IR 05000454/2005011: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{IR-Nav| site = 05000454 | year = 2005 | report number = 011 | url = https://www.nrc.gov/reactors/operating/oversight/reports/byro_2005011.pdf }}
{{Adams
| number = ML060530605
| issue date = 02/21/2006
| title = Errata to Byron Station, Unit 1 and 2, NRC Integrated IR 05000454-05-011; IR 05000455-05-011
| author name = Skokowski R
| author affiliation = NRC/RGN-III/DRP/RPB3
| addressee name = Crane C
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000454, 05000455
| license number = NPF-037, NPF-066
| contact person =
| document report number = IR-05-011
| document type = Inspection Report, Letter
| page count = 3
}}
 
{{IR-Nav| site = 05000454 | year = 2005 | report number = 011 }}
 
=Text=
{{#Wiki_filter:February 21, 2006
 
==SUBJECT:==
ERRATA TO BYRON STATION, UNITS 1 & 2, NRC INTEGRATED INSPECTION REPORT 05000454/2005011; 05000455/2005011
 
==Dear Mr. Crane:==
On February 3, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued Integrated Inspection Report 05000454/2005011; 05000455/2005011 (ML060390424). There was one typographical error in numbering an inspection finding on page 27. The corrected inspection finding is NCV 05000454/2005011-03; 05000455/2005011-03.
 
We apologize for any inconvenience to you and your staff.
 
Sincerely,
/RA/
Richard A. Skokowski, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 See Attached Distribution DOCUMENT NAME:E:\\Filenet\\ML060530605.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME RSkokowski:dtp DATE 02/21/06 OFFICIAL RECORD COPY cc w/encl:
Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station ADAMS Distribution:
GYS JBH1 RidsNrrDirsIrib GEG KGO RAS CAA1 C. Pederson, DRS (hard copy - IRs only)
DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)
}}

Latest revision as of 11:28, 15 January 2025

Errata to Byron Station, Unit 1 and 2, NRC Integrated IR 05000454-05-011; IR 05000455-05-011
ML060530605
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/21/2006
From: Richard Skokowski
NRC/RGN-III/DRP/RPB3
To: Crane C
Exelon Generation Co
References
IR-05-011
Download: ML060530605 (3)


Text

February 21, 2006

SUBJECT:

ERRATA TO BYRON STATION, UNITS 1 & 2, NRC INTEGRATED INSPECTION REPORT 05000454/2005011; 05000455/2005011

Dear Mr. Crane:

On February 3, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued Integrated Inspection Report 05000454/2005011; 05000455/2005011 (ML060390424). There was one typographical error in numbering an inspection finding on page 27. The corrected inspection finding is NCV 05000454/2005011-03; 05000455/2005011-03.

We apologize for any inconvenience to you and your staff.

Sincerely,

/RA/

Richard A. Skokowski, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 See Attached Distribution DOCUMENT NAME:E:\\Filenet\\ML060530605.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME RSkokowski:dtp DATE 02/21/06 OFFICIAL RECORD COPY cc w/encl:

Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station ADAMS Distribution:

GYS JBH1 RidsNrrDirsIrib GEG KGO RAS CAA1 C. Pederson, DRS (hard copy - IRs only)

DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)