{{#Wiki_filter:August 23, | {{#Wiki_filter:August 23, 2006 MEMORANDUM TO: James E. Lyons, Director Division of Risk Assessment Office of Nuclear Reactor Regulation THRU: | ||
Sunil D. Weerakkody, Chief /RA/ | |||
Office of Nuclear Reactor | Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM: | ||
/RA/Fire Protection Branch Division of Risk Assessment | Paul W. Lain, Team Leader NFPA 805 Transition Pilot Program Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation | ||
Office of Nuclear Reactor | |||
Fire Protection Branch Division of Risk Assessment | |||
Office of Nuclear Reactor Regulation | |||
==SUBJECT:== | ==SUBJECT:== | ||
NFPA 805 SECOND PILOT OBSERVATION VISIT TRIP REPORT, MARCH, 2006 We have enclosed the trip report on the second observation visit of pilot plants transitioning to the risk-informed, performance-based fire protection licensing basis in Title 10 of the Code of Federal Regulations (10 CFR) 50.48(c), (the NFPA 805 Rule). The trip occurred March 27 to 30, 2006 at Progress Energy headquarters in Raleigh, NC. The two Utilities with transitioning | NFPA 805 SECOND PILOT OBSERVATION VISIT TRIP REPORT, MARCH, 2006 We have enclosed the trip report on the second observation visit of pilot plants transitioning to the risk-informed, performance-based fire protection licensing basis in Title 10 of the Code of Federal Regulations (10 CFR) 50.48(c), (the NFPA 805 Rule). The trip occurred March 27 to 30, 2006 at Progress Energy headquarters in Raleigh, NC. The two Utilities with transitioning pilot plants; Duke Power for Oconee Nuclear Station and Progress Energy for the Shearon Harris Nuclear Plant provided briefings. We have included the trip report, the agenda, parking lot issues, and Issue Summary Sheets as enclosures to this memo. The handouts from the meeting are available in a separate file. This trip report will be publically available to provide lessons learned to those non-pilot plants transitioning NFPA 805. | ||
pilot plants; Duke Power for Oconee Nuclear Station and Progress Energy for the Shearon | |||
Harris Nuclear Plant provided briefings. We have included the trip report, the agenda, | |||
lot issues, | |||
meeting are available in a separate file. This | |||
==Enclosure:== | ==Enclosure:== | ||
As stated CONTACT: | |||
Paul Lain, NRR/DRA/AFPB 301-415-2346 | |||
MEMORANDUM TO: James E. Lyons, Director Division of Risk Assessment Office of Nuclear Reactor Regulation THRU: | |||
Sunil D. Weerakkody, Chief Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM: | |||
Office of Nuclear Reactor | Paul W. Lain, Team Leader NFPA 805 Transition Pilot Program Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation | ||
Office of Nuclear Reactor | |||
Fire Protection Branch Division of Risk Assessment | |||
Office of Nuclear Reactor Regulation | |||
==SUBJECT:== | ==SUBJECT:== | ||
NFPA 805 SECOND PILOT OBSERVATION VISIT TRIP REPORT, MARCH, 2006 We have enclosed the trip report on the second observation visit of pilot plants transitioning to the risk-informed, performance-based fire protection licensing basis in Title 10 of the Code of Federal Regulations (10 CFR) 50.48(c), (the NFPA 805 Rule). The trip occurred March 27 to 30, 2006 at Progress Energy headquarters in Raleigh, NC. The two Utilities with transitioning | NFPA 805 SECOND PILOT OBSERVATION VISIT TRIP REPORT, MARCH, 2006 We have enclosed the trip report on the second observation visit of pilot plants transitioning to the risk-informed, performance-based fire protection licensing basis in Title 10 of the Code of Federal Regulations (10 CFR) 50.48(c), (the NFPA 805 Rule). The trip occurred March 27 to 30, 2006 at Progress Energy headquarters in Raleigh, NC. The two Utilities with transitioning pilot plants; Duke Power for Oconee Nuclear Station and Progress Energy for the Shearon Harris Nuclear Plant provided briefings. We have included the trip report, the agenda, parking lot issues, and Issue Summary Sheets as enclosures to this memo. The handouts from the meeting are available in a separate file. This trip report will be publically available to provide lessons learned to those non-pilot plants transitioning NFPA 805. | ||
pilot plants; Duke Power for Oconee Nuclear Station and Progress Energy for the Shearon | |||
Harris Nuclear Plant provided briefings. We have included the trip report, the agenda, | |||
lot issues, | |||
meeting are available in a separate file. This | |||
==Enclosure:== | ==Enclosure:== | ||
As stated DISTRIBUTION: | As stated DISTRIBUTION: | ||
ADAMS RidsNrrAdra (GHolahan) | ADAMS RidsNrrAdra (GHolahan) | ||
RidsNrrDra (JLyons) | RidsNrrDra (JLyons) | ||
TQuay MTschiltz RidsNrrDraAfpb RidsNrrDirsIrib AFPB R/F SDinsmore PKoltay DSolorio. OE DStarkey, OE MSalley, RES JS Hyslop, RES AFPB PFillon, RII JBradey, RII RidsRgn1MailCenter RidsRgn2MailCenter RidsRgn3MailCenter RidsRgn4MailCenter ADAMS Accession # (Package): | |||
TQuay MTschiltz RidsNrrDraAfpb | ML061530462 ADAMS Accession # (Memo): | ||
ML061520285 ADAMS Accession # (Trip Report): | |||
RidsNrrDirsIrib AFPB R/F SDinsmore PKoltay DSolorio. OE DStarkey, OE MSalley, RES JS Hyslop, RES AFPB PFillon, RII | ML061500468 ADAMS Accession # (Handouts): | ||
ML061530193 OFFICE DRA:AFPB C:DRA:AFPB NAME PLain SDinsmore SWeerakkody DATE 08/17/06 08/12/06 08 /23/06 OFFICIAL RECORD COPY}} | |||
JBradey, RII | |||
RidsRgn1MailCenter | |||
RidsRgn2MailCenter | |||
RidsRgn3MailCenter | |||
Latest revision as of 08:39, 15 January 2025
| ML061520285 | |
| Person / Time | |
|---|---|
| Site: | Oconee, Harris |
| Issue date: | 08/23/2006 |
| From: | Lain P NRC/NRR/ADRA/DRA |
| To: | Lyons J NRC/NRR/ADRA/DRA |
| Lain P 415-2346, Lavretta A 415-3285 | |
| Shared Package | |
| ML061530462 | List: |
| References | |
| Download: ML061520285 (2) | |
Text
August 23, 2006 MEMORANDUM TO: James E. Lyons, Director Division of Risk Assessment Office of Nuclear Reactor Regulation THRU:
Sunil D. Weerakkody, Chief /RA/
Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM:
Paul W. Lain, Team Leader NFPA 805 Transition Pilot Program Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation
SUBJECT:
NFPA 805 SECOND PILOT OBSERVATION VISIT TRIP REPORT, MARCH, 2006 We have enclosed the trip report on the second observation visit of pilot plants transitioning to the risk-informed, performance-based fire protection licensing basis in Title 10 of the Code of Federal Regulations (10 CFR) 50.48(c), (the NFPA 805 Rule). The trip occurred March 27 to 30, 2006 at Progress Energy headquarters in Raleigh, NC. The two Utilities with transitioning pilot plants; Duke Power for Oconee Nuclear Station and Progress Energy for the Shearon Harris Nuclear Plant provided briefings. We have included the trip report, the agenda, parking lot issues, and Issue Summary Sheets as enclosures to this memo. The handouts from the meeting are available in a separate file. This trip report will be publically available to provide lessons learned to those non-pilot plants transitioning NFPA 805.
Enclosure:
As stated CONTACT:
Paul Lain, NRR/DRA/AFPB 301-415-2346
MEMORANDUM TO: James E. Lyons, Director Division of Risk Assessment Office of Nuclear Reactor Regulation THRU:
Sunil D. Weerakkody, Chief Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM:
Paul W. Lain, Team Leader NFPA 805 Transition Pilot Program Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation
SUBJECT:
NFPA 805 SECOND PILOT OBSERVATION VISIT TRIP REPORT, MARCH, 2006 We have enclosed the trip report on the second observation visit of pilot plants transitioning to the risk-informed, performance-based fire protection licensing basis in Title 10 of the Code of Federal Regulations (10 CFR) 50.48(c), (the NFPA 805 Rule). The trip occurred March 27 to 30, 2006 at Progress Energy headquarters in Raleigh, NC. The two Utilities with transitioning pilot plants; Duke Power for Oconee Nuclear Station and Progress Energy for the Shearon Harris Nuclear Plant provided briefings. We have included the trip report, the agenda, parking lot issues, and Issue Summary Sheets as enclosures to this memo. The handouts from the meeting are available in a separate file. This trip report will be publically available to provide lessons learned to those non-pilot plants transitioning NFPA 805.
Enclosure:
As stated DISTRIBUTION:
ADAMS RidsNrrAdra (GHolahan)
RidsNrrDra (JLyons)
TQuay MTschiltz RidsNrrDraAfpb RidsNrrDirsIrib AFPB R/F SDinsmore PKoltay DSolorio. OE DStarkey, OE MSalley, RES JS Hyslop, RES AFPB PFillon, RII JBradey, RII RidsRgn1MailCenter RidsRgn2MailCenter RidsRgn3MailCenter RidsRgn4MailCenter ADAMS Accession # (Package):
ML061530462 ADAMS Accession # (Memo):
ML061520285 ADAMS Accession # (Trip Report):
ML061500468 ADAMS Accession # (Handouts):
ML061530193 OFFICE DRA:AFPB C:DRA:AFPB NAME PLain SDinsmore SWeerakkody DATE 08/17/06 08/12/06 08 /23/06 OFFICIAL RECORD COPY