On August 2, 2005, the NRC staff completed its performance review of Three Mile Island Unit 1 for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
On August 2, 2005, the NRC staff completed its performance review of Three Mile Island Unit 1 for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempted from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempted from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at Three Mile Island Unit 1 was within the Regulatory Response column of the NRCs Action Matrix based on one inspection finding being classified as having low to moderate safety significance (White) in the emergency preparedness cornerstone. The White finding was finalized in a letter dated July 29, 2005, and related to not conducting required annual classroom retraining for some members of the emergency response organization. The NRC plans to conduct a Supplemental inspection for this White finding.
Plant performance for the most recent quarter at Three Mile Island Unit 1 was within the Regulatory Response column of the NRCs Action Matrix based on one inspection finding being classified as having low to moderate safety significance (White) in the emergency preparedness cornerstone. The White finding was finalized in a {{letter dated|date=July 29, 2005|text=letter dated July 29, 2005}}, and related to not conducting required annual classroom retraining for some members of the emergency response organization. The NRC plans to conduct a Supplemental inspection for this White finding.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2007. The inspection plan is provided to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2007. The inspection plan is provided to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Mr. Christopher M. Crane                           2 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Dr. Ronald R. Bellamy at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
Mr. Christopher M. Crane 2
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Dr. Ronald R. Bellamy at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
                                                /RA/
/RA/
Brian E. Holian, Director Division of Reactor Projects Docket No. 50-289 License No. DPR-50
Brian E. Holian, Director Division of Reactor Projects Docket No. 50-289 License No. DPR-50


Line 38: Line 38:
D. Allard, PADER M. Schoppman, Framatome ANP
D. Allard, PADER M. Schoppman, Framatome ANP


Mr. Christopher M. Crane                                       3 Distribution w/encl:
Mr. Christopher M. Crane 3
Distribution w/encl:
S. Collins, RA M. Dapas, DRA R. Bellamy, DRP R. Fuhrmeister, DRP D. Kern, DRP, Senior Resident Inspector P. Sauder, DRP, Resident OA S. Lee, RI OEDO R. Laufer, NRR P. Tam, PM, NRR DRS Director, Region I DRS Deputy Director, Region I DRS Branch Chiefs (5)
S. Collins, RA M. Dapas, DRA R. Bellamy, DRP R. Fuhrmeister, DRP D. Kern, DRP, Senior Resident Inspector P. Sauder, DRP, Resident OA S. Lee, RI OEDO R. Laufer, NRR P. Tam, PM, NRR DRS Director, Region I DRS Deputy Director, Region I DRS Branch Chiefs (5)
C. ODaniell, DRP Region I Docket Room (with concurrences)
C. ODaniell, DRP Region I Docket Room (with concurrences)
RidsNrrDipmIipb@nrc.gov Institute of Nuclear Power Operations (INPO)
RidsNrrDipmIipb@nrc.gov Institute of Nuclear Power Operations (INPO)
SISP Review Complete: ___AAR_____ (Reviewers Initials)
SISP Review Complete: ___AAR_____ (Reviewers Initials)
DOCUMENT NAME: S:\ROP-6 Mid-Cycle Review\2005 Mid-Cycle Letters\TMI2005midletterRev3.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE             RI/DRP                       RI/DRP                       RI/DRP NAME               Rfuhrmeister/RLF1             Rbellamy/RRB                 BHolian/BEH DATE               8/05/2005                     8/08/2005                   8/25/2005 OFFICIAL RECORD COPY
DOCUMENT NAME: S:\\ROP-6 Mid-Cycle Review\\2005 Mid-Cycle Letters\\TMI2005midletterRev3.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME Rfuhrmeister/RLF1 Rbellamy/RRB BHolian/BEH DATE 8/05/2005 8/08/2005 8/25/2005 OFFICIAL RECORD COPY


Page 1 of 2                                                                                Three Mile Island 08/30/2005    10:35:18                                                                Inspection / Activity Plan Report 22 08/01/2005 - 03/31/2007 Unit                                                                                                                      No. of Staff     Planned Dates          Inspection Number      Inspection Activity                                                  Title                                    on Site         Start    End              Type 95001         - F/U TO ERO TRAINING WHITE FINDING                                                                     1 1                IP 2515/149            Mitigating Systems Performance Index Pilot Verification                                          08/29/2005 08/31/2005 Safety Issues 71121         - OCC RAD SAFETY                                                                                       1 1                IP 7112101            Access Control to Radiologically Significant Areas                                               10/10/2005 10/14/2005 Baseline Inspections 1                IP 7112102            ALARA Planning and Controls                                                                     10/10/2005 10/14/2005 Baseline Inspections 1                IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                                   10/10/2005 10/14/2005 Baseline Inspections 7111108P      - INSERVICE INSPECTION                                                                                  2 1                IP 2515/160            Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]             10/24/2005 10/28/2005 Safety Issues 1                IP 7111108P            Inservice Inspection Activities - PWR                                                           10/24/2005 10/28/2005 Baseline Inspections 1                IP 7111108P            Inservice Inspection Activities - PWR                                                           10/31/2005 11/04/2005 Baseline Inspections 71121          - OCC RAD SAFETY                                                                                        1 1                IP 7112101            Access Control to Radiologically Significant Areas                                               10/31/2005 11/04/2005 Baseline Inspections 1                IP 7112102            ALARA Planning and Controls                                                                     10/31/2005 11/04/2005 Baseline Inspections 1                IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                                   10/31/2005  11/04/2005 Baseline Inspections TRI FIRE       - TRIENNIAL FIRE PROTECTION INSPECTION                                                                 4 1                IP 7111105T            Fire Protection [Triennial]                                                                      11/28/2005 12/02/2005 Baseline Inspections 1                IP 7111105T            Fire Protection [Triennial]                                                                     12/12/2005 12/16/2005 Baseline Inspections 7111107B       - HEAT SINK                                                                                             1 1                IP 7111107B            Heat Sink Performance                                                                            12/05/2005 12/09/2005 Baseline Inspections 71121         - OCC RAD SAFETY                                                                                       1 1                IP 7112101            Access Control to Radiologically Significant Areas                                               12/12/2005 12/16/2005 Baseline Inspections 1                IP 7112102            ALARA Planning and Controls                                                                     12/12/2005 12/16/2005 Baseline Inspections 1                IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                                   12/12/2005 12/16/2005 Baseline Inspections 1                IP 71151              Performance Indicator Verification                                                               12/12/2005  12/16/2005 Baseline Inspections 71152B         - PI&R                                                                                                 4 1                IP 71152B              Identification and Resolution of Problems                                                        03/13/2006 03/17/2006 Baseline Inspections 1                IP 71152B              Identification and Resolution of Problems                                                       03/27/2006 03/31/2006 Baseline Inspections 71121         - OCC RAD PROT                                                                                         1 1                IP 7112101            Access Control to Radiologically Significant Areas                                               04/03/2006 04/07/2006 Baseline Inspections 1                IP 7112102            ALARA Planning and Controls                                                                     04/03/2006 04/07/2006 Baseline Inspections 1                IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                                   04/03/2006  04/07/2006 Baseline Inspections MODS           - MODS AND 50.59                                                                                       3 1                IP 7111102            Evaluation of Changes, Tests, or Experiments                                                    07/17/2006 07/21/2006 Baseline Inspections 1                IP 7111117B            Permanent Plant Modifications                                                                    07/17/2006 07/21/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.
Three Mile Island Inspection / Activity Plan 08/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2005 10:35:18 Report 22 1
95001
- F/U TO ERO TRAINING WHITE FINDING Safety Issues 08/29/2005 08/31/2005 Mitigating Systems Performance Index Pilot Verification IP 2515/149 1
1 71121
- OCC RAD SAFETY Baseline Inspections 10/10/2005 10/14/2005 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 10/10/2005 10/14/2005 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 10/10/2005 10/14/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
2 7111108P
- INSERVICE INSPECTION Safety Issues 10/24/2005 10/28/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
IP 2515/160 1
Baseline Inspections 10/24/2005 10/28/2005 Inservice Inspection Activities - PWR IP 7111108P 1
Baseline Inspections 10/31/2005 11/04/2005 Inservice Inspection Activities - PWR IP 7111108P 1
1 71121
- OCC RAD SAFETY Baseline Inspections 10/31/2005 11/04/2005 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 10/31/2005 11/04/2005 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 10/31/2005 11/04/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
4 TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 11/28/2005 12/02/2005 Fire Protection [Triennial]
IP 7111105T 1
Baseline Inspections 12/12/2005 12/16/2005 Fire Protection [Triennial]
IP 7111105T 1
1 7111107B
- HEAT SINK Baseline Inspections 12/05/2005 12/09/2005 Heat Sink Performance IP 7111107B 1
1 71121
- OCC RAD SAFETY Baseline Inspections 12/12/2005 12/16/2005 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 12/12/2005 12/16/2005 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 12/12/2005 12/16/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
Baseline Inspections 12/12/2005 12/16/2005 Performance Indicator Verification IP 71151 1
4 71152B
- PI&R Baseline Inspections 03/13/2006 03/17/2006 Identification and Resolution of Problems IP 71152B 1
Baseline Inspections 03/27/2006 03/31/2006 Identification and Resolution of Problems IP 71152B 1
1 71121
- OCC RAD PROT Baseline Inspections 04/03/2006 04/07/2006 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 04/03/2006 04/07/2006 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 04/03/2006 04/07/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
3 MODS
- MODS AND 50.59 Baseline Inspections 07/17/2006 07/21/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 1
Baseline Inspections 07/17/2006 07/21/2006 Permanent Plant Modifications IP 7111117B 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 2                                                                                Three Mile Island 08/30/2005    10:35:18                                                                Inspection / Activity Plan Report 22 08/01/2005 - 03/31/2007 Unit                                                                                                          No. of Staff     Planned Dates        Inspection Number      Inspection Activity                                                  Title                          on Site         Start    End            Type 71122         - PUB RAD PROT                                                                               1 1                IP 7112201            Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems             07/17/2006 07/21/2006 Baseline Inspections 71121          - OCC RAD PROT                                                                              1 1                IP 7112101            Access Control to Radiologically Significant Areas                                   11/06/2006 11/10/2006 Baseline Inspections 1                IP 7112102            ALARA Planning and Controls                                                           11/06/2006 11/10/2006 Baseline Inspections 1                IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                         11/06/2006 11/10/2006 Baseline Inspections 1                IP 71151              Performance Indicator Verification                                                   11/06/2006  11/10/2006 Baseline Inspections 71114         - EP PRGM INSP & PI VERIFICATION                                                             1 1                IP 7111402            Alert and Notification System Testing                                                 12/04/2006 12/08/2006 Baseline Inspections 1                IP 7111403            Emergency Response Organization Augmentation Testing                                 12/04/2006 12/08/2006 Baseline Inspections 1                IP 7111404            Emergency Action Level and Emergency Plan Changes                                     12/04/2006 12/08/2006 Baseline Inspections 1                IP 7111405            Correction of Emergency Preparedness Weaknesses and Deficiencies                     12/04/2006 12/08/2006 Baseline Inspections 1                IP 71151              Performance Indicator Verification                                                   12/04/2006  12/08/2006 Baseline Inspections 7111112       - MAINTENANCE RULE INSP                                                                     1 1                IP 7111112B            Maintenance Effectiveness                                                            01/15/2007 01/19/2007 Baseline Inspections 7111121       - SSD&PC                                                                                     6 1                IP 7111121            Safety System Design and Performance Capability                                      01/22/2007 01/26/2007 Baseline Inspections 1                IP 7111121            Safety System Design and Performance Capability                                       02/05/2007 02/09/2007 Baseline Inspections 1                IP 7111121            Safety System Design and Performance Capability                                       02/19/2007 02/23/2007 Baseline Inspections 1                IP 7111121            Safety System Design and Performance Capability                                       02/26/2007 03/02/2007 Baseline Inspections 7111111B       - LO REQUALIFICATION INSPECTION                                                             3 1                IP 7111111B            Licensed Operator Requalification Program                                            03/19/2007 03/30/2007 Baseline Inspections 71121         - OCC RAD SAFETY                                                                             1 1                IP 7112101            Access Control to Radiologically Significant Areas                                   03/05/2007 03/09/2007 Baseline Inspections 1                IP 7112102            ALARA Planning and Controls                                                           03/05/2007 03/09/2007 Baseline Inspections 1                IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                         03/05/2007  03/09/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
Three Mile Island Inspection / Activity Plan 08/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2005 10:35:18 Report 22 1
71122
- PUB RAD PROT Baseline Inspections 07/17/2006 07/21/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1
1 71121
- OCC RAD PROT Baseline Inspections 11/06/2006 11/10/2006 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 11/06/2006 11/10/2006 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 11/06/2006 11/10/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
Baseline Inspections 11/06/2006 11/10/2006 Performance Indicator Verification IP 71151 1
1 71114
- EP PRGM INSP & PI VERIFICATION Baseline Inspections 12/04/2006 12/08/2006 Alert and Notification System Testing IP 7111402 1
Baseline Inspections 12/04/2006 12/08/2006 Emergency Response Organization Augmentation Testing IP 7111403 1
Baseline Inspections 12/04/2006 12/08/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 12/04/2006 12/08/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1
Baseline Inspections 12/04/2006 12/08/2006 Performance Indicator Verification IP 71151 1
1 7111112
- MAINTENANCE RULE INSP Baseline Inspections 01/15/2007 01/19/2007 Maintenance Effectiveness IP 7111112B 1
6 7111121
- SSD&PC Baseline Inspections 01/22/2007 01/26/2007 Safety System Design and Performance Capability IP 7111121 1
Baseline Inspections 02/05/2007 02/09/2007 Safety System Design and Performance Capability IP 7111121 1
Baseline Inspections 02/19/2007 02/23/2007 Safety System Design and Performance Capability IP 7111121 1
Baseline Inspections 02/26/2007 03/02/2007 Safety System Design and Performance Capability IP 7111121 1
3 7111111B
- LO REQUALIFICATION INSPECTION Baseline Inspections 03/19/2007 03/30/2007 Licensed Operator Requalification Program IP 7111111B 1
1 71121
- OCC RAD SAFETY Baseline Inspections 03/05/2007 03/09/2007 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 03/05/2007 03/09/2007 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 03/05/2007 03/09/2007 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 15:43, 15 January 2025

2005 Mid-Cycle Review and Inspection Plan - Three Mile Island, Unit 1
ML052420723
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/30/2005
From: Brian Holian
NRC/RGN-I/DRP/PB5
To: Crane C
AmerGen Energy Co
Bellamy R Rgn-I/DRP/Br7/610-337-5200
References
Download: ML052420723 (5)


Text

August 30, 2005 Mr. Christopher M. Crane President and CEO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - THREE MILE ISLAND UNIT 1

Dear Mr. Crane:

On August 2, 2005, the NRC staff completed its performance review of Three Mile Island Unit 1 for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempted from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at Three Mile Island Unit 1 was within the Regulatory Response column of the NRCs Action Matrix based on one inspection finding being classified as having low to moderate safety significance (White) in the emergency preparedness cornerstone. The White finding was finalized in a letter dated July 29, 2005, and related to not conducting required annual classroom retraining for some members of the emergency response organization. The NRC plans to conduct a Supplemental inspection for this White finding.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2007. The inspection plan is provided to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Mr. Christopher M. Crane 2

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Dr. Ronald R. Bellamy at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Brian E. Holian, Director Division of Reactor Projects Docket No. 50-289 License No. DPR-50

Enclosure:

Three Mile Island, Unit 1 Inspection/ Activity Plan cc w/encl:

Chief Operating Officer, AmerGen Site Vice President - TMI Unit 1, AmerGen Plant Manager - TMI, Unit 1, AmerGen Regulatory Assurance Manager - TMI, Unit 1, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing - AmerGen Manager Licensing - TMI, AmerGen Vice President - General Counsel and Secretary, AmerGen T. ONeill, Associate General Counsel, Exelon Generation Company J. Fewell, Esq., Assistant General Counsel, Exelon Nuclear Correspondence Control Desk - AmerGen Chairman, Board of County Commissioners of Dauphin County Chairman, Board of Supervisors of Londonderry Township R. Janati, Chief, Division of Nuclear Safety, State of PA J. Johnsrud, National Energy Committee E. Epstein, TMI-Alert (TMIA)

D. Allard, PADER M. Schoppman, Framatome ANP

Mr. Christopher M. Crane 3

Distribution w/encl:

S. Collins, RA M. Dapas, DRA R. Bellamy, DRP R. Fuhrmeister, DRP D. Kern, DRP, Senior Resident Inspector P. Sauder, DRP, Resident OA S. Lee, RI OEDO R. Laufer, NRR P. Tam, PM, NRR DRS Director, Region I DRS Deputy Director, Region I DRS Branch Chiefs (5)

C. ODaniell, DRP Region I Docket Room (with concurrences)

RidsNrrDipmIipb@nrc.gov Institute of Nuclear Power Operations (INPO)

SISP Review Complete: ___AAR_____ (Reviewers Initials)

DOCUMENT NAME: S:\\ROP-6 Mid-Cycle Review\\2005 Mid-Cycle Letters\\TMI2005midletterRev3.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME Rfuhrmeister/RLF1 Rbellamy/RRB BHolian/BEH DATE 8/05/2005 8/08/2005 8/25/2005 OFFICIAL RECORD COPY

Three Mile Island Inspection / Activity Plan 08/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2005 10:35:18 Report 22 1

95001

- F/U TO ERO TRAINING WHITE FINDING Safety Issues 08/29/2005 08/31/2005 Mitigating Systems Performance Index Pilot Verification IP 2515/149 1

1 71121

- OCC RAD SAFETY Baseline Inspections 10/10/2005 10/14/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 10/10/2005 10/14/2005 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 10/10/2005 10/14/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

2 7111108P

- INSERVICE INSPECTION Safety Issues 10/24/2005 10/28/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]

IP 2515/160 1

Baseline Inspections 10/24/2005 10/28/2005 Inservice Inspection Activities - PWR IP 7111108P 1

Baseline Inspections 10/31/2005 11/04/2005 Inservice Inspection Activities - PWR IP 7111108P 1

1 71121

- OCC RAD SAFETY Baseline Inspections 10/31/2005 11/04/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 10/31/2005 11/04/2005 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 10/31/2005 11/04/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

4 TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 11/28/2005 12/02/2005 Fire Protection [Triennial]

IP 7111105T 1

Baseline Inspections 12/12/2005 12/16/2005 Fire Protection [Triennial]

IP 7111105T 1

1 7111107B

- HEAT SINK Baseline Inspections 12/05/2005 12/09/2005 Heat Sink Performance IP 7111107B 1

1 71121

- OCC RAD SAFETY Baseline Inspections 12/12/2005 12/16/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 12/12/2005 12/16/2005 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 12/12/2005 12/16/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

Baseline Inspections 12/12/2005 12/16/2005 Performance Indicator Verification IP 71151 1

4 71152B

- PI&R Baseline Inspections 03/13/2006 03/17/2006 Identification and Resolution of Problems IP 71152B 1

Baseline Inspections 03/27/2006 03/31/2006 Identification and Resolution of Problems IP 71152B 1

1 71121

- OCC RAD PROT Baseline Inspections 04/03/2006 04/07/2006 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 04/03/2006 04/07/2006 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 04/03/2006 04/07/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

3 MODS

- MODS AND 50.59 Baseline Inspections 07/17/2006 07/21/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 1

Baseline Inspections 07/17/2006 07/21/2006 Permanent Plant Modifications IP 7111117B 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Three Mile Island Inspection / Activity Plan 08/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2005 10:35:18 Report 22 1

71122

- PUB RAD PROT Baseline Inspections 07/17/2006 07/21/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1

1 71121

- OCC RAD PROT Baseline Inspections 11/06/2006 11/10/2006 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 11/06/2006 11/10/2006 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 11/06/2006 11/10/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

Baseline Inspections 11/06/2006 11/10/2006 Performance Indicator Verification IP 71151 1

1 71114

- EP PRGM INSP & PI VERIFICATION Baseline Inspections 12/04/2006 12/08/2006 Alert and Notification System Testing IP 7111402 1

Baseline Inspections 12/04/2006 12/08/2006 Emergency Response Organization Augmentation Testing IP 7111403 1

Baseline Inspections 12/04/2006 12/08/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1

Baseline Inspections 12/04/2006 12/08/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1

Baseline Inspections 12/04/2006 12/08/2006 Performance Indicator Verification IP 71151 1

1 7111112

- MAINTENANCE RULE INSP Baseline Inspections 01/15/2007 01/19/2007 Maintenance Effectiveness IP 7111112B 1

6 7111121

- SSD&PC Baseline Inspections 01/22/2007 01/26/2007 Safety System Design and Performance Capability IP 7111121 1

Baseline Inspections 02/05/2007 02/09/2007 Safety System Design and Performance Capability IP 7111121 1

Baseline Inspections 02/19/2007 02/23/2007 Safety System Design and Performance Capability IP 7111121 1

Baseline Inspections 02/26/2007 03/02/2007 Safety System Design and Performance Capability IP 7111121 1

3 7111111B

- LO REQUALIFICATION INSPECTION Baseline Inspections 03/19/2007 03/30/2007 Licensed Operator Requalification Program IP 7111111B 1

1 71121

- OCC RAD SAFETY Baseline Inspections 03/05/2007 03/09/2007 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 03/05/2007 03/09/2007 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 03/05/2007 03/09/2007 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.