ML071720269: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML071720269
| number = ML071720269
| issue date = 06/21/2007
| issue date = 06/21/2007
| title = 06/05/2007 Summary of Annual Assessment Meeting with Entergy Nuclear Northwest
| title = Summary of Annual Assessment Meeting with Entergy Nuclear Northwest
| author name = Cobey E W
| author name = Cobey E
| author affiliation = NRC/RGN-I/DRP/PB2
| author affiliation = NRC/RGN-I/DRP/PB2
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:June 21, 2007MEETING
{{#Wiki_filter:June 21, 2007 MEETING


==SUMMARY==
==SUMMARY==
LICENSEE:ENTERGY NUCLEAR OPERATIONS, INC.FACILITY:JAMES A. FITZPATRICK NUCLEAR POWER PLANT
LICENSEE:
ENTERGY NUCLEAR OPERATIONS, INC.
FACILITY:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF JUNE 5, 2007, ANNUAL ASSESSMENT MEETING WITHENTERGY NUCLEAR NORTHEASTOn June 5, 2007 at 12:30 p.m., an annual assessment meeting was conducted at the JointNews Center in Fulton, New York, between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The NRC requested the meeting with Entergy officials to discuss the NRC's assessment of the safety performance of the James A.
OF JUNE 5, 2007, ANNUAL ASSESSMENT MEETING WITH ENTERGY NUCLEAR NORTHEAST On June 5, 2007 at 12:30 p.m., an annual assessment meeting was conducted at the Joint News Center in Fulton, New York, between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The NRC requested the meeting with Entergy officials to discuss the NRCs assessment of the safety performance of the James A.
FitzPatrick Nuclear Power Plant for calendar year 2006. A list of meeting attendees is attached. The NRC presented and discussed its assessment of the safety performance of the James A.FitzPatrick Nuclear Power Plant for the period of January 1 through December 31, 2006. The NRC presentation included a discussion on the NRC, its strategic goals, the Reactor Oversight Process, and performance assessment results for calendar year 2006. As part of this regulatory performance meeting, Entergy acknowledged and agreed with NRC's assessment and presented its perspective on the station's performance.The NRC and Entergy presentations were followed by a short question and answer period. Feedback forms submitted by the public following the meeting will be evaluated. NRC's assessment letter can be found in ADAMS with an accession number of ML070610609. The annual assessment meeting notice with the attached meeting agenda, and the NRC and Entergy meeting slides can be located in ADAMS package ML070950570. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
FitzPatrick Nuclear Power Plant for calendar year 2006. A list of meeting attendees is attached.
.Sincerely,/RA by Blake D. Welling For/Eugene W. Cobey, ChiefProjects Branch 2 Division of Reactor Projects
The NRC presented and discussed its assessment of the safety performance of the James A.
FitzPatrick Nuclear Power Plant for the period of January 1 through December 31, 2006. The NRC presentation included a discussion on the NRC, its strategic goals, the Reactor Oversight Process, and performance assessment results for calendar year 2006. As part of this regulatory performance meeting, Entergy acknowledged and agreed with NRC's assessment and presented its perspective on the stations performance.
The NRC and Entergy presentations were followed by a short question and answer period.
Feedback forms submitted by the public following the meeting will be evaluated. NRCs assessment letter can be found in ADAMS with an accession number of ML070610609. The annual assessment meeting notice with the attached meeting agenda, and the NRC and Entergy meeting slides can be located in ADAMS package ML070950570. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA by Blake D. Welling For/
Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects


==Attachment:==
==Attachment:==
Meeting Attendees 2Meeting AttendeesNameBonnie BostianWayne Rheaume
Meeting Attendees  


Jim Costedio Kay Daitcher Gene Dorman Kevin Mulligan Steve Bono Tim Page Tom Gurdziel Ed Stronski Pete DietrichOrganization (If Any)EntergyEntergy Entergy GP Entergy Entergy Entergy Entergy local resident citizen Entergy 2Meeting AttendeesNameBonnie BostianWayne Rheaume
2 Meeting Attendees Name Bonnie Bostian Wayne Rheaume Jim Costedio Kay Daitcher Gene Dorman Kevin Mulligan Steve Bono Tim Page Tom Gurdziel Ed Stronski Pete Dietrich Organization (If Any)
Entergy Entergy Entergy GP Entergy Entergy Entergy Entergy local resident citizen Entergy


Jim Costedio Kay Daitcher Gene Dorman Kevin Mulligan Steve Bono Tim Page Tom Gurdziel Ed Stronski Pete DietrichOrganization (If Any)EntergyEntergy Entergy GP Entergy Entergy Entergy Entergy local resident citizen EntergyDistribution
2 Meeting Attendees Name Bonnie Bostian Wayne Rheaume Jim Costedio Kay Daitcher Gene Dorman Kevin Mulligan Steve Bono Tim Page Tom Gurdziel Ed Stronski Pete Dietrich Organization (If Any)
:E. Cobey, DRP B. Welling, DRP D. Orr, DRP G. Hunegs, DRP, SRI D. Dempsey, DRP, RI R. Martin, DRP, OASUNSI Review Complete:         BDW               (Reviewer's Initials
Entergy Entergy Entergy GP Entergy Entergy Entergy Entergy local resident citizen Entergy Distribution:
)DOCUMENT NAME: C:\FileNet\ML071720269.wpdAfter declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box:
E. Cobey, DRP B. Welling, DRP D. Orr, DRP G. Hunegs, DRP, SRI D. Dempsey, DRP, RI R. Martin, DRP, OA SUNSI Review Complete: BDW (Reviewers Initials)
" C" = Copy without attachment/enclosure   " E" = Copy with attachment/enclosure
DOCUMENT NAME: C:\\FileNet\\ML071720269.wpd After declaring this document An Official Agency Record it will be released to the Public.
" N" = No copyOFFICERI/DRPRI/DRPNAMEBWellingECobey/BDW FORDATE06/20/0706/20/07OFFICIAL RECORD COPYML071720269}}
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME BWelling ECobey/BDW FOR DATE 06/20/07 06/20/07 OFFICIAL RECORD COPY ML071720269}}

Latest revision as of 23:10, 14 January 2025

Summary of Annual Assessment Meeting with Entergy Nuclear Northwest
ML071720269
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/21/2007
From: Cobey E
Reactor Projects Branch 2
To:
Cobey, Eugene W. RI/DRP/PB2/610-337-5171
References
Download: ML071720269 (3)


Text

June 21, 2007 MEETING

SUMMARY

LICENSEE:

ENTERGY NUCLEAR OPERATIONS, INC.

FACILITY:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF JUNE 5, 2007, ANNUAL ASSESSMENT MEETING WITH ENTERGY NUCLEAR NORTHEAST On June 5, 2007 at 12:30 p.m., an annual assessment meeting was conducted at the Joint News Center in Fulton, New York, between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The NRC requested the meeting with Entergy officials to discuss the NRCs assessment of the safety performance of the James A.

FitzPatrick Nuclear Power Plant for calendar year 2006. A list of meeting attendees is attached.

The NRC presented and discussed its assessment of the safety performance of the James A.

FitzPatrick Nuclear Power Plant for the period of January 1 through December 31, 2006. The NRC presentation included a discussion on the NRC, its strategic goals, the Reactor Oversight Process, and performance assessment results for calendar year 2006. As part of this regulatory performance meeting, Entergy acknowledged and agreed with NRC's assessment and presented its perspective on the stations performance.

The NRC and Entergy presentations were followed by a short question and answer period.

Feedback forms submitted by the public following the meeting will be evaluated. NRCs assessment letter can be found in ADAMS with an accession number of ML070610609. The annual assessment meeting notice with the attached meeting agenda, and the NRC and Entergy meeting slides can be located in ADAMS package ML070950570. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA by Blake D. Welling For/

Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects

Attachment:

Meeting Attendees

2 Meeting Attendees Name Bonnie Bostian Wayne Rheaume Jim Costedio Kay Daitcher Gene Dorman Kevin Mulligan Steve Bono Tim Page Tom Gurdziel Ed Stronski Pete Dietrich Organization (If Any)

Entergy Entergy Entergy GP Entergy Entergy Entergy Entergy local resident citizen Entergy

2 Meeting Attendees Name Bonnie Bostian Wayne Rheaume Jim Costedio Kay Daitcher Gene Dorman Kevin Mulligan Steve Bono Tim Page Tom Gurdziel Ed Stronski Pete Dietrich Organization (If Any)

Entergy Entergy Entergy GP Entergy Entergy Entergy Entergy local resident citizen Entergy Distribution:

E. Cobey, DRP B. Welling, DRP D. Orr, DRP G. Hunegs, DRP, SRI D. Dempsey, DRP, RI R. Martin, DRP, OA SUNSI Review Complete: BDW (Reviewers Initials)

DOCUMENT NAME: C:\\FileNet\\ML071720269.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME BWelling ECobey/BDW FOR DATE 06/20/07 06/20/07 OFFICIAL RECORD COPY ML071720269