IR 05000528/2006007: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 09/21/2006 | | issue date = 09/21/2006 | ||
| title = IR 05000528/2006007, 05000529/2006007, 05000530/2006007; 08/25/2006 - 08/28/2006; Palo Verde Nuclear Generating Station, Units 1, 2 and 3; Security Inspection Letter Only | | title = IR 05000528/2006007, 05000529/2006007, 05000530/2006007; 08/25/2006 - 08/28/2006; Palo Verde Nuclear Generating Station, Units 1, 2 and 3; Security Inspection Letter Only | ||
| author name = Shannon M | | author name = Shannon M | ||
| author affiliation = NRC/RGN-IV/DRS/PSB | | author affiliation = NRC/RGN-IV/DRS/PSB | ||
| addressee name = Levine J | | addressee name = Levine J | ||
| addressee affiliation = Arizona Public Service Co | | addressee affiliation = Arizona Public Service Co | ||
| docket = 05000528, 05000529, 05000530 | | docket = 05000528, 05000529, 05000530 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:September 21, 2006 | ||
==SUBJECT:== | |||
PALO VERDE NUCLEAR GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000528/2006007, 05000529/2006007, and 05000530/2006007 | |||
==Dear Mr. Levine:== | |||
On August 28, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palo Verde Nuclear Generating Station facility. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results that were discussed on August 28, 2006, with you and other members of your staff. | |||
This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | |||
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
Based on the results of this inspection no findings of significance were identified. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS. | |||
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. | |||
Arizona Public Service Company-2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements | Arizona Public Service Company-2-In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information - Withhold under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1). | ||
Sincerely,/RA/Michael P. Shannon, | Sincerely, | ||
/RA/ | |||
Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Dockets: 50-528, 50-529, 50-530 Licenses: NPF-41, NPF-51, NPF-74 NRC Inspection Report 05000528; 05000529; 05000530/2006007 w/Attachment: Supplemental Information cc w/encl: | |||
Craig K. Seaman, General Manager Regulatory Affairs and Performance Improvement Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 | |||
Arizona Public Service Company-3-cc without enclosure: | |||
Electronic distribution by RIV: | |||
Regional Administrator (BSM1) | |||
DRP Director (ATH) | |||
DRS Director (DDC) | |||
DRS Deputy Director (RJC1) | |||
Senior Resident Inspector (GXW2) | |||
Branch Chief, DRP/D (TWP) | |||
Senior Project Engineer, DRP/D(MCH2) | |||
Team Leader, DRP/TSS (RLN1) | |||
RITS Coordinator (KEG) | |||
DRS STA (DAP) | |||
J. Lamb, OEDO RIV Coordinator (JGL1) | |||
ROPreports PV Site Secretary (PRC) | |||
SUNSI Review Completed: Yes ADAMS: O Yes G No Initials: MPS _ | |||
G Publicly Available O Non-Publicly Available O Sensitive G Non-Sensitive PLACE LETTER ONLY IN ADAMS as Publicly Available/Non-Sensitive DOCUMENT: R:\\_REACTORS\\_PV\\2006\\PV2006007-RLP-OUO-Letter.wpd RIV:DRS/PSB Peer Review C:PSB DRP/C C:PSB RLPatterson JRLarsen MPShannon TWPruett MPShannon | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
9/11/06 9/13/06 9/13/06 9/18/06 9/20/06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax | |||
}} | }} | ||
Latest revision as of 06:33, 15 January 2025
| ML062640399 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/21/2006 |
| From: | Shannon M Plant Support Branch Region IV |
| To: | James M. Levine Arizona Public Service Co |
| References | |
| IR-06-007 | |
| Download: ML062640399 (3) | |
Text
September 21, 2006
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000528/2006007, 05000529/2006007, and 05000530/2006007
Dear Mr. Levine:
On August 28, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palo Verde Nuclear Generating Station facility. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results that were discussed on August 28, 2006, with you and other members of your staff.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Arizona Public Service Company-2-In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information - Withhold under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Dockets: 50-528, 50-529, 50-530 Licenses: NPF-41, NPF-51, NPF-74 NRC Inspection Report 05000528; 05000529; 05000530/2006007 w/Attachment: Supplemental Information cc w/encl:
Craig K. Seaman, General Manager Regulatory Affairs and Performance Improvement Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034
Arizona Public Service Company-3-cc without enclosure:
Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJC1)
Senior Resident Inspector (GXW2)
Branch Chief, DRP/D (TWP)
Senior Project Engineer, DRP/D(MCH2)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
J. Lamb, OEDO RIV Coordinator (JGL1)
ROPreports PV Site Secretary (PRC)
SUNSI Review Completed: Yes ADAMS: O Yes G No Initials: MPS _
G Publicly Available O Non-Publicly Available O Sensitive G Non-Sensitive PLACE LETTER ONLY IN ADAMS as Publicly Available/Non-Sensitive DOCUMENT: R:\\_REACTORS\\_PV\\2006\\PV2006007-RLP-OUO-Letter.wpd RIV:DRS/PSB Peer Review C:PSB DRP/C C:PSB RLPatterson JRLarsen MPShannon TWPruett MPShannon
/RA/
/RA/
/RA/
/RA/
/RA/
9/11/06 9/13/06 9/13/06 9/18/06 9/20/06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax