS I Continued ISI ASME XI Component Description Report Examination 1ST Iso Category Results HMA-B007 105085 UT VS-01-07 B-A Accepted HMA-B008 105086 UT VS-01-07 B-A Accepted HMA-B009 105087 UT VS-01-07 B-A Accepted HCA-H002 105088 MT VS-01-08 B-K Accepted VSK-K001 105089 VT-3 VS-01-08 F-A Accepted VFA-E00I 105001 VT-2 VS-01-22 B-E Accepted VFA-E002 105001 VT-2 VS-01-23 B-E Accepted VCB-CO05 105090 UT VS-01-41 B-A Accepted VLB-AOO1 105093 UT VS-01-41 B-A Accepted VLB-A002 105094 UT VS-01-41 B-A Accepted VLC-B001 105095 UT VS-01-41 B-A Accepted VLC-B002 105096 UT VS-01-41 B-A Accepted VLD-B001 105097 UT VS-01-41 B-A Accepted VLD-B002 105098 UT VS-01-41 B-A Accepted BH-CRD 105001 VT-2 VS-12-01 B-E Accepted HSING/ST TUB BH-CRD STUB 105001 VT-2 VS-12-02 B-E Accepted TUBES BH-INCORE 105001 VT-2 VS-13-03 B-E Accepted HOUSING Reactor Vessel VSW-0 AZ 105158 MT 1.1-10 B-K Accepted Stabilizers VSW-180AZ 105159 MT 1.1-10 B-K Accepted VSW-180AZ 105159 VT-3 1.1-10 F-A Accepted VSW-270 AZ 105160 MT 1.1-10 B-K Accepted VSW-270 AZ 105160 VT-3 1.1-10 F-A Accepted VSW-90 AZ 105161 MT 1.1-10 B-K Accepted VSW-90AZ 105161 VT-3 1.1-10 F-A Accepted Main Steam MSC-D001 105005 UT 1.2-03 B-D Accepted MSC-D001 105005 UT 1.2-03 B-D Accepted INNER RADIUS MSD-DOOI 105007 UT 1.2-04 B-D Accepted MSC-D00I 105007 UT 1.2-04 B-D Accepted INNER RADIUS


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part D, page 2 of 6 I)   Owners: Interstate Power and light Company,         Central Iowa Power Cooperative         Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                           Humbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part D, page 3 of 6 I)
Owners: Interstate Power and Light Company, Central Iowa Power Cooperative Corn Belt Power Cooperative an Alliant Company Marion, IA.
liumbolt, IA.
P.O. Box 351 Cedar Rapids, IA. 52406
P.O. Box 351 Cedar Rapids, IA. 52406
: 2)   Plant   Duane Amold Energy Center, Palo, IA. 52324                         3) Plant Unit: #1
: 2)
: 4)   Owners Certificate of Authorization (if required): N/A                    5) Commercial Service Date: 02/01175
Plant Duane Amold Energy Center, Palo, IA. 52324
: 6)   National Board Number of Unit: N/A                                         Gross Generating Capacity: 614 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS I Continued ISI                                            ASME XI Component                  Description                    Report      Examination            1ST Iso        Category            Results HMA-B007                      105085        UT                  VS-01-07          B-A          Accepted HMA-B008                      105086        UT                  VS-01-07          B-A          Accepted HMA-B009                      105087        UT                  VS-01-07          B-A          Accepted HCA-H002                      105088        MT                  VS-01-08          B-K          Accepted VSK-K001                      105089        VT-3                VS-01-08          F-A          Accepted VFA-E00I                      105001        VT-2                VS-01-22            B-E          Accepted VFA-E002                      105001        VT-2                VS-01-23            B-E          Accepted VCB-CO05                      105090        UT                  VS-01-41          B-A          Accepted VLB-AOO1                      105093        UT                  VS-01-41            B-A          Accepted VLB-A002                      105094        UT                  VS-01-41            B-A          Accepted VLC-B001                      105095        UT                  VS-01-41            B-A          Accepted VLC-B002                      105096        UT                  VS-01-41            B-A          Accepted VLD-B001                      105097        UT                  VS-01-41            B-A          Accepted VLD-B002                      105098        UT                  VS-01-41            B-A          Accepted BH-CRD                        105001        VT-2                VS-12-01            B-E          Accepted HSING/ST TUB BH-CRD STUB                  105001        VT-2                VS-12-02            B-E          Accepted TUBES BH-INCORE                    105001        VT-2                VS-13-03            B-E          Accepted HOUSING Reactor Vessel            VSW-0 AZ                      105158          MT                    1.1-10          B-K          Accepted Stabilizers VSW-180AZ                    105159          MT                    1.1-10          B-K          Accepted VSW-180AZ                    105159        VT-3                  1.1-10          F-A          Accepted VSW-270 AZ                    105160          MT                    1.1-10          B-K          Accepted VSW-270 AZ                    105160          VT-3                  1.1-10          F-A          Accepted VSW-90 AZ                    105161          MT                    1.1-10          B-K          Accepted VSW-90AZ                      105161        VT-3                  1.1-10          F-A          Accepted Main Steam                MSC-D001                      105005        UT                    1.2-03          B-D          Accepted MSC-D001                      105005        UT                    1.2-03          B-D          Accepted INNER RADIUS MSD-DOOI                      105007        UT                    1.2-04          B-D          Accepted MSC-D00I                      105007        UT                    1.2-04          B-D          Accepted INNER RADIUS
: 4)
 
Owners Certificate of Authorization (if required): NIA
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part D, page 3 of 6 I)  Owners: Interstate Power and Light Company,          Central Iowa Power Cooperative        Corn Belt Power Cooperative an Alliant Company                          Marion, IA.                          liumbolt, IA.
: 6)
P.O. Box 351 Cedar Rapids, IA.52406
National Board Number of Unit N/A
: 2)  Plant Duane Amold Energy Center, Palo, IA. 52324                          3) Plant Unit: #1
: 3) Plant Unit: #1
: 4)  Owners Certificate of Authorization (if required): NIA                    5) Commercial Service Date: 02/0115
: 5) Commercial Service Date: 02/0115 Gross Generating Capacity: 614 MV'E COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS I Continued ISI ASME XI Component Description Report Examination ISI Iso Category Results Feedwater FWA-THERM SLV 105010 UT 1.2-05 R-A*
: 6)  National Board Number of Unit N/A                                          Gross Generating Capacity: 614 MV'E COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS I Continued ISI                                           ASME XI Component                 Description                     Report       Examination           ISI Iso         Category           Results Feedwater                 FWA-THERM SLV                 105010         UT                   1.2-05           R-A*         Accepted FWB-D001                     105011         UT                   1.2-05           B-D         Accepted FWB-DOOI                     105011         UT                   1.2-05           B-D         Accepted INNER RADIUS FWA-J003                     105014         UT                   1.2-05           R-A*         Accepted FWB-K032                     105013         VT-3                 1.2-05           F-A         Accepted FWC-DOO1                     105017         UT                   1.2-06           B-D         Accepted FWC-DOO1                     105017         UT                   1.2-06           B-D         Accepted INNER RADIUS FWC-THERM                     105018         UT                   1.2-06           R-A*         Accepted SLEV FWD-DOOI                     105019         UT                   1.2-06           B-D         Accepted FWD-DOOI                     105019         UT                   1.2-06           B-D         Accepted INNER RADIUS FWC-J002                     105021         UT                   1.2-06           R-A*         Accepted FWC-J003                     105022         UT                   1.2-06           R-A*         Accepted FWC-JO05                     EC05006       UT                   1.2-06           R-A*         Accepted FWC-JO05                     105023         UT                   1.2-06           R-A*         Accepted FWC-J006                     105024         UT                   1.2-06           R-A*         Accepted FWC-J006                     EC05006       UT                   1.2-06           R-A*         Accepted FWC-K004                     105025         VT-3                 1.2-06           F-A         Accepted FWC-K033                     105026         VT-3                 1.2-06           F-A         Accepted FWD-J0 11                     ECO5058       UT                   1.2-06           R-A*         Accepted FWD-JO16                     EC05059       UT                   1.2-06           R-A*         Accepted Core Spray                 CSA-JOI1                     105032         UT                   1.2-07           R-A*         Accepted CSA-J012                     105033         UT                   1.2-07           R-A*         Accepted High Pressure             PSA-JOOI                     105034         UT                   1.2-09           R-A*         Accepted Coolant Injection PSA-J004                     105035         UT                   1.2-09           R-A*         Accepted Control Rod Drive         CRA-J032                     105040         UT                   1.2-12B           R-A*         Accepted Return Residual Heat             RHD-J008                     105042         UT                   1.2-16           R-A*         Accepted Removal RHD-J009                     105043         UT                   1.2-16           R-A*         Accepted Recirculation             RCA-J012                     105044         UT                   1.2-19A           R-A*         Accepted Pump 'A' Suction RCA-J021                     105016         UT                   1.2-19A           R-A*         Accepted
Accepted FWB-D001 105011 UT 1.2-05 B-D Accepted FWB-DOOI 105011 UT 1.2-05 B-D Accepted INNER RADIUS FWA-J003 105014 UT 1.2-05 R-A*
Accepted FWB-K032 105013 VT-3 1.2-05 F-A Accepted FWC-DOO1 105017 UT 1.2-06 B-D Accepted FWC-DOO1 105017 UT 1.2-06 B-D Accepted INNER RADIUS FWC-THERM 105018 UT 1.2-06 R-A*
Accepted SLEV FWD-DOOI 105019 UT 1.2-06 B-D Accepted FWD-DOOI 105019 UT 1.2-06 B-D Accepted INNER RADIUS FWC-J002 105021 UT 1.2-06 R-A*
Accepted FWC-J003 105022 UT 1.2-06 R-A*
Accepted FWC-JO05 EC05006 UT 1.2-06 R-A*
Accepted FWC-JO05 105023 UT 1.2-06 R-A*
Accepted FWC-J006 105024 UT 1.2-06 R-A*
Accepted FWC-J006 EC05006 UT 1.2-06 R-A*
Accepted FWC-K004 105025 VT-3 1.2-06 F-A Accepted FWC-K033 105026 VT-3 1.2-06 F-A Accepted FWD-J0 11 ECO5058 UT 1.2-06 R-A*
Accepted FWD-JO16 EC05059 UT 1.2-06 R-A*
Accepted Core Spray CSA-JOI1 105032 UT 1.2-07 R-A*
Accepted CSA-J012 105033 UT 1.2-07 R-A*
Accepted High Pressure PSA-JOOI 105034 UT 1.2-09 R-A*
Accepted Coolant Injection PSA-J004 105035 UT 1.2-09 R-A*
Accepted Control Rod Drive CRA-J032 105040 UT 1.2-12B R-A*
Accepted Return Residual Heat RHD-J008 105042 UT 1.2-16 R-A*
Accepted Removal RHD-J009 105043 UT 1.2-16 R-A*
Accepted Recirculation RCA-J012 105044 UT 1.2-19A R-A*
Accepted Pump 'A' Suction RCA-J021 105016 UT 1.2-19A R-A*
Accepted


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part D, page 4 of 6 I) Owners: Interstate Power and Light Company,         Central Iowa Power Cooperative        Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                          Ilumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part D, page 4 of 6 Corn Belt Power Cooperative Ilumbolt, IA.
P.O. Box 351 Cedar Rapids, IA. 52406
I)
: 2)   Plant: Duane Amold Energy Center, Palo, IA.52324                         3) Plant Unit: #1
Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 4)   Owners Certificate ofAuthorization (if required): N/A                     5) Commercial Service Date: 02/01n5
: 2)
: 6)   National Board Number of Unit: N/A                                       Gross Generating Capacity: 614 MVE CONMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS I Continued ISI                                             ASME XI Component                 Description                     Report       Examination           IS Iso         Category           Results Recirculation             RRG-DOOI                     105045         UT                   1.2-20           B-D             Accepted Manifold 'A' and Risers E, F, G & H RRG-DOO1                     105045         UT                   1.2-20           B-D       Accepted INNER RADIUS RRG-F002                     105048         UT                   1.2-20           R-A*       Accepted RRG-J003                     105049         UT                   1.2-20           REA*       Accepted
Plant:
'A' Recirculation         RDB-J005                     105053         UT                   1.2-21B           R-A*         Accepted Drain                                                                   VT-2 Recirculation             RRD-J005                     105058         UT                   1.2-22           R.A*       Accepted Manifold 'B' and Risers A, B, C & D Jet Pump                   JPB-DOOI                     105061         UT                   1.2-26           B-D       Accepted Instrumentation JPB-DOO1                     105061         UT                   1.2-26           B-D       Accepted INNER RADIUS Liquid Level               LCA-D00I                     105064         UT                   1.2-27           B-D       Accepted Control LCA-D00I                     105064         UT                   1.2-27           B-D       Accepted INNER RADIUS Reactor Vessel             VIB-D00I                     105065         UT                   1.2-29           B-D       Accepted Instrumentation VIB-D001                     105065         UT                   1.2-29           B-D       Accepted INNER RADIUS Reactor Vessel             Vessel Head                   105149         VT-3               VS-01-06           B-N-I       Accepted Internals CSB Welds-2 100               105149        VT-3              VS-01-26            B-N-2      Accepted CSB Welds-330 0              105149         VT-3               VS-01 -26           B-N-2       Accepted FWB Welds NE -               105149        VT-3              VS-01 -27          B-N-2       Accepted 3150 FWB Welds NW -                105149         VT-3               VS-0 1-27           B-N-2       Accepted 2250 GRB Welds-I 800              105149        VT-3               VS-01 -28          B-N-2      Accepted Guide Rod Brt-1800            105149        VT-3               VS-01 -28           B-N-I      Accepted DSB-2250                    105149          VT-3              VS-01 -29           B-N-2      Accepted DSB-3150                    105149          VT-3              VS-01 -29           B-N-2      Accepted DHB-2110                    105149          VT-3              VS-01 -30           B-N-2      Accepted DHB-3290                    105149          VT-3              VS-01-30            B-N-2       Accepted SH Welds-288 0-LW            105149          VT-I               VS-01-31            B-N-2       Accepted SH Welds-288 0-UP            105149          VT-3              VS-01-31            B-N-2       Accepted
Duane Amold Energy Center, Palo, IA. 52324
: 4)
Owners Certificate ofAuthorization (if required): N/A
: 6)
National Board Number of Unit: N/A
: 3) Plant Unit: #1
: 5) Commercial Service Date: 02/01n5 Gross Generating Capacity: 614 MVE CONMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS I Continued ISI ASME XI Component Description Report Examination IS Iso Category Results Recirculation RRG-DOOI 105045 UT 1.2-20 B-D Accepted Manifold 'A' and Risers E, F, G & H RRG-DOO1 105045 UT 1.2-20 B-D Accepted INNER RADIUS RRG-F002 105048 UT 1.2-20 R-A*
Accepted RRG-J003 105049 UT 1.2-20 REA*
Accepted
'A' Recirculation RDB-J005 105053 UT 1.2-21B R-A*
Accepted Drain VT-2 Recirculation RRD-J005 105058 UT 1.2-22 R.A*
Accepted Manifold 'B' and Risers A, B, C & D Jet Pump JPB-DOOI 105061 UT 1.2-26 B-D Accepted Instrumentation JPB-DOO1 105061 UT 1.2-26 B-D Accepted INNER RADIUS Liquid Level LCA-D00I 105064 UT 1.2-27 B-D Accepted Control LCA-D00I 105064 UT 1.2-27 B-D Accepted INNER RADIUS Reactor Vessel VIB-D00I 105065 UT 1.2-29 B-D Accepted Instrumentation VIB-D001 105065 UT 1.2-29 B-D Accepted INNER RADIUS Reactor Vessel Vessel Head 105149 VT-3 VS-01-06 B-N-I Accepted Internals CSB Welds-2 100 CSB Welds-3300 FWB Welds NE -
3150 FWB Welds NW -
2250 GRB Welds-I 800 Guide Rod Brt-1800 DSB-2250 DSB-3150 DHB-2110 DHB-3290 SH Welds-2880-LW SH Welds-2880-UP 105149 105149 105149 VT-3 VT-3 VT-3 VS-01-26 VS-01 -26 VS-01 -27 B-N-2 B-N-2 B-N-2 Accepted Accepted Accepted 105149 VT-3 VS-0 1-27 B-N-2 Accepted 105149 105149 105149 105149 105149 105149 105149 105149 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-I VT-3 VS-01 -28 VS-01 -28 VS-01 -29 VS-01 -29 VS-01 -30 VS-01-30 VS-01-31 VS-01-31 B-N-2 B-N-I B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 Accepted Accepted Accepted Accepted Accepted Accepted Accepted Accepted


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part D, page 5 of 6 I)   Owners: Interstate Power and iUght Company,         Central Iowa Power Cooperative        Corn Belt PowerCooperative an Alliant Company                       Marion, IA.                          Iumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part D, page 5 of 6 Corn Belt PowerCooperative Iumbolt, IA.
P.O. Box 351 Cedar Rapids, IA. 52406
I)
: 2)   Plant   Duane Arnold Energy Center, Palo, IA. 52324                     3) Plant Unit: #1
Owners: Interstate Power and iUght Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 4)   Owners Certificate ofAuthorization (if required): N/A                   5) Commercial Service Date: 02/01in5
: 2)
: 6)   National Board Number of Unit N/A                                       Gross Generating Capacity 614 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS I Continued 1s5                                           ASME XI Component                 Description                     Report     Examination           IS Iso       Category             Results JPR-SUPP PAD-               105149         VT-I               VS-01-34         B-N-2         Accepted 1440 JPR-SUPP PAD-               105149         VT-I               VS-01-34         B-N-2         Accepted 2520 SHROUD LEDGE                105149        VT-3                VS-02-11         B-N-I         Accepted 0°-180° CSS-PERIPH FUEL              105149        VT-3                VS-03-09         B-N-2         Accepted SUP TOP GUIDE                    105149        VT-3                VS-04-01         B-N-I         Accepted SAMPLE HLDR-                105149        VT-3                VS-1 0-02       B-N-I         Accepted 2880
Plant Duane Arnold Energy Center, Palo, IA. 52324
    *Risk-Informed process was used.
: 4)
CLASS I PRESSURE TESTS ISI                                           ASME XI Component                 Description                     Report Examination             ISI ISO       Category         Results Class I Hydrostatic           STP 3.10.1-02             105001     VT-2               ISONO-P           B-P         Accepted Pressure Test
Owners Certificate ofAuthorization (if required): N/A
: 6)
National Board Number of Unit N/A
: 3) Plant Unit: #1
: 5) Commercial Service Date: 02/01in5 Gross Generating Capacity 614 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS I Continued 1s5 ASME XI Component Description Report Examination IS Iso Category Results JPR-SUPP PAD-105149 VT-I VS-01-34 B-N-2 Accepted 1440 JPR-SUPP PAD-2520 SHROUD LEDGE 0°-180° CSS-PERIPH FUEL SUP TOP GUIDE SAMPLE HLDR-2880 105149 VT-I 105149 105149 VT-3 VT-3 VS-01-34 B-N-2 Accepted VS-02-11 B-N-I Accepted VS-03-09 B-N-2 Accepted VS-04-01 B-N-I Accepted VS-1 0-02 B-N-I Accepted 105149 VT-3 105149 VT-3
*Risk-Informed process was used.
CLASS I PRESSURE TESTS ISI ASME XI Component Description Report Examination ISI ISO Category Results Class I Hydrostatic STP 3.10.1-02 105001 VT-2 ISONO-P B-P Accepted Pressure Test


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3,2005 Part D Page 6 of 6 I)   Owners: Interstate Power and Light Company,         Central Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                          flumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3,2005 Part D Page 6 of 6 Corn Belt Power Cooperative flumbolt, IA.
P.O. Box 351 Cedar Rapids, IA. 52406
I)
: 2)   Plant: Duane Amold Energy Center, Palo, IA. 52324                       3) Plant Unit: #1
Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 4)   Owxners Certificate of Authorization (ifrequired): N/A                   5) Commercial Service Date: o2   in5
: 2)
: 6)  NationalBoardNumberofUnit:        NIA                                    Gross Generating Capacity 614 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS 2 ISi                                         ASME XI Component                   Description                   Report       Examination           1SI Iso     Category         Results There were no Class 2 component or weld examinations performed during this outage.
Plant:
CLASS 2 PRESSURE TESTS ISI                                         ASME XI Component                   Description                   Report Examination                 ISI ISO       Category         Results Core Spray                 STP NS510002                 103119 VT-2                     ISONO-P           C-H         Accepted HPCI                       STP NS520001                 105100 VT-2                     ISONO-P           C-H         Accepted HPCI (Steam                 STP NS520003                 105162 VT-2                     ISONO-P           C-H         Accepted Tunnel Components)
Duane Amold Energy Center, Palo, IA. 52324
Standby Liquid             STP NS530001                 104001       VT-2               ISONO-P           C-H         Accepted Control Main Steam                 STP NS830003                 105102       VT-2               ISONO-P           C-H         Accepted Residual Heat               STP NS490003                 103118       VT-2               ISONO-P           C-H         Accepted Removal CRD Hydraulic               STP NS550001                 105157       VT-2                 ISNO-P         C-H         Accepted IWE COMPONENTS
: 4)
* ISI       Exam                         ASME XI Component               Description                         Report Method                 ISI ISO       Category           Results Drycvell                 STP 3.6.1.1-01                       105109 VT                       N/A           E-A         Accepted DRYWELL HEAD                         105110 VT-3                     N/A           E-A         Accepted DW INT 798'-805'                     105111     VT-3                 N/A           E-A         Accepted DW INT 776'-798' NW                 105112 VT-3                     N/A           E-A         Accepted DW INT 742'-757' SE                 105113 VT-3                     N/A           E-A         Accepted MOIST. BAR 742' SE                   105114 VT-3                     N/A           E-D         Accepted CRD BOLTS                           105115 VT-I                     N/A           E-G         Accepted Torus                   TORUS INT (5,6,7,8)                 105116 VT-3                     N/A           E-A         Accepted ABOVE WATER LEVEL TORUS EXT (5,6,7,8)                 105122     VT-3                 N/A           E-A         Accepted TORUS BAYS 1-16                     105123     VT-4                 N/A           E-C         Accepted DW TO TORUS VENT NE                 105124     VT-3                 N/A           E-A         Accepted DW TO TORUS VENT#F                   105148     VT-3                 N/A           E-A         Accepted
Owxners Certificate of Authorization (ifrequired): N/A
: 6)
NationalBoardNumberofUnit:
NIA
: 3) Plant Unit: #1
: 5) Commercial Service Date: o2 i n5 Gross Generating Capacity 614 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS 2 ISi ASME XI Component Description Report Examination 1SI Iso Category Results There were no Class 2 component or weld examinations performed during this outage.
CLASS 2 PRESSURE TESTS ISI ASME XI Component Description Report Examination ISI ISO Category Results Core Spray STP NS510002 103119 VT-2 ISONO-P C-H Accepted HPCI STP NS520001 105100 VT-2 ISONO-P C-H Accepted HPCI (Steam STP NS520003 105162 VT-2 ISONO-P C-H Accepted Tunnel Components)
Standby Liquid STP NS530001 104001 VT-2 ISONO-P C-H Accepted Control Main Steam STP NS830003 105102 VT-2 ISONO-P C-H Accepted Residual Heat STP NS490003 103118 VT-2 ISONO-P C-H Accepted Removal CRD Hydraulic STP NS550001 105157 VT-2 ISNO-P C-H Accepted IWE COMPONENTS
* ISI Exam ASME XI Component Description Report Method ISI ISO Category Results Drycvell STP 3.6.1.1-01 105109 VT N/A E-A Accepted DRYWELL HEAD 105110 VT-3 N/A E-A Accepted DW INT 798'-805' 105111 VT-3 N/A E-A Accepted DW INT 776'-798' NW 105112 VT-3 N/A E-A Accepted DW INT 742'-757' SE 105113 VT-3 N/A E-A Accepted MOIST. BAR 742' SE 105114 VT-3 N/A E-D Accepted CRD BOLTS 105115 VT-I N/A E-G Accepted Torus TORUS INT (5,6,7,8) 105116 VT-3 N/A E-A Accepted ABOVE WATER LEVEL TORUS EXT (5,6,7,8) 105122 VT-3 N/A E-A Accepted TORUS BAYS 1-16 105123 VT-4 N/A E-C Accepted DW TO TORUS VENT NE 105124 VT-3 N/A E-A Accepted DW TO TORUS VENT#F 105148 VT-3 N/A E-A Accepted
* Credited for Third Period of IWE Plan Interval
* Credited for Third Period of IWE Plan Interval


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part E, page I of I I) Owners: Interstate Power and Light Company,         C,crntral Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                         Mlarion, IA.                          Ilumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part E, page I of I I)
Owners: Interstate Power and Light Company, C,
an Alliant Company M
P.O. Box 351 Cedar Rapids, IA. 52406
P.O. Box 351 Cedar Rapids, IA. 52406
: 2)   Plant: Duane Arnold Energy Center, Palo, IA. 52324                         3) Plant Unit: #I
: 2)
: 4)   Owners Certificate of Authorization (if required): N/A                     5) Commercial Service Date: 02on7n5
Plant:
: 6)   NationalBoardNumberofUnit         N/A                                       Gross Generting Capacity 614 MWE ADDITIONAL EXAMINATION IDENTIFICATION RECORDS Class I Component Examined Previous ISI Report Number ISI Report Number            I Examination F      ASME XI Category I       Results NO ADDITIONAL EXAMS WERE PERFORMED DURING THE THIRD PERIOD FOR THIS CYCLE SUCCESSIVE EXAMINATION IDENTIFICATION RECORDS Class I Component             Previous ISI             ISI Report             Examination             ASME XI               Results Examined                 Report                 Number                                         Category Number HCC-B002                     101093                   105027                   UT                   B-A           Acceptable (HOLES 2040)
Duane Arnold Energy Center, Palo, IA. 52324
RRF-F002                     101068                   105047                   UT                   R-A           Acceptable CRA-KO17AA                   101051                   105015                   VT-3                   F-A           Acceptable
: 4)
Owners Certificate of Authorization (if required): N/A
: 6)
NationalBoardNumberofUnit N/A crntral Iowa Power Cooperative larion, IA.
Corn Belt Power Cooperative Ilumbolt, IA.
: 3) Plant Unit: #I
: 5) Commercial Service Date: 02on7n5 Gross Generting Capacity 614 MWE ADDITIONAL EXAMINATION IDENTIFICATION RECORDS Class I Component Previous ISI ISI Report Examination ASME XI I
Results Examined Report Number Number I
F Category NO ADDITIONAL EXAMS WERE PERFORMED DURING THE THIRD PERIOD FOR THIS CYCLE SUCCESSIVE EXAMINATION IDENTIFICATION RECORDS Class I Component Previous ISI ISI Report Examination ASME XI Results Examined Report Number Category Number HCC-B002 101093 105027 UT B-A Acceptable (HOLES 2040)
RRF-F002 101068 105047 UT R-A Acceptable CRA-KO17AA 101051 105015 VT-3 F-A Acceptable


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part F, page I of 3 I)   Owners: Interstate Power and light Company,         Central Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                          Ilumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part F, page I of 3 I)
P.O. Box 351 Cedar Rapids, IA. 52406
Owners: Interstate Power and light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 2)   Plant   Duane Amold Energy Center, Palo, IA. 52324                       3) Plant Unit: #I
Corn Belt Power Cooperative Ilumbolt, IA.
: 4)   Owners Certificate of Authorization (if required): N/A                   5) Commercial Service Date: 02101/ 75
: 2)
: 6)   National Board Number of Unit: N/A                                       Gross Generating Capacity 614 MWE ABSTRACT OF ASMIE SECTION XI REPAIRS AND REPLACEMENTS The repairs and replacements addressed in this report were performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 1992 with the 1992 Addenda (Ref. Relief Request NDE-RO 15 Rev. 1).
Plant Duane Amold Energy Center, Palo, IA. 52324
NIS-2 NO.       CLASS       COMPONENT                       WORK DOCUMENT              DESCRIPTION 19-03-01           2         SV4334B Containment               CWO A62771                Replaced Main Disc Assembly Atmosphere Dilution N2 Supply Outboard Isolation 19-03-02           1         Spare Main Steam                  PO 19829                  Spare Main Steam Safety/Relief Safety Relief Valve                                         Valves were repaired and tested Pilots 19-03-05           2         SV4333A Containment CWO A62941                              Replaced Main Disc Assembly Atmosphere Dilution N2 Supply Inboard Isolation 19-03-06           1         Spare Main Steam                  PO 19829                  Spare Main Steam Safety/Relief Safety Relief Valve                                         Valve was repaired and tested Pilot 19-03-09           2         M01055 Moisture                   CWO A64131                Welded guide slots to improve Separator Reheat                 &                        alignment Steam Supply                     CWO A68176 19-03-10           2         IP216 & IP216A                   CWO A63477                Installed piping supports for seal High Pressure Coolant &                                    water piping Injection Pump                   CW0 A63478 19-03-11           2         lP21IB Core Spray               MWO 1126361              Replaced pump seal with a design Pump                                                       for higher temperatures 19-03-13           2         M04323A                           CWO A51965                Seal welded bonnet to body Containment Atmosphere Dilution Supply 19-03-14           1         PSV4401 Main Steam               PWO 1128061               Pilot Valve S/N 201 was rotated in Relief Valve                                                place of S/N 226 19-05-01          2        CV1064 Main Steam                CWO A67068                Removed and replaced seal weld on Drain Isolation                                            bonnet for valve disassembly 19-05-02          2          1P211A Core Spray                MWO 1126360              Replaced pump seal with a design Pump                                                        for higher temperatures 19-05-03          2          lP21IB Core Spray                MWO 1130269              Replaced pump seal in order to add Pump                                                        a spacer 19-05-04           2         1P229A Residual Heat PWO 1127332                          Replaced snubber DA-53 with Removal Pump Torus                                         snubber DA-250 Suction Line Snubber
: 4)
Owners Certificate of Authorization (if required): N/A
: 6)
National Board Number of Unit: N/A
: 3) Plant Unit: #I
: 5) Commercial Service Date: 02101/ 75 Gross Generating Capacity 614 MWE ABSTRACT OF ASMIE SECTION XI REPAIRS AND REPLACEMENTS The repairs and replacements addressed in this report were performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 1992 with the 1992 Addenda (Ref. Relief Request NDE-RO 15 Rev. 1).
NIS-2 NO.
CLASS COMPONENT 19-03-01 2
SV4334B Containment Atmosphere Dilution N2 Supply Outboard Isolation 19-03-02 1
Spare Main Steam Safety Relief Valve Pilots 19-03-05 2
SV4333A Containment Atmosphere Dilution N2 Supply Inboard Isolation 19-03-06 1
Spare Main Steam Safety Relief Valve Pilot 19-03-09 2
M01055 Moisture Separator Reheat Steam Supply 19-03-10 2
IP216 & IP216A High Pressure Coolant Injection Pump 19-03-11 2
lP21IB Core Spray Pump 19-03-13 2
M04323A Containment Atmosphere Dilution Supply 19-03-14 1
PSV4401 Main Steam Relief Valve 19-05-01 2
CV1064 Main Steam Drain Isolation 19-05-02 2
1P211A Core Spray WORK DOCUMENT DESCRIPTION CWO A62771 Replaced Main Disc Assembly PO 19829 CWO A62941 PO 19829 CWO A64131 CWO A68176 CWO A63477 CW0 A63478 MWO 1126361 CWO A51965 PWO 1128061 CWO A67068 MWO 1126360 MWO 1130269 PWO 1127332 Spare Main Steam Safety/Relief Valves were repaired and tested Replaced Main Disc Assembly Spare Main Steam Safety/Relief Valve was repaired and tested Welded guide slots to improve alignment Installed piping supports for seal water piping Replaced pump seal with a design for higher temperatures Seal welded bonnet to body Pilot Valve S/N 201 was rotated in place of S/N 226 Removed and replaced seal weld on bonnet for valve disassembly Replaced pump seal with a design for higher temperatures Replaced pump seal in order to add a spacer Replaced snubber DA-53 with snubber DA-250 19-05-03 19-05-04 Pump 2
lP21IB Core Spray Pump 2
1P229A Residual Heat Removal Pump Torus Suction Line Snubber


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3,2005 Part F, page 2 of 3 I)   Owners: Interstate Power and Light Company,         Central Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                          Ilumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3,2005 Part F, page 2 of 3 Corn Belt Power Cooperative Ilumbolt, IA.
P.O. Box 351 Cedar Rapids, IA. 52406
I)
: 2)   Plant: Duane Arnold Energy Center, Palo, IA. 52324                       3) Plant Unit: #1
Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 4)   Owners Certificate of Authorization (if required): N/A                   5) Commercial Service Date: 02/10175
: 2)
: 6)   National Board Number of Unit: N/A                                       Gross Generxing Capacity: 614 MVE ABSTRACT OF ASME SECTION XI REPAIRS AND REPLACEMENTS (cont.)
Plant:
Duane Arnold Energy Center, Palo, IA. 52324
: 4)
Owners Certificate of Authorization (if required): N/A
: 6)
National Board Number of Unit: N/A
: 3) Plant Unit: #1
: 5) Commercial Service Date: 02/10175 Gross Generxing Capacity: 614 MVE ABSTRACT OF ASME SECTION XI REPAIRS AND REPLACEMENTS (cont.)
The repairs and replacements addressed in this report were performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 1992 with the 1992 Addenda (Ref. Relief Request NDE-R015 Rev. l).
The repairs and replacements addressed in this report were performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 1992 with the 1992 Addenda (Ref. Relief Request NDE-R015 Rev. l).
NIS-2 NO.       CLASS       COMPONENT                       WORK DOCUMENT              DESCRIPTION 19-05-09           1         Core Spray Dissimilar             PWO 1129011 &            Ground the crowns from welds Metal Pipe Welds                 CWO A67445                CSA-F002 and CSA-F004 19-05-10           1         Reactor Water                     CWO A66243 &              Ground the crown from weld CUB-Cleanup Dissimilar               PWO 1129234              F004 Metal Pipe Weld 19-05-11           1         DLA-6-H-8 and DLA-               MWO 1129050              Replaced bolt, nut, and added the 6-SS-13 Residual Heat                                       clamp support bars on clamp hanger Removal Piping 19-05-12           1         Control Rod Drives               PWOs 1129089-             Replaced bolting and control rod 1129095 & CWO            drives at 06-23, 10-11, 10-23, 14-A067500                  07, 14-11, 14-23, 18-31 locations 19-05-13          2        M02112 'A' Core                  MWO A63071                Replaced valve disc Spray Test Bypass 19-05-15          2        XS2618B Standby                  PWO 1128161              Replaced explosive valve Liquid Control SQUIB 19-05-16          1        Control Rod Drives                PWOs 1129096-            Replaced bolting and control rod 1129102 & CWO            drives at 22-03, 22-07, 22-11, 22-A067500                  31, 26-11, 26-31, 30-15 locations 19-05-17          1        Control Rod Drives                PWOs 1129104,            Replaced bolting and control rod 1129105, 129107,          drives at 30-39, 34-07,34-39, 34-1129114,1132803          11, 30-31 locations
NIS-2 NO.
                                                                & CWO A067500 19-05-18          2        HCU Accumulators                  PWOs 1132908,            Replaced HCU Accumulators at 02-1129109, 129108,          19, 34-23, 10-23, 10-15, 30-39, 14-1132909, 129110,          27, 42-23 locations 1129113 & CWO A65092 19-05-19          2        CVI 064 Main Steam                CWO A54646                Replaced CV1064 with a valve that Drain Isolation                                            has a heavier operator, and installed new supports 19-05-20          1        Reactor Recirculation            CWO A64843                Removed weld crown on RRF-F002 Riser Dissimilar Metal                                      weld by Machining Weld 19-05-21          1        Reactor Recirculation            CWO A64844              Removed weld crown on RRG-Riser Dissimilar Metal                                    F002 weld by machining.
CLASS COMPONENT 19-05-09 1
Weld
Core Spray Dissimilar Metal Pipe Welds 19-05-10 1
Reactor Water Cleanup Dissimilar Metal Pipe Weld 19-05-11 1
DLA-6-H-8 and DLA-6-SS-13 Residual Heat Removal Piping 19-05-12 1
Control Rod Drives 19-05-13 2
M02112 'A' Core Spray Test Bypass 19-05-15 2
XS2618B Standby Liquid Control SQUIB 19-05-16 1
Control Rod Drives 19-05-17 1
Control Rod Drives 19-05-18 2
HCU Accumulators 19-05-19 2
CVI 064 Main Steam Drain Isolation 19-05-20 1
Reactor Recirculation Riser Dissimilar Metal Weld 19-05-21 1
Reactor Recirculation Riser Dissimilar Metal Weld WORK DOCUMENT PWO 1129011 &
CWO A67445 CWO A66243 &
PWO 1129234 MWO 1129050 PWOs 1129089-1129095 & CWO A067500 MWO A63071 PWO 1128161 PWOs 1129096-1129102 & CWO A067500 PWOs 1129104, 1129105, 129107, 1129114,1132803
& CWO A067500 PWOs 1132908, 1129109, 129108, 1132909, 129110, 1129113 & CWO A65092 CWO A54646 CWO A64843 CWO A64844 DESCRIPTION Ground the crowns from welds CSA-F002 and CSA-F004 Ground the crown from weld CUB-F004 Replaced bolt, nut, and added the clamp support bars on clamp hanger Replaced bolting and control rod drives at 06-23, 10-11, 10-23, 14-07, 14-11, 14-23, 18-31 locations Replaced valve disc Replaced explosive valve Replaced bolting and control rod drives at 22-03, 22-07, 22-11, 22-31, 26-11, 26-31, 30-15 locations Replaced bolting and control rod drives at 30-39, 34-07,34-39, 34-11, 30-31 locations Replaced HCU Accumulators at 02-19, 34-23, 10-23, 10-15, 30-39, 14-27, 42-23 locations Replaced CV1064 with a valve that has a heavier operator, and installed new supports Removed weld crown on RRF-F002 weld by Machining Removed weld crown on RRG-F002 weld by machining.


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part F, page 3 of 3 I)   Owners: Interstate Power and Light Company,         Central Iowa Power Cooperative       Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                         Hlumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part F, page 3 of 3 I)
Owners: Interstate Power and Light Company, Central Iowa Power Cooperative Corn Belt Power Cooperative an Alliant Company Marion, IA.
Hlumbolt, IA.
P.O. Box 351 Cedar Rapids, IA. 52406
P.O. Box 351 Cedar Rapids, IA. 52406
: 2)   Plant Du3neAmoldEnergyCenter,Palo,IA. 52324                             3) Plant Unit: #l
: 2)
: 4)   Owners Certificate of Authorization (if required): N/A                   5) Commercial Service Date: 02on15
Plant Du3neAmoldEnergyCenter,Palo,IA. 52324
: 6)   NationalBoardNumberofUnit:       N/A                                     Gross Generating Capacity- 614MWE ABSTRACT OF ASMIE SECTION XI REPAIRS AND REPLACEMENTS (cont.)
: 3) Plant Unit: #l
: 4)
Owners Certificate of Authorization (if required): N/A
: 5) Commercial Service Date: 02on 15
: 6)
NationalBoardNumberofUnit:
N/A Gross Generating Capacity-614MWE ABSTRACT OF ASMIE SECTION XI REPAIRS AND REPLACEMENTS (cont.)
The repairs and replacements addressed in this report were performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 1992 with the 1992 Addenda (Ref. Relief Request NDE-RO1 5 Rev. 1).*
The repairs and replacements addressed in this report were performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 1992 with the 1992 Addenda (Ref. Relief Request NDE-RO1 5 Rev. 1).*
NIS-2 NO.       CLASS         COMPONENT                       WORK DOCUMENT              DESCRIPTION 19-05-22           1         Reactor Recirculation               CWO A66133            Blended arc strike on weld RRD-Riser Weld                                                 J005 19-05-23           1         CRD Return                           PWO 1129048            Ground down weld crown on weld Dissimilar metal Weld                                       CRA-J032 19-05-25           1         PSV4400 Main Steam                   PWO 1128060           Pilot Valve S/N 207 was rotated in Relief Valve                                                place of SIN 218 19-05-26          1        PSV4402 Main Steam                  PWO 1128063            Pilot Valve SIN 200 was rotated in Relief Valve                                                place of S/N 189 19-05-27          1        PSV4405 Main Steam                  PWO 1128066            Pilot Valve SIN 176 was rotated in Relief Valve                                                place of SIN 141 19-05-28          1        PSV4406 Main Steam                  PWO 1128067            Pilot Valve S/N 227 was rotated in Relief Valve                                                place of S/N 203 19-05-29          1        PSV4407 Main Steam                  PWO 1128068            Pilot Valve S/N 199 was rotated in Relief Valve                                                place of S/N 202 19-05-30          1        PSV4401 Main Steam                  PWO 1128062            Main Valve Body S/N 201 was Relief Valve                                                rotated in place of S/N 141 19-05-31          1        PSV4407 Main Steam                  PWO 1128069            Main Valve Body S/N 218 was Relief Valve                                                rotated in place of SIN 202 19-05-32          2        12" HLE014 RHR                      CWO A71357            Replace 18" length section of 12" Test Line                                                  diameter HLE014 19-05-33          2        18" HLE023                          MWO 1132980            Repaired containment vent piping Containment Vent                                            to allow for containment thermal growth 19-05-34          2        HLE0335 Drywell                    MWO 1133017            Removed Hanger HLE-35-SR-79 Cooling Well Water                                          from HLE035 to allow for containment thermal growth
NIS-2 NO.
CLASS COMPONENT 19-05-22 1
Reactor Recirculation Riser Weld 19-05-23 1
CRD Return Dissimilar metal Weld 19-05-25 1
PSV4400 Main Steam Relief Valve 19-05-26 1
PSV4402 Main Steam Relief Valve 19-05-27 1
PSV4405 Main Steam Relief Valve 19-05-28 1
PSV4406 Main Steam Relief Valve 19-05-29 1
PSV4407 Main Steam Relief Valve 19-05-30 1
PSV4401 Main Steam Relief Valve 19-05-31 1
PSV4407 Main Steam Relief Valve 19-05-32 2
12" HLE014 RHR Test Line 19-05-33 2
18" HLE023 Containment Vent 19-05-34 2
HLE0335 Drywell Cooling Well Water WORK DOCUMENT CWO A66133 PWO 1129048 PWO 1128060 PWO 1128063 PWO 1128066 PWO 1128067 PWO 1128068 PWO 1128062 PWO 1128069 CWO A71357 MWO 1132980 MWO 1133017 DESCRIPTION Blended arc strike on weld RRD-J005 Ground down weld crown on weld CRA-J032 Pilot Valve S/N 207 was rotated in place of SIN 218 Pilot Valve SIN 200 was rotated in place of S/N 189 Pilot Valve SIN 176 was rotated in place of SIN 141 Pilot Valve S/N 227 was rotated in place of S/N 203 Pilot Valve S/N 199 was rotated in place of S/N 202 Main Valve Body S/N 201 was rotated in place of S/N 141 Main Valve Body S/N 218 was rotated in place of SIN 202 Replace 18" length section of 12" diameter HLE014 Repaired containment vent piping to allow for containment thermal growth Removed Hanger HLE-35-SR-79 from HLE035 to allow for containment thermal growth


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part G, page I of 75 I) Owners: Interstate Power and Light Company,         C entral Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                          Hlumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part G, page I of 75 Corn Belt Power Cooperative Hlumbolt, IA.
I)
Owners: Interstate Power and Light Company, C
an Alliant Company M
P.O. Box 351 Cedar Rapids, LA. 52406
P.O. Box 351 Cedar Rapids, LA. 52406
: 2)   Plant: Duane Amold Energy Center, Palo, IA. 52324                         3) Plant Unit: #I
: 2)
: 4)   Owners Certificate of Authorization (ifrequired): N/A                     5) Commercial Service Date: 02/0 1175
Plant:
: 6) National Board Number of Unit: N/A                                         Gross Generating Capacity: 614 MWE Form NIS-2's
Duane Amold Energy Center, Palo, IA. 52324
: 4)
Owners Certificate of Authorization (ifrequired): N/A
: 6)
National Board Number of Unit: N/A entral Iowa Power Cooperative arion, IA.
: 3) Plant Unit: #I
: 5) Commercial Service Date: 02/0 1175 Gross Generating Capacity: 614 MWE Form NIS-2's


FORM NIS-2 19-03-01 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
FORM NIS-2 19-03-01 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1.     Owners       Alliant Energy (Interstate P & L                   Date                    04108/04 Name P. O. Box 35 1. Cedar Rapids, IA 52406                           Sheet                  1      -Of                2 Address 1-
: 1.
: 2.      Plant         Duane Arnold Energy Center                         Unit Name 3277 DAEC Road, Palo, IA 52324                                                         CWO A62771 Address                                  Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (Interstate P & L Name 2.
: 3.       Work Performed by Nuclear Management Co. LLC                     Type Code Symbol Stamp                 None Name                                         Authorization No.                      None 3277 DAEC Road, Palo, IA 52324                                   Expiration Date                         None
P. O. Box 35 1. Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit 04108/04 1
: 4.       Identification of System:         Containment Atmosphere Dilution, Class 11
-Of 2
: 5.    (a) Applicable Construction Code           ASME Section III       19     71     Edition S72         Addenda              Code Case.
1-CWO A62771 Repair Organization to P. 0. No., Job No., etc.
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 r
: 3.
: 6.       Identification of Compone ts Repaired or Re laced and Re lacement Components I                                                                                     Repaired, ASME Code Name of           Name or       Manufacturer                                                       Year Built Component       Manuracturer       Serial No.       National         Other Identification                     Replaced,or Stamped (fanger No.)                                         Board No.                                                   Replacement (YES or Main DisTargeRoc                     SIN22-                                 Work OrderS4                            I Rt             NO)
Work Performed by Nuclear Management Co. LLC Type Code Symbol Stamp None Name 3277 DAEC Road, Palo, IA 52324 Authorization No.
Mtain Disc Assy     Target Rock     S/N 22                 N/A                 SV4334B                     1987     Replacement     No
Expiration Date None None 4.
: 7.       Description of Work:         Replaced Main Disc Assy, P/N 200442-1 in SV4334B on CWO A62771
5.
: 8.      Tests Conducted:                Hydrostatic        [i       Pneumatic         []         Nominal Operating Pressure Other =           Pressure         N/A         psi   Test Temp             N/A       -      F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Identification of System:
Containment Atmosphere Dilution, Class 11 (a) Applicable Construction Code ASME Section III 19 71 Edition S72 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda Code Case.
r6.
Identification of Compone ts Repaired or Re laced and Re lacement Components I
ASME Name of Name or Manufacturer Year Built
: Repaired, Code Component Manuracturer Serial No.
National Other Identification Replaced,or Stamped (fanger No.)
Board No.
Replacement (YES or Main DisTargeRoc SIN22-Work OrderS 4
I Rt NO)
Mtain Disc Assy Target Rock S/N 22 N/A SV4334B 1987 Replacement No
: 7.
Description of Work:
: 8.
Tests Conducted:
Replaced Main Disc Assy, P/N 200442-1 in SV4334B on CWO A62771 Hydrostatic
[i Pneumatic
[]
Nominal Operating Pressure Other =
Pressure N/A psi Test Temp N/A F
NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) Trhis lForm (E00030) maybe obtained from the Order Dept., ASME, 345 E. 47th St., NewYork, NY 10017.
(12/82) Trhis lForm (E00030) maybe obtained from the Order Dept., ASME, 345 E. 47th St., NewYork, NY 10017.


FORM NIS-2 19-03-01 FORM NIS-2 (Back)
FORM NIS-2 19-03-01 FORM NIS-2 (Back)
: 9.       Remarks:     Valve disassembled due to LLRT failure. Main Disc Assy. P/N 200442-1 replaced and valve reassembled. No pressure test reqir*4per ASME Repair Repacement Administrative Document Section 5.1.1 3d.
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this       Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Remarks:
Type Code Symbol Stamp                         None Certificate of Authorizati n No.                     None                Expiration Date              NIA Signed         (Fz:A 6'.,                   TL Equipment
Valve disassembled due to LLRT failure. Main Disc Assy. P/N 200442-1 replaced and valve reassembled. No pressure test reqir*4per ASME Repair Repacement Administrative Document Section 5.1.1 3d.
                                                        = Reliability   Date             991//                 2004 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                   and employed by         IISB CT of                         Hartford, Conn.                         have inspected the components described in this Owner's Report during the period         -_______-    ___3   _    -_-_to             C/-     (-/
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section XI.
4                     ,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Ownier's Report in accordance with the requirements of the ASME Code, Section XI.
Replacement (repair or replacement)
Type Code Symbol Stamp Certificate of Authorizati n No.
Signed (Fz:A None None Expiration Date 6'.,
TL Equipment Reliability Date NIA 991//
2004
=
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period
___3  
-_-_to C/-
(-/
4  
,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Ownier's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shiall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shiall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
I   c s n                       Conunissions Inspector's Signature                               National Board, State, Province, anti Endorsements Date         C/-e                           , 2004 Date       200
I c s n Inspector's Signature Conunissions National Board, State, Province, anti Endorsements Date C/-e
, 2004 Date 200


FORM NIS-2 19-03-02 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
FORM NIS-2 19-03-02 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
: 1.     Owners       Alliant Energy (Interstate P & L Co.)               Date                  07/14/03 Name P. 0. Box 351, Cedar Rapids, IA 52406                           Sheet                  I        of            2 Address
: 1.
: 2.      Plant       Duane Arnold Energy Center                         Unit                  I Name 3277 DAEC Road, Palo, IA 52324                                                         PO 19829 Address                                  Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (Interstate P & L Co.)
: 3. Work Performed by Nuclear Maiianement Co. LLC                     Type Code Symbol Stamp               None Name                                          Authorization No.                     None 3277 DAEC Road, Palo, IA 523224                                  Expiration Date                       None
Name 2.
: 4. Identification of System:           Spare Main Steam Safety Relief Valve Pilots (Class 1)
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit 07/14/03 I
: 5.    (a) Applicable Construction Code           ASME, Section III     19     68     Edition W68       Addenda       N/A   Code Case.
of 2
I PO 19829 Repair Organization to P. 0. No., Job No., etc.
: 3.
Work Performed by Nuclear Mai Name 3277 DAEC Road, Palo, IA 5232 ianement Co. LLC Type Code Symbol Stamp Authorization No.
24 Expiration Date None None None 4.
5.
Identification of System:
Spare Main Steam Safety Relief Valve Pilots (Class 1)
(a) Applicable Construction Code ASME, Section III 19 68 Edition W68 Addenda N/A Code Case.
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
: 6. Identuicauon o mlomponenis Repaired or Relaced and K placement Components ASME Name of           Name or       Manufacturer                                                   Year Built     Repaired,     Code Component       Manufacturer       Serial No.       National       Other Identification                       Replaced, or Stamped Board No.                                                 Replacement   (YES or NO)
: 6.
.PilotDisc          Target Rock           SIN 358             -NA       sparc Pilot (SIN 176)         Unknown         Repair       No
Identuicauon o
  'stage Disc       Target Rock           S/N 15           N/A         Spare Pilot (S/N 176)         Unknown         Repair       No jPreload Spacer     Target Rock           S/N 8           N/A         Spare Pilot (S/N 176)         Unknown       Repair         No Pilot Disc           Target Rock           S/N 615           NIA         Spare Pilot (SIN 199)         Unknown         Repair       No 2"d Stage Disc       Target Rock           S/N 50           N/A         Spare Pilot (SIN 199)         Unknown       Repair         No Preload Spacer       Target Rock           SIN 575           N/A         Spare Pilot (SIN 199)         Unknown       Repair         No Pilot Disc           Target Rock           SIN 390           N/A         Sparm Pilot (S/N 227)         Unknown       Repair         No 2-' Stage Disc       Target Rock           S/N 16           NIA         Spare Pilot (S/N 227)         Unknown       Repair         No Preload Spacer       Target Rock           S/N 574           N/A         Spare Pilot (S/N 227)         Unknown       Repair         No Pilot Disc           Target Rock           S/N 619           N/A         Spare Pilot (SIN 207)         Unknown       Repair         No 2" Stage Disc       Target Rock           S/N 73           N/A         Spare Pilot (S/N 207)         Unknown       Repair         No Preload Spacer       Target Rock         S/N 1037           N/A         Spare Pilot (S/N 201)           1999         Replace       No Pilot Disc           Target Rock         S/N 625           N/A         Spare Pilot (S/N 201)           1993       Replace         No 2- Stage Disc       Target Rock       - SIN 536           N/A         Spare Pilot (S/N 201)           1993         Repair         No
mlomponenis Repaired or Re laced and K placement Components ASME Name of Name or Manufacturer Year Built
: 7.     Description of Work:         Spare Main Steam Safety/Relief Valves were repaired and tested at NWS facilities
: Repaired, Code Component Manufacturer Serial No.
: 8.     Tests Conducted:                 Hydrostatic       [.         Pneumatic         [j,       Nominal Operating Pressure Other [         Pressure
National Other Identification Replaced, or Stamped Board No.
* psi       Test Temp
Replacement (YES or NO)
* F
.Pilot Disc Target Rock SIN 358  
-NA sparc Pilot (SIN 176)
Unknown Repair No
'stage Disc Target Rock S/N 15 N/A Spare Pilot (S/N 176)
Unknown Repair No jPreload Spacer Target Rock S/N 8 N/A Spare Pilot (S/N 176)
Unknown Repair No Pilot Disc Target Rock S/N 615 NIA Spare Pilot (SIN 199)
Unknown Repair No 2"d Stage Disc Target Rock S/N 50 N/A Spare Pilot (SIN 199)
Unknown Repair No Preload Spacer Target Rock SIN 575 N/A Spare Pilot (SIN 199)
Unknown Repair No Pilot Disc Target Rock SIN 390 N/A Sparm Pilot (S/N 227)
Unknown Repair No 2-' Stage Disc Target Rock S/N 16 NIA Spare Pilot (S/N 227)
Unknown Repair No Preload Spacer Target Rock S/N 574 N/A Spare Pilot (S/N 227)
Unknown Repair No Pilot Disc Target Rock S/N 619 N/A Spare Pilot (SIN 207)
Unknown Repair No 2" Stage Disc Target Rock S/N 73 N/A Spare Pilot (S/N 207)
Unknown Repair No Preload Spacer Target Rock S/N 1037 N/A Spare Pilot (S/N 201) 1999 Replace No Pilot Disc Target Rock S/N 625 N/A Spare Pilot (S/N 201) 1993 Replace No 2-Stage Disc Target Rock  
- SIN 536 N/A Spare Pilot (S/N 201) 1993 Repair No
: 7.
Description of Work:
Spare Main Steam Safety/Relief Valves were repaired and tested at NWS facilities
: 8.
Tests Conducted:
Hydrostatic
[.
Pneumatic
[j, Nominal Operating Pressure Other [
Pressure psi Test Temp F
*These are spare pilot valves.
*These are spare pilot valves.
NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Line 239: Line 560:


FORM NIS-2 19-03-02 FORM NIS-2 (Back)
FORM NIS-2 19-03-02 FORM NIS-2 (Back)
: 9.       Remarks:     Pilot Valves (S/N's 176. 199. 201, 207. 227) were removed during RFOI7 and sent to NWS Tech. for testing And refurbishment. During the refurbishment it was necessary to machine the pilot discs.
: 9.
Remarks:
Pilot Valves (S/N's 176. 199. 201, 207. 227) were removed during RFOI7 and sent to NWS Tech. for testing And refurbishment. During the refurbishment it was necessary to machine the pilot discs.
2'd stane discs and preload spacers for S/N's 176. 199. and 227. The pilot disc and 2tnd stage disc were machined on S/N 207.
2'd stane discs and preload spacers for S/N's 176. 199. and 227. The pilot disc and 2tnd stage disc were machined on S/N 207.
PT exams were successfully performed on the machined surfaces for the above discs and spacers. The pilot disc and preload spacer were replaced on S/N 201. and preservice VT-3s were performed on the parts prior to shipping the items to NWS. The new 2n staye disc for S/N 201 was machined, and successful PT was performed on the machined surface. The preload spacer and the pilot stem were drilled and pinned together for SIN 201. After the above mentioned repairs, all five valve pilots were tested and found to have three successive tests that were acceptable.
PT exams were successfully performed on the machined surfaces for the above discs and spacers. The pilot disc and preload spacer were replaced on S/N 201. and preservice VT-3s were performed on the parts prior to shipping the items to NWS. The new 2n staye disc for S/N 201 was machined, and successful PT was performed on the machined surface. The preload spacer and the pilot stem were drilled and pinned together for SIN 201. After the above mentioned repairs, all five valve pilots were tested and found to have three successive tests that were acceptable.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Repair/Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair/Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                         None Certificate of Authorization No.                     None               Expiration Date               N/A Signed                   a               Sup. Equipment Reliability   Date     & e'u           /3             2003 Owner f Owner's Designee, Title                                                         200 I
Type Code Symbol Stamp None Certificate of Authorization No.
CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                   and employed by       HSB CT of                           Hartford, Conn.                         have inspected the components described in this Owner's Report during the period         y-/o-c,3       -             to     _  -
None Expiration Date N/A Signed a
_3   _        _  _on                 ,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code; Section XI.
Sup. Equipment Reliability Date  
& e'u  
/3 2003 Owner f Owner's Designee, Title 200 I
CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period y-/o-c,3 -
to
_3
_on  
,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code; Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
__                                      Commissions       /VP, J;?-),1             a4,         /y A, .r,--
Commissions  
Inspector's Signature                               National Board, State, Province, and Endorsements Date     R -1                             ,,22003
/VP, J;?-),1 a4,  
/y A,.r,--
Inspector's Signature National Board, State, Province, and Endorsements Date R -1  
,2
, 2003


FORM NIS-2 19-03-05 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
FORM NIS-2 19-03-05 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1.       Owners       Alliant Energy (Interstate P & L)                 Date                    04/08/04 Name P. 0. Box 351, Cedar Rapids, IA 52406                           Sheet                  1        Of            2 Address
: 1.
: 2.      Plant    -Duane     Arnold Energy Center                       Unit                    1 Name 3277 DAEC Road, Palo, IA 52324                                                         CWO A62941 Address                                  Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (Interstate P & L)
: 3.       Work Performed by Nuclear Mat iageement Co. LLC                 Type Code Symbol Stamp                 None Name                                        Authorization No.                     None 3277 DAEC Road, Palo, IA 5232 A4                                 Expiration Date                       None
Name 2.
: 4.       Identification of System:           Containment Atmosphere Dilution, Class II
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant
: 5.      (a) Applicable Construction Code           ASME Section III     19     71     Edition S72       Addenda              Code Case.
-Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit 04/08/04 1
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
Of 2
: 6.       Identificati on of Components Repaired or Re laced and Re placement Components ASME Name of             Name of       Manufacturer                                                     YearBuilt   Repaired,     Code Component         Manufacturer       Serial No.       National         Other Identification                     Replaced, or Stamped (1(anger No.)                                           Board No.                                                 Replacement   (YES or
1 CWO A62941 Repair Organization to P. 0. No., Job No., etc.
_workOrder/SUS                         l                 NO)
: 3.
Main Disc Assy         Target Rock     SIN 14                 N/A                 SV4333A                   1999     Replacement     No
Work Performed by Nuclear Mat Name 3277 DAEC Road, Palo, IA 5232 iageement Co. LLC Type Code Symbol Stamp Authorization No.
: 7.       Description of Work:         Replaced Main Disc Assy, P/N 200442-1 in SV4333A on CWO A62941
A4 Expiration Date None None None 4.
: 8.       Tests Conducted:                 Hydrostatic       [         Pneumatic         [I]         Nominal Operating Pressure Other   E         Pressure         N/A         psi   Test Temp             N/A           °F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (l) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
5.
Identification of System:
Containment Atmosphere Dilution, Class II (a) Applicable Construction Code ASME Section III 19 71 Edition S72 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda Code Case.
: 6.
Identificati on of Components Repaired or Re laced and Re placement Components ASME Name of Name of Manufacturer YearBuilt
: Repaired, Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped (1(anger No.)
Board No.
Replacement (YES or
_workOrder/SUS l
NO)
Main Disc Assy Target Rock SIN 14 N/A SV4333A 1999 Replacement No
: 7.
Description of Work:
Replaced Main Disc Assy, P/N 200442-1 in SV4333A on CWO A62941
: 8.
Tests Conducted:
Hydrostatic
[
Pneumatic
[I]
Nominal Operating Pressure Other E Pressure N/A psi Test Temp N/A  
° F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (l) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


FORM NIS-2 19-03-05 FORM NIS-2 (Back)
FORM NIS-2 19-03-05 FORM NIS-2 (Back)
: 9.       Remarks:     Valve disassembled due lo LLRT failure. Main Disc Assy. P/N 200442-1 replaced and valve reassembled. No prlessure test required per ASME Repair Repacement Administrative Document Section 5.1.1 3d.
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Remarks:
Type Code Symbol Stamp                           None Certificate of Authorizatioy No.                     None             Expii -ation Date               N/A Signed 60    9                      TL Equipment Reliability Owner or Owner's Designee, Title Date              Il,/    /u              2004 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                           Iowa                 and employed by         IiSB CT of                           Hartford, Conn.                       have inspected the components described in this Owner's Report during the period         z-- )j -_6 3                 to           (4- q- 0 i                       , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
Valve disassembled due lo LLRT failure. Main Disc Assy. P/N 200442-1 replaced and valve reassembled. No prlessure test required per ASME Repair Repacement Administrative Document Section 5.1.1 3d.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section XI.
Replacement (repair or replacement)
Type Code Symbol Stamp None Certificate of Authorizatioy No.
None Expii Signed 60 9
TL Equipment Reliability Date
-ation Date N/A Il,/ /u 2004 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IiSB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period z-- )j -_ 6 3 to (4-q- 0 i  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions       AVA r'i%           X     F..       / i9       -i Inspector's Signature                               National Board, State, Province, and Endorsements Date        A- I                              , 2004
Commissions AVA r'i%
X F..
/ i9  
-i Inspector's Signature Date A-I National Board, State, Province, and Endorsements
, 2004


FORM NIS-2 19-03-06 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
FORM NIS-2 19-03-06 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owners       Alliant Energy (Interstate P & L Co.)                 Date                   10/22/03 Name P. 0. Box 351, Cedar Rapids, IA 52406                               Sheet                  1        of            2 Address
: 1.
: 2. Plant         Duane Arnold Energy Center                             Unit                  1 Name 3277 DAEC Road, Palo, IA 52324                                                             PO 19829 Address                                      Repair Organization to P. O. No., Job No., etc.
Owners Alliant Energy (Interstate P & L Co.)
: 3. Work Performed by Nuclear Mai ,iapement Co. LLC                       Type Code Symbol Stamp               None Name                                            Authorization No.                     None 3277 DAEC Road, Palo, IA 523224                                -_______
Name Date 2.
Expiration Date                     None
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 10/22/03 1
* 4. Identification of System:           Spare Main Steam Safety Relief Valve Pilot (Class 1)
of 2
: 5.  (a) Applicable Construction Code             ASME, Section III       19     68 Edition W68             Addenda      N/A    Code Case.
1 PO 19829 Repair Organization to P. O. No., Job No., etc.
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 ot Components Repaired or Relaced and Keplacement Components r
: 3.
: 6. Identilicatlon
Work Performed by Nuclear Mai Name 3277 DAEC Road, Palo, IA 5232
                                                            .                                                                            ASME Name of           Name of       Manufacturer                                                     Year Built     Repaired,     Code Component       M1anuracturer       Serial No.       National         Other Identification                       Replaced, or Stamped Board No.                                                 Replacement   (YES or NO)
,iapement Co. LLC Type Code Symbol Stamp Authorization No.
Pilot Disc           Target Rock           SIN 269           N/A           Spare Pilot (S/N 200)         Unknown       Repair       No 2 Stage Disc         Target Rock           S/N 85             N/A           Spare Pilot (SIN 200)         Unknown       Repair         No Pilot Base           Target Rock                               N/A           Spare Pilot (SIN 200)         Unknown       Repair         No SR                                                      a
24 Expiration Date None None None
: 7. Description of Work:           Spare Main Steamn Safety/Relief Valve 'wasrepaired and tested at NWS facilities
* 4.
: 8. Tests Conducted:                   Hydrostatic       [j]         Pneumatic         [I]       Nominal Operating Pressure     EZn Other.             Pressure
5.
* psi     Test Temp
Identification of System:
* F
Spare Main Steam Safety Relief Valve Pilot (Class 1)
  *This is spare pilot valve.
(a) Applicable Construction Code ASME, Section III 19 68 Edition W68 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.
r6.
Identilicatlon ot Components Repaired or Relaced and Keplacement Components ASME Name of Name of Manufacturer Year Built
: Repaired, Code Component M1anuracturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YES or NO)
Pilot Disc Target Rock SIN 269 N/A Spare Pilot (S/N 200)
Unknown Repair No 2 Stage Disc Target Rock S/N 85 N/A Spare Pilot (SIN 200)
Unknown Repair No Pilot Base Target Rock N/A Spare Pilot (SIN 200)
Unknown Repair No
: 7.
Description of Work:
SR a
Spare Main Steamn Safety/Relief Valve 'was repaired and tested at NWS facilities
: 8.
Tests Conducted:
Hydrostatic
[j]
Pneumatic
[I]
Nominal Operating Pressure EZn Other.
Pressure psi Test Temp F
*This is spare pilot valve.
NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) maybe obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) maybe obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


FORM NIS-2 19-03-06 FORM NIS-2 (Back)
FORM NIS-2 19-03-06 FORM NIS-2 (Back)
: 9.       Remarks:       Pilot Valve (S/N 200) was removed duriniz RFO18 and sent to NWS Tech. for testineg And refiurbhhment     liirine the refiirhishment it was n ecTrv tn maihine the     plilnt disc 2"d stane disc and weld a new seat into the base of the pilot. PT exams were successfully performed on the machined and welded surfaces.
: 9.
CERTIFICATE OF COMPLM We certify that the statements made in the report are correct and this (repair or replacement) conforms to the rules of the ASME Code, Section Xl.
Remarks:
Type Code Symbol Stamp                         None Certificate of Authorization No.                     None                 Expi ration Date                N/A Signed                                   Sup. Equipment Reliability       Date       DCf e                                2003 Ownl~r or Owner's Designee, Title I
Pilot Valve (S/N 200) was removed duriniz RFO18 and sent to NWS Tech. for testineg And refiurbhhment liirine the refiirhishment it was n ecTrv tn maihine the plilnt disc 2"d stane disc and weld a new seat into the base of the pilot. PT exams were successfully performed on the machined and welded surfaces.
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                     and employed by       HSB CT of                           Hartford, Corn.                           have inspected the components described in this Owner's Report during the period       C- /q-M63                         to       AD -)Vy o3:                               , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
CERTIFICATE OF COMPLM We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp None Certificate of Authorization No.
None Expi Signed Sup. Equipment Reliability Date Ownl~r or Owner's Designee, Title (repair or replacement) ration Date e
DCf N/A 2003 I
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Corn.
have inspected the components described in this Owner's Report during the period C- /q-M63 to AD -)Vy o3:  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
______                  _              Commissions               V       I)3)A.i.                 I./q(,     -PX Inspector's Signature                                 National Board, State, Province, and Endorsements Date     1d-     q.-/                       ,2003
Commissions V
I)3)A.i.
I. /q(,  
-PX Inspector's Signature National Board, State, Province, and Endorsements Date 1d-q.-/  
,2003


FORM NIS-2 19-03-09 Rev. I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi I. Owners       Alliant Energv (Interstate P & L Co.)                 'Date                   7/2 1105                                      I Name P. 0. Box 351, Cedar Rapids, IA 52406                               Sheet                  I          of              2 Address
FORM NIS-2 19-03-09 Rev. I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi I.
: 2. Plant       Duane Arnold Energy Center                             Unit Name 3277 DAEC Road, Palo, IA 52324                                                             CWO A64131 and CWO A68176                     .1 Address                                      Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energv (Interstate P & L Co.)
: 3. Work Performed by Nuclear Marinaement Co. LLC                       Type Code Symbol Stamp                 None Name                                              Authorization No.                     None 3277 DAEC Road, Palo, IA 5232 _4                                     Expiration Date                         None
Name
: 4. Identification of System:           Main Steam Line Second Stage Reheat
'Date 2.
: 5.    (a) Applicable Construction Code           ANSI B31.1               19     67     Edition N/A         Addenda       NIA   Code Case: I (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 7/2 1105 I
: 6. Identification 0fComponents Repaired or Ke paced and Re lacement Components ASMiE Nameof           Name of       Manufacturer                                                       Year Built     Repaired,       Code Component       Manufacturer       Serial No.       National         Other Identification                       Replaced, or Stamped Board No.                                                     Replacement   (YES or N101055           Flowservc Corp.     X00256888         N/A         NMSR IE8A 2< Stage Rchcat           2001         Repaired       No Stm Supply
of 2
: 7. Description of Work:         Welded guide slots to improve alignment. Machined bore to clean up scratches from stem.                     .1
I CWO A64131 and CWO A68176
: 8. Tests Conducted:                 Hydrostatic         z         Pneumatic         0         Nominal Operating Pressure       I4%ZV-Other El           Pressure           968           Psi     Test Temp             552           &deg;F               I NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
.1 Repair Organization to P. 0. No., Job No., etc.
: 3.
Work Performed by Nuclear Mar Name 3277 DAEC Road, Palo, IA 5232 inaement Co. LLC Type Code Symbol Stamp Authorization No.
_4 Expiration Date None None None 4.
5.
Identification of System:
Main Steam Line Second Stage Reheat (a) Applicable Construction Code ANSI B31.1 19 67 Edition N/A Addenda NIA Code Case: I (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92
: 6.
Identification 0f Components Repaired or Ke paced and Re lacement Components ASMiE Nameof Name of Manufacturer Year Built
: Repaired, Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YES or N101055 Flowservc Corp.
X00256888 N/A NMSR IE8A 2< Stage Rchcat 2001 Repaired No Stm Supply
: 7.
Description of Work:
Welded guide slots to improve alignment. Machined bore to clean up scratches from stem.
.1
: 8.
Tests Conducted:
Hydrostatic z
Pneumatic 0
Nominal Operating Pressure I 4%ZV-Other El Pressure 968 Psi Test Temp 552  
&deg; F I
NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


                                                                                                                                    ---------  L-LUL FORNI NIS-2 19-03-09 Rev. I FORM NIS-2 (Black)
L-LUL FORNI NIS-2 19-03-09 Rev. I FORM NIS-2 (Black)
: 9.       Remarks:       Welded disc guide slots to obtain the proper clearance P'erformed visuatexaii under work orderA64 13 1.
: 9.
Remarks:
Welded disc guide slots to obtain the proper clearance P'erformed visuatexaii under work orderA64 13 1.
Successful surface exam was perfonned on the welded areas of the disc Guide slots under work order A68 176.
Successful surface exam was perfonned on the welded areas of the disc Guide slots under work order A68 176.
Machined bonnet bore to remove rough surfaces caused by stem calling. Machined area of bonnet bore was not accessible for a surface exam. VT-2 of the valve was successfullv pe{formoed durino plant startup(C94O Oob).
Machined bonnet bore to remove rough surfaces caused by stem calling. Machined area of bonnet bore was not accessible for a surface exam. VT-2 of the valve was successfullv pe{formoed durino plant startup(C94O Oob).
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Repair (repair or replacement) conforms to the rules of the ASME Code, Section XI.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                         None Certificate of, tho       jon No.                   None               Expiration Date               N/A Signed                 <                  Sup. Equipment Reliability   Date       7C'             ZZ            2005 rOwne(Sr Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                   and employed by         HSB CT of                         Hartford, Conn.                         have inspected the components described in this Owner's Report during the period             .) a -                   To         7- ,2?-Oh                           , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
Type Code Symbol Stamp None Certificate of, tho jon No.
None Expiration Date N/A Signed Sup. Equipment Reliability Date 7C' Z Z 2005 rOwne(Sr Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period  
.) a -
To 7-,2?- Oh  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthennore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthennore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions         JJ         0 via (                   /44(A Inspector's Signature                               National Board, State, Province, and Endorsements Date               )                           09
Commissions JJ 0 via (  
                                            , 2005                                                                                             I
/44(
A Inspector's Signature National Board, State, Province, and Endorsements Date 09
)
, 2005 I


FORM NIS-2 19-03-10 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
FORM NIS-2 19-03-10 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owners       Alliant Energy (Interstate P & L Co.) .             Date                 1/10105 Name P.O. Box 351, Cedar Rapids, IA 52406                               Sheet                1        of            2 Address
: 1.
: 2. Plant         Duane Arnold Energy Center                           Unit                  1 Name 3277 DAEC Road, Palo, IA 52324                                                         PWO A63477 and A63478 Address                                    Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (Interstate P & L Co.).
: 3. Work Performed by Nuclear Mar ianement Co. LLC                   Type Code Symbol Stamp               None Name                                          'Authorization No.                     None 3277 DAEC Road, Palo, IA 5232 24                                 Expiration Date                       None
Name Date 2.
: 4. Identification of System:           High Pressure Coolant Injection'
P.O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 1/10105 1
: 5.     (a) Applicable Construction Code             ASME Draft P & V 19           68 Edition N/A             Addenda     N/A   Code Case:
of 2
1 PWO A63477 and A63478 Repair Organization to P. 0. No., Job No., etc.
: 3.
Work Performed by Nuclear Mar Name 3277 DAEC Road, Palo, IA 5232 ianement Co. LLC Type Code Symbol Stamp
'Authorization No.
24 Expiration Date None None None
: 4.
Identification of System:
High Pressure Coolant Injection'
: 5.
(a) Applicable Construction Code ASME Draft P & V 19 68 Edition N/A Addenda N/A Code Case:
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
: 6. Identification of Components Repaired or Re laced and Re placement Components ASME Name of           Name of         Mbanuracturer                                                   Year Built     Repaired,     Code Component       Manufacturer       Serial No.       National       Other Identification                     Replaced, or Stamped Board No.                                                 Replacement   (YES or 1P216               Byron Jackson       691S1050           N/A             ttPCI Main Pump             1970         Rcpaired       No IP216A              Byron Jackson       691S 1051           NIA           HPCI Booster Pump             1970         Repaired       No
: 6.
___                                                    __t__
Identification of Components Repaired or Re laced and Re placement Components ASME Name of Name of Mbanuracturer Year Built
: 7. Description of Work:         Installed piping supports for seal water piping on main and booster pump flanges.
: Repaired, Code Component Manufacturer Serial No.
S. Tests Conducted:                 Hydrostatic         C         Pneumatic'       []         Nominal Operating Pressure     EZ Other =           Pressure         NA*         Psi Test Temp               NA*           OF
National Other Identification Replaced, or Stamped Board No.
Replacement (YES or 1P216 Byron Jackson 691S1050 N/A ttPCI Main Pump 1970 Rcpaired No I P216A Byron Jackson 691S 1051 NIA HPCI Booster Pump 1970 Repaired No
__t__
: 7.
Description of Work:
Installed piping supports for seal water piping on main and booster pump flanges.
S.
Tests Conducted:
Hydrostatic C
Pneumatic'
[]
Nominal Operating Pressure EZ Other =
Pressure NA*
Psi Test Temp NA*
OF
*Pressure testing not required by IWA4710 since welds did not penetrate through the pressure boundary.
*Pressure testing not required by IWA4710 since welds did not penetrate through the pressure boundary.
NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 12 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 12 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Line 334: Line 792:


FORM NIS-2 19-03-10 FORM NIS-2 (Back)
FORM NIS-2 19-03-10 FORM NIS-2 (Back)
: 9.         Remarks:       Seal lines to I P216, HPCI main pump and I P21 6A. lPCI booster pump were rerouted for easier maintenan, This required two existing cyclone separator supports on I P216 to be ground off of the pump flange. and two larger supports were welded back onto the pump flange. The welds successfully passed surface exams. Also, welded two supports for cyclone separators on IP216A pump flange. Those welds successfully passed surface exams. Machined area of pump flange to permit threading of a larger seal flush line fitting into the seal flange, This area was accessible for a surface exam. A PT exam was performed with no indications. Pressure testing was not required since the welding the supports onto the components did not penetrate through the pressure boundary of the components. as described in IWA4710.
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this             Repair (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Remarks:
Type Code Symbol Stamp                           None Certificate of Authorizan           o.                 None                 Expiration Date               N/A Signed                                       Sup. Equipment Reliabilit     Date   j41Cv'"t       &D4                 2005 wner o0 wner's Designee, Title Ii CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                           Iowa                   and employed by         HSB CT of                             Hartford, Conn.                         have inspected the components described in this Owner's Report during the period         - _-9
Seal lines to I P216, HPCI main pump and I P21 6A. lPCI booster pump were rerouted for easier maintenan, This required two existing cyclone separator supports on I P216 to be ground off of the pump flange. and two larger supports were welded back onto the pump flange. The welds successfully passed surface exams. Also, welded two supports for cyclone separators on IP216A pump flange. Those welds successfully passed surface exams.
                              -      - 0(/               To       3 -?i- 5                                 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
Machined area of pump flange to permit threading of a larger seal flush line fitting into the seal flange, This area was accessible for a surface exam. A PT exam was performed with no indications. Pressure testing was not required since the welding the supports onto the components did not penetrate through the pressure boundary of the components. as described in IWA4710.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp None Certificate of Authorizan
: o.
None Expiration Date N/A Signed Sup. Equipment Reliabilit Date j41Cv'"t &D4 2005 wner o0 wner's Designee, Title Ii CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period  
- _-9  
- 0(/
To 3 -?i-5  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shalt be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shalt be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
________________                          Commissions         A         ) 1 4 A' i             , /'N,           Z9 Inspector's Signature                               National Board, State, Province, and Endorsements Date         3 -,20                             , 2005
Commissions A  
) 1 4 A ' i  
/'N, Z9 Inspector's Signature National Board, State, Province, and Endorsements Date 3 -,20
, 2005


FORM NIS-2 19-03-1_i1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
FORM NIS-2 19-03-1_i1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owners         Alliant Energy (Interstate P & L Co.)                       Date                   419/04 Name P. O. Box 351, Cedar Rapids, IA 52406                                     Sheet                    I        of              2 Address
: 1.
: 2.      Plant         Duane Arnold Energy Center                                   Unit Name 3277 DAEC Road, Palo, IA 52324                                                                   MWO 1126361 Address                                          Repair Organization to P. O. No., Job No., etc.
Owners Alliant Energy (Interstate P & L Co.)
: 3.       Work Performed by Nuclear Manaeement Co. LLC                             Type Code Symbol Stamp                    None Name                                                 Authorization No.                        None 3277 DAEC Road, Palo, IA 52324                                             Expiration Date                         None
Name Date 2.
: 4.       Identification of System:             C'ore Spray
P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 419/04 I
: 5.      (a) Applicable Construction Code               ASME Draft P& V             19       68       Edition   N/A     Addenda       N/A   Code Case:
of 2
MWO 1126361 Repair Organization to P. O. No., Job No., etc.
: 3.
Work Performed by Nuclear Manaeement Co. LLC Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
Expiration Date None None None 4.
5.
Identification of System:
C (a) Applicable Construction Code
'ore Spray ASME Draft P & V 19 68 Edition N/A Addenda N/A Code Case:
N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
: 6.       Identilication of Components Repaired or Kelaced and Re lacement Components ASME Name of           Name Of         Manufacturer                                                           Year Built     Repaired,     Code (Component         Manufacturer         Serial No.         National           Other Identification                         Replaced, or Stamped Board No.                                                         Replacement   (YVES or
-6.
.rcal Gland             FlowScrve             R1SA04765             N/A         11'21 1B Core Spray Pump           2003         Replacement     No Seat Gland Cap         Texas Bolt           IIT# 90940             N/A         I1P2`1IB Core Spray Pump           1995         Replacement     No Screw s                                 _  _  _  _ _  _  _ _  _  _  _  _ _    _  _  _  _  _  _ _  _  _ _  _  _ _ _ _  _  _  _
Identilication of Components Repaired or K elaced and Re lacement Components ASME Name of Name Of Manufacturer Year Built
: 7.       I)escription of Work:         Replaced pump seal with a design for higher temperatures X.       Tests Conducted:                     Hydrostatic             j       Pneumatic           []         Nominal Operating Pressure       X-T Other   EII         Pressure           295             I'si     Test Temp             76.9           0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings maybe used, provided (I) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top olfthis form.
: Repaired, Code (Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YVES or
.rcal Gland FlowScrve R1SA04765 N/A 11'21 1 B Core Spray Pump 2003 Replacement No Seat Gland Cap Texas Bolt IIT# 90940 N/A I1P2`1 IB Core Spray Pump 1995 Replacement No Screw s
: 7.
I)escription of Work:
Replaced pump seal with a design for higher temperatures X.
Tests Conducted:
Hydrostatic j
Pneumatic
[]
Nominal Operating Pressure X-T Other EII Pressure 295 I'si Test Temp 76.9 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings maybe used, provided (I) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top olfthis form.
(I2;'S2) This Form (E00030) may be obtained from the Order Dept.. ASNI., 345 E. 471h St.. New York, NY 10017.
(I2;'S2) This Form (E00030) may be obtained from the Order Dept.. ASNI., 345 E. 471h St.. New York, NY 10017.


FORM NIS-2 19-03-1 1 FORM NIS-2 (Back)
FORM NIS-2 19-03-1 1 FORM NIS-2 (Back)
: 9.       Remarks:         R     _plc Ipumn seat with larger seal designed for higher temperatt re application. Replaced cap screws since new seal is larger. and therefore requires longer cap screws Successfull performed VT-2 exam after installation.
: 9.
CERTIFICATE OF COB4PLIANCE We certify that the statements made in the report are correct and this           Replacement (repair or replacement) conforms to the nrles of the ASME Code, Section Xi.
Remarks:
Type Code Symbol Stamp                           None Certificate of Authoratio- No.                         None                Expiration Date                N/A Signed         ,LLze>e4=t     e       _&    Sup. Equipment Reliability
R
                          'Otner or6%wvner's Designee, Title Date      .62L1,i I/
_plc Ipumn seat with larger seal designed for higher temperatt re application. Replaced cap screws since new seal is larger. and therefore requires longer cap screws Successfull performed VT-2 exam after installation.
                                                                                                    /3.
CERTIFICATE OF COB We certify that the statements made in the report are correct and this conforms to the nrles of the ASME Code, Section Xi.
                                                                                                        /
Type Code Symbol Stamp None 4PLIANCE Replacement (repair or replacement)
2004 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                           Iowa                   and employed by       HSB CT of                           Ilartford, Conn.                         have inspected the components described in this Owner's Report during the period         3 - /--Oct                     To           t-4/4 *e                           , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
Certificate of Authoratio-No.
Signed  
, LLze>e4=t e
'Otner o None Expiration Date N/A Sup. Equipment Reliability Date r6%wvner's Designee, Title
.62L1,i
/3.
2004 I/
/
CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Ilartford, Conn.
have inspected the components described in this Owner's Report during the period 3 - /--Oct To t-4/4 *e  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions           AM)     )XV?9/1-v -r-.
Commissions AM)  
Inspector's Sigllnature                               National Board, State, Province, antd Endorsements Date         Lj-l       c                     , 2004 200
)XV?9/1-v -r-.
Inspector's Sigllnature National Board, State, Province, antd Endorsements Date Lj-l c
200
, 2004


FORM NIS-2 19-03-13 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
FORM NIS-2 19-03-13 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
: 1. Owners       Alliant EnerEgy (Interstate P & L Co.)             Date                   4/13/04 Name P. 0. Box 351, Cedar Rapids, IA 52406                             SI eet                I          of              2 Address
: 1.
: 2. Plant         Duane Arnold Energy Center                         Unit                  1 Name 3277 DAEC Road, Palo, IA 52324                                                         CWO A51965 Address                                    Repair Organization to P. 0. No., Job No., etc.
Owners Alliant EnerEgy (Interstate P & L Co.)
: 3. Work Performed by Nuclear Maiiagement Co. LLC                   Type Code Symbol Stamp                 None Name                                          Authorization No.                       None 3277 DAEC Road, Palo, IA 523224                                  Expiration Date                       None
Name Date 2.
: 4. Identification of System:           Containment Atmosphere Dilution                                                         _  _  _
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address SI eet Unit 4/13/04 I
: 5.    (a) Applicable Construction Code           ASME Section III       19     71     Edition NIA         Addenda        NIA    Code Case:
of 2
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
1 CWO A51965 Repair Organization to P. 0. No., Job No., etc.
: 0. Identilication of Cornponents Repaired or Re laced and K     lacement Components ASME Name of           Name of         Manufacturer                                                   Year Built     Repaired,       Code Component       Manufacturer       Serial No.       National       Other Identification                       Replaced, or   Stamped Board No.                                                   Replacement   (YFS or 1104323ARockwell                           KA034             NA     A CAD SUPI'LY PCV INLET           Unknown       Repaired         No Edwards
: 3.
: 7. Description of Work:         Seal welded bonnet to body and bonnet to motor flange.
Work Performed by Nuclear Mai Name 3277 DAEC Road, Palo, IA 5232 iagement Co. LLC Type Code Symbol Stamp Authorization No.
: 8. Tests Conducted:                   Hydrostatic           I   Pneumatic         E         Nominal Operating Pressure Other =             Pressure                     Psi     Test Temp NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
24 Expiration Date None None None 4.
5.
Identification of System:
Containment Atmosphere Dilution (a) Applicable Construction Code ASME Section III 19 71 Edition NIA (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda NIA Code Case:
: 0.
Identilication of Cornponents Repaired or Re laced and K lacement Components ASME Name of Name of Manufacturer Year Built
: Repaired, Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YFS or 1104323ARockwell KA034 NA A CAD SUPI'LY PCV INLET Unknown Repaired No Edwards
: 7.
Description of Work:
Seal welded bonnet to body and bonnet to motor flange.
: 8.
Tests Conducted:
Hydrostatic I
Pneumatic E
Nominal Operating Pressure Other =
Pressure Psi Test Temp NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(I 2/Z2) This Form (E00030) may be obtained from the Order Dept., ASNE, 345 E. 47th St., New York, NY 10017.
(I 2/Z2) This Form (E00030) may be obtained from the Order Dept., ASNE, 345 E. 47th St., New York, NY 10017.


FORM NIS-2 19-03-13 FORIMI NIS-2 (Back)
FORM NIS-2 19-03-13 FORIMI NIS-2 (Back)
: 9.       Remarks:             Disassembled valve bonnet. During re-assembly seal welded bonnet to bod1and bonnet to the motor flange.
: 9.
Remarks:
Disassembled valve bonnet. During re-assembly seal welded bonnet to bod 1and bonnet to the motor flange.
Successful surface exams were performned on both welds.
Successful surface exams were performned on both welds.
CERTIFICATE OF COMIPLIANCE We certify that the statements made in the report are correct and this               Repair (repair or replacement) conforms to the riles of the ASME Code, Section XI.
CERTIFICATE OF COMIPLIANCE We certify that the statements made in the report are correct and this conforms to the riles of the ASME Code, Section XI.
Type Code Symbol Stamp                               None Certificate of AuthorizatimnNl.                           None               Expii iation Date              N/A
Repair (repair or replacement)
                  ..'                  1 7.
Type Code Symbol Stamp None Certificate of AuthorizatimnNl.
Signed     i           6L4.-- ./c- Sup. Equipment Reliability               Date           A,~~p13.
None Expii
is 2004
: 7.
                \                %Wiiror Q'(ner's Designee, Title                                         I CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                               Iowa                   and employed by         IISB CT of                                 Hartford, Conn.                       have inspected the components described in this Owner's Report during the period             it - ? y. o03               To             L(- My. ot/                       , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
1 Signed i
6L4.--  
./c-Sup. Equipment Reliability Date
\\
%Wiir or Q'(ner's Designee, Title iation Date N/A A,~~p13.
2004 is I
CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period it - ? y. o03 To L(- My. ot/  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions       YA     Q1341.                     t VCq ,   2/'
Commissions YA Q1341.
Inspector's Signature                                    National Board, State, Province, and ]Endorsements Date       -/ 4     -0 Li                     , 20041 20
t VCq,
2/'
National Board, State, Province, and ]Endorsements Inspector's Signature Date  
-/ 4 -0 Li 20
, 20041


FORM NIS-2 19-03-14 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME. Code Section XI I.     Owners         Alliant Eneryv (IES Utilities)                         Date                   03/31/05 Name P'. 0. Box 351. Cedar Rapids, IA 52406                               Sheet                  I        Of                2 Address
FORM NIS-2 19-03-14 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME. Code Section XI I.
: 2.      Plant         Duane Arnold Energy Center                             Unit Name 3277 DAEC Road, Palo, IA 52324                                                             PWO 1128061 Address                                      Repair Organization to P. 0. No.. Job No., etc.
Owners Alliant Eneryv (IES Utilities)
: 3.     Work Performed by Nuclear Mat iagement Co I.LLC                       Type Code Symbol Stamp                 None Name                                            Authorization No.                     None 3277 DAEC Road, Palo, IA 523224                                        Expiration Date                       None
Name Date 2.
: 4.       Identification of System:               Main Steam Safety Relief Valve (Class I)
P'. 0. Box 351. Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 03/31/05 I
: 5.      (a) Applicable Construction Code               ASME III               19     68     Edition W68         Addenda         NIA       Code Case.
Of 2
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92
PWO 1128061 Repair Organization to P. 0. No.. Job No., etc.
: 6.      Identification of Components Repaired or Replaced and Replacement Components AS, ,
: 3.
Name of             Name of         Manufacturer                                                       Year Built     Repaired,         Code Componient         Manufacturer         Serial No.       National         Other Identificalion                       Replaced. or     Slamped (langer No.)                                               Board No.                                                     Replacement     (YFS or Work Order/ SUS                                               NO)
Work Performed by Nuclear Mat Name 3277 DAEC Road, Palo, IA 5232 iagement Co I.LLC Type Code Symbol Stamp Authorization No.
Pluto Valc             Tarect Rock             S/N 201           N/A             PW0 1129061 /83.04             1976       Replacement         Yes I~~~                                           I.-II 4-                 *                    .t           +                                 +             4-             4-4-                 4                   4             4                                 +             4               +
24 Expiration Date None None None 4.
4-                 4                   4             4                                 4             4               4-4-                 4                   4             4                                 4-           4               4-
5.
: 7.       Description of Work:             The Pilot Valve was repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of S/N 226.
Identification of System:
: 8.       Tests Conducted:                     Hydrostatic       E           Pneumatic       El         Nominal Operating Pressure           EJ1 Other       ]       Pressure         955         psi   Test Temp               514             0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Main Steam Safety Relief Valve (Class I)
(a) Applicable Construction Code ASME III 19 68 Edition W68 Addenda NIA Code Case.
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Identification of Components Repaired or Replaced and Replacement Components 6.
AS,,
Name of Name of Manufacturer Year Built
: Repaired, Code Componient Manufacturer Serial No.
National Other Identificalion Replaced. or Slamped (langer No.)
Board No.
Replacement (YFS or Work Order/ SUS NO)
Pluto Valc Tarect Rock S/N 201 N/A PW0 1 129061 /83.04 1976 Replacement Yes I~~~
I.-II 4-  
.t  
+  
+
4-4-
4-4 4
4  
+
4  
+
4-4 4
4 4
4 4-4-
4 4
4 4-4 4-
: 7.
Description of Work:
The Pilot Valve was repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of S/N 226.
: 8.
Tests Conducted:
Hydrostatic E
Pneumatic El Nominal Operating Pressure EJ1 Other  
]
Pressure 955 psi Test Temp 514 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


FORM NIS-2 19-03-1.t FORM NIS-2 (Black)
FORM NIS-2 19-03-1.t FORM NIS-2 (Black)
: 9.       Remarks:     Pilot Valve S/N 226 was removed and pilot valve S/N 201 was installed. Prior to installation SiN 201 was repc and documented on NIS-2 (19-03-02). A VT-2 (1 03064) was completed on the mechanical connection and found acceptaible.
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this           Replacement (repair or replacement) conforms to the nmles of the ASME Code, Section Xi.
Remarks:
Type Code Symbol Stamp                           None Certificate of Authorization No.                       None               Expiration Date                 N/A Signed      'r                      cc,       Tl Equipment Reliability Date     7;T4Ly     /G&                 2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                           Iowa                 and employed by         IISB3 CT of                           I lartford, Conmi.                       have inspected the components described in this Owner's Report during the period           cl- O- 03   xf            to             7_     - o                       and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASlME Code, Section Xl.
Pilot Valve S/N 226 was removed and pilot valve S/N 201 was installed. Prior to installation SiN 201 was repc and documented on NIS-2 (19-03-02). A VT-2 (1 03064) was completed on the mechanical connection and found acceptaible.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the nmles of the ASME Code, Section Xi.
Replacement (repair or replacement)
Type Code Symbol Stamp Certificate of Authorization No.
Signed
' r None None Expiration Date N/A cc, Tl Equipment Reliability Date 7;T4Ly  
/G&
2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB3 CT of I lartford, Conmi.
have inspected the components described in this Owner's Report during the period cl-O xf
- 03 to 7_  
- o and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASlME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warrant), expressed or implied, concening the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warrant), expressed or implied, concening the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions       Iv3       O 5 Aqlv&           /q         1e 1
Commissions Inspector's Signature Iv3 O 5 Aqlv&  
Inspector's Signature                                National Board, State, Province, and Endorsements Date                                           ,2005 Date       200
/q 1e 1
National Board, State, Province, and Endorsements Date
,2005 Date 200


FORM NIS-2 19-05-01 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
FORM NIS-2 19-05-01 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1. Owners       Alliant Energy (GES Utilities)                     Date                January 10, 2005 Name P. 0. Box 351, Cedar Rapids, IA 52406                           Sheet               I_ _     of             2 Address
: 1.
: 2.     Plant        Duane Arnold Energy Center                        Unit Name 3277 DAEC Road, Palo, IA 52324                                                     A67068 Address                                    Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (GES Utilities)
: 3.      Work Performed by Nuclear Management Co. LLC.                  Type Code Symbol Stamp             None Name                                          Authorization No.                 None 3277 DAEC Road, Palo, IA 52324                                  Expiration Date                   None
Name 2.
: 4. Identification of System:         Main Steam
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit January 10, 2005 I_ _
: 5.     (a) Applicable Construction Code         ANSI B3 1.1             19     67   Edition     NA     Addenda     NA    Code Case.
of 2
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-92A
A67068
: 6. Identification of Components Repaired or Replaced and Replacement Components ASME Nameao           Name of       Manufacturer                                                     Year     Repaired,       Code Component         Manufacturer       Serial No.       National Board       Other Identification     Built   Replaced, or   Stamped No.                                               Replacement     (YES or
: 3.
      .______                      E4                 NA                   NA__9_8                                               NO CV 1064             Anchor Darling  EA748-l           NA                   NA                       1988           ReardNo
Work Performed by Nuclear Management Co. LLC.
: 7.     Description of Work:       Removed and replaced seal weld on bonnet for valve disassembly
Name 3277 DAEC Road, Palo, IA 52324 Repair Organization to P. 0. No., Job No., etc.
: 8.     Tests Conducted:               Hydrostatic     M         Pneumatic         [a       Nominal Operating Pressure       Li1 Other M         Pressure         NA*          psi    Test Temp          NA*           0 F
Type Code Symbol Stamp None Authorization No.
None Expiration Date None
: 4.
Identification of System:
Main Steam
: 5.
(a) Applicable Construction Code ANSI B3 1.1 19 67 Edition NA Addenda (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-92A
: 6.
Identification of Components Repaired or Replaced and Replacement Components NA Code Case.
ASME Nameao Name of Manufacturer Year
: Repaired, Code Component Manufacturer Serial No.
National Board Other Identification Built Replaced, or Stamped No.
Replacement (YES or E4 NA NA__9_8 NO CV 1064 Anchor Darl ing EA748-l NA NA 1988 ReardNo
: 7.
Description of Work:
Removed and replaced seal weld on bonnet for valve disassembly
: 8.
Tests Conducted:
Hydrostatic M
Pneumatic
[a Nominal Operating Pressure Li1 Other M Pressure NA*
* Pressure testing seal welds not required in accordance with IWA-4710.
* Pressure testing seal welds not required in accordance with IWA-4710.
NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
psi Test Temp NA*
0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME,345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME,345 E. 47th St., New York, NY 10017.


FORM NIS-2 19-05-01 FORM NIS-2 (Back)
FORM NIS-2 19-05-01 FORM NIS-2 (Back)
: 9.       Remarks:     Valve was disassembled an internal components were replaced. No pressure boundary components were replaced. Valve bonnet requires a seal weld to be removed and installed after disassembly and reassembly.
: 9.
Remarks:
Valve was disassembled an internal components were replaced. No pressure boundary components were replaced. Valve bonnet requires a seal weld to be removed and installed after disassembly and reassembly.
Surface exam was successfully completed on the body to bonnet seal weld. Pressure test was not necessary since IWA47 10 does not require pressure testine seal welds.
Surface exam was successfully completed on the body to bonnet seal weld. Pressure test was not necessary since IWA47 10 does not require pressure testine seal welds.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Repair (repair or replacement) conforms to the rules of the ASME Code, Section Xl.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp                       None Certificate ofAuthoriz    on No.                   None                 Expiration Date               N/A Signed                         %ll,'.,,t&N GLEquipmentMonitoring         Date     I U       Q.o                2005
Repair (repair or replacement)
(             vwer or O)wner's Dleisynee- 1itle                                     13     1
Type Code Symbol Stamp None Certificate of Authoriz on No.
                          - - "-- - I -, "-. - -        - --,-
None Expiration Date Signed  
CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                     and employed by         HSB CT of                         Hartford, Cona.                         have inspected the components described in this Owner's Report duringtheperiod       V 7/ -04                       to       /A/2 -cs"                               , andstatethattothebest of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
%ll,'.,,t&N GLEquipmentMonitoring Date I U
(
vwer or O)wner's Dleisynee-1itle N/A Q.o 2005 13 1
I -, "-. - -
CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Cona.
have inspected the components described in this Owner's Report duringtheperiod V 7/ -04 to  
/A/2 -cs"  
, andstatethattothebest of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature                                National Board, State, Province, and Endorsements Date 2005
Commissions National Board, State, Province, and Endorsements Inspector's Signature Date 2005


FORM NIS-2 19-05-02 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
FORM NIS-2 19-05-02 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owners         Alliant Energy (Interstate P &: 1, Co.)                 Date                  1/10/05 Name P. O. Box 351, Cedar Rapids, IA 52406                                   Sheet                I        of            2 Address
: 1.
: 2. Plant         Duane Arnold Energy Center                               Unit Name 3277 DAEC Road, Palo, IA 52324                                                               MWO 1126360 Address                                      Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (Interstate P &: 1, Co.)
: 3. Work Performed by Nuclear Management Co. LLC                           Type Code Symbol Stamp              None Name                                             Authorization No.                    None 3277 DAEC Road, Palo, IA 52324                                         Expiration Date                     None
Name 2.
: 4. Identification of System:           Core Spray
P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit 1/10/05 I
: 5.    (a) Applicable Construction Code             ASME Draft P & V         19     68     Edition N/A       Addenda      N/A    Code Case:
of 2
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92
MWO 1126360 Repair Organization to P. 0. No., Job No., etc.
: 6. Identification of Components Repaired or Re laced and Replacement Components ASMIE Nameof               NameoF         Manufacturer                                                     Year Built     Repaired,     code Component         Manufacturer       Serial No.       National         Other Identification                     Replaced, or Stamped Board No.                                                   Replacement   (YES or Seal Gland           FlowServe           RLSAO4764           N/A         IP21 IA Core Spray Pump         2003       Replacement     No Seal Gland Cap       Texas Bolt         HT # 90940           N/A         I P21 IA Core Spray Pump         1995       Replacement     No Screws             .
: 3.
: 7. Description of Work:           Replaced pump seal with a design for higher temperatures
Work Performed by Nuclear Management Co. LLC Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
: 8. Tests Conducted:                   Hydrostatic       Cl         Pneumatic         E         Nominal Operating Pressure Other [           Pressure           302           Psi     Test Temp           96.2         aF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Expiration Date None None None 4.
5.
Identification of System:
Core Spray (a) Applicable Construction Code ASME Draft P & V 19 68 Edition N/A (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case:
: 6.
Identification of Components Repaired or Re laced and Replacement Components ASMIE Nameof NameoF Manufacturer Year Built
: Repaired, code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YES or Seal Gland FlowServe RLSAO4764 N/A IP21 IA Core Spray Pump 2003 Replacement No Seal Gland Cap Texas Bolt HT # 90940 N/A I P21 IA Core Spray Pump 1995 Replacement No Screws
: 7.
Description of Work:
Replaced pump seal with a design for higher temperatures
: 8.
Tests Conducted:
Hydrostatic Cl Pneumatic E
Nominal Operating Pressure Other [
Pressure 302 Psi Test Temp 96.2 a F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


FORM NIS-2 19-05-02 FORM NIS-2 (Back)
FORM NIS-2 19-05-02 FORM NIS-2 (Back)
: 9.       Remarks:       Replaced pump seal with larger seal desiened for higher temperature application. Replaced cap screws since new seal is larer, and therefore requires loneer can screws Successfuliv performed VT-2 exam after installation.
: 9.
CERTIFICATE OF COMPLIANCE I We certify that the statements made in the report are correct and this           Replacement (repair or replacement)
Remarks:
Replaced pump seal with larger seal desiened for higher temperature application. Replaced cap screws since new seal is larer, and therefore requires loneer can screws Successfuliv performed VT-2 exam after installation.
CERTIFICATE OF COMPLIANCE I We certify that the statements made in the report are correct and this Replacement (repair or replacement)
Il conforms to the rules of the ASME Code, Section XI.
Il conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                       None Certificate of Autho' tion No.                     None                 Expiration Date                 N/A Signed                                    Sup. Equipment Reliability     Date                         /0,           2005 Owner[6r Owner's Designee, Title                           I Q,
Type Code Symbol Stamp Certificate of Autho' tion No.
CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                     and employed by       HSB CT of                           Hartford, Conn.                         have inspected the components described in this Owner's Report during the period           - /J - 0 Li               To         / - I/A - V                             , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
Signed None None Expiration Date N/A Sup. Equipment Reliability Date
/0, 2005 Owner[6r Owner's Designee, Title I
Q, CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period  
- /J  
- 0 Li To  
/ - /A - V I
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions           Nati n l           State,       i/P q (, E d env Inspector's Signature                              National Board, State, Province, and Endorsements Date       1-   /                         , 2005 20
Inspector's Signature Commissions N at i n l
: State,  
/P i q (, E d env National Board, State, Province, and Endorsements Date 1 -
/
20
, 2005


FORIM NIS-2 19-05-03 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
FORIM NIS-2 19-05-03 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
: 1. Owners       Alliant Energy (Interstate P & L Co.)                 Date                   1/10/05 Name P. O. Box 351, Cedar Rapids, IA 52406                               Sheet                   I_ _     of             2 Address
: 1.
: 2.     Plant         Duane Arnold Energy Center                           Unit Name 3277 DAEC Road, Palo, 1A 52324                                                           MWO 1130269 Address                                      Repair Organization to P. O. No., Job No., etc.
Owners Alliant Energy (Interstate P & L Co.)
: 3.     Work Performed by Nuclear Management Co. LLC                       Type Code Symbol Stamp                None Name                                             Authorization No.                    None 3277 DAEC Road, Palo, IA 52324                                     Expiration Date                       None
Name Date P. O. Box 351, Cedar Rapids, IA 52406 Address Sheet 1/10/05 I_ _
: 4.     Identification of System:         Core Spray
of 2
: 5.  (a) Applicable Construction Code             ASME Draft P & V       19       68     Edition N/A       Addenda        N/A    Code Case:
: 2.
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 r
Plant Duane Arnold Energy Center Name Unit 3277 DAEC Road, Palo, 1A 52324 Address MWO 1130269 Repair Organization to P. O. No., Job No., etc.
: 6.     Identification 0! Components Repaired or Rel Iaced and Re lacement Components ASAIE Name of           Name of         Manufacturer                                                     Year Built     Repaired,     Code Component       Manufacturer       Serial No.       National         Other Identification                       Replaced, or Stamped Board No.                                                     Replaement   (YES or NO)
: 3.
Seal Gland           FlowServe           RLSA04763           N/A         I P21 I B Core Spray Pump         2003       Replacenent     No
Work Performed by Nuclear Management Co. LLC Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
: 7.     Description of Work:         Replaced pump seal in order to add a spacer
Expiration Date None None None 4.
: 8.     Tests Conducted:                 Hydrostatic         a         Pneumatic         E         Nominal Operating Pressure Other [jj         Pressure           293           Psi     Test Temp           N/A           &deg;F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
5.
Identification of System:
Core Spray (a) Applicable Construction Code ASME Draft P & V 19 68 Edition N/A (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case:
r6.
Identification 0! Components Repaired or Rel Iaced and Re lacement Components ASAIE Name of Name of Manufacturer Year Built
: Repaired, Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replaement (YES or NO)
Seal Gland FlowServe RLSA04763 N/A I P21 I B Core Spray Pump 2003 Replacenent No
: 7.
Description of Work:
Replaced pump seal in order to add a spacer
: 8.
Tests Conducted:
Hydrostatic a
Pneumatic E
Nominal Operating Pressure Other [jj Pressure 293 Psi Test Temp N/A  
&deg; F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 471h St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 471h St., New York, NY 10017.


FORM NIS-2 19-05-03 FORM NIS-2 (Back)
FORM NIS-2 19-05-03 FORM NIS-2 (Back)
: 9.       Remarks:       Replaced pump seal after addine a spacer. Spacer was requiredpae  to asrqod obtain rood fiti for seal. Old seal sa.Od       elws was removed
: 9.
                                                                                                                                              =eoe because the set screw was jammed, and seal could not be removed without damaoing the seal. Successfully
Remarks:
                                                                                                                              =  _
Replaced pump seal after addine a spacer. Spacer was required to obtain rood fit for seal. Old seal was removed pae asrqod i
performed VT-2 exam after installation of new seal.
o sa.Od elws  
CERTIFICATE OF COMPLIANCE We certify that the statements made in tile report are correct and this       Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.
=eoe because the set screw was jammed, and seal could not be removed without damaoing the seal. Successfully performed VT-2 exam after installation of new seal.
Type Code Symbol Stamp                       None Certificate of Authoriz I     No.                 None                 Expiration Date                   N/A Signed                             06X Sup. Equipment Reliability     Date                           1 (0,           2005 xOvner ouIwncr's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and II the State or Province of                       Iowa                     and employed by             IISB CT of                           Hartford, Conti.                       have inspeefoA the components described in this Owner's Report during the period         //- /7 - oY                 To           - /             0*-5O v                ,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
=
CERTIFICATE OF COMPLIANCE We certify that the statements made in tile report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp None Certificate of Authoriz I No.
None Expiration Date N/A Signed 06X Sup. Equipment Reliability Date 1 (0, 2005 xOvner ouIwncr's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conti.
have inspeefoA the components described in this Owner's Report during the period  
//- /7 -oY To  
/
0* v
-5O  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions         AJ5 I2302z41V -Z.
II Commissions AJ5 I2302z41V -Z.
Inspector's Signature                               National Board, State, Province, and Endorsements Date        /- d  v                      ,2005
Inspector's Signature Date
/- d v National Board, State, Province, and Endorsements
,2005


FORM NIS-2 19-05-04 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
FORM NIS-2 19-05-04 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1.     Owners         Alliant Energy (Interstate P & L Co.)                     Date                 3/12/05 Name P. O. Box 351, Cedar Rapids, IA 52406                                   Sheet                I          of              2 Address
: 1.
: 2.      Plant         Duane Arnold Energy Center                               Unit                  I Name 3277 DAEC Road, Palo, IA 52324                                                               PWO 1127332 Address                                        Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (Interstate P & L Co.)
: 3.     Work Performed by Nuclear Management Co. LLC                           Type Code Symbol Stamp                None Name                                               Authorization No.                      None 3277 DAEC Road, Palo, IA 52324                                         Expiration Date                       None
Name Date 2.
: 4.       Identification of System:              Residual Ifeat Removal                                                                                _
P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 3/12/05 I
of 2
I PWO 1127332 Repair Organization to P. 0. No., Job No., etc.
: 3.
Work Performed by Nuclear Management Co. LLC Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
Expiration Date None None None 4.
5.
5.
(a) Applicable Construction Code               ANSI B31.7             19       69     Edition 71           Addenda        N/A      Code Case:
Identification of System:
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
Residual Ifeat Removal (a) Applicable Construction Code ANSI B31.7 19 69 Edition 71 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Identification of Components Repaired or Replaced and Replacement Components Addenda N/A Code Case:
: 6.      Identification of Components Repaired or Replaced and Replacement Components I                                                                                                             AS'ME Name of             Name of         Manufacturer                                                       Year Built       Repaired,         Code Component         Mlanufacturer         Serial No.         National         Other Identification                         Replaced, or     Stamped Board No.                                                     Replacement       (YES or NO)
6.
I P-229A Torus       Bergen-                 DA-250             N/A             IIBB-024-SS-222               N/A         Replacemnent         No Suction ine           Patterson Snubber
I AS'ME Name of Name of Manufacturer Year Built
_  _  _  _    I                .I__  _        _    I _   _      _ I _ _      _      _      _  I _  _        _ I __            I _
: Repaired, Code Component Mlanufacturer Serial No.
: 7.       Description of Vork:             Replaced snubber DA-53 with snubber DA-250 due to end of seal life.
National Other Identification Replaced, or Stamped Board No.
S.       Tests Conducted:                     Hydrostatic       j           Pneumatic       E           Nominal Operating Pressure         w_7_
Replacement (YES or NO)
Other               Pressure         N/A             Psi   Test Temp             N/A             OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
I P-229A Torus Bergen-DA-250 N/A IIBB-024-SS-222 N/A Replacemnent No Suction ine Patterson Snubber I
I__.
I _
_ I
_ I
_ I I
: 7.
Description of Vork:
Replaced snubber DA-53 with snubber DA-250 due to end of seal life.
S.
Tests Conducted:
Hydrostatic j
Pneumatic E
Nominal Operating Pressure w_7_
Other Pressure N/A Psi Test Temp N/A OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


                                                                                                                                            . 11.
. 11.
FORM NIS-2 19-05-04 FORMI NIS-2 (Back)
FORM NIS-2 19-05-04 FORMI NIS-2 (Back)
: 9.       Remarks:       Snubber DA-53. located at 1IBB-024-SS-2221had reached the end of seal life and was replaced with DA-250.
: 9.
Remarks:
Snubber DA-53. located at 1IBB-024-SS-2221 had reached the end of seal life and was replaced with DA-250.
This snubber (DA-53) passed the visual and functional tests. The snubber (DA 250) was rebuilt under PWO 1124686. No load bearing parts were repaired or replaced during rebuild. Successfully performed VT-3 exam (Rpt # P05032) after installation of replacement snubber.
This snubber (DA-53) passed the visual and functional tests. The snubber (DA 250) was rebuilt under PWO 1124686. No load bearing parts were repaired or replaced during rebuild. Successfully performed VT-3 exam (Rpt # P05032) after installation of replacement snubber.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this           Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                         None Certificate of Authorization No.                     None                 Expiration Date               NIA Signed        10 V                        Sup. Equipment Reliability     Date     V//WO       S                   2005 Owner or Owner's Designee, Title II CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                     and employed by       HSB CT of                         Hartford, Conn.                           have inspected the components described in this Owner's Report during the period         1L -1/ -6o                     To         3- /6- O5                             , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
Replacement (repair or replacement)
Type Code Symbol Stamp Certificate of Authorization No.
Signed 10 V None None Expiration Date Sup. Equipment Reliability Date V //WO S NIA 2005 Owner or Owner's Designee, Title II CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period 1L -1/ -6o To 3- /6-O5  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions             atio   /o3;, S4te Po,           adEnre Inspector's Signature                                National Board, State, Province, and Endorsements Date       3>l                             , 2005 2005
Commissions atio  
/o3;, S4te Po, ad Enre National Board, State, Province, and Endorsements Inspector's Signature Date 3 >l
, 2005 Date 2005


FORM NIS-2 19-05-09 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Owners       Alliant Energv (JES Utilities)                         Date                 4/16/2005 Name P. 0. Box 351, Cedar Rapids, IA 52406                               Sheet                  1        of            2 Address
FORM NIS-2 19-05-09 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Owners Alliant Energv (JES Utilities)
: 2. Plant         Duane Arnold Energy Center                           Unit Name 3277 DAEC Road, Palo, IA 52324                                                           PWO 1129011 and CWO A67445 Address                                      Repair Organization to P. 0. No., Job No., etc.
Name Date 2.
: 3. Work Performed by Alliant Energv (IES Utilities)                   Type Code Symbol Stamp                None Name                                           Authorization No.                    None 3277 DAEC Road, Palo, IA 52324                                     Expiration Date                       None
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 4/16/2005 1
: 4. Identification of System:           Core Spray Piping
of 2
: 5.    (a) Applicable Construction Code             ANSI B31.7 Class 1 19         69 Edition 70             Addenda       NIA   Code Case.
PWO 1129011 and CWO A67445 Repair Organization to P. 0. No., Job No., etc.
: 3.
Work Performed by Alliant Energv (IES Utilities)
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
Expiration Date None None None 4.
5.
Identification of System:
Core Spray Piping (a) Applicable Construction Code ANSI B31.7 Class 1 19 69 Edition 70 Addenda NIA Code Case.
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
: 6. Identification o Components Repaired or Re laced and Ke lacement Components ASME Name of           Name of           Manufacturer                                                   Year Built   Repaired,     Code Component       Manufacturer         Serial No.       National       Other Identification                     Replaced, or Stamped l                                                             Board No.                                                 Replacement   (YES or l__NO)
: 6.
DCA-008             Bechtel Corp..           NA               N/A       Core Spray Dissimilar Metal       1974         Repair       No Pipe Welds
Identification o Components Repaired or Re laced and Ke lacement Components ASME Name of Name of Manufacturer Year Built
: 7. Description of Work:           Ground the crowns from welds CSA-F002 and CSA-F004 to improve UT examination of weld.
: Repaired, Code Component Manufacturer Serial No.
: 8. Tests Conducted:                   Hydrostatic       Z         Pneumatic       i]         Nominal Operating Pressure   E[=
National Other Identification Replaced, or Stamped l
Other   [         Pressure           N/A         psi   Test Temp             N/A NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Board No.
Replacement (YES or l__NO)
DCA-008 Bechtel Corp..
NA N/A Core Spray Dissimilar Metal 1974 Repair No Pipe Welds
: 7.
Description of Work:
Ground the crowns from welds CSA-F002 and CSA-F004 to improve UT examination of weld.
: 8.
Tests Conducted:
Hydrostatic Z
Pneumatic i]
Nominal Operating Pressure E[=
Other [
Pressure N/A psi Test Temp N/A NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12182) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12182) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


FORM NIS-2 19-05-09 FORM NIS-2 (Back)
FORM NIS-2 19-05-09 FORM NIS-2 (Back)
: 9.       Remarks:     Ground the crowns from welds CSA-F002 and CSA-F004 to improve UT examination of weld.
: 9.
Remarks:
Ground the crowns from welds CSA-F002 and CSA-F004 to improve UT examination of weld.
Successful surface exam was performed on CSA-F002 (P05055) and on CSA-F004 (P05048) after weld crowi.
Successful surface exam was performed on CSA-F002 (P05055) and on CSA-F004 (P05048) after weld crowi.
was removed by grinding.
was removed by grinding.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Repair (repair or replacement) conforms to the rules of the ASME Code, Section XI.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp                       None Certificate of Autho 'tion   No.                   None               Expiration Date                 N/A Signed     v   ,-           .- c' Supervisor, Materials/lnspection   Date       ,k       /     IC,             2005
Type Code Symbol Stamp None Certificate of Autho 'tion No.
                  '    Owier or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION                                                         I 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                       Iowa                   and employed by         HSB CT of                         Hartford, Conn.                       have inspected the components described in this Owner's Report during the period       3- a - %                      to       /- if', -0o",                         , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
None Expiration Date N/A Signed v,-  
.- c' Supervisor, Materials/lnspection Date  
,k  
/
IC, 2005 Owier or Owner's Designee, Title I
CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period 3-a --
to  
/- if', -0o",  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions         /V/:;       ,.)--x, 944,v-z                 /q I?L6Z 27iV Inspector's Signature                               National Board, State, Province, and Endorsements Date        Dt -                           , 2005 2005
Commissions
/V/:;  
,.)--x, 944,v-z
/q I?L 6Z 27iV Date Inspector's Signature National Board, State, Province, and Endorsements D t -
2 0 0 5
, 2005


FORM NIS-2 19-05-10 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
FORM NIS-2 19-05-10 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Alliant Encrgy (TES Utilities)
: 1. Owners        Alliant Encrgy (TES Utilities)                       Date                   5/4/2005 Name P. 0. Box 351, Cedar Rapids, IA 52406                               Sheet                  I        of            2 Address
Date 5/4/2005
: 2. Plant         Duane Arnold Energy Center                           Unit                    I Name 3277 DAEC Road, Palo, IA 52324                                                             CWO A66243 and PWO 1129234 Address                                     Repair Organization to P. 0. No., Job No., etc.
: 1.
: 3. Work Performed by Alliant Enerfry (IES Utilities)                   Type Code Symbol Stamp                 None Name                                            Authorization No.                     None 3277 DAEC Road, Palo, IA 5232 4                                     Expiration Date                       None
Owners Name P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Sheet Unit I
: 4. Identification of System:           Reactor Water Cleanup Piping
of 2
: 5.    (a) Applicable Construction Code             ANSI B331.7 Class 1 19           69     Edition 70         Addenda      N/A    Code Case.
I 2.
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
CWO A66243 and PWO 1129234 Address
: 6. Identitication o! Uomponcnts Repaired or Replaced and Kelacement Uomponents ASINE Nameor           Name of         Oanufacturer                                                     Year Built     Repaired,     Code Component       Manufacturer         Serial No.       National       Other Identification                       Replaced, or Stamped Board No.                                                   Replacement   (YES or DCA.014       B     lchtcl Corp..           NA             N/A           Reactor Water Cleanup             1974         Repair         No Dissirnilar Metal Pipe Weld
: 3.
: 7. Description of Work ::        Ground the crown from weld CUB-F004 to improve UT examination of weld.
Work Performed by Alliant Enerf Name 3277 DAEC Road, Palo, IA 5232 Repair Organization to P. 0. No., Job No., etc.
: 8. Tests Conducted:                  Hydrostatic         Cl       Pneumatic           []         Nominal Operating Pressure    LIo Other  F          Pressure          N/A           psi     Test Ten ip         N/A N              F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
ry (IES Utilities)
Type Code Symbol Stamp None Authorization No.
None 4
Expiration Date None Reactor Water Cleanup Piping 4.
5.
Identification of System:
(a) Applicable Construction Code ANSI B331.7 Class 1 19 69 Edition 70 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.
: 6.
Identitication o! Uomponcnts Repaired or Replaced and Kelacement Uomponents ASINE Nameor Name of Oanufacturer Year Built
: Repaired, Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YES or DCA.014 B
lchtcl Corp..
NA N/A Reactor Water Cleanup 1974 Repair No Dissirnilar Metal Pipe Weld 7.
8.
Description of Work Tests Conducted:
Ground the crown from weld CUB-F004 to improve UT examination of weld.
Hydrostatic Other F Pressure Cl Pneumatic
[]
N/A psi Test Ten Nominal Operating Pressure ip N
N/A F
LIo NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


FORM NIS-2 19-05-1 0 FORAI NIS-2 (Back)
FORM NIS-2 19-05-1 0 FORAI NIS-2 (Back)
: 9.       Remarks:     Ground the crown from weld CUB-F004 to improve UT examination of weld. Uncovered porosity under the Crown. Ground out the porosity and verified weld was above minimum wall by using UT. Successful surface exam was performed on CUB-F004 (P05050) after the porosity was removed and after the UT verifyine adequate wall thickness was performed.
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this           Repair (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Remarks:
Type Code Symbol Stamp                         None Certificate of Auth ition No.                       None                 Expiration Date               N/A Signed                   It _A         Supervisor, Materials/Inspection   Date       mlc           '                2005 Ow   r or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                     and employed by       lISB CT of                         Hartford, Conn.                           have inspected the components described in this Owner's Report during the period         e go     '                  to         S-     - C s,                       , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
Ground the crown from weld CUB-F004 to improve UT examination of weld. Uncovered porosity under the Crown. Ground out the porosity and verified weld was above minimum wall by using UT. Successful surface exam was performed on CUB-F004 (P05050) after the porosity was removed and after the UT verifyine adequate wall thickness was performed.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp None Certificate of Auth ition No.
None Expiration Date N/A Signed It _A Supervisor, Materials/Inspection Date mlc 2005 Ow r or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by lISB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period e go to S -
- C s,  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
    )Y3     _--                          Commissions           /13         3       ; I' r1 Inspector's Signature                                 National Board, State, Province, and Endorsements Date                                         , 2005 005
)Y3 Commissions  
/13 3
r1
; I' Inspector's Signature National Board, State, Province, and Endorsements Date 0 0 5
, 2005


FORM NIS-2 19 11 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Owners         Alliant Energy (IES Utilities)                         Date                   4/21/2005 Name P. 0. Box 351, Cedar Rapids, IA 52406                                 Sheet                  1I        of            2 Address
FORM NIS-2 19 11 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Owners Alliant Energy (IES Utilities)
: 2.      Plant         Duane Arnold Energy Center                             Unit Name 3277 DAEC Road, Palo, IA 52324                                                               MWO 1129050 Address                                      Repair Organization to P. O. No., Job No., etc.
Name Date 2.
: 3.       Work Performed by Alliant Energy (IES Utilities)                       Type Code Symbol Stamp              None Name                                             Authorization No.                    None 3277 DAEC Road, Palo, IA 52324                                         Expiration Date                     None
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 4/21/2005 1 I of 2
: 4.       Identification of System:             Residual Heat Removal
MWO 1129050 Repair Organization to P. O. No., Job No., etc.
: 5.    (a) Applicable Construction Code             ANSI B331.7 Class 1 19             69     Edition 71       Addenda       NIA   Code Case.
: 3.
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 r       w     s     .-    _    ..      r     A     .    . s     l   s     s       .    .
Work Performed by Alliant Energy (IES Utilities)
: 6.       Identilicatton o0 Components Repaired or Replaced and Re lacement Components ASME Name of             Name of           Manufacturer                                                   Year Built     Repaired,     Code Component           Manufacturer         Serial No.       National         Other Identification                     Replaced, or Stamped Board No.                                                   Replacement   (YES or NO)
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
DLA-641-8 and           Nova                     NA             N/A             Dolt H# 8898297             2005       Replacement     No
Expiration Date None None None 4.
    .A-6-SS-13                                           .
5.
  -A-641-8 and         Nova                     NA             N/A             Nut Lot #50041551           2005       Replacement     No DLA-6-SS-13 DLA-6-H-8 and           Tuscaloosa Steel         NA             N/A         t       it # A7X3024             1998         Repair         No DLA-6-SS-13
Identification of System:
: 7.       Description of Work:           Replaced one bolt, one nut, and added the clamp support bars on clamp hanger that was reinstalled for supports DLA-6-H-8 and DLA-6-SS-13. Clamp was removed to perform ISI exams on welds.
Residual Heat Removal (a) Applicable Construction Code ANSI B331.7 Class 1 19 69 Edition 71 Addenda NIA Code Case.
: 8.       Tests Conducted:                     Hydrostatic         m         Pneumatic         EF         Nominal Operating Pressure   mi Other =             Pressure           N/A           psi   Test Temp           N/A           0F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 r
w s
r A
s l
s s
: 6.
Identilicatton o0 Components Repaired or Replaced and Re lacement Components ASME Name of Name of Manufacturer Year Built
: Repaired, Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YES or NO)
DLA-641-8 and Nova NA N/A Dolt H# 8898297 2005 Replacement No
.A-6-SS-13  
-A-641-8 and Nova NA N/A Nut Lot #50041551 2005 Replacement No DLA-6-SS-13 DLA-6-H-8 and Tuscaloosa Steel NA N/A it t  
# A7X3024 1998 Repair No DLA-6-SS-13
: 7.
Description of Work:
Replaced one bolt, one nut, and added the clamp support bars on clamp hanger that was reinstalled for supports DLA-6-H-8 and DLA-6-SS-13. Clamp was removed to perform ISI exams on welds.
: 8.
Tests Conducted:
Hydrostatic m
Pneumatic EF Nominal Operating Pressure mi Other =
Pressure N/A psi Test Temp N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


FORM NIS-2 19-05-1 1 FORM NIS-2 (Back)
FORM NIS-2 19-05-1 1 FORM NIS-2 (Back)
: 9.       Remarks:     Replaced one bolt and nut that were cut to remove the pipe clamp for supports DLA-6-H-8 and DLA-6-SS-l3 Pipe clamp was removed to facilitate examining welds next to the clamp. Welded support bars onto the pipe clamp as depicted on the clamp drawing.
: 9.
Successful mreservice VT-3 exam was performed on the sunnorts (P05004 and PGoS6V CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Repair/Replacement (repair or replacement) conforms to the rules of the ASME Code, Section X[.
Remarks:
Type Code Symbol Stamp                       None Certificate of Authorization No.                   None               Expii iation Date                N/A Signed                               Supervisor, Materials/Inspection   Date       A;y~      2  a/,.            2005 Ow~ner or Owner's Designee, Title II CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                   and employed by         HSB CT of                         Hartford, Conn.                         have inspected the components described in this Owner's Report during the period                   5     -C (         to         j - )* - -c'                           ,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
Replaced one bolt and nut that were cut to remove the pipe clamp for supports DLA-6-H-8 and DLA-6-SS-l3 Pipe clamp was removed to facilitate examining welds next to the clamp. Welded support bars onto the pipe clamp as depicted on the clamp drawing.
Successful mreservice VT-3 exam was performed on the sunnorts (P05004 and PGoS6V CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section X[.
Repair/Replacement (repair or replacement)
Type Code Symbol Stamp None Certificate of Authorization No.
None Expii Signed Supervisor, Materials/Inspection Date Ow~ner or Owner's Designee, Title iation Date N/A A;y~
2 a/,
2005 II CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period 5  
-C (
to j -
)*  
- -c'  
,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
  )                                       Commissions           /V/     iAqVr             E         /Y     27 Inspector's Signature                               National Board, State, Province, and Endorsements Date Date ~                                 , 2005 2 0
)
Commissions  
/V/
iAqVr E  
/Y 27 Inspector's Signature National Board, State, Province, and Endorsements Date
, 2005 Date ~
2 0


IFORM NIS-2 19-05-12 IFORM NIS-2 OWNER'S REPORT FOR REPAIRS OR RIEPLACEMFENTS As Required by the Provisions of tile ASME Code Section XI I. Owvners         Alliant   amnerv (FS Utilities)                           I)ate                   4/30!2005 Name P. 0. Box 351, Cedar Rapids, IA 52406                                   Sheet                    I_ _      of            2 Address
IFORM NIS-2 19-05-12 IFORM NIS-2 OWNER'S REPORT FOR REPAIRS OR RIEPLACEMFENTS As Required by the Provisions of tile ASME Code Section XI I.
: 2.      Plant         Duane Arnold Energy Center                                 Unit Name PWO 1129089, 1129090, 1129091, 1129092 3277 DAEC Road, Palo, IA 52324                                                    1129093, 1129094, 1129095 and CWVO A067500 Address                                          Repair Organization to P.0. No., Job No., etc.
Owvners Alliant amnerv (FS Utilities)
: 3. Work Performed by Alliant Energv (IES Utilities)                         Type Code Symbol Stamp                  None Name                                                 Authorization No.                      None 3277 DAEC Road, Palo, IA 52324                                           Expiration Date                         None
Name I)ate 2.
: 4. Identification of System:             CControl Rod Drive
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 4/30!2005 I_ _
: 5.    (a) Applicable Construction Code             ASME Sect. III             19       68       Edition W68       Addenda       N/A   Code Case.
of 2
Class I (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 I
PWO 1129089, 1129090, 1129091, 1129092 1129093, 1129094, 1129095 and CWVO A067500 Repair Organization to P. 0. No., Job No., etc.
: 0. Identimicaton ot tomnponents tepaired or ep laced and Ke lacement Components ASMI E Name     or         Name of         Manufacturer                                                         Year Built     Repaired.     Code Component         Manufacturer       Serial No.         National           Other Identification                       Replaced. or Stamped Board No.                                                       Replacement   (VES or
: 3.
Work Performed by Alliant Energv (IES Utilities)
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
Expiration Date None None None 4.
5.
Identification of System:
C (a) Applicable Construction Code Control Rod Drive ASME Sect. III 19 68 Edition W68 Addenda N/A Code Case.
Class I (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 I0.
Identimicaton ot tomnponents tepaired or ep laced and Ke lacement Components ASMI E Name or Name of Manufacturer Year Built Repaired.
Code Component Manufacturer Serial No.
National Other Identification Replaced. or Stamped Board No.
Replacement (VES or
_NO)
_NO)
IR215(06-23)         GE                     S/N 4501                                                               1972       Replacement     Yes I R215(06-23)         Nova                   N/A               N/A               8 [Bolts I I0 8960755           2004       Replacement     No I R2t15(l 0- II)     GE                     S/N 2519                                                               1972       Replacement     Yes I R215(l 0-t t)     Nova                     N/A               N/A               8 Bolts 11W8960755              2004       Replacement     No I R215(t0-23)       GE                     S/N 4494                                                               1972       Replacement     Yes IR215(10-23)         Nova                     N/A               N/A               8 Bolts llt# 8960755           2004       Replacement     No IR215(14-07)         GE                   S/N A4286                                                               1990      Replacement     Yes IR215(14-07)         Nova                     N/A               N/A               8 [lolts llt# 8960755           2004       Replacement     No I R215(14-1 1)       GE                     S/N 3522                                                               1972      Replacement     Yes I R215(14-1   l)     Noa                     N/A               N/A               8 Bolts It# 8960755             2004       Replacement     No IR2t5(14-23)         GE                     S/N 4467                                                               1973      Replacement     Yes IR215(14-23)         Nova                     N/A               N/A               8 Bolts Ift# 8960755           2004       Replacement     No IR215(18-31)         GE                     S/N 4333                       _____________t                         1972      Replacement     Yes IR215(18-31)         Nova                     N/A               N/A               8 Bolts IM 8960755             2004       Replacement     No
IR215(06-23)
: 7.     Description of Work:           Replaced bolting and control rod drives at 06-23, 10-11, 10-23, 14-07, 14-1 1, 14-23, 18-31 loc.
GE S/N 4501 1972 Replacement Yes I R215(06-23)
: 8.     Tests Conducted:                   Ihydrostatic      I           Pneumatic               OI       Nominal Operating Pressure     EFI1 Other [             Pressure           1025             psi     Test Temp           240.6         &deg;F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Nova N/A N/A 8 [Bolts I I0 8960755 2004 Replacement No I R2t15(l 0- II)
GE S/N 2519 1972 Replacement Yes I R215(l 0-t t)
Nova N/A N/A 8 Bolts 11W 8960755 2004 Replacement No I R215(t0-23)
GE S/N 4494 1972 Replacement Yes IR215(10-23)
Nova N/A N/A 8 Bolts llt# 8960755 2004 Replacement No IR215(14-07)
GE S/N A4286 1 990 Replacement Yes IR215(14-07)
Nova N/A N/A 8 [lolts llt# 8960755 2004 Replacement No I R215(14-1 1)
GE S/N 3522 1 972 Replacement Yes I R215(14-1 l)
Noa N/A N/A 8 Bolts It# 8960755 2004 Replacement No IR2t5(14-23)
GE S/N 4467 1 973 Replacement Yes IR215(14-23)
Nova N/A N/A 8 Bolts Ift# 8960755 2004 Replacement No IR215(18-31)
GE S/N 4333 1
_____________t 972 Replacement Yes IR215(18-31)
Nova N/A N/A 8 Bolts I M 8960755 2004 Replacement No
: 7.
Description of Work:
Replaced bolting and control rod drives at 06-23, 10-11, 10-23, 14-07, 14-1 1, 14-23, 18-31 loc.
: 8.
Tests Conducted:
I hydrostatic I
Pneumatic OI Nominal Operating Pressure EFI1 Other [
Pressure 1025 psi Test Temp 240.6  
&deg; F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept.. ASME, 345 E. 47th St.. New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept.. ASME, 345 E. 47th St.. New York, NY 10017.


FORM NIS-2 I9-05-12 FORMtl NIS-2 (Back)
FORM NIS-2 I9-05-12 FORMtl NIS-2 (Back)
').       Remarks:     Replaced bolting and control rod drives at 06-23. 10-11. 10-23. 14-07. IJ-Il. 141-23. IX-'I locations.
').
Remarks:
Replaced bolting and control rod drives at 06-23. 10-11. 10-23. 14-07. IJ-Il. 141-23. IX-'I locations.
Successfully performed VT'-2 of replaced drives (105001). A V 1-I was successfuilly completed on all remoed bolting. See the individual work orders lbr each VT-I. A VT-I was successfiluly completed for all installed bolting at receivin; inspection.
Successfully performed VT'-2 of replaced drives (105001). A V 1-I was successfuilly completed on all remoed bolting. See the individual work orders lbr each VT-I. A VT-I was successfiluly completed for all installed bolting at receivin; inspection.
CERTIFICATE OF COMPLIANCE We certify that the statements mantde in the report are correct and this             Replacement (repair or replacement) conforms to the rules of the ASME Code, Section Xl.
CERTIFICATE OF COMPLIANCE We certify that the statements mantde in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp                           None Certificate of Autihorization No.                       None                 Expiration Date                 N/A Signed         &        Y           -t Supervist)r,Materials/lnspectioni     Date       aLyr                             2005 Owner or Owner's D)esihnee, Title CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid cominission issued by the National Board of l3oilerand Pressure Vessel Inspectors and the State or Province of                           lowva                     and employed by         I ISB CT of                           I lartford, Conii.                       have inspected the components described in this Owner's Report during the period           9q l b   .                 to         -7   -                                    , and state that to the best of my knowledge and belief, the Owner has perfonned examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASMIE Code, Section Xl.
Type Code Symbol Stamp None Certificate of Autihorization No.
None Expiration Date N/A Signed Y  
-t Supervist)r,Materials/lnspectioni Date aLyr 2005 Owner or Owner's D)esihnee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid cominission issued by the National Board of l3oilerand Pressure Vessel Inspectors and the State or Province of lowva and employed by I ISB CT of I lartford, Conii.
have inspected the components described in this Owner's Report during the period 9q l b.
to  
-7  
, and state that to the best of my knowledge and belief, the Owner has perfonned examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASMIE Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
___                                    Commissions           1v5     l3'   )94y-             /,'4     m Inspector's Signattire                                 National Board, State, Province, and Endorsements Date       7 - //                             , 2005
Commissions 1v5 l3'  
)94y-  
/,'4 m
Inspector's Signattire National Board, State, Province, and Endorsements Date 7 - //
, 2005


FORM NIS-2 19-05-13 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
FORM NIS-2 19-05-13 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owners         Alliant Energy (JES Utilities)                       Date                 4/30/2005 Name P. 0. Box 351, Cedar Rapids, IA 52406                             Sheet                  I        of            2 Address
: 1.
: 2. Plant         Duane AI2Iold Energy Center                         Unit Name 3277 DAEC Road, Palo, IA 52324                                                           MWO A63071 Address                                  Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (JES Utilities)
: 3. Work Performed by Alliant Eneray (IES Utilities)                   Type Code Symbol Stamp                None Name                                       Authorization No.                    None 3277 DAEC Road, Palo, IA 52324                                     Expiration Date                       None
Name Date 2.
: 4. Identification of System:           Core Spray
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane AI2Iold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 4/30/2005 I
: 5.    (a) Applicable Construction Code           P&V Draft Class 2       19     68     Edition           Addenda      N/A    Code Case.
of 2
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
MWO A63071 Repair Organization to P. 0. No., Job No., etc.
: 6. Identitication ot Components Repaired or Replaced and Replacement Components I                                                                                               ASME Name of             Name of       Manufacturer                                                   Year Built   Repaired,     Code Component     .Manufacturer         Serial No.       National       Other Identification                     Replaced, or Stamped Board No.                                                 Replacement   (YES or M02112               Flowserve           23520-1           N/A                 Valve Disc               2005       Replacement     No
: 3.
: 7. Description of Work:           Replaced valve disc due to poor connection between valve stem and disc on replaced components.
Work Performed by Alliant Eneray (IES Utilities)
: 8. Tests Conducted:                   Hydrostatic       f         Pneumatic         [       Nominal Operating Pressure Other =         Pressure           N/A         psi     Test Temp             N/A           OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
Expiration Date None None None 4.
5.
Identification of System:
Core Spray (a) Applicable Construction Code P&V Draft Class 2 19 68 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.
: 6.
Identitication ot Components Repaired or Replaced and Replacement Components I
ASME Name of Name of Manufacturer Year Built
: Repaired, Code Component  
.Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YES or M02112 Flowserve 23520-1 N/A Valve Disc 2005 Replacement No
: 7.
Description of Work:
Replaced valve disc due to poor connection between valve stem and disc on replaced components.
: 8.
Tests Conducted:
Hydrostatic f
Pneumatic
[
Nominal Operating Pressure Other =
Pressure N/A psi Test Temp N/A OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12182) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12182) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


FORM NIS-2 19-05-13 FORM NIS-2 (Back)
FORM NIS-2 19-05-13 FORM NIS-2 (Back)
: 9.       Remarks:         Replaced valve disc.
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this           Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Remarks:
Type Code Symbol Stamp                           None Certificate of Authorization No.                     None               Expir ation Date              N/A Signed     iiI4   ?'li-i       ;    Supervisor, MateriaMnspection     Date       8      iS-      '3            2005 Qpener or Owner's Designee, Title
Replaced valve disc.
                                                                                                                                        .1 the State or Province of CERTIFICATE OF INSERVICE INSPECTION I1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and Iowa                   and employed by         HSB CT I
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section XI.
of                             Hartford, Conn.                       have inspected the components described in this Owner's Report during the period           -      of                 to       S- 5Of                                 ,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
Replacement (repair or replacement)
Type Code Symbol Stamp None Certificate of Authorization No.
None Expir Signed iiI4  
?'li-i Supervisor, MateriaMnspection Date Qpener or Owner's Designee, Title ation Date N/A 8
iS-
'3 2005
.1 CERTIFICATE OF INSERVICE INSPECTION I1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period of to S-5Of  
,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
9 Commissions         /V-/;)         3?94X       l / b- -Z Inspector's Signature                              National Board, State, Pro ince, and Endorsements Date     '  -                                  200
I Commissions
                                              , 2005
/V-/;)
3?94X  
/
l  
/ 9 b-  
-Z National Board, State, Pro ince, and Endorsements Inspector's Signature Date 200
, 2005


FORM NIS-2 19-05-15 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
FORM NIS-2 19-05-15 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1. Owners       Alliant Energy (IES Utilities)                         Date                 4/30,2005 Name P. 0. Box 351, Cedar Rapids, IA 52406                               Sheet                I          of            2 Address
: 1.
: 2. Plant       Duane Arnold Energy Center                             Unit                  1 Name 3277 DAEC Road, Palo, IA 52324                                                           PWO 1128161 Address                                      Repair Organization to P. O. No., Job No., etc.
Owners Alliant Energy (IES Utilities)
: 3. Work Performed by Alliant Energy (IES Utilities)                     Type Code Symbol Stamp              None Name                                             Authorization No.                    None 3277 DAEC Road, Palo, IA 52324                                       Expiration Date                     None
Name Date 2.
: 4. Identification of System:         Standby Liquid Control
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 4/30,2005 I
: 5.    (a) Applicable Construction Code           P&V Draft Class 2       19     68     Edition           Addenda      N/A    Code Case.
of 2
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
1 PWO 1128161 Repair Organization to P. O. No., Job No., etc.
: 6. Identification ofComponents Repaired or Replaced and R           lacement Components ASAIE Name of           Name of         Manufracturer                                                     Year Built   Repaired,     Code Component       Mianufacturer       Serial No.       National         Other Identification                     Replaced, or Stamped Board No.                                                   Replacement   (YES or NO)
: 3.
XS2618B             IST Conax               608             N/A                   Valve                   2004       Replacement     No Nuclear
Work Performed by Alliant Energy (IES Utilities)
: 7. Description of Work:         Replaced explosive valve on frequency required by IST Prograrm.
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
: 8. Tests Conducted:                 Hydrostatic       [           Pneumatic         [I         Nominal Operating Pressure     EI1 Other =           Pressure         1245         psi     Test Temp             N/A           &deg;F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Expiration Date None None None 4.
5.
Identification of System:
Standby Liquid Control (a) Applicable Construction Code P&V Draft Class 2 19 68 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.
: 6.
Identification ofComponents Repaired or Replaced and R lacement Components ASAIE Name of Name of Manufracturer Year Built
: Repaired, Code Component Mianufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YES or NO)
XS2618B IST Conax 608 N/A Valve 2004 Replacement No Nuclear
: 7.
Description of Work:
Replaced explosive valve on frequency required by IST Prograrm.
: 8.
Tests Conducted:
Hydrostatic
[
Pneumatic
[I Nominal Operating Pressure EI1 Other =
Pressure 1245 psi Test Temp N/A  
&deg; F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


FORM NIS-2 19-05-ls FOR;IM NIS-2 (Back)
FORM NIS-2 19-05-ls FOR;IM NIS-2 (Back)
: 9.       Remarks:     Replaced valve.Valve is threaded into place. Successfully performed VT-2 of the valve after installation (P05024).
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this           Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Remarks:
Type Code Symbol Stamp                       None Certificate of Authorization No.                   None                 Expiration Date                 N/A Signed     i I-4     Supervisor,Materials/Inspection Owfieror0%vner'sDesigneeTitle Date      G    o Q
Replaced valve.Valve is threaded into place. Successfully performed VT-2 of the valve after installation (P05024).
(41 I
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section XI.
                                                                                                          ,          2005 CERTIFICATE OF INSERVICE INSPECTION                                                           l 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                       Iowa                     and employed by         IISB CT of                         Hartford, Conn.                       have inspected the components described in this Owner's Report during the period             //- i& - ocl             to   _        _  _ - 6 _'  _C_
Replacement (repair or replacement)
_                  , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
Type Code Symbol Stamp Certificate of Authorization No.
None None Expiration Date N/A Signed i
4 Supervisor,Materials/Inspection Date G
o (41 2005 I-Owfieror0%vner'sDesigneeTitle Q
I CERTIFICATE OF INSERVICE INSPECTION l
1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period  
//-
i& - ocl to  
- 6
_C_  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions           -V5 j )                   / ,
Commissions
Inspector's Signature                               National Board, State, Province, and Endorsements Date          )  6    - So                ,2005
-V5 j )  
/,
Inspector's Signature Date
) 6 So National Board, State, Province, and Endorsements
,2005


FORM NIS-2 19-05-16 FORM NIS-2 OWNIERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASMI-E Code Section Xi I. Owners       Alliant Energy (IES Utilities)                       Date                     5/2/2005 Name P. O. Box 351, Cedar Rapids, IA 52406                               Sheet                    I          of              2 Address
FORM NIS-2 19-05-16 FORM NIS-2 OWNIERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASMI-E Code Section Xi I.
: 2. Plant         Duane Arnold Energy Center                           Unit Name PWO 1129096, 1129097, 1129098, 1129099 3277 DAEC Road, Palo, IA 52324                                                1129100, 1129101, 1129102 and CWO A067500 Address                                      Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (IES Utilities)
: 3.       Work Performed by Alliant Energey (IES Utilities)                   Type Code Symbol Stamp                    None Name                                             Authorization No.                        None 3277 DAEC Road, Palo, IA 52324                                     Expiration Date                           None
Name Date 2.
: 4.       Identification of System:         Ccontrol Rod Drive S.    (a) Applicable Construction Code           ASME Sect. III         19       68       Edition U'68       Addenda       NIA   Code Case.
P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 5/2/2005 I
Class I (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1992-A92 Io.     Identimication o0LomponenIs Kepaired or Ke laced and Ke lacement Components AS,%l:
of 2
Name or           Name of       Manufacturer                                                         Year Built     Repaired. Code Component       NManuracturer     Serial No.         National       Other Identification                         Replaced. or Stamped Board No.                                                     Replacement   (YES or
PWO 1129096, 1129097, 1129098, 1129099 1129100, 1129101, 1129102 and CWO A067500 Repair Organization to P. 0. No., Job No., etc.
                                      ._                                  .                                .                                NO)
: 3.
IR215(22-03)         GE                 S/N4407                                                               1972       Replacement     Yes I R2l5(22-03)       Nova                 N/A               NMA           8 Bolts lth# 8960755             2004       Replacement     No 1R215(22-07)       GE                 S/N 4388                                                               1972       Replacement     Yes IR215(22-07)         Nova                 N/A               N/A           8 Bolts Ith# 8960755             2004       Replacement     No I R215(22-1 1)       GE                 S/N 4017                                                               1972       Replacement     Yes IR215(22-1 t)       Nova                 N/A               N/A           8 Bolts llt# 8960755             2004       Rcplaccmcnt     No I R215(22-31)       GE                 S/N 3965                                                               1972       Replacement     Yes I R2 15(22-31)       Nova                 N/A               N/A           8 Bolts I It# 8960755             2004       Replacement     No 1R2 15(26-l t)       GE                 S/N 3956                                                               1972      Replacement     Yes IR215(26-1l)         Nova                 N/A               N/A           8 BoLS lutH8960755                2004       Replacement     No IR215(26-31)         GE                 S/N 4789                                                               1973       Replacement     Yes IR215(26-31)         Nova                 N/A               N/A           8 Bolts 1llt 8960755         =   2004       Replacement     No I R215(30-15)       GE                 S/N 4350                                                               1972       Replacement     Yes IR215(30-15)         Nova                 N/A               N/A           8 Bolts llt# 8960755             2004         ecplacemcnt     No
Work Performed by Alliant Energey (IES Utilities)
: 7.       Description of Work:         Replaced bolting and control rod drives at 22-03, 22-07, 22-11, 22-31. 26-1 1, 26-31, 30-15 loc.
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
: 8.       Tests Conducted:                 Hlydrostatic         z         Pneumatic           z       Nominal Operating Pressure       Exl1 Other   L         Pressure           1025         psi     Test Temp             240.6           0 F NOTE: Supplemental sheets in form of lists. sketches. or drawings may be used, provided (I) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Expiration Date None None None 4.
S.
Identification of System:
C (a) Applicable Construction Code control Rod Drive ASME Sect. III 19 68 Edition U'68 Addenda NIA Code Case.
Class I (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1992-A92 Io.
Identimication o0 LomponenIs Kepaired or Ke laced and Ke lacement Components AS,%l:
Name or Name of Manufacturer Year Built Repaired.
Code Component NManuracturer Serial No.
National Other Identification Replaced. or Stamped Board No.
Replacement (YES or NO)
IR215(22-03)
GE S/N4407 1972 Replacement Yes I R2l5(22-03)
Nova N/A NMA 8 Bolts lth# 8960755 2004 Replacement No 1 R215(22-07)
GE S/N 4388 1972 Replacement Yes IR215(22-07)
Nova N/A N/A 8 Bolts Ith# 8960755 2004 Replacement No I R215(22-1 1)
GE S/N 4017 1972 Replacement Yes IR215(22-1 t)
Nova N/A N/A 8 Bolts llt# 8960755 2004 Rcplaccmcnt No I R215(22-31)
GE S/N 3965 1972 Replacement Yes I R2 15(22-31)
Nova N/A N/A 8 Bolts I It# 8960755 2004 Replacement No 1 R2 15(26-l t)
GE S/N 3956 1 972 Replacement Yes IR215(26-1l)
Nova N/A N/A 8 BoLS lutH 8960755 2004 Replacement No IR215(26-31)
GE S/N 4789 1973 Replacement Yes IR215(26-31)
Nova N/A N/A 8 Bolts 1llt 8960755  
=
2004 Replacement No I R215(30-15)
GE S/N 4350 1972 Replacement Yes IR215(30-15)
Nova N/A N/A 8 Bolts llt# 8960755 2004 ecplacemcnt No
: 7.
Description of Work:
Replaced bolting and control rod drives at 22-03, 22-07, 22-11, 22-31. 26-1 1, 26-31, 30-15 loc.
: 8.
Tests Conducted:
Hlydrostatic z
Pneumatic z
Nominal Operating Pressure Exl1 Other L Pressure 1025 psi Test Temp 240.6 0 F NOTE: Supplemental sheets in form of lists. sketches. or drawings may be used, provided (I) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St.. New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St.. New York, NY 10017.


F()RM NIS-2 '19-05-16, FORM NIS-2 (Back)
F()RM NIS-2 '19-05-16, FORM NIS-2 (Back)
').       IReniarks:   Replaced bolting and control rod (Irives at 22-03. 2?-07. 22-1 1, 22-31, 26-1 1. 26-31. 30-1 5 locations.
').
Successfiully performedw   v-2 of replaced drives (105001 ). A VT-I was successfully completed at receiving inspection for replacement bolting. An Inservice bolting, vr-I inspection was complete(d on all removed boltin, and lound satisfactory. See the individual work order lor each VT-I.
IReniarks:
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this             Replacement (repair or replacement) confonns to the rules of the ASME Code, Section Xi.
Replaced bolting and control rod (Irives at 22-03. 2?-07. 22-1 1, 22-31, 26-1 1. 26-31. 30-1 5 locations.
Type Code Symbol Stamirp                         None Certificate of Authorization No.                     None                 Expiration Date               N/A Signed       %                  (0Ot   Supervisor, Materials/Inspection   I)ate   0 t L       d/1                   2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the Nalional Board of Boiler and Pressure Vessel Inspectors and the State or Province of                           Iowa                     and employed by         HSIS CT of                           llartford, Conn.                         have inspected the components described inthis Owner's Report during the period         C? - /6- - o0                  to                     o
Successfi ully performedw v-2 of replaced drives (105001 ). A VT-I was successfully completed at receiving inspection for replacement bolting. An Inservice bolting, vr-I inspection was complete(d on all removed boltin, and lound satisfactory. See the individual work order lor each VT-I.
                                                                        - f// -c                           , and state that to the best of my knowledge and belief: the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) confonns to the rules of the ASME Code, Section Xi.
Type Code Symbol Stamirp None Certificate of Authorization No.
None Expiration Date N/A Signed (0Ot Supervisor, Materials/Inspection I)ate 0 t L d /1 2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the Nalional Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSIS CT of llartford, Conn.
have inspected the components described in this Owner's Report during the period C? - /6- - 0 o
to  
- f// -c o
, and state that to the best of my knowledge and belief: the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions         Ae)
Commissions Ae)
Inspector's Sinature                                 National Board, State, Province, and Endorsements Date                                         , 2005
Inspector's Sinature National Board, State, Province, and Endorsements Date
[)ate                                           2005
, 2005
[)ate 2005


FORM NIS-2 19-05-17 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions ofthe ASME Code Section Xl
FORM NIS-2 19-05-17 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions ofthe ASME Code Section Xl
: 1. Owners       Alliant l-neriw (II'S Utilities)                         Date                     512/2005 Name P. 0. Box 351, Cedar Rapids, IA 52406                                 Sheet                    I        of              2 Address
: 1.
: 2. Plant         Duane Arnold Energy Center                               Unit Name PWO 1129104, 1129105, 1129107, 1129114, 3277 DAEC Road, Palo, IA 52324                                                        1132803 and CWO A067500 Address                                          Repair Organization to P. 0. No., Job No., etc.
Owners Alliant l-neriw (II'S Utilities)
: 3. Work Performed by Alliant Energv (IES Utilities)                       Type Code Symbol Stamp                  None Name                                                 Authorization No.                      None 3277 DAEC Road, Palo, IA 52324                                         Expiration Date                         None
Name Date 2.
: 4.     Identification of System:             C'ontrol Rod Drive
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 512/2005 I
: 5.    (a) Applicable Construction Code               ASME Sect. III           19       68       Edition W68        Addenda      N/A    Code Case.
of 2
Class I (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92
PWO 1129104, 1129105, 1129107, 1129114, 1132803 and CWO A067500 Repair Organization to P. 0. No., Job No., etc.
: 6.     Identitication of Components Repaired or Re laced and Replacement Components AS E Name of           Name or         'lanturacttirer                                                       Year Buill     Repaired.       Code Component       Mianufacturer         Serial No.         National         Other ldenlification                         Replaced, or Stamped Board No.                                                     Replacement   (YUS or
: 3.
                                                                            ._                                                                  NO)
Work Performed by Alliant Energv (IES Utilities)
IR215(30-39)       GE                     SIN 4X75                                                             1973       Replacement       Yes IR215(30-39)       Nova                     NIA               N/A             8 Bolts llt 8960755             200I4       Replacement       No IR215(34 -07)       GE                   SIN A8883                                                             1990       Replacement       Yes IR215(34-07)       Noia                     N/A               N/A             8 Bolts Ilt# 8960755             2004       Replacement       No IR215(34-39)       (E                     S/N 3979                                                             1972       Replacement       Yes I R215(34-39)       Nova                     N/A               N/A             8 Bolts I It# 8960755           2004       Replacement       No IR215(34-1t1)       GE                     SIN 4355       1             1                                     1972       Replacement       Yes IR215(34-1 1)       Nova                     N/A               N/A             8 Bolts I1tW 8960755             2004       Replacement       No IR215(30-31)       GE                     SIN 3964                       1                                     1972       Replacement       Yes IR215(30-31)         Nova                     NIA               N/A             8 Bolts IIt0 8960755             2004       Replacement       No
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
: 7.     Description of Work:         Replaced bolting and control rod drives at 30-39, 34-07, 34-39, 34-11, 30-31 loc.
Expiration Date None None None 4.
: 8. Tests Conducted:                       yldrostatic         z         Pneumatic           FI1       Nominal Operating Pressure Other EI]           Pressure           1025         psi       Test Temp           240.6           &deg;F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
5.
Identification of System:
C'ontrol Rod Drive (a) Applicable Construction Code ASME Sect. III 19 68 Edition Class I (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 W68 Addenda N/A Code Case.
: 6.
Identitication of Components Repaired or Re laced and Replacement Components
.AS E Name of Name or  
'lanturacttirer Year Buill Repaired.
Code Component Mianufacturer Serial No.
National Other ldenlification Replaced, or Stamped Board No.
Replacement (YUS or NO)
IR215(30-39)
GE SIN 4X75 1973 Replacement Yes IR215(30-39)
Nova NIA N/A 8 Bolts llt 8960755 200I4 Replacement No IR215(34 -07)
GE SIN A8883 1990 Replacement Yes IR215(34-07)
Noia N/A N/A 8 Bolts Ilt# 8960755 2004 Replacement No IR215(34-39)
(E S/N 3979 1972 Replacement Yes I R215(34-39)
Nova N/A N/A 8 Bolts I It# 8960755 2004 Replacement No IR215(34-1t1)
GE SIN 4355 1
1 1972 Replacement Yes IR215(34-1 1)
Nova N/A N/A 8 Bolts I1tW 8960755 2004 Replacement No IR215(30-31)
GE SIN 3964 1
1972 Replacement Yes IR215(30-31)
Nova NIA N/A 8 Bolts IIt0 8960755 2004 Replacement No
: 7.
Description of Work:
Replaced bolting and control rod drives at 30-39, 34-07, 34-39, 34-11, 30-31 loc.
: 8.
Tests Conducted:
yldrostatic z
Pneumatic FI1 Nominal Operating Pressure Other EI]
Pressure 1025 psi Test Temp 240.6  
&deg; F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Forn (1.00030) may be obtained from the Order Dept., ASME. 345 E. 47th St., New York, NY 10017.
(12/82) This Forn (1.00030) may be obtained from the Order Dept., ASME. 345 E. 47th St., New York, NY 10017.


I ORN NIS-2 19-(5-17 FOIRM NIS-2 (Back)
I ORN NIS-2 19-(5-17 FOIRM NIS-2 (Back)
: 9.       Remarks:     Replaced boiling and control rod drives at 30-39, 34-07. 34-39, 34-i 1. 30-3 I locations. SuccesslIlIly performed VT-2 of replaced drives (105001). A V 1-I was successfuilly completed at receivin, inspection for all replacement bolting. An Inservice bolting V-l'-l was completed on all removed bolting an found satisfactory with one exception. 105141 on PWo 11)29105 found one bolt with damage to two threads from handling damnae.
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Replacement (repair or replacement) conforms to the rules of the ASME Code, Section Xl.
Remarks:
Type Code Symbol Stamp                         None Certificate of Authorization No.                   None                 [Expiration Date               N/A Signed         ,    >  AeX,P Ccr Supervisor. Materials/Inspectiom     Date       ,'*L     ..                    2005 Owner or Owner's Designee, TIitle CERTIFICATE. OF INSERVICE INSPECTlION 1,the undersigned. holding, a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                   and employed by         IISB cr of                           IlartFord, Conn.                       have inspected the components described in this Owner's Report dluring the period       q *3 -oq                     to         7 a0                             , and state that to the best of my knowledge and belief, the Owner has perforned examin-ations and taken corrective measures described in this 0Owner's Report in accordance wvith the requirements of the ASMIE Code, Section Xl.
Replaced boiling and control rod drives at 30-39, 34-07. 34-39, 34-i 1. 30-3 I locations. SuccesslIlIly performed VT-2 of replaced drives (105001). A V 1-I was successfuilly completed at receivin, inspection for all replacement bolting. An Inservice bolting V-l'-l was completed on all removed bolting an found satisfact ory with one exception. 105141 on PWo 11)29105 found one bolt with damage to two threads from handling damnae.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp None Certificate of Authorization No.
None
[Expiration Date N/A Signed AeX  
,P Ccr Supervisor. Materials/Inspectiom Date  
,'* L 2005 Owner or Owner's Designee, TIitle CERTIFICATE. OF INSERVICE INSPECTlION 1, the undersigned. holding, a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB cr of IlartFord, Conn.
have inspected the components described in this Owner's Report dluring the period q *3  
-oq to 7 a0  
, and state that to the best of my knowledge and belief, the Owner has perforned examin-ations and taken corrective measures described in this 0Owner's Report in accordance wvith the requirements of the ASMIE Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
__________________                  Commissions         ,VB         )         4.2 ,          /'
Commissions  
Inspector's Signature                               National Board, State, Province, and Endorsementts I)ate         /                             270
,VB  
                                            , 20(05
)
4.2  
/'
Inspector's Signature National Board, State, Province, and Endorsementts I)ate 270
/
, 20(05


FORM NIS-2 19-05-18 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
FORM NIS-2 19-05-18 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Onwners       Alliant Energy (IES Utilities)                                   Date                   512/2005 Name P. 0. Box 351, Cedar Rapids, IA 52406                                         Sheet                  I        of            2 Address
: 1.
: 2. Plant         Duane Arnold Energy Center                                       Unit                   1 Name PWOs 1132908, 1129109, 1129108, 1132909, 3277 DAEC Road, Palo, IA 52324                                                          1129110, 1129113 and CWO A067500, A65092 Address                                                Repair Organization to P. O. No., Job No., etc.
Onwners Alliant Energy (IES Utilities)
: 3. Work Performed by Alliant Energy (ES Utilities)                               Type Code Symbol Stamp                None Name                                                       Authorization No.                      None 3277 DAEC Road, Palo, IA 52324                                                 Expiration Date                       None
Name Date 2.
: 4. Identification of System:         Control Rod Drive
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 512/2005 I
: 5.    (a) Applicable Construction Code           ASME Sect. VIII                   19     68     Edition             Addenda      N/A    Code Case.
of 2
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92
1 PWOs 1132908, 1129109, 1129108, 1132909, 1129110, 1129113 and CWO A067500, A65092 Repair Organization to P. O. No., Job No., etc.
: 6. Identification of Components Repaired or Re laced and R                 lacement Components ASME Name of           Name of         Manufacturer                                                                 Year Built     Repaired,     Code Component       Manufacturer       Serial No.               National             Other Identification                       Replaced, or Stamped Board No.                                                         Replacement   (YES or
: 3.
_ _ _ _ ____ _  _  _ _  _ _ _  _ _ __ _  _ _ _  _ _ _ _  _ _ _N                                 O) 1S220 (02-19)       GE                 SIN C0101                                       IiCU Accumulator               1978       Replacement     Yes IS220 (34-23)       GE                 S/N C0079                     }iCU                 Accumulator               1978       Replacement     Yes IS220 (10-23)       GE                 S/N A2573                                       IICU Accumulator               1978       Replacement     Yes IS220 (10-15)       GE                 S/N A2547                                       I1CU Accumulator               1978       Replacemcnt     Yes IS220 (30-39)       GE                 S/N C0089                                       llCU Accumulator               1978       Replacement     Ycs IS220 (14-27)       GE                 SIN C0078             _1CU                           Accumulator               1978       Replacement     Yes IS220 (42-23)       GE                 S/N CO 100                                       MCU Accumulator               1978       Replacement     Yes
Work Performed by Alliant Energy (ES Utilities)
: 7. Description of Work:         Replaced HCU Accumulators at 02-19, 34-23, 10-23, 10-15, 30-39, 14-27, 42-23 locations
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
: 8. Tests Conducted:                 Hydrostatic               [         Pneumatic             []         Nominal Operating Pressure Other [         Pressure                 1025             psi     Test Temp             240.6         0 F
Expiration Date None None None 4.
- NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
5.
Identification of System:
Control Rod Drive (a) Applicable Construction Code ASME Sect. VIII 19 68 Edition (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.
: 6.
Identification of Components Repaired or Re laced and R lacement Components ASME Name of Name of Manufacturer Year Built
: Repaired, Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YES or
_ _ _N O )
1 S220 (02-19)
GE SIN C0101 IiCU Accumulator 1978 Replacement Yes IS220 (34-23)
GE S/N C0079  
}iCU Accumulator 1978 Replacement Yes IS220 (10-23)
GE S/N A2573 IICU Accumulator 1978 Replacement Yes I S220 (10-15)
GE S/N A2547 I1CU Accumulator 1978 Replacemcnt Yes IS220 (30-39)
GE S/N C0089 llCU Accumulator 1978 Replacement Ycs IS220 (14-27)
GE SIN C0078
_1CU Accumulator 1978 Replacement Yes IS220 (42-23)
GE S/N CO 100 MCU Accumulator 1978 Replacement Yes
: 7.
Description of Work:
Replaced HCU Accumulators at 02-19, 34-23, 10-23, 10-15, 30-39, 14-27, 42-23 locations
: 8.
Tests Conducted:
Hydrostatic
[
Pneumatic
[]
Nominal Operating Pressure Other [
Pressure 1025 psi Test Temp 240.6 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


I-IORtMI NIS-2 19-05-IS FORM NIS-2 (Back)
I -
: 9.       Remarks:     Replaced IICU Accumulators at 02-19, 34-23, 10-23, 10-15, 30-39, 14-27, 42-23 locations. Successfully performed VT-2 of replaced IICU accumulators (105001).
IORtMI NIS-2 19-05-IS FORM NIS-2 (Back)
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this       Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.
: 9.
Type Code Symbol Stamp                         None Certificate of Authorization No.                   None               Expiration Date               N/A Signed                             Supervisor, Materials/Inspection   Date     /Y?ae.1 (9 ,                   2005 Owtler or O'vner's Designee, Title                             \J CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                       Iowa                   and employed by       IISB CT of                           Hartford, Conn.                       have inspected the components described in this Owner's Report during the period         !- 6 -O-/                   to       A-/f-c,                               , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
Remarks:
Replaced IICU Accumulators at 02-19, 34-23, 10-23, 10-15, 30-39, 14-27, 42-23 locations. Successfully performed VT-2 of replaced IICU accumulators (105001).
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp None Certificate of Authorization No.
None Expiration Date N/A Signed Supervisor, Materials/Inspection Date  
/Y? ae.1 (9,
2005 Owtler or O'vner's Designee, Title  
\\J CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period  
!- 6 -O-/
to A- /f-c,  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions         AtI, 1,3-3)i 4,v'J.
Commissions AtI, 1,3-3)i 4,v'J.
Inspector's Signature                               National Board, State, Province, and Endorsements Date             -                            20q
Inspector's Signature National Board, State, Province, and Endorsements Date 2
                                            , 2005
0q
, 2005


FORM NIS-2 19-05-19 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
FORM NIS-2 19-05-19 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owners       Alliant Energy (IES Utilities)                             Date                   5125/2005 Name P. O. Box 351, Cedar Rapids, IA 52406                                     Sheet                  I        of            2 Address
: 1.
: 2.      Plant       Duane Arnold Energy Center                                   Unit Name 3277 DAEC Road, Palo, IA 52324                                                       CWO A54646 Address                                          Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (IES Utilities)
: 3. Work Performed by Alliant Energv (IES Utilities)                         Type Code Symbol Stamp                None Name                                                 Authorization No.                      None 3277 DAEC Road, Palo, IA 52324                                             Expiration Date                       None
Name Date 2.
: 4.     Identification of System:               Main Steam Line Drain
P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 5125/2005 I
: 5.    (a) Applicable Construction Code                 ANSIB31.1               19     67       Edition N/A       Addenda   N/A       Code Case.
of 2
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 ID.      I -     .. ot omponenis IIdentlicaton                  .- -        . . - .        . -      I Repaired or .Kq aced and Ke lacement Cornponents ASME Name of           Name of           Manufacturer                                                         Year Built     Repaired,     Code Component         Manufacturer           Serial No.       National         Other Identification                       Replaced, or Stamped Board No.                                                     Replacement   (Y'ES or NO)
CWO A54646 Repair Organization to P. 0. No., Job No., etc.
CV1064               Flowserve             SIN 29AXD             N/A             Main Steam Drain to             2004       Replacement     No Condenser Isolation Valve EBDO02               Vision Metals           I IT# 151234         N/A               Piping to CVI 064             1999       Replacement     No EBDO02               Gulf States Stecl [IT#     7462666         N/A         1/4 " Plate Steel for CV1064       1998       Replacement     No Support EBDO02               Lukens Steel           HT# R2958             N/A         Sf8" Plate Steel for CV1064         1991       Replacement     No Support EBD002               Independence           iIT# D42964           N/A             Tube Steel for CV 1064           2002       Replacement     No Tube Corp                                                           Support EBDO02               Bergen-Power                 283             N/A                     U-Bolts                 2004       Replacement     No
: 3.
: 7. Description of Work:           Replaced CV1064 with a valve that has a heavier operator, and installed new supports for the operator.
Work Performed by Alliant Energv (IES Utilities)
: 8. Tests Conducted:                       Hydrostatic         L         Pneumatic             [I]       Nominal Operating Pressure Other     j           Pressure         968*             psi     Test Temp           552*           0 F
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
Expiration Date None None None 4.
5.
Identification of System:
Main Steam Line Drain (a) Applicable Construction Code ANSIB31.1 19 67 Edition N/A Addenda N/A Code Case.
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 I
I I -
I D.
Identlicaton ot omponenis Repaired or.Kq aced and Ke lacement Cornponents ASME Name of Name of Manufacturer Year Built
: Repaired, Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (Y'ES or NO)
CV1064 Flowserve SIN 29AXD N/A Main Steam Drain to 2004 Replacement No Condenser Isolation Valve EBDO02 Vision Metals I IT# 151234 N/A Piping to CVI 064 1999 Replacement No EBDO02 Gulf States Stecl
[IT#
7462666 N/A 1/4 " Plate Steel for CV1064 1998 Replacement No Support EBDO02 Lukens Steel HT# R2958 N/A Sf8" Plate Steel for CV1064 1991 Replacement No Support EBD002 Independence iIT# D42964 N/A Tube Steel for CV 1064 2002 Replacement No Tube Corp Support EBDO02 Bergen-Power 283 N/A U-Bolts 2004 Replacement No
: 7.
Description of Work:
Replaced CV1064 with a valve that has a heavier operator, and installed new supports for the operator.
: 8.
Tests Conducted:
Hydrostatic L
Pneumatic
[I]
Nominal Operating Pressure Other j Pressure 968*
psi Test Temp 552*
0 F
*Performed in-accordance with Code Case N416-1 NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
*Performed in-accordance with Code Case N416-1 NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E.47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E.47th St., New York, NY 10017.


______ LL-FORM NIS-2 19-05-19 FORM NIS-2 (Back)
LL-FORM NIS-2 19-05-19 FORM NIS-2 (Back)
: 9.       Remarks:       Replaced CV1064. Welded in Valve and a pipe pup piece to fit valve into systeII. Successfully surface examined piping welds. Built additional supports from the flat plate and u-bolts to support the heavier valve and operator. Successfully performed VT-2 of piping welds and of the replaced valve (Report P05025 performed on Report 105102).
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this             Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Remarks:
Type Code Symbol Stamp                           None Certificate of Atth       tion 3       o.                 None               Expiration Date                 N/A Signe   4
Replaced CV1064. Welded in Valve and a pipe pup piece to fit valve into systeII. Successfully surface examined piping welds. Built additional supports from the flat plate and u-bolts to support the heavier valve and operator. Successfully performed VT-2 of piping welds and of the replaced valve (Report P05025 performed on Report 105102).
              -                        Supervisor, Materials/inspection   Date     /IY 1 cf Z       I1             2005 Ovtner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                           Iowa                   and employed by         HSB CT of                             Hartford, Conn.                       have inspected the components described in this Owner's Report during the period       /I I-o q                         to             S - J 2R-. &#xb6;i;                     , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp None Certificate of Atth tion 3
: o.
None Expiration Date N/A Signe 4
Supervisor, Materials/inspection Date  
/IY 1 cf Z I1 2005 Ovtner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period  
/I I-o q
to S - J 2R -.  
&#xb6;i;  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commnissions         .AlV-g i.94       4,.-v             / L/ 9 t..
Commnissions
Inspector's Signature                                 National Board, State, Province, and Endorsements Date                                             2.0-0
.AlV-g i.94 4,.-v
                                              , 2005
/ L/ 9 t..
Inspector's Signature National Board, State, Province, and Endorsements Date
: 2. 0-0
, 2005


FORM NIS-2 19-05-20
FORM NIS-2 19-05-20
* FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
* FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1. Oweners       Alliant Energy (IES Utilities)                       Date                   5/26/2005 Name P. O. Box 351, Cedar Rapids, IA 52406                             Sheet                    I        of            2 Address I
: 1.
: 2. Plant         Duane Arnold Energy Center                           Unit Name 3277 DAEC Road, Palo, LA 52324                                               CWO A64843 Address                                    Repair Organization to P. O. No., Job No., etc.
Oweners Alliant Energy (IES Utilities)
: 3. Work Performed by Alliant Energy (IES Utilities)                   Type Code Symbol Stamp                  None Name                                           Authorization No.                      None 3277 DAEC Road. Palo, IA 52324                                     Expiration Date                         None
Name Date 2.
: 4. Identification of System:         Reactor Recirculation
P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, LA 52324 Address Sheet Unit 5/26/2005 I
: 5.    (a) Applicable Construction Code           ANSI B3 1.1           19     67 Edition N/A               Addenda   NIA       Code Case.
of 2
I CWO A64843 Repair Organization to P. O. No., Job No., etc.
: 3.
Work Performed by Alliant Energy (IES Utilities)
Name 3277 DAEC Road. Palo, IA 52324 Type Code Symbol Stamp Authorization No.
Expiration Date None None None 4.
5.
Identification of System:
Reactor Recirculation (a) Applicable Construction Code ANSI B3 1.1 19 67 Edition N/A Addenda NIA Code Case.
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
: 0. Identificaton of Componens Repaired or Ke laced and       Ke lacement Components ASME Name of           Name of       Manufacturer                                                       Year Built     Repaired,     Code Component       Manufacturer       Serial No.       National         Other Identification                       Replaced, or Stamped Board No.                                                     Replacement   (YES or I_                                                                                                                                     NO)
: 0.
Recirculation       GE                     NIA             NA         Reactor Recirculation Riser       Unknown       Repaired       No Piping                                                                   Dissimilar Metal Weld
Identificaton of Componens Repaired or Ke laced and Ke lacement Components ASME Name of Name of Manufacturer Year Built
: 7. Description of Work:         Removed weld crown on RRF-F002 weld by Machining.
: Repaired, Code Component Manufacturer Serial No.
: 8. Tests Conducted:                 Hydrostatic       Z         Pneumatic           [II         Nominal Operating Pressure   LII Pressure         N/A           psi     Test Temp             N/A           0 F Other =
National Other Identification Replaced, or Stamped Board No.
NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Replacement (YES or I_
NO)
Recirculation GE NIA NA Reactor Recirculation Riser Unknown Repaired No Piping Dissimilar Metal Weld
: 7.
Description of Work:
Removed weld crown on RRF-F002 weld by Machining.
: 8.
Tests Conducted:
Hydrostatic Z
Pneumatic
[II Nominal Operating Pressure LII Other =
Pressure N/A psi Test Temp N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


_  _    _  _  _          _  _ _ _ _ _ _      _ _ _ _ I .LA FORM NIS-2 19-05-20 FORM NIS-2 (Back)
I.LA FORM NIS-2 19-05-20 FORM NIS-2 (Back)
: 9.       Remarks:     Removed weld crown from Recirculation Riser safe-end dissimilar metal weld RRF-F002 by machining. Weld crown was removed to improve the ultrasonic examination of the weld. Successful surface exam was completed on weld (P05019) after machining was completed.
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Repair (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Remarks:
Type Code Symbol Stamp                         None Certificate of AutE tion No.                       None               Expiration Date                     N/A Signed X2                            Supervisor, Materials/Inspection   Date                                             2005 l-E-     OPner or Owner's Designee, Title                               '-4 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                   and employed by         IISB CT of                         Hartford, Conn.                         have inspected the components described in this Owner's Report during the period           ii- 6 -A.'q               to                 - A6- C)v                         , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
Removed weld crown from Recirculation Riser safe-end dissimilar metal weld RRF-F002 by machining. Weld crown was removed to improve the ultrasonic examination of the weld. Successful surface exam was completed on weld (P05019) after machining was completed.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section XI.
Repair (repair or replacement)
Type Code Symbol Stamp Certificate of AutE tion No.
Signed X2 None None Expiration Date N/A Supervisor, Materials/Inspection Date 2005 E-OPner or Owner's Designee, Title
'-4 l-CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period ii-6 -A.' q to  
- A6-C) v  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions         Comiss /o3ns       //99 7-         J/_/         -Tm)(
Commissions Comiss /o3ns  
7 Inspector's Signature                               National Board, State, Province, and Endorsements Date Date,200                               , 2005
//99  
-T 7-J/_/
m)(
7 Inspector's Signature National Board, State, Province, and Endorsements Date
, 2005 Date,200


FORM NIS-2 19-05-21 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
FORM NIS-2 19-05-21 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1. Owners       Alliant Energy (IFS Utilities)                             Date                 5/26/2005 Name P. O. Box 351, Cedar Rapids, IA 52406                                   Sheet                  I        of2 Address
: 1.
: 2.      Plant       Duane Arnold Energy Center                               Unit Name 3277 DAEC Road, Palo, IA 52324                                                     CWO A64844 Address                                        Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (IFS Utilities)
: 3. Work Performed by Alliant Energy (IES Utilities)                       Type Code Symbol Stamp                None Name,                                               Authorization No.                      None 3277 DAEC Road, Palo, IA 52324                                         Expiration Date                       None
Name Date 2.
: 4. Identification of System:           PReactor Recirculation
P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 5/26/2005 I
: 5.  (a) Applicable Construction Code             ANSI B31.1               19       67       Edition   N/A     Addenda   N/A       Code Case.
of2 CWO A64844 Repair Organization to P. 0. No., Job No., etc.
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 r     ,      .  .. _    .-    ,    .      .      .  .    .    .    .    .      _
: 3.
: 6. Identificat ion of Components Repaired or Re laced and Retlacement Components ASINE Name of           Nameof           lManufacturer                                                       Year Built     Repaired,     Code Component       Manufacturer         Serial No.       National           Other Identification                     Replaced, or Stamped Board No.                                                     Replacement   (YES or Recirculation       GE                     N/A               N/A         Reactor Recirculation Riser     Unknown       Repaired       No Piping                                                                         Dissimilar Metal Weld
Work Performed by Alliant Energy (IES Utilities)
: 7. Description of Work:         Removed weld crown on RRG-F002 weld by machining.
: Name, 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
: 8. Tests Conducted:                   Hydrostatic       [I]         Pneumatic           _II       Nominal Operating Pressure Other   11         Pressure           N/A             psi     Test Temp           N/A           0 F
Expiration Date None None None 4.
NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8 12 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
5.
Identification of System:
PReactor Recirculation (a) Applicable Construction Code ANSI B31.1 19 67 Edition N/A Addenda N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Code Case.
r
: 6.
Identificat ion of Components Repaired or Re laced and Retlacement Components ASINE Name of Nameof lManufacturer Year Built
: Repaired, Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YES or Recirculation GE N/A N/A Reactor Recirculation Riser Unknown Repaired No Piping Dissimilar Metal Weld
: 7.
Description of Work:
Removed weld crown on RRG-F002 weld by machining.
: 8.
Tests Conducted:
Hydrostatic
[I]
Pneumatic
_II Nominal Operating Pressure Other 11 Pressure N/A psi Test Temp N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8 12 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) maybe obtained from the Order Dept., ASME, 345 E.47th St., New York, NY 10017.
(12/82) This Form (E00030) maybe obtained from the Order Dept., ASME, 345 E.47th St., New York, NY 10017.


                                                                                                                                  -I     J L FORM NIS-2 19-05-21 FORM NIS-2 (Back)
-I J L FORM NIS-2 19-05-21 FORM NIS-2 (Back)
: 9.       Remarks:     Removed weld crown from Recirculation Riser safe-end dissimilar metal weld RRG-F002 by machining. Weld crown was removed to improve the ultrasonic examination of the weld. Successful surface exam wvas completed on weld (1'05020) after machining was completed.
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Repair (repair or replacement) conforms to the rules of the ASME Code, Section XI.
Remarks:
Type Code Symbol Stamp                       None Certificate of Autho ionNo.                         None               Expii ration Date              N/A Signed                               Supervisor, Materials/Inspection   Date       mCa          Zi I              2005 wn or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                   and employed by         IISB CT                                 .
Removed weld crown from Recirculation Riser safe-end dissimilar metal weld RRG-F002 by machining. Weld crown was removed to improve the ultrasonic examination of the weld. Successful surface exam wvas completed on weld (1'05020) after machining was completed.
of                         Hartford, Conn.                         have inspected the components described in this Owner's Report during the period         /_ - _ _  4--_
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section XI.
_                to         '  - - a,                           , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
Repair (repair or replacement)
Type Code Symbol Stamp None Certificate of Autho ionNo.
None Expii Signed Supervisor, Materials/Inspection Date wn or Owner's Designee, Title ration Date N/A mCa Zi I 2005 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period  
/_
to 4--_
to  
- - a,  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
J3      U -Co                           mi si n Commissions           /V       39!~       vn Inspector's Signature                               National Board, State, Province, and Endorsements Date Date                                   , 2005
J 3 U -Co mi si n Commissions
/V 39! ~
vn Inspector's Signature National Board, State, Province, and Endorsements Date
, 2005 Date 2005


FORM NIS-2 19-05-22 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
FORM NIS-2 19-05-22 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
: 1. Owners         Alliant Energy (OES Utilities)                           Date                   5/26n2005 Name P. O. Box 351, Cedar Rapids, IA 52406                                     Sheet                    I1_      of            2 Address
: 1.
: 2. Plant         Duane Arnold Energy Center                                 Unit                    I Name 3277 DAEC Road, Palo, IA 52324                                                       CWO A66133 Address                                        Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (OES Utilities)
: 3. Work Performed by Alliant EneMy (GESUtilities)                           Type Code Symbol Stamp                None Name                                                 Authorization No.                    None 3277 DAEC Road, Palo, IA 52324                                           Expiration Date                       None
Name Date 2.
: 4.     Identification of System:               Reactor Recirculation
P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 5/26n2005 I1_
: 5.    (a) Applicable Construction Code               ANSI B3 1.1               19       67 Edition N/A             Addenda   N/A       Code Case.
of 2
(b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1992-A92
I CWO A66133 Repair Organization to P. 0. No., Job No., etc.
-      w    s   .--        .-      r     . s     s   s     s   s   s     . _      .
: 3.
: 6.     Identification Components Repatred or Re laced and Re placement Components ASME Name of             Name of           Manufacturer                                                       YearBuilt     Repaired,     Code Component         Manufacturer         Serial No.         National         Other Identification                       Replaced, or Stamped Board No.                                                     Replacement   (YES or NO)
Work Performed by Alliant EneMy (GES Utilities)
Recirculation         GE                       N/A               NIA         Reactor Recirculation Riser       Unknown       Repaired       No Piping                                                                                     Weld
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
  . E .
Expiration Date None None None 4.
: 7. Description of Work             Blended arc strike on weld RRD-J005.
5.
: 8. Tests Conducted:                     Hydrostatic         [           Pneumatic         FI]         Nominal Operating Pressure   LZ Other   [           Pressure           N/A             psi   Test Temp             N/A           OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Identification of System:
Reactor Recirculation (a) Applicable Construction Code ANSI B3 1.1 19 67 Edition N/A Addenda N/A Code Case.
(b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1992-A92 w
s r
s s
s s
s s
: 6.
Identification Components Repatred or Re laced and Re placement Components ASME Name of Name of Manufacturer YearBuilt
: Repaired, Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YES or NO)
Recirculation GE N/A NIA Reactor Recirculation Riser Unknown Repaired No Piping Weld E.
: 7.
Description of Work Blended arc strike on weld RRD-J005.
: 8.
Tests Conducted:
Hydrostatic
[
Pneumatic FI]
Nominal Operating Pressure LZ
Other [
Pressure N/A psi Test Temp N/A OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


FORM NIS-2 19-05-22 FORM NIS-2 (Back)
FORM NIS-2 19-05-22 FORM NIS-2 (Back)
: 9.       Remarks:     Blended arc strike on Recirculation Riser weld RRD-J005. Successful surface exam was completed on wveld (P05054) after grinding wvas completed.
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Repair (repair or replacement) conforms to the rules of the ASME Code, Section Xl.
Remarks:
Type Code Symbol Stamp                         None Certificatef Authori         n No.                 None                 Expiration Date                 N/A Signe                               supevisor, Materials/Inspection 11@e                                  Date     ,    C!t      2 ),             - 2005 wner 6r Owner's Designee, Title                                 (J CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                   and employed by         [ISB CT of                           Hartford, Conn.                       have inspected the components described in this Owner's Report during the period         Y-i/ of                       to             U ) G -e f
Blended arc strike on Recirculation Riser weld RRD-J005. Successful surface exam was completed on wveld (P05054) after grinding wvas completed.
                                                                          -                              , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair (repair or replacement) conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp None Certificatef Authori n No.
None Expiration Date N/A Signe 11@e supevisor, Materials/Inspection Date t
C!
2 ),  
-2005 wner 6r Owner's Designee, Title (J
CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by
[ISB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period Y-i/ of to U -
) G -e f  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
wc)S   U-                           Commissions       /V'5     J? 3/'4ar               '/Yt6   .9 Inspector's Signature                               National Board, State, Province, and Endorsements Date                                       , 2005 2005
wc)S U-Commissions  
_at
/V'5 J? 3/'4ar  
'/Yt6.9 Inspector's Signature National Board, State, Province, and Endorsements Date
, 2005
_at 2005


FORM NIS-2 19-05-23 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
FORM NIS-2 19-05-23 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owners         Alliant Energy (IES Utilities)                     Date                   5/26/2005 Name P. 0. Box 351, Cedar Rapids, IA 52406                             Sheet                  _I        of            2 Address
: 1.
: 2. Plant         Duane Arnold Energy Center                           Unit                  I Name 3277 DAEC Road, Palo, IA 52324                                               PWO 1129048 Address                                    Repair Organization to P. O. No., Job No., etc.
Owners Alliant Energy (IES Utilities)
: 3. Work Performed by Alliant Enemy (IES Utilities)                   Type Code Symbol Stamp              None Name                                         Authorization No.                    None 3277 DAEC Road, Palo, IA 52324                                   Expiration Date                     None
Name Date 2.
: 4. Identification of System:         Control Rod Drive
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 5/26/2005
: 5.    (a) Applicable Construction Code             ANSI B31.7           19     69 Edition 70             Addenda    NIA      Code Case.
_I of 2
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
I PWO 1129048 Repair Organization to P. O. No., Job No., etc.
: 6. Identification ofComponents Repaired or Re laced and Re lacement Components ASMIE Name of           Name or         Manufacturer                                                   Yar Built     Repaired,     Code Component       Manuracturer       Serial No.       National       Other Identification                       Replaced,or Stamped Board No.                                                 Replacement (YES or Control Rod Drive   Bechtel                 N/A             N/A       CRD Return Dissimilar metal       1974         Repaired     No Return                                                                           Weld
: 3.
: 7. Description of Work:         Ground down weld crown on weld CRA-J032.
Work Performed by Alliant Enemy (IES Utilities)
: 8. Tests Conducted:                 Hydrostatic       [         Pneumatic       [-I         Nominal Operating Pressure Other [I]         Pressure         N/A         psi     Test Temp           N/A             oF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
Expiration Date None None None 4.
5.
Identification of System:
Control Rod Drive (a) Applicable Construction Code ANSI B31.7 19 69 Edition 70 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda NIA Code Case.
: 6.
Identification ofComponents Repaired or Re laced and Re lacement Components ASMIE Name of Name or Manufacturer Yar Built
: Repaired, Code Component Manuracturer Serial No.
National Other Identification Replaced,or Stamped Board No.
Replacement (YES or Control Rod Drive Bechtel N/A N/A CRD Return Dissimilar metal 1974 Repaired No Return Weld
: 7.
Description of Work:
Ground down weld crown on weld CRA-J032.
: 8.
Tests Conducted:
Hydrostatic
[
Pneumatic
[-I Nominal Operating Pressure Other [I]
Pressure N/A psi Test Temp N/A oF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


l 1- L FORM NIS-2 19-05-23 FORM NIS-2 (Back)
1-l L
: 9.       Remarks:     Ground down weld crown on CRD Return weld CRA-4032. Successful surface exam was completed on weld after grinding was completed.
FORM NIS-2 19-05-23 FORM NIS-2 (Back)
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Repair (repair or replacement) conforms to the rules of the ASME Code, Section Xi.
: 9.
Type Code Symbol Stamp                         None Certificate of Authorization No.                   None                 Expiration Date               NIA Signed           r     ,A       f   Supervisor, MateriaLsllnspection Owner r Owner's Designee, Title Date        1            (2ti        2005 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                     and employed by       HSB CT of                           Hartford, Conn.                       have inspected the components described in this Owner's Report duringtheperiod             ,- 3/ -o'f                 to           So--- d     OS                     ,andstatethattothebestof my knowledge and belief, the Owner has performed examinations'and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
Remarks:
Ground down weld crown on CRD Return weld CRA-4032. Successful surface exam was completed on weld after grinding was completed.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair (repair or replacement) conforms to the rules of the ASME Code, Section Xi.
Type Code Symbol Stamp None Certificate of Authorization No.
None Expiration Date NIA Signed r  
,A f
Supervisor, MateriaLsllnspection Date 1
(2ti 2005 Owner r Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.
have inspected the components described in this Owner's Report duringtheperiod  
,- 3/ -o'f to So--- d OS  
,andstatethattothebestof my knowledge and belief, the Owner has performed examinations'and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
23       --                            Commissions         ij413 I,?3&#x17d;rA'-,                   / 9(6 Ad Inspector's Signature                               National Board, State, Province, and Endorsements Date           5-0&,                       , 2005
23 Commissions ij413 I,?3&#x17d;rA'-,  
/ 9(6 Ad Inspector's Signature National Board, State, Province, and Endorsements Date 5-0&,  
, 2005


FORM NIS-2 19-05-25
FORM NIS-2 19-05-25
                                      -FORM NIS-2 OWVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
-FORM NIS-2 OWVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1.     Owners       Alliant Energy (IES Utilities)                       Date                   05/27/05 Name P. 0. Box 351, Cedar Rapids, IA 52406                             Sheet                  I        of              2 Address
: 1.
: 2.      Plant         Duane Arnold Energy Center                           Unit                  I.
Owners Alliant Energy (IES Utilities)
Name 3277 DAEC Road, Palo, IA 52324                                                         PWO 1128060 Address                                    Repair Organization to P. 0. No., Job No., etc.
Name Date 2.
: 3.     Work Performed by Alliant Enen gv (IES Utilities)                 Type Code Symbol Stamp                 None Name                                          Authorization No.                     None 3277 DAEC Road, Palo, IA 5232A4                                    Expiration Date                       None
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 05/27/05 I
: 4.     Identification of System:          Main Steam Safety Relief Valve (Class I)                                                  _
of 2
I.
PWO 1128060 Repair Organization to P. 0. No., Job No., etc.
: 3.
Work Performed by Alliant Enen Name 3277 DAEC Road, Palo, IA 5232 gv (IES Utilities)
Type Code Symbol Stamp Authorization No.
A4 Expiration Date None None None 4.
5.
5.
(a) Applicable Construction Code           ASME III               19     68     Edition W68         Addenda        N/A    Code Case.
Identification of System:
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
Main Steam Safety Relief Valve (Class I)
: 6.      Identification of Components Repaired or Replaced and Replacement Components ASNIE Name of           Name of         Manufacturer                                                     Year Built    Repaired,      Code Component        Manufacturer       Serial No.       National           Other Identification                       Replaced, or   Stamped (Ilanger No.)                                          Board No.                                                    -Replacement   (YES or -
(a) Applicable Construction Code ASME III 19 68 Edition W68 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Identification of Components Repaired or Replaced and Replacement Components Addenda N/A Code Case.
Order/SUS                       .Work                NO)
6.
Pilot Valve           Target Rock         S/N 207           N/A             PWO 1128060 / 83.04             1976       Replacement       Yes
Name of Component (Ilanger No.)
: 7.       Description of Work:         The Pilot Valve was repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of S/N 218.
Name of Manufacturer Manufacturer Serial No.
: 8.       Tests Conducted:                 Hydrostatic         L         Pneumatic           E       Nominal Operating Pressure Other L         Pressure         1020         psi   Test Temp               240             &deg;F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8 1/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Year Built National Board No.
Other Identification
: Repaired, Replaced, or
-Replacement ASNIE Code Stamped (YES or -
NO)
.Work Order/SUS Pilot Valve Target Rock S/N 207 N/A PWO 1 128060 / 83.04 1976 Replacement Yes
: 7.
Description of Work:
The Pilot Valve was repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of S/N 218.
: 8.
Tests Conducted:
Hydrostatic L
Pneumatic E
Nominal Operating Pressure Other L Pressure 1020 psi Test Temp 240  
&deg; F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8 1/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


LL FORM NIS-2 19-05-25 FORM NIS-2 (Back)
LL FORM NIS-2 19-05-25 FORM NIS-2 (Back)
: 9.       Remarks:       Pilot Valve S/N 218 was removed and pilot valve S/N 207 was installed. Prior to installation S/N 207 was repaired and documented on NIS-2 (19-03-02). A VT-2 (105001) was completed on the mechanical connection and found acceptable.
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Replacement (repair or replacement) conforms to the rules of the ASME Code, Section Xl.
Remarks:
Type Code Symbol Stamp                         None Certificate of Authorization No.                   None                 Expiration Date               N/A Signed       6d     I/]9-A2 ,      Go(d GL Equipment Monitoring       Date     Ji4d/er       7?                 2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                   and employed by         HSB CT.
Pilot Valve S/N 218 was removed and pilot valve S/N 207 was installed. Prior to installation S/N 207 was repaired and documented on NIS-2 (19-03-02). A VT-2 (105001) was completed on the mechanical connection and found acceptable.
of                           Hartford, Conn.                       have inspected the components described in this Owner's Report during the period         9 -/                         to           ,-/IV -0o                         , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp None Certificate of Authorization No.
None Expiration Date N/A Signed 6d I/]9-A2 Go(d GL Equipment Monitoring Date Ji4d/er 7?
2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT.
of Hartford, Conn.
have inspected the components described in this Owner's Report during the period 9 -/
to  
,-/IV -0o  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions       IV-;a iD3aqAvz-
Commissions IV-;a  
                                                                    )
) iD3aqAvz-Inspector's Signature National Board, State, Province, and Endorsements Date
Inspector's Signature                               National Board, State, Province, and Endorsements Date                                       , 2005 Date                                         2005
, 2005 Date 2005


FORM NIS-2 19-05-26 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
FORM NIS-2 19-05-26 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
: 1. Owners       Alliant Energy (IES Utilities)                         Date                   05/27/05 Name P. 0. Box 351, Cedar Rapids, IA 52406                               Sheet                  I        of            2 Address
: 1.
: 2.      Plant         Duane Arnold Energy Center                             Unit Name 3277 DAEC Road, Palo, IA 52324                                                           PWO 1128063 Address                                      Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (IES Utilities)
: 3.       Work Performed by Alliant Enern wv   (IES Utilities)               Type Code Symbol Stamp               None Name                                            Authorization No.                     None 3277 DAEC Road, Palo, IA 5232 4                                     Expiration Date                       None
Name Date 2.
: 4.       Identification of System:           Main Steam Safety Relief Valve (Class I)
P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 05/27/05 I
: 5.      (a) Applicable Construction Code           ASME III                 19     68     Edition W68         Addenda      N/A    Code Case.
of 2
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92
PWO 1128063 Repair Organization to P. 0. No., Job No., etc.
: 6.       Identification of Components Repaired or Re laced and Re placement Components CASIDE Nameor             Name of       Manufacturer                                                         Year Built Repaired,     Code Component         Manufacturer       Serial No.       National           Other Identification                     Replaced, or Stamped (I[anger No.)                                           Board No.                                                   Replacement   (YFS or l                                                                               Work Order / SUS                                       NO)
: 3.
Pilot Valve           Target Rock           SIN 200           N/A             PWO 1128063 /83.04               1976     Replaccment     Ycs
Work Performed by Alliant Enern Name 3277 DAEC Road, Palo, IA 5232 wv (IES Utilities)
: 7.       Description of Work:         The Pilot Valve was repaired and documented on NIS-2 (19-03-06). This Pilot Valve was rotated in place of S/N 189.
Type Code Symbol Stamp Authorization No.
: 8.     Tests Conducted:                   Hydrostatic         2         Pneumatic       [           Nominal Operating Pressure Other   a         Pressure           1020         psi   Test Temp               240           OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
4 Expiration Date None None None 4.
5.
Identification of System:
Main Steam Safety Relief Valve (Class I)
(a) Applicable Construction Code ASME III 19 68 Edition W68 (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.
: 6.
Identification of Components Repaired or Re laced and Re placement Components CASIDE Nameor Name of Manufacturer Year Built
: Repaired, Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped (I[anger No.)
Board No.
Replacement (YFS or l
Work Order / SUS NO)
Pilot Valve Target Rock SIN 200 N/A PWO 1128063 /83.04 1976 Replaccment Ycs
: 7.
Description of Work:
The Pilot Valve was repaired and documented on NIS-2 (19-03-06). This Pilot Valve was rotated in place of S/N 189.
: 8.
Tests Conducted:
Hydrostatic 2
Pneumatic
[
Nominal Operating Pressure Other a
Pressure 1020 psi Test Temp 240 O F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


ILL-FORM NIS-2 19-05-26 FORM NIS-2 (Back)
ILL-FORM NIS-2 19-05-26 FORM NIS-2 (Back)
: 9.       Remarks:     Pilot Valve S/N 189 was removed and pilot valve S/N 200 was installed. Prior to installation S/N 200 was repaired and documented on NIS-2 (19-03-06). A VT-2 (105001) vas completed on the mechanical connection and found acceptable.
: 9.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this       Replacement (repair or replacement) conforms to the rules of the ASME Code, Section Xl.
Remarks:
Type Code Symbol Stamp                         None Certificate of Authorization No.                   None               Expiration Date                 N/A Signed                               QX _ GL Equipment Monitoring       Date     -i     i4: 2                       2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                   and employed by         I ISB CT.
Pilot Valve S/N 189 was removed and pilot valve S/N 200 was installed. Prior to installation S/N 200 was repaired and documented on NIS-2 (19-03-06). A VT-2 (105001) vas completed on the mechanical connection and found acceptable.
of                           I artford, Conn.                       have inspected the components described in this Owner's Report during the period         ' ci 4'/-                           to     ; c- . -,-                              , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp None Certificate of Authorization No.
None Expiration Date N/A Signed QX GL Equipment Monitoring Date  
-i i4: 2 2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by I ISB CT.
of I artford, Conn.
have inspected the components described in this Owner's Report during the period 4'/-  
' ci to c -
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
'4-43 ~---                               Commissions         A3 i,)         4v 2 V3. /             Z>,
'4-43 ~---
Inspector's Signature                               National Board, State, Province, and Endorsements Date       (--/,                           , 2005
Commissions A3 i,)
4v 2 V3.  
/
Z>,
Inspector's Signature National Board, State, Province, and Endorsements Date
(--/,
, 2005


FORM NIS-2 19-05-27 F'ORM NIS-2 OWk'NE'R'S RlEPlORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions ofthe ASME Code Section Xl
FORM NIS-2 19-05-27 F'ORM NIS-2 OWk'NE'R'S RlEPlORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions ofthe ASME Code Section Xl
: 1. Owners         Alliant EnergA(IES Utilities)                         Date                   06/7/05 Name P. 0. Box 351, Cedar Rapids, IA 52406                               Sheet                    I        of              2 Address Plant         Duane Arnold Energy Center                           Unit Name 3277 DAEC Road, Palo, IA 52324                                                             [IWO 1128066 Address                                    Repair Organization to P. 0. No., Job No., etc.
: 1.
: 3.       Work Performed by Alliant Ener cv (iES Utilities)                   Type Code Symbol Stamp                 None Name                                            Authorization No.                       None 3277 DAEC Road, Palo, IA 523224                                      Expiration Date                         None
Owners Alliant EnergA (IES Utilities)
: 4.       Identification of Svstem:             Main Steam Safety Relief Valve (Class I)
Name Date P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 06/7/05 I
: 5.      (a) Applicable Construction Code               ASME III               19     68     Edition W68         Addenda       NIA   Code Case.
of 2
(b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1992-A92 r
[IWO 1128066 Repair Organization to P. 0. No., Job No., etc.
: 6.      Identiticati on or Components Kepaired or Replaced and Re placement Components ASISE Name of             Name of         Mlanufacturer                                                       Vear Built   Repaired. Code lomponent           Manufacturer         Serial No.         National         Other Identification                     Replaced. or Stamped (Ilanger No.)                                               Board No.                                                   Replacement   VF( or Work   Order / St IS                                     NO)
: 3.
Pilot Valve           Target Relk             S/N 176           N/A           PWO 1128066 I83.04               1976     Replacement     Yes rody     to Pilot Bolt   Nova Machinc         Item # 107           N/A             'W(O I 128066 / 83.04           1996     Rcplacement     No
Work Performed by Alliant Ener Name 3277 DAEC Road, Palo, IA 5232 cv (iES Utilities)
.            _It                               1     66923 Bodv to Pilot Nut     Target Rock         Item H 150           N/A           PWO I 128066/83.04               1991     Replacement     No lIIt                                         l   # IN 85326
Type Code Symbol Stamp Authorization No.
: 7.       Description of Work:           The Pilot Valve was repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of S/N 141. During removal of SIN 14 1, two bolts / one nut required replacement.
24 Expiration Date None None None 4.
: 8.       Tests Conducted:                     I lvdrostatic     L         Pneumatic         C           Nominal Operating l'ressure   Eif Other   E           Pressure         1020         psi     Test Temp             240           oF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
5.
Identification of Svstem:
Main Steam Safety Relief Valve (Class I)
(a) Applicable Construction Code ASME III 19 68 Edition W68 Addenda NIA Code Case.
(b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1992-A92 r6.
Identiticati on or Components Kepaired or Replaced and Re placement Components ASIS E Name of Name of Mlanufacturer Vear Built Repaired.
Code lomponent Manufacturer Serial No.
National Other Identification Replaced. or Stamped (Ilanger No.)
Board No.
Replacement VF( or Work Order / St IS NO)
Pilot Valve Target Relk S/N 176 N/A PWO 1128066 I83.04 1976 Replacement Yes rody to Pilot Bolt Nova Machinc Item # 107 N/A  
'W(O I 128066 / 83.04 1996 Rcplacement No
_It 1
66923 Bodv to Pilot Nut Target Rock Item H 150 N/A PWO I 128066/83.04 1991 Replacement No lIIt l # IN 85326
: 7.
Description of Work:
The Pilot Valve w as repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of S/N 141. During removal of SIN 14 1, two bolts / one nut required replacement.
: 8.
Tests Conducted:
I lvdrostatic L
Pneumatic C
Nominal Operating l'ressure Eif Other E Pressure 1020 psi Test Temp 240 oF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


IORM NIS-2 19-0S-27 FORMNI NIS-2 (13ack)
IORM NIS-2 19-0S-27 FORMNI NIS-2 (13ack)
: 9.       Remnar ks:     Pilot Vale S/N 141 %%as removed and pilot valve SiN 176 %%as installed. Prior to installaion. S,.N 176 was repaired and docuimented on NIS-2 (19-03-02). I)Dring removal ol'S.N 14 1, two bolts . one nut as galled and required replacemenit. A Vl-l was Cperformed as part or the receipt inspections. A V U-2 (10(3:01) was completed on the mechanical connection and LundL acceptable.
: 9.
CERTIFICATE OF COI1'LIANCE We certify that the statemeents made inthe report are correct and this         Replacement (repair or replacement) confonns to the riles oflthe ASME Code. Section Xl.
Remnar ks:
Type Code Symbol Stamp                         Nonc Certificate of Authorization No.                     None               Expiration Date               N/A Signed       a       -'                    GI Eiquipment Monitoring,   Date     Jcz4'L- ZO-,                   2005 Owner or Otner's D)esinee. Title CuRTiFICATE OF INSERVICE INSPECTION 1,the undersigned, holdin, a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                   and employed by       I S13 C1.
Pilot Vale S/N 141 %%as removed and pilot valve SiN 176 %%as installed. Prior to installaion. S,.N 176 was repaired and docuimented on NIS-2 (19-03-02). I)Dring removal ol'S.N 14 1, two bolts. one nut as galled and required replacemenit. A Vl-l was Cperformed as part or the receipt inspections. A V U-2 (10(3:01) was completed on the mechanical connection and LundL acceptable.
of                             lartford, Conn.                     have inspected the components described in this Owner's Report during the period         g   -                       to                   -                          and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
CERTIFICATE OF COI1'LIANCE We certify that the statemeents made in the report are correct and this Replacement (repair or replacement) confonns to the riles oflthe ASME Code. Section Xl.
Type Code Symbol Stamp Nonc Certificate of Authorization No.
None Expiration Date N/A Signed a
GI Eiquipment Monitoring, Date Jcz4'L-ZO-,
2005 Owner or Otner's D)esinee. Title CuRTiFICATE OF INSERVICE INSPECTION 1, the undersigned, holdin, a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by I S13 C1.
of lartford, Conn.
have inspected the components described in this Owner's Report during the period g -
to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal njinjry or property dainage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal njinjry or property dainage or a loss of any kind arising from or connected with this inspection.
19
.-.19 Comnm issions
      .-.                                 Comnm issions     /V3 O.",                   -f Inspector's Signature                               National Board, State, Province, and Endorsements Da;ll                                         ,2005t 1)at                               200
/V3 O.",  
-f Inspector's Signature National Board, State, Province, and Endorsements Da;ll
,2005t 1)at 200


FORM NIS-2 19-05-28 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
FORM NIS-2 19-05-28 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
: 1.       Owners       Alliant Eneray (IES Utilities)                     Date                   06/7/05 Name P. 0. Box 351, Cedar Rapids, IA 52406                           Sheet                   I       of             2 Address
: 1.
: 2.         Plant       Duane Arnold Energy Center                         Unit Name 3277 DAEC Road, Palo, IA 52324                                                         PWO 1128067 Address                                  Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Eneray (IES Utilities)
: 3.       Work Performed by Alliant Ener rv (IES Utilities)               Type Code Symbol Stamp               None Name                                        Authorization No.                     None 3277 DAEC Road, Palo, IA 523224                                  Expiration Date                       None
Name Date P. 0. Box 351, Cedar Rapids, IA 52406 Address Sheet 06/7/05 I
: 4.       Identification of System:         Main Steam Safety Relief Valve (Class 1)
of 2
: 5.      (a) Applicable Construction Code         ASME III               19     68 Edition W68             Addenda      N/A    Code Case.
: 2.
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 ID.      . J_.-_
Plant Duane Arnold Energy Center Name Unit 3277 DAEC Road, Palo, IA 52324 Address PWO 1128067 Repair Organization to P. 0. No., Job No., etc.
                  -.        -ro       .          __ rw__     __ rs_____       a_____
: 3.
Identlicatron ot Componenrs Repaired or Re laced and Ke lacement Components ASMIE Name or           Name o       Manufacturer                                                     Year Built Repaired,     Code Component         Manufacturer     Serial No.       National         Other Identification                   Replaced, or Stamped (I Ianger No.)                                         Board No.                                                 Replacement   (YES or Work Order / SIS                                       NO)
Work Performed by Alliant Ener Name 3277 DAEC Road, Palo, IA 5232 rv (IES Utilities)
Pilot Valve           Target Rock         SIN 227           NIA             PWO 11280671 83.04             1976     Replacement     Yes
Type Code Symbol Stamp Authorization No.
: 7.       Description of Work:         The Pilot Valve was repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of S/N 203.
24 Expiration Date None None None 4.
: 8.       Tests Conducted:                 Hydrostatic         2         Pneumatic         LI         Nominal Operating Pressure Other =         Pressure         1020       psi     Test Temp             240           0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8 12 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
5.
Identification of System:
Main Steam Safety Relief Valve (Class 1)
(a) Applicable Construction Code ASME III 19 68 Edition W68 (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 J_.-_  
-ro
__ rw__
__ rs_____
a_____
Addenda N/A Code Case.
ID.
Identlicatron ot Componenrs Repaired or Re laced and Ke lacement Components ASMIE Name or Name o Manufacturer Year Built
: Repaired, Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped (I I anger No.)
Board No.
Replacement (YES or Work Order / SIS NO)
Pilot Valve Target Rock SIN 227 NIA PWO 11280671 83.04 1976 Replacement Yes
: 7.
Description of Work:
The Pilot Valve was repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of S/N 203.
: 8.
Tests Conducted:
Hydrostatic 2
Pneumatic LI Nominal Operating Pressure Other =
Pressure 1020 psi Test Temp 240 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8 12 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


                                                                                                                                  -    ~ l l FORMI NIS-2 19-05-28 FORM NIS-2 (Back)
~
: 9.       Remarks:     Pilot Valve SIN 203 was removed and pilot valve SIN 227 was installed. Prior to installation, S/N 227 was repaired and documented on NIS-2 (19-03-02). A VT-2 (105001) was completed on the mechanical connection and found acceptable.
l l FORMI NIS-2 19-05-28 FORM NIS-2 (Back)
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Replacement (repair or replacement) conforms to the rules of the ASNIE Code, Section Xi.
: 9.
Type Code Symbol Stamp                         None Certificate of Authorization No.                   None               Expiration Date                 N/A Signed         C)       ?A       />,    , GL Equipment Monitoring     Date     __i_       e   7               2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Iowa                   and employed by         IISB CT.
Remarks:
of                           Hartford, Conn.                     have inspected the components described in this Owner's Report during the period           9 / -6o'.                   to             -
Pilot Valve SIN 203 was removed and pilot valve SIN 227 was installed. Prior to installation, S/N 227 was repaired and documented on NIS-2 (19-03-02). A VT-2 (105001) was completed on the mechanical connection and found acceptable.
                                                                      -6 Iv -':                       , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASNIE Code, Section Xi.
Type Code Symbol Stamp None Certificate of Authorization No.
None Expiration Date N/A Signed C)  
?A  
/>  
, GL Equipment Monitoring Date
__i_
e 7
2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT.
of Hartford, Conn.
have inspected the components described in this Owner's Report during the period 9  
/ -6o '.
to Iv -':  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
__  _        _        _            Commissions         AA3, 1)3?9A4,'                   ftfq(     X<
Commissions AA3, 1)3?9A4,'
Inspector's Signature                             National Board, State, Province, and Endorsements Date         (,-/U2                         , 2005
ftfq(
X<
Inspector's Signature National Board, State, Province, and Endorsements Date
(,-/U2
, 2005


FORM NIS-2 19-05-29 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REP[.ACEM.ENTS As Required by the Provisions of the ASM1' Code Section Xl I.     Owners         Alliant Energg (EES Utilities)                     Date                   06.')31)05 Name P. O. Box 351, Cedar Rapids, IA 52406                             Sheet                  I          of              2 Address 1_
FORM NIS-2 19-05-29 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REP[.ACEM.ENTS As Required by the Provisions of the ASM1' Code Section Xl I.
: 2.      Plant         I)uane Arnold Energy Center                         Unit Name 3277 DAEC Road, Palo. IA 52324                                                           [IWO 1128068 Address                                  Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energg (EES Utilities)
: 3.       Work Performed by Alliant Energv (IES Utilities)                 Type Code Symbol Stamp                    None Name                                         Authorization No.                        None 3277 DAEC Road, Palo, IA 52324                                   Expiration Date                           None
Name Date 2.
: 4.       Identification of System:           Main Steam Safety Relief Valve (Class I)
P. O. Box 351, Cedar Rapids, IA 52406 Address Plant I)uane Arnold Energy Center Name 3277 DAEC Road, Palo. IA 52324 Address Sheet Unit 06.')31)05 I
: 5.      (a) Applicable Construction Code             ASME III             19     68     Edition W68         Addenda        N/A    Code Case.
of 2
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92
1_
: 6.       Identification of Components Repaired or Re laced and Re lacement Components ASNIE Name or           Name or         anufacturer                                                         ear Built   Repaired.     Code Component         Manufacturer       Serial No.       National         Other Identification                       Replaced. or Stamped (langer No.)                                           Board No.                                                     Replacement   (UES or
[IWO 1128068 Repair Organization to P. 0. No., Job No., etc.
_Work Order / SUS                                         NO)
: 3.
Pilot Valve           Targct Rock           SIN 199           NIA           PWO 1 28008 / 83.04               1976     Replacement     Yes
Work Performed by Alliant Energv (IES Utilities)
: 7.       Description of Work:         The Pilot Valve was repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of SIN 202.
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
: 8.       Tests Conducted:                 lydrostatic       L         Pneumatic       FII         Nominal Operating Pressure       IE i Other Cl           Pressure         1020         psi   Test Temip               240             F NOTE': Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Expiration Date None None None 4.
5.
Identification of System:
Main Steam Safety Relief Valve (Class I)
(a) Applicable Construction Code ASME III 19 68 Edition W68 (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.
: 6.
Identification of Components Repaired or Re laced and Re lacement Components ASNIE Name or Name or anufacturer ear Built Repaired.
Code Component Manufacturer Serial No.
National Other Identification Replaced. or Stamped (langer No.)
Board No.
Replacement (UES or
_Work Order / SUS NO)
Pilot Valve Targct Rock SIN 199 NIA PWO 1 28008 / 83.04 1976 Replacement Yes
: 7.
Description of Work:
The Pilot Valve was repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of SIN 202.
: 8.
Tests Conducted:
lydrostatic L
Pneumatic FII Nominal Operating Pressure IE i Other Cl Pressure 1020 psi Test Temip 240 F
NOTE': Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME. 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME. 345 E. 47th St., New York, NY 10017.


JH()[NI NIS-2   I14-05-2')
JH()[NI NIS-2 I14-05-2')
FORIK   NIS-2 (Back)
FORIK NIS-2 (Back)
Ren' 1kalk:     ilot VAh e S.N 202 %%asremtxed and pi lot %IAe S N I99 \as     % inltal lel. I1i itr to installatioll. S-N I99')\;i>
Ren' 1kalk:
re. mred antd documient ed l N IS- (I ')-_', -01). A V I'-2'(0       I ) Azs jomtnpleted tot the inec han icacl connectit nio aindi     mloudacceptable.
ilot VAh e S. N 202 %%as remtxed and pi lot % IA e S N I 99 %
CE.RTIFICAT'E OF COMIPLIANCE We certilv that the statements made in the report are correct an(I this             Replacement (repair or replacement) con forms to the rules ofthe ASME1 Code, Section Xl.
\\as inltal lel. I1i itr to installatioll. S-N I 99') \\;i>
Type Code Symbol Stamp                             None Certificate of Autihorizatioxi No.                       None                B1piration Date                    N/A Signed           f Sg         t 1" 4-Dr              GI. lEquipmient Monitoring   l)ate                                         2005 Owner or Owner's l)esinee. Title CERTIFICATE OF INSERVICE INSPECTION 1,the utidersigned, holdin-, a valid commission issued liv the National Board of Boiler andal Pressure Vessel Inspectors and the State or Province of'                             Iowa                   and employed by         I IS3 (Tr.
re. mred antd documient ed l N IS- (I ')-_', -01). A V I'-2'(0 I ) Azs jomtnpleted tot the inec han icacl connectit nio aindi mloudacceptable.
of                             I1artford, Conn.                         have inspected the components described in this Omner's Report during the period           9   - /-C                     to           - -0     -o                           , and state that to the best of my knoxsledg1e and belief, the Owner has performicd examinations an(d taken corrective measures described in this Owner's Report il accordance wvilt the requirements of the ASMEI Code, Section Xl.
CE.RTIFICAT'E OF COMIPLIANCE We certilv that the statements made in the report are correct an(I this con forms to the rules ofthe ASME1 Code, Section Xl.
Replacement (repair or replacement)
Type Code Symbol Stamp Certificate of Autihorizatioxi No.
Signed f Sg tDr 1" 4-None None B1piration Date N/A GI. lEquipmient Monitoring l)ate 2005 Owner or Owner's l)esinee. Title CERTIFICATE OF INSERVICE INSPECTION 1, the utidersigned, holdin-, a valid commission issued liv the National Board of Boiler andal Pressure Vessel Inspectors and the State or Province of' Iowa and employed by I IS3 (Tr.
of I1artford, Conn.
have inspected the components described in this Omner's Report during the period 9  
- /-C to  
-0  
- o  
, and state that to the best of my knoxsledg1e and belief, the Owner has performicd examinations an(d taken corrective measures described in this Owner's Report il accordance wvilt the requirements of the ASMEI Code, Section Xl.
Bly signing this certificate neither the Inspector nor his employer mankes any warranty. expressed or implied, concerning, the examllinationis and corrective measures described in this Owner's Report. lurthermore. neither the Inspector nor his employer shall be liable in any manner for any personal injury or property datiage or a loss ofany kind arising from or connected with this inspection.
Bly signing this certificate neither the Inspector nor his employer mankes any warranty. expressed or implied, concerning, the examllinationis and corrective measures described in this Owner's Report. lurthermore. neither the Inspector nor his employer shall be liable in any manner for any personal injury or property datiage or a loss ofany kind arising from or connected with this inspection.
J(                                     tCommissions          A4V     )     ,14-v2r 9                  / 9           m Inspector's Signature                                   National Board. State, Province, and I-ndorsements
J(
                                                , 2005
t Commissions A4V  
)
9
,14-v2r  
/
9 m
Inspector's Signature National Board. State, Province, and I-ndorsements
, 2005


FORM NIS-' 19-(5i-30 FORM N1S-2 OWNER'S REPORT FOR REPAIRS OR RIEPL.ACEM ENTS As Required bly the Proviiions of the ASME Code Section Xl I. Owners         Alliant EnercES Ulitities)                         Date                   06!23/05 Name P. O. Box 351, Cedar Rapids. IA 52406                             Sheet                  I          of              2 Address Plant         DDuane Arnold Energy Center                         Unit Name 3277 DAEC Road, Palo, IA 52324                                                         PWO 1128062 Address                                    Repair Organization to P. 0. No., Job No., etc.
FORM NIS-' 19-(5i-30 FORM N1S-2 OWNER'S REPORT FOR REPAIRS OR RIEPL.ACEM ENTS As Required bly the Proviiions of the ASME Code Section Xl I.
: 3.     Work Performed by Alliant Ener v (IEOS Utilities)                 Type Code Symbol Stamp                 None Name                                          Authorization No.                     None 3277 DAEC Road, Palo, IA 523224                                    Expiration Date                       None
Owners Alliant EnercE S Ulitities)
: 4.     Identification of System:           Main Steam Safety Relief Valve (Class 1)
Name Date P. O. Box 351, Cedar Rapids. IA 52406 Address Plant DDuane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 06!23/05 I
: 5.    (a) Applicable Construction Code             ASMi III               19     68     Edition W68         Addenda         NIA   Code Case.
of 2
PWO 1128062 Repair Organization to P. 0. No., Job No., etc.
: 3.
Work Performed by Alliant Ener Name 3277 DAEC Road, Palo, IA 5232 v (IEOS Utilities)
Type Code Symbol Stamp Authorization No.
24 Expiration Date None None None 4.
5.
Identification of System:
Main Steam Safety Relief Valve (Class 1)
(a) Applicable Construction Code ASMi III 19 68 Edition W68 Addenda NIA Code Case.
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92
: 6.     Identificati on of Compone ts Repaired or Re laced and Re lacement Components ASNIE Name of             Name or       IN1anufactirer                                                     Year Ituill Repaired.     Code Component         Maniufacturer     Serial No.       National         Other Identification                     Replaced. or Stamped (Ianger No.)                                       . oard No.                                                   Replacement   (YES or IWork Order/SIUS                                         NO)
: 6.
Main Valve Body       Tarect Rocl         S/N 201           N/A                 PSV 4401                   1976     Replacemcent     Ycs
Identificati on of Compone ts Repaired or Re laced and Re lacement Components ASNIE Name of Name or IN1anufactirer Year Ituill Repaired.
: 7.     Description of Work:           Main Valve Body S/N 201 dwas repaired and documented on NIS-2 (17-00-01). This Main Valve Body was rotated in place of SIN 141.
Code Component Maniufacturer Serial No.
: 8.     Tests Conducted:                   Hydrostatic     f           Pneumatic     F           Nominal Operating Pressure     [Ei-Other   I       Pressure         955         psi   Test Temp               514             0F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8 1/2 in. x I I in.. (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
National Other Identification Replaced. or Stamped (Ianger No.)
oard No.
Replacement (YES or IWork Order/SIUS NO)
Main Valve Body Tarect Rocl S/N 201 N/A PSV 4401 1976 Replacemcent Ycs
: 7.
Description of Work:
Main Valve Body S/N 201 dwas repaired and documented on NIS-2 (17-00-01). This Main Valve Body was rotated in place of SIN 141.
: 8.
Tests Conducted:
Hydrostatic f
Pneumatic F
Nominal Operating Pressure
[Ei-Other I
Pressure 955 psi Test Temp 514 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8 1/2 in. x I I in.. (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) tnay be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) tnay be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


AL FO RN1 N IS-.! I9'-0i- ;o FORMl NIS-2 (Black)
AL FO RN1 N IS-.! I9'-0i- ;o FORMl NIS-2 (Black)
: 9. Reiarks       MIaiii Va.lve Bockv S:N I II %%a rienmed and Mlain V~alve Bod% S-N 2011 %%,ini'.alled. Priior hi in)z~illlatioii. S.N 2101 arpardaddciL!e(iN1- I70()I.A                                     - P3b acupeeontenehnil oid COnl icIJI onall~~ fo       CCCIat pibsI.
: 9. Reiarks MIaiii Va.lve Bockv S:N I II %%a rienmed and Mlain V~alve Bod% S-N 2011 %%, ini'.alled. Priior hi in)z~illlatioii. S. N 2101 arpardaddciL!e(iN1-I70()I.A  
CERTIFICATE OF COMPLIANCF We certify that the statements   Imade in tIhe report are correct and this         Replacement (repair or replacement) conforms to tile rules of tile ASMINi Code, Scction Xi.
- P3b acupeeontenehnil COnl icIJI onall~~ oid fo CCCIa t
Type Code Symbol Stamp                             None Certificate ofAtithorization No.                         None               Expiration Date                     NIA Si-ncd       feQ @                   o       (;1. Equlipiment Monitoring   l)ate           Vc   23                       2005 Owner or Owner's Designee.rit ie ICrTIFICATE OF INSERVICE INSPECTION 1, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                             Iowa                   and employed hy           11;13 C'l'.
pibsI.
of                           lartford, Conn.                           have inspected the components described in this Owner's Report during the period           b                           to         6 - -)q- o                               ,' and state that to the best of my knowledge and belief, the Owner has perlormed examinations and takeit corrective measures (lescribed inthis Owner's Report in accordance with the requirements of the ASME Code, Section Xi.
CERTIFICATE OF COMPLIANCF We certify that the statements Imade in tIhe report are correct and this Replacement (repair or replacement) conforms to tile rules of tile ASMINi Code, Scction Xi.
Type Code Symbol Stamp None Certificate ofAtithorization No.
None Expiration Date NIA Si-ncd feQ @
o
(;1. Equlipiment Monitoring l)ate Vc 23 2005 Owner or Owner's Designee.rit ie ICrTIFICATE OF INSERVICE INSPECTION 1, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed hy 11;13 C'l'.
of lartford, Conn.
have inspected the components described in this Owner's Report during the period b to 6 - -)q-o  
,' and state that to the best of my knowledge and belief, the Owner has perlormed examinations and takeit corrective measures (lescribed in this Owner's Report in accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate neither the Inspector nor his employer makes any warrantv, expressed or implied, colicening the examinations and corrective measures described in this Owner's Report. Furthennore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising firon or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warrantv, expressed or implied, colicening the examinations and corrective measures described in this Owner's Report. Furthennore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising firon or connected with this inspection.
        *  \                               Commissions           V       /   9 <j-7AN.,I           'i     ,
\\
tzs Inspector's Signature                                     National Board. State. Province, anLI Endorsements Date                   Li.9L                   . 2005
Commissions V  
/
9<j-7AN.,I  
'i  
, tzs Inspector's Signature National Board. State. Province, anLI Endorsements Date L i.9L  
. 2005


FORM NIS-2 19)-05-31I FORM NIS-2 OWNIR'RS REPORT FOR REPAIRS OR REPLACEM ENTS As Reqiuired lv the Provisions of the ASME Code Section Xi I. Owners         Alliant     e                                       [)ate                 06?23!05 Name P.O. Box 351, Cedar Rapids, IA 52406                             Sheet                   I         of             2 Address
FORM NIS-2 19)-05-31I FORM NIS-2 OWNIR'RS REPORT FOR REPAIRS OR REPLACEM ENTS As Reqiuired lv the Provisions of the ASME Code Section Xi I.
: 2. Plant         [)uane Arnold Energy Center                         Unit Name 3277 DAEC Road, Palo, IA 52324                                                         PWO 1128069 Address                                    Repair Organization to P. 0. No., Job No.. etc.
Owners Alliant e
: 3. Work Performed by Alliant Enen cy (IES Utilities)                 Type Code Symbol Stamp                 None Name                                          Authorization No.                       None 3277 DAEC Road, Palo, IA 5232 4                                   Expiration Date                         None
Name
: 4. Identification of System:         Main Steam Safety Relief Valve (Class I)
[)ate P.O. Box 351, Cedar Rapids, IA 52406 Sheet 06?23!05 I
(a) Applicable Construction Code           ASME III             19       68     Edition W68       Addenda       N/A   Code Case.
of 2
Address
: 2.
Plant
[)uane Arnold Energy Center Unit Name 3277 DAEC Road, Palo, IA 52324 PWO 1128069 Repair Organization to P. 0. No., Job No.. etc.
Address
: 3.
Work Performed by Alliant Enen Name 3277 DAEC Road, Palo, IA 5232 cy (IES Utilities)
Type Code Symbol Stamp Authorization No.
4 Expiration Date None None None 4.
Identification of System:
Main Steam Safety Relief Valve (Class I)
(a) Applicable Construction Code ASME III 19 68 Edition W68 Addenda N/A Code Case.
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92
: 6. Identilication of Components Repaired or Re laced and Re lacement Components AS'%I E l Nameor           Name Of       NManuifacturer                                                     Ytar Buill   Repaired.     Code Component       Manufracturer     Serial No.       National         Other ldentification                     Replaced, or Slaniped (Ianger No.)                                         Board No.                                                   Replacenlent (YES or Work OrderIStlS                                           NO)
: 6.
Main Valve Body     Tar-el Rock         S/N 218           N/A                   P'SV 4407                 1974     Replacemient     Yes
Identilication of Components Repaired or Re laced and Re lacement Components AS'%I E l
: 7.     Description of Work:         Main Valve Body S/N 218 was repaired and documented on NIS-2 (15-97-12). This Main Valve Body was rotated in place of S/N 202.
Nameor Name Of NManuifacturer Ytar Buill Repaired.
: 8.     Tests Conducted:                 hydrostatic         i         Pneumatic         j-         Nominal Operating Pressure     rV_I Other EZ         Pressure         1020         psi     Test Temp           240.6           0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is inclided on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Code Component Manufracturer Serial No.
(12182) This Form (E00030) may be obtained from the Order Dept., ASME, 345 1E.           47th St., New York, NY 10017.
National Other ldentification Replaced, or Slaniped (Ianger No.)
Board No.
Replacenlent (YES or Work OrderIStlS NO)
Main Valve Body Tar-el Rock S/N 218 N/A P'SV 4407 1974 Replacemient Yes
: 7.
Description of Work:
Main Valve Body S/N 218 was repaired and documented on NIS-2 (15-97-12). This Main Valve Body was rotated in place of S/N 202.
: 8.
Tests Conducted:
hydrostatic i
Pneumatic j-Nominal Operating Pressure I
rV_
Other EZ Pressure 1020 psi Test Temp 240.6 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is inclided on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12182) This Form (E00030) may be obtained from the Order Dept., ASME, 345 1E.
47th St., New York, NY 10017.


I OR\I NI-I9-05-3 1 FORM^^ NIS-2 (I:ack)
I OR\\I NI-I9-05-3 1 FORM^^ NIS-2 (I:ack)
  '.      Renutiks:     NlainVal!*e I!odv S N 4)' !;as rginov!;1ll\;tb!l m auiVkeBd cd                Si 2lS'a n!s911!taled 1u uor to instllatio.S N KN
Renu tiks:
                              . ~..s riz.ired. - .a-nd d uiiet-If!!c. NIS-2 (I 5-97-i 2). A\V..       .I-05)) I) ; s cmpeted .the   on    n !!hai.
N lainVal!*e I!odv S N 4)' !;as rginov!;1ll\\;tb!l cd m auiVkeBd Si KN 2lS'a n!s911!taled 1u uor to instllatio.S N
. ~..s riz.ired. -
.a-nd d
uiiet-If!!c.
NIS-2 (I 5-97-i 2). A\\V..  
.I-05)) I) ; s cmpeted on
.the n  
!!hai.
CoillneCtion and found acceptable.
CoillneCtion and found acceptable.
CEIRTIFICATE OF COMP'LIANCE IWe certify that the statements made in the report are correct and this               Replacement (repair or replacemient) conformis to the rules ol the ASNIIE Code. Section XI.
CE IRTIFICATE OF COMP'LIANCE IWe certify that the statements made in the report are correct and this conformis to the rules ol the ASNIIE Code. Section XI.
Typc Code Symbol Stamp                           None Certificate of Authorizat ion No.                       None                   1 xpiration Date                 N/A Signcd            ci Cor                        (;I. Equipment Mloniitoring     Date       l           Z- 9,                 2005 Owner or Owner's Oesignee. ritle
Replacement (repair or replacemient)
(:ClF:IFlCA       Or
Typc Code Symbol Stamp Certificate of Authorizat ion No.
()1- INSEIIVICE INSP'ECTION 1.the undersigned, holding a valid commission issued by the National Board of Boiler aun(d Pressiure Vessel Inspectors and the State or Province of                             lowa                     and employed by         I ISB C l .
Signcd ci Cor None None 1 xpiration Date
of                             I lartford. Conn.                         have inspected the components described in this Owner's Report during the period         j i-       -    ;o                                     - 9 LI c,   '                    and state that to the best of my knowledge and helief, the Owner has perforined examinations anti taken corrective measures described in this Oner's Report in accordance with the requirements of the ASNIE Code, Section Xl.
(;I. Equipment Mloniitoring Date l
Z-9, N/A 2005 Owner or Owner's Oesignee. ritle
(:ClF:IFlCA Or
()1-INSEIIVICE INSP'ECTION
: 1. the undersigned, holding a valid commission issued by the National Board of Boiler aun(d Pressiure Vessel Inspectors and the State or Province of lowa and employed by I ISB C l.
of I lartford. Conn.
have inspected the components described in this Owner's Report during the period j i -
;o  
- 9 LI c, and state that to the best of my knowledge and helief, the Owner has perforined examinations anti taken corrective measures described in this Oner's Report in accordance with the requirements of the ASNIE Code, Section Xl.
By' signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owvner's Report. Furthermore, neither the Inspector nor his emiplover shall be liable in any manner for any personal injury or properly damage or a loss of any kind arising from or connected with this inspection.
By' signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owvner's Report. Furthermore, neither the Inspector nor his emiplover shall be liable in any manner for any personal injury or properly damage or a loss of any kind arising from or connected with this inspection.
_____________                            Commissions           i3     ,.):3 N4'AZ,                 i q-i &
Commissions i3  
Inspector's Signature                                   National Board. State, Province, and [Endorsements Date                                              . 005 I~t                     2 0
,.):3 N4'AZ, i q-i Inspector's Signature National Board. State, Province, and [Endorsements D ate
. 005 I~t 2 0


FORM NIS-2 19-05-32 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions ofthe ASMF Code Section XI
FORM NIS-2 19-05-32 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions ofthe ASMF Code Section XI
: 1. Owners       Alliant Energy (lIES Utilities)                       Date                   06/24/05 Name P. O. Box 351, Cedar Rapids, IA 52406                               Sheet                   I_ _     of             2 Address
: 1.
: 2.     Plant       Duane Arnold Energy Center                             Unit Name 3277 DAEC Road, Palo, IA 52324                                                             CWO A71357 Address                                        Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (lIES Utilities)
: 3.     Work Performed by Alliant Enernv (IES Utilities)                     Type Code Symbol Stamp                  None Name                                             Authorization No.                      None 3277 DAEC Road, Palo, IA 52324                                       Expiration Date                         None
Name Date P. O. Box 351, Cedar Rapids, IA 52406 Sheet 06/24/05 I_ _
: 4.       Identification of System:           Residual Heat Removal (Class 2)
of 2
: 5.    (a) Applicable Construction Code             ANSI B31.7               19     69     Edition N/A         Addenda        N/A    Code Case.
Address
(b) Applicable Edition of Section Xl Utilized     for Repairs or Replacements     1992-A92 I6. muentinicaton o0ComponenIs Kepaired or Ke laced anu Ke lacement components ASINIE Name or           Name or       NManuracturer                                                         Year Built   Repaired.     Code Component         Mlanuracturer       Serial No.       National           Other Identification                     Replaced, or Stamped (Ianger No.)                                           Board No.                                                     Replacement   (YES or W_ork Order / sis                                       NO)
: 2.
Residual Heat       Dubose National     IIT # 24353         N/A           12" IILE.014 dowvnstrcam or         2005     Replacement     No Removal Piping     Energy                                                           N102007
Plant Duane Arnold Energy Center Name Unit 3277 DAEC Road, Palo, IA 52324 Address CWO A71357 Repair Organization to P. 0. No., Job No., etc.
: 7.     Description of Work:         Replace 18" length section of 12" diameter HLE-014 downstream of M02007. Applied Code Case N416-1.
: 3.
: 8.     Tests Conducted:                   Hydrostatic         2         Pneumatic         D         Nominal Operating Pressure     [EI-0 Other     L         Pressure           177           psi     Test Temp               78             F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Work Performed by Alliant Enernv (IES Utilities)
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
Expiration Date None None None 4.
5.
Identification of System:
Residual Heat Removal (Class 2)
(a) Applicable Construction Code ANSI B31.7 19 69 Edition N/A (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.
I6.
muentinicaton o0 ComponenIs Kepaired or Ke laced anu Ke lacement components ASINIE Name or Name or NManuracturer Year Built Repaired.
Code Component Mlanuracturer Serial No.
National Other Identification Replaced, or Stamped (Ianger No.)
Board No.
Replacement (YES or W_ ork Order / sis NO)
Residual Heat Dubose National IIT # 24353 N/A 12" IILE.014 dowvnstrcam or 2005 Replacement No Removal Piping Energy N102007
: 7.
Description of Work:
Replace 18" length section of 12" diameter HLE-014 downstream of M02007. Applied Code Case N416-1.
: 8.
Tests Conducted:
Hydrostatic 2
Pneumatic D
Nominal Operating Pressure
[EI-Other L
Pressure 177 psi Test Temp 78 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.


l:'ORNI NIS-2 19-   -3 FORM NIS-2 (Ilack)
l:'ORNI NIS-2 19-  
: 9.       Remarks:     A I ' Iont section of I2' diameter I IL-() 14 was replaced on CW(O A71357 due to localized thinninlfbrom cavitation erosion. Ilanear IILIE-014-0111 was renmovdc and reinstalle(I due to interference. A VTi-3 exam was successfililv performed to document proper installation. The welds were radiographed and accepted after one repair. A baseline u rexam was successfully compieted on EC05072. A VT-2 exam (1'05049) was completed on the mechanical connection and found acceptable.
-3 FORM NIS-2 (Ilack)
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this         Replacement (repair or replacement) conforns to the rules of the ASNIE. Code, Section Xl.
: 9.
Type Code Symbol Staimp                         None Certificate of Authorization No.                     None                Expiration Date                N/A Signed       N       H       e           GL Equipment Monitoring       Date   U (4,wt:                         2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         Sowa                   and employed by       IISB CT.
Remarks:
of                           Hartford. Conn.                         have inspected the components described in this Owner's Report during the period         /-,-     5                    to       60                                     , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements oftlie ASNIE Code, Section Xi.
A I ' Iont section of I2' diameter I IL-() 14 was replaced on CW(O A71357 due to localized thinnin lfbrom cavitation erosion. Ilanear IILIE-014-0111 was renmovdc and reinstalle(I due to interference. A VTi-3 exam was successfililv performed to document proper installation. The welds were radiographed and accepted after one repair. A baseline u rexam was successfully compieted on EC05072. A VT-2 exam (1'05049) was completed on the mechanical connection and found acceptable.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforns to the rules of the ASNIE. Code, Section Xl.
Replacement (repair or replacement)
Type Code Symbol Staimp Certificate of Authorization No.
Signed N
H e
None None Expiration Date GL Equipment Monitoring Date U (4,wt:
N/A 2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Sowa and employed by IISB CT.
of Hartford. Conn.
have inspected the components described in this Owner's Report during the period  
/-,-
to 60 5
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements oftlie ASNIE Code, Section Xi.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions           IIA5 It? 3-c9q,-1-1V _41           /,/ 96     -Z7.
Commissions IIA5 It? 3-c9q,-1-1V _41
Inspector's Signature                                 National Board, State, Province, and Endorsements Date                                         , 2005 200
/,/ 96  
-Z7.
Inspector's Signature National Board, State, Province, and Endorsements Date 2 00
, 2005


FORM NIS-2 19-05-33 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
FORM NIS-2 19-05-33 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
: 1. Owners         Alliant Energy (IES Utilities)                             Date                       7/21/2005 Name P. 0. Box 351. Cedar Rapids, IA 52406                                   Sheet                      I__        of            2 Address
: 1.
: 2.      Plant       Duane Arnold Energy Center                                 Unit Name 3277 DAEC Road, Palo, IA 52324                                                         MWO 1132980 Address                                          Repair Organization to P. 0. No., Job No., etc.
Owners Alliant Energy (IES Utilities)
: 3. Work Performed by Alliant Ener av (IES Utilities)                         Type Code Symbol Stamp                     None Name                                                Authorization No.                         None 3277 DAEC Road, Palo, IA 5232.4                                           Expiration Date                           None
Name Date 2.
: 4.     Identification of System:             Containment Atmosphere Control
P. 0. Box 351. Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 7/21/2005 I_ _
: 5.    (a) Applicable Construction Code               ANSI B31.7                 19       69 Edition 71                   Addenda    N/A      Code Case.
of 2
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 I
MWO 1132980 Repair Organization to P. 0. No., Job No., etc.
: 6.     Identilication ot Componenrs Repaired or         Keplaced and Ke lacement Components AS.MIE Name of           Name of         Manufacturer                                                             Y'ear Built     Repaired,     Code Component         Manufacturer         Serial No.         National           Other Identification                           Replaced, or Stamped Board No.                                                           Replacement   (YES or NO) 2:- Bypass piping   Bechtel                   N/A             N/A           Removed and rerouted 2:"             tlnkown         Repaired       No on HILE-23                                                                     Bypass piping on I ILE-23 2:" Bypass piping   Ladish               lit # YU(32K         N/A         2" tee installed as part of the         1973       Replaced       No on HLE-23                                                                             rerouting.
: 3.
IILE-23-SS47         Bergen Pooner       251 IISSAN3K           N/A             Piston Rod Connector                 1992       Replacement     No 1ILE-23-SS17         Bergen Po%%er           DA.064             N/A                     Snubber                   Unknotsn       Replacement     No IILE-23-SS-47       Bergen Power             2510             N/A               End Cap Assembly                   2005       Replacement     No 2:" Bypass piping   ALRO Steel           I It# D22 186         N/A             U-Bolt from rod stock                 1999       Replacement     No on IILE-23 2:" Bypass piping   Dubose NES           lt# 2Z151           N/A           Nuts for attaching U bolt             2003       Replacement     No on HLE-23
Work Performed by Alliant Ener Name 3277 DAEC Road, Palo, IA 5232 av (IES Utilities)
: 7. Description of Work:           Removed part of 2" bypass, and modified supports on Drywell purge piping to allow thermal growth of the containment.
Type Code Symbol Stamp Authorization No.
: 8. Tests Conducted:                   Hydrostatic         Z           Pneumatic           EX1         Nominal Operating Pressure       LIZ Other   L           Pressure         68.5             psi     Test Temp               N/A           0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
.4 Expiration Date None None None 4.
5.
Identification of System:
Containment Atmosphere Control (a) Applicable Construction Code ANSI B31.7 19 69 Edition 71 (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.
I6.
Identilication ot Componenrs Repaired or Keplaced and Ke lacement Components AS.MIE Name of Name of Manufacturer Y'ear Built
: Repaired, Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YES or NO) 2:- Bypass piping Bechtel N/A N/A Removed and rerouted 2:"
tlnkown Repaired No on HILE-23 Bypass piping on I ILE-23 2:" Bypass piping Ladish lit # YU(32K N/A 2" tee installed as part of the 1973 Replaced No on HLE-23 rerouting.
IILE-23-SS47 Bergen Pooner 251 IISSAN3K N/A Piston Rod Connector 1992 Replacement No 1ILE-23-SS17 Bergen Po%%er DA.064 N/A Snubber Unknotsn Replacement No IILE-23-SS-47 Bergen Power 2510 N/A End Cap Assembly 2005 Replacement No 2:" Bypass piping ALRO Steel I It# D22 186 N/A U-Bolt from rod stock 1999 Replacement No on IILE-23 2:" Bypass piping Dubose NES lt# 2Z151 N/A Nuts for attaching U bolt 2003 Replacement No on HLE-23
: 7.
Description of Work:
Removed part of 2" bypass, and modified supports on Drywell purge piping to allow thermal growth of the containment.
: 8.
Tests Conducted:
Hydrostatic Z
Pneumatic EX1 Nominal Operating Pressure LIZ Other L Pressure 68.5 psi Test Temp N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This Fonn (E00030) may be obtained from the Order Dept., ASME, 345 E.47th St., New York, NY 10017.
(12/82) This Fonn (E00030) may be obtained from the Order Dept., ASME, 345 E.47th St., New York, NY 10017.
3
3


IORM NIS-2 19-05-33 FORM N IS-2 (Back)
IORM NIS-2 19-05-33 FORM N IS-2 (Back)
: 9.       Remarks:     This work order reconligured the b pass line around the Drvwell purge I ne including a support change and changed a support on the Drvwell purge line. The current support design did not account for containment thermal growth. The bypass line run was cut out and welded, with one elbowv added. Surface exams were successfully performed on the welds. A support on the 2" bypass line was modified, a new u-bolt was installed that allowed for thermal movement. The new welds and fitting were pneumatically pressure tested successfully (P05053) A snubber (previously installed under PWOI 131078) was installed on the Drvwell pursue line.
: 9.
Remarks:
This work order reconligured the b pass line around the Drvwell purge I ne including a support change and changed a support on the Drvwell purge line. The current support design did not account for containment thermal growth. The bypass line run was cut out and welded, with one elbowv added. Surface exams were successfully performed on the welds. A support on the 2" bypass line was modified, a new u-bolt was installed that allowed for thermal movement. The new welds and fitting were pneumatically pressure tested successfully (P05053) A snubber (previously installed under PWOI 131078) was installed on the Drvwell pursue line.
Successful VT-3 was nerforined (P05052) afler the newv supports were installed.
Successful VT-3 was nerforined (P05052) afler the newv supports were installed.
CERTIFICATE OF COMP11 LIANCE We certify that the statements made in the report are correct and this       Repair/Replaceiment (repair or replacement) confonrs to the rules of the ASMI Code, Section Xl.
CERTIFICATE OF COMP11 LIANCE We certify that the statements made in the report are correct and this confonrs to the rules of the ASMI Code, Section Xl.
Type Code Symbol Stamp                         None Certificate oftAuthorji, iUnNo.                     None                 Expiration Date                 N/A Signed                               Supervisor, Materials/Inspection   Date   4L     g     2/1   li           2005 I   Owne(or Owner's Designee, Title                         /I-- 7 CERTIFICATE OF INSERVICE INSIPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                         lowa                   and employed by       I ISB CT of                           Hartford, Conn.                       have inspected the components described in this Owner's Report during the period                   o                  to toi,-         7- 9 -c so                       , and state that to the best of my knowledge and belief, the Owner has perfonned examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xi.
Repair/Replaceiment (repair or replacement)
Type Code Symbol Stamp None Certificate oftAuthorji, iUnNo.
None Expiration Date Signed Supervisor, Materials/Inspection Date 4L g
2/1 li N/A 2005 I Owne(or Owner's Designee, Title
/I-- 7 CERTIFICATE OF INSERVICE INSIPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of lowa and employed by I ISB CT of Hartford, Conn.
have inspected the components described in this Owner's Report during the period toi,-
o to 7-9 -c so  
, and state that to the best of my knowledge and belief, the Owner has perfonned examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owvner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising fromt or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owvner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising fromt or connected with this inspection.
_3 @(                                 Commissions         /VJ       /93dS-v9                   /qfG .,2 Inspector's Signature                               National Board, State, Province, and Endorsements Date                 7 -da                 , 2005 3
_3 @(
Commissions  
/VJ  
/93dS-v9  
/qfG.,2 Inspector's Signature National Board, State, Province, and Endorsements Date 7 -da  
, 2005 3


FORNI NIS-2 19-05-34 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
FORNI NIS-2 19-05-34 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi
: 1. Owners         Alliant Enerpv (IES Utilities)                             Date                   7/25/2005 Name P. O. Box 351, Cedar Rapids, IA 52406                                     Sheet       _          I         of               2 Address
: 1.
: 2. Plant         Duane Arnold Energy Center                                   Unit Name 3277 DAEC Road, Palo, IA 52324                                                         MWO 1133017 Address                                            Repair Organization to P.0.No., Job No., etc.
Owners Alliant Enerpv (IES Utilities)
: 3. Work Pcrfonmed by Alliant Enerzv (IES Utilities)                           Type Code Symbol Stamp                  None Name                                                 Authorization No.                      None 3277 DAEC Road, Palo, IA 52324                                             Expiration Date                         None
Name Date P. O. Box 351, Cedar Rapids, IA 52406 Address Sheet 7/25/2005 I
: 4. Identification of System:           Primary Containment
of 2
: 5.    (a) Applicable Construction Code           ANSI B31.7                     19     69       Edition N/A         Addenda     N/A         Code Case.
: 2.
(b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1992-A92
Plant Duane Arnold Energy Center Name Unit 3277 DAEC Road, Palo, IA 52324 Address MWO 1133017 Repair Organization to P. 0. No., Job No., etc.
: 6. Identification of Components Repaired or Replaced and Replacement Components ASINIE Namc of           Name or         Mlanuracturer                                                           Year Built       Repaired.       Code Component         Manufacturer       Serial No.       National               Other Identification                           Replaced, or   Stamped Board No.                                                               Replacement     (YES or
: 3.
_ __ __ __  _  _ _  _ _    _ _  _              _  _ _ _  _ _ _N                       O)
Work Pcrfonmed by Alliant Enerzv (IES Utilities)
IILE-035             Bechtel               N/A             N/A                   Piping outside X-24B           Unknown           Repaired         No penctration I               1.                 I                 I                                   I                 1.             4
Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.
: 7. Description of Work:           Removed Hanger HLE-35-SR-79 from line HLE-035 to allow for drywell thermal growth.
Expiration Date None None None 4.
: 8. Tests Conducted:                   Hydrostatic       L                 Pneumatic             Cl1     Nominal Operating Pressure           LIZ Other   Ci-       Pressure           N/A                 psi       Test Temp             NIA               0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top ofthis form.
5.
Identification of System:
Primary Containment (a) Applicable Construction Code ANSI B31.7 19 69 Edition N/A Addenda N/A Code Case.
(b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1992-A92 6.
Identification of Components Repaired or Replaced and Replacement Components ASINIE Namc of Name or Mlanuracturer Year Built Repaired.
Code Component Manufacturer Serial No.
National Other Identification Replaced, or Stamped Board No.
Replacement (YES or
_ _ _N O )
IILE-035 Bechtel N/A N/A Piping outside X-24B Unknown Repaired No penctration I
: 1.
I I
I
: 1.
4
: 7.
Description of Work:
Removed Hanger HLE-35-SR-79 from line HLE-035 to allow for drywell thermal growth.
: 8.
Tests Conducted:
Hydrostatic L
Pneumatic Cl1 Nominal Operating Pressure LIZ Other Ci-Pressure N/A psi Test Temp NIA 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top ofthis form.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., Newv York, NY 10017.
(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., Newv York, NY 10017.
3
3


IO(RNIl NIS-2 19-05-3-1 FORM NIS-2 (Back)
IO(RNIl NIS-2 1 9-05-3-1 FORM NIS-2 (Back)
: 9.       Remarks:       I[his work order rcIop9 hjanher I IL..-35-SR-79 firomithe IILE 35 line near penetratliont       -L4 13 TIhe hngter \as removed to allow thermgal or i_1of the do el l pr ElI17 IS.
: 9.
CERTIFICATE OF COdIMPLIANCE WVe certify that the statements made in the report are correct and this           Repair (repair or replacement) confonns to the rules of the ASME Code, Section XI.
Remarks:
Type Code Symbol Stamp                         None Certificate of Autl i     tion No.                   None                 Expiration Date               N/A Signed                   L           Supervisor. NIaterials/Inspection   [)ate _        _        _      _        2005 Owd/er or Owner's Designee, Title CERTIFICATE OF INSERVICE INSIPECTION 1 the undersigned, holding a valid commission issuedl by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                           lowa                     and employed by       I ISB CT of                           Ilartford, Conn.                         have inspected the components described in this Owner's Report during the period             -                          to           ?7 D- of                             , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
I[his work order rcIop9 hjanher I IL..-35-SR-79 firomi the I ILE 35 line near penetratliont  
-L4 13 TIhe hngter \\as removed to allow thermg al or i_1 of the do el l pr ElI17 IS.
CERTIFICATE OF COdIMPLIANCE WVe certify that the statements made in the report are correct and this Repair (repair or replacement) confonns to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp None Certificate of Autl i tion No.
None Expiration Date N/A Signed L
Supervisor. NIaterials/Inspection
[)ate 2005 Owd/er or Owner's Designee, Title CERTIFICATE OF INSERVICE INSIPECTION 1 the undersigned, holding a valid commission issuedl by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of lowa and employed by I ISB CT of Ilartford, Conn.
have inspected the components described in this Owner's Report during the period to  
?7 D-of  
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthennore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthennore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
x       U.-                             Commissions           /V<%   I?3493q,4,-\     A.       /9   94,   *~o Inspector's Signature                                   National Board, State, Province, and Endorsements Date       ,                             2005 3
x U.-
Commissions  
/V<% I?3493q,4,-\\
A.  
/9 94,  
*~o Inspector's Signature National Board, State, Province, and Endorsements Date,
2 005 3


                                              . I ..
I..
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part H, page I of I I)   Owners: Interstate Power and Light Company,         Central Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                       Marion, IA.                          Ilumbolt, [A.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part H, page I of I Corn Belt Power Cooperative Ilumbolt, [A.
P.O. Box 351 Cedar Rapids, IA. 52406
I)
: 2)   Plant: Duanc Amold Energy Ccnter, Palo, IA. 52324                       3) Plant Unit: #1
Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 4)   Owners Certificate ofAuthorization (if required): N/A                   5) Commercial Service Date: 02A)1f75
: 2)
: 6)   National Board Number of Unit   N/A                                     Gross Generating Capacity. 614 MVE ABSTRACT OF CONDITIONS NOTED AND CORRECTIVE MEASURES TAKEN:
Plant:
Duanc Amold Energy Ccnter, Palo, IA. 52324
: 4)
Owners Certificate ofAuthorization (if required): N/A
: 6)
National Board Number of Unit N/A
: 3) Plant Unit: #1
: 5) Commercial Service Date: 02A)1f75 Gross Generating Capacity. 614 MVE ABSTRACT OF CONDITIONS NOTED AND CORRECTIVE MEASURES TAKEN:
The corrective measures are addressed in this report and were performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 1992 with the 1992 Addenda (Ref. Relief Request NDE-R015 Rev. 1), and the Duane Arnold Energy Center Updated Final Safety Analysis Report. The corrective measures performed as Repairs or Replacements are listed in Part F of this report and are documented, using Form NIS-2, in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, 1992, 1992 Addenda. Specific details and associated records of additional corrective measures are on file at Duane Arnold Energy Center. The corrective measures addressed were performed during the period of April 21,2003 through May 3, 2005.
The corrective measures are addressed in this report and were performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 1992 with the 1992 Addenda (Ref. Relief Request NDE-R015 Rev. 1), and the Duane Arnold Energy Center Updated Final Safety Analysis Report. The corrective measures performed as Repairs or Replacements are listed in Part F of this report and are documented, using Form NIS-2, in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, 1992, 1992 Addenda. Specific details and associated records of additional corrective measures are on file at Duane Arnold Energy Center. The corrective measures addressed were performed during the period of April 21,2003 through May 3, 2005.


TIHRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part I, page I of 41 I)   Owners: Interstate Power and Light Company,         Ce ntral Iowa Power Cooperative      Corn Belt PowcrCooperative an Alliant Company                         M. irion, IA.                        Humbolt, IA.
TIHRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part I, page I of 41 I)
Owners: Interstate Power and Light Company, Ce an Alliant Company M.
P.O. Box 351 Cedar Rapids, IA. 52406
P.O. Box 351 Cedar Rapids, IA. 52406
: 2) Plant   Duane Amold Encrgy Centcr, Palo, IA. 52324                         3) Plant Unit: #1
: 2)
: 4) Owners Certificate of Authorization (if required): N/A                     5) Commercial Service Date: 02/0lins
Plant Duane Amold Encrgy Centcr, Palo, IA. 52324
: 6) National Board Number of Unit: N/A                                         Gross Generating Capacity- 614 MWE ISI FIGURES AND ISOMETRICS PLEASE NOTE: ISI Figures and Isometrics are listed in Part B and Part D of this report
: 4)
Owners Certificate of Authorization (if required): N/A
: 6)
National Board Number of Unit: N/A ntral Iowa Power Cooperative irion, IA.
Corn Belt PowcrCooperative Humbolt, IA.
: 3) Plant Unit: #1
: 5) Commercial Service Date: 02/0lins Gross Generating Capacity-614 MWE ISI FIGURES AND ISOMETRICS PLEASE NOTE: ISI Figures and Isometrics are listed in Part B and Part D of this report


1 1/16 Dip.
1 1/16 Dip.
INSERT PORT WITHDRAW PORT                 1/2' DIn DOWEL PIN CRT. B-C-2 ITEM NO. 87.80 (VT-I UHEN DISASSEMBLED) 89     CRD' S CRD FIGURE           NO. 1. 1-8B DRAUINCS:
INSERT PORT WITHDRAW PORT 1/2' DIn DOWEL PIN CRT.
B-C-2 ITEM NO.
87.80 (VT-I UHEN DISASSEMBLED) 89 CRD' S CRD FIGURE NO.
: 1. 1-8B DRAUINCS:
BECH-BI 1-012
BECH-BI 1-012
)
)


Cs U
Cs U
co C
I-3 t-J
0 I-3 0 N    I        I In U)- L)    -  U t-J CA iLn cnU,              I?
-J F-0 C-)
-J C-) -T -J-                 U)
U, U) coC
_j L)         ujW w F-  U, Cl) I',IW Jw w SEE VS-01-39C M                    Y U) LO              UI )
0 CA iLn
C                        0 0 Cn                        C, 0         8  (1 z
-T
_jL)
Cl)
M LO C
Cn N
: cnU,
-J -
I',I' U ) L )
U n I
I ujW W Jw U I )
0 z
I.-
I.-
Cn E
Cn x
ii-x
Cr r-  
                                                      -ING SURFACE(7)&
'U I
w I--  'U PLt    4'U z        Cr      N SS BUILD-UP PER o-                   N                        WPS-103-3F5 or 0
n I
C-z            SECTION A-A  WPS-143-4F5F7 x
I?
    'U 41 'U r- 'U                   .0 C 0                    z
U) w wY
                              'U C C,       I n 0,
SEE VS-01-39C E
N                        r-.
ii-PLt 0
IES:
C-
'U C
w
'U I--
4 o-x41 0
C N
'U z
'U C,
N N
0z z
'U 0
C, 8
r-.
0 (1
.0 0,
-ING SURFACE(7)&
SS BUILD-UP PER WPS-103-3F5 or WPS-143-4F5F7 SECTION A-A IES:
Inservice Inspection Program Reactor Pressure Vessel Sketch
Inservice Inspection Program Reactor Pressure Vessel Sketch


IL Cs w                                                                                                                 SEE VS-01-39<1>
IL Cs w
SE :E VS-01-39<1>                        DETAIL 4            2 DETAIL 2 (TYP(                                                T 0
-J I
Cq Ir       rr I
Cq Ir 0
O'"TO                                    J./Thi0'DI)
O(A C-iU (1)
L .. f(L/ A-O'VCB-BI
M In CIn
                                                                                                                    \BOTTOM (HC-H2)
-j -IiULii i Cq rrI w
HEAD)
LA10U)
Cn
(nU)U O'"TO SE DE Cn WW Cn 0
    -J I
U)
O (A
WI
C
~5'is"--
            -i -j- LA10U)
_ _ W v
U IiULii Cn i W U) 0 (ICSKIRWELD) w        W WI         ~5'is"--                 --  -
II I
__W (1)
9 I.-
M Cq (nU)U In C
In
        . . I ._ . .
_               _    _    _  v II d    t:  Wcn 9
I.-        'I C2 I--
3 e.
3 e.
w I.-
wI.-
            -j
-j wa U)
                -I CL w -I0j 0
'II--
                                ..Ir ol
-I CL
-I 0j 0j a
U1 0
0 cc~
CC Li-C (IC x
I-Ct d
t:
Wcn C2
..I o r l I
(HMA-B6DD
%8 0
(
(
I l     (H10 -2)
l (H10  
(HMA-B6DD (H12-12)
-2)
N1
N1 (H12-12)
                                                                      %8 PVIW a 0j U)
_UTSIDI SEE VS-01-39<2>c 324 REFERENCE DRAWING:
_UTSIDI                    I           H11-)
(HMA-B4) 192 V1(H1-7))
a (HICA,_
(S-02-10(
0 12-)           (HMA-BD)       ((HI1t02 cc~
CHH1-7 SEE VS-01-39<1>
IIS9'S
:E VS-01-39<1>
                                                                                                -            /36'/_,_,
DETAIL 4 2
CC I-n       SEEVS-01-39<1>
TAIL 2 (TYP(
U1 Li-                                                                              n         l         -        (HCA-BI 0    C    Ct (IC 0    x z<;,'t\__t-\
T J./Thi0'DI)
II                        (H10-3)t (H           7 )kiL2W-             (H11-3)
\\BOTTOM L.. f(L/
(H12-1)          DTI 30       _      154                                   1 /(H0-4) 1       -/h     / /     18- (11-4)1 SEE VS-01-39<2>c
A-O'VCB-BI HEAD)
                                                                                            -                  -214) zC                                                                      A   l   _6
(HC-H2)
_<\       >   si~'EE VS-01-39<1>
(ICSKIRWELD)
IL          La.
PVIW I
CHH1-7 Cr                                                      324                        _CE~pp=a
H11-)
                                                                                                  ,o1             144-\     (H11-5) V2 W50-1          X   Hl2-0~
(H12-1)
REFERENCE DRAWING:              (HMA-B4)      192 w                                                                                            5       (10-6)           V-0-08<1>
DTI (HICA,_
O)
0 12-) (HMA-BD)
V1(H1-7))                                                          (H11-6)         tE-01-08<2>
((HI1t02 I -
w                                (S-02-10(                                PLAN               X     H12-6)     -      ETAIL 6
IS9'S /36'/_,_,
                                                                                                              '-s_,__,-     (CA-H2) i~_ JIES:                                                                       BOTTOM HEAD E0 co -i
n SEEVS-01-39<1>
      ,   Nc            Inservice Inspection Program                                           ASSEMBLY 7_          c Reactor Pressure Vessel Sketch DWG.NO.                                                                               REV.
n l
M                                                             VS-01-07                         1 K
(HCA-BI z II
<;,'t\\__t-\\
(H10-3)t (H
7 )kiL2W- (H11-3) 30 154 1 /(H0-4) 1  
-/h / /
18- (11-4)1
-214)
A l _6
_<\\ > si~'EE VS-01-39<1>
_CE~pp=a  
,o1 144-\\
(H11-5) V2 1
W50-X Hl 2-5 (10-6)
V-0-08<1>
(H11-6) tE-01-08<2>
PLAN X
H12-6)
ETAIL 6
'-s_,__,-
(CA-H2)
IL Cr 0~
w O) w zC La.
J i~ _ IES:
BOTTOM HEAD E0 co -i
, N c Inservice Inspection Program ASSEMBLY 7 _
c Reactor Pressure Vessel Sketch DWG.NO.
REV.
M VS-01-07 1
K


I L
L I


DETAIL 1                     DETAIL 2                      DETAIL 3 SKIRT KNUCKLE TO SKIRT               SKIRT EXTENSION            SKIRT EXTENSION TO KNUCKLE EXTENSION                   GIRTH SEAM                  SUPPORT SKIRT (WELD PER WPS-325-2F4F6)           (WELD PER WPS-301-lF4)       (WELD PER WPS-301-2F4) a-LI.
DETAIL 1 SKIRT KNUCKLE TO SKIRT KNUCKLE EXTENSION (WELD PER WPS-325-2F4F6)
C DETAIL 4                               DETAIL 5 SKIRT KNUCKLE VERT SEAMS              SKIRT EXTENSION VERT SEAMS (WELD PER WPS-303-lF4)                 (WELD PER WPS-301-lF4) 0 2
DETAIL 2 SKIRT EXTENSION GIRTH SEAM (WELD PER WPS-301-lF4)
C Lzr 270-SEAM ORIENTATION .                         DETAIL 6 SKIRT KNUCKLE & SKIRT EXTENSION ib DETAIL OF SKIRT KNUCKLE TO BOTTOM HEAD JUNCTION REFERENCE DRAWING:
DETAIL 3 SKIRT EXTENSION TO SUPPORT SKIRT (WELD PER WPS-301-2F4) a-LI.C DETAIL 4 DETAIL 5 SKIRT KNUCKLE VERT SEAMS (WELD PER WPS-303-lF4)
(WELD PER WPS-323-2F4F6 or APED-B11-2655-127                              - WPS-343-lF4F6 I_t_U_ IES:                                         SKIRT KNUCKLE &
SKIRT EXTENSION VERT SEAMS (WELD PER WPS-301-lF4) 0 2
t C Inservice Inspection Program                   SKIRT EXTENSION 7U C- Reactor Pressure Vessel Sketch           DwG NO.     VS0108       >          REV.
C Lzr 270-SEAM ORIENTATION.
SKIRT KNUCKLE & SKIRT EXTENSION ib DETAIL 6 DETAIL OF SKIRT KNUCKLE TO BOTTOM HEAD JUNCTION REFERENCE DRAWING:
APED-B11-2655-127 (WELD PER WPS-323-2F4F6 or WPS-343-lF4F6 I_
t_
U_ IES:
SKIRT KNUCKLE &
t C Inservice Inspection Program SKIRT EXTENSION 7 -
Reactor Pressure Vessel Sketch DwG NO.
VS0108 REV.
U C


dLL 01
d LL 01
    -I I-.
-I I-.
N tn
-J
          -j
-J N
  -J  to
tn
  -J  Co ea (3, LO2 z0 4t E-cc
-j ea LO2 to Co (3,
z 0
E-cc
(-
(-
U)
U)
A
A 4t I21
      -j                                 PLAN VIEW I21  0 tn INCONEL BUTTERING tL                                                    ,PER WPS-103-2F43 LL IL I:
-j tn tL 0
z CD C,,                                           NOZZLE ASSEMBLY LU kJ\
LL ILI:
SECTION A-A REFERENCE DRAWING:
PLAN VIEW INCONEL BUTTERING
APED-BIl-2655-195 oEIES:HP                                     SEAL LEAK DETECTOR C9 cl   Inservice Inspection Program             NOZZLE MK N13 77 L           Reactor Pressure Vessel Sketch DWG.NO.                           REV.
,PER WPS-103-2F43 z
CD C,,
LU kJ\\
NOZZLE ASSEMBLY SECTION A-A REFERENCE DRAWING:
APED-BIl-2655-195 oE IES:HP SEAL LEAK DETECTOR C9 cl Inservice Inspection Program NOZZLE MK N13 77 L Reactor Pressure Vessel Sketch DWG.NO.
REV.


d w
dw I-J
A -o~
-J A -o~
N I-J
N
          -J U}
-J L)U}
L)
co
  -J  to CD co a, to C,
: toC, to CD a,VI E
VI E
P-cc U,
P-cc U,                                       PLAN VIEW 0   z0 2
0 0 z
      -j Q)
-jQ)
U)
U) tn a-(Li 0
H1 tn a-(Li 0
En PLAN VIEW 2H1 zC Uw I 'I I
En zC                 I 'I I I Uw I I kc; SECTION A-A                     NOZZLE ASSEMBLY REFERENCE DRAWING:
I I
APED-B11-2655-195 c             o PgaESm     LP SEAL LEAK DETECTOR
I kc; SECTION A-A NOZZLE ASSEMBLY REFERENCE DRAWING:
__ ii Inservice Inspection Program                   NOZZLE MK N14 717I7         Reactor Pressure Vessel Sketch DWO.NO.                   REV.
APED-B11-2655-195 c
    \0\ ~ _ _ _ _ _ _ _ _ _ _ _i
o PgaESm LP SEAL LEAK DETECTOR
_ ii Inservice Inspection Program NOZZLE MK N14 717I7 Reactor Pressure Vessel Sketch DWO.NO.
REV.
\\0\\
~ _ _ _ _ _ _ _ _ _ _ _i


180 160 140 120 100 80 60 40 20 0 340 320 300 280 260 240 220 200 180 170150130110         i 90       70 503l0 10J5
180 160 140 120 100 80 60 40 20 0
                                    -r --r r-r 310 i2        ,270250T 23 mF ZI        a T210TT907
340 320 300 280 260 240 220 200 180 170150130110 90 70 503l0 10J5 310 i2
                                                                                                                          - A-GH 6763I2                                               (VCB-C5)
,270 250T 23 T210TT907 i
N3B           N3A                                             N30         N3C (MSB-DI)     IMSA-DO)                                           (MSD-DI)   (MSC-DI) 09                                     N12A                   0Q                                 N128 (VIC-DI)                   2                               (VID-D1)
r r
FG 5307__                                                      (VCB-B4)                                     SHELL NO.4 NIIA                                                         NIIB (VIA-D1)                                                   (VIB-D0)
r r-ZI mF a
N4B                               0                           N4D                           0 IFWB-DL)           N5A                                         (FWD-DL)         N5B
A-U)
( CSA-DI)                       N4A                           (CSB-DI)           \       NC N9                   (       i         I       (FWA-DI)                           ( X                    IFWC-DI)
GH 6763I2 (VCB-C5)
:          lCRA-DI) 0 J       =
N3B N3A N30 N3C (MSB-DI)
U                       EF tL u
IMSA-DO)
3843/4                                                     (VCB-83)                               :      SHELL NO.3 NI6A                                                       N16B U)                                                    (VIE-DI)                                                   (VIF-DI) 0                                                           0
(MSD-DI)
_CLADDING
(MSC-DI) 09 N12A 0Q N128 (VIC-DI) 2 (VID-D1)
_              0                                     o                                          PATCHES 0       0               a         0EXAMINED DE 238%                                                 IVCB-A2)                                           SHELL NO.2 N2D         N2C           N2B         N2A                   N2H         N2G         N2F         N2E (RRD-DI)   (RRC-DI)     (RRB-D1)       ERRA-D)               (RRH-DI)     (RRG-01)   (RRF-DI)     (RRE-DI)
FG 5307_ _
(Q)         (g)           (Q)_         (B)         NIA       (g)         (         (                 )
(VCB-B4)
c                 (RCA-DI)                                   a 0 C 0
SHELL NO.4 NIIA NIIB (VIA-D1)
NBN8A                       i         ~       -~                         N8B         -j (RCB-DI)         (JPA-Dt)       -                                  BO         (JPB-DI)       >N F4 Li wY                                                        OUTSIDE                 BD                           SE       N OUTSIDE VIEW TL IJ   IES:                                                                 VESSEL             SHELL             RING Nc      Inservice Inspection Program                                                       LAYOUT eactor Pressure Vessel Sketch OWG.NO.
(VIB-D0)
R7                                                                                VS               1REV.
N4B 0
N4D 0
IFWB-DL)
N5A (FWD-DL)
N5B
( CSA-DI)
N4A
( CSB-DI)  
\\
NC N9
(
i I
(FWA-DI)
X
(
IFWC-DI) lCRA-DI)
J  
=
0 U
EF tL u
3843/4 (VCB-83)
SHELL NO.3 NI6A N16B (VIE-DI)
(VIF-DI) 0 0
_CLADDING o
0 PATCHES 0
0 a
0EXAMINED DE 238%
IVCB-A2)
SHELL NO.2 N2D N2C N2B N2A N2H N2G N2F N2E (RRD-DI)
(RRC-DI)
(RRB-D1)
ERRA-D)
(RRH-DI)
(RRG-01)
(RRF-DI)
(RRE-DI)
(Q)
(g)
(Q)_
(B)
NIA (g)
(
(  
)
c (RCA-DI) a 0 C NBN8A i  
~  
-~
N8B  
-j (RCB-DI)
(JPA-Dt)
BO (JPB-DI)  
>N OUTSIDE BD SE N
OUTSIDE VIEW 0
Li F4 wY TL IJ IES:
VESSEL SHELL RING N c Inservice Inspection Program LAYOUT R7 eactor Pressure Vessel Sketch OWG.NO.
VS 1REV.


d F.
d I.-
2 6
d N
En wU w
In F.
IF ti Lw wL U,
N wIn-U, Ii IL w8 Ca 27 n IZ (n=
(n n 0- 9 w
0(11 0
I.-
I.-
                                                      - - -ELEV. 195.94 2 N IF      N U,
I.4
6 En ti d  wULw w wL w In U, In-Ii IL 8
\\
w          w0 Ca n IZ I.-
- --ELEV.
(n=  0(11 I.4 27
195.94
                                              \        --- ELEV. 35.63
--- ELEV. 35.63
                                                      -0<
-0<
0-                                TYP.
s
(nn9 TYP. ELE
-- ELEV. (-139.38 TYP.
                                                        --.s 2
TYP. ELE REFERENCE DRAWING:
C
                                                          -- ELEV. (-139.38 LL REFERENCE DRAWING:
APED-Bi1-084<1>
APED-Bi1-084<1>
_ uA       IES:                                 CONTROL ROD DRIVE
2C LL
__=         Inservice Inspection Program                 ASSEMBLY 77    A         Reactor Pressure Vessel Sketch DWG.NO.                       REV.
_ uA IES:
CONTROL ROD DRIVE
__ =
Inservice Inspection Program ASSEMBLY 7 7 A Reactor Pressure Vessel Sketch DWG.NO.
REV.


-LJ I-U, B-J
-LJ I-B-J
            -J U
-J U,
  -J CD tc)
-J U
tc)
U)
U)
F-
CD F-
;0t                                   CENTER CRD STUB ASSEMBLY cc U,
;0t cc U,
Q     LIT S     F
Q LIT S
F 0
P
_ _3
_ _3
:nin 0
:n in a-J z0 I-LL (-
P LL (-
0t z
a-J z0 I-WPS 309-2F43 0t w
w 0
0 z
(Li 0
(Li 0
w I.-
w I.-U-Wc:
U-Wc:                             TYPICAL CR0D STUB ASSEMBLY 0                                          NOTEt ALL STUB TUBES SHALL EXTEND A MINIMUM OF REFERENCE DRAWINGS:                      4W4' ABOVE THE INNER SURFACE OF THE BOTTOM HEAD AND A MINIMUM OF lY BELOV THE INNER APED-B11-2655-189,                       SURFACE OF THE BOTTOM HEAD.
0 CENTER CRD STUB ASSEMBLY WPS 309-2F43 0D STUB ASSEMBLY NOTEt ALL STUB TUBES SHALL EXTEND A MINIMUM OF 4W4' ABOVE THE INNER SURFACE OF THE BOTTOM HEAD AND A MINIMUM OF lY BELOV THE INNER SURFACE OF THE BOTTOM HEAD.
APED-BI1-001<2>
TYPICAL CR REFERENCE DRAWINGS:
cm IES                                             CRD STUB TUBE cm Inservice Inspection Program 77 cReactor Pressure Vessel Sketch           DWG.NO.                                         REV.
APED-B11-2655-189, APED-BI1-001<2>
cm IES CRD STUB TUBE cm Inservice Inspection Program 77 cReactor Pressure Vessel Sketch DWG.NO.
REV.


LU
LU
    -Jtb                     -
-Jtb  
                              ~0
~0
                    ;r LI         ,
;r LI P
P ow     ZZw
ow ZZw N n
          -  Nn  -rjw     f   L0 0.
-rjw f
L0 0.
IL z
IL z
C LI-.
C LI-.
Line 1,236: Line 2,956:
APED-B11-042<01>, APED-B11-042<02>.
APED-B11-042<01>, APED-B11-042<02>.
APED-B11-042<08>% APED-B11-042<09>
APED-B11-042<08>% APED-B11-042<09>
IIIr           PES:
IIIr PES:
liii                                             DRY TUBE
liii DRY TUBE
          , =Inservice Inspection Program____________________
, =Inservice Inspection Program____________________
7CD Reactor Pressure Vessel Sketch DWG. NO. V-30     REV.
R 7
\                                                   Vm3.2.
eactor Pressure Vessel Sketch DWG. NO.
V-30 REV.
CD
\\
Vm3.2.


w M
M w
l C4
l
-j t-C4 Cl
(,
(,
vCn
vCn Cl)
-j t-Cl)
I-Po w
Cl I-Po Ld 0
0 Ld 0z
z 0
-J U-00 I,
-J 0 U- I, 0
(-A z
(-A z
0 Fr wL REFERENCE DRAWING:
0 Fr wL REFERENCE DRAWING:
APEO-B11-034<01>
APEO-B11-034<01>
_D_ IJES:
Cruj IJES:
Cruj                        ,                      ISIN-CORE HOUSING
_D _
  ,  =   Inservice Inspection Program
ISIN-CORE HOUSING
_r         Reactor Pressure Vessel Sketch DWG.NO.wREv.
=
Inservice Inspection Program
_r Reactor Pressure Vessel Sketch DWG.NO.
wREv.


VSW-180 l     1LADER VESSEL       STRBILIZER F ; qvr-*   No . 1 . 1- I 0 P ROUND
VSW-180 l 1LADER VESSEL STRBILIZER F ; qvr-*
_RRMINC   RELERSE RECORD REV   ORTE   PREPARED   2E-EWEDI APPROVED                                 PURPOSE
No.
            .5t8^t~~~~~                               -t0 E*m7rl^9'h4Mb$mumUW~sRt HI   2           DA                                 CELETED OVG PER DURF-0013 TAH       _______                        RE-ISSUED PER DURF-U0027 I       i   .  ._ .. ___
1. 1 - I 0 P ROUND
I)REC ZKStOVICE ZNSPMfloJ RUE S!CTWN XI [IOIRIC
_RRMINC RELERSE RECORD REV ORTE PREPARED 2E-EWEDI APPROVED PURPOSE
.5t8^t~~~~~  
-t0 E*m7 rl^ 9 '
h4Mb$mumUW~sRt HI 2 DA CELETED OVG PER DURF-0013 TAH RE-ISSUED PER DURF-U0027 I
i I)REC ZKStOVICE ZNSPMfloJ RUE S!CTWN XI [IOIRIC


N STERN "C" DRAWING RELEASE RECORD REV   DATE   PREPRRED REVIEWED     APPROVED                       PURPOSE T   3       9AH JA     __      _        F-     REV.PER DURF-U0N27 2   9-2450s     DR       GP         KKM       1S0 S TO CHO FORMRT RS PER NC-85-OT94 3   10-3-91                           KKri     REMOVED EXTRA UEL       NUMER 4 4S&...........zL.......                     CHANGED ISO WDSETO           AKON-5   7-22-94     OA       FED           OP   -REVISED   PER IS   SPECTION VAIN I I-Z4-96               _    _                REV._PERDURF-_1H OREC INSERVICE INSPECTION ASME SECTION XI ISOMETRIC
N STERN "C" DRAWING RELEASE RECORD REV DATE PREPRRED REVIEWED APPROVED PURPOSE T
3 9 JA A H F-REV.PER DURF-U0N27 2
9-2450s DR GP KKM 1S0 S TO CHO FORMRT RS PER NC-85-OT94 3
10-3-91 KKri REMOVED EXTRA UEL NUMER 4 4S&...........zL.......
CHANGED ISO WDSETO AKON-5 7-22-94 OA FED OP  
-REVISED PER IS SPECTION VAIN I I-Z4-96 REV._PERDURF-_1H OREC INSERVICE INSPECTION ASME SECTION XI ISOMETRIC


MAIN STEAM "D" rSDo-CS, 20", 6" ISO. NO. 1.2-04 P&10 lSl-nI14 APED-621 .7 20   0W220           DW220 (STEAMRM13l TUNNEL)
MAIN STEAM "D" rSDo-CS, 20",
EL. 763'
6" ISO. NO. 1.2-04 P&10 lSl-nI14 APED-621.7 20 0W220 DW220 RM13l (STEAM TUNNEL)
: 2. 2-Z6
EL. 763' NON INTECRAL 10 FLOW ELEMENT LINE
*  - NON INTECRAL
: 2. 2-Z6 I
** - 10 FLOW ELEMENT LINE                                                    I DRAWING RELEASE RECORD REV     DATE   PREPARED       REVIEWED   APPROVEO                         PURPOSE
DRAWING RELEASE RECORD REV DATE PREPARED REVIEWED APPROVEO PURPOSE 3-7-86 L
_    3-7-86                       L       RCM     ISO'S FOR 2nd 10 YEAR PLAN 2   9--m-50.         _                  %tp       1S5' 5 TD CR0 FORMRT MS PER NG-89-e75'I yFED 9 3                DA                     6GP         REVISE0 PER ISI INSPECTION WALKDOWN 4   j1-8-9C36   TAKI                       GP O        REV. PER DL-RF-0818 5     3-21-96   JAH           DA         GP       REV.PER DURF-U0027
RCM ISO'S FOR 2nd 10 YEAR PLAN 2
-                      __I-                   -_
9--m-50.  
OREC INSERVICE INSPECTION RSME SECTION XI     ISOMETRIC
%tp 1S5' 5 TD CR0 FORMRT MS PER NG-89-e75'I 3 9 DA yFED 6GP REVISE0 PER ISI INSPECTION WALKDOWN 4
j1-8-9C36 TAKI O
GP REV. PER DL-RF-0818 5
3-21-96 JAH DA GP REV.PER DURF-U0027
__I-OREC INSERVICE INSPECTION RSME SECTION XI ISOMETRIC


NLfFB 0QW530           J16                                                     /afi-R 0LW430 W330~FW-H-                                                                    F     B-BPBP6401
NLfFB 0QW530 J16  
____w_4_4__ _________EDE                         E RERORD    D W RRELE R 4     722-4 D                 J FE OP         REISEDPE   15 NSPCTO 1.2KD05
/afi-R 0LW430 H-W330~FW-F B-BPBP6401
                              \\H_____-- 26         K1____-
____w_4_4__ _________EDE D
W RRELE R E RERORD 4
722-4 D
J FE OP REISEDPE 15 NSPCTO 1.2KD05
\\\\H_____-- 26 K1____-


EL. 811'                                           )
EL.
J2                                                   1 a               J1J6                                                         DW5l0 K!     I                                                           J     OW410 J5\                                                 /               8   DW310i J5J i                     +           l         \                                   ~BP-409               1 J J6               DW520 BP1 \H-6       isBP-410ii---        ----------
811'  
BP-416                                 J7               DW420 i                                                 _ - J8                 ~DW320                               \\-0 FEEDWATER                             "C"'&#"D"                         J9              DW'._
)
FWC-, FWD-                                                 BP415 i CS.a10 ",1G6                                               i                       J10\
J2 1
ISO.             NO.               1.2-06                 H-15 iJ15                                                                                             '/   L   -2             K13 PLID ISI-lilIN                                                                                 1 i     BECH DWG# DLR-2-4Y-H                                                     8 J1                             \
a J1J6 DW5l0 K!
                                            .BP-6009                                                                                           J NE3                         K1M J13                                                           7a       i 1                                                   L                          \                                               18       r       !On1 J17               B                                     RE-VISE     P i                                 J25             J2TAK                                   R                               J 9   /                     !
I J
DW32020                                                                                         4 6l               -        DE             3BP-414                   F                             PER1DUBP411       11 BP-600                     J7                                                                               P412     BP-411         i i                     ,AQ~~~29                                                       P40/\\                                       /
OW410 J5\\
r6"DLA-2l I                                                                                                    K33             BP-6008 i   C       3                               o                               RSEB-JIi i *-NOS             INTEGRRL                       RB3ISEM                 UN                 SO. 1-2-18 DRRUING         RELERSE           RECORDi i   REV       019TE       PREPARED           REVIEWED           flPPROVED                                         PURPOSEi I 3-11-86               SnL                   StL                 RC"             ISO'S FOR 2nd 10               YEAR PLANi Z       5-24-90                                 GP                 KKt1           ISO'S TO CAD FOtRMT RS PER MG-69-eT9                         .
/
a 3       I-10-92         b                   (p                                     REVISED PER DDC-2041                                         j 4     t7-22-941           DA                 BJ8                   GP           IREVISED PER ISI INSPECTION WALKDOWNi
8 DW310i J5J i  
      !  5      13/26/981           DA                 TAK                   GP             REVISED PER DURF-U0046i 6     16/4/99 1           OA         I       GP         I       FED           IREVISED PER DURF-U0111i
+
_L_._       ._.      _. _._      ._.    ._. _.*      ._    ._.      _.---          J----_R--       -zPlN WgH                      ] rtdF~~r _._
l  
\\  
~BP-409 1 J J6 DW520 BP1 \\H-6 isBP-410ii BP-416 J7 DW420 i
_ - J8  
~DW320  
\\\\-0 FEEDWATER "C"'&#"D" DW'._
J9 FWC-, FWD-BP415 i C S.a10 ",1G6 i
J10\\
ISO.
NO.
1.2-06 H-15 iJ15  
'/
L  
-2 K13 PLID ISI-lilIN 1
i BECH DWG#
DLR-2-4Y-H  
\\
8 J1
.BP-6009 J
NE3 K1M J13 7a i
1  
\\
18 L
r  
!On J17 B
RE-VISE P
i J25 J2TAK J
R 9  
/
DW32020 4
6l DE 3BP-414 F
PER1DUBP411 11 BP-600 J7 P412 BP-411 i
i  
,AQ~~~29 P40/\\\\
/
I r6"DLA-2l K33 BP-6008 i
C 3
o RSEB-JIi i *-NOS INTEGRRL RB3ISEM UN SO.
1-2-18 DRRUING RELERSE RECORDi i
REV 019TE PREPARED REVIEWED flPPROVED PURPOSEi I 3-11-86 SnL StL RC" ISO'S FOR 2nd 10 YEAR PLANi Z
5-24-90 GP KKt1 ISO'S TO CAD FOtRMT RS PER MG-69-eT9 a
3 I-10-92 b
(p REVISED PER DDC-2041 j
4 t7-22-941 DA BJ8 GP IREVISED PER ISI INSPECTION WALKDOWNi 5
13/26/981 DA TAK GP REVISED PER DURF-U0046i 6
16/4/99 1 OA I
GP I
FED IREVISED PER DURF-U0111i
_ L_._
J----_R--
WgH
-zPlN  
] rtdF~~r  
 
ORiEC INSERVICE INSPECTION IISME SECTIOGH XI ISOMETRIC


ORiEC INSERVICE INSPECTION IISME SECTIOGH XI ISOMETRIC Qj/
z 0
z 0
'-4     %'-1 Jl J2         HIGH PRESSURE COOLRNT l"-DCA-1 t C,
'-4 C,
I-INJECTION-STERM Jt*
I-Qj/
%'-1 Jl J2 l"-DCA-1 t HIGH PRESSURE COOLRNT INJECTION-STERM Jt*
PSR-CS, 10" ISO. NO, 1.2-09 PBEC ISI-M122 BECH DUG# DLRI 1-H A*
PSR-CS, 10" ISO. NO, 1.2-09 PBEC ISI-M122 BECH DUG# DLRI 1-H A*
i1 J20 V J21 CONT'D ON ISO. NO.
i1 J20 V
J21 CONT'D ON ISO.
NO.
3/4" DLA-3
3/4" DLA-3


3/4t-DBA-6S BP6028 K20 BP6029 DW330 CONTROL ROD                   DRIVE RETURN BP4411 CRR-SS,       CS,       2 1/2"3" BP4410        ISO.         NO.         1.2-12R
3/4t-DBA-6S BP6028 K20 DW330 BP6029 CONTROL ROD DRIVE RETURN CRR-SS, CS, 2 1 /2"3" ISO.
          -    X-36 EL. 782' CONT. ON ISO. HO. 1.2-12B                                       PUdS Isi-11117 BECH. DWG# DBA-6-1-H ORRUING   RELERSE RECORD REV   DATE   PREPARED   REVIEWED     APPROVED                         PURPOSE I   a-13-86
NO.
          -L             , L             RCt1     ISO'S FOR 2nJ 10 YEAR PLAN 2   i-71-io     W     1f       __    I ff -     ISO' S TO CRD FoRMAT RISPER HG-83-079' 3   7-22-94     -DA   JAH / FED         GP       REVISED PER ISI INSPECTION WALKDOWN 4   7-6-95       DA     JDF             GP       REVISED PER DORF-0013 OREC INSERVICE   INSPECTION ASME SECTION XI ISOMETRIC
1.2-12R BP4411 BP4410 X-36 EL. 782' CONT. ON ISO. HO. 1.2-12B PUdS Isi-11117 BECH. DWG# DBA-6-1-H ORRUING RELERSE RECORD REV DATE PREPARED REVIEWED APPROVED PURPOSE I
a-13-86  
-L  
, L RCt1 ISO'S FOR 2nJ 10 YEAR PLAN 2
i-71-io W
I 1f ff -
ISO' S TO CRD FoRMAT RIS PER HG-83-079' 3
7-22-94  
-DA JAH / FED GP REVISED PER ISI INSPECTION WALKDOWN 4
7-6-95 DA JDF GP REVISED PER DORF-0013 OREC INSERVICE INSPECTION ASME SECTION XI ISOMETRIC


3/9-   CAPPED     COHN.                                     X-36 7
3/9-CAPPED COHN.
Ja Ja?               V-17-52 Jas
X-36 Ja 7
                *J39 J40 I   J41 IB PUID BECH-l1 17 BECH DUCG   O6R-6-2-H JI3 CONTROL ROD                     DRIVE           RETURN CRR-CS, 3" ISO. NO.               1.2-12B
Ja?
* -    NON INTEGRAL DRUWIN;G RELEASE     RECORD REV     DATE     PREPARED       REVIEWED     APPROYED                       PURPOSE I     3-13-86         S L           ML           RCn     ISO'S FOR 2nd 10 YEAR PLAN Z     1-qo *50S                                  -(OK
V-17-52 Jas
* TO Cno FORnRT RS PER HG-89-8754 3     7-22-94         DA       JAH / FED         GP       REVISED PER IS INSPECTION WALKOOWN
*J39 J40 I
  -I       I   +__             -          L..
J41 IB PUID BECH-l1 17 BECH DUCG O6R-6-2-H JI3 CONTROL ROD DRIVE RETURN CRR-CS, 3"
                                            -            I OCEC INSERVICE INSPECTION ASHE SECTION XI ISOnETRIC
ISO.
NO.
1.2-12B NON INTEGRAL DRUWIN;G RELEASE RECORD REV DATE PREPARED REVIEWED APPROYED PURPOSE I
3-13-86 S L ML RCn ISO'S FOR 2nd 10 YEAR PLAN Z
1-qo  
-(OK *
*50S TO Cno FORnRT RS PER HG-89-8754 3
7-22-94 DA JAH / FED GP REVISED PER IS INSPECTION WALKOOWN
-I I
I
+__
L..
OCEC INSERVICE INSPECTION ASHE SECTION XI ISOnETRIC


ISO 1.2-21 RCB JI4 CONT'D ON                       ,612l Dov ~Jl
ISO 1.2-21 RCB JI4 CONT'D ON ISO. NO.
'I  ISO. NO.                                               K' 2.2-40 0
2.2-40
,612l Dov ~Jl
'I 0
LA z
LA z
'1 c
'1 c
n
n
-u an m
-u an m
n
n-4 z
-4 z                           J23
:1
:1
'In RESIDUAL    HEAT    REMOVAL-20B
'In
:A m
:A m
n RHD -
n
-4 0
-4 0
x PUI  BECH-M1I19              SS, CS, 20" BGCH DUWG OLA-6-1 -H ISO. NO. 1 . 2 - I 6 0
x 0
-4 n)
-4 n)
K' J23 RESIDUAL HEAT REMOVAL-20B RHD -
PUI BECH-M1I19 BGCH DUWG OLA-6-1 -H SS, CS, 20" ISO.
NO.
1. 2 - I 6


I . . . . I . .
I..
0                                         JY-OR      AU U'1   w IV                                                                                                                     SEE 1SO.         NO,     t.2-Z0---g L                            L5                            DJ      RECIRCULATION                PUMP "R"          &                            J43-LS I Q
I.
I-IIn I      4 I,
0 I
Th ro J'3-LS2 OD N                                                                        DISCHRRGE VALVE BY-PRSS I
OD I0)
: 0)            0ImI                                                                                                                          ,/       \     J41-LS           .
-1 Dx U'1 4
              .a                    J5A I  Pe      \J4    l IJ                          RCA-, RBR-                                                        J41-LS2 C                        iJ5 - ~LS              5                                                              8311-3099-4 (                    d6        K 2m
N C
                                                      'i" P-c2                                                              2 SHOCK NS ;Ali-SC428)
w Th IV L
-1 o SS, 22",f           1"              LUGS      \SSR-74a28 )
I,ro 0I
JfI-
.a I-mI JY-OR AU L5 DJ I Pe
                                                                                                                                                                            -S D                                                    dJ6                     SHOCK                                                                                               J38 x                                J6-LS %                                                                                      S31-v'O43W                                    N r-b                       LUCS           I SD. NO.      1.2-19A                                                            -LS DW2                              fls     )
\\J4 IJ l
XB31-3099-45 (OY AZMKJ r                                                                  I" FLOW ELE tMENT LINES                            J38 SS7         B 31-3099-48 SSR8 ( //---\                                                                                                     'DJ37 KSI                                                                                                                                  DW2 f-  It.                               -   %_                              ,    _    \                                                     JGS      X                        270 AZM) m                      013 -LbST                                              LUGS              31-3    -28I SHOC      B313 r                                                                                                                                                  K35
~LS 5
                                                                                                                  /    LUG JI      >o            (aDAwM I RJR-J12          I.1270'
'i" P-c2 RECIRCULATION PUMP "R" DISCHRRGE VALVE BY-PRSS SEE 1SO.
                                                                                                                                                                                  ~wl OI AZMW z
NO, t.2-Z0---g J43-LS I J'3-LS2 Q
C.,                           512          D12.                          2 DW12e                                      4r        v;2                        J34 J12              iZ21n        .                                                                                                        4"P8 I,                                                                                                                         J10 --
,/  
m    r-     Jlt                        20wI2P m                                                                 DJf20                                    30M m
\\
J41-LS J41-LS2 J5A iJ5 -
RCA-, RBR-r-
S o
f-J6-LS %
DW2 (OY AZMKJ KS I
dJ6 SHOCK b
LUCS I
r fls  
)
XB31-3099-45 SS7 B
31-3099-48 SSR8 ( //---\\
831 S, 22", f 1"
SD. NO.
1.2-19A 2 SHOCK NS LUGS
\\S S31-v'O43W I" FLOW ELE 1-3099-4
(
d6 K 2m It. m
\\
r m
z C.,
I, r-m m
U' m
U' m
0            ;v 0            rn
;v rn o
                        'In
o
                                                - OFR-                                                                                                  1                   J32-LS 0            o
'In Jlt 013
    '13                                      (i39JJ15-LS o                                                                                                                                        oV
'13 I-w 0
          '1 129
0 0
                                                                  /=_\           J19 z                                                                                  J2     JR I -ORA P17                                                                            V16-30               J I-
'1 z
_ti        in
P17
                    -g I  SHOCK LUG              2--OCR-19                 3                                       tla B31-3099-31 w              ;u                                                                  vis-as                            K                    'J8                   \       J32-O 0
-LbST JI
                    *,                                                        41,--]                                                          I.J8 J30-on Ill    11-               831-3e"-53 PLI0 BECH-I1I16                                                   831-3S99-17 CFIT B-G-2 Sfl              TEM 27.50 t  - NOR INTEGRRL                                                        93L-3099-      "        (VT-I      STUDS, NUTS)
>o (a DAwM I 512 D12.
.ini - In in in i .l   m
J12 iZ2 1n 20wI2P (i39JJ15-LS
/=_\\
J19 OFR-I SHOCK LUG B31-3099-31 LUGS 31-3
-28I SHOC B313
/
LUG DW12e 2 4r DJf20 3 0M J2 JR I -ORA V16-30 J
2--OCR-19 3
vis-as K
831-3S99-17 CF Sfl 93L-3099-(VT-I
;Ali-SC428)
JfI-SR-74a 28 )
tMENT LINES JGS X
K35 RJR-J12 v;2 J10
-S N
I.
I In J38
-LS J38
'D J37 DW2 270 AZM)
OI
~wl 1270' AZMW J34 4" P8 1
J32-LS oV 129
'J8  
\\
J32-O ti in tla J30-on I.J8 11-831-3e"-53
-g
;u 0*,
41,--]
Ill PLI0 BECH-I1I16 t -
NOR INTEGRRL IT B-G-2 TEM 27.50
: STUDS, NUTS)
.ini - In in in i.l m


(D I CD
LL 0f)
                                                                                                                    =-
L-LI (0
I' 0-Hf (D
I CD
=-
LII tD c 1
LII tD c 1
C3 LL I
C3 I 1fl o 4, II,3 ZSCc G
1fl 0f)
CD LI-
L-LI I'
.-~
(0 0-Hf o4 , I I,3 ZS          0*
Cc Cw G
                                                                                                -          U CD 0*l LI- 0*
                                                                                                  ~.-
a_
a_
L-(9
5)
: 5)        Uf CDl 0 1
-7J CD G:1 I
                                                                                                -7J                    ,-I     s LuJ n/
UL 0*
toz G:1 CDI                (-D         Z ly-0*          al:        CJ     CD UL                  cD         U) 5*              (f     -ff DRRWING RELEARSE     RECORD REV     DRIE       PREPRRELO   REYVEWED     AHPPROVED                                 PURPOSE 1   aZ066               L                     Rcn         ]SOS         FOR 2nod     10 YE.R PLN 2   9i-Vt -"to       ____WY_________                     ISO'$5 TO CAD FORMAT H5 PER               G-a9-e0754 3   7-22-94         -IA     JAH / BJB       GP         REVISEO PER IS1 IDPECTION WALKDO" 4   1-18-96         TAK       JW       .                REV. PER OURF-0018 I           I           I     _
0*
                                                  -ee ,.,.-    o Wtrt e   oe v .- n.. 0e-c       .  .-  ... I-,     .      VIT
Cw U
0*l 0*
L-Uf LuJ n/
al:
5*
ly-(9 CDl 0 1
,-I s
toz
(-D Z
CJ CD cD U)
(f  
-ff DRRWING RELEARSE RECORD REV DRIE PREPRRELO REYVEWED AHPPROVED PURPOSE 1
aZ066 L
Rcn  
]SOS FOR 2nod 10 YE.R PLN 2
9i-Vt -"to
____WY_________
ISO'$5 TO CAD FORMAT H5 PER G-a9-e0754 3
7-22-94  
-IA JAH / BJB GP REVISEO PER IS1 IDPECTION WALKDO" 4
1-18-96 TAK JW REV. PER OURF-0018 I
I I  
-ee Wtrt o
e oe v.- n..
0e-c I-,
VIT


DRAIN           LINE I                     RECIRCULATIION " B" ISO. NO.
DRAIN LINE I
P&ID BECH-1I16 1.2-21B FSK-04169
RECIRCULATIION  
      *-  NON INTEGRAiL DRAWING RELEASE RECORD REV     DATE   PREPARED   REVIEWED   APPROVED                         PURPOSE a3-2t-6E       L                   RCf     ISO'S FOR 2nd 10 YEAR PLAN 2   9v14-4o           .        _            . 150'SO TO CAD FOR1tfT RS PER HC-89-07S4
" B" ISO.
;  -    7-22-94       A     JAH / FED     OP       REVISED PER ISI INSPECTION WALKDOWN
NO.
  -        --                            G OflEC IHSERVICE [HSPECTIOH R~S1E SECTIOH XI   ISOMETRIC
1.2-21B P&ID BECH-1I16 FSK-04169 NON INTEGRAiL DRAWING RELEASE RECORD REV DATE PREPARED REVIEWED APPROVED PURPOSE a3-2t-6E L
RCf ISO'S FOR 2nd 10 YEAR PLAN 2
9v14-4o 150'SO TO CAD FOR1tfT RS PER HC-89-07S4 7-22-94 A
JAH / FED OP REVISED PER ISI INSPECTION WALKDOWN G
OflEC IHSERVICE [HSPECTIOH R~S1E SECTIOH XI ISOMETRIC


('Ul         ni N,       r'j Ai U,  .fl        ra, "I m Nt 0)
;n VI C,
          &#xa3;-
' n
C-2D
-I
:r Ic-
,rn
          --i
,in
::E D       N wo L-           0 co r-1 C)CI)   C
*0 Ix I :!
      ;n                        (n VI 21                :0 m                I1 0"                                             I
rn ii o
* -  -  m   -n C,
I-I
21   ~0 P1         C-
('Ul N,
  ' n     C cn          2u CD          o, 21 CD
U, "I
  ,rn-I 1w Ix U,
m
  ,in I    :!                    n.2 r,        RMD-J12                                       R18-J 1 0
.fl ni r'j Nt Ai ra, 0)
m X EA)
&#xa3;-
I-
--i I c-
  *0rn                    21 Pn FC ii RECIRCULFITION MANIFOLD " B" & RISERS A, B,C, D o
:r
RMB-,     RRR-, RRB-, RRC-, RRD-,
::E D
PLID BECH-M116 SS,   1 6", 10"                      RPED 0331-9 I
C-2D N
I-                              ISO. N O. 1 e22
wo L-co C) CI)
C 0
r-1 (n
:0 I1 0"
m 21 C
21 1w U,
21 m
~0 P1 CD CD
-n cn C-o, 2u n.2 I-21 m
r, X
FC I
0 EA)
Pn RMD-J12 R18-J 1 RECIRCULFITION MANIFOLD  
" B"
& RISERS A, B,C, D RMB-,
RRR-,
RRB-,
RRC-,
RRD-,
SS, 1 6",
ISO.
N O.
10" 1 e 22 PLID BECH-M116 RPED 0331-9


N8B D01 JET PUMP             INSTRUMENTATITON                         "  B" JPB-ssS        T" ISO.         NO.     1. 2-26 P&ID BECH-M115 RPED-B 1I-2653- 105-4
N8B D01 JET PUMP INSTRUMENTATITON JPB-ss S
_DRAWING RELEASE RECORD REV   DATE   PREPARED   REVIEWED     APPROVED                       PURPOSE I   a-26-86         LfI         L         RCh     isa's FOR 2nd 1e YEAR PLAN Z
T"
1    lzq 7-22-94      DA      JAH /  FED
" B "
                                            *1IXM , a505' GP S TO CAD FORMIRT RS PER NC-89-0794 REVISED PER ISI INSPECTION WALKDOWN DAEC IHSERVICE INSPECTION RSME SECTION XI ISOMETRIC
ISO.
NO.
: 1. 2-26 P&ID BECH-M115 RPED-B 1I-2653-105-4
_DRAWING RELEASE RECORD REV DATE PREPARED REVIEWED APPROVED PURPOSE I a-26-86 LfI L
RCh isa's FOR 2nd 1e YEAR PLAN Z
lzq  
*1IXM, a505' S TO CAD FORMIRT RS PER NC-89-0794 1 7-22-94 DA JAH / FED GP REVISED PER ISI INSPECTION WALKDOWN DAEC IHSERVICE INSPECTION RSME SECTION XI ISOMETRIC


K2A FSK-037348
K2A FSK-037348
* DOW210 P&ID ]SI tl12G FSK-03734 a. 03992
* D OW210 P&ID ]SI tl12G FSK-03734 a. 03992 NON INTEGRAL 122 STANDBY LIQUID CON LCA-SS, 1 1/2",
                        * -  NON   INTEGRAL 122 STANDBY     LIQUID       CON TROL LCA-SS, 1 1/2", 2",           4" ISO. NO. 1.2-27
2",
4" ISO.
NO.
1.2-27 TROL


2   1/2"           2 ",               1       1/'"
2 1/2" 2 ",
F2     J31       JLI     J5 vI N-1 B                                                                EL. 813'-6' D1 DW510 VESSEL INSTRUMENTATION N-11B VI B-SS,       1 1/L4"T         2", 2 1/2"2 ISO. NO.             1. 2-29 P&lID BECH-f115 FSK-5564 DRHWING RELEASE RECORD REV   DATE     PREPARED   REVIEWED   APPROVED                           PURPOSE 1 3-27-86                               RCn       ISO'S FOR 2nd 10 YEAR PLAN 2
1 1/'"
3  72    -94_A W
N-1 B VESSEL F2 v I J31 JLI J5 EL. 813'-6' D 1 DW510 INSTRUMENTATION N-11B V I B -
(zr-0
SS, 1
                              /FED Jlh GP
1/L4"T 2",
(% tt   1O'5 TO CAD FORMAT As PER HG-83-079Y REVISED PER ISI INSPECTION WALKOOWN
2 1/2"2 ISO.
_**__ 1/18/96     TAK         JW         GP         REV. PER DUHF-01FB
NO.
__                -_I         m           -
: 1. 2-29 P&lID BECH-f115 FSK-5564 DRHWING RELEASE RECORD REV DATE PREPARED REVIEWED APPROVED PURPOSE 1
DREC INSERVICE INSPECTION RASE SECTION XI     ISOMETRIC
3-27-86 RCn ISO'S FOR 2nd 10 YEAR PLAN 2
W (zr- 0 Jlh (%
tt 1O'5 TO CAD FORMAT As PER HG-83-079Y 3
72
-94_A
/FED GP REVISED PER ISI INSPECTION WALKOOWN
_**__ 1/18/96 TAK JW GP REV. PER DUHF-01FB
-_I m
DREC INSERVICE INSPECTION RASE SECTION XI ISOMETRIC


I Is I
I Is I
Lfl PLAN VIEW Uf)
Lfl Uf)
                            -BP .
(A)
(A)
E)
E) 0 0
I                       1.5 0 0
PLAN VIEW
0 I1I I I1     I ELEV. 461' iOVERLAY WELD PER              WPS-103-1F5 WPS-305-lF5                                    I C)                                                                 -ONE LAYER OVERLAY E-                                I Li  LU x                                                                      a-   Wx6 0
-BP.
PLAN                                           . _
WELD PER WPS-305-lF5 I
Ui ELEVATION w
1.5 0 I1 I I I1 I
REFERENCE DRAWINGS:
i OVERLAY WPS-103-1F5 E-Li x
APED-B11-001<4>. APED-B11-2655-169 a:
0 Ui w
_T uCa IES:                                       FEEDWATER SPARGER
a:
    , ~a   Inservice Inspection Program                   BRACKET 7z         Reactor Pressure Vessel Sketch DWG. NO.     VS-01-27               jREV.
C)
LU I
ELEV. 461'
-ONE LAYER OVERLAY a-Wx6 I
PLAN ELEVATION REFERENCE DRAWINGS:
APED-B11-001<4>. APED-B11-2655-169
_T uC a IES:
FEEDWATER SPARGER
, ~ a Inservice Inspection Program BRACKET 7z Reactor Pressure Vessel Sketch DWG. NO.
VS-01-27 j REV.


0.
0.
I.-
I.-
    .4-
-J
-J N
-J
-(n5
.4-N (n5
    -J C.)
-J C.)
1I-a; 180-0 PLAN VIEW 9                                                       WELD PER -
1I-a; 0
WPS-305-1F5 PLAN VIEW FLANGE SURFACE
180-PLAN VIEW 9
                                                                      - 16 SS OVERLAY s0 z0)
WELD PER -
Cn                                                              ONE LAYER Lii                                                            OVERLAY PER WPS-103-1F5 ELEVATION REFERENCE DRAWINGS:
WPS-305-1F5 PLAN VIEW FLANGE SURFACE s0 z
APED-BI1-001<4% APED-BII-2655-171
0)
_ cm CD S:
Cn Lii 16 SS OVERLAY ONE LAYER OVERLAY PER WPS-103-1F5 ELEVATION REFERENCE DRAWINGS:
eInservice Inspection Program j         GUIDE ROD BRACKET
APED-BI1-001<4% APED-BII-2655-171 CD S:
        /   Reactor Pressure Vessel Sketch           NO.
j GUIDE ROD BRACKET
WG.QREv.
_ cm eInservice Inspection Program
/
Reactor Pressure Vessel Sketch WG. NO.
QREv.


d1 I-I
d1 I
-z
I-
-j I.-
-z
;L w
-j I.-
IE 0
;L w
180-PLAN VIEW                               LAYER WELD PER -            WPS-103-IF5 WPS-305-IF5 SECTION A-A 0-6' OVERLAY
0 IE 180-PLAN VIEW LAYER WPS-103-IF5 WELD PER -
                                                        -- ONE LAYER OVERLAY ELEV. 6021/8 A           A
WPS-305-IF5 SECTION A-A 0-6' OVERLAY
                                                      -A REFERENCE DRAWINGS:
-- ONE LAYER OVERLAY ELEV. 6021/8 A
APED-BII-001<4>, APED-B11-2655-170 ELEVATION IES:                                 STEAM DRYER Inservice Inspection Program I    SUPPORT BRACKET Reactor Pressure Vessel Sketch VS-01-29
A
-A REFERENCE DRAWINGS:
APED-BII-001<4>, APED-B11-2655-170 ELEVATION IES:
Inservice Inspection Program Reactor Pressure Vessel Sketch STEAM DRYER SUPPORT BRACKET I
VS-01-29


es CL j
es CL j
I 0
I 0
-j
-j-J mj z0 P-c-
-J mj z
0 4!v PLAN VIEW-TOP HEAD HEAD FLANGE SEALING SURFARE ELEVATION VIEW WELD REFERENCE DRAWINGS:
0 P-c-
SECTION A-A APED-B11-001<4.
4!v 0
APED-B11-2655-172 IES:
PLAN VIEW-TOP HEAD HEAD FLANGE SEALING SURFARE ELEVATION VIEW WELD REFERENCE DRAWINGS:         SECTION   A-A APED-B11-001<4. APED-B11-2655-172 IES:                                         STEAM DRYER Inservice Inspection Program           HOLD-DOWN BRACKETS Reactor Pressure Vessel Sketch k VS-01-30
Inservice Inspection Program Reactor Pressure Vessel Sketch k STEAM HOLD-DOWN DRYER BRACKETS VS-01-30


w U
w U0 0.
0 0.
-I I'.
  -I I'.
0
0   N
-I
  -I U,
-J N
  -J Cl) 108' C-G Ri U
U, Cl)
GC-Ri U
w 0
w 0
180' PLAN VIEW SECTION A-A CL ONE LAYER OVERLAY PER WPS-103-1F5 REFERENCE DRAWINGS:
108' 180' PLAN VIEW CL SECTION A-A ONE LAYER OVERLAY PER WPS-103-1F5 REFERENCE DRAWINGS:
APED-B11-0014>. APED-B11-059,                     ELEVAT I ON APED-B1I-067. APED-BII-2655-198
APED-B11-0014>. APED-B11-059, APED-B1I-067. APED-BII-2655-198 ELEVAT I ON
_     __S IES:                                               SURVEILLANCE Inservice Inspection Program                 SPECIMEN BRACKET 7t _z Reactor Pressure Vessel Sketch             OWG.NO.                     REv.
_ __S IES:
SURVEILLANCE Inservice Inspection Program SPECIMEN BRACKET 7 t _z Reactor Pressure Vessel Sketch OWG.NO.
REv.


L Cs w
Cs w
U 0
U 0
a.
a.
I I.-
II.-
E     -j IL 0
E IL 0
-J     L 0
-J
0r 0
-j L0 0r a;
a; (AnI 0   r 0.
(AnI 0 r 0.a.
a.
Cn 0
Cn PLAN VIEW cn Ca-0 LiL                                                   BUILD-UP PER 0                                                      WPS-103-1F5 or 11                                                    WPS-143-1F5F7 co I1<       6' SECTION B-B C
PLAN VIEW cn Ca-0 LiL 0
a:i REFERENCE DRAWINGS:
co 11 BUILD-UP PER WPS-103-1F5 or WPS-143-1F5F7 I 1<
6' L
K C
a:i SECTION B-B REFERENCE DRAWINGS:
APED-B11-001<4> APED-B11-2655-167
APED-B11-001<4> APED-B11-2655-167
                        -II C"         IES:E                                     JET PUMP RISER I%= Inservice Inspection Program                       SUPPORT PAD (kV11 R7eactor          Pressure Vessel Sketch DWG NO.                     REV.
-II C"
K
IES:E JET PUMP RISER I% = Inservice Inspection Program SUPPORT PAD R7 eactor Pressure Vessel Sketch DWG NO.
REV.
(k V1 1


d                                                                           WELD BUILD-UP AS REO'D. PER WPS-309-2F43 a.
d a.
SECTION A-A
-3 I-IL 0
    -3 I-                                                                    DRILL & TAP %-13 LK 2BxA DEEP co (a IL    co It to to A
-j
0 ao Ch
-j WELD BUILD-UP AS REO'D. PER WPS-309-2F43 SECTION A-A DRILL & TAP %-13 LK 2BxA DEEP A
  -j    (A U) U)
F 018 co to (A
    -j F          018 Cu bU-                                      MANHOLE PLUG
co It ao U)
          -_ J
(ato Ch U)
          .a a a-z ww U-    or w c0 :3
U-w 0
                  -J
(n C,.)
                  ,0.
0 bU-Cu
0-w0 U)
-_ J
                    -i a0 0 X:-
.a a
U)        z
a-zww o c0 r w 0-a0 0 X:-
          -. c<
U) c<
MANHOLE PLUG
:3
-J 0.
U)
-i z
C)
C)
(n C,.)
Lii 0
0 2
Lii Ci) ul 2C Cr-LL REFERENCE DRAWINGS:
C Cr-LL Lii 0
APED-B11-2655-2n3. APED-B11-2655-205, APED-B1I-2655-265 1808 1 11 1 IEQ:
Lii Ci)               REFERENCE DRAWINGS:                         1808 ul APED-B11-2655-2n3. APED-B11-2655-205, APED-B1I-2655-265 1 111 IEQ:   _                                                            LEDGE SEGMENT 1,-            Inservice Inspection Program                               PLATES N
LEDGE SEGMENT 1,
          -E         Reactor Pressure Vessel Sketch           DWG.NO.                               REV.
Inservice Inspection Program PLATES
7
-E Reactor Pressure Vessel Sketch DWG.NO.
REV.
N 7


d w
dw L) 0 EL IU-0
L) 0 EL IU-0
-z
  -z co
-J co z
  -J z0 a-C-
0 a-C-
Lii 0
Lii 0
                            .500 D0I z
z
2.56 REFERENCE DRAWINGS:
.500 D0I 2.56 REFERENCE DRAWINGS:
APED-B11-3084 -008, APED-B 1-011 CQI   IES:I                             PERIPHERAL FUEL SUPPORT
APED-B11-3084 -008, APED-B 1-011 CQI IES:I PERIPHERAL FUEL SUPPORT tc,
          =Inservice tc,              Inspection Program 77L    E oReactor     Pressure Vessel Sketch DWG. NO. VS-03-09         REV.
=Inservice Inspection Program 77 L E oReactor Pressure Vessel Sketch DWG. NO.
_                          ~~I F
VS-03-09 REV.
~~I F


I     I   I   I   I I                                         I 1 I     I     -  1    NO.      DESCRIPTION 1 TOP PLATE BILL OF MATL.
I I
(SEE VS-04-02 PROCED.
I I
/1\62-09-94         DRAFTED FOR VESSEL INSPECTION PROGRAM   I MS I DF I GP I SS                                               _
I I
NO. DATE                         REVISION                   1DRFIN   MI.ENI ER.     2  SIDE RING PLATE      (SEE VS-04-02) 3  BOTTOM PLATE          (SEE VS-04-03)
I 1 I I
DU 4  CROSS BEAMS          (SEE VS-04-04) r'1 mm        17                                                      5  SUPPORT PLATES        (SEE VS-04-05) 0 0 m                                                        6  LATCH                (SEE VS-04-06) 0 .               C-)
1
ww                                                                7  EYEBOLT              (SEE VS-04-07)
/1\\62-09-94 DRAFTED FOR VESSEL INSPECTION PROGRAM I MS I DF I GP I SS NO.
        -I 8  EYEBOLT BLOCK        (SEE VS-04-08) 9  PIN BARS              (SEE VS-04-09)
DATE REVISION 1DRFIN MI.ENI ER.
(0       -bl .9h
0.
                                      &.t&m~              ii                          10 PIN (0.875" DIA.)  304 A276 t,,         C)-
-I (0
t,,
I CD M0 c)
I CD M0 c)
M0                       m U) m 0
M0 m m 0 0 w w
z CO          C)                                                                                   II c01.        c:-I 1-Cq 0tj       U, D,
-bl.9h C)-
I I     U,)
DU r'1 17 m
m C) m                                                                                  --i m          r'                                                                                  03
C-)
                          --I                                                                      I I z
&.t&m~
0                                                                        II z                                                                                  C')
ii m
C) w                                                                        tI w
NO.
,. :1 rm
DESCRIPTION BILL OF MATL.
                                                                                                    '1M rr
PROCED.
1 TOP PLATE (SEE VS-04-02 2
SIDE RING PLATE (SEE VS-04-02) 3 BOTTOM PLATE (SEE VS-04-03) 4 CROSS BEAMS (SEE VS-04-04) 5 SUPPORT PLATES (SEE VS-04-05) 6 LATCH (SEE VS-04-06) 7 EYEBOLT (SEE VS-04-07) 8 EYEBOLT BLOCK (SEE VS-04-08) 9 PIN BARS (SEE VS-04-09) 10 PIN (0.875" DIA.)
304 A276 COc
01.
:1
,. rr U)m 0
z D,
C)c:-I 1-Cq 0tj m
U,m r'
--I 0z w
w II I I I I I I tI rm
'1M U,)
m C)
--i 03 z
C')
C)
 -



I                                                                                                                                                   L
I L
  -              I R88/8/95 REVISED PER OURF-0011                               I A IGD ISS ISS         NO.      DESCRIPTION            BILL OF MATL. PROCED.
I R88/8/95 REVISED PER OURF-0011 I A IGD ISS ISS 12-09-94 DRAFTED FOR VESSEL INSPECTION PROGRAM MS OF GP SS NO. DATE REVISION EI,  
12-09-94 DRAFTED FOR VESSEL INSPECTION PROGRAM           MS OF GP SS             I HANDLE NO. DATE                         REVISION                     EI,     .IENGR. VER     2 PIPE m                                                                3 CAPSULE BASKET 4 MIDOLE SUPPORT BRACKET PLATE 304 SS o Pli         D To                                                                  5 BOLT m
.I ENGR.
    ,_I   -.
VER NO.
O.&deg; zr-)
DESCRIPTION BILL OF MATL.
0 IN IC Cb                  C, U,)
PROCED.
16.S4 uo 0 U)        I-CI m
I HANDLE 2
rVIEW O-                           VIEW C-C           VIEW E-E                         VIEW B-B N)l I                                       12325 (WITH SPRING RELAXED)                                                 I
PIPE 3
                                                                                                                                                -1 CC n        r)                l      ~1.25 IP5 SCH. 40 PIPE -
CAPSULE BASKET 4
C m
MIDOLE SUPPORT BRACKET PLATE 304 SS 5
63.50I 115.37 SPRING RELAXED
BOLT o Pli
                                  -        i        -          I 71                                                                                                                                                 K-
,_I C b uo 0 U)
I-CI m CC n
r)Cm D To O.&deg; IN m
m zr-)
0 IC C,
U,)
16.S4 rVIEW O-VIEW C-C VIEW E-E VIEW B-B N)l I
12325 (WITH SPRING RELAXED)
I l
~1.25 IP5 SCH. 40 PIPE -
63.50I
-1 115.37 SPRING RELAXED i
I 71 K-


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part J, page I of 5 I)   Owners: Interstate Power and Light Company,         Central Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                          Humbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part J, page I of 5 I)
P.O. Box 351 Cedar Rapids, IA. 52406
Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 2)   Plant   Duane Amold Energy Center, Palo, IA. 52324                       3) Plant Unit: #l
Corn Belt Power Cooperative Humbolt, IA.
: 4)   Owners Certificate of Authorization (if required): N/A                   5) Commercial Service Date: 02/01f75
: 2)
: 6)   National Board Number of Unit N/A                                         Gross Generaing Capacity: 614 MWE STATUS OF WORK FOR THIRD TEN YEAR INTERVAL (Those percentages shown are actual, where the percentages exceed the allowable only the maximum (50% for period one and at least 16% for period two) will be taken credit for).
Plant Duane Amold Energy Center, Palo, IA. 52324
CLASS I ITEM NO.           TOTAL X             PERIOD 1           PERIOD 2           PERIOD 3             REMARKS BI.11                  4                  0%              0%                 0%             See Note 12 B1.12                  8                  0%               0%                 75%             See Note 13 B1.21                  2                25%               50%               100%
: 4)
B1.22                15                0%               0%               100%
Owners Certificate of Authorization (if required): N/A
B1.30                  1                50%               50%               100%               See Note 7 B1.40                  I                33%               67%               100%             See Note 14 B3.90                33                 48%               73%               100%             See Note 1,8 B3.100                33                 48%               73%               100%             See Note 1,8 B4.11                  2                  0%               0%               100%               See Note 2 B4.12                89                  0%               0%               100%               See Note 2 B4.13                30                  0%               0%               100%               See Note 2 B5.10                14                50%               71%               71%           See Note 8 and 1I B5.20                  8                38%               63%               63%             See Note 11 B5.130                  8                38%               63%               63%             See Note 11 B5.140                  2                0%               50%               50%             See Note 11 B6.10                60                33%               67%               100%
: 6)
B6.20                56                29%               64%               100%
National Board Number of Unit N/A
B6.30                  4                100%             100%               100%
: 3) Plant Unit: #l
B6.40                60                33%               67%               100%
: 5) Commercial Service Date: 02/01f75 Gross Generaing Capacity: 614 MWE STATUS OF WORK FOR THIRD TEN YEAR INTERVAL (Those percentages shown are actual, where the percentages exceed the allowable only the maximum (50% for period one and at least 16% for period two) will be taken credit for).
B6.50                60                33%               67%               100%
CLASS I ITEM NO.
B6.180                  2                0%               0%                 0%               See Note 3 B6.190                  2                0%               0%                 0%               See Note 3 B6.200                  2                0%               0%                 0%               See Note 3 B7.10                  3                33%               67%               100%
BI.11 B1.12 B 1.21 B 1.22 B 1.30 B 1.40 B3.90 B3.100 B4.11 B4.12 B4.13 B5.10 B5.20 B5.130 B5.140 B6.10 B6.20 B6.30 B6.40 B6.50 B6.180 B6.190 B6.200 B7.10 B7.50 B7.60 B7.70 B7.80 B9.11 B9.12 B9.21 B9.31 B9.32 B9.40 B10.10 B10.20 TOTAL X 4
B7.50                  5                20%               20%                20%              See Note 3 B7.60                  2                0%                0%                  0%              See Note 3 B7.70                47                  4%                6%                  9%              See Note 3 B7.80                89                15%              15%                34%              See Note 3 B9.11                94                22%              33%                33%              See Note 11 B9.12                  0                0%                0%                  0%          See Note 6 and 11 B9.21                  9                22%              22%                22%              See Note 11 B9.31                  6                17%              33%                33%              See Note 11 B9.32                  l                0%                0%                0%              See Note 11 B9.40                23                22%              40%                40%              See Note 11 B10.10                  5                0%                0%                100%              See Note 4 B10.20                  3                33%                67%              100%              See Note 4
8 2
15 1
I 33 33 2
89 30 14 8
8 2
60 56 4
60 60 2
2 2
3 5
2 47 89 94 0
9 6
l 23 5
3 PERIOD 1 0%
0%
25%
0%
50%
33%
48%
48%
0%
0%
0%
50%
38%
38%
0%
33%
29%
100%
33%
33%
0%
0%
0%
33%
20%
0%
4%
15%
22%
0%
22%
17%
0%
22%
0%
33%
PERIOD 2 0%
0%
50%
0%
50%
67%
73%
73%
0%
0%
0%
71%
63%
63%
50%
67%
64%
100%
67%
67%
0%
0%
0%
67%
20%
0%
6%
15%
33%
0%
22%
33%
0%
40%
0%
67%
PERIOD 3 0%
75%
100%
100%
100%
100%
100%
100%
100%
100%
100%
71%
63%
63%
50%
100%
100%
100%
100%
100%
0%
0%
0%
100%
20%
0%
9%
34%
33%
0%
22%
33%
0%
40%
100%
100%
REMARKS See Note 12 See Note 13 See Note 7 See Note 14 See Note 1,8 See Note 1,8 See Note 2 See Note 2 See Note 2 See Note 8 and 1 I See Note 11 See Note 11 See Note 11 See Note 3 See Note 3 See Note 3 See Note 3 See Note 3 See Note 3 See Note 3 See Note 11 See Note 6 and 11 See Note 11 See Note 11 See Note 11 See Note 11 See Note 4 See Note 4


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part J, page 2 of 5
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part J, page 2 of 5
: 1)   Owners: Interstate Power and light Company,         Central Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                       Marion, IA.                          Ilumbolt, IA.
: 1)
P.O. Box 351 Cedar Rapids, IA. 52406
Owners: Interstate Power and light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 2)   Plant   Duane Amold Energy Center, Palo, IA. 52324                       3) Plant Unit: #1
Corn Belt Power Cooperative Ilumbolt, IA.
: 4)   Owners Certificate of Authorization (ifrequired): N/A                   5) Commercial Service Date: 0201/n5
: 2)
: 6)   National Board Number of Unit N/A                                       Gross Generating Capacity: 614 MWE STATUS OF WORK FOR THIRD TEN YEAR INTERVAL CLASS I ITEM NO.           TOTAL               PERIOD 1         PERIOD 2           PERIOD 3           REMARKS B10.30                 1                 0%               0%               100%             See Note 4 B12.20                 2                 0%               0%                 0%
Plant Duane Amold Energy Center, Palo, IA. 52324
B12.50               45                 6%               9%               11%             SeeNote3 B13.10                 35               37%               63%               100%             SeeNote 15 B13.20               I1               36%               36%               100%
: 4)
B13.30               27                 4%               9%               100%             See Note 16 B13A0                 5               20%               20%               100%
Owners Certificate of Authorization (if required): N/A
B14.10                 3                 0%               0%               100%
: 6)
B315.10               I               N/A               N/A               N/A         Once per refueling outage B15.11                 I               N/A               N/A               N/A         Once per interval CLASS I AND CLASS 2 Risk Informed ITENM NO.         TOTAL #             PERIOD I         PERIOD 2           PERIOD 3         REMARKS R-1                 70                 0%               33%               61%           See Note 11 CLASS 2 ITEM NO.           TOTAL #             PERIOD I         PERIOD 2           PERIOD 3         REMARKS CI.10                 2               50%               50%               100%
National Board Number of Unit N/A
Cl.20                 1                 0%             100%               100%
: 3) Plant Unit: #1
C2.21                  2                0%               50%               100%
: 5) Commercial Service Date: 0201/n5 Gross Generating Capacity: 614 MWE STATUS OF WORK FOR THIRD TEN YEAR INTERVAL CLASS I ITEM NO.
C2.22                  2                0%               50%               100%
TOTAL PERIOD 1 PERIOD 2 PERIOD 3 REMARKS B10.30 1
C3.10                                    0%               0%               100%         See Note 4 C3.20                  7                29%              57%              100%         See Note 4 C5.S1                69                17%              36%               36%          See Note 11 C5.81                  5              100%             100%              100%          See Note II C7.10                  5s              N/A               N/A              N/A         Once per period C7.20                 5               N/A              N/A               N/A         Once per interval
0%
0%
100%
See Note 4 B12.20 2
0%
0%
0%
B12.50 45 6%
9%
11%
SeeNote3 B13.10 35 37%
63%
100%
SeeNote 15 B13.20 I1 36%
36%
100%
B13.30 27 4%
9%
100%
See Note 16 B13A0 5
20%
20%
100%
B14.10 3
0%
0%
100%
B315.10 I
N/A N/A N/A Once per refueling outage B15.11 I
N/A N/A N/A Once per interval CLASS I AND CLASS 2 Risk Informed ITENM NO.
TOTAL #
PERIOD I PERIOD 2 PERIOD 3 REMARKS R-1 70 0%
33%
61%
See Note 11 CLASS 2 ITEM NO.
TOTAL #
PERIOD I PERIOD 2 PERIOD 3 CI.10 2
50%
50%
100%
REMARKS Cl.20 C2.21 C2.22 C3.10 C3.20 C5.S1 C5.81 C7.10 1
2 2
7 69 5
5s 0%
0%
0%
0%
29%
17%
100%
N/A 100%
50%
50%
0%
57%
36%
100%
N/A 100%
100%
100%
100%
See Note 4 100%
See Note 4 36%
See Note 11 100%
See Note II N/A Once per period N/A Once per interval C7.20 5
N/A N/A


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part J, page 3 of 5 I) Owners: Interstate Power and light Company,         Central Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                          Ilumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part J, page 3 of 5 I)
P.O. Box 351 Cedar Rapids, IA. 52406
Owners: Interstate Power and light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 2) Plant   Duane Amold Energy Center, Palo, IA. 52324                       3) Plant Unit: #1
Corn Belt Power Cooperative Ilumbolt, IA.
: 4) Owners Certificate of Authorization (if required): N/A                   5) Commercial Service Date: 020I/75
: 2)
: 6) National Board Number of Unit: N/A                                       Gross Generating Capacity 614 MWE STATUS OF WORK FOR THIRD TEN YEAR INTERVAL CLASS I AND 2 SUPPORTS ITEMI NO.         TOTAL #             PERIOD 1         PERIOD 2           PERIOD 3         REMARKS FI.10                 42                 33%               64%               100%           SeeNote5 F1.20                 52                 27%             58%               100%           See Note 5 Fl.40                 20                 40%             65%               100%           See Note 5 STATUS OF WORK FOR (IWE) FIRST TEN YEAR INTERVAL I                                                   CLASSMIC ITEM NO.           TOTAL#             PERIOD 1           PERIOD 2          PERIOD 3          REMARKS El.11                  3                33%               67%               100%
Plant Duane Amold Energy Center, Palo, IA. 52324
El.12                31                19%               67%               87%
: 4)
El.20                  8                38%              75%               100%
Owners Certificate of Authorization (if required): N/A
E4.11                  2                  0%               40%               100%             See Note 9 E5.30                  4                25%               75%               100%
: 6)
E8.10                  14                29%               71%                78%
National Board Number of Unit: N/A
E9.20                                    N/A               N/A                N/A            See Note 10
: 3) Plant Unit: #1
: 5) Commercial Service Date: 020 I/75 Gross Generating Capacity 614 MWE STATUS OF WORK FOR THIRD TEN YEAR INTERVAL CLASS I AND 2 SUPPORTS ITEMI NO.
TOTAL #
PERIOD 1 PERIOD 2 PERIOD 3 REMARKS FI.10 42 33%
64%
100%
SeeNote5 F1.20 52 27%
58%
100%
See Note 5 Fl.40 20 40%
65%
100%
See Note 5 STATUS OF WORK FOR (IWE) FIRST TEN YEAR INTERVAL I
CLASSMIC ITEM NO.
El.11 El.12 El.20 E4.11 E5.30 E8.10 E9.20 TOTAL#
3 31 8
2 4
14 PERIOD 1 33%
19%
38%
0%
25%
29%
N/A PERIOD 2 67%
67%
75%
40%
75%
71%
N/A PERIOD 3 100%
87%
100%
100%
100%
78%
N/A REMARKS See Note 9 See Note 10


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part J, page 4 of 5 I) Owners: Interstate Power and Light Company,     Central Iowa Power Cooperative       Corn Belt Power Cooperative an Alliant Company                   Marion, IA.                         flumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part J, page 4 of 5 I)
Owners: Interstate Power and Light Company, Central Iowa Power Cooperative Corn Belt Power Cooperative an Alliant Company Marion, IA.
flumbolt, IA.
P.O. Box 351 Cedar Rapids, IA. 52406
P.O. Box 351 Cedar Rapids, IA. 52406
: 2) Plant: DuaneAmoldEnergyCenterPalo,IA.52324                         3) Plant Unit: #1
: 2)
: 4) OwnersCertificateofAuthorization(ifrequired): N/A                   5) CommercialServiceDate: 02017n5
Plant:
: 6) National Board Number of Unit: N/A                                   Gross Generating Capacity. 614MWE STATUS OF WORK FOR THIRD TEN YEAR INTERVAL NOTE I - Item Numbers B3.90, B3.100 There are a total of 34 nozzles, however I of the nozzles is exempt by IWB-1220(c) and not included in the percentages.
DuaneAmoldEnergyCenterPalo,IA.52324
NOTE 2 - Item Numbers B4.1 1, B4.12, B4.13 These items are required to be examined during conduct of the system hydrostatic test, IES Utilities has implemented Code Case N-498-1 (TAP-POIO)
: 3) Plant Unit: #1
: 4)
OwnersCertificateofAuthorization(ifrequired): N/A
: 5) CommercialServiceDate: 02017n5
: 6)
National Board Number of Unit: N/A Gross Generating Capacity. 614MWE STATUS OF WORK FOR THIRD TEN YEAR INTERVAL NOTE I -
Item Numbers B3.90, B3.100 There are a total of 34 nozzles, however I of the nozzles is exempt by IWB-1220(c) and not included in the percentages.
NOTE 2 -
Item Numbers B4.1 1, B4.12, B4.13 These items are required to be examined during conduct of the system hydrostatic test, IES Utilities has implemented Code Case N-498-1 (TAP-POIO)
NOTE 3 - Item Numbers B6.180, B6.190, B6.200, B7.50, B7.60,B7.70, B7.80, B12.50 These examinations are performed when the component is disassembled for other reasons. Therefore IWVX-2412-1 does not apply.
NOTE 3 - Item Numbers B6.180, B6.190, B6.200, B7.50, B7.60,B7.70, B7.80, B12.50 These examinations are performed when the component is disassembled for other reasons. Therefore IWVX-2412-1 does not apply.
NOTE 4 - Item Numbers BI0.I0, B10.20, B10.30, C3.10, C3.20 These item numbers are from Code Case N509 (TAP-1004)
NOTE 4 - Item Numbers BI0.I0, B10.20, B10.30, C3.10, C3.20 These item numbers are from Code Case N509 (TAP-1004)
Line 1,612: Line 3,848:
NOTE II - Item Numbers B5.XX, B9.XX, C5.XX, and R-I Risk-Informed methods are utilized as described in EPRI TR-I 12657B-A to determine scope of inspections for examination categories B-F, B-J, and C-F-2. The Risk-Informed scope has been combined into a new item number R-I for implementation in the second and third periods of the third interval.
NOTE II - Item Numbers B5.XX, B9.XX, C5.XX, and R-I Risk-Informed methods are utilized as described in EPRI TR-I 12657B-A to determine scope of inspections for examination categories B-F, B-J, and C-F-2. The Risk-Informed scope has been combined into a new item number R-I for implementation in the second and third periods of the third interval.


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part J, page 5 of 5 I) Owners: Interstate Power and light Company,         Central Iowa Power Cooperative       Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                         Ilumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part J, page 5 of 5 I)
Owners: Interstate Power and light Company, Central Iowa Power Cooperative Corn Belt Power Cooperative an Alliant Company Marion, IA.
Ilumbolt, IA.
P.O. Box 351 Cedar Rapids, IA. 52406
P.O. Box 351 Cedar Rapids, IA. 52406
: 2) Plant: DuaneAmoldEnergyCenterPalo,IA.52324                               3) Plant Unit: #1
: 2)
: 4) Owners Certificate of Authorization (if required): N/A                   5) CommercialServiceDate: 020I75
Plant: DuaneAmoldEnergyCenterPalo,IA.52324
: 6) NationalBoardNumberofUnit:       N/A                                     Gross Generating Capacity: 614MWE NOTE 12 - Item Number Bl .1l There are no welds counted for this item number because of the use of Relief Request NDE-R33 NOTE 13 - Item Number Bl .12 Relief Request submitted July 14, 2005 requested deferral of examination of two welds.
: 3) Plant Unit: #1
: 4)
Owners Certificate of Authorization (if required): N/A
: 5) CommercialServiceDate: 020I75
: 6)
NationalBoardNumberofUnit:
N/A Gross Generating Capacity: 614MWE NOTE 12 - Item Number Bl.1 l There are no welds counted for this item number because of the use of Relief Request NDE-R33 NOTE 13 - Item Number Bl.12 Relief Request submitted July 14, 2005 requested deferral of examination of two welds.
NOTE 14 - Item Number B 1.40 This weld was examined in "thirds". To obtain increased coverage, the "third" that was examined in period I was reexamined in period 3.
NOTE 14 - Item Number B 1.40 This weld was examined in "thirds". To obtain increased coverage, the "third" that was examined in period I was reexamined in period 3.
NOTE 15 -Item Number B13.10 Areas to be examined shall include the spaces above and below the reactor ore that are made accessible for examination by removal of components during normal refueling outages.
NOTE 15 -Item Number B13.10 Areas to be examined shall include the spaces above and below the reactor ore that are made accessible for examination by removal of components during normal refueling outages.
NOTE 16 - Item Number B 13.30 The RFO 17 Summary Report included Shroud Ledge/Vessel Weld (Summary No. 175000) as a B-N-i, B 13.10 examination, however it did not report the B-N-2, B 13.30 VT-3 performed (Summary No. 174700).
NOTE 16 - Item Number B 13.30 The RFO 17 Summary Report included Shroud Ledge/Vessel Weld (Summary No. 175000) as a B-N-i, B 13.10 examination, however it did not report the B-N-2, B 13.30 VT-3 performed (Summary No. 174700).


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part K, page I of 2 I) Owners: Interstate Power and Light Company,       Central Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                       Marion, IA.                          lumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part K, page I of 2 I)
P.O. Box 351 Cedar Rapids, IA. 52406
Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 2) Plant: Duane Amold Energy Center, Palo, IA. 52324                     3) Plant Unit: #1
Corn Belt Power Cooperative lumbolt, IA.
: 4) Owners Certificate ofAuthorization (ifrequired): N/A                   5) Commercial Service Date:  OnIlfn5
: 2)
: 6) National Board Number of Unit N/A                                       Gross Generating Capacity: 614 MWE RELIEF REQUESTS / CODE CASES The following are the relief requests and code cases that were used during the period of this Summary Report.
Plant:
RELIEF REQUESTS                   DESCRIPTION NDE-ROOI                   Reactor Vessel weld limitations NDE-R008                  Use of existing calibration blocks NDE-ROI I                  Exemption from Appendix III calibration block notch dimensions NDE-RO12                  Use of the 1992 Addenda of ASME Section XI to govern repairs/replacements NDE-R013                  Examination of reactor vessel closure head nuts NDE-RO18                  Limited examinations of Nozzle to Vessel welds NDE-R025                  Alternative requirements to Appendix VIll Supplement 4, length sizing acceptance criteria NDE-R026                  Alternative Requirements to VII-4240 "Annual Training" NDE-R027                  Use of the 1992 Edition of ASME Section XI for "Additional Examinations" NDE-R030                  Use of PDI for dissimilar metal welds in lieu of Supplement 10 to Appendix VIII NDE-R031                  Use of Examination Volume as defined by N-613-1 NDE-R032                  Use of PDI for Overlays in lieu of Supplement II to Appendix VIII NDE-R033                  Reactor Pressure Vessel Circumferential Shell Welds PR-002                  Alternative Testing for Class 2 Pressure Retaining Containment Penetrations connected to non-safety related piping systems MC-R001                  Qualification of Nondestructive Examination Personnel MC-R002                  Alternative to VT-3 for Seals and Gaskets MC-R003                  Alternative to Torque Test of Bolting MC-R004                  Preservice Examination of Reapplied Paint or Coatings MC-R005                  Visual Examination of Painted or Coated Containment Components Prior to Removal of Paint of Coatings MC-R006                  Successive examinations of Repaired Areas MC-R007                  Use of Code Case N-601 CODE CASE #                    DESCRIPTION N-198-1                  Exemption From Examination for ASME Class 1 and 2 Piping Located at Containment Penetrations.
Duane Amold Energy Center, Palo, IA. 52324
N-307-1                  Revised Ultrasonic Examination Volume for Class I Bolting, Table IWB-2500-1, Examination Category B-G-1, When Examinations Are Conducted From the Center Drilled Hole.
: 4)
NA416-1                   Alternative Pressure Test Requirement for Welded Repairs, Fabrication Welds for Replacement Parts and Piping Subassemblies, or Installation of Replacement Items by Welding, Class 1, 2 and 3.
Owners Certificate of Authorization (if required): N/A
N416-2                    Alternative Pressure Test Requirement for Welded Repairs, Fabrication Welds for Replacement Parts and Piping. Includes limitation from Regulatory Guide 1.147 Revision 13, required using hold times from Section XI 1989 Edition.
: 6)
N457                    Qualification Specification Notch Location for Ultrasonic Examination of Bolts and Studs.
National Board Number of Unit N/A
N-460                    Alternative Examination Coverage for Class I and 2 Welds.
: 3) Plant Unit: #1
: 5) Commercial Service Date:
OnIlfn5 Gross Generating Capacity: 614 MWE RELIEF REQUESTS / CODE CASES The following are the relief requests and code cases that were used during the period of this Summary Report.
RELIEF REQUESTS NDE-ROOI NDE-R008 NDE-ROI I NDE-RO12 NDE-R013 NDE-RO18 NDE-R025 NDE-R026 NDE-R027 NDE-R030 NDE-R031 NDE-R032 NDE-R033 PR-002 MC-R001 MC-R002 MC-R003 MC-R004 MC-R005 MC-R006 MC-R007 CODE CASE #
N-198-1 N-307-1 DESCRIPTION Reactor Vessel weld limitations Use of existing calibration blocks Exemption from Appendix III calibration block notch dimensions Use of the 1992 Addenda of ASME Section XI to govern repairs/replacements Examination of reactor vessel closure head nuts Limited examinations of Nozzle to Vessel welds Alternative requirements to Appendix VIll Supplement 4, length sizing acceptance criteria Alternative Requirements to VII-4240 "Annual Training" Use of the 1992 Edition of ASME Section XI for "Additional Examinations" Use of PDI for dissimilar metal welds in lieu of Supplement 10 to Appendix VIII Use of Examination Volume as defined by N-613-1 Use of PDI for Overlays in lieu of Supplement II to Appendix VIII Reactor Pressure Vessel Circumferential Shell Welds Alternative Testing for Class 2 Pressure Retaining Containment Penetrations connected to non-safety related piping systems Qualification of Nondestructive Examination Personnel Alternative to VT-3 for Seals and Gaskets Alternative to Torque Test of Bolting Preservice Examination of Reapplied Paint or Coatings Visual Examination of Painted or Coated Containment Components Prior to Removal of Paint of Coatings Successive examinations of Repaired Areas Use of Code Case N-601 DESCRIPTION Exemption From Examination for ASME Class 1 and 2 Piping Located at Containment Penetrations.
Revised Ultrasonic Examination Volume for Class I Bolting, Table IWB-2500-1, Examination Category B-G-1, When Examinations Are Conducted From the Center Drilled Hole.
NA416-1 N416-2 N457 Alternative Pressure Test Requirement for Welded Repairs, Fabrication Welds for Replacement Parts and Piping Subassemblies, or Installation of Replacement Items by Welding, Class 1, 2 and 3.
Alternative Pressure Test Requirement for Welded Repairs, Fabrication Welds for Replacement Parts and Piping. Includes limitation from Regulatory Guide 1.147 Revision 13, required using hold times from Section XI 1989 Edition.
Qualification Specification Notch Location for Ultrasonic Examination of Bolts and Studs.
Alternative Examination Coverage for Class I and 2 Welds.
N-460


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part K, page 2 of 2 I) Owners: Interstate Power and Ught Company,           Central Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                         Marion, IA.                          Ilumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part K, page 2 of 2 I)
P.O. Box 351 Cedar Rapids, IA. 52406
Owners: Interstate Power and Ught Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 2)   Plant Duane Amold Energy Center, Palo, IA. 52324                         3) Plant Unit: #1
Corn Belt Power Cooperative Ilumbolt, IA.
: 4)   Owners Certificate of Authorization (if required): N/A                   5) Commercial Service Date: 02/017n5
: 2)
: 6)  NationalBoardNumberofUnit        N/A                                    Gross Generating Capacity 614 MWE CODE CASE #                     DESCRIPTION N-461-1                     Alternative Rules for Piping Calibration Block Thickness.
Plant Duane Amold Energy Center, Palo, IA. 52324
N-491-1                    Alternative Rules for the Examination of Class 1,2, 3 and MC Components Supports of Light Water Cooled Power Plants.
: 4)
N-498-1                    Alternative Rules for 10 Year Hydrostatic Pressure Testing for Class 1, 2 and Class 3 Systems.
Owners Certificate of Authorization (if required): N/A
N-503                      Limited Certification of Nondestructive Examination Personnel Section XI, Division 1.
: 6)
N-508-1                    Rotation of Serviced Snubbers and Pressure Relief Valves for the Purpose of Testing Section XI, Division 1.
NationalBoardNumberofUnit N/A
N-509                      Alternative Rules for the Selection and Examinations of Class 1, 2, and 3 Integrally Welded Attachments, Section XI, Division 1.
: 3) Plant Unit: #1
N-522                      Pressure Testing of Containment Piping, Section XI, Division I N-524                      Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping, Section XI, Division 1.
: 5) Commercial Service Date: 02/017n5 Gross Generating Capacity 614 MWE CODE CASE #
N-535                      Alternative Requirements for Inservice Inspection Intervals, Section XI, Division 1.
N-461-1 N-491-1 N-498-1 N-503 N-508-1 N-509 N-522 N-524 N-535 N-546 N-552 N-573 N-583 N-598 DESCRIPTION Alternative Rules for Piping Calibration Block Thickness.
N-546                      Alternative Requirements for Qualification of VT-2 Examination Personnel, Section XI, Division 1. Limitation requires initial and every 3 year written testing of examiners on Section XI knowledge, and only applies to performance of examinations.
Alternative Rules for the Examination of Class 1, 2, 3 and MC Components Supports of Light Water Cooled Power Plants.
N-552                      Alternative Methods - Qualification for Nozzle Inside Radius Section from the Outside Surface, Section XI, Division 1. This Case is referenced in Final Rule dated 9/22/99, I0CFR 50.55a(b)(2)(xv)(J).
Alternative Rules for 10 Year Hydrostatic Pressure Testing for Class 1, 2 and Class 3 Systems.
N-573                      Transfer of Procedure Qualification Records Between Owners.
Limited Certification of Nondestructive Examination Personnel Section XI, Division 1.
N-583                      Annual Training Alternative.
Rotation of Serviced Snubbers and Pressure Relief Valves for the Purpose of Testing Section XI, Division 1.
N-598                      Alternative Requirements to Required Percentages of Examination.
Alternative Rules for the Selection and Examinations of Class 1, 2, and 3 Integrally Welded Attachments, Section XI, Division 1.
Pressure Testing of Containment Piping, Section XI, Division I Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping, Section XI, Division 1.
Alternative Requirements for Inservice Inspection Intervals, Section XI, Division 1.
Alternative Requirements for Qualification of VT-2 Examination Personnel, Section XI, Division 1. Limitation requires initial and every 3 year written testing of examiners on Section XI knowledge, and only applies to performance of examinations.
Alternative Methods - Qualification for Nozzle Inside Radius Section from the Outside Surface, Section XI, Division 1. This Case is referenced in Final Rule dated 9/22/99, I0CFR 50.55a(b)(2)(xv)(J).
Transfer of Procedure Qualification Records Between Owners.
Annual Training Alternative.
Alternative Requirements to Required Percentages of Examination.


ENCLOSURE 2 TO NG-05-0420
ENCLOSURE 2 TO NG-05-0420


Augmented Inspection Results RFO 19 Page 1 of2 System       Weld or Component     Report     Inspection     ISI   Acc   Exam Description         Description       Number   Requirement Iso/Fig Number Feedwvater   FWA-Bore (Zone 3)         105009       C       1.2-05   Y     UT FWA-Nozzle (Zones I & 2) 105009         C       1.2-05   Y     UT FWA-Thermal Sleeve       I05010         C       1.2-05   Y     UT FWB-Bore (Zone 3)         105011       C       1.2-05   Y     UT FWB-Nozzle (Zones 1 & 2) I05011         C       1.2-05   Y     UT FWB-Thermal Sleeve         105012       C       1.2-05   Y     UT FWC-Bore (Zone 3)         105017       C       1.2-06   Y     UT FWC-Nozzle (Zones 1 & 2) I05017         C       1.2-06   Y     UT FWC-Thermal Sleeve       105018         C       1.2-06   Y     UT FWD-Bore (Zone 3)         105019         C       1.2-06   Y     UT FWD-Nozzle (Zones I & 2)   105019       C       1.2-06   Y     UT FWVD-Thernal Sleeve       105020         C       1.2-06   Y     UT Core Spray   CSA-F002                   105029       A       1.2-07   Y     UT CSA-FO02A                 I05030         A       1.2-07   Y     UT CSA-F004                 I05031         A       1.2-07   Y     UT RWCU         CUB-F004                   105036       A       1.2-1 IB Y     UT CUB-J019                   105037       A       1.2-1 B   Y     UT CUB-J022                   105038       A       1.2-1 lB Y     UT CUB-J025                   105039       A       1.2-1 lB Y       UT RHR           RHB-J002                   105041       A       1.2-14   Y       UT Recirculation RRF-F002                   105047       A       1.2-20   Y       UT RRG-F002                 I05048         A       1.2-20   Y       UT RCB-F002                 I05051         A       1.2-21A   Y     UT RCB-J044                   105052       A       1.2-21A   Y       UT RRB-F002-OVL               105055       A       1.2-22   Y       UT RRD-F002-OVL             105057         A       1.2-22   Y       UT RRD-JO05                 105058         A       1.2-22   Y       UT Jet Pump Inst JPA-F002                   105059       A       1.2-25   Y       UT JPA-J003                 105060         A       1.2-25   Y       UT JPB-F002                   105062       A       1.2-26   Y       UT JPB-J003                   105063       A       1.2-26   Y       UT RxVessel     CRDRLNozzle               105149       C     VS-01-41   Y     EVT-I Top Guide Latch 1360       105149       D     VS-04-06   Y     VT-I Top Guide Latch 3160       105149       D     VS-04-06   Y     VT-I Top Guide 460             I05149       D     VS-04-10   Y     VT-1 Top Guide 1360             I05149       D     VS-04-10   Y     VT-I Top Guide 2260             105149       D     VS-04-10   Y     VT-1 Top Guide 316 0            105149       D     VS-04-10   Y     VT-1 Core Spray                 105149       F     VS-05-01   Y     EVT-1 Core Spray Sparger         105149       F     VS-05-02   Y     EVT-I Moist Sep Shrd Head       105149       B     VS-06-02   Y     VT-I Moisture Separator         105149       B     VS-06-03   Y     VT-3 Feedwater Spargers         I05149       C     VS-09-01   Y     VT-I CRD Guide Tube             I05149       D     VS-12-04   Y     VT-3 /
Augmented Inspection Results RFO 19 Page 1 of2 System Weld or Component Report Inspection ISI Acc Exam Description Description Number Requirement Iso/Fig Number Feedwvater FWA-Bore (Zone 3) 105009 C
1.2-05 Y
UT FWA-Nozzle (Zones I & 2) 105009 C
1.2-05 Y
UT FWA-Thermal Sleeve I05010 C
1.2-05 Y
UT FWB-Bore (Zone 3) 105011 C
1.2-05 Y
UT FWB-Nozzle (Zones 1 & 2)
I05011 C
1.2-05 Y
UT FWB-Thermal Sleeve 105012 C
1.2-05 Y
UT FWC-Bore (Zone 3) 105017 C
1.2-06 Y
UT FWC-Nozzle (Zones 1 & 2)
I05017 C
1.2-06 Y
UT FWC-Thermal Sleeve 105018 C
1.2-06 Y
UT FWD-Bore (Zone 3) 105019 C
1.2-06 Y
UT FWD-Nozzle (Zones I & 2) 105019 C
1.2-06 Y
UT FWVD-Thernal Sleeve 105020 C
1.2-06 Y
UT Core Spray CSA-F002 105029 A
1.2-07 Y
UT CSA-FO02A I05030 A
1.2-07 Y
UT CSA-F004 I05031 A
1.2-07 Y
UT RWCU CUB-F004 105036 A
1.2-1 IB Y
UT CUB-J019 105037 A
1.2-1 B Y
UT CUB-J022 105038 A
1.2-1 lB Y
UT CUB-J025 105039 A
1.2-1 lB Y
UT RHR RHB-J002 105041 A
1.2-14 Y
UT Recirculation RRF-F002 105047 A
1.2-20 Y
UT RRG-F002 I05048 A
1.2-20 Y
UT RCB-F002 I05051 A
1.2-21A Y
UT RCB-J044 105052 A
1.2-21A Y
UT RRB-F002-OVL 105055 A
1.2-22 Y
UT RRD-F002-OVL 105057 A
1.2-22 Y
UT RRD-JO05 105058 A
1.2-22 Y
UT Jet Pump Inst JPA-F002 105059 A
1.2-25 Y
UT JPA-J003 105060 A
1.2-25 Y
UT JPB-F002 105062 A
1.2-26 Y
UT JPB-J003 105063 A
1.2-26 Y
UT RxVessel CRDRLNozzle 105149 C
VS-01-41 Y
EVT-I Top Guide Latch 1360 105149 D
VS-04-06 Y
VT-I Top Guide Latch 3160 105149 D
VS-04-06 Y
VT-I Top Guide 460 I05149 D
VS-04-10 Y
VT-1 Top Guide 1360 I05149 D
VS-04-10 Y
VT-I Top Guide 2260 105149 D
VS-04-10 Y
VT-1 Top Guide 3160 105149 D
VS-04-10 Y
VT-1 Core Spray 105149 F
VS-05-01 Y
EVT-1 Core Spray Sparger 105149 F
VS-05-02 Y
EVT-I Moist Sep Shrd Head 105149 B
VS-06-02 Y
VT-I Moisture Separator 105149 B
VS-06-03 Y
VT-3 Feedwater Spargers I05149 C
VS-09-01 Y
VT-I CRD Guide Tube I05149 D
VS-12-04 Y
VT-3 /
EVT-1
EVT-1


Augmented Inspection Results RFO 19 Page 2 of 2 System           Weld or Component         Report       Inspection     ISI     Acc     Exam Description             Description           Number       Requirement Iso/Fig Number Torus             Torus Support #5               105117         H         N/A         Y     VT-3 Torus Support #6               105118         H         N/A         Y     VT-3 Earth Quake Tie #2             105119         H         N/A         Y     VT-3 Torus Support #7               105120         H         N/A       Y       VT-3 Torus Support#8               105121           H         N/A         Y     VT-3 Instrument         lT-429                         105126         H     M144-071       Y     VT-3 Air Accumulator Fuel Oil Day       IT-037B                       105127           H     M15-56       Y       VT-3 Tank ACC- ACCEPTED, Y INDICATING ACCEPTED, N INDICATING REJECTED.
Augmented Inspection Results RFO 19 Page 2 of 2 System Weld or Component Report Inspection ISI Acc Exam Description Description Number Requirement Iso/Fig Number Torus Torus Support #5 105117 H
A- BWRVIP-75                                                     E - BWRVIP-76 (GL 94-03)
N/A Y
B- GE SILS                                                      F - BWRVIP-I 8 C - NUREG 0619                                                  G - BWRVIP-41 D- BWRVIP                                                        11 - OWNER DEFINED
VT-3 Torus Support #6 105118 H
N/A Y
VT-3 Earth Quake Tie #2 105119 H
N/A Y
VT-3 Torus Support #7 105120 H
N/A Y
VT-3 Torus Support#8 105121 H
N/A Y
VT-3 Instrument lT-429 105126 H
M144-071 Y
VT-3 Air Accumulator Fuel Oil Day IT-037B 105127 H
M15-56 Y
VT-3 Tank ACC-ACCEPTED, Y INDICATING ACCEPTED, N INDICATING REJECTED.
A-BWRVIP-75 B-GE SILS C - NUREG 0619 D-BWRVIP E - BWRVIP-76 (GL 94-03)
F - BWRVIP-I 8 G - BWRVIP-41 11 - OWNER DEFINED


ENCLOSURE 3 TO NG-05-0420
ENCLOSURE 3 TO NG-05-0420


FORM NIS- I OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As Required by the Provisions of the ASME Code Rules SUPPLEMENT TO RFO 17  
FORM NIS-I OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As Required by the Provisions of the ASME Code Rules SUPPLEMENT TO RFO 17  


==SUMMARY==
==SUMMARY==
REPORT SUBMITTAL
REPORT SUBMITTAL
: 1. Owner: IES Utilities Inc., an Alliant company. P. O. Box 351, Cedar Rapids, IA 52406                                     (Note 2)
: 1. Owner: IES Utilities Inc., an Alliant company. P. O. Box 351, Cedar Rapids, IA 52406 (Note 2)
(Name and address of Owncr)
(Name and address of Owncr)
: 2. Plant: Duane Arnold Energy Center. 3277 DAEC Road, Palo, IA 52324 (Name and Address of Plant)
: 2. Plant: Duane Arnold Energy Center. 3277 DAEC Road, Palo, IA 52324 (Name and Address of Plant)
: 3. Plant Unit                     1                 4. Owvner Certificate of Authorization (if required)                   N/A
: 3. Plant Unit 1
: 5. Commercial Service Date                         02/01/75             6. National Board Number of Unit                   N/A
: 4. Owvner Certificate of Authorization (if required)
N/A
: 5. Commercial Service Date 02/01/75
: 6. National Board Number of Unit N/A
: 7. Components Inspected Corrected Pages (Part D, Pages 1 and 2) are attached.
: 7. Components Inspected Corrected Pages (Part D, Pages 1 and 2) are attached.
Component or                             Manufacturer                   Manufacturer               State or                 National Appurtenance                               or Installer                 or Installer           Province No.               Board No.
Component or Manufacturer Manufacturer State or National Appurtenance or Installer or Installer Province No.
__ _ _ __ __ __ __ _ __ __ _ _ _ _ _ _ __ _  _ _ _ _ _S         erial N o._      _  _  _ _ _  _  _ __    _  _  _  _ _ _ _ _  _
Board No.
Reactor                         Chicago Bridge                         3-4833                   N/A                       3663 Pressure                                   & Iron Vessel       (RPV)                                                                           .                .
_ _ _ _ _S erial N o._
I                     I-
Reactor Chicago Bridge 3-4833 N/A 3663 Pressure  
                                  +                                   4                     4-                       +
& Iron Vessel (RPV)
                                  +                                   I                     4-                       4.
I I-
4                                   4                     4-                       +
+
: 4.                                   t                     4-                       4-i               i                     i.
4 4-  
+
+
I 4-4.
4 4
4-  
+
: 4.
t 4-4-
i i
i.
Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8.5 X II inches. (2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top ofthis form.
Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8.5 X II inches. (2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top ofthis form.
(12/82) This form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, N.Y 10010
(12/82) This form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, N.Y 10010


FORM NIS-1 (back)
FORM NIS-1 (back)
: 8. Examination Dates           12/01/99     to   05/27/01         9. Inspection Interval from     11/01/96     to   11/01/05
: 8. Examination Dates 12/01/99 to 05/27/01
: 9. Inspection Interval from 11/01/96 to 11/01/05
: 10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.
: 10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.
Corrected Pages (Part D, Pages 1 and 2) are attached.
Corrected Pages (Part D, Pages 1 and 2) are attached.
I 1. Abstract of Conditions Noted N/A
I 1. Abstract of Conditions Noted N/A
: 12. Abstract of Corrective Measures Recommended and Taken N/A We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code, Section XI.
: 12. Abstract of Corrective Measures Recommended and Taken N/A We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code, Section XI.
Date     ' /Z 7                   2005 Signed                                                                 By                   A\Jc;                 \
Date  
Certificate of Authorization No. (if applicable)                     A/I                 Expiration Date CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Iowa and employed by Hartford Boiler Co. of Hartford CT have inspected the components described in this Owner's Data Report during the period 12/01/99 to 05/27/01 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code, Section XI.
' /Z 7 2005 Signed By A\\Jc;  
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Data Report. Furthermore, neither the Inspector, nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
\\
Date       7     ;2005 Commissions6           /d31994, /yQ9 Inspector's Signature                                                   National Board, State, Province and No.
Certificate of Authorization No. (if applicable)
Note 1:   As per letter NG-89-3390, the ASME Section Xl "Vessels' RIIR Ileat Exchangers IE-201A and IE-201B and the Reactor Vessel are excluded from the Summary Report to the State.
A/I Expiration Date CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Iowa and employed by Hartford Boiler Co. of Hartford CT have inspected the components described in this Owner's Data Report during the period 12/01/99 to 05/27/01, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code, Section XI.
Note 2:   Other owners are Central Iowa Power Cooperative and Corn Belt Power Cooperative.
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Data Report.
Furthermore, neither the Inspector, nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date 7  
;2005 Commissions6 /d31994, /yQ9 Inspector's Signature National Board, State, Province and No.
Note 1:
As per letter NG-89-3390, the ASME Section Xl "Vessels' RIIR Ileat Exchangers IE-201A and IE-201B and the Reactor Vessel are excluded from the Summary Report to the State.
Note 2:
Other owners are Central Iowa Power Cooperative and Corn Belt Power Cooperative.


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT December 01, 1999 through May 27,2001 Part D, page I of 5 I)   Owners: IES Utilities Inc., an Alliant company     Central Iowa Power Cooperative      Corn Belt Power Cooperative P.O. Box 351                             Marion, IA.                         Ilumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT December 01, 1999 through May 27,2001 Part D, page I of 5 Corn Belt Power Cooperative Ilumbolt, IA.
Cedar Rapids, IA. 52406
I)
: 2)   Plant: Duane Amold Energy Center, Palo, IA. 52324                       3) Plant Unit: #l
Owners: IES Utilities Inc., an Alliant company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 4)   Owners Certificate of Authorization (if required): N/A                   5) Commercial Service Date: 02/01/75
: 2)
: 6)   National Board Number of Unit: N/A                                       Gross Generating Capacity 565 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS 1 ISI                                           ASME XI Component                   Description                   Report     Examination           ISI Iso         Category           Results RPV Head                   HCC-13002 (Stud 20           101093     UT                 VS-01-06             B-A           Accepted by
Plant:
                          -40)                                                                                             evaluation (AR 25397)
Duane Amold Energy Center, Palo, IA. 52324
HCC-COOI (Stud 20             101094     UT, MT             VS-01-06             B-A             Accepted
: 4)
                          - 40)
Owners Certificate of Authorization (if required): N/A
Main Steam                 MSC-KOIIA                     101010     VT-3                 1.2-03           F-A             Accepted Main Steam                 PSV-4405 VALVE                 101208     VT-3                 1.2-03           B-M-2           Accepted BODY PSV-4405 BOLTING               101207     VT-I                 1.2-03           B-G-2           Accepted MSD-K034                       101015     VT-3                 1.2-04           F-A             Accepted Feedwater                 FWB-K036                       101021     VT-3                 1.2-05           F-A             Accepted FWC-K020                       101026     VT-3                 1.2-06           F-A             Accepted FWD-K014                       101027     VT-3                 1.2-06           F-A             Accepted Core Spray                 CSB-F002                     101028       PT, UT               1.2-08           B-F             Accepted CSB-F004                     101030       PT, UT               1.2-08           B-F             Accepted High Pressure             PSA-K015                       101032     VT-3                 1.2-09           F-A             Accepted Coolant Injection Control Rod Drive         CRA-KO17AA                     101051     VT-3                 1.2-12A           F-A         Accepted by repair Return                                                                                                                     (AR 25237)
: 6)
Residual Heat             RHB-F003                       101055     PT, UT               1.2-14           B-F             Accepted Removal RHB-K009                       101057     VT-3                 1.2-14           F-A             Accepted RHC-K016                     101058       VT-3                 1.2-15           F-A             Accepted RHD-K005                     101059       VT-3                 1.2-16           F-A             Accepted Reactor Core               RSA-KO24AA                   101061       VT-3                 1.2-17           F-A             Accepted Isolation Cooling Recirculation             RCA-KO17                       101063     VT-3                 1.2-19A           F-A             Accepted Pump 'A' Suction Recirculation             RMA-J002                       101065     PT, UT               1.2-20           B-J             Accepted Manifold 'A' and Risers E,FG,H RMA-J008                       101066     PT, UT               1.2-20           B-J             Accepted RRF-D001                     101067       UT                   1.2-20           B-D             Accepted RRF-DOOI Inner Rad             101067     UT                   1.2-20           B-D             Accepted RRH-J005                       101069     PT, UT               1.2-20           B-J             Accepted Recirculation             RBB-JOOI                     101070       PT, UT               1.2-21A           B-J             Accepted System 'B' Suction         RBB-KO05A                     101071       VT-3                 1.2-21A           F-A           Accepted and Bypass                 RCB-J030                       101203     PT, UT               1.2-21A           B-J             Accepted RCB-K029                     101072       VT-3, PT             1.2-21A         F-A/B-K         Accepted
National Board Number of Unit: N/A
: 3) Plant Unit: #l
: 5) Commercial Service Date: 02/01/75 Gross Generating Capacity 565 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS 1 ISI ASME XI Component Description Report Examination ISI Iso Category Results RPV Head HCC-13002 (Stud 20 101093 UT VS-01-06 B-A Accepted by
-40) evaluation (AR 25397)
HCC-COOI (Stud 20 101094 UT, MT VS-01-06 B-A Accepted
- 40)
Main Steam MSC-KOIIA 101010 VT-3 1.2-03 F-A Accepted Main Steam PSV-4405 VALVE 101208 VT-3 1.2-03 B-M-2 Accepted BODY PSV-4405 BOLTING 101207 VT-I 1.2-03 B-G-2 Accepted MSD-K034 101015 VT-3 1.2-04 F-A Accepted Feedwater FWB-K036 101021 VT-3 1.2-05 F-A Accepted FWC-K020 101026 VT-3 1.2-06 F-A Accepted FWD-K014 101027 VT-3 1.2-06 F-A Accepted Core Spray CSB-F002 101028 PT, UT 1.2-08 B-F Accepted CSB-F004 101030 PT, UT 1.2-08 B-F Accepted High Pressure PSA-K015 101032 VT-3 1.2-09 F-A Accepted Coolant Injection Control Rod Drive CRA-KO17AA 101051 VT-3 1.2-12A F-A Accepted by repair Return (AR 25237)
Residual Heat RHB-F003 101055 PT, UT 1.2-14 B-F Accepted Removal RHB-K009 101057 VT-3 1.2-14 F-A Accepted RHC-K016 101058 VT-3 1.2-15 F-A Accepted RHD-K005 101059 VT-3 1.2-16 F-A Accepted Reactor Core RSA-KO24AA 101061 VT-3 1.2-17 F-A Accepted Isolation Cooling Recirculation RCA-KO17 101063 VT-3 1.2-19A F-A Accepted Pump 'A' Suction Recirculation RMA-J002 101065 PT, UT 1.2-20 B-J Accepted Manifold 'A' and Risers E,FG,H RMA-J008 101066 PT, UT 1.2-20 B-J Accepted RRF-D001 101067 UT 1.2-20 B-D Accepted RRF-DOOI Inner Rad 101067 UT 1.2-20 B-D Accepted RRH-J005 101069 PT, UT 1.2-20 B-J Accepted Recirculation RBB-JOOI 101070 PT, UT 1.2-21A B-J Accepted System 'B' Suction RBB-KO05A 101071 VT-3 1.2-21A F-A Accepted and Bypass RCB-J030 101203 PT, UT 1.2-21A B-J Accepted RCB-K029 101072 VT-3, PT 1.2-21A F-A/B-K Accepted


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT December 01, 1999 through May 27,2001 Part D Page 2 of 5 I)   Owners: IES Utilities Inc., an Alliant company   Central Iowa Power Cooperative      Corn Belt Power Cooperative P.O. Box 351                           Marion. IA.                         Ilumbolt, IA.
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT December 01, 1999 through May 27,2001 Part D Page 2 of 5 I)
Cedar Rapids, IA. 52406
Owners: IES Utilities Inc., an Alliant company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion. IA.
: 2)   Plant: Duanc Amold Energy Center, Palo, IA. 52324                   3) Plant Unit: #1
Corn Belt Power Cooperative Ilumbolt, IA.
: 4)   OwnersCertiricateofAuthorization(ifrequired): N/A                     5) Commercial Service Date: 02/0/n5
: 2)
: 6)  National Board NumberofUnit: N/A                                      Gross Generating Capacity: 565 MWE COM PONENT AND W'ELD EXAM INATION IDENTIFICATION RECORDS CLASS I con't ISI                                         ASME Xi Component                   Description               Report     Examination           ISI Iso       Category       Results Recirculation               RRA-1005                   101076 PT, UT                     1.2-22           B-J         Accepted Manifold 'B' and Risers A,B,C,D RRB-J007                   101078     PT, UT               1.2-22           B-J         Accepted Reactor Head               HSB-D001                   101080     UT                   1.2-23           B-D         Accepted Spare                       HSB-D001 Inner Rad         101080     UT                   1.2-23           B-D         Accepted HSB-FLG-BOLTING           101081     VT-I                 1.2-23         B-G-2         Accepted Reactor Head Vent           HVA-FLG-                   101116     VT-I                 1.2-24         B-G-2         Accepted BOLTING Standby Liquid             LCA-F002                   101082     PT                   1.2-27           B-F         Accepted Control                     LCA-J025                   101083     PT                   1.2-27           B-i         Accepted LCA-J026                   101084     PT                   1.2-27           B-i         Accepted LCA-J026A                 101085     PT                   1.2-27           B-J         Accepted LCA-J027                   101086     PT                   1.2-27           B-J         Accepted LCA-KO03A                 101087     VT-3                 1.2-27           F-A         Accepted Reactor Vessel             VIA-D001                   101088     UT                   1.2-28           B-D         Accepted Instrument. N-I IA         VIA-DOOI Inner Rad.       101088     UT                   1.2-28           B-D         Accepted Reactor Vessel             VIC-DOOI                   101089     UT                   1.2-30           B-D         Accepted Instrument. N-12A           VIC-DOOI Inner Rad.       101089     UT                   1.2-30         B-D           Accepted Reactor Vessel             VIF-D00I                   101090     UT                   1.2-34           B-D         Accepted Instrument. N-16B           VIF-D00I Inner Rad.       101090     UT                   1.2-34           B-D         Accepted VIF-F002                   101091     PT                   1.2-34           B-F         Accepted Reactor Pressure           GUIDE ROD BRT(0)           101095     VT-3               VS-01-28           B-N-I         Accepted Vessel Internals           SHROUD LEDGE 0-           101095     VT-3               VS-02-11           B-N-I         Accepted 180 SHROUD LEDGE 0-           101095     VT-3               VS-02-11           B-N-2         Accepted 180 CORE PLATE                 101095     VT-3                 VS         B-N-I         Accepted 02<1>
Plant:
TOP GUIDE                 101095     VT-3               VS-04-01           B-N-I         Accepted SAMPLE HOLDER-             101095     VT-3               VS-01-31           B-N-I         Accepted 108 DEG CLASS I PRESSURE TESTS Class I System             STP 3.10.1-01             101092 VT-2                     ISONO-P           B-P         Accepted Leakage Test
Duanc Amold Energy Center, Palo, IA. 52324
: 4)
OwnersCertiricateofAuthorization(ifrequired): N/A
: 6)
National Board NumberofUnit: N/A
: 3) Plant Unit: #1
: 5) Commercial Service Date: 02/0/n5 Gross Generating Capacity: 565 MWE COM PONENT AND W'ELD EXAM I NATION IDENTIFICATION RECORDS CLASS I con't ISI ASME Xi Component Description Report Examination ISI Iso Category Results Recirculation RRA-1005 101076 PT, UT 1.2-22 B-J Accepted Manifold 'B' and Risers A,B,C,D RRB-J007 101078 PT, UT 1.2-22 B-J Accepted Reactor Head HSB-D001 101080 UT 1.2-23 B-D Accepted Spare HSB-D001 Inner Rad 101080 UT 1.2-23 B-D Accepted HSB-FLG-BOLTING 101081 VT-I 1.2-23 B-G-2 Accepted Reactor Head Vent HVA-FLG-101116 VT-I 1.2-24 B-G-2 Accepted BOLTING Standby Liquid LCA-F002 101082 PT 1.2-27 B-F Accepted Control LCA-J025 101083 PT 1.2-27 B-i Accepted LCA-J026 101084 PT 1.2-27 B-i Accepted LCA-J026A 101085 PT 1.2-27 B-J Accepted LCA-J027 101086 PT 1.2-27 B-J Accepted LCA-KO03A 101087 VT-3 1.2-27 F-A Accepted Reactor Vessel VIA-D001 101088 UT 1.2-28 B-D Accepted Instrument. N-I IA VIA-DOOI Inner Rad.
101088 UT 1.2-28 B-D Accepted Reactor Vessel VIC-DOOI 101089 UT 1.2-30 B-D Accepted Instrument. N-12A VIC-DOOI Inner Rad.
101089 UT 1.2-30 B-D Accepted Reactor Vessel VIF-D00I 101090 UT 1.2-34 B-D Accepted Instrument. N-16B VIF-D00I Inner Rad.
101090 UT 1.2-34 B-D Accepted VIF-F002 101091 PT 1.2-34 B-F Accepted Reactor Pressure GUIDE ROD BRT(0) 101095 VT-3 VS-01-28 B-N-I Accepted Vessel Internals SHROUD LEDGE 0-101095 VT-3 VS-02-11 B-N-I Accepted 180 SHROUD LEDGE 0-101095 VT-3 VS-02-11 B-N-2 Accepted 180 CORE PLATE 101095 VT-3 VS B-N-I Accepted 02<1>
TOP GUIDE 101095 VT-3 VS-04-01 B-N-I Accepted SAMPLE HOLDER-101095 VT-3 VS-01-31 B-N-I Accepted 108 DEG CLASS I PRESSURE TESTS Class I System STP 3.10.1-01 101092 VT-2 ISONO-P B-P Accepted Leakage Test


FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As Required by the Provisions of the ASME Code Rules SUPPLEMENT TO RFO 18  
FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As Required by the Provisions of the ASME Code Rules SUPPLEMENT TO RFO 18  


==SUMMARY==
==SUMMARY==
REPORT SUBMITTAL I.Owner: Interstate Power and Light Company, an Alliant Co.. P.O. Box 351.Cedar Rapids, IA 52406 *           .
REPORT SUBMITTAL I.Owner: Interstate Power and Light Company, an Alliant Co.. P.O. Box 351.Cedar Rapids, IA 52406 *
(Name and address of Owner)
(Name and address of Owner)
: 2. Plant: Duane Arnold Energy Center. 3277 DAEC Road. Palo, IA 52324 (Name and Address of Plant)
: 2. Plant: Duane Arnold Energy Center. 3277 DAEC Road. Palo, IA 52324 (Name and Address of Plant)
: 3. Plant Unit             1             4. Owner Certificate of Authorization (if required)                           N/A
: 3. Plant Unit 1
: 5. Commercial Service Date               02/01/75         6. National Board Number of Unit                             N/A
: 4. Owner Certificate of Authorization (if required)
N/A
: 5. Commercial Service Date 02/01/75
: 6. National Board Number of Unit N/A
: 7. Components Inspected Corrected Page (Part D, Page 3) is attached.
: 7. Components Inspected Corrected Page (Part D, Page 3) is attached.
Component or                   Manufacturer                 Manufacturer                   State or                     National Appurtenance   Apputennceor      or Installer IstalerSerial            or Installer No.               Province No.                   Board No.
Component or Manufacturer Manufacturer State or National Appurtenance or Installer or Installer Province No.
Reactor                 Chicago Bridge                     3-4833                       N/A                         3663 Pressure                         & Iron Vessel (RPV)
Board No.
Apputennceor IstalerSerial No.
Reactor Chicago Bridge 3-4833 N/A 3663 Pressure  
& Iron Vessel (RPV)
Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8.5 X 11 inches, (2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8.5 X 11 inches, (2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82) This form (E00029) may be obtained from the Order Dept., ASNIE, 345 E. 47th St., Newv York, N.Y 10010
(12/82) This form (E00029) may be obtained from the Order Dept., ASNIE, 345 E. 47th St., Newv York, N.Y 10010


FORM NIS-1 (back)
FORM NIS-1 (back)
: 8. Examination Dates         3/31/03     to   4/20/03       9. Inspection Interval from       11/01/96 to   11/01/05
: 8. Examination Dates 3/31/03 to 4/20/03
: 9. Inspection Interval from 11/01/96 to 11/01/05
: 10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.
: 10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.
Corrected Page (Part D, Page 3) is attached.
Corrected Page (Part D, Page 3) is attached.
: 11. Abstract of Conditions Noted N/A
: 11. Abstract of Conditions Noted N/A
: 12. Abstract of Corrective Measures Recommended and Taken N/A We certify that the statements made in this report arc correct and the examinations and corrective measures taken conform to the rules of the ASME Code, Section Xi.
: 12. Abstract of Corrective Measures Recommended and Taken N/A We certify that the statements made in this report arc correct and the examinations and corrective measures taken conform to the rules of the ASME Code, Section Xi.
Date     7ZL 7                   2005 I
Date 7ZL 7 2005 Signed
Signed      -/       -            I                                   By                   \Jnl     A             dk-Certificate of Authorization No. (if applicable)                 f/14                   Expiration Date_
-/
I I
By  
\\Jnl A dk-
Certificate of Authorization No. (if applicable) f/14 Expiration Date_
CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Iova and employed by HSB CT of Hartford CT have inspected the components described in this Owner's Data Report during the period 3/31/03 to 04/20/03, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code, Section Xl.
CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Iova and employed by HSB CT of Hartford CT have inspected the components described in this Owner's Data Report during the period 3/31/03 to 04/20/03, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Data Report. Furthermore, neither the Inspector, nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Data Report. Furthermore, neither the Inspector, nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date   21S                     2005
Date 21S 2005
___Commissions                                                                                   fi2 1>234, /LL/GZ Inspector's Signature                                                     National Board, State, Province and No.
___Commissions fi2 1>234, /LL/GZ Inspector's Signature National Board, State, Province and No.
* Note - Other owners are Central Iowa Power Cooperative and Corn Belt Power Cooperative.
* Note - Other owners are Central Iowa Power Cooperative and Corn Belt Power Cooperative.


THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT March 31, 2003 through April 20, 2003 Part D Page 3 of 4
THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT March 31, 2003 through April 20, 2003 Part D Page 3 of 4
: 1) Owners: Interstate Power and Light Company,         Central Iowa Power Cooperative      Corn Belt Power Cooperative an Alliant Company                       Marion, IA.                          Hlumbolt, IA.
: 1)
P.O. Box 351 Cedar Rapids, IA. 52406
Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.
: 2)   Plant: Duane Arnold Energy Center, Palo, IA. 52324                     3) Plant Unit: #l
Corn Belt Power Cooperative Hlumbolt, IA.
: 4)   Owners Certificate of Authorization (if required): N/A                   5) Commercial Service Date: 02/01/7
: 2)
: 6)   National Board Number of Unit: N/A                                       Gross Generating Capacity: 614 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS 2 ISI                                         ASME XI Component               Description                     Report Examination                 IS Iso       Category         Results Residual Heat           HEA-CA-I                       103065 UT                         2.1-01         C-A           Accepted Removal Heat Exchanger HEA-CB-2                       103066     MT                   2.1-01         C-B           Accepted UT                                                   Accepted HEA-CB-2 (Inner Rad)           103066 UT                         2.1-01         C-B           Accepted HEA-CC-7                       103067 MT                         2.1-01         C-C           Accepted VT-3                 2.1-01         F-A           Accepted HEA-CC-8 (04)                   103068 VT-3                       2.1-01         F-A           Accepted Residual Heat             RHA-CE009                       103069 MT                         2.2-32         C-C           Accepted Removal                                                               VT-3                                 F-A           Accepted RHA-CE027                       103070 VT-3                     2.2-32         F-A           Accepted RHB-CE050                       103071 VT-3                       2.2-33         F-A         Accepted, but replaced due to planned PWO RHE-CE036                       103072     VT-3                 2.2-36         F-A           Accepted RHF-CE078                       103073     VT-3                 2.2-37A         F-A           Accepted RHI-CE052                       103074     VT-3                 2.2-39         F-A           Accepted RHK-CE008A                     103075     VT-3                 2.2-41         F-A           Accepted RHM-CE005                       103076     VT-3                 2.2-43         F-A           Accepted High Pressure             HPA-CE016                       103077     VT-3                 2.2-44         F-A           Accepted Coolant Injection HPB-CE013                       103079     VT-3                 2.2-45         F-A           Accepted HPB-CE072                       103080     VT-3                 2.2-45         F-A           Accepted HPC-CE059                       103081     VT-3                 2.2-46         F-A           Accepted}}
Plant:
Duane Arnold Energy Center, Palo, IA. 52324
: 4)
Owners Certificate of Authorization (if required): N/A
: 6)
National Board Number of Unit: N/A
: 3) Plant Unit: #l
: 5) Commercial Service Date: 02/01/7 Gross Generating Capacity: 614 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS 2 ISI ASME XI Component Description Report Examination IS Iso Category Results Residual Heat HEA-CA-I 103065 UT 2.1-01 C-A Accepted Removal Heat Exchanger HEA-CB-2 103066 MT 2.1-01 C-B Accepted UT Accepted HEA-CB-2 (Inner Rad) 103066 UT 2.1-01 C-B Accepted HEA-CC-7 103067 MT 2.1-01 C-C Accepted VT-3 2.1-01 F-A Accepted HEA-CC-8 (04) 103068 VT-3 2.1-01 F-A Accepted Residual Heat RHA-CE009 103069 MT 2.2-32 C-C Accepted Removal VT-3 F-A Accepted RHA-CE027 103070 VT-3 2.2-32 F-A Accepted RHB-CE050 103071 VT-3 2.2-33 F-A Accepted, but replaced due to planned PWO RHE-CE036 103072 VT-3 2.2-36 F-A Accepted RHF-CE078 103073 VT-3 2.2-37A F-A Accepted RHI-CE052 103074 VT-3 2.2-39 F-A Accepted RHK-CE008A 103075 VT-3 2.2-41 F-A Accepted RHM-CE005 103076 VT-3 2.2-43 F-A Accepted High Pressure HPA-CE016 103077 VT-3 2.2-44 F-A Accepted Coolant Injection HPB-CE013 103079 VT-3 2.2-45 F-A Accepted HPB-CE072 103080 VT-3 2.2-45 F-A Accepted HPC-CE059 103081 VT-3 2.2-46 F-A Accepted}}

Latest revision as of 15:56, 15 January 2025

Inservice Inspection Report
ML052310453
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/29/2005
From: Vanmiddlesworth G
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NG-05-0420
Download: ML052310453 (159)


Text

N\\i_

Committed to Nuclear Excellence Duane Arnold Energy Center Operated by Nuclear Management Company, LLC July 29, 2005 NG-05-0420 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 Inservice Inspection Report In accordance with the requirements of Paragraph IWA-6230 of ASME, Section Xl, 1989 Edition/No Addenda and 10 CFR Section 50.55a(g), Nuclear Management Company, LLC (NMC) herewith submits the Refueling Outage (RFO) 19 Inservice Inspection Summary Report (Enclosure 1). This report addresses examinations that were performed at the Duane Arnold Energy Center (DAEC) during the time period from April 21, 2003 through May 3, 2005. Information regarding augmented inspections performed during RFO 19 is included in Enclosure 2. Enclosure 3 provides amended information from previously submitted RFO 17 and RFO 18 Summary Reports. These pages are being provided to correct minor errors that were identified on three pages of these reports.

As noted on Form NIS-1 included in the RFO 19 Summary Report, the third ten-year interval began on November 1, 1996 and will end on October 31, 2006. This end date has been changed from that shown on Form NIS-1 included with the RFO 18 Summary Report. The second ten year interval began on November 1, 1985 and had been previously extended in accordance with IWA-2430(d), resulting in an eleven year second interval. IWA-2430(d) states that interval adjustments shall not cause successive intervals to be altered by more than 1 year from the original pattern of intervals. Ending the third interval on October 3 2006 meets this requirement and is therefore allowed by IWA-2430.

Ga an Middlesworth Site Vice President, Duane Arnold Energy Center Nuclear Management Company, LLC Enclosures (3) cc:

Administrator, Region 1II, USNRC Project Manager, DAEC, USNRC Resident Inspector, DAEC, USNRC 3277 DAEC Road

  • Palo, Iowa 52324-9785 I

f4`7 Telephone: 319.851.7611

ENCLOSURE 1 TO NG-05-0420

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 ASME Section Xl Summary Report Duane Arnold Energy Center Refueling Outage 19 (Period 3)

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 DUANE ARNOLD ENERGY CENTER UNIT#I PALO, IOWA Commercial Service Date: February 1, 1975 THIRD TEN YEAR INTERVAL INSERVICE INSPECTION

SUMMARY

REPORT April 21,2003 through May 3, 2005 Dated:

July 28, 2005 OWNER:

ALLIANT ENERGY P.O. Box 351 Cedar Rapids, Iowa 52406 Prepared by-

=

)

Date:

A§ME Section XI Administrator Reviewed by:

-1 g/Al,/f" v

Date:

Program Engineering Staff Reviewed by:

bs Date:

Inspct n and Matea sor Concurred by-y Date:

P gram Engine g Manager

-7/?7

?-?-& -1)5--

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 This page intentionally blank

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 TABLE OF CONTENTS PART A

B C

D E

F G

H I

K DESCRIPTION Form NIS-I Certificate of Inservice Inspection Abstract Table of Component and Weld Examination Identification Records Table of Additional and Successive Examinations Identification Records Abstract of ASME Section XI Repairs and Replacements Form NIS-2's Abstract of Conditions Noted and Corrective Measures Taken ISI Figures and Isometrics Status of Work for Third Ten Year Interval Listing of Relief Requests and Code Cases Utilized PAGE NO.

Pages 1-2 Pages 1-3 Page 1 Pages 1-6 Page I Pages 1-3 Pages 1-75 Page I Pages 1-41 Pages 1-5 Page 1-2

THIRD TEN Y'EAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 This page intentionally blank

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part A, Page I of 2 FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As Required by the Provisions of the ASME Code Rules I.Owner: Interstate Power and Light Company, an Alliant Company. P.O. Box 351.Cedar Rapids, IA 52406 *

(Name and address of Owner)

2. Plant: Duane Arnold Energy Center. 3277 DAEC Road. Palo, IA 52324 (Name and Address of Plant)
3. Plant Unit 1
4. Owner Certificate of Authorization (if required)

N/A

5. Commercial Service Date 02/01 n5
6. National Board Number of Unit N/A
7. Components Inspected This report includes a Table of Contents (P1), Part A (PPI-2), Part B (PPI-3), Part C (P1), Part D (PP1-6), Part E (P1),

Part F (PP1-3), Part G (PP1-75), Part H (P1), Part I (PP1-41),

Part J (PP 1-5), and Part K (PP 1-2).

Component or Manufacturer Manufacturer State or National Appurtenance or Installer Province No.

Board No.

A ppurtenance or InstallerS erial N o._

Reactor Pressure Chicago Bridge 3-4833 N/A 3663 Vessel (RPV)

& Iron__

Refer to Part B, Pages 1-3, of this report for a continuation of components examined I _

I 1

T 4

4 4

4 4

4 4

4 4

4

.4.

.4.

4 4

1

4 4

4 1

4 4

4

'1'

+

4 4

4 4

4 4

4 4

4 4

4 4

4 4

+

4 4

4

+

4 I

1

.1-4 I

1 4

4 Note: Supplemental sheets in form of lists, sketches, ordrawings maybe used provided (I) size is 8.5 X II inches, (2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10010

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part A, Page 2 of 2 FORAM NIS-1 (back)

8. Examination Dates 4/21/03 to 5/03/05
9. Inspection Interval from 11/01/96 to 10/31/06
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.

Refer to Part C, Part D, and Part J.

I1. Abstract of Conditions Noted Refer to Part H.

12. Abstract of Corrective Measures Recommended and Taken Refer to Part H.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.

Date 2

2005 Signed y

l G tt~j X

\\LIN Amp;- 4 Certificate of Authorization No. (if applicable)

N/A Expiration Date N/A CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Iowa and employed by HSB CT of Hartford CT have inspected the components described in this Owner's Data Report during the period 4121/03 to 5/3/05, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Data Report.

Furthermore, neither the Inspector, nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date 7

- 7 2005.

? UCommissions A/

1519 :

Inspector's Signature National Board, State, Province and No.

  • Note - Other owners ate Central Iowa Power Cooperative and Corn Belt Power Cooperative.

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3,2005 Part B, page I of 3 I)

Owners: Interstate Power and iUght Company, Central Iowa Power Cooperative an Alliant Company Marion, IA.

P.O. Box 351 Cedar Rapids, IA. 52406

2)

Plant:

Duane Arnold Energy Center, Palo, IA. 52324

3) Plant I
4)

Owners Certificate of Authorization (if required): N/A

5) Comm
6)

National Board Number of Unit: N/A Gross Ge Corn Belt Power Cooperative Ilumbolt, IA.

Unit: #1 iercial Service Date: 02/01175 nerating Capacity 614 MWE CERTIFICATE OF INSERVICE INSPECTION COMPONENTS EXAMINED:

Reactor Pressure Vessel:

Manufacturer:

Chicago Bridge and Iron Post Office Box 13308 Memphis, TN 38113 National Board Number 3663, Mfr. Serial Number 3-4833 Refer to Part A, Page 1, form NIS-1, Owners Data Report for Inservice Inspections.

Piping:

Manufacturers, sizes, part numbers and locations are noted and traceable through the piping isometric and piping instrumentation drawings (P&ID). Installation contractor, fabricator, systems P&ID's and Isometric drawings are listed below.

Constructor:

Bechtel Power Co.

P.O. Box 3865 San Francisco, CA 94119 Fabricator:

Southwest Fabricating and Welding Co.

P.O. Box 9449 Houston, TX 77011

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3,2005 Part B, page 2 of 3 I)

Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

Corn Belt Power Cooperative Ilumbolt, IA.

2)

Plant:

Duane Amold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

National Board Number of Unit: N/A

3) Plant Unit: #1
5) Commercial Service Date: 02/01175 Gross Generating Capacity: 614 MWE CERTIFICATE OF INSERVICE INSPECTION COMPONENTS EXAMINED:

CLASS I Component Iso No Reactor Vessel 1.1-0813 VS-01-06/-07/-08 VS-0 I -22/-23/4 1 VS-12-01/-02 VS-13-02/-03 Reactor Vessel Stabilizers 1.1-10 Main Steam 1.2-03/-04 Feedwater 1.2-05/-06 Core Spray 1.2-07 High Pressure Coolant Injection 1.2-09 Control Rod Drive Return 1.2-12A&B Residual Heat Removal 1.2-16 Recirculation Pump 'A' Suction 1.2-19A Recirculation Manifold 'A' and Risers 'F' & 'G' 1.2-20 Recirculation Drain 'A' 1.2-21 B Recirculation Manifold 'B' and Riser 'D' 1.2-22 Jet Pump Instrumentation 1.2-26 Liquid Level Control 1.2-27 Reactor Vessel Instrumentation 1.2-29 lVVI

- Component Vessel Head Core Spray Brackets Feedwater Brackets Guide Rod Brackets Steam Dryer Brackets Surveillance Specimen Brackets Jet Pump Riser Support Pads Iso No VS-01-06 VS-01-26 VS-01 -27 VS-01-28 VS-01-29/-30 VS-01-31 VS-01-34

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part B, page 3 of 3 I)

Owners: Interstate Power and Light Company, C

an Alliant Company M:

P.O. Box 351 Cedar Rapids, IA. 52406

2)

Plant Duane Amold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

National Board Number of Unit: N/A CERTIFICATE 4 entral Iowa Power Cooperative arion, IA.

Corn Belt Power Cooperative Ilumbolt, IA.

3) Plant Unit: #1
5) Commercial Service Date: 02/0 if5 Gross Generating Capacity: 614 MAT'E OF INSERVICE INSPECTION COMPONENTS EXAMINED:

I IVVI Continued Component Iso No Shroud Ledge VS-02-1 I Peripheral Fuel Support Pieces VS-03-09 Top Guide VS-04-01 Sample Holder VS-10-02 Bottom Head CRD Housing Stub Tubes VS-12-01/-02 CLASS 2 Component Iso No There were no Class 2 component or weld examinations performed during this outage.

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part C, page I of 1

1)

Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Coopcrative Marion, IA.

Corn Belt Power Cooperative 1lumbolt, 1A.

2)

Plant Duane Arnold Energy Center, Palo, 1A. 52324

4)

Owners Certificate of Authorization (ifrequired): N/A

6)

National Board Number of Unit: N/A

3) Plant Unit #1
5) Commercial Service Date: 02/01/75 Gross Generating Capacity 614 MWE CERTIFICATE OF INSERVICE INSPECTION ABSTRACT:

The Inservice Inspection addressed in this report was performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI 1989 Edition, No Addenda, and the Duane Arnold Energy Center Updated Final Safety Analysis Report. The inspections were performed utilizing Non-Destructive Examination Techniques (i.e., UT, PT, MT, etc.). The examinations were conducted during the period of April 21, 2003 through May 3, 2005. The specific details and associated records of the examinations are on file at Duane Arnold Energy Center.

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 This page intentionally blank

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part D, page I of 6 Corn Belt Power Cooperative Hlumbolt, IA.

I)

Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

2)

Plant: Duane Arnold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

National Board Number of Unit N/A

3) PlantUnit: #1
5) Commercial Service Date: 02/01/75 Gross Generating Capacity: 614 MWE COMPONENT AND WVELD EXAMINATION IDENTIFICATION RECORDS CLASS I

'SI Component Description Report Examination Reactor Vessel IR215(02-19) 105002 UT ASME XI I R2 15(02-27)

I R215(42-27)

IR215(06-23)

IR215(10-1 1)

IR215(10-23)

IR215(14-07)

IR215(14-1I)

IR215(18-31)

IR215(22-03)

I R215(22-07)

IR215(22-11)

IR215(26-11)

IR215(26-31)

IR215(30-15)

IR215(30-31)

I R215(30-39)

IR215(34-11)

I R215(34-39)

I R215(34-07) 105003 105004 105125 105146 105147 105128 105129 105131 105132 105133 105134 105136 105137 105138 105139 105140 105144 105143 105141 UT UT VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I VT-I ISI Iso Category Results 1.1-08 B-O Accepted 1.1-08 B-O Accepted 1.1-08 B-O Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted 1.1-08 B-G-2 Accepted by Replacement CAP036901 VS-01-06 B-A Accepted HCC-B002 (HOLES 40-60)

HMC-B0O1 HMC-B002 HMC-B003 HMC-B004 HMC-B005 HMC-B006 HCC-C00I (HOLES 40-60)

HCC-C001 (HOLES 60-20)

HCA-B001 HMA-B001 HMA-B002 HMA-B003 HMA-B004 HMA-B005 HMA-B006 105069 UT 105070 UT 105071 UT 105072 UT 105073 UT 105074 UT 105075 UT 105076 UT MT 105076 UT MT 107078 UT 105079 UT 105080 UT 105081 UT 105082 UT 105083 UT 105084 UT VS-01 -06 VS-01 -06 VS-01 -06 VS-01 -06 VS-01-06 VS-01 -06 VS-01 -06 B-A B-A B-A B-A B-A B-A B-A Accepted Accepted Accepted Accepted Accepted Accepted Accepted VS-01-06 B-A Accepted VS-01 -07 VS-01 -07 VS-01 -07 VS-01 -07 VS-01 -07 VS-01 -07 VS-01 -07 B-A B-A B-A B-A B-A B-A B-A Accepted Accepted Accepted Accepted Accepted Accepted Accepted

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part D, page 2 of 6 Corn Belt Power Cooperative Humbolt, IA.

I)

Owners: Interstate Power and light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

2)

Plant Duane Amold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

National Board Number of Unit: N/A

3) Plant Unit: #1
5) Commercial Service Date: 02/01175 Gross Generating Capacity: 614 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS I Continued ISI ASME XI Component Description Report Examination 1ST Iso Category Results HMA-B007 105085 UT VS-01-07 B-A Accepted HMA-B008 105086 UT VS-01-07 B-A Accepted HMA-B009 105087 UT VS-01-07 B-A Accepted HCA-H002 105088 MT VS-01-08 B-K Accepted VSK-K001 105089 VT-3 VS-01-08 F-A Accepted VFA-E00I 105001 VT-2 VS-01-22 B-E Accepted VFA-E002 105001 VT-2 VS-01-23 B-E Accepted VCB-CO05 105090 UT VS-01-41 B-A Accepted VLB-AOO1 105093 UT VS-01-41 B-A Accepted VLB-A002 105094 UT VS-01-41 B-A Accepted VLC-B001 105095 UT VS-01-41 B-A Accepted VLC-B002 105096 UT VS-01-41 B-A Accepted VLD-B001 105097 UT VS-01-41 B-A Accepted VLD-B002 105098 UT VS-01-41 B-A Accepted BH-CRD 105001 VT-2 VS-12-01 B-E Accepted HSING/ST TUB BH-CRD STUB 105001 VT-2 VS-12-02 B-E Accepted TUBES BH-INCORE 105001 VT-2 VS-13-03 B-E Accepted HOUSING Reactor Vessel VSW-0 AZ 105158 MT 1.1-10 B-K Accepted Stabilizers VSW-180AZ 105159 MT 1.1-10 B-K Accepted VSW-180AZ 105159 VT-3 1.1-10 F-A Accepted VSW-270 AZ 105160 MT 1.1-10 B-K Accepted VSW-270 AZ 105160 VT-3 1.1-10 F-A Accepted VSW-90 AZ 105161 MT 1.1-10 B-K Accepted VSW-90AZ 105161 VT-3 1.1-10 F-A Accepted Main Steam MSC-D001 105005 UT 1.2-03 B-D Accepted MSC-D001 105005 UT 1.2-03 B-D Accepted INNER RADIUS MSD-DOOI 105007 UT 1.2-04 B-D Accepted MSC-D00I 105007 UT 1.2-04 B-D Accepted INNER RADIUS

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part D, page 3 of 6 I)

Owners: Interstate Power and Light Company, Central Iowa Power Cooperative Corn Belt Power Cooperative an Alliant Company Marion, IA.

liumbolt, IA.

P.O. Box 351 Cedar Rapids, IA. 52406

2)

Plant Duane Amold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): NIA

6)

National Board Number of Unit N/A

3) Plant Unit: #1
5) Commercial Service Date: 02/0115 Gross Generating Capacity: 614 MV'E COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS I Continued ISI ASME XI Component Description Report Examination ISI Iso Category Results Feedwater FWA-THERM SLV 105010 UT 1.2-05 R-A*

Accepted FWB-D001 105011 UT 1.2-05 B-D Accepted FWB-DOOI 105011 UT 1.2-05 B-D Accepted INNER RADIUS FWA-J003 105014 UT 1.2-05 R-A*

Accepted FWB-K032 105013 VT-3 1.2-05 F-A Accepted FWC-DOO1 105017 UT 1.2-06 B-D Accepted FWC-DOO1 105017 UT 1.2-06 B-D Accepted INNER RADIUS FWC-THERM 105018 UT 1.2-06 R-A*

Accepted SLEV FWD-DOOI 105019 UT 1.2-06 B-D Accepted FWD-DOOI 105019 UT 1.2-06 B-D Accepted INNER RADIUS FWC-J002 105021 UT 1.2-06 R-A*

Accepted FWC-J003 105022 UT 1.2-06 R-A*

Accepted FWC-JO05 EC05006 UT 1.2-06 R-A*

Accepted FWC-JO05 105023 UT 1.2-06 R-A*

Accepted FWC-J006 105024 UT 1.2-06 R-A*

Accepted FWC-J006 EC05006 UT 1.2-06 R-A*

Accepted FWC-K004 105025 VT-3 1.2-06 F-A Accepted FWC-K033 105026 VT-3 1.2-06 F-A Accepted FWD-J0 11 ECO5058 UT 1.2-06 R-A*

Accepted FWD-JO16 EC05059 UT 1.2-06 R-A*

Accepted Core Spray CSA-JOI1 105032 UT 1.2-07 R-A*

Accepted CSA-J012 105033 UT 1.2-07 R-A*

Accepted High Pressure PSA-JOOI 105034 UT 1.2-09 R-A*

Accepted Coolant Injection PSA-J004 105035 UT 1.2-09 R-A*

Accepted Control Rod Drive CRA-J032 105040 UT 1.2-12B R-A*

Accepted Return Residual Heat RHD-J008 105042 UT 1.2-16 R-A*

Accepted Removal RHD-J009 105043 UT 1.2-16 R-A*

Accepted Recirculation RCA-J012 105044 UT 1.2-19A R-A*

Accepted Pump 'A' Suction RCA-J021 105016 UT 1.2-19A R-A*

Accepted

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part D, page 4 of 6 Corn Belt Power Cooperative Ilumbolt, IA.

I)

Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

2)

Plant:

Duane Amold Energy Center, Palo, IA. 52324

4)

Owners Certificate ofAuthorization (if required): N/A

6)

National Board Number of Unit: N/A

3) Plant Unit: #1
5) Commercial Service Date: 02/01n5 Gross Generating Capacity: 614 MVE CONMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS I Continued ISI ASME XI Component Description Report Examination IS Iso Category Results Recirculation RRG-DOOI 105045 UT 1.2-20 B-D Accepted Manifold 'A' and Risers E, F, G & H RRG-DOO1 105045 UT 1.2-20 B-D Accepted INNER RADIUS RRG-F002 105048 UT 1.2-20 R-A*

Accepted RRG-J003 105049 UT 1.2-20 REA*

Accepted

'A' Recirculation RDB-J005 105053 UT 1.2-21B R-A*

Accepted Drain VT-2 Recirculation RRD-J005 105058 UT 1.2-22 R.A*

Accepted Manifold 'B' and Risers A, B, C & D Jet Pump JPB-DOOI 105061 UT 1.2-26 B-D Accepted Instrumentation JPB-DOO1 105061 UT 1.2-26 B-D Accepted INNER RADIUS Liquid Level LCA-D00I 105064 UT 1.2-27 B-D Accepted Control LCA-D00I 105064 UT 1.2-27 B-D Accepted INNER RADIUS Reactor Vessel VIB-D00I 105065 UT 1.2-29 B-D Accepted Instrumentation VIB-D001 105065 UT 1.2-29 B-D Accepted INNER RADIUS Reactor Vessel Vessel Head 105149 VT-3 VS-01-06 B-N-I Accepted Internals CSB Welds-2 100 CSB Welds-3300 FWB Welds NE -

3150 FWB Welds NW -

2250 GRB Welds-I 800 Guide Rod Brt-1800 DSB-2250 DSB-3150 DHB-2110 DHB-3290 SH Welds-2880-LW SH Welds-2880-UP 105149 105149 105149 VT-3 VT-3 VT-3 VS-01-26 VS-01 -26 VS-01 -27 B-N-2 B-N-2 B-N-2 Accepted Accepted Accepted 105149 VT-3 VS-0 1-27 B-N-2 Accepted 105149 105149 105149 105149 105149 105149 105149 105149 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-I VT-3 VS-01 -28 VS-01 -28 VS-01 -29 VS-01 -29 VS-01 -30 VS-01-30 VS-01-31 VS-01-31 B-N-2 B-N-I B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 B-N-2 Accepted Accepted Accepted Accepted Accepted Accepted Accepted Accepted

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part D, page 5 of 6 Corn Belt PowerCooperative Iumbolt, IA.

I)

Owners: Interstate Power and iUght Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

2)

Plant Duane Arnold Energy Center, Palo, IA. 52324

4)

Owners Certificate ofAuthorization (if required): N/A

6)

National Board Number of Unit N/A

3) Plant Unit: #1
5) Commercial Service Date: 02/01in5 Gross Generating Capacity 614 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS I Continued 1s5 ASME XI Component Description Report Examination IS Iso Category Results JPR-SUPP PAD-105149 VT-I VS-01-34 B-N-2 Accepted 1440 JPR-SUPP PAD-2520 SHROUD LEDGE 0°-180° CSS-PERIPH FUEL SUP TOP GUIDE SAMPLE HLDR-2880 105149 VT-I 105149 105149 VT-3 VT-3 VS-01-34 B-N-2 Accepted VS-02-11 B-N-I Accepted VS-03-09 B-N-2 Accepted VS-04-01 B-N-I Accepted VS-1 0-02 B-N-I Accepted 105149 VT-3 105149 VT-3
  • Risk-Informed process was used.

CLASS I PRESSURE TESTS ISI ASME XI Component Description Report Examination ISI ISO Category Results Class I Hydrostatic STP 3.10.1-02 105001 VT-2 ISONO-P B-P Accepted Pressure Test

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3,2005 Part D Page 6 of 6 Corn Belt Power Cooperative flumbolt, IA.

I)

Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

2)

Plant:

Duane Amold Energy Center, Palo, IA. 52324

4)

Owxners Certificate of Authorization (ifrequired): N/A

6)

NationalBoardNumberofUnit:

NIA

3) Plant Unit: #1
5) Commercial Service Date: o2 i n5 Gross Generating Capacity 614 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS 2 ISi ASME XI Component Description Report Examination 1SI Iso Category Results There were no Class 2 component or weld examinations performed during this outage.

CLASS 2 PRESSURE TESTS ISI ASME XI Component Description Report Examination ISI ISO Category Results Core Spray STP NS510002 103119 VT-2 ISONO-P C-H Accepted HPCI STP NS520001 105100 VT-2 ISONO-P C-H Accepted HPCI (Steam STP NS520003 105162 VT-2 ISONO-P C-H Accepted Tunnel Components)

Standby Liquid STP NS530001 104001 VT-2 ISONO-P C-H Accepted Control Main Steam STP NS830003 105102 VT-2 ISONO-P C-H Accepted Residual Heat STP NS490003 103118 VT-2 ISONO-P C-H Accepted Removal CRD Hydraulic STP NS550001 105157 VT-2 ISNO-P C-H Accepted IWE COMPONENTS

  • ISI Exam ASME XI Component Description Report Method ISI ISO Category Results Drycvell STP 3.6.1.1-01 105109 VT N/A E-A Accepted DRYWELL HEAD 105110 VT-3 N/A E-A Accepted DW INT 798'-805' 105111 VT-3 N/A E-A Accepted DW INT 776'-798' NW 105112 VT-3 N/A E-A Accepted DW INT 742'-757' SE 105113 VT-3 N/A E-A Accepted MOIST. BAR 742' SE 105114 VT-3 N/A E-D Accepted CRD BOLTS 105115 VT-I N/A E-G Accepted Torus TORUS INT (5,6,7,8) 105116 VT-3 N/A E-A Accepted ABOVE WATER LEVEL TORUS EXT (5,6,7,8) 105122 VT-3 N/A E-A Accepted TORUS BAYS 1-16 105123 VT-4 N/A E-C Accepted DW TO TORUS VENT NE 105124 VT-3 N/A E-A Accepted DW TO TORUS VENT#F 105148 VT-3 N/A E-A Accepted
  • Credited for Third Period of IWE Plan Interval

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part E, page I of I I)

Owners: Interstate Power and Light Company, C,

an Alliant Company M

P.O. Box 351 Cedar Rapids, IA. 52406

2)

Plant:

Duane Arnold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

NationalBoardNumberofUnit N/A crntral Iowa Power Cooperative larion, IA.

Corn Belt Power Cooperative Ilumbolt, IA.

3) Plant Unit: #I
5) Commercial Service Date: 02on7n5 Gross Generting Capacity 614 MWE ADDITIONAL EXAMINATION IDENTIFICATION RECORDS Class I Component Previous ISI ISI Report Examination ASME XI I

Results Examined Report Number Number I

F Category NO ADDITIONAL EXAMS WERE PERFORMED DURING THE THIRD PERIOD FOR THIS CYCLE SUCCESSIVE EXAMINATION IDENTIFICATION RECORDS Class I Component Previous ISI ISI Report Examination ASME XI Results Examined Report Number Category Number HCC-B002 101093 105027 UT B-A Acceptable (HOLES 2040)

RRF-F002 101068 105047 UT R-A Acceptable CRA-KO17AA 101051 105015 VT-3 F-A Acceptable

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part F, page I of 3 I)

Owners: Interstate Power and light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

Corn Belt Power Cooperative Ilumbolt, IA.

2)

Plant Duane Amold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

National Board Number of Unit: N/A

3) Plant Unit: #I
5) Commercial Service Date: 02101/ 75 Gross Generating Capacity 614 MWE ABSTRACT OF ASMIE SECTION XI REPAIRS AND REPLACEMENTS The repairs and replacements addressed in this report were performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 1992 with the 1992 Addenda (Ref. Relief Request NDE-RO 15 Rev. 1).

NIS-2 NO.

CLASS COMPONENT 19-03-01 2

SV4334B Containment Atmosphere Dilution N2 Supply Outboard Isolation 19-03-02 1

Spare Main Steam Safety Relief Valve Pilots 19-03-05 2

SV4333A Containment Atmosphere Dilution N2 Supply Inboard Isolation 19-03-06 1

Spare Main Steam Safety Relief Valve Pilot 19-03-09 2

M01055 Moisture Separator Reheat Steam Supply 19-03-10 2

IP216 & IP216A High Pressure Coolant Injection Pump 19-03-11 2

lP21IB Core Spray Pump 19-03-13 2

M04323A Containment Atmosphere Dilution Supply 19-03-14 1

PSV4401 Main Steam Relief Valve 19-05-01 2

CV1064 Main Steam Drain Isolation 19-05-02 2

1P211A Core Spray WORK DOCUMENT DESCRIPTION CWO A62771 Replaced Main Disc Assembly PO 19829 CWO A62941 PO 19829 CWO A64131 CWO A68176 CWO A63477 CW0 A63478 MWO 1126361 CWO A51965 PWO 1128061 CWO A67068 MWO 1126360 MWO 1130269 PWO 1127332 Spare Main Steam Safety/Relief Valves were repaired and tested Replaced Main Disc Assembly Spare Main Steam Safety/Relief Valve was repaired and tested Welded guide slots to improve alignment Installed piping supports for seal water piping Replaced pump seal with a design for higher temperatures Seal welded bonnet to body Pilot Valve S/N 201 was rotated in place of S/N 226 Removed and replaced seal weld on bonnet for valve disassembly Replaced pump seal with a design for higher temperatures Replaced pump seal in order to add a spacer Replaced snubber DA-53 with snubber DA-250 19-05-03 19-05-04 Pump 2

lP21IB Core Spray Pump 2

1P229A Residual Heat Removal Pump Torus Suction Line Snubber

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3,2005 Part F, page 2 of 3 Corn Belt Power Cooperative Ilumbolt, IA.

I)

Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

2)

Plant:

Duane Arnold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

National Board Number of Unit: N/A

3) Plant Unit: #1
5) Commercial Service Date: 02/10175 Gross Generxing Capacity: 614 MVE ABSTRACT OF ASME SECTION XI REPAIRS AND REPLACEMENTS (cont.)

The repairs and replacements addressed in this report were performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 1992 with the 1992 Addenda (Ref. Relief Request NDE-R015 Rev. l).

NIS-2 NO.

CLASS COMPONENT 19-05-09 1

Core Spray Dissimilar Metal Pipe Welds 19-05-10 1

Reactor Water Cleanup Dissimilar Metal Pipe Weld 19-05-11 1

DLA-6-H-8 and DLA-6-SS-13 Residual Heat Removal Piping 19-05-12 1

Control Rod Drives 19-05-13 2

M02112 'A' Core Spray Test Bypass 19-05-15 2

XS2618B Standby Liquid Control SQUIB 19-05-16 1

Control Rod Drives 19-05-17 1

Control Rod Drives 19-05-18 2

HCU Accumulators 19-05-19 2

CVI 064 Main Steam Drain Isolation 19-05-20 1

Reactor Recirculation Riser Dissimilar Metal Weld 19-05-21 1

Reactor Recirculation Riser Dissimilar Metal Weld WORK DOCUMENT PWO 1129011 &

CWO A67445 CWO A66243 &

PWO 1129234 MWO 1129050 PWOs 1129089-1129095 & CWO A067500 MWO A63071 PWO 1128161 PWOs 1129096-1129102 & CWO A067500 PWOs 1129104, 1129105, 129107, 1129114,1132803

& CWO A067500 PWOs 1132908, 1129109, 129108, 1132909, 129110, 1129113 & CWO A65092 CWO A54646 CWO A64843 CWO A64844 DESCRIPTION Ground the crowns from welds CSA-F002 and CSA-F004 Ground the crown from weld CUB-F004 Replaced bolt, nut, and added the clamp support bars on clamp hanger Replaced bolting and control rod drives at 06-23, 10-11, 10-23, 14-07, 14-11, 14-23, 18-31 locations Replaced valve disc Replaced explosive valve Replaced bolting and control rod drives at 22-03, 22-07, 22-11, 22-31, 26-11, 26-31, 30-15 locations Replaced bolting and control rod drives at 30-39, 34-07,34-39, 34-11, 30-31 locations Replaced HCU Accumulators at 02-19, 34-23, 10-23, 10-15, 30-39, 14-27, 42-23 locations Replaced CV1064 with a valve that has a heavier operator, and installed new supports Removed weld crown on RRF-F002 weld by Machining Removed weld crown on RRG-F002 weld by machining.

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part F, page 3 of 3 I)

Owners: Interstate Power and Light Company, Central Iowa Power Cooperative Corn Belt Power Cooperative an Alliant Company Marion, IA.

Hlumbolt, IA.

P.O. Box 351 Cedar Rapids, IA. 52406

2)

Plant Du3neAmoldEnergyCenter,Palo,IA. 52324

3) Plant Unit: #l
4)

Owners Certificate of Authorization (if required): N/A

5) Commercial Service Date: 02on 15
6)

NationalBoardNumberofUnit:

N/A Gross Generating Capacity-614MWE ABSTRACT OF ASMIE SECTION XI REPAIRS AND REPLACEMENTS (cont.)

The repairs and replacements addressed in this report were performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 1992 with the 1992 Addenda (Ref. Relief Request NDE-RO1 5 Rev. 1).*

NIS-2 NO.

CLASS COMPONENT 19-05-22 1

Reactor Recirculation Riser Weld 19-05-23 1

CRD Return Dissimilar metal Weld 19-05-25 1

PSV4400 Main Steam Relief Valve 19-05-26 1

PSV4402 Main Steam Relief Valve 19-05-27 1

PSV4405 Main Steam Relief Valve 19-05-28 1

PSV4406 Main Steam Relief Valve 19-05-29 1

PSV4407 Main Steam Relief Valve 19-05-30 1

PSV4401 Main Steam Relief Valve 19-05-31 1

PSV4407 Main Steam Relief Valve 19-05-32 2

12" HLE014 RHR Test Line 19-05-33 2

18" HLE023 Containment Vent 19-05-34 2

HLE0335 Drywell Cooling Well Water WORK DOCUMENT CWO A66133 PWO 1129048 PWO 1128060 PWO 1128063 PWO 1128066 PWO 1128067 PWO 1128068 PWO 1128062 PWO 1128069 CWO A71357 MWO 1132980 MWO 1133017 DESCRIPTION Blended arc strike on weld RRD-J005 Ground down weld crown on weld CRA-J032 Pilot Valve S/N 207 was rotated in place of SIN 218 Pilot Valve SIN 200 was rotated in place of S/N 189 Pilot Valve SIN 176 was rotated in place of SIN 141 Pilot Valve S/N 227 was rotated in place of S/N 203 Pilot Valve S/N 199 was rotated in place of S/N 202 Main Valve Body S/N 201 was rotated in place of S/N 141 Main Valve Body S/N 218 was rotated in place of SIN 202 Replace 18" length section of 12" diameter HLE014 Repaired containment vent piping to allow for containment thermal growth Removed Hanger HLE-35-SR-79 from HLE035 to allow for containment thermal growth

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part G, page I of 75 Corn Belt Power Cooperative Hlumbolt, IA.

I)

Owners: Interstate Power and Light Company, C

an Alliant Company M

P.O. Box 351 Cedar Rapids, LA. 52406

2)

Plant:

Duane Amold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (ifrequired): N/A

6)

National Board Number of Unit: N/A entral Iowa Power Cooperative arion, IA.

3) Plant Unit: #I
5) Commercial Service Date: 02/0 1175 Gross Generating Capacity: 614 MWE Form NIS-2's

FORM NIS-2 19-03-01 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1.

Owners Alliant Energy (Interstate P & L Name 2.

P. O. Box 35 1. Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit 04108/04 1

-Of 2

1-CWO A62771 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Nuclear Management Co. LLC Type Code Symbol Stamp None Name 3277 DAEC Road, Palo, IA 52324 Authorization No.

Expiration Date None None 4.

5.

Identification of System:

Containment Atmosphere Dilution, Class 11 (a) Applicable Construction Code ASME Section III 19 71 Edition S72 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda Code Case.

r6.

Identification of Compone ts Repaired or Re laced and Re lacement Components I

ASME Name of Name or Manufacturer Year Built

Repaired, Code Component Manuracturer Serial No.

National Other Identification Replaced,or Stamped (fanger No.)

Board No.

Replacement (YES or Main DisTargeRoc SIN22-Work OrderS 4

I Rt NO)

Mtain Disc Assy Target Rock S/N 22 N/A SV4334B 1987 Replacement No

7.

Description of Work:

8.

Tests Conducted:

Replaced Main Disc Assy, P/N 200442-1 in SV4334B on CWO A62771 Hydrostatic

[i Pneumatic

[]

Nominal Operating Pressure Other =

Pressure N/A psi Test Temp N/A F

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) Trhis lForm (E00030) maybe obtained from the Order Dept., ASME, 345 E. 47th St., NewYork, NY 10017.

FORM NIS-2 19-03-01 FORM NIS-2 (Back)

9.

Remarks:

Valve disassembled due to LLRT failure. Main Disc Assy. P/N 200442-1 replaced and valve reassembled. No pressure test reqir*4per ASME Repair Repacement Administrative Document Section 5.1.1 3d.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Replacement (repair or replacement)

Type Code Symbol Stamp Certificate of Authorizati n No.

Signed (Fz:A None None Expiration Date 6'.,

TL Equipment Reliability Date NIA 991//

2004

=

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period

___3

-_-_to C/-

(-/

4

,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Ownier's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shiall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

I c s n Inspector's Signature Conunissions National Board, State, Province, anti Endorsements Date C/-e

, 2004 Date 200

FORM NIS-2 19-03-02 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi

1.

Owners Alliant Energy (Interstate P & L Co.)

Name 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit 07/14/03 I

of 2

I PO 19829 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Nuclear Mai Name 3277 DAEC Road, Palo, IA 5232 ianement Co. LLC Type Code Symbol Stamp Authorization No.

24 Expiration Date None None None 4.

5.

Identification of System:

Spare Main Steam Safety Relief Valve Pilots (Class 1)

(a) Applicable Construction Code ASME,Section III 19 68 Edition W68 Addenda N/A Code Case.

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92

6.

Identuicauon o

mlomponenis Repaired or Re laced and K placement Components ASME Name of Name or Manufacturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or NO)

.Pilot Disc Target Rock SIN 358

-NA sparc Pilot (SIN 176)

Unknown Repair No

'stage Disc Target Rock S/N 15 N/A Spare Pilot (S/N 176)

Unknown Repair No jPreload Spacer Target Rock S/N 8 N/A Spare Pilot (S/N 176)

Unknown Repair No Pilot Disc Target Rock S/N 615 NIA Spare Pilot (SIN 199)

Unknown Repair No 2"d Stage Disc Target Rock S/N 50 N/A Spare Pilot (SIN 199)

Unknown Repair No Preload Spacer Target Rock SIN 575 N/A Spare Pilot (SIN 199)

Unknown Repair No Pilot Disc Target Rock SIN 390 N/A Sparm Pilot (S/N 227)

Unknown Repair No 2-' Stage Disc Target Rock S/N 16 NIA Spare Pilot (S/N 227)

Unknown Repair No Preload Spacer Target Rock S/N 574 N/A Spare Pilot (S/N 227)

Unknown Repair No Pilot Disc Target Rock S/N 619 N/A Spare Pilot (SIN 207)

Unknown Repair No 2" Stage Disc Target Rock S/N 73 N/A Spare Pilot (S/N 207)

Unknown Repair No Preload Spacer Target Rock S/N 1037 N/A Spare Pilot (S/N 201) 1999 Replace No Pilot Disc Target Rock S/N 625 N/A Spare Pilot (S/N 201) 1993 Replace No 2-Stage Disc Target Rock

- SIN 536 N/A Spare Pilot (S/N 201) 1993 Repair No

7.

Description of Work:

Spare Main Steam Safety/Relief Valves were repaired and tested at NWS facilities

8.

Tests Conducted:

Hydrostatic

[.

Pneumatic

[j, Nominal Operating Pressure Other [

Pressure psi Test Temp F

  • These are spare pilot valves.

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-03-02 FORM NIS-2 (Back)

9.

Remarks:

Pilot Valves (S/N's 176. 199. 201, 207. 227) were removed during RFOI7 and sent to NWS Tech. for testing And refurbishment. During the refurbishment it was necessary to machine the pilot discs.

2'd stane discs and preload spacers for S/N's 176. 199. and 227. The pilot disc and 2tnd stage disc were machined on S/N 207.

PT exams were successfully performed on the machined surfaces for the above discs and spacers. The pilot disc and preload spacer were replaced on S/N 201. and preservice VT-3s were performed on the parts prior to shipping the items to NWS. The new 2n staye disc for S/N 201 was machined, and successful PT was performed on the machined surface. The preload spacer and the pilot stem were drilled and pinned together for SIN 201. After the above mentioned repairs, all five valve pilots were tested and found to have three successive tests that were acceptable.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair/Replacement (repair or replacement) conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp None Certificate of Authorization No.

None Expiration Date N/A Signed a

Sup. Equipment Reliability Date

& e'u

/3 2003 Owner f Owner's Designee, Title 200 I

CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period y-/o-c,3 -

to

_3

_on

,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code;Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions

/VP, J;?-),1 a4,

/y A,.r,--

Inspector's Signature National Board, State, Province, and Endorsements Date R -1

,2

, 2003

FORM NIS-2 19-03-05 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1.

Owners Alliant Energy (Interstate P & L)

Name 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant

-Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit 04/08/04 1

Of 2

1 CWO A62941 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Nuclear Mat Name 3277 DAEC Road, Palo, IA 5232 iageement Co. LLC Type Code Symbol Stamp Authorization No.

A4 Expiration Date None None None 4.

5.

Identification of System:

Containment Atmosphere Dilution, Class II (a) Applicable Construction Code ASME Section III 19 71 Edition S72 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda Code Case.

6.

Identificati on of Components Repaired or Re laced and Re placement Components ASME Name of Name of Manufacturer YearBuilt

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped (1(anger No.)

Board No.

Replacement (YES or

_workOrder/SUS l

NO)

Main Disc Assy Target Rock SIN 14 N/A SV4333A 1999 Replacement No

7.

Description of Work:

Replaced Main Disc Assy, P/N 200442-1 in SV4333A on CWO A62941

8.

Tests Conducted:

Hydrostatic

[

Pneumatic

[I]

Nominal Operating Pressure Other E Pressure N/A psi Test Temp N/A

° F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (l) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-03-05 FORM NIS-2 (Back)

9.

Remarks:

Valve disassembled due lo LLRT failure. Main Disc Assy. P/N 200442-1 replaced and valve reassembled. No prlessure test required per ASME Repair Repacement Administrative Document Section 5.1.1 3d.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Replacement (repair or replacement)

Type Code Symbol Stamp None Certificate of Authorizatioy No.

None Expii Signed 60 9

TL Equipment Reliability Date

-ation Date N/A Il,/ /u 2004 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IiSB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period z-- )j -_ 6 3 to (4-q- 0 i

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions AVA r'i%

X F..

/ i9

-i Inspector's Signature Date A-I National Board, State, Province, and Endorsements

, 2004

FORM NIS-2 19-03-06 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1.

Owners Alliant Energy (Interstate P & L Co.)

Name Date 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 10/22/03 1

of 2

1 PO 19829 Repair Organization to P. O. No., Job No., etc.

3.

Work Performed by Nuclear Mai Name 3277 DAEC Road, Palo, IA 5232

,iapement Co. LLC Type Code Symbol Stamp Authorization No.

24 Expiration Date None None None

  • 4.

5.

Identification of System:

Spare Main Steam Safety Relief Valve Pilot (Class 1)

(a) Applicable Construction Code ASME,Section III 19 68 Edition W68 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.

r6.

Identilicatlon ot Components Repaired or Relaced and Keplacement Components ASME Name of Name of Manufacturer Year Built

Repaired, Code Component M1anuracturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or NO)

Pilot Disc Target Rock SIN 269 N/A Spare Pilot (S/N 200)

Unknown Repair No 2 Stage Disc Target Rock S/N 85 N/A Spare Pilot (SIN 200)

Unknown Repair No Pilot Base Target Rock N/A Spare Pilot (SIN 200)

Unknown Repair No

7.

Description of Work:

SR a

Spare Main Steamn Safety/Relief Valve 'was repaired and tested at NWS facilities

8.

Tests Conducted:

Hydrostatic

[j]

Pneumatic

[I]

Nominal Operating Pressure EZn Other.

Pressure psi Test Temp F

  • This is spare pilot valve.

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) maybe obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-03-06 FORM NIS-2 (Back)

9.

Remarks:

Pilot Valve (S/N 200) was removed duriniz RFO18 and sent to NWS Tech. for testineg And refiurbhhment liirine the refiirhishment it was n ecTrv tn maihine the plilnt disc 2"d stane disc and weld a new seat into the base of the pilot. PT exams were successfully performed on the machined and welded surfaces.

CERTIFICATE OF COMPLM We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section Xl.

Type Code Symbol Stamp None Certificate of Authorization No.

None Expi Signed Sup. Equipment Reliability Date Ownl~r or Owner's Designee, Title (repair or replacement) ration Date e

DCf N/A 2003 I

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Corn.

have inspected the components described in this Owner's Report during the period C- /q-M63 to AD -)Vy o3:

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions V

I)3)A.i.

I. /q(,

-PX Inspector's Signature National Board, State, Province, and Endorsements Date 1d-q.-/

,2003

FORM NIS-2 19-03-09 Rev. I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi I.

Owners Alliant Energv (Interstate P & L Co.)

Name

'Date 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 7/2 1105 I

of 2

I CWO A64131 and CWO A68176

.1 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Nuclear Mar Name 3277 DAEC Road, Palo, IA 5232 inaement Co. LLC Type Code Symbol Stamp Authorization No.

_4 Expiration Date None None None 4.

5.

Identification of System:

Main Steam Line Second Stage Reheat (a) Applicable Construction Code ANSI B31.1 19 67 Edition N/A Addenda NIA Code Case: I (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92

6.

Identification 0f Components Repaired or Ke paced and Re lacement Components ASMiE Nameof Name of Manufacturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or N101055 Flowservc Corp.

X00256888 N/A NMSR IE8A 2< Stage Rchcat 2001 Repaired No Stm Supply

7.

Description of Work:

Welded guide slots to improve alignment. Machined bore to clean up scratches from stem.

.1

8.

Tests Conducted:

Hydrostatic z

Pneumatic 0

Nominal Operating Pressure I 4%ZV-Other El Pressure 968 Psi Test Temp 552

° F I

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

L-LUL FORNI NIS-2 19-03-09 Rev. I FORM NIS-2 (Black)

9.

Remarks:

Welded disc guide slots to obtain the proper clearance P'erformed visuatexaii under work orderA64 13 1.

Successful surface exam was perfonned on the welded areas of the disc Guide slots under work order A68 176.

Machined bonnet bore to remove rough surfaces caused by stem calling. Machined area of bonnet bore was not accessible for a surface exam. VT-2 of the valve was successfullv pe{formoed durino plant startup(C94O Oob).

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair (repair or replacement) conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp None Certificate of, tho jon No.

None Expiration Date N/A Signed Sup. Equipment Reliability Date 7C' Z Z 2005 rOwne(Sr Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period

.) a -

To 7-,2?- Oh

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthennore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions JJ 0 via (

/44(

A Inspector's Signature National Board, State, Province, and Endorsements Date 09

)

, 2005 I

FORM NIS-2 19-03-10 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1.

Owners Alliant Energy (Interstate P & L Co.).

Name Date 2.

P.O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 1/10105 1

of 2

1 PWO A63477 and A63478 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Nuclear Mar Name 3277 DAEC Road, Palo, IA 5232 ianement Co. LLC Type Code Symbol Stamp

'Authorization No.

24 Expiration Date None None None

4.

Identification of System:

High Pressure Coolant Injection'

5.

(a) Applicable Construction Code ASME Draft P & V 19 68 Edition N/A Addenda N/A Code Case:

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92

6.

Identification of Components Repaired or Re laced and Re placement Components ASME Name of Name of Mbanuracturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or 1P216 Byron Jackson 691S1050 N/A ttPCI Main Pump 1970 Rcpaired No I P216A Byron Jackson 691S 1051 NIA HPCI Booster Pump 1970 Repaired No

__t__

7.

Description of Work:

Installed piping supports for seal water piping on main and booster pump flanges.

S.

Tests Conducted:

Hydrostatic C

Pneumatic'

[]

Nominal Operating Pressure EZ Other =

Pressure NA*

Psi Test Temp NA*

OF

  • Pressure testing not required by IWA4710 since welds did not penetrate through the pressure boundary.

NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 12 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-03-10 FORM NIS-2 (Back)

9.

Remarks:

Seal lines to I P216, HPCI main pump and I P21 6A. lPCI booster pump were rerouted for easier maintenan, This required two existing cyclone separator supports on I P216 to be ground off of the pump flange. and two larger supports were welded back onto the pump flange. The welds successfully passed surface exams. Also, welded two supports for cyclone separators on IP216A pump flange. Those welds successfully passed surface exams.

Machined area of pump flange to permit threading of a larger seal flush line fitting into the seal flange, This area was accessible for a surface exam. A PT exam was performed with no indications. Pressure testing was not required since the welding the supports onto the components did not penetrate through the pressure boundary of the components. as described in IWA4710.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair (repair or replacement) conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp None Certificate of Authorizan

o.

None Expiration Date N/A Signed Sup. Equipment Reliabilit Date j41Cv'"t &D4 2005 wner o0 wner's Designee, Title Ii CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period

- _-9

- 0(/

To 3 -?i-5

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shalt be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions A

) 1 4 A ' i

/'N, Z9 Inspector's Signature National Board, State, Province, and Endorsements Date 3 -,20

, 2005

FORM NIS-2 19-03-1_i1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1.

Owners Alliant Energy (Interstate P & L Co.)

Name Date 2.

P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 419/04 I

of 2

MWO 1126361 Repair Organization to P. O. No., Job No., etc.

3.

Work Performed by Nuclear Manaeement Co. LLC Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

C (a) Applicable Construction Code

'ore Spray ASME Draft P & V 19 68 Edition N/A Addenda N/A Code Case:

N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92

-6.

Identilication of Components Repaired or K elaced and Re lacement Components ASME Name of Name Of Manufacturer Year Built

Repaired, Code (Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YVES or

.rcal Gland FlowScrve R1SA04765 N/A 11'21 1 B Core Spray Pump 2003 Replacement No Seat Gland Cap Texas Bolt IIT# 90940 N/A I1P2`1 IB Core Spray Pump 1995 Replacement No Screw s

7.

I)escription of Work:

Replaced pump seal with a design for higher temperatures X.

Tests Conducted:

Hydrostatic j

Pneumatic

[]

Nominal Operating Pressure X-T Other EII Pressure 295 I'si Test Temp 76.9 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings maybe used, provided (I) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top olfthis form.

(I2;'S2) This Form (E00030) may be obtained from the Order Dept.. ASNI., 345 E. 471h St.. New York, NY 10017.

FORM NIS-2 19-03-1 1 FORM NIS-2 (Back)

9.

Remarks:

R

_plc Ipumn seat with larger seal designed for higher temperatt re application. Replaced cap screws since new seal is larger. and therefore requires longer cap screws Successfull performed VT-2 exam after installation.

CERTIFICATE OF COB We certify that the statements made in the report are correct and this conforms to the nrles of the ASME Code, Section Xi.

Type Code Symbol Stamp None 4PLIANCE Replacement (repair or replacement)

Certificate of Authoratio-No.

Signed

, LLze>e4=t e

'Otner o None Expiration Date N/A Sup. Equipment Reliability Date r6%wvner's Designee, Title

.62L1,i

/3.

2004 I/

/

CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Ilartford, Conn.

have inspected the components described in this Owner's Report during the period 3 - /--Oct To t-4/4 *e

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions AM)

)XV?9/1-v -r-.

Inspector's Sigllnature National Board, State, Province, antd Endorsements Date Lj-l c

200

, 2004

FORM NIS-2 19-03-13 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi

1.

Owners Alliant EnerEgy (Interstate P & L Co.)

Name Date 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address SI eet Unit 4/13/04 I

of 2

1 CWO A51965 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Nuclear Mai Name 3277 DAEC Road, Palo, IA 5232 iagement Co. LLC Type Code Symbol Stamp Authorization No.

24 Expiration Date None None None 4.

5.

Identification of System:

Containment Atmosphere Dilution (a) Applicable Construction Code ASME Section III 19 71 Edition NIA (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda NIA Code Case:

0.

Identilication of Cornponents Repaired or Re laced and K lacement Components ASME Name of Name of Manufacturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YFS or 1104323ARockwell KA034 NA A CAD SUPI'LY PCV INLET Unknown Repaired No Edwards

7.

Description of Work:

Seal welded bonnet to body and bonnet to motor flange.

8.

Tests Conducted:

Hydrostatic I

Pneumatic E

Nominal Operating Pressure Other =

Pressure Psi Test Temp NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(I 2/Z2) This Form (E00030) may be obtained from the Order Dept., ASNE, 345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-03-13 FORIMI NIS-2 (Back)

9.

Remarks:

Disassembled valve bonnet. During re-assembly seal welded bonnet to bod 1and bonnet to the motor flange.

Successful surface exams were performned on both welds.

CERTIFICATE OF COMIPLIANCE We certify that the statements made in the report are correct and this conforms to the riles of the ASME Code,Section XI.

Repair (repair or replacement)

Type Code Symbol Stamp None Certificate of AuthorizatimnNl.

None Expii

7.

1 Signed i

6L4.--

./c-Sup. Equipment Reliability Date

\\

%Wiir or Q'(ner's Designee, Title iation Date N/A A,~~p13.

2004 is I

CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period it - ? y. o03 To L(- My. ot/

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions YA Q1341.

t VCq,

2/'

National Board, State, Province, and ]Endorsements Inspector's Signature Date

-/ 4 -0 Li 20

, 20041

FORM NIS-2 19-03-14 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME. Code Section XI I.

Owners Alliant Eneryv (IES Utilities)

Name Date 2.

P'. 0. Box 351. Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 03/31/05 I

Of 2

PWO 1128061 Repair Organization to P. 0. No.. Job No., etc.

3.

Work Performed by Nuclear Mat Name 3277 DAEC Road, Palo, IA 5232 iagement Co I.LLC Type Code Symbol Stamp Authorization No.

24 Expiration Date None None None 4.

5.

Identification of System:

Main Steam Safety Relief Valve (Class I)

(a) Applicable Construction Code ASME III 19 68 Edition W68 Addenda NIA Code Case.

(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Identification of Components Repaired or Replaced and Replacement Components 6.

AS,,

Name of Name of Manufacturer Year Built

Repaired, Code Componient Manufacturer Serial No.

National Other Identificalion Replaced. or Slamped (langer No.)

Board No.

Replacement (YFS or Work Order/ SUS NO)

Pluto Valc Tarect Rock S/N 201 N/A PW0 1 129061 /83.04 1976 Replacement Yes I~~~

I.-II 4-

.t

+

+

4-4-

4-4 4

4

+

4

+

4-4 4

4 4

4 4-4-

4 4

4 4-4 4-

7.

Description of Work:

The Pilot Valve was repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of S/N 226.

8.

Tests Conducted:

Hydrostatic E

Pneumatic El Nominal Operating Pressure EJ1 Other

]

Pressure 955 psi Test Temp 514 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-03-1.t FORM NIS-2 (Black)

9.

Remarks:

Pilot Valve S/N 226 was removed and pilot valve S/N 201 was installed. Prior to installation SiN 201 was repc and documented on NIS-2 (19-03-02). A VT-2 (1 03064) was completed on the mechanical connection and found acceptaible.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the nmles of the ASME Code, Section Xi.

Replacement (repair or replacement)

Type Code Symbol Stamp Certificate of Authorization No.

Signed

' r None None Expiration Date N/A cc, Tl Equipment Reliability Date 7;T4Ly

/G&

2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB3 CT of I lartford, Conmi.

have inspected the components described in this Owner's Report during the period cl-O xf

- 03 to 7_

- o and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASlME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warrant), expressed or implied, concening the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions Inspector's Signature Iv3 O 5 Aqlv&

/q 1e 1

National Board, State, Province, and Endorsements Date

,2005 Date 200

FORM NIS-2 19-05-01 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1.

Owners Alliant Energy (GES Utilities)

Name 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit January 10, 2005 I_ _

of 2

A67068

3.

Work Performed by Nuclear Management Co. LLC.

Name 3277 DAEC Road, Palo, IA 52324 Repair Organization to P. 0. No., Job No., etc.

Type Code Symbol Stamp None Authorization No.

None Expiration Date None

4.

Identification of System:

Main Steam

5.

(a) Applicable Construction Code ANSI B3 1.1 19 67 Edition NA Addenda (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-92A

6.

Identification of Components Repaired or Replaced and Replacement Components NA Code Case.

ASME Nameao Name of Manufacturer Year

Repaired, Code Component Manufacturer Serial No.

National Board Other Identification Built Replaced, or Stamped No.

Replacement (YES or E4 NA NA__9_8 NO CV 1064 Anchor Darl ing EA748-l NA NA 1988 ReardNo

7.

Description of Work:

Removed and replaced seal weld on bonnet for valve disassembly

8.

Tests Conducted:

Hydrostatic M

Pneumatic

[a Nominal Operating Pressure Li1 Other M Pressure NA*

psi Test Temp NA*

0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME,345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-05-01 FORM NIS-2 (Back)

9.

Remarks:

Valve was disassembled an internal components were replaced. No pressure boundary components were replaced. Valve bonnet requires a seal weld to be removed and installed after disassembly and reassembly.

Surface exam was successfully completed on the body to bonnet seal weld. Pressure test was not necessary since IWA47 10 does not require pressure testine seal welds.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section Xl.

Repair (repair or replacement)

Type Code Symbol Stamp None Certificate of Authoriz on No.

None Expiration Date Signed

%ll,'.,,t&N GLEquipmentMonitoring Date I U

(

vwer or O)wner's Dleisynee-1itle N/A Q.o 2005 13 1

I -, "-. - -

CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Cona.

have inspected the components described in this Owner's Report duringtheperiod V 7/ -04 to

/A/2 -cs"

, andstatethattothebest of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions National Board, State, Province, and Endorsements Inspector's Signature Date 2005

FORM NIS-2 19-05-02 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1.

Owners Alliant Energy (Interstate P &: 1, Co.)

Name 2.

P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit 1/10/05 I

of 2

MWO 1126360 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Nuclear Management Co. LLC Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Core Spray (a) Applicable Construction Code ASME Draft P & V 19 68 Edition N/A (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case:

6.

Identification of Components Repaired or Re laced and Replacement Components ASMIE Nameof NameoF Manufacturer Year Built

Repaired, code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or Seal Gland FlowServe RLSAO4764 N/A IP21 IA Core Spray Pump 2003 Replacement No Seal Gland Cap Texas Bolt HT # 90940 N/A I P21 IA Core Spray Pump 1995 Replacement No Screws

7.

Description of Work:

Replaced pump seal with a design for higher temperatures

8.

Tests Conducted:

Hydrostatic Cl Pneumatic E

Nominal Operating Pressure Other [

Pressure 302 Psi Test Temp 96.2 a F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-05-02 FORM NIS-2 (Back)

9.

Remarks:

Replaced pump seal with larger seal desiened for higher temperature application. Replaced cap screws since new seal is larer, and therefore requires loneer can screws Successfuliv performed VT-2 exam after installation.

CERTIFICATE OF COMPLIANCE I We certify that the statements made in the report are correct and this Replacement (repair or replacement)

Il conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp Certificate of Autho' tion No.

Signed None None Expiration Date N/A Sup. Equipment Reliability Date

/0, 2005 Owner[6r Owner's Designee, Title I

Q, CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period

- /J

- 0 Li To

/ - /A - V I

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Inspector's Signature Commissions N at i n l

State,

/P i q (, E d env National Board, State, Province, and Endorsements Date 1 -

/

20

, 2005

FORIM NIS-2 19-05-03 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi

1.

Owners Alliant Energy (Interstate P & L Co.)

Name Date P. O. Box 351, Cedar Rapids, IA 52406 Address Sheet 1/10/05 I_ _

of 2

2.

Plant Duane Arnold Energy Center Name Unit 3277 DAEC Road, Palo, 1A 52324 Address MWO 1130269 Repair Organization to P. O. No., Job No., etc.

3.

Work Performed by Nuclear Management Co. LLC Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Core Spray (a) Applicable Construction Code ASME Draft P & V 19 68 Edition N/A (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case:

r6.

Identification 0! Components Repaired or Rel Iaced and Re lacement Components ASAIE Name of Name of Manufacturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replaement (YES or NO)

Seal Gland FlowServe RLSA04763 N/A I P21 I B Core Spray Pump 2003 Replacenent No

7.

Description of Work:

Replaced pump seal in order to add a spacer

8.

Tests Conducted:

Hydrostatic a

Pneumatic E

Nominal Operating Pressure Other [jj Pressure 293 Psi Test Temp N/A

° F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 471h St., New York, NY 10017.

FORM NIS-2 19-05-03 FORM NIS-2 (Back)

9.

Remarks:

Replaced pump seal after addine a spacer. Spacer was required to obtain rood fit for seal. Old seal was removed pae asrqod i

o sa.Od elws

=eoe because the set screw was jammed, and seal could not be removed without damaoing the seal. Successfully performed VT-2 exam after installation of new seal.

=

CERTIFICATE OF COMPLIANCE We certify that the statements made in tile report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp None Certificate of Authoriz I No.

None Expiration Date N/A Signed 06X Sup. Equipment Reliability Date 1 (0, 2005 xOvner ouIwncr's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conti.

have inspeefoA the components described in this Owner's Report during the period

//- /7 -oY To

/

0* v

-5O

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

II Commissions AJ5 I2302z41V -Z.

Inspector's Signature Date

/- d v National Board, State, Province, and Endorsements

,2005

FORM NIS-2 19-05-04 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1.

Owners Alliant Energy (Interstate P & L Co.)

Name Date 2.

P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 3/12/05 I

of 2

I PWO 1127332 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Nuclear Management Co. LLC Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Residual Ifeat Removal (a) Applicable Construction Code ANSI B31.7 19 69 Edition 71 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Identification of Components Repaired or Replaced and Replacement Components Addenda N/A Code Case:

6.

I AS'ME Name of Name of Manufacturer Year Built

Repaired, Code Component Mlanufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or NO)

I P-229A Torus Bergen-DA-250 N/A IIBB-024-SS-222 N/A Replacemnent No Suction ine Patterson Snubber I

I__.

I _

_ I

_ I

_ I I

7.

Description of Vork:

Replaced snubber DA-53 with snubber DA-250 due to end of seal life.

S.

Tests Conducted:

Hydrostatic j

Pneumatic E

Nominal Operating Pressure w_7_

Other Pressure N/A Psi Test Temp N/A OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

. 11.

FORM NIS-2 19-05-04 FORMI NIS-2 (Back)

9.

Remarks:

Snubber DA-53. located at 1IBB-024-SS-2221 had reached the end of seal life and was replaced with DA-250.

This snubber (DA-53) passed the visual and functional tests. The snubber (DA 250) was rebuilt under PWO 1124686. No load bearing parts were repaired or replaced during rebuild. Successfully performed VT-3 exam (Rpt # P05032) after installation of replacement snubber.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Replacement (repair or replacement)

Type Code Symbol Stamp Certificate of Authorization No.

Signed 10 V None None Expiration Date Sup. Equipment Reliability Date V //WO S NIA 2005 Owner or Owner's Designee, Title II CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period 1L -1/ -6o To 3- /6-O5

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions atio

/o3;, S4te Po, ad Enre National Board, State, Province, and Endorsements Inspector's Signature Date 3 >l

, 2005 Date 2005

FORM NIS-2 19-05-09 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Owners Alliant Energv (JES Utilities)

Name Date 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 4/16/2005 1

of 2

PWO 1129011 and CWO A67445 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Energv (IES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Core Spray Piping (a) Applicable Construction Code ANSI B31.7 Class 1 19 69 Edition 70 Addenda NIA Code Case.

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92

6.

Identification o Components Repaired or Re laced and Ke lacement Components ASME Name of Name of Manufacturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped l

Board No.

Replacement (YES or l__NO)

DCA-008 Bechtel Corp..

NA N/A Core Spray Dissimilar Metal 1974 Repair No Pipe Welds

7.

Description of Work:

Ground the crowns from welds CSA-F002 and CSA-F004 to improve UT examination of weld.

8.

Tests Conducted:

Hydrostatic Z

Pneumatic i]

Nominal Operating Pressure E[=

Other [

Pressure N/A psi Test Temp N/A NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12182) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-05-09 FORM NIS-2 (Back)

9.

Remarks:

Ground the crowns from welds CSA-F002 and CSA-F004 to improve UT examination of weld.

Successful surface exam was performed on CSA-F002 (P05055) and on CSA-F004 (P05048) after weld crowi.

was removed by grinding.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair (repair or replacement) conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp None Certificate of Autho 'tion No.

None Expiration Date N/A Signed v,-

.- c' Supervisor, Materials/lnspection Date

,k

/

IC, 2005 Owier or Owner's Designee, Title I

CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period 3-a --

to

/- if', -0o",

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions

/V/:;

,.)--x, 944,v-z

/q I?L 6Z 27iV Date Inspector's Signature National Board, State, Province, and Endorsements D t -

2 0 0 5

, 2005

FORM NIS-2 19-05-10 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Alliant Encrgy (TES Utilities)

Date 5/4/2005

1.

Owners Name P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Sheet Unit I

of 2

I 2.

CWO A66243 and PWO 1129234 Address

3.

Work Performed by Alliant Enerf Name 3277 DAEC Road, Palo, IA 5232 Repair Organization to P. 0. No., Job No., etc.

ry (IES Utilities)

Type Code Symbol Stamp None Authorization No.

None 4

Expiration Date None Reactor Water Cleanup Piping 4.

5.

Identification of System:

(a) Applicable Construction Code ANSI B331.7 Class 1 19 69 Edition 70 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.

6.

Identitication o! Uomponcnts Repaired or Replaced and Kelacement Uomponents ASINE Nameor Name of Oanufacturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or DCA.014 B

lchtcl Corp..

NA N/A Reactor Water Cleanup 1974 Repair No Dissirnilar Metal Pipe Weld 7.

8.

Description of Work Tests Conducted:

Ground the crown from weld CUB-F004 to improve UT examination of weld.

Hydrostatic Other F Pressure Cl Pneumatic

[]

N/A psi Test Ten Nominal Operating Pressure ip N

N/A F

LIo NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-05-1 0 FORAI NIS-2 (Back)

9.

Remarks:

Ground the crown from weld CUB-F004 to improve UT examination of weld. Uncovered porosity under the Crown. Ground out the porosity and verified weld was above minimum wall by using UT. Successful surface exam was performed on CUB-F004 (P05050) after the porosity was removed and after the UT verifyine adequate wall thickness was performed.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair (repair or replacement) conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp None Certificate of Auth ition No.

None Expiration Date N/A Signed It _A Supervisor, Materials/Inspection Date mlc 2005 Ow r or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by lISB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period e go to S -

- C s,

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

)Y3 Commissions

/13 3

r1

I' Inspector's Signature National Board, State, Province, and Endorsements Date 0 0 5

, 2005

FORM NIS-2 19 11 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI Owners Alliant Energy (IES Utilities)

Name Date 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 4/21/2005 1 I of 2

MWO 1129050 Repair Organization to P. O. No., Job No., etc.

3.

Work Performed by Alliant Energy (IES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Residual Heat Removal (a) Applicable Construction Code ANSI B331.7 Class 1 19 69 Edition 71 Addenda NIA Code Case.

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 r

w s

r A

s l

s s

6.

Identilicatton o0 Components Repaired or Replaced and Re lacement Components ASME Name of Name of Manufacturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or NO)

DLA-641-8 and Nova NA N/A Dolt H# 8898297 2005 Replacement No

.A-6-SS-13

-A-641-8 and Nova NA N/A Nut Lot #50041551 2005 Replacement No DLA-6-SS-13 DLA-6-H-8 and Tuscaloosa Steel NA N/A it t

  1. A7X3024 1998 Repair No DLA-6-SS-13
7.

Description of Work:

Replaced one bolt, one nut, and added the clamp support bars on clamp hanger that was reinstalled for supports DLA-6-H-8 and DLA-6-SS-13. Clamp was removed to perform ISI exams on welds.

8.

Tests Conducted:

Hydrostatic m

Pneumatic EF Nominal Operating Pressure mi Other =

Pressure N/A psi Test Temp N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-05-1 1 FORM NIS-2 (Back)

9.

Remarks:

Replaced one bolt and nut that were cut to remove the pipe clamp for supports DLA-6-H-8 and DLA-6-SS-l3 Pipe clamp was removed to facilitate examining welds next to the clamp. Welded support bars onto the pipe clamp as depicted on the clamp drawing.

Successful mreservice VT-3 exam was performed on the sunnorts (P05004 and PGoS6V CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section X[.

Repair/Replacement (repair or replacement)

Type Code Symbol Stamp None Certificate of Authorization No.

None Expii Signed Supervisor, Materials/Inspection Date Ow~ner or Owner's Designee, Title iation Date N/A A;y~

2 a/,

2005 II CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period 5

-C (

to j -

)*

- -c'

,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

)

Commissions

/V/

iAqVr E

/Y 27 Inspector's Signature National Board, State, Province, and Endorsements Date

, 2005 Date ~

2 0

IFORM NIS-2 19-05-12 IFORM NIS-2 OWNER'S REPORT FOR REPAIRS OR RIEPLACEMFENTS As Required by the Provisions of tile ASME Code Section XI I.

Owvners Alliant amnerv (FS Utilities)

Name I)ate 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 4/30!2005 I_ _

of 2

PWO 1129089, 1129090, 1129091, 1129092 1129093, 1129094, 1129095 and CWVO A067500 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Energv (IES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

C (a) Applicable Construction Code Control Rod Drive ASME Sect. III 19 68 Edition W68 Addenda N/A Code Case.

Class I (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 I0.

Identimicaton ot tomnponents tepaired or ep laced and Ke lacement Components ASMI E Name or Name of Manufacturer Year Built Repaired.

Code Component Manufacturer Serial No.

National Other Identification Replaced. or Stamped Board No.

Replacement (VES or

_NO)

IR215(06-23)

GE S/N 4501 1972 Replacement Yes I R215(06-23)

Nova N/A N/A 8 [Bolts I I0 8960755 2004 Replacement No I R2t15(l 0- II)

GE S/N 2519 1972 Replacement Yes I R215(l 0-t t)

Nova N/A N/A 8 Bolts 11W 8960755 2004 Replacement No I R215(t0-23)

GE S/N 4494 1972 Replacement Yes IR215(10-23)

Nova N/A N/A 8 Bolts llt# 8960755 2004 Replacement No IR215(14-07)

GE S/N A4286 1 990 Replacement Yes IR215(14-07)

Nova N/A N/A 8 [lolts llt# 8960755 2004 Replacement No I R215(14-1 1)

GE S/N 3522 1 972 Replacement Yes I R215(14-1 l)

Noa N/A N/A 8 Bolts It# 8960755 2004 Replacement No IR2t5(14-23)

GE S/N 4467 1 973 Replacement Yes IR215(14-23)

Nova N/A N/A 8 Bolts Ift# 8960755 2004 Replacement No IR215(18-31)

GE S/N 4333 1

_____________t 972 Replacement Yes IR215(18-31)

Nova N/A N/A 8 Bolts I M 8960755 2004 Replacement No

7.

Description of Work:

Replaced bolting and control rod drives at 06-23, 10-11, 10-23, 14-07, 14-1 1, 14-23, 18-31 loc.

8.

Tests Conducted:

I hydrostatic I

Pneumatic OI Nominal Operating Pressure EFI1 Other [

Pressure 1025 psi Test Temp 240.6

° F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept.. ASME, 345 E. 47th St.. New York, NY 10017.

FORM NIS-2 I9-05-12 FORMtl NIS-2 (Back)

').

Remarks:

Replaced bolting and control rod drives at 06-23. 10-11. 10-23. 14-07. IJ-Il. 141-23. IX-'I locations.

Successfully performed VT'-2 of replaced drives (105001). A V 1-I was successfuilly completed on all remoed bolting. See the individual work orders lbr each VT-I. A VT-I was successfiluly completed for all installed bolting at receivin; inspection.

CERTIFICATE OF COMPLIANCE We certify that the statements mantde in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code, Section Xl.

Type Code Symbol Stamp None Certificate of Autihorization No.

None Expiration Date N/A Signed Y

-t Supervist)r,Materials/lnspectioni Date aLyr 2005 Owner or Owner's D)esihnee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid cominission issued by the National Board of l3oilerand Pressure Vessel Inspectors and the State or Province of lowva and employed by I ISB CT of I lartford, Conii.

have inspected the components described in this Owner's Report during the period 9q l b.

to

-7

, and state that to the best of my knowledge and belief, the Owner has perfonned examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASMIE Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions 1v5 l3'

)94y-

/,'4 m

Inspector's Signattire National Board, State, Province, and Endorsements Date 7 - //

, 2005

FORM NIS-2 19-05-13 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1.

Owners Alliant Energy (JES Utilities)

Name Date 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane AI2Iold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 4/30/2005 I

of 2

MWO A63071 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Eneray (IES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Core Spray (a) Applicable Construction Code P&V Draft Class 2 19 68 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.

6.

Identitication ot Components Repaired or Replaced and Replacement Components I

ASME Name of Name of Manufacturer Year Built

Repaired, Code Component

.Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or M02112 Flowserve 23520-1 N/A Valve Disc 2005 Replacement No

7.

Description of Work:

Replaced valve disc due to poor connection between valve stem and disc on replaced components.

8.

Tests Conducted:

Hydrostatic f

Pneumatic

[

Nominal Operating Pressure Other =

Pressure N/A psi Test Temp N/A OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12182) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-05-13 FORM NIS-2 (Back)

9.

Remarks:

Replaced valve disc.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Replacement (repair or replacement)

Type Code Symbol Stamp None Certificate of Authorization No.

None Expir Signed iiI4

?'li-i Supervisor, MateriaMnspection Date Qpener or Owner's Designee, Title ation Date N/A 8

iS-

'3 2005

.1 CERTIFICATE OF INSERVICE INSPECTION I1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period of to S-5Of

,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

I Commissions

/V-/;)

3?94X

/

l

/ 9 b-

-Z National Board, State, Pro ince, and Endorsements Inspector's Signature Date 200

, 2005

FORM NIS-2 19-05-15 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1.

Owners Alliant Energy (IES Utilities)

Name Date 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 4/30,2005 I

of 2

1 PWO 1128161 Repair Organization to P. O. No., Job No., etc.

3.

Work Performed by Alliant Energy (IES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Standby Liquid Control (a) Applicable Construction Code P&V Draft Class 2 19 68 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.

6.

Identification ofComponents Repaired or Replaced and R lacement Components ASAIE Name of Name of Manufracturer Year Built

Repaired, Code Component Mianufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or NO)

XS2618B IST Conax 608 N/A Valve 2004 Replacement No Nuclear

7.

Description of Work:

Replaced explosive valve on frequency required by IST Prograrm.

8.

Tests Conducted:

Hydrostatic

[

Pneumatic

[I Nominal Operating Pressure EI1 Other =

Pressure 1245 psi Test Temp N/A

° F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-05-ls FOR;IM NIS-2 (Back)

9.

Remarks:

Replaced valve.Valve is threaded into place. Successfully performed VT-2 of the valve after installation (P05024).

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Replacement (repair or replacement)

Type Code Symbol Stamp Certificate of Authorization No.

None None Expiration Date N/A Signed i

4 Supervisor,Materials/Inspection Date G

o (41 2005 I-Owfieror0%vner'sDesigneeTitle Q

I CERTIFICATE OF INSERVICE INSPECTION l

1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period

//-

i& - ocl to

- 6

_C_

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions

-V5 j )

/,

Inspector's Signature Date

) 6 So National Board, State, Province, and Endorsements

,2005

FORM NIS-2 19-05-16 FORM NIS-2 OWNIERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASMI-E Code Section Xi I.

Owners Alliant Energy (IES Utilities)

Name Date 2.

P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 5/2/2005 I

of 2

PWO 1129096, 1129097, 1129098, 1129099 1129100, 1129101, 1129102 and CWO A067500 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Energey (IES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

S.

Identification of System:

C (a) Applicable Construction Code control Rod Drive ASME Sect. III 19 68 Edition U'68 Addenda NIA Code Case.

Class I (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1992-A92 Io.

Identimication o0 LomponenIs Kepaired or Ke laced and Ke lacement Components AS,%l:

Name or Name of Manufacturer Year Built Repaired.

Code Component NManuracturer Serial No.

National Other Identification Replaced. or Stamped Board No.

Replacement (YES or NO)

IR215(22-03)

GE S/N4407 1972 Replacement Yes I R2l5(22-03)

Nova N/A NMA 8 Bolts lth# 8960755 2004 Replacement No 1 R215(22-07)

GE S/N 4388 1972 Replacement Yes IR215(22-07)

Nova N/A N/A 8 Bolts Ith# 8960755 2004 Replacement No I R215(22-1 1)

GE S/N 4017 1972 Replacement Yes IR215(22-1 t)

Nova N/A N/A 8 Bolts llt# 8960755 2004 Rcplaccmcnt No I R215(22-31)

GE S/N 3965 1972 Replacement Yes I R2 15(22-31)

Nova N/A N/A 8 Bolts I It# 8960755 2004 Replacement No 1 R2 15(26-l t)

GE S/N 3956 1 972 Replacement Yes IR215(26-1l)

Nova N/A N/A 8 BoLS lutH 8960755 2004 Replacement No IR215(26-31)

GE S/N 4789 1973 Replacement Yes IR215(26-31)

Nova N/A N/A 8 Bolts 1llt 8960755

=

2004 Replacement No I R215(30-15)

GE S/N 4350 1972 Replacement Yes IR215(30-15)

Nova N/A N/A 8 Bolts llt# 8960755 2004 ecplacemcnt No

7.

Description of Work:

Replaced bolting and control rod drives at 22-03, 22-07, 22-11, 22-31. 26-1 1, 26-31, 30-15 loc.

8.

Tests Conducted:

Hlydrostatic z

Pneumatic z

Nominal Operating Pressure Exl1 Other L Pressure 1025 psi Test Temp 240.6 0 F NOTE: Supplemental sheets in form of lists. sketches. or drawings may be used, provided (I) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St.. New York, NY 10017.

F()RM NIS-2 '19-05-16, FORM NIS-2 (Back)

').

IReniarks:

Replaced bolting and control rod (Irives at 22-03. 2?-07. 22-1 1, 22-31, 26-1 1. 26-31. 30-1 5 locations.

Successfi ully performedw v-2 of replaced drives (105001 ). A VT-I was successfully completed at receiving inspection for replacement bolting. An Inservice bolting, vr-I inspection was complete(d on all removed boltin, and lound satisfactory. See the individual work order lor each VT-I.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) confonns to the rules of the ASME Code, Section Xi.

Type Code Symbol Stamirp None Certificate of Authorization No.

None Expiration Date N/A Signed (0Ot Supervisor, Materials/Inspection I)ate 0 t L d /1 2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the Nalional Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSIS CT of llartford, Conn.

have inspected the components described in this Owner's Report during the period C? - /6- - 0 o

to

- f// -c o

, and state that to the best of my knowledge and belief: the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions Ae)

Inspector's Sinature National Board, State, Province, and Endorsements Date

, 2005

[)ate 2005

FORM NIS-2 19-05-17 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions ofthe ASME Code Section Xl

1.

Owners Alliant l-neriw (II'S Utilities)

Name Date 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 512/2005 I

of 2

PWO 1129104, 1129105, 1129107, 1129114, 1132803 and CWO A067500 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Energv (IES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

C'ontrol Rod Drive (a) Applicable Construction Code ASME Sect. III 19 68 Edition Class I (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 W68 Addenda N/A Code Case.

6.

Identitication of Components Repaired or Re laced and Replacement Components

.AS E Name of Name or

'lanturacttirer Year Buill Repaired.

Code Component Mianufacturer Serial No.

National Other ldenlification Replaced, or Stamped Board No.

Replacement (YUS or NO)

IR215(30-39)

GE SIN 4X75 1973 Replacement Yes IR215(30-39)

Nova NIA N/A 8 Bolts llt 8960755 200I4 Replacement No IR215(34 -07)

GE SIN A8883 1990 Replacement Yes IR215(34-07)

Noia N/A N/A 8 Bolts Ilt# 8960755 2004 Replacement No IR215(34-39)

(E S/N 3979 1972 Replacement Yes I R215(34-39)

Nova N/A N/A 8 Bolts I It# 8960755 2004 Replacement No IR215(34-1t1)

GE SIN 4355 1

1 1972 Replacement Yes IR215(34-1 1)

Nova N/A N/A 8 Bolts I1tW 8960755 2004 Replacement No IR215(30-31)

GE SIN 3964 1

1972 Replacement Yes IR215(30-31)

Nova NIA N/A 8 Bolts IIt0 8960755 2004 Replacement No

7.

Description of Work:

Replaced bolting and control rod drives at 30-39, 34-07, 34-39, 34-11, 30-31 loc.

8.

Tests Conducted:

yldrostatic z

Pneumatic FI1 Nominal Operating Pressure Other EI]

Pressure 1025 psi Test Temp 240.6

° F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Forn (1.00030) may be obtained from the Order Dept., ASME. 345 E. 47th St., New York, NY 10017.

I ORN NIS-2 19-(5-17 FOIRM NIS-2 (Back)

9.

Remarks:

Replaced boiling and control rod drives at 30-39, 34-07. 34-39, 34-i 1. 30-3 I locations. SuccesslIlIly performed VT-2 of replaced drives (105001). A V 1-I was successfuilly completed at receivin, inspection for all replacement bolting. An Inservice bolting V-l'-l was completed on all removed bolting an found satisfact ory with one exception. 105141 on PWo 11)29105 found one bolt with damage to two threads from handling damnae.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code, Section Xl.

Type Code Symbol Stamp None Certificate of Authorization No.

None

[Expiration Date N/A Signed AeX

,P Ccr Supervisor. Materials/Inspectiom Date

,'* L 2005 Owner or Owner's Designee, TIitle CERTIFICATE. OF INSERVICE INSPECTlION 1, the undersigned. holding, a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB cr of IlartFord, Conn.

have inspected the components described in this Owner's Report dluring the period q *3

-oq to 7 a0

, and state that to the best of my knowledge and belief, the Owner has perforned examin-ations and taken corrective measures described in this 0Owner's Report in accordance wvith the requirements of the ASMIE Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions

,VB

)

4.2

/'

Inspector's Signature National Board, State, Province, and Endorsementts I)ate 270

/

, 20(05

FORM NIS-2 19-05-18 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1.

Onwners Alliant Energy (IES Utilities)

Name Date 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 512/2005 I

of 2

1 PWOs 1132908, 1129109, 1129108, 1132909, 1129110, 1129113 and CWO A067500, A65092 Repair Organization to P. O. No., Job No., etc.

3.

Work Performed by Alliant Energy (ES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Control Rod Drive (a) Applicable Construction Code ASME Sect. VIII 19 68 Edition (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.

6.

Identification of Components Repaired or Re laced and R lacement Components ASME Name of Name of Manufacturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or

_ _ _N O )

1 S220 (02-19)

GE SIN C0101 IiCU Accumulator 1978 Replacement Yes IS220 (34-23)

GE S/N C0079

}iCU Accumulator 1978 Replacement Yes IS220 (10-23)

GE S/N A2573 IICU Accumulator 1978 Replacement Yes I S220 (10-15)

GE S/N A2547 I1CU Accumulator 1978 Replacemcnt Yes IS220 (30-39)

GE S/N C0089 llCU Accumulator 1978 Replacement Ycs IS220 (14-27)

GE SIN C0078

_1CU Accumulator 1978 Replacement Yes IS220 (42-23)

GE S/N CO 100 MCU Accumulator 1978 Replacement Yes

7.

Description of Work:

Replaced HCU Accumulators at 02-19, 34-23, 10-23, 10-15, 30-39, 14-27, 42-23 locations

8.

Tests Conducted:

Hydrostatic

[

Pneumatic

[]

Nominal Operating Pressure Other [

Pressure 1025 psi Test Temp 240.6 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

I -

IORtMI NIS-2 19-05-IS FORM NIS-2 (Back)

9.

Remarks:

Replaced IICU Accumulators at 02-19, 34-23, 10-23, 10-15, 30-39, 14-27, 42-23 locations. Successfully performed VT-2 of replaced IICU accumulators (105001).

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp None Certificate of Authorization No.

None Expiration Date N/A Signed Supervisor, Materials/Inspection Date

/Y? ae.1 (9,

2005 Owtler or O'vner's Designee, Title

\\J CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period

!- 6 -O-/

to A- /f-c,

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions AtI, 1,3-3)i 4,v'J.

Inspector's Signature National Board, State, Province, and Endorsements Date 2

0q

, 2005

FORM NIS-2 19-05-19 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1.

Owners Alliant Energy (IES Utilities)

Name Date 2.

P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 5125/2005 I

of 2

CWO A54646 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Energv (IES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Main Steam Line Drain (a) Applicable Construction Code ANSIB31.1 19 67 Edition N/A Addenda N/A Code Case.

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 I

I I -

I D.

Identlicaton ot omponenis Repaired or.Kq aced and Ke lacement Cornponents ASME Name of Name of Manufacturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (Y'ES or NO)

CV1064 Flowserve SIN 29AXD N/A Main Steam Drain to 2004 Replacement No Condenser Isolation Valve EBDO02 Vision Metals I IT# 151234 N/A Piping to CVI 064 1999 Replacement No EBDO02 Gulf States Stecl

[IT#

7462666 N/A 1/4 " Plate Steel for CV1064 1998 Replacement No Support EBDO02 Lukens Steel HT# R2958 N/A Sf8" Plate Steel for CV1064 1991 Replacement No Support EBD002 Independence iIT# D42964 N/A Tube Steel for CV 1064 2002 Replacement No Tube Corp Support EBDO02 Bergen-Power 283 N/A U-Bolts 2004 Replacement No

7.

Description of Work:

Replaced CV1064 with a valve that has a heavier operator, and installed new supports for the operator.

8.

Tests Conducted:

Hydrostatic L

Pneumatic

[I]

Nominal Operating Pressure Other j Pressure 968*

psi Test Temp 552*

0 F

  • Performed in-accordance with Code Case N416-1 NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E.47th St., New York, NY 10017.

LL-FORM NIS-2 19-05-19 FORM NIS-2 (Back)

9.

Remarks:

Replaced CV1064. Welded in Valve and a pipe pup piece to fit valve into systeII. Successfully surface examined piping welds. Built additional supports from the flat plate and u-bolts to support the heavier valve and operator. Successfully performed VT-2 of piping welds and of the replaced valve (Report P05025 performed on Report 105102).

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp None Certificate of Atth tion 3

o.

None Expiration Date N/A Signe 4

Supervisor, Materials/inspection Date

/IY 1 cf Z I1 2005 Ovtner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period

/I I-o q

to S - J 2R -.

¶i;

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commnissions

.AlV-g i.94 4,.-v

/ L/ 9 t..

Inspector's Signature National Board, State, Province, and Endorsements Date

2. 0-0

, 2005

FORM NIS-2 19-05-20

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
1.

Oweners Alliant Energy (IES Utilities)

Name Date 2.

P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, LA 52324 Address Sheet Unit 5/26/2005 I

of 2

I CWO A64843 Repair Organization to P. O. No., Job No., etc.

3.

Work Performed by Alliant Energy (IES Utilities)

Name 3277 DAEC Road. Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Reactor Recirculation (a) Applicable Construction Code ANSI B3 1.1 19 67 Edition N/A Addenda NIA Code Case.

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92

0.

Identificaton of Componens Repaired or Ke laced and Ke lacement Components ASME Name of Name of Manufacturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or I_

NO)

Recirculation GE NIA NA Reactor Recirculation Riser Unknown Repaired No Piping Dissimilar Metal Weld

7.

Description of Work:

Removed weld crown on RRF-F002 weld by Machining.

8.

Tests Conducted:

Hydrostatic Z

Pneumatic

[II Nominal Operating Pressure LII Other =

Pressure N/A psi Test Temp N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

I.LA FORM NIS-2 19-05-20 FORM NIS-2 (Back)

9.

Remarks:

Removed weld crown from Recirculation Riser safe-end dissimilar metal weld RRF-F002 by machining. Weld crown was removed to improve the ultrasonic examination of the weld. Successful surface exam was completed on weld (P05019) after machining was completed.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Repair (repair or replacement)

Type Code Symbol Stamp Certificate of AutE tion No.

Signed X2 None None Expiration Date N/A Supervisor, Materials/Inspection Date 2005 E-OPner or Owner's Designee, Title

'-4 l-CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period ii-6 -A.' q to

- A6-C) v

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions Comiss /o3ns

//99

-T 7-J/_/

m)(

7 Inspector's Signature National Board, State, Province, and Endorsements Date

, 2005 Date,200

FORM NIS-2 19-05-21 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1.

Owners Alliant Energy (IFS Utilities)

Name Date 2.

P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 5/26/2005 I

of2 CWO A64844 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Energy (IES Utilities)

Name, 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

PReactor Recirculation (a) Applicable Construction Code ANSI B31.1 19 67 Edition N/A Addenda N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Code Case.

r

6.

Identificat ion of Components Repaired or Re laced and Retlacement Components ASINE Name of Nameof lManufacturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or Recirculation GE N/A N/A Reactor Recirculation Riser Unknown Repaired No Piping Dissimilar Metal Weld

7.

Description of Work:

Removed weld crown on RRG-F002 weld by machining.

8.

Tests Conducted:

Hydrostatic

[I]

Pneumatic

_II Nominal Operating Pressure Other 11 Pressure N/A psi Test Temp N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8 12 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) maybe obtained from the Order Dept., ASME, 345 E.47th St., New York, NY 10017.

-I J L FORM NIS-2 19-05-21 FORM NIS-2 (Back)

9.

Remarks:

Removed weld crown from Recirculation Riser safe-end dissimilar metal weld RRG-F002 by machining. Weld crown was removed to improve the ultrasonic examination of the weld. Successful surface exam wvas completed on weld (1'05020) after machining was completed.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code,Section XI.

Repair (repair or replacement)

Type Code Symbol Stamp None Certificate of Autho ionNo.

None Expii Signed Supervisor, Materials/Inspection Date wn or Owner's Designee, Title ration Date N/A mCa Zi I 2005 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period

/_

to 4--_

to

- - a,

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

J 3 U -Co mi si n Commissions

/V 39! ~

vn Inspector's Signature National Board, State, Province, and Endorsements Date

, 2005 Date 2005

FORM NIS-2 19-05-22 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi

1.

Owners Alliant Energy (OES Utilities)

Name Date 2.

P. O. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 5/26n2005 I1_

of 2

I CWO A66133 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant EneMy (GES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Reactor Recirculation (a) Applicable Construction Code ANSI B3 1.1 19 67 Edition N/A Addenda N/A Code Case.

(b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1992-A92 w

s r

s s

s s

s s

6.

Identification Components Repatred or Re laced and Re placement Components ASME Name of Name of Manufacturer YearBuilt

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or NO)

Recirculation GE N/A NIA Reactor Recirculation Riser Unknown Repaired No Piping Weld E.

7.

Description of Work Blended arc strike on weld RRD-J005.

8.

Tests Conducted:

Hydrostatic

[

Pneumatic FI]

Nominal Operating Pressure LZ

Other [

Pressure N/A psi Test Temp N/A OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

FORM NIS-2 19-05-22 FORM NIS-2 (Back)

9.

Remarks:

Blended arc strike on Recirculation Riser weld RRD-J005. Successful surface exam was completed on wveld (P05054) after grinding wvas completed.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair (repair or replacement) conforms to the rules of the ASME Code, Section Xl.

Type Code Symbol Stamp None Certificatef Authori n No.

None Expiration Date N/A Signe 11@e supevisor, Materials/Inspection Date t

C!

2 ),

-2005 wner 6r Owner's Designee, Title (J

CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by

[ISB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period Y-i/ of to U -

) G -e f

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

wc)S U-Commissions

/V'5 J? 3/'4ar

'/Yt6.9 Inspector's Signature National Board, State, Province, and Endorsements Date

, 2005

_at 2005

FORM NIS-2 19-05-23 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1.

Owners Alliant Energy (IES Utilities)

Name Date 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 5/26/2005

_I of 2

I PWO 1129048 Repair Organization to P. O. No., Job No., etc.

3.

Work Performed by Alliant Enemy (IES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Control Rod Drive (a) Applicable Construction Code ANSI B31.7 19 69 Edition 70 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Addenda NIA Code Case.

6.

Identification ofComponents Repaired or Re laced and Re lacement Components ASMIE Name of Name or Manufacturer Yar Built

Repaired, Code Component Manuracturer Serial No.

National Other Identification Replaced,or Stamped Board No.

Replacement (YES or Control Rod Drive Bechtel N/A N/A CRD Return Dissimilar metal 1974 Repaired No Return Weld

7.

Description of Work:

Ground down weld crown on weld CRA-J032.

8.

Tests Conducted:

Hydrostatic

[

Pneumatic

[-I Nominal Operating Pressure Other [I]

Pressure N/A psi Test Temp N/A oF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

1-l L

FORM NIS-2 19-05-23 FORM NIS-2 (Back)

9.

Remarks:

Ground down weld crown on CRD Return weld CRA-4032. Successful surface exam was completed on weld after grinding was completed.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Repair (repair or replacement) conforms to the rules of the ASME Code, Section Xi.

Type Code Symbol Stamp None Certificate of Authorization No.

None Expiration Date NIA Signed r

,A f

Supervisor, MateriaLsllnspection Date 1

(2ti 2005 Owner r Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn.

have inspected the components described in this Owner's Report duringtheperiod

,- 3/ -o'f to So--- d OS

,andstatethattothebestof my knowledge and belief, the Owner has performed examinations'and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

23 Commissions ij413 I,?3ŽrA'-,

/ 9(6 Ad Inspector's Signature National Board, State, Province, and Endorsements Date 5-0&,

, 2005

FORM NIS-2 19-05-25

-FORM NIS-2 OWVNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1.

Owners Alliant Energy (IES Utilities)

Name Date 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 05/27/05 I

of 2

I.

PWO 1128060 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Enen Name 3277 DAEC Road, Palo, IA 5232 gv (IES Utilities)

Type Code Symbol Stamp Authorization No.

A4 Expiration Date None None None 4.

5.

Identification of System:

Main Steam Safety Relief Valve (Class I)

(a) Applicable Construction Code ASME III 19 68 Edition W68 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92 Identification of Components Repaired or Replaced and Replacement Components Addenda N/A Code Case.

6.

Name of Component (Ilanger No.)

Name of Manufacturer Manufacturer Serial No.

Year Built National Board No.

Other Identification

Repaired, Replaced, or

-Replacement ASNIE Code Stamped (YES or -

NO)

.Work Order/SUS Pilot Valve Target Rock S/N 207 N/A PWO 1 128060 / 83.04 1976 Replacement Yes

7.

Description of Work:

The Pilot Valve was repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of S/N 218.

8.

Tests Conducted:

Hydrostatic L

Pneumatic E

Nominal Operating Pressure Other L Pressure 1020 psi Test Temp 240

° F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8 1/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

LL FORM NIS-2 19-05-25 FORM NIS-2 (Back)

9.

Remarks:

Pilot Valve S/N 218 was removed and pilot valve S/N 207 was installed. Prior to installation S/N 207 was repaired and documented on NIS-2 (19-03-02). A VT-2 (105001) was completed on the mechanical connection and found acceptable.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code, Section Xl.

Type Code Symbol Stamp None Certificate of Authorization No.

None Expiration Date N/A Signed 6d I/]9-A2 Go(d GL Equipment Monitoring Date Ji4d/er 7?

2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT.

of Hartford, Conn.

have inspected the components described in this Owner's Report during the period 9 -/

to

,-/IV -0o

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions IV-;a

) iD3aqAvz-Inspector's Signature National Board, State, Province, and Endorsements Date

, 2005 Date 2005

FORM NIS-2 19-05-26 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi

1.

Owners Alliant Energy (IES Utilities)

Name Date 2.

P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 05/27/05 I

of 2

PWO 1128063 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Enern Name 3277 DAEC Road, Palo, IA 5232 wv (IES Utilities)

Type Code Symbol Stamp Authorization No.

4 Expiration Date None None None 4.

5.

Identification of System:

Main Steam Safety Relief Valve (Class I)

(a) Applicable Construction Code ASME III 19 68 Edition W68 (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.

6.

Identification of Components Repaired or Re laced and Re placement Components CASIDE Nameor Name of Manufacturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped (I[anger No.)

Board No.

Replacement (YFS or l

Work Order / SUS NO)

Pilot Valve Target Rock SIN 200 N/A PWO 1128063 /83.04 1976 Replaccment Ycs

7.

Description of Work:

The Pilot Valve was repaired and documented on NIS-2 (19-03-06). This Pilot Valve was rotated in place of S/N 189.

8.

Tests Conducted:

Hydrostatic 2

Pneumatic

[

Nominal Operating Pressure Other a

Pressure 1020 psi Test Temp 240 O F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

ILL-FORM NIS-2 19-05-26 FORM NIS-2 (Back)

9.

Remarks:

Pilot Valve S/N 189 was removed and pilot valve S/N 200 was installed. Prior to installation S/N 200 was repaired and documented on NIS-2 (19-03-06). A VT-2 (105001) vas completed on the mechanical connection and found acceptable.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code, Section Xl.

Type Code Symbol Stamp None Certificate of Authorization No.

None Expiration Date N/A Signed QX GL Equipment Monitoring Date

-i i4: 2 2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by I ISB CT.

of I artford, Conn.

have inspected the components described in this Owner's Report during the period 4'/-

' ci to c -

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

'4-43 ~---

Commissions A3 i,)

4v 2 V3.

/

Z>,

Inspector's Signature National Board, State, Province, and Endorsements Date

(--/,

, 2005

FORM NIS-2 19-05-27 F'ORM NIS-2 OWk'NE'R'S RlEPlORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions ofthe ASME Code Section Xl

1.

Owners Alliant EnergA (IES Utilities)

Name Date P. 0. Box 351, Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 06/7/05 I

of 2

[IWO 1128066 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Ener Name 3277 DAEC Road, Palo, IA 5232 cv (iES Utilities)

Type Code Symbol Stamp Authorization No.

24 Expiration Date None None None 4.

5.

Identification of Svstem:

Main Steam Safety Relief Valve (Class I)

(a) Applicable Construction Code ASME III 19 68 Edition W68 Addenda NIA Code Case.

(b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1992-A92 r6.

Identiticati on or Components Kepaired or Replaced and Re placement Components ASIS E Name of Name of Mlanufacturer Vear Built Repaired.

Code lomponent Manufacturer Serial No.

National Other Identification Replaced. or Stamped (Ilanger No.)

Board No.

Replacement VF( or Work Order / St IS NO)

Pilot Valve Target Relk S/N 176 N/A PWO 1128066 I83.04 1976 Replacement Yes rody to Pilot Bolt Nova Machinc Item # 107 N/A

'W(O I 128066 / 83.04 1996 Rcplacement No

_It 1

66923 Bodv to Pilot Nut Target Rock Item H 150 N/A PWO I 128066/83.04 1991 Replacement No lIIt l # IN 85326

7.

Description of Work:

The Pilot Valve w as repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of S/N 141. During removal of SIN 14 1, two bolts / one nut required replacement.

8.

Tests Conducted:

I lvdrostatic L

Pneumatic C

Nominal Operating l'ressure Eif Other E Pressure 1020 psi Test Temp 240 oF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

IORM NIS-2 19-0S-27 FORMNI NIS-2 (13ack)

9.

Remnar ks:

Pilot Vale S/N 141 %%as removed and pilot valve SiN 176 %%as installed. Prior to installaion. S,.N 176 was repaired and docuimented on NIS-2 (19-03-02). I)Dring removal ol'S.N 14 1, two bolts. one nut as galled and required replacemenit. A Vl-l was Cperformed as part or the receipt inspections. A V U-2 (10(3:01) was completed on the mechanical connection and LundL acceptable.

CERTIFICATE OF COI1'LIANCE We certify that the statemeents made in the report are correct and this Replacement (repair or replacement) confonns to the riles oflthe ASME Code. Section Xl.

Type Code Symbol Stamp Nonc Certificate of Authorization No.

None Expiration Date N/A Signed a

GI Eiquipment Monitoring, Date Jcz4'L-ZO-,

2005 Owner or Otner's D)esinee. Title CuRTiFICATE OF INSERVICE INSPECTION 1, the undersigned, holdin, a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by I S13 C1.

of lartford, Conn.

have inspected the components described in this Owner's Report during the period g -

to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal njinjry or property dainage or a loss of any kind arising from or connected with this inspection.

.-.19 Comnm issions

/V3 O.",

-f Inspector's Signature National Board, State, Province, and Endorsements Da;ll

,2005t 1)at 200

FORM NIS-2 19-05-28 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl

1.

Owners Alliant Eneray (IES Utilities)

Name Date P. 0. Box 351, Cedar Rapids, IA 52406 Address Sheet 06/7/05 I

of 2

2.

Plant Duane Arnold Energy Center Name Unit 3277 DAEC Road, Palo, IA 52324 Address PWO 1128067 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Ener Name 3277 DAEC Road, Palo, IA 5232 rv (IES Utilities)

Type Code Symbol Stamp Authorization No.

24 Expiration Date None None None 4.

5.

Identification of System:

Main Steam Safety Relief Valve (Class 1)

(a) Applicable Construction Code ASME III 19 68 Edition W68 (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 J_.-_

-ro

__ rw__

__ rs_____

a_____

Addenda N/A Code Case.

ID.

Identlicatron ot Componenrs Repaired or Re laced and Ke lacement Components ASMIE Name or Name o Manufacturer Year Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped (I I anger No.)

Board No.

Replacement (YES or Work Order / SIS NO)

Pilot Valve Target Rock SIN 227 NIA PWO 11280671 83.04 1976 Replacement Yes

7.

Description of Work:

The Pilot Valve was repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of S/N 203.

8.

Tests Conducted:

Hydrostatic 2

Pneumatic LI Nominal Operating Pressure Other =

Pressure 1020 psi Test Temp 240 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8 12 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

~

l l FORMI NIS-2 19-05-28 FORM NIS-2 (Back)

9.

Remarks:

Pilot Valve SIN 203 was removed and pilot valve SIN 227 was installed. Prior to installation, S/N 227 was repaired and documented on NIS-2 (19-03-02). A VT-2 (105001) was completed on the mechanical connection and found acceptable.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASNIE Code, Section Xi.

Type Code Symbol Stamp None Certificate of Authorization No.

None Expiration Date N/A Signed C)

?A

/>

, GL Equipment Monitoring Date

__i_

e 7

2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by IISB CT.

of Hartford, Conn.

have inspected the components described in this Owner's Report during the period 9

/ -6o '.

to Iv -':

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions AA3, 1)3?9A4,'

ftfq(

X<

Inspector's Signature National Board, State, Province, and Endorsements Date

(,-/U2

, 2005

FORM NIS-2 19-05-29 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REP[.ACEM.ENTS As Required by the Provisions of the ASM1' Code Section Xl I.

Owners Alliant Energg (EES Utilities)

Name Date 2.

P. O. Box 351, Cedar Rapids, IA 52406 Address Plant I)uane Arnold Energy Center Name 3277 DAEC Road, Palo. IA 52324 Address Sheet Unit 06.')31)05 I

of 2

1_

[IWO 1128068 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Energv (IES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Main Steam Safety Relief Valve (Class I)

(a) Applicable Construction Code ASME III 19 68 Edition W68 (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.

6.

Identification of Components Repaired or Re laced and Re lacement Components ASNIE Name or Name or anufacturer ear Built Repaired.

Code Component Manufacturer Serial No.

National Other Identification Replaced. or Stamped (langer No.)

Board No.

Replacement (UES or

_Work Order / SUS NO)

Pilot Valve Targct Rock SIN 199 NIA PWO 1 28008 / 83.04 1976 Replacement Yes

7.

Description of Work:

The Pilot Valve was repaired and documented on NIS-2 (19-03-02). This Pilot Valve was rotated in place of SIN 202.

8.

Tests Conducted:

lydrostatic L

Pneumatic FII Nominal Operating Pressure IE i Other Cl Pressure 1020 psi Test Temip 240 F

NOTE': Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME. 345 E. 47th St., New York, NY 10017.

JH()[NI NIS-2 I14-05-2')

FORIK NIS-2 (Back)

Ren' 1kalk:

ilot VAh e S. N 202 %%as remtxed and pi lot % IA e S N I 99 %

\\as inltal lel. I1i itr to installatioll. S-N I 99') \\;i>

re. mred antd documient ed l N IS- (I ')-_', -01). A V I'-2'(0 I ) Azs jomtnpleted tot the inec han icacl connectit nio aindi mloudacceptable.

CE.RTIFICAT'E OF COMIPLIANCE We certilv that the statements made in the report are correct an(I this con forms to the rules ofthe ASME1 Code, Section Xl.

Replacement (repair or replacement)

Type Code Symbol Stamp Certificate of Autihorizatioxi No.

Signed f Sg tDr 1" 4-None None B1piration Date N/A GI. lEquipmient Monitoring l)ate 2005 Owner or Owner's l)esinee. Title CERTIFICATE OF INSERVICE INSPECTION 1, the utidersigned, holdin-, a valid commission issued liv the National Board of Boiler andal Pressure Vessel Inspectors and the State or Province of' Iowa and employed by I IS3 (Tr.

of I1artford, Conn.

have inspected the components described in this Omner's Report during the period 9

- /-C to

-0

- o

, and state that to the best of my knoxsledg1e and belief, the Owner has performicd examinations an(d taken corrective measures described in this Owner's Report il accordance wvilt the requirements of the ASMEI Code, Section Xl.

Bly signing this certificate neither the Inspector nor his employer mankes any warranty. expressed or implied, concerning, the examllinationis and corrective measures described in this Owner's Report. lurthermore. neither the Inspector nor his employer shall be liable in any manner for any personal injury or property datiage or a loss ofany kind arising from or connected with this inspection.

J(

t Commissions A4V

)

9

,14-v2r

/

9 m

Inspector's Signature National Board. State, Province, and I-ndorsements

, 2005

FORM NIS-' 19-(5i-30 FORM N1S-2 OWNER'S REPORT FOR REPAIRS OR RIEPL.ACEM ENTS As Required bly the Proviiions of the ASME Code Section Xl I.

Owners Alliant EnercE S Ulitities)

Name Date P. O. Box 351, Cedar Rapids. IA 52406 Address Plant DDuane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 06!23/05 I

of 2

PWO 1128062 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Ener Name 3277 DAEC Road, Palo, IA 5232 v (IEOS Utilities)

Type Code Symbol Stamp Authorization No.

24 Expiration Date None None None 4.

5.

Identification of System:

Main Steam Safety Relief Valve (Class 1)

(a) Applicable Construction Code ASMi III 19 68 Edition W68 Addenda NIA Code Case.

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1992-A92

6.

Identificati on of Compone ts Repaired or Re laced and Re lacement Components ASNIE Name of Name or IN1anufactirer Year Ituill Repaired.

Code Component Maniufacturer Serial No.

National Other Identification Replaced. or Stamped (Ianger No.)

oard No.

Replacement (YES or IWork Order/SIUS NO)

Main Valve Body Tarect Rocl S/N 201 N/A PSV 4401 1976 Replacemcent Ycs

7.

Description of Work:

Main Valve Body S/N 201 dwas repaired and documented on NIS-2 (17-00-01). This Main Valve Body was rotated in place of SIN 141.

8.

Tests Conducted:

Hydrostatic f

Pneumatic F

Nominal Operating Pressure

[Ei-Other I

Pressure 955 psi Test Temp 514 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8 1/2 in. x I I in.. (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) tnay be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

AL FO RN1 N IS-.! I9'-0i- ;o FORMl NIS-2 (Black)

9. Reiarks MIaiii Va.lve Bockv S:N I II %%a rienmed and Mlain V~alve Bod% S-N 2011 %%, ini'.alled. Priior hi in)z~illlatioii. S. N 2101 arpardaddciL!e(iN1-I70()I.A

- P3b acupeeontenehnil COnl icIJI onall~~ oid fo CCCIa t

pibsI.

CERTIFICATE OF COMPLIANCF We certify that the statements Imade in tIhe report are correct and this Replacement (repair or replacement) conforms to tile rules of tile ASMINi Code, Scction Xi.

Type Code Symbol Stamp None Certificate ofAtithorization No.

None Expiration Date NIA Si-ncd feQ @

o

(;1. Equlipiment Monitoring l)ate Vc 23 2005 Owner or Owner's Designee.rit ie ICrTIFICATE OF INSERVICE INSPECTION 1, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed hy 11;13 C'l'.

of lartford, Conn.

have inspected the components described in this Owner's Report during the period b to 6 - -)q-o

,' and state that to the best of my knowledge and belief, the Owner has perlormed examinations and takeit corrective measures (lescribed in this Owner's Report in accordance with the requirements of the ASME Code, Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warrantv, expressed or implied, colicening the examinations and corrective measures described in this Owner's Report. Furthennore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising firon or connected with this inspection.

\\

Commissions V

/

9<j-7AN.,I

'i

, tzs Inspector's Signature National Board. State. Province, anLI Endorsements Date L i.9L

. 2005

FORM NIS-2 19)-05-31I FORM NIS-2 OWNIR'RS REPORT FOR REPAIRS OR REPLACEM ENTS As Reqiuired lv the Provisions of the ASME Code Section Xi I.

Owners Alliant e

Name

[)ate P.O. Box 351, Cedar Rapids, IA 52406 Sheet 06?23!05 I

of 2

Address

2.

Plant

[)uane Arnold Energy Center Unit Name 3277 DAEC Road, Palo, IA 52324 PWO 1128069 Repair Organization to P. 0. No., Job No.. etc.

Address

3.

Work Performed by Alliant Enen Name 3277 DAEC Road, Palo, IA 5232 cy (IES Utilities)

Type Code Symbol Stamp Authorization No.

4 Expiration Date None None None 4.

Identification of System:

Main Steam Safety Relief Valve (Class I)

(a) Applicable Construction Code ASME III 19 68 Edition W68 Addenda N/A Code Case.

(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92

6.

Identilication of Components Repaired or Re laced and Re lacement Components AS'%I E l

Nameor Name Of NManuifacturer Ytar Buill Repaired.

Code Component Manufracturer Serial No.

National Other ldentification Replaced, or Slaniped (Ianger No.)

Board No.

Replacenlent (YES or Work OrderIStlS NO)

Main Valve Body Tar-el Rock S/N 218 N/A P'SV 4407 1974 Replacemient Yes

7.

Description of Work:

Main Valve Body S/N 218 was repaired and documented on NIS-2 (15-97-12). This Main Valve Body was rotated in place of S/N 202.

8.

Tests Conducted:

hydrostatic i

Pneumatic j-Nominal Operating Pressure I

rV_

Other EZ Pressure 1020 psi Test Temp 240.6 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x I I in., (2) information in items I through 6 on this report is inclided on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12182) This Form (E00030) may be obtained from the Order Dept., ASME, 345 1E.

47th St., New York, NY 10017.

I OR\\I NI-I9-05-3 1 FORM^^ NIS-2 (I:ack)

Renu tiks:

N lainVal!*e I!odv S N 4)' !;as rginov!;1ll\\;tb!l cd m auiVkeBd Si KN 2lS'a n!s911!taled 1u uor to instllatio.S N

. ~..s riz.ired. -

.a-nd d

uiiet-If!!c.

NIS-2 (I 5-97-i 2). A\\V..

.I-05)) I) ; s cmpeted on

.the n

!!hai.

CoillneCtion and found acceptable.

CE IRTIFICATE OF COMP'LIANCE IWe certify that the statements made in the report are correct and this conformis to the rules ol the ASNIIE Code.Section XI.

Replacement (repair or replacemient)

Typc Code Symbol Stamp Certificate of Authorizat ion No.

Signcd ci Cor None None 1 xpiration Date

(;I. Equipment Mloniitoring Date l

Z-9, N/A 2005 Owner or Owner's Oesignee. ritle

(:ClF:IFlCA Or

()1-INSEIIVICE INSP'ECTION

1. the undersigned, holding a valid commission issued by the National Board of Boiler aun(d Pressiure Vessel Inspectors and the State or Province of lowa and employed by I ISB C l.

of I lartford. Conn.

have inspected the components described in this Owner's Report during the period j i -

o

- 9 LI c, and state that to the best of my knowledge and helief, the Owner has perforined examinations anti taken corrective measures described in this Oner's Report in accordance with the requirements of the ASNIE Code, Section Xl.

By' signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owvner's Report. Furthermore, neither the Inspector nor his emiplover shall be liable in any manner for any personal injury or properly damage or a loss of any kind arising from or connected with this inspection.

Commissions i3

,.):3 N4'AZ, i q-i Inspector's Signature National Board. State, Province, and [Endorsements D ate

. 005 I~t 2 0

FORM NIS-2 19-05-32 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions ofthe ASMF Code Section XI

1.

Owners Alliant Energy (lIES Utilities)

Name Date P. O. Box 351, Cedar Rapids, IA 52406 Sheet 06/24/05 I_ _

of 2

Address

2.

Plant Duane Arnold Energy Center Name Unit 3277 DAEC Road, Palo, IA 52324 Address CWO A71357 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Enernv (IES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Residual Heat Removal (Class 2)

(a) Applicable Construction Code ANSI B31.7 19 69 Edition N/A (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.

I6.

muentinicaton o0 ComponenIs Kepaired or Ke laced anu Ke lacement components ASINIE Name or Name or NManuracturer Year Built Repaired.

Code Component Mlanuracturer Serial No.

National Other Identification Replaced, or Stamped (Ianger No.)

Board No.

Replacement (YES or W_ ork Order / sis NO)

Residual Heat Dubose National IIT # 24353 N/A 12" IILE.014 dowvnstrcam or 2005 Replacement No Removal Piping Energy N102007

7.

Description of Work:

Replace 18" length section of 12" diameter HLE-014 downstream of M02007. Applied Code Case N416-1.

8.

Tests Conducted:

Hydrostatic 2

Pneumatic D

Nominal Operating Pressure

[EI-Other L

Pressure 177 psi Test Temp 78 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.

l:'ORNI NIS-2 19-

-3 FORM NIS-2 (Ilack)

9.

Remarks:

A I ' Iont section of I2' diameter I IL-() 14 was replaced on CW(O A71357 due to localized thinnin lfbrom cavitation erosion. Ilanear IILIE-014-0111 was renmovdc and reinstalle(I due to interference. A VTi-3 exam was successfililv performed to document proper installation. The welds were radiographed and accepted after one repair. A baseline u rexam was successfully compieted on EC05072. A VT-2 exam (1'05049) was completed on the mechanical connection and found acceptable.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforns to the rules of the ASNIE. Code, Section Xl.

Replacement (repair or replacement)

Type Code Symbol Staimp Certificate of Authorization No.

Signed N

H e

None None Expiration Date GL Equipment Monitoring Date U (4,wt:

N/A 2005 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Sowa and employed by IISB CT.

of Hartford. Conn.

have inspected the components described in this Owner's Report during the period

/-,-

to 60 5

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements oftlie ASNIE Code, Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions IIA5 It? 3-c9q,-1-1V _41

/,/ 96

-Z7.

Inspector's Signature National Board, State, Province, and Endorsements Date 2 00

, 2005

FORM NIS-2 19-05-33 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi

1.

Owners Alliant Energy (IES Utilities)

Name Date 2.

P. 0. Box 351. Cedar Rapids, IA 52406 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 7/21/2005 I_ _

of 2

MWO 1132980 Repair Organization to P. 0. No., Job No., etc.

3.

Work Performed by Alliant Ener Name 3277 DAEC Road, Palo, IA 5232 av (IES Utilities)

Type Code Symbol Stamp Authorization No.

.4 Expiration Date None None None 4.

5.

Identification of System:

Containment Atmosphere Control (a) Applicable Construction Code ANSI B31.7 19 69 Edition 71 (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1992-A92 Addenda N/A Code Case.

I6.

Identilication ot Componenrs Repaired or Keplaced and Ke lacement Components AS.MIE Name of Name of Manufacturer Y'ear Built

Repaired, Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or NO) 2:- Bypass piping Bechtel N/A N/A Removed and rerouted 2:"

tlnkown Repaired No on HILE-23 Bypass piping on I ILE-23 2:" Bypass piping Ladish lit # YU(32K N/A 2" tee installed as part of the 1973 Replaced No on HLE-23 rerouting.

IILE-23-SS47 Bergen Pooner 251 IISSAN3K N/A Piston Rod Connector 1992 Replacement No 1ILE-23-SS17 Bergen Po%%er DA.064 N/A Snubber Unknotsn Replacement No IILE-23-SS-47 Bergen Power 2510 N/A End Cap Assembly 2005 Replacement No 2:" Bypass piping ALRO Steel I It# D22 186 N/A U-Bolt from rod stock 1999 Replacement No on IILE-23 2:" Bypass piping Dubose NES lt# 2Z151 N/A Nuts for attaching U bolt 2003 Replacement No on HLE-23

7.

Description of Work:

Removed part of 2" bypass, and modified supports on Drywell purge piping to allow thermal growth of the containment.

8.

Tests Conducted:

Hydrostatic Z

Pneumatic EX1 Nominal Operating Pressure LIZ Other L Pressure 68.5 psi Test Temp N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This Fonn (E00030) may be obtained from the Order Dept., ASME, 345 E.47th St., New York, NY 10017.

3

IORM NIS-2 19-05-33 FORM N IS-2 (Back)

9.

Remarks:

This work order reconligured the b pass line around the Drvwell purge I ne including a support change and changed a support on the Drvwell purge line. The current support design did not account for containment thermal growth. The bypass line run was cut out and welded, with one elbowv added. Surface exams were successfully performed on the welds. A support on the 2" bypass line was modified, a new u-bolt was installed that allowed for thermal movement. The new welds and fitting were pneumatically pressure tested successfully (P05053) A snubber (previously installed under PWOI 131078) was installed on the Drvwell pursue line.

Successful VT-3 was nerforined (P05052) afler the newv supports were installed.

CERTIFICATE OF COMP11 LIANCE We certify that the statements made in the report are correct and this confonrs to the rules of the ASMI Code, Section Xl.

Repair/Replaceiment (repair or replacement)

Type Code Symbol Stamp None Certificate oftAuthorji, iUnNo.

None Expiration Date Signed Supervisor, Materials/Inspection Date 4L g

2/1 li N/A 2005 I Owne(or Owner's Designee, Title

/I-- 7 CERTIFICATE OF INSERVICE INSIPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of lowa and employed by I ISB CT of Hartford, Conn.

have inspected the components described in this Owner's Report during the period toi,-

o to 7-9 -c so

, and state that to the best of my knowledge and belief, the Owner has perfonned examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owvner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising fromt or connected with this inspection.

_3 @(

Commissions

/VJ

/93dS-v9

/qfG.,2 Inspector's Signature National Board, State, Province, and Endorsements Date 7 -da

, 2005 3

FORNI NIS-2 19-05-34 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xi

1.

Owners Alliant Enerpv (IES Utilities)

Name Date P. O. Box 351, Cedar Rapids, IA 52406 Address Sheet 7/25/2005 I

of 2

2.

Plant Duane Arnold Energy Center Name Unit 3277 DAEC Road, Palo, IA 52324 Address MWO 1133017 Repair Organization to P. 0. No., Job No., etc.

3.

Work Pcrfonmed by Alliant Enerzv (IES Utilities)

Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.

Expiration Date None None None 4.

5.

Identification of System:

Primary Containment (a) Applicable Construction Code ANSI B31.7 19 69 Edition N/A Addenda N/A Code Case.

(b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1992-A92 6.

Identification of Components Repaired or Replaced and Replacement Components ASINIE Namc of Name or Mlanuracturer Year Built Repaired.

Code Component Manufacturer Serial No.

National Other Identification Replaced, or Stamped Board No.

Replacement (YES or

_ _ _N O )

IILE-035 Bechtel N/A N/A Piping outside X-24B Unknown Repaired No penctration I

1.

I I

I

1.

4

7.

Description of Work:

Removed Hanger HLE-35-SR-79 from line HLE-035 to allow for drywell thermal growth.

8.

Tests Conducted:

Hydrostatic L

Pneumatic Cl1 Nominal Operating Pressure LIZ Other Ci-Pressure N/A psi Test Temp NIA 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top ofthis form.

(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., Newv York, NY 10017.

3

IO(RNIl NIS-2 1 9-05-3-1 FORM NIS-2 (Back)

9.

Remarks:

I[his work order rcIop9 hjanher I IL..-35-SR-79 firomi the I ILE 35 line near penetratliont

-L4 13 TIhe hngter \\as removed to allow thermg al or i_1 of the do el l pr ElI17 IS.

CERTIFICATE OF COdIMPLIANCE WVe certify that the statements made in the report are correct and this Repair (repair or replacement) confonns to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp None Certificate of Autl i tion No.

None Expiration Date N/A Signed L

Supervisor. NIaterials/Inspection

[)ate 2005 Owd/er or Owner's Designee, Title CERTIFICATE OF INSERVICE INSIPECTION 1 the undersigned, holding a valid commission issuedl by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of lowa and employed by I ISB CT of Ilartford, Conn.

have inspected the components described in this Owner's Report during the period to

?7 D-of

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthennore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

x U.-

Commissions

/V<% I?3493q,4,-\\

A.

/9 94,

  • ~o Inspector's Signature National Board, State, Province, and Endorsements Date,

2 005 3

I..

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part H, page I of I Corn Belt Power Cooperative Ilumbolt, [A.

I)

Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

2)

Plant:

Duanc Amold Energy Ccnter, Palo, IA. 52324

4)

Owners Certificate ofAuthorization (if required): N/A

6)

National Board Number of Unit N/A

3) Plant Unit: #1
5) Commercial Service Date: 02A)1f75 Gross Generating Capacity. 614 MVE ABSTRACT OF CONDITIONS NOTED AND CORRECTIVE MEASURES TAKEN:

The corrective measures are addressed in this report and were performed in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, 1992 with the 1992 Addenda (Ref. Relief Request NDE-R015 Rev. 1), and the Duane Arnold Energy Center Updated Final Safety Analysis Report. The corrective measures performed as Repairs or Replacements are listed in Part F of this report and are documented, using Form NIS-2, in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, 1992, 1992 Addenda. Specific details and associated records of additional corrective measures are on file at Duane Arnold Energy Center. The corrective measures addressed were performed during the period of April 21,2003 through May 3, 2005.

TIHRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part I, page I of 41 I)

Owners: Interstate Power and Light Company, Ce an Alliant Company M.

P.O. Box 351 Cedar Rapids, IA. 52406

2)

Plant Duane Amold Encrgy Centcr, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

National Board Number of Unit: N/A ntral Iowa Power Cooperative irion, IA.

Corn Belt PowcrCooperative Humbolt, IA.

3) Plant Unit: #1
5) Commercial Service Date: 02/0lins Gross Generating Capacity-614 MWE ISI FIGURES AND ISOMETRICS PLEASE NOTE: ISI Figures and Isometrics are listed in Part B and Part D of this report

1 1/16 Dip.

INSERT PORT WITHDRAW PORT 1/2' DIn DOWEL PIN CRT.

B-C-2 ITEM NO.

87.80 (VT-I UHEN DISASSEMBLED) 89 CRD' S CRD FIGURE NO.

1. 1-8B DRAUINCS:

BECH-BI 1-012

)

Cs U

I-3 t-J

-J F-0 C-)

U, U) coC

0 CA iLn

-T

_jL)

Cl)

M LO C

Cn N

cnU,

-J -

I',I' U ) L )

U n I

I ujW W Jw U I )

0 z

I.-

Cn x

Cr r-

'U I

n I

I?

U) w wY

SEE VS-01-39C E

ii-PLt 0

C-

'U C

w

'U I--

4 o-x41 0

C N

'U z

'U C,

N N

0z z

'U 0

C, 8

r-.

0 (1

.0 0,

-ING SURFACE(7)&

SS BUILD-UP PER WPS-103-3F5 or WPS-143-4F5F7 SECTION A-A IES:

Inservice Inspection Program Reactor Pressure Vessel Sketch

IL Cs w

-J I

Cq Ir 0

O(A C-iU (1)

M In CIn

-j -IiULii i Cq rrI w

LA10U)

(nU)U O'"TO SE DE Cn WW Cn 0

U)

WI

~5'is"--

_ _ W v

II I

9 I.-

3 e.

wI.-

-j wa U)

'II--

-I CL

-I 0j 0j a

U1 0

0 cc~

CC Li-C (IC x

I-Ct d

t:

Wcn C2

..I o r l I

(HMA-B6DD

%8 0

(

l (H10

-2)

N1 (H12-12)

_UTSIDI SEE VS-01-39<2>c 324 REFERENCE DRAWING:

(HMA-B4) 192 V1(H1-7))

(S-02-10(

CHH1-7 SEE VS-01-39<1>

E VS-01-39<1>

DETAIL 4 2

TAIL 2 (TYP(

T J./Thi0'DI)

\\BOTTOM L.. f(L/

A-O'VCB-BI HEAD)

(HC-H2)

(ICSKIRWELD)

PVIW I

H11-)

(H12-1)

DTI (HICA,_

0 12-) (HMA-BD)

((HI1t02 I -

IS9'S /36'/_,_,

n SEEVS-01-39<1>

n l

(HCA-BI z II

<;,'t\\__t-\\

(H10-3)t (H

7 )kiL2W- (H11-3) 30 154 1 /(H0-4) 1

-/h / /

18- (11-4)1

-214)

A l _6

_<\\ > si~'EE VS-01-39<1>

_CE~pp=a

,o1 144-\\

(H11-5) V2 1

W50-X Hl 2-5 (10-6)

V-0-08<1>

(H11-6) tE-01-08<2>

PLAN X

H12-6)

ETAIL 6

'-s_,__,-

(CA-H2)

IL Cr 0~

w O) w zC La.

J i~ _ IES:

BOTTOM HEAD E0 co -i

, N c Inservice Inspection Program ASSEMBLY 7 _

c Reactor Pressure Vessel Sketch DWG.NO.

REV.

M VS-01-07 1

K

L I

DETAIL 1 SKIRT KNUCKLE TO SKIRT KNUCKLE EXTENSION (WELD PER WPS-325-2F4F6)

DETAIL 2 SKIRT EXTENSION GIRTH SEAM (WELD PER WPS-301-lF4)

DETAIL 3 SKIRT EXTENSION TO SUPPORT SKIRT (WELD PER WPS-301-2F4) a-LI.C DETAIL 4 DETAIL 5 SKIRT KNUCKLE VERT SEAMS (WELD PER WPS-303-lF4)

SKIRT EXTENSION VERT SEAMS (WELD PER WPS-301-lF4) 0 2

C Lzr 270-SEAM ORIENTATION.

SKIRT KNUCKLE & SKIRT EXTENSION ib DETAIL 6 DETAIL OF SKIRT KNUCKLE TO BOTTOM HEAD JUNCTION REFERENCE DRAWING:

APED-B11-2655-127 (WELD PER WPS-323-2F4F6 or WPS-343-lF4F6 I_

t_

U_ IES:

SKIRT KNUCKLE &

t C Inservice Inspection Program SKIRT EXTENSION 7 -

Reactor Pressure Vessel Sketch DwG NO.

VS0108 REV.

U C

d LL 01

-I I-.

-J

-J N

tn

-j ea LO2 to Co (3,

z 0

E-cc

(-

U)

A 4t I21

-j tn tL 0

LL ILI:

PLAN VIEW INCONEL BUTTERING

,PER WPS-103-2F43 z

CD C,,

LU kJ\\

NOZZLE ASSEMBLY SECTION A-A REFERENCE DRAWING:

APED-BIl-2655-195 oE IES:HP SEAL LEAK DETECTOR C9 cl Inservice Inspection Program NOZZLE MK N13 77 L Reactor Pressure Vessel Sketch DWG.NO.

REV.

dw I-J

-J A -o~

N

-J L)U}

co

toC, to CD a,VI E

P-cc U,

0 0 z

-jQ)

U) tn a-(Li 0

En PLAN VIEW 2H1 zC Uw I 'I I

I I

I kc; SECTION A-A NOZZLE ASSEMBLY REFERENCE DRAWING:

APED-B11-2655-195 c

o PgaESm LP SEAL LEAK DETECTOR

_ ii Inservice Inspection Program NOZZLE MK N14 717I7 Reactor Pressure Vessel Sketch DWO.NO.

REV.

\\0\\

~ _ _ _ _ _ _ _ _ _ _ _i

180 160 140 120 100 80 60 40 20 0

340 320 300 280 260 240 220 200 180 170150130110 90 70 503l0 10J5 310 i2

,270 250T 23 T210TT907 i

r r

r r-ZI mF a

A-U)

GH 6763I2 (VCB-C5)

N3B N3A N30 N3C (MSB-DI)

IMSA-DO)

(MSD-DI)

(MSC-DI) 09 N12A 0Q N128 (VIC-DI) 2 (VID-D1)

FG 5307_ _

(VCB-B4)

SHELL NO.4 NIIA NIIB (VIA-D1)

(VIB-D0)

N4B 0

N4D 0

IFWB-DL)

N5A (FWD-DL)

N5B

( CSA-DI)

N4A

( CSB-DI)

\\

NC N9

(

i I

(FWA-DI)

X

(

IFWC-DI) lCRA-DI)

J

=

0 U

EF tL u

3843/4 (VCB-83)

SHELL NO.3 NI6A N16B (VIE-DI)

(VIF-DI) 0 0

_CLADDING o

0 PATCHES 0

0 a

0EXAMINED DE 238%

IVCB-A2)

SHELL NO.2 N2D N2C N2B N2A N2H N2G N2F N2E (RRD-DI)

(RRC-DI)

(RRB-D1)

ERRA-D)

(RRH-DI)

(RRG-01)

(RRF-DI)

(RRE-DI)

(Q)

(g)

(Q)_

(B)

NIA (g)

(

(

)

c (RCA-DI) a 0 C NBN8A i

~

-~

N8B

-j (RCB-DI)

(JPA-Dt)

BO (JPB-DI)

>N OUTSIDE BD SE N

OUTSIDE VIEW 0

Li F4 wY TL IJ IES:

VESSEL SHELL RING N c Inservice Inspection Program LAYOUT R7 eactor Pressure Vessel Sketch OWG.NO.

VS 1REV.

d I.-

2 6

d N

En wU w

In F.

IF ti Lw wL U,

N wIn-U, Ii IL w8 Ca 27 n IZ (n=

(n n 0- 9 w

0(11 0

I.-

I.4

\\

- --ELEV.

195.94

--- ELEV. 35.63

-0<

s

-- ELEV. (-139.38 TYP.

TYP. ELE REFERENCE DRAWING:

APED-Bi1-084<1>

2C LL

_ uA IES:

CONTROL ROD DRIVE

__ =

Inservice Inspection Program ASSEMBLY 7 7 A Reactor Pressure Vessel Sketch DWG.NO.

REV.

-LJ I-B-J

-J U,

-J U

tc)

U)

CD F-

0t cc U,

Q LIT S

F 0

P

_ _3

n in a-J z0 I-LL (-

0t z

w 0

(Li 0

w I.-U-Wc:

0 CENTER CRD STUB ASSEMBLY WPS 309-2F43 0D STUB ASSEMBLY NOTEt ALL STUB TUBES SHALL EXTEND A MINIMUM OF 4W4' ABOVE THE INNER SURFACE OF THE BOTTOM HEAD AND A MINIMUM OF lY BELOV THE INNER SURFACE OF THE BOTTOM HEAD.

TYPICAL CR REFERENCE DRAWINGS:

APED-B11-2655-189, APED-BI1-001<2>

cm IES CRD STUB TUBE cm Inservice Inspection Program 77 cReactor Pressure Vessel Sketch DWG.NO.

REV.

LU

-Jtb

~0

r LI P

ow ZZw N n

-rjw f

L0 0.

IL z

C LI-.

REFERENCE DRAWINGS:

APED-B11-042<01>, APED-B11-042<02>.

APED-B11-042<08>% APED-B11-042<09>

IIIr PES:

liii DRY TUBE

, =Inservice Inspection Program____________________

R 7

eactor Pressure Vessel Sketch DWG. NO.

V-30 REV.

CD

\\

Vm3.2.

M w

l

-j t-C4 Cl

(,

vCn Cl)

I-Po w

0 Ld 0z

-J U-00 I,

(-A z

0 Fr wL REFERENCE DRAWING:

APEO-B11-034<01>

Cruj IJES:

_D _

ISIN-CORE HOUSING

=

Inservice Inspection Program

_r Reactor Pressure Vessel Sketch DWG.NO.

wREv.

VSW-180 l 1LADER VESSEL STRBILIZER F ; qvr-*

No.

1. 1 - I 0 P ROUND

_RRMINC RELERSE RECORD REV ORTE PREPARED 2E-EWEDI APPROVED PURPOSE

.5t8^t~~~~~

-t0 E*m7 rl^ 9 '

h4Mb$mumUW~sRt HI 2 DA CELETED OVG PER DURF-0013 TAH RE-ISSUED PER DURF-U0027 I

i I)REC ZKStOVICE ZNSPMfloJ RUE S!CTWN XI [IOIRIC

N STERN "C" DRAWING RELEASE RECORD REV DATE PREPRRED REVIEWED APPROVED PURPOSE T

3 9 JA A H F-REV.PER DURF-U0N27 2

9-2450s DR GP KKM 1S0 S TO CHO FORMRT RS PER NC-85-OT94 3

10-3-91 KKri REMOVED EXTRA UEL NUMER 4 4S&...........zL.......

CHANGED ISO WDSETO AKON-5 7-22-94 OA FED OP

-REVISED PER IS SPECTION VAIN I I-Z4-96 REV._PERDURF-_1H OREC INSERVICE INSPECTION ASME SECTION XI ISOMETRIC

MAIN STEAM "D" rSDo-CS, 20",

6" ISO. NO. 1.2-04 P&10 lSl-nI14 APED-621.7 20 0W220 DW220 RM13l (STEAM TUNNEL)

EL. 763' NON INTECRAL 10 FLOW ELEMENT LINE

2. 2-Z6 I

DRAWING RELEASE RECORD REV DATE PREPARED REVIEWED APPROVEO PURPOSE 3-7-86 L

RCM ISO'S FOR 2nd 10 YEAR PLAN 2

9--m-50.

%tp 1S5' 5 TD CR0 FORMRT MS PER NG-89-e75'I 3 9 DA yFED 6GP REVISE0 PER ISI INSPECTION WALKDOWN 4

j1-8-9C36 TAKI O

GP REV. PER DL-RF-0818 5

3-21-96 JAH DA GP REV.PER DURF-U0027

__I-OREC INSERVICE INSPECTION RSME SECTION XI ISOMETRIC

NLfFB 0QW530 J16

/afi-R 0LW430 H-W330~FW-F B-BPBP6401

____w_4_4__ _________EDE D

W RRELE R E RERORD 4

722-4 D

J FE OP REISEDPE 15 NSPCTO 1.2KD05

\\\\H_____-- 26 K1____-

EL.

811'

)

J2 1

a J1J6 DW5l0 K!

I J

OW410 J5\\

/

8 DW310i J5J i

+

l

\\

~BP-409 1 J J6 DW520 BP1 \\H-6 isBP-410ii BP-416 J7 DW420 i

_ - J8

~DW320

\\\\-0 FEEDWATER "C"'&#"D" DW'._

J9 FWC-, FWD-BP415 i C S.a10 ",1G6 i

J10\\

ISO.

NO.

1.2-06 H-15 iJ15

'/

L

-2 K13 PLID ISI-lilIN 1

i BECH DWG#

DLR-2-4Y-H

\\

8 J1

.BP-6009 J

NE3 K1M J13 7a i

1

\\

18 L

r

!On J17 B

RE-VISE P

i J25 J2TAK J

R 9

/

DW32020 4

6l DE 3BP-414 F

PER1DUBP411 11 BP-600 J7 P412 BP-411 i

i

,AQ~~~29 P40/\\\\

/

I r6"DLA-2l K33 BP-6008 i

C 3

o RSEB-JIi i *-NOS INTEGRRL RB3ISEM UN SO.

1-2-18 DRRUING RELERSE RECORDi i

REV 019TE PREPARED REVIEWED flPPROVED PURPOSEi I 3-11-86 SnL StL RC" ISO'S FOR 2nd 10 YEAR PLANi Z

5-24-90 GP KKt1 ISO'S TO CAD FOtRMT RS PER MG-69-eT9 a

3 I-10-92 b

(p REVISED PER DDC-2041 j

4 t7-22-941 DA BJ8 GP IREVISED PER ISI INSPECTION WALKDOWNi 5

13/26/981 DA TAK GP REVISED PER DURF-U0046i 6

16/4/99 1 OA I

GP I

FED IREVISED PER DURF-U0111i

_ L_._

J----_R--

WgH

-zPlN

] rtdF~~r

ORiEC INSERVICE INSPECTION IISME SECTIOGH XI ISOMETRIC

z 0

'-4 C,

I-Qj/

%'-1 Jl J2 l"-DCA-1 t HIGH PRESSURE COOLRNT INJECTION-STERM Jt*

PSR-CS, 10" ISO. NO, 1.2-09 PBEC ISI-M122 BECH DUG# DLRI 1-H A*

i1 J20 V

J21 CONT'D ON ISO.

NO.

3/4" DLA-3

3/4t-DBA-6S BP6028 K20 DW330 BP6029 CONTROL ROD DRIVE RETURN CRR-SS, CS, 2 1 /2"3" ISO.

NO.

1.2-12R BP4411 BP4410 X-36 EL. 782' CONT. ON ISO. HO. 1.2-12B PUdS Isi-11117 BECH. DWG# DBA-6-1-H ORRUING RELERSE RECORD REV DATE PREPARED REVIEWED APPROVED PURPOSE I

a-13-86

-L

, L RCt1 ISO'S FOR 2nJ 10 YEAR PLAN 2

i-71-io W

I 1f ff -

ISO' S TO CRD FoRMAT RIS PER HG-83-079' 3

7-22-94

-DA JAH / FED GP REVISED PER ISI INSPECTION WALKDOWN 4

7-6-95 DA JDF GP REVISED PER DORF-0013 OREC INSERVICE INSPECTION ASME SECTION XI ISOMETRIC

3/9-CAPPED COHN.

X-36 Ja 7

Ja?

V-17-52 Jas

  • J39 J40 I

J41 IB PUID BECH-l1 17 BECH DUCG O6R-6-2-H JI3 CONTROL ROD DRIVE RETURN CRR-CS, 3"

ISO.

NO.

1.2-12B NON INTEGRAL DRUWIN;G RELEASE RECORD REV DATE PREPARED REVIEWED APPROYED PURPOSE I

3-13-86 S L ML RCn ISO'S FOR 2nd 10 YEAR PLAN Z

1-qo

-(OK *

  • 50S TO Cno FORnRT RS PER HG-89-8754 3

7-22-94 DA JAH / FED GP REVISED PER IS INSPECTION WALKOOWN

-I I

I

+__

L..

OCEC INSERVICE INSPECTION ASHE SECTION XI ISOnETRIC

ISO 1.2-21 RCB JI4 CONT'D ON ISO. NO.

2.2-40

,612l Dov ~Jl

'I 0

LA z

'1 c

n

-u an m

n-4 z

1

'In

A m

n

-4 0

x 0

-4 n)

K' J23 RESIDUAL HEAT REMOVAL-20B RHD -

PUI BECH-M1I19 BGCH DUWG OLA-6-1 -H SS, CS, 20" ISO.

NO.

1. 2 - I 6

I..

I.

0 I

OD I0)

-1 Dx U'1 4

N C

w Th IV L

I,ro 0I

.a I-mI JY-OR AU L5 DJ I Pe

\\J4 IJ l

~LS 5

'i" P-c2 RECIRCULATION PUMP "R" DISCHRRGE VALVE BY-PRSS SEE 1SO.

NO, t.2-Z0---g J43-LS I J'3-LS2 Q

,/

\\

J41-LS J41-LS2 J5A iJ5 -

RCA-, RBR-r-

S o

f-J6-LS %

DW2 (OY AZMKJ KS I

dJ6 SHOCK b

LUCS I

r fls

)

XB31-3099-45 SS7 B

31-3099-48 SSR8 ( //---\\

831 S, 22", f 1"

SD. NO.

1.2-19A 2 SHOCK NS LUGS

\\S S31-v'O43W I" FLOW ELE 1-3099-4

(

d6 K 2m It. m

\\

r m

z C.,

I, r-m m

U' m

v rn o

o

'In Jlt 013

'13 I-w 0

0 0

'1 z

P17

-LbST JI

>o (a DAwM I 512 D12.

J12 iZ2 1n 20wI2P (i39JJ15-LS

/=_\\

J19 OFR-I SHOCK LUG B31-3099-31 LUGS 31-3

-28I SHOC B313

/

LUG DW12e 2 4r DJf20 3 0M J2 JR I -ORA V16-30 J

2--OCR-19 3

vis-as K

831-3S99-17 CF Sfl 93L-3099-(VT-I

Ali-SC428)

JfI-SR-74a 28 )

tMENT LINES JGS X

K35 RJR-J12 v;2 J10

-S N

I.

I In J38

-LS J38

'D J37 DW2 270 AZM)

OI

~wl 1270' AZMW J34 4" P8 1

J32-LS oV 129

'J8

\\

J32-O ti in tla J30-on I.J8 11-831-3e"-53

-g

u 0*,

41,--]

Ill PLI0 BECH-I1I16 t -

NOR INTEGRRL IT B-G-2 TEM 27.50

STUDS, NUTS)

.ini - In in in i.l m

LL 0f)

L-LI (0

I' 0-Hf (D

I CD

=-

LII tD c 1

C3 I 1fl o 4, II,3 ZSCc G

CD LI-

.-~

a_

5)

-7J CD G:1 I

UL 0*

0*

Cw U

0*l 0*

L-Uf LuJ n/

al:

5*

ly-(9 CDl 0 1

,-I s

toz

(-D Z

CJ CD cD U)

(f

-ff DRRWING RELEARSE RECORD REV DRIE PREPRRELO REYVEWED AHPPROVED PURPOSE 1

aZ066 L

Rcn

]SOS FOR 2nod 10 YE.R PLN 2

9i-Vt -"to

____WY_________

ISO'$5 TO CAD FORMAT H5 PER G-a9-e0754 3

7-22-94

-IA JAH / BJB GP REVISEO PER IS1 IDPECTION WALKDO" 4

1-18-96 TAK JW REV. PER OURF-0018 I

I I

-ee Wtrt o

e oe v.- n..

0e-c I-,

VIT

DRAIN LINE I

RECIRCULATIION

" B" ISO.

NO.

1.2-21B P&ID BECH-1I16 FSK-04169 NON INTEGRAiL DRAWING RELEASE RECORD REV DATE PREPARED REVIEWED APPROVED PURPOSE a3-2t-6E L

RCf ISO'S FOR 2nd 10 YEAR PLAN 2

9v14-4o 150'SO TO CAD FOR1tfT RS PER HC-89-07S4 7-22-94 A

JAH / FED OP REVISED PER ISI INSPECTION WALKDOWN G

OflEC IHSERVICE [HSPECTIOH R~S1E SECTIOH XI ISOMETRIC

n VI C,

' n

-I

,rn

,in

  • 0 Ix I :!

rn ii o

I-I

('Ul N,

U, "I

m

.fl ni r'j Nt Ai ra, 0)

£-

--i I c-

r
E D

C-2D N

wo L-co C) CI)

C 0

r-1 (n

0 I1 0"

m 21 C

21 1w U,

21 m

~0 P1 CD CD

-n cn C-o, 2u n.2 I-21 m

r, X

FC I

0 EA)

Pn RMD-J12 R18-J 1 RECIRCULFITION MANIFOLD

" B"

& RISERS A, B,C, D RMB-,

RRR-,

RRB-,

RRC-,

RRD-,

SS, 1 6",

ISO.

N O.

10" 1 e 22 PLID BECH-M116 RPED 0331-9

N8B D01 JET PUMP INSTRUMENTATITON JPB-ss S

T"

" B "

ISO.

NO.

1. 2-26 P&ID BECH-M115 RPED-B 1I-2653-105-4

_DRAWING RELEASE RECORD REV DATE PREPARED REVIEWED APPROVED PURPOSE I a-26-86 LfI L

RCh isa's FOR 2nd 1e YEAR PLAN Z

lzq

  • 1IXM, a505' S TO CAD FORMIRT RS PER NC-89-0794 1 7-22-94 DA JAH / FED GP REVISED PER ISI INSPECTION WALKDOWN DAEC IHSERVICE INSPECTION RSME SECTION XI ISOMETRIC

K2A FSK-037348

  • D OW210 P&ID ]SI tl12G FSK-03734 a. 03992 NON INTEGRAL 122 STANDBY LIQUID CON LCA-SS, 1 1/2",

2",

4" ISO.

NO.

1.2-27 TROL

2 1/2" 2 ",

1 1/'"

N-1 B VESSEL F2 v I J31 JLI J5 EL. 813'-6' D 1 DW510 INSTRUMENTATION N-11B V I B -

SS, 1

1/L4"T 2",

2 1/2"2 ISO.

NO.

1. 2-29 P&lID BECH-f115 FSK-5564 DRHWING RELEASE RECORD REV DATE PREPARED REVIEWED APPROVED PURPOSE 1

3-27-86 RCn ISO'S FOR 2nd 10 YEAR PLAN 2

W (zr- 0 Jlh (%

tt 1O'5 TO CAD FORMAT As PER HG-83-079Y 3

72

-94_A

/FED GP REVISED PER ISI INSPECTION WALKOOWN

_**__ 1/18/96 TAK JW GP REV. PER DUHF-01FB

-_I m

DREC INSERVICE INSPECTION RASE SECTION XI ISOMETRIC

I Is I

Lfl Uf)

(A)

E) 0 0

PLAN VIEW

-BP.

WELD PER WPS-305-lF5 I

1.5 0 I1 I I I1 I

i OVERLAY WPS-103-1F5 E-Li x

0 Ui w

a:

C)

LU I

ELEV. 461'

-ONE LAYER OVERLAY a-Wx6 I

PLAN ELEVATION REFERENCE DRAWINGS:

APED-B11-001<4>. APED-B11-2655-169

_T uC a IES:

FEEDWATER SPARGER

, ~ a Inservice Inspection Program BRACKET 7z Reactor Pressure Vessel Sketch DWG. NO.

VS-01-27 j REV.

0.

I.-

-J

-J

.4-N (n5

-J C.)

1I-a; 0

180-PLAN VIEW 9

WELD PER -

WPS-305-1F5 PLAN VIEW FLANGE SURFACE s0 z

0)

Cn Lii 16 SS OVERLAY ONE LAYER OVERLAY PER WPS-103-1F5 ELEVATION REFERENCE DRAWINGS:

APED-BI1-001<4% APED-BII-2655-171 CD S:

j GUIDE ROD BRACKET

_ cm eInservice Inspection Program

/

Reactor Pressure Vessel Sketch WG. NO.

QREv.

d1 I

I-

-z

-j I.-

L w

0 IE 180-PLAN VIEW LAYER WPS-103-IF5 WELD PER -

WPS-305-IF5 SECTION A-A 0-6' OVERLAY

-- ONE LAYER OVERLAY ELEV. 6021/8 A

A

-A REFERENCE DRAWINGS:

APED-BII-001<4>, APED-B11-2655-170 ELEVATION IES:

Inservice Inspection Program Reactor Pressure Vessel Sketch STEAM DRYER SUPPORT BRACKET I

VS-01-29

es CL j

I 0

-j-J mj z0 P-c-

0 4!v PLAN VIEW-TOP HEAD HEAD FLANGE SEALING SURFARE ELEVATION VIEW WELD REFERENCE DRAWINGS:

SECTION A-A APED-B11-001<4.

APED-B11-2655-172 IES:

Inservice Inspection Program Reactor Pressure Vessel Sketch k STEAM HOLD-DOWN DRYER BRACKETS VS-01-30

w U0 0.

-I I'.

0

-I

-J N

U, Cl)

GC-Ri U

w 0

108' 180' PLAN VIEW CL SECTION A-A ONE LAYER OVERLAY PER WPS-103-1F5 REFERENCE DRAWINGS:

APED-B11-0014>. APED-B11-059, APED-B1I-067. APED-BII-2655-198 ELEVAT I ON

_ __S IES:

SURVEILLANCE Inservice Inspection Program SPECIMEN BRACKET 7 t _z Reactor Pressure Vessel Sketch OWG.NO.

REv.

Cs w

U 0

a.

II.-

E IL 0

-J

-j L0 0r a;

(AnI 0 r 0.a.

Cn 0

PLAN VIEW cn Ca-0 LiL 0

co 11 BUILD-UP PER WPS-103-1F5 or WPS-143-1F5F7 I 1<

6' L

K C

a:i SECTION B-B REFERENCE DRAWINGS:

APED-B11-001<4> APED-B11-2655-167

-II C"

IES:E JET PUMP RISER I% = Inservice Inspection Program SUPPORT PAD R7 eactor Pressure Vessel Sketch DWG NO.

REV.

(k V1 1

d a.

-3 I-IL 0

-j

-j WELD BUILD-UP AS REO'D. PER WPS-309-2F43 SECTION A-A DRILL & TAP %-13 LK 2BxA DEEP A

F 018 co to (A

co It ao U)

(ato Ch U)

U-w 0

(n C,.)

0 bU-Cu

-_ J

.a a

a-zww o c0 r w 0-a0 0 X:-

U) c<

MANHOLE PLUG

3

-J 0.

U)

-i z

C)

Lii 0

Lii Ci) ul 2C Cr-LL REFERENCE DRAWINGS:

APED-B11-2655-2n3. APED-B11-2655-205, APED-B1I-2655-265 1808 1 11 1 IEQ:

LEDGE SEGMENT 1,

Inservice Inspection Program PLATES

-E Reactor Pressure Vessel Sketch DWG.NO.

REV.

N 7

dw L) 0 EL IU-0

-z

-J co z

0 a-C-

Lii 0

z

.500 D0I 2.56 REFERENCE DRAWINGS:

APED-B11-3084 -008, APED-B 1-011 CQI IES:I PERIPHERAL FUEL SUPPORT tc,

=Inservice Inspection Program 77 L E oReactor Pressure Vessel Sketch DWG. NO.

VS-03-09 REV.

~~I F

I I

I I

I I

I 1 I I

1

/1\\62-09-94 DRAFTED FOR VESSEL INSPECTION PROGRAM I MS I DF I GP I SS NO.

DATE REVISION 1DRFIN MI.ENI ER.

0.

-I (0

t,,

I CD M0 c)

M0 m m 0 0 w w

-bl.9h C)-

DU r'1 17 m

C-)

&.t&m~

ii m

NO.

DESCRIPTION BILL OF MATL.

PROCED.

1 TOP PLATE (SEE VS-04-02 2

SIDE RING PLATE (SEE VS-04-02) 3 BOTTOM PLATE (SEE VS-04-03) 4 CROSS BEAMS (SEE VS-04-04) 5 SUPPORT PLATES (SEE VS-04-05) 6 LATCH (SEE VS-04-06) 7 EYEBOLT (SEE VS-04-07) 8 EYEBOLT BLOCK (SEE VS-04-08) 9 PIN BARS (SEE VS-04-09) 10 PIN (0.875" DIA.)

304 A276 COc

01.

1

,. rr U)m 0

z D,

C)c:-I 1-Cq 0tj m

U,m r'

--I 0z w

w II I I I I I I tI rm

'1M U,)

m C)

--i 03 z

C')

C)

 -



I L

I R88/8/95 REVISED PER OURF-0011 I A IGD ISS ISS 12-09-94 DRAFTED FOR VESSEL INSPECTION PROGRAM MS OF GP SS NO. DATE REVISION EI,

.I ENGR.

VER NO.

DESCRIPTION BILL OF MATL.

PROCED.

I HANDLE 2

PIPE 3

CAPSULE BASKET 4

MIDOLE SUPPORT BRACKET PLATE 304 SS 5

BOLT o Pli

,_I C b uo 0 U)

I-CI m CC n

r)Cm D To O.° IN m

m zr-)

0 IC C,

U,)

16.S4 rVIEW O-VIEW C-C VIEW E-E VIEW B-B N)l I

12325 (WITH SPRING RELAXED)

I l

~1.25 IP5 SCH. 40 PIPE -

63.50I

-1 115.37 SPRING RELAXED i

I 71 K-

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part J, page I of 5 I)

Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

Corn Belt Power Cooperative Humbolt, IA.

2)

Plant Duane Amold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

National Board Number of Unit N/A

3) Plant Unit: #l
5) Commercial Service Date: 02/01f75 Gross Generaing Capacity: 614 MWE STATUS OF WORK FOR THIRD TEN YEAR INTERVAL (Those percentages shown are actual, where the percentages exceed the allowable only the maximum (50% for period one and at least 16% for period two) will be taken credit for).

CLASS I ITEM NO.

BI.11 B1.12 B 1.21 B 1.22 B 1.30 B 1.40 B3.90 B3.100 B4.11 B4.12 B4.13 B5.10 B5.20 B5.130 B5.140 B6.10 B6.20 B6.30 B6.40 B6.50 B6.180 B6.190 B6.200 B7.10 B7.50 B7.60 B7.70 B7.80 B9.11 B9.12 B9.21 B9.31 B9.32 B9.40 B10.10 B10.20 TOTAL X 4

8 2

15 1

I 33 33 2

89 30 14 8

8 2

60 56 4

60 60 2

2 2

3 5

2 47 89 94 0

9 6

l 23 5

3 PERIOD 1 0%

0%

25%

0%

50%

33%

48%

48%

0%

0%

0%

50%

38%

38%

0%

33%

29%

100%

33%

33%

0%

0%

0%

33%

20%

0%

4%

15%

22%

0%

22%

17%

0%

22%

0%

33%

PERIOD 2 0%

0%

50%

0%

50%

67%

73%

73%

0%

0%

0%

71%

63%

63%

50%

67%

64%

100%

67%

67%

0%

0%

0%

67%

20%

0%

6%

15%

33%

0%

22%

33%

0%

40%

0%

67%

PERIOD 3 0%

75%

100%

100%

100%

100%

100%

100%

100%

100%

100%

71%

63%

63%

50%

100%

100%

100%

100%

100%

0%

0%

0%

100%

20%

0%

9%

34%

33%

0%

22%

33%

0%

40%

100%

100%

REMARKS See Note 12 See Note 13 See Note 7 See Note 14 See Note 1,8 See Note 1,8 See Note 2 See Note 2 See Note 2 See Note 8 and 1 I See Note 11 See Note 11 See Note 11 See Note 3 See Note 3 See Note 3 See Note 3 See Note 3 See Note 3 See Note 3 See Note 11 See Note 6 and 11 See Note 11 See Note 11 See Note 11 See Note 11 See Note 4 See Note 4

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part J, page 2 of 5

1)

Owners: Interstate Power and light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

Corn Belt Power Cooperative Ilumbolt, IA.

2)

Plant Duane Amold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

National Board Number of Unit N/A

3) Plant Unit: #1
5) Commercial Service Date: 0201/n5 Gross Generating Capacity: 614 MWE STATUS OF WORK FOR THIRD TEN YEAR INTERVAL CLASS I ITEM NO.

TOTAL PERIOD 1 PERIOD 2 PERIOD 3 REMARKS B10.30 1

0%

0%

100%

See Note 4 B12.20 2

0%

0%

0%

B12.50 45 6%

9%

11%

SeeNote3 B13.10 35 37%

63%

100%

SeeNote 15 B13.20 I1 36%

36%

100%

B13.30 27 4%

9%

100%

See Note 16 B13A0 5

20%

20%

100%

B14.10 3

0%

0%

100%

B315.10 I

N/A N/A N/A Once per refueling outage B15.11 I

N/A N/A N/A Once per interval CLASS I AND CLASS 2 Risk Informed ITENM NO.

TOTAL #

PERIOD I PERIOD 2 PERIOD 3 REMARKS R-1 70 0%

33%

61%

See Note 11 CLASS 2 ITEM NO.

TOTAL #

PERIOD I PERIOD 2 PERIOD 3 CI.10 2

50%

50%

100%

REMARKS Cl.20 C2.21 C2.22 C3.10 C3.20 C5.S1 C5.81 C7.10 1

2 2

7 69 5

5s 0%

0%

0%

0%

29%

17%

100%

N/A 100%

50%

50%

0%

57%

36%

100%

N/A 100%

100%

100%

100%

See Note 4 100%

See Note 4 36%

See Note 11 100%

See Note II N/A Once per period N/A Once per interval C7.20 5

N/A N/A

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part J, page 3 of 5 I)

Owners: Interstate Power and light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

Corn Belt Power Cooperative Ilumbolt, IA.

2)

Plant Duane Amold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

National Board Number of Unit: N/A

3) Plant Unit: #1
5) Commercial Service Date: 020 I/75 Gross Generating Capacity 614 MWE STATUS OF WORK FOR THIRD TEN YEAR INTERVAL CLASS I AND 2 SUPPORTS ITEMI NO.

TOTAL #

PERIOD 1 PERIOD 2 PERIOD 3 REMARKS FI.10 42 33%

64%

100%

SeeNote5 F1.20 52 27%

58%

100%

See Note 5 Fl.40 20 40%

65%

100%

See Note 5 STATUS OF WORK FOR (IWE) FIRST TEN YEAR INTERVAL I

CLASSMIC ITEM NO.

El.11 El.12 El.20 E4.11 E5.30 E8.10 E9.20 TOTAL#

3 31 8

2 4

14 PERIOD 1 33%

19%

38%

0%

25%

29%

N/A PERIOD 2 67%

67%

75%

40%

75%

71%

N/A PERIOD 3 100%

87%

100%

100%

100%

78%

N/A REMARKS See Note 9 See Note 10

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part J, page 4 of 5 I)

Owners: Interstate Power and Light Company, Central Iowa Power Cooperative Corn Belt Power Cooperative an Alliant Company Marion, IA.

flumbolt, IA.

P.O. Box 351 Cedar Rapids, IA. 52406

2)

Plant:

DuaneAmoldEnergyCenterPalo,IA.52324

3) Plant Unit: #1
4)

OwnersCertificateofAuthorization(ifrequired): N/A

5) CommercialServiceDate: 02017n5
6)

National Board Number of Unit: N/A Gross Generating Capacity. 614MWE STATUS OF WORK FOR THIRD TEN YEAR INTERVAL NOTE I -

Item Numbers B3.90, B3.100 There are a total of 34 nozzles, however I of the nozzles is exempt by IWB-1220(c) and not included in the percentages.

NOTE 2 -

Item Numbers B4.1 1, B4.12, B4.13 These items are required to be examined during conduct of the system hydrostatic test, IES Utilities has implemented Code Case N-498-1 (TAP-POIO)

NOTE 3 - Item Numbers B6.180, B6.190, B6.200, B7.50, B7.60,B7.70, B7.80, B12.50 These examinations are performed when the component is disassembled for other reasons. Therefore IWVX-2412-1 does not apply.

NOTE 4 - Item Numbers BI0.I0, B10.20, B10.30, C3.10, C3.20 These item numbers are from Code Case N509 (TAP-1004)

NOTE 5 - Item Number Fl.10, Fl.20, Fl.40 These item numbers are from Code Case N491 -I (TAP-1005)

NOTE 6 - Item Number B9.12 There are no welds counted for this item number because of the use of Code Case N-524 (NDE-R009)

NOTE 7 - Item Number B 1.30 50% of the shell-to-flange weld may be performed during the first and third inspection periods as allowed by Note 4 of Table IWB-2500-1.

NOTE 8 - Item Numbers B3.90, B3.100, B5.10 Relief Request NDE-R024 allows alternative percentages (ref. Code Case N-598). 2 of the Nozzle-to-safe-end welds (RRB-F002 and RRD-F002) have been repaired by applying a weld overlay.

These two welds are now covered by the requirements of BWRVIP-75.

NOTE 9 - Item Number E4.11 The DAEC has evaluated the need for augmented examination per this item number and has determined that the Torus should be examined twice per interval. Details are specified in Technical Approach and Position TAP-E002.

NOTE 10- Item Number E9.20 There are no components identified under this item number because the DAEC has been approved to use Option B of Appendix J. The "Performance Based Containment Testing Program" contains the requirements.

NOTE II - Item Numbers B5.XX, B9.XX, C5.XX, and R-I Risk-Informed methods are utilized as described in EPRI TR-I 12657B-A to determine scope of inspections for examination categories B-F, B-J, and C-F-2. The Risk-Informed scope has been combined into a new item number R-I for implementation in the second and third periods of the third interval.

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part J, page 5 of 5 I)

Owners: Interstate Power and light Company, Central Iowa Power Cooperative Corn Belt Power Cooperative an Alliant Company Marion, IA.

Ilumbolt, IA.

P.O. Box 351 Cedar Rapids, IA. 52406

2)

Plant: DuaneAmoldEnergyCenterPalo,IA.52324

3) Plant Unit: #1
4)

Owners Certificate of Authorization (if required): N/A

5) CommercialServiceDate: 020I75
6)

NationalBoardNumberofUnit:

N/A Gross Generating Capacity: 614MWE NOTE 12 - Item Number Bl.1 l There are no welds counted for this item number because of the use of Relief Request NDE-R33 NOTE 13 - Item Number Bl.12 Relief Request submitted July 14, 2005 requested deferral of examination of two welds.

NOTE 14 - Item Number B 1.40 This weld was examined in "thirds". To obtain increased coverage, the "third" that was examined in period I was reexamined in period 3.

NOTE 15 -Item Number B13.10 Areas to be examined shall include the spaces above and below the reactor ore that are made accessible for examination by removal of components during normal refueling outages.

NOTE 16 - Item Number B 13.30 The RFO 17 Summary Report included Shroud Ledge/Vessel Weld (Summary No. 175000) as a B-N-i, B 13.10 examination, however it did not report the B-N-2, B 13.30 VT-3 performed (Summary No. 174700).

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21,2003 through May 3, 2005 Part K, page I of 2 I)

Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

Corn Belt Power Cooperative lumbolt, IA.

2)

Plant:

Duane Amold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

National Board Number of Unit N/A

3) Plant Unit: #1
5) Commercial Service Date:

OnIlfn5 Gross Generating Capacity: 614 MWE RELIEF REQUESTS / CODE CASES The following are the relief requests and code cases that were used during the period of this Summary Report.

RELIEF REQUESTS NDE-ROOI NDE-R008 NDE-ROI I NDE-RO12 NDE-R013 NDE-RO18 NDE-R025 NDE-R026 NDE-R027 NDE-R030 NDE-R031 NDE-R032 NDE-R033 PR-002 MC-R001 MC-R002 MC-R003 MC-R004 MC-R005 MC-R006 MC-R007 CODE CASE #

N-198-1 N-307-1 DESCRIPTION Reactor Vessel weld limitations Use of existing calibration blocks Exemption from Appendix III calibration block notch dimensions Use of the 1992 Addenda of ASME Section XI to govern repairs/replacements Examination of reactor vessel closure head nuts Limited examinations of Nozzle to Vessel welds Alternative requirements to Appendix VIll Supplement 4, length sizing acceptance criteria Alternative Requirements to VII-4240 "Annual Training" Use of the 1992 Edition of ASME Section XI for "Additional Examinations" Use of PDI for dissimilar metal welds in lieu of Supplement 10 to Appendix VIII Use of Examination Volume as defined by N-613-1 Use of PDI for Overlays in lieu of Supplement II to Appendix VIII Reactor Pressure Vessel Circumferential Shell Welds Alternative Testing for Class 2 Pressure Retaining Containment Penetrations connected to non-safety related piping systems Qualification of Nondestructive Examination Personnel Alternative to VT-3 for Seals and Gaskets Alternative to Torque Test of Bolting Preservice Examination of Reapplied Paint or Coatings Visual Examination of Painted or Coated Containment Components Prior to Removal of Paint of Coatings Successive examinations of Repaired Areas Use of Code Case N-601 DESCRIPTION Exemption From Examination for ASME Class 1 and 2 Piping Located at Containment Penetrations.

Revised Ultrasonic Examination Volume for Class I Bolting, Table IWB-2500-1, Examination Category B-G-1, When Examinations Are Conducted From the Center Drilled Hole.

NA416-1 N416-2 N457 Alternative Pressure Test Requirement for Welded Repairs, Fabrication Welds for Replacement Parts and Piping Subassemblies, or Installation of Replacement Items by Welding, Class 1, 2 and 3.

Alternative Pressure Test Requirement for Welded Repairs, Fabrication Welds for Replacement Parts and Piping. Includes limitation from Regulatory Guide 1.147 Revision 13, required using hold times from Section XI 1989 Edition.

Qualification Specification Notch Location for Ultrasonic Examination of Bolts and Studs.

Alternative Examination Coverage for Class I and 2 Welds.

N-460

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT April 21, 2003 through May 3, 2005 Part K, page 2 of 2 I)

Owners: Interstate Power and Ught Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

Corn Belt Power Cooperative Ilumbolt, IA.

2)

Plant Duane Amold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

NationalBoardNumberofUnit N/A

3) Plant Unit: #1
5) Commercial Service Date: 02/017n5 Gross Generating Capacity 614 MWE CODE CASE #

N-461-1 N-491-1 N-498-1 N-503 N-508-1 N-509 N-522 N-524 N-535 N-546 N-552 N-573 N-583 N-598 DESCRIPTION Alternative Rules for Piping Calibration Block Thickness.

Alternative Rules for the Examination of Class 1, 2, 3 and MC Components Supports of Light Water Cooled Power Plants.

Alternative Rules for 10 Year Hydrostatic Pressure Testing for Class 1, 2 and Class 3 Systems.

Limited Certification of Nondestructive Examination Personnel Section XI, Division 1.

Rotation of Serviced Snubbers and Pressure Relief Valves for the Purpose of Testing Section XI, Division 1.

Alternative Rules for the Selection and Examinations of Class 1, 2, and 3 Integrally Welded Attachments,Section XI, Division 1.

Pressure Testing of Containment Piping,Section XI, Division I Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping,Section XI, Division 1.

Alternative Requirements for Inservice Inspection Intervals,Section XI, Division 1.

Alternative Requirements for Qualification of VT-2 Examination Personnel,Section XI, Division 1. Limitation requires initial and every 3 year written testing of examiners on Section XI knowledge, and only applies to performance of examinations.

Alternative Methods - Qualification for Nozzle Inside Radius Section from the Outside Surface,Section XI, Division 1. This Case is referenced in Final Rule dated 9/22/99, I0CFR 50.55a(b)(2)(xv)(J).

Transfer of Procedure Qualification Records Between Owners.

Annual Training Alternative.

Alternative Requirements to Required Percentages of Examination.

ENCLOSURE 2 TO NG-05-0420

Augmented Inspection Results RFO 19 Page 1 of2 System Weld or Component Report Inspection ISI Acc Exam Description Description Number Requirement Iso/Fig Number Feedwvater FWA-Bore (Zone 3) 105009 C

1.2-05 Y

UT FWA-Nozzle (Zones I & 2) 105009 C

1.2-05 Y

UT FWA-Thermal Sleeve I05010 C

1.2-05 Y

UT FWB-Bore (Zone 3) 105011 C

1.2-05 Y

UT FWB-Nozzle (Zones 1 & 2)

I05011 C

1.2-05 Y

UT FWB-Thermal Sleeve 105012 C

1.2-05 Y

UT FWC-Bore (Zone 3) 105017 C

1.2-06 Y

UT FWC-Nozzle (Zones 1 & 2)

I05017 C

1.2-06 Y

UT FWC-Thermal Sleeve 105018 C

1.2-06 Y

UT FWD-Bore (Zone 3) 105019 C

1.2-06 Y

UT FWD-Nozzle (Zones I & 2) 105019 C

1.2-06 Y

UT FWVD-Thernal Sleeve 105020 C

1.2-06 Y

UT Core Spray CSA-F002 105029 A

1.2-07 Y

UT CSA-FO02A I05030 A

1.2-07 Y

UT CSA-F004 I05031 A

1.2-07 Y

UT RWCU CUB-F004 105036 A

1.2-1 IB Y

UT CUB-J019 105037 A

1.2-1 B Y

UT CUB-J022 105038 A

1.2-1 lB Y

UT CUB-J025 105039 A

1.2-1 lB Y

UT RHR RHB-J002 105041 A

1.2-14 Y

UT Recirculation RRF-F002 105047 A

1.2-20 Y

UT RRG-F002 I05048 A

1.2-20 Y

UT RCB-F002 I05051 A

1.2-21A Y

UT RCB-J044 105052 A

1.2-21A Y

UT RRB-F002-OVL 105055 A

1.2-22 Y

UT RRD-F002-OVL 105057 A

1.2-22 Y

UT RRD-JO05 105058 A

1.2-22 Y

UT Jet Pump Inst JPA-F002 105059 A

1.2-25 Y

UT JPA-J003 105060 A

1.2-25 Y

UT JPB-F002 105062 A

1.2-26 Y

UT JPB-J003 105063 A

1.2-26 Y

UT RxVessel CRDRLNozzle 105149 C

VS-01-41 Y

EVT-I Top Guide Latch 1360 105149 D

VS-04-06 Y

VT-I Top Guide Latch 3160 105149 D

VS-04-06 Y

VT-I Top Guide 460 I05149 D

VS-04-10 Y

VT-1 Top Guide 1360 I05149 D

VS-04-10 Y

VT-I Top Guide 2260 105149 D

VS-04-10 Y

VT-1 Top Guide 3160 105149 D

VS-04-10 Y

VT-1 Core Spray 105149 F

VS-05-01 Y

EVT-1 Core Spray Sparger 105149 F

VS-05-02 Y

EVT-I Moist Sep Shrd Head 105149 B

VS-06-02 Y

VT-I Moisture Separator 105149 B

VS-06-03 Y

VT-3 Feedwater Spargers I05149 C

VS-09-01 Y

VT-I CRD Guide Tube I05149 D

VS-12-04 Y

VT-3 /

EVT-1

Augmented Inspection Results RFO 19 Page 2 of 2 System Weld or Component Report Inspection ISI Acc Exam Description Description Number Requirement Iso/Fig Number Torus Torus Support #5 105117 H

N/A Y

VT-3 Torus Support #6 105118 H

N/A Y

VT-3 Earth Quake Tie #2 105119 H

N/A Y

VT-3 Torus Support #7 105120 H

N/A Y

VT-3 Torus Support#8 105121 H

N/A Y

VT-3 Instrument lT-429 105126 H

M144-071 Y

VT-3 Air Accumulator Fuel Oil Day IT-037B 105127 H

M15-56 Y

VT-3 Tank ACC-ACCEPTED, Y INDICATING ACCEPTED, N INDICATING REJECTED.

A-BWRVIP-75 B-GE SILS C - NUREG 0619 D-BWRVIP E - BWRVIP-76 (GL 94-03)

F - BWRVIP-I 8 G - BWRVIP-41 11 - OWNER DEFINED

ENCLOSURE 3 TO NG-05-0420

FORM NIS-I OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As Required by the Provisions of the ASME Code Rules SUPPLEMENT TO RFO 17

SUMMARY

REPORT SUBMITTAL

1. Owner: IES Utilities Inc., an Alliant company. P. O. Box 351, Cedar Rapids, IA 52406 (Note 2)

(Name and address of Owncr)

2. Plant: Duane Arnold Energy Center. 3277 DAEC Road, Palo, IA 52324 (Name and Address of Plant)
3. Plant Unit 1
4. Owvner Certificate of Authorization (if required)

N/A

5. Commercial Service Date 02/01/75
6. National Board Number of Unit N/A
7. Components Inspected Corrected Pages (Part D, Pages 1 and 2) are attached.

Component or Manufacturer Manufacturer State or National Appurtenance or Installer or Installer Province No.

Board No.

_ _ _ _ _S erial N o._

Reactor Chicago Bridge 3-4833 N/A 3663 Pressure

& Iron Vessel (RPV)

I I-

+

4 4-

+

+

I 4-4.

4 4

4-

+

4.

t 4-4-

i i

i.

Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8.5 X II inches. (2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top ofthis form.

(12/82) This form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, N.Y 10010

FORM NIS-1 (back)

8. Examination Dates 12/01/99 to 05/27/01
9. Inspection Interval from 11/01/96 to 11/01/05
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.

Corrected Pages (Part D, Pages 1 and 2) are attached.

I 1. Abstract of Conditions Noted N/A

12. Abstract of Corrective Measures Recommended and Taken N/A We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.

Date

' /Z 7 2005 Signed By A\\Jc;

\\

Certificate of Authorization No. (if applicable)

A/I Expiration Date CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Iowa and employed by Hartford Boiler Co. of Hartford CT have inspected the components described in this Owner's Data Report during the period 12/01/99 to 05/27/01, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Data Report.

Furthermore, neither the Inspector, nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date 7

2005 Commissions6 /d31994, /yQ9 Inspector's Signature National Board, State, Province and No.

Note 1:

As per letter NG-89-3390, the ASME Section Xl "Vessels' RIIR Ileat Exchangers IE-201A and IE-201B and the Reactor Vessel are excluded from the Summary Report to the State.

Note 2:

Other owners are Central Iowa Power Cooperative and Corn Belt Power Cooperative.

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT December 01, 1999 through May 27,2001 Part D, page I of 5 Corn Belt Power Cooperative Ilumbolt, IA.

I)

Owners: IES Utilities Inc., an Alliant company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

2)

Plant:

Duane Amold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

National Board Number of Unit: N/A

3) Plant Unit: #l
5) Commercial Service Date: 02/01/75 Gross Generating Capacity 565 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS 1 ISI ASME XI Component Description Report Examination ISI Iso Category Results RPV Head HCC-13002 (Stud 20 101093 UT VS-01-06 B-A Accepted by

-40) evaluation (AR 25397)

HCC-COOI (Stud 20 101094 UT, MT VS-01-06 B-A Accepted

- 40)

Main Steam MSC-KOIIA 101010 VT-3 1.2-03 F-A Accepted Main Steam PSV-4405 VALVE 101208 VT-3 1.2-03 B-M-2 Accepted BODY PSV-4405 BOLTING 101207 VT-I 1.2-03 B-G-2 Accepted MSD-K034 101015 VT-3 1.2-04 F-A Accepted Feedwater FWB-K036 101021 VT-3 1.2-05 F-A Accepted FWC-K020 101026 VT-3 1.2-06 F-A Accepted FWD-K014 101027 VT-3 1.2-06 F-A Accepted Core Spray CSB-F002 101028 PT, UT 1.2-08 B-F Accepted CSB-F004 101030 PT, UT 1.2-08 B-F Accepted High Pressure PSA-K015 101032 VT-3 1.2-09 F-A Accepted Coolant Injection Control Rod Drive CRA-KO17AA 101051 VT-3 1.2-12A F-A Accepted by repair Return (AR 25237)

Residual Heat RHB-F003 101055 PT, UT 1.2-14 B-F Accepted Removal RHB-K009 101057 VT-3 1.2-14 F-A Accepted RHC-K016 101058 VT-3 1.2-15 F-A Accepted RHD-K005 101059 VT-3 1.2-16 F-A Accepted Reactor Core RSA-KO24AA 101061 VT-3 1.2-17 F-A Accepted Isolation Cooling Recirculation RCA-KO17 101063 VT-3 1.2-19A F-A Accepted Pump 'A' Suction Recirculation RMA-J002 101065 PT, UT 1.2-20 B-J Accepted Manifold 'A' and Risers E,FG,H RMA-J008 101066 PT, UT 1.2-20 B-J Accepted RRF-D001 101067 UT 1.2-20 B-D Accepted RRF-DOOI Inner Rad 101067 UT 1.2-20 B-D Accepted RRH-J005 101069 PT, UT 1.2-20 B-J Accepted Recirculation RBB-JOOI 101070 PT, UT 1.2-21A B-J Accepted System 'B' Suction RBB-KO05A 101071 VT-3 1.2-21A F-A Accepted and Bypass RCB-J030 101203 PT, UT 1.2-21A B-J Accepted RCB-K029 101072 VT-3, PT 1.2-21A F-A/B-K Accepted

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT December 01, 1999 through May 27,2001 Part D Page 2 of 5 I)

Owners: IES Utilities Inc., an Alliant company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion. IA.

Corn Belt Power Cooperative Ilumbolt, IA.

2)

Plant:

Duanc Amold Energy Center, Palo, IA. 52324

4)

OwnersCertiricateofAuthorization(ifrequired): N/A

6)

National Board NumberofUnit: N/A

3) Plant Unit: #1
5) Commercial Service Date: 02/0/n5 Gross Generating Capacity: 565 MWE COM PONENT AND W'ELD EXAM I NATION IDENTIFICATION RECORDS CLASS I con't ISI ASME Xi Component Description Report Examination ISI Iso Category Results Recirculation RRA-1005 101076 PT, UT 1.2-22 B-J Accepted Manifold 'B' and Risers A,B,C,D RRB-J007 101078 PT, UT 1.2-22 B-J Accepted Reactor Head HSB-D001 101080 UT 1.2-23 B-D Accepted Spare HSB-D001 Inner Rad 101080 UT 1.2-23 B-D Accepted HSB-FLG-BOLTING 101081 VT-I 1.2-23 B-G-2 Accepted Reactor Head Vent HVA-FLG-101116 VT-I 1.2-24 B-G-2 Accepted BOLTING Standby Liquid LCA-F002 101082 PT 1.2-27 B-F Accepted Control LCA-J025 101083 PT 1.2-27 B-i Accepted LCA-J026 101084 PT 1.2-27 B-i Accepted LCA-J026A 101085 PT 1.2-27 B-J Accepted LCA-J027 101086 PT 1.2-27 B-J Accepted LCA-KO03A 101087 VT-3 1.2-27 F-A Accepted Reactor Vessel VIA-D001 101088 UT 1.2-28 B-D Accepted Instrument. N-I IA VIA-DOOI Inner Rad.

101088 UT 1.2-28 B-D Accepted Reactor Vessel VIC-DOOI 101089 UT 1.2-30 B-D Accepted Instrument. N-12A VIC-DOOI Inner Rad.

101089 UT 1.2-30 B-D Accepted Reactor Vessel VIF-D00I 101090 UT 1.2-34 B-D Accepted Instrument. N-16B VIF-D00I Inner Rad.

101090 UT 1.2-34 B-D Accepted VIF-F002 101091 PT 1.2-34 B-F Accepted Reactor Pressure GUIDE ROD BRT(0) 101095 VT-3 VS-01-28 B-N-I Accepted Vessel Internals SHROUD LEDGE 0-101095 VT-3 VS-02-11 B-N-I Accepted 180 SHROUD LEDGE 0-101095 VT-3 VS-02-11 B-N-2 Accepted 180 CORE PLATE 101095 VT-3 VS B-N-I Accepted 02<1>

TOP GUIDE 101095 VT-3 VS-04-01 B-N-I Accepted SAMPLE HOLDER-101095 VT-3 VS-01-31 B-N-I Accepted 108 DEG CLASS I PRESSURE TESTS Class I System STP 3.10.1-01 101092 VT-2 ISONO-P B-P Accepted Leakage Test

FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As Required by the Provisions of the ASME Code Rules SUPPLEMENT TO RFO 18

SUMMARY

REPORT SUBMITTAL I.Owner: Interstate Power and Light Company, an Alliant Co.. P.O. Box 351.Cedar Rapids, IA 52406 *

(Name and address of Owner)

2. Plant: Duane Arnold Energy Center. 3277 DAEC Road. Palo, IA 52324 (Name and Address of Plant)
3. Plant Unit 1
4. Owner Certificate of Authorization (if required)

N/A

5. Commercial Service Date 02/01/75
6. National Board Number of Unit N/A
7. Components Inspected Corrected Page (Part D, Page 3) is attached.

Component or Manufacturer Manufacturer State or National Appurtenance or Installer or Installer Province No.

Board No.

Apputennceor IstalerSerial No.

Reactor Chicago Bridge 3-4833 N/A 3663 Pressure

& Iron Vessel (RPV)

Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8.5 X 11 inches, (2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

(12/82) This form (E00029) may be obtained from the Order Dept., ASNIE, 345 E. 47th St., Newv York, N.Y 10010

FORM NIS-1 (back)

8. Examination Dates 3/31/03 to 4/20/03
9. Inspection Interval from 11/01/96 to 11/01/05
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.

Corrected Page (Part D, Page 3) is attached.

11. Abstract of Conditions Noted N/A
12. Abstract of Corrective Measures Recommended and Taken N/A We certify that the statements made in this report arc correct and the examinations and corrective measures taken conform to the rules of the ASME Code, Section Xi.

Date 7ZL 7 2005 Signed

-/

I I

By

\\Jnl A dk-

Certificate of Authorization No. (if applicable) f/14 Expiration Date_

CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Iova and employed by HSB CT of Hartford CT have inspected the components described in this Owner's Data Report during the period 3/31/03 to 04/20/03, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Data Report. Furthermore, neither the Inspector, nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date 21S 2005

___Commissions fi2 1>234, /LL/GZ Inspector's Signature National Board, State, Province and No.

  • Note - Other owners are Central Iowa Power Cooperative and Corn Belt Power Cooperative.

THIRD TEN YEAR INTERVAL INSERVICE INSPECTION REPORT March 31, 2003 through April 20, 2003 Part D Page 3 of 4

1)

Owners: Interstate Power and Light Company, an Alliant Company P.O. Box 351 Cedar Rapids, IA. 52406 Central Iowa Power Cooperative Marion, IA.

Corn Belt Power Cooperative Hlumbolt, IA.

2)

Plant:

Duane Arnold Energy Center, Palo, IA. 52324

4)

Owners Certificate of Authorization (if required): N/A

6)

National Board Number of Unit: N/A

3) Plant Unit: #l
5) Commercial Service Date: 02/01/7 Gross Generating Capacity: 614 MWE COMPONENT AND WELD EXAMINATION IDENTIFICATION RECORDS CLASS 2 ISI ASME XI Component Description Report Examination IS Iso Category Results Residual Heat HEA-CA-I 103065 UT 2.1-01 C-A Accepted Removal Heat Exchanger HEA-CB-2 103066 MT 2.1-01 C-B Accepted UT Accepted HEA-CB-2 (Inner Rad) 103066 UT 2.1-01 C-B Accepted HEA-CC-7 103067 MT 2.1-01 C-C Accepted VT-3 2.1-01 F-A Accepted HEA-CC-8 (04) 103068 VT-3 2.1-01 F-A Accepted Residual Heat RHA-CE009 103069 MT 2.2-32 C-C Accepted Removal VT-3 F-A Accepted RHA-CE027 103070 VT-3 2.2-32 F-A Accepted RHB-CE050 103071 VT-3 2.2-33 F-A Accepted, but replaced due to planned PWO RHE-CE036 103072 VT-3 2.2-36 F-A Accepted RHF-CE078 103073 VT-3 2.2-37A F-A Accepted RHI-CE052 103074 VT-3 2.2-39 F-A Accepted RHK-CE008A 103075 VT-3 2.2-41 F-A Accepted RHM-CE005 103076 VT-3 2.2-43 F-A Accepted High Pressure HPA-CE016 103077 VT-3 2.2-44 F-A Accepted Coolant Injection HPB-CE013 103079 VT-3 2.2-45 F-A Accepted HPB-CE072 103080 VT-3 2.2-45 F-A Accepted HPC-CE059 103081 VT-3 2.2-46 F-A Accepted