==Dear Mr. Crane:==
==Dear Mr. Crane:==
In accordance with NRC Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff and management have developed Master Inspection Plans (MIP) for the Dresden Unit 1 and Zion Stations. The plans are based on your current performance and schedule of significant decommissioning activities planned for the sites for October 2006 through September 2007 (FY2007). The plans outline how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.
In accordance with NRC Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff and management have developed Master Inspection Plans (MIP) for the Dresden Unit 1 and Zion Stations. The plans are based on your current performance and schedule of significant decommissioning activities planned for the sites for October 2006 through September 2007 (FY2007). The plans outline how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.
Because the FY2007 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY2007, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2007 MIP remains current, we request that you keep the Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Dresden Unit 1 and Zion Stations FY2007 MIPs.
Because the FY2007 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY2007, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2007 MIP remains current, we request that you keep the Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Dresden Unit 1 and Zion Stations FY2007 MIPs.
Line 29: Line 28:
The inspection will be conducted following the completion of the Unit 1 spent fuel pool draining activities and during the processing of the water in the 102 Tank. The following is a list of the inspection procedures we expect to use during our inspection. The specific procedures used during the inspection will depend on the specific decommissioning activities being conducted.
The inspection will be conducted following the completion of the Unit 1 spent fuel pool draining activities and during the processing of the water in the 102 Tank. The following is a list of the inspection procedures we expect to use during our inspection. The specific procedures used during the inspection will depend on the specific decommissioning activities being conducted.
Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.
Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.
Inspection Procedure       Inspection Procedure Title IP 36801       Organization, Management and Cost Controls IP 71801       Decommissioning Performance and Status Review IP 84750       Radioactive Waste Treatment, and Effluent and Environmental Monitoring
Inspection Procedure Inspection Procedure Title IP 36801 Organization, Management and Cost Controls IP 71801 Decommissioning Performance and Status Review IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring


C. Crane                                       It is our expectation that we will conduct two onsite inspections at Zion during FY2007. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.
C. Crane It is our expectation that we will conduct two onsite inspections at Zion during FY2007. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.
Inspection Procedure       Inspection Procedure Title IP 36801         Organization, Management and Cost Controls IP 37801         Safety Reviews, Design Changes, and Modifications IP 40801         Self-Assessment, Auditing, and Corrective Action IP 60801         Spent Fuel Pool Safety IP 62801         Maintenance and Surveillance IP 71801         Decommissioning Performance and Status Review IP 83750         Occupational Radiation Exposure IP 84750         Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750         Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Inspection Procedure Inspection Procedure Title IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Mr. William Snell of my staff at (630) 829-9871.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Mr. William Snell of my staff at (630) 829-9871.
Sincerely,
Sincerely,
                                                /RA/
/RA/
Jamnes L. Cameron, Chief Decommissioning Branch Docket Nos. 050-0010; 050-0295; 050-0304 License Nos. DPR-2; DPR-39; DPR-48 cc:     Daren Perrero, Illinois Emergency Management Agency, Division of Nuclear Safety State Senator Garrett State Senator Geo-Karis
Jamnes L. Cameron, Chief Decommissioning Branch Docket Nos. 050-0010; 050-0295; 050-0304 License Nos. DPR-2; DPR-39; DPR-48 cc:
Daren Perrero, Illinois Emergency Management Agency, Division of Nuclear Safety State Senator Garrett State Senator Geo-Karis


C. Crane                                                                   It is our expectation that we will conduct two onsite inspections at Zion during FY2007. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.
C. Crane It is our expectation that we will conduct two onsite inspections at Zion during FY2007. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.
Inspection Procedure                 Inspection Procedure Title IP 36801                 Organization, Management and Cost Controls IP 37801                 Safety Reviews, Design Changes, and Modifications IP 40801                 Self-Assessment, Auditing, and Corrective Action IP 60801                 Spent Fuel Pool Safety IP 62801                 Maintenance and Surveillance IP 71801                 Decommissioning Performance and Status Review IP 83750                 Occupational Radiation Exposure IP 84750                 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750                 Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Inspection Procedure Inspection Procedure Title IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Mr. William Snell of my staff at (630) 829-9871.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Mr. William Snell of my staff at (630) 829-9871.
Sincerely,
Sincerely,
                                                                          /RA/
/RA/
Jamnes L. Cameron, Chief Decommissioning Branch Docket Nos. 050-0010; 050-0295; 050-0304 License Nos. DPR-2; DPR-39; DPR-48 cc:         Daren Perrero, Illinois Emergency Management Agency, Division of Nuclear Safety State Senator Garrett State Senator Geo-Karis DISTRIBUTION:
Jamnes L. Cameron, Chief Decommissioning Branch Docket Nos. 050-0010; 050-0295; 050-0304 License Nos. DPR-2; DPR-39; DPR-48 cc:
See next page DOCUMENT NAME:E:\Filenet\ML062860327.wpd X Publicly Available                       G Non-Publicly Available                   G Sensitive             X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII                                           RIII                               RIII                               RIII NAME PJLee:mb                                         WGSnell                           JLCameron DATE           10/05/06                             10/11/06                           10/11/06 OFFICIAL RECORD COPY
Daren Perrero, Illinois Emergency Management Agency, Division of Nuclear Safety State Senator Garrett State Senator Geo-Karis DISTRIBUTION:
See next page DOCUMENT NAME:E:\\Filenet\\ML062860327.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME PJLee:mb WGSnell JLCameron DATE 10/05/06 10/11/06 10/11/06 OFFICIAL RECORD COPY


C. Crane           DISTRIBUTION:
C. Crane DISTRIBUTION:
Docket File J. B. Hickman, NMSS C. M. Craig, NMSS R. M. Lickus, RIII J. L. Lynch RIII SRI, Dresden}}
Docket File J. B. Hickman, NMSS C. M. Craig, NMSS R. M. Lickus, RIII J. L. Lynch RIII SRI, Dresden}}

Latest revision as of 05:49, 15 January 2025

Master Inspection Plans - Fy 2007
ML062860327
Person / Time
Site: Dresden, Zion  Constellation icon.png
Issue date: 10/11/2006
From: Jamnes Cameron
NRC/RGN-III/DNMS/DB
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
IP 36801, IP 37801, IP 40801, IP 60801, IP 62801, IP 71801, IP 83750, IP 84750, IP 86750
Download: ML062860327 (4)


Text

October 11, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN UNIT 1 AND ZION STATION MASTER INSPECTION PLANS -

FISCAL YEAR (FY) 2007

Dear Mr. Crane:

In accordance with NRC Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff and management have developed Master Inspection Plans (MIP) for the Dresden Unit 1 and Zion Stations. The plans are based on your current performance and schedule of significant decommissioning activities planned for the sites for October 2006 through September 2007 (FY2007). The plans outline how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.

Because the FY2007 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY2007, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2007 MIP remains current, we request that you keep the Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Dresden Unit 1 and Zion Stations FY2007 MIPs.

We currently project the Region will conduct one inspection at Dresden Unit 1 during FY2006.

The inspection will be conducted following the completion of the Unit 1 spent fuel pool draining activities and during the processing of the water in the 102 Tank. The following is a list of the inspection procedures we expect to use during our inspection. The specific procedures used during the inspection will depend on the specific decommissioning activities being conducted.

Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.

Inspection Procedure Inspection Procedure Title IP 36801 Organization, Management and Cost Controls IP 71801 Decommissioning Performance and Status Review IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring

C. Crane It is our expectation that we will conduct two onsite inspections at Zion during FY2007. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.

Inspection Procedure Inspection Procedure Title IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Mr. William Snell of my staff at (630) 829-9871.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Decommissioning Branch Docket Nos. 050-0010; 050-0295; 050-0304 License Nos. DPR-2; DPR-39; DPR-48 cc:

Daren Perrero, Illinois Emergency Management Agency, Division of Nuclear Safety State Senator Garrett State Senator Geo-Karis

C. Crane It is our expectation that we will conduct two onsite inspections at Zion during FY2007. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.

Inspection Procedure Inspection Procedure Title IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Mr. William Snell of my staff at (630) 829-9871.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Decommissioning Branch Docket Nos. 050-0010; 050-0295; 050-0304 License Nos. DPR-2; DPR-39; DPR-48 cc:

Daren Perrero, Illinois Emergency Management Agency, Division of Nuclear Safety State Senator Garrett State Senator Geo-Karis DISTRIBUTION:

See next page DOCUMENT NAME:E:\\Filenet\\ML062860327.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME PJLee:mb WGSnell JLCameron DATE 10/05/06 10/11/06 10/11/06 OFFICIAL RECORD COPY

C. Crane DISTRIBUTION: