ML072060123: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML072060123
| number = ML072060123
| issue date = 07/25/2007
| issue date = 07/25/2007
| title = 07/17/2007 Summary of Category 2 Public Meeting Between the Nuclear Regulatory Commission Staff and the Expert Panel for the Wolf Creek Advanced Finite Element Analyses (Fea)
| title = Summary of Category 2 Public Meeting Between the Nuclear Regulatory Commission Staff and the Expert Panel for the Wolf Creek Advanced Finite Element Analyses (Fea)
| author name = Gutierrez M
| author name = Gutierrez M
| author affiliation = NRC/RES/DFERR/DDME/CIB
| author affiliation = NRC/RES/DFERR/DDME/CIB
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:July 25, 2007 MEMORANDUM TO: Jennifer L. Uhle, Director Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research THRU:                   Robert Hardies, Chief         /RA/
{{#Wiki_filter:July 25, 2007 MEMORANDUM TO: Jennifer L. Uhle, Director Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research THRU:
Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research FROM:                 Mauricio Gutierrez, General Engineer         /RA/
Robert Hardies, Chief  
Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research
/RA/
Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research FROM:
Mauricio Gutierrez, General Engineer  
/RA/
Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF THE JULY 17, 2007 CATEGORY 2 PUBLIC MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION STAFF AND THE EXPERT PANEL FOR THE ADVANCED FINITE ELEMENT ANALYSES (FEA) OF PRESSURIZER NOZZLE WELDS On July 17, 2007, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a Category 2 public meeting with industry representatives. The meeting was held at Dominion Engineering, Inc. offices in Reston, VA by means of a teleconference with electronically distributed presentations. A list of attendees, industry and NRC staff presentations are enclosed. The meeting was a continuation of ongoing discussions between industry representatives and NRC staff regarding the likelihood that pressurizer nozzle dissimilar metal welds, susceptible to stress corrosion cracking, will leak before rupturing under certain conditions.
OF THE JULY 17, 2007 CATEGORY 2 PUBLIC MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION STAFF AND THE EXPERT PANEL FOR THE ADVANCED FINITE ELEMENT ANALYSES (FEA) OF PRESSURIZER NOZZLE WELDS On July 17, 2007, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a Category 2 public meeting with industry representatives. The meeting was held at Dominion Engineering, Inc. offices in Reston, VA by means of a teleconference with electronically distributed presentations. A list of attendees, industry and NRC staff presentations are enclosed. The meeting was a continuation of ongoing discussions between industry representatives and NRC staff regarding the likelihood that pressurizer nozzle dissimilar metal welds, susceptible to stress corrosion cracking, will leak before rupturing under certain conditions.
Line 26: Line 29:
The meeting began with a discussion by representatives of Dominion Engineering of their final analytical results. New evaluations addressing the effects of multiple flaws were also introduced.
The meeting began with a discussion by representatives of Dominion Engineering of their final analytical results. New evaluations addressing the effects of multiple flaws were also introduced.
Model validation was discussed further, and will be addressed specifically through evaluation comparisons with a crack found at Duane Arnold as described in Materials Reliability Program Report (MRP)-113 (ADAMS Accession Number: ML042080193) and a comparison between calculated and measured residual stresses from a European Union round-robin validation exercise. The meeting concluded with a discussion on the final project schedule, milestones, and deliverable. The NRC staff recognized industrys significant efforts to develop, benchmark, verify, and evaluate the advanced Finite Element Analysis program including validation of weld residual stresses. A table of NRC comments was provided in the NRC presentation with the most significant comments highlighted in yellow.
Model validation was discussed further, and will be addressed specifically through evaluation comparisons with a crack found at Duane Arnold as described in Materials Reliability Program Report (MRP)-113 (ADAMS Accession Number: ML042080193) and a comparison between calculated and measured residual stresses from a European Union round-robin validation exercise. The meeting concluded with a discussion on the final project schedule, milestones, and deliverable. The NRC staff recognized industrys significant efforts to develop, benchmark, verify, and evaluate the advanced Finite Element Analysis program including validation of weld residual stresses. A table of NRC comments was provided in the NRC presentation with the most significant comments highlighted in yellow.
CONTACT: Mauricio Gutierrez, RES/DFERR 301-415-1122
CONTACT: Mauricio Gutierrez, RES/DFERR 301-415-1122  


J. Uhle                                     A member of the public was present at the meeting. The information discussed was non-proprietary. Please direct any inquiries to me at 301-415-1122 or mrg3@nrc.gov.
J. Uhle A member of the public was present at the meeting. The information discussed was non-proprietary. Please direct any inquiries to me at 301-415-1122 or mrg3@nrc.gov.  


==Enclosure:==
==Enclosure:==
: 1. List of Attendees
: 1. List of Attendees
: 2. Industry Presentation
: 2. Industry Presentation
: 3. NRC Presentation
: 3. NRC Presentation  


J. Uhle                                                     A member of the public was present at the meeting. The information discussed was non-proprietary. Please direct any inquiries to me at 301-415-1122 or mrg3@nrc.gov.
J. Uhle A member of the public was present at the meeting. The information discussed was non-proprietary. Please direct any inquiries to me at 301-415-1122 or mrg3@nrc.gov.  


==Enclosure:==
==Enclosure:==
Line 41: Line 44:
: 2. Industry Presentation
: 2. Industry Presentation
: 3. NRC Presentation DISTRIBUTION:
: 3. NRC Presentation DISTRIBUTION:
DFERR r/f                       ME r/f                 MEvans           RidsNrrDprPspb               RidsNrrDciCpnb RidsOpaMail                     RidsNrrAdro             RidsNrrDpr       Tlupold                       RidsOgcMailCenter RidsNrrDe                       JGrobe                 TMensah           WBateman                     Chai-Fu Sheng RidsACrsAcnwMailCenter         RHardies               ESullivan         TChan G:¥DFERR¥Mauricio Gutierrez¥July 17 Meeting¥July 17 Meeting Summary.doc OAR in ADAMS? (Y or N) Y           ADAMS ACCESSION NO.: ML072060132                   TEMPLATE NO. RES- 006 Publicly Available? (Y or N) Y     DATE OF RELEASE TO PUBLIC 07/31/07                             SENSITIVE? N To receive a copy of this document, indicate in the box: "C" = Copy without enclosure "E" = Copy with enclosure AN" = No copy OFFICE       RES/DFERR/CIB       RES/DFERR/CIB               BC:RES/DFERR/           SUNSI Review             SUNSI Review CIB                    Complete                  Complete NAME         MGutierrez           ACsontos                   RHardies               MGutierrez               RHardies DATE         07/25/07             0724/07                     07/24/07               07/25/07                 07/25/07 OFFICIAL RECORD COPY
DFERR r/f ME r/f MEvans RidsNrrDprPspb RidsNrrDciCpnb RidsOpaMail RidsNrrAdro RidsNrrDpr Tlupold RidsOgcMailCenter RidsNrrDe JGrobe TMensah WBateman Chai-Fu Sheng RidsACrsAcnwMailCenter RHardies ESullivan TChan G:¥DFERR¥Mauricio Gutierrez¥July 17 Meeting¥July 17 Meeting Summary.doc OAR in ADAMS? (Y or N) Y ADAMS ACCESSION NO.: ML072060132 TEMPLATE NO. RES- 006 Publicly Available? (Y or N) Y DATE OF RELEASE TO PUBLIC 07/31/07 SENSITIVE? N To receive a copy of this document, indicate in the box: "C" = Copy without enclosure "E" = Copy with enclosure AN" = No copy OFFICE RES/DFERR/CIB RES/DFERR/CIB BC:RES/DFERR/
CIB SUNSI Review Complete SUNSI Review Complete NAME MGutierrez ACsontos RHardies MGutierrez RHardies DATE 07/25/07 0724/07 07/24/07 07/25/07 07/25/07 OFFICIAL RECORD COPY  


Nuclear Regulatory Commission Meeting with the Expert Panel for Wolf Creek Finite Element Analysis July 17, 2007 U.S. NUCLEAR REGULATORY COMMISSION Edmund Sullivan Aladar Csontos Tim Lupold Simon Sheung Dave Rudland (NRC Contractor)
Nuclear Regulatory Commission Meeting with the Expert Panel for Wolf Creek Finite Element Analysis July 17, 2007 U.S. NUCLEAR REGULATORY COMMISSION Edmund Sullivan Aladar Csontos Tim Lupold Simon Sheung Dave Rudland (NRC Contractor)
Mauricio Gutierrez INDUSTRY Craig Harrington, EPRI Tim Gilman, Structural Integrity Glenn White, DEI John Broussard, DEI Jim Riley Guy DeBoo, Exelon Lee Goyette, DCCP Terry McAlister, VC Summer Warren Bamford, Westinghouse Doug Killian, AREVA Ken Yoon, AREVA PUBLIC Daniel Horner, Platts/McGraw Hill Enclosure 1
Mauricio Gutierrez INDUSTRY Craig Harrington, EPRI Tim Gilman, Structural Integrity Glenn White, DEI John Broussard, DEI Jim Riley Guy DeBoo, Exelon Lee Goyette, DCCP Terry McAlister, VC Summer Warren Bamford, Westinghouse Doug Killian, AREVA Ken Yoon, AREVA PUBLIC Daniel Horner, Platts/McGraw Hill Enclosure 1  


cc:
cc:
Mr. Anthony Pietrangelo, Vice President Regulatory Affairs                             Mr. Alexander Marion, Executive Director Nuclear Energy Institute                       Nuclear Operations & Engineering 1776 I Street, NW, Suite 400                   Nuclear Energy Institute Washington, DC 20006-3708                       1776 I Street, NW, Suite 400 arp@nei.org                                    Washington, DC 20006-3708 am@nei.org Mr. Jack Roe, Director Operations Support                              Mr. Jay Thayer, Vice President Nuclear Energy Institute                       Nuclear Operations 1776 I Street, NW, Suite 400                   Nuclear Energy Institute Washington, DC 20006-3708                       1776 I Street, NW, Suite 400 jwr@nei.org                                    Washington, DC 20006-3708 jkt@nei.org Mr. Charles B. Brinkman Washington Operations                          Mr. John Butler, Director ABB-Combustion Engineering, Inc.                Safety-Focused Regulation 12300 Twinbrook Parkway, Suite 330              Nuclear Energy Institute Rockville, MD 20852                            1776 I Street, NW, Suite 400 brinkmcb@westinghouse.com                      Washington, DC 20006-3708 jcb@nei.org Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector Mr. James H. Riley, Director EPRI                                            Engineering 2000 L Street, NW, Suite 805                    Nuclear Energy Institute Washington, DC 20036                            1776 I Street, NW gvine@epri.com                                  Washington, DC 20006-3708 jhr@nei.org Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing      Mr. David J. Modeen Westinghouse Electric Company                  Vice President and Chief Nuclear Officer P.O. Box 355                                    EPRI Pittsburgh, PA 15230-0355                      1300 W. T. Harris Boulevard greshaja@westinghouse.com                      Charlotte, NC 28262-8550 dmodeen@epri.com Ms. Barbara Lewis Assistant Editor                                Mr. John Gaertner Platts, Principal Editorial Office              EPRI 1200 G St., N.W., Suite 1100                    1300 W.T. Harris Boulevard Washington, DC 20005                            Charlotte, NC 28262-8550 Barbara_lewis@platts.com                        jgaertner@epri.com Mr. Gary Welsh                                  Ms. Rosa Yang Institute of Nuclear Power Operations          EPRI Suite 100                                      3412 Hillview Avenue 700 Galleria Parkway, SE                        Palo Alto, CA 94304-1338 Atlanta, GA 30339-5957                          ryang@epri.com welshgc@inpo.org
Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org Mr. Jack Roe, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036 gvine@epri.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Gary Welsh Institute of Nuclear Power Operations Suite 100 700 Galleria Parkway, SE Atlanta, GA 30339-5957 welshgc@inpo.org Mr. Alexander Marion, Executive Director Nuclear Operations & Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. Jay Thayer, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jkt@nei.org Mr. John Butler, Director Safety-Focused Regulation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org Mr. David J. Modeen Vice President and Chief Nuclear Officer EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 dmodeen@epri.com Mr. John Gaertner EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 jgaertner@epri.com Ms. Rosa Yang EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 ryang@epri.com  


Mr. Kenneth Huffman EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 khuffman@epri.com}}
Mr. Kenneth Huffman EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 khuffman@epri.com}}

Latest revision as of 22:48, 14 January 2025

Summary of Category 2 Public Meeting Between the Nuclear Regulatory Commission Staff and the Expert Panel for the Wolf Creek Advanced Finite Element Analyses (Fea)
ML072060123
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/25/2007
From: Mauricio Gutierrez
NRC/RES/DFERR/DDME/CIB
To: Uhle J
NRC/RES/DFERR
References
Download: ML072060123 (6)


Text

July 25, 2007 MEMORANDUM TO: Jennifer L. Uhle, Director Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research THRU:

Robert Hardies, Chief

/RA/

Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research FROM:

Mauricio Gutierrez, General Engineer

/RA/

Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research

SUBJECT:

SUMMARY

OF THE JULY 17, 2007 CATEGORY 2 PUBLIC MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION STAFF AND THE EXPERT PANEL FOR THE ADVANCED FINITE ELEMENT ANALYSES (FEA) OF PRESSURIZER NOZZLE WELDS On July 17, 2007, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a Category 2 public meeting with industry representatives. The meeting was held at Dominion Engineering, Inc. offices in Reston, VA by means of a teleconference with electronically distributed presentations. A list of attendees, industry and NRC staff presentations are enclosed. The meeting was a continuation of ongoing discussions between industry representatives and NRC staff regarding the likelihood that pressurizer nozzle dissimilar metal welds, susceptible to stress corrosion cracking, will leak before rupturing under certain conditions.

The meeting specifically provided an opportunity for the NRC staff to provide comments on Draft Report A (ADAMS Accession Number: ML071970073) submitted by industry on July 10, 2007.

The meeting began with a discussion by representatives of Dominion Engineering of their final analytical results. New evaluations addressing the effects of multiple flaws were also introduced.

Model validation was discussed further, and will be addressed specifically through evaluation comparisons with a crack found at Duane Arnold as described in Materials Reliability Program Report (MRP)-113 (ADAMS Accession Number: ML042080193) and a comparison between calculated and measured residual stresses from a European Union round-robin validation exercise. The meeting concluded with a discussion on the final project schedule, milestones, and deliverable. The NRC staff recognized industrys significant efforts to develop, benchmark, verify, and evaluate the advanced Finite Element Analysis program including validation of weld residual stresses. A table of NRC comments was provided in the NRC presentation with the most significant comments highlighted in yellow.

CONTACT: Mauricio Gutierrez, RES/DFERR 301-415-1122

J. Uhle A member of the public was present at the meeting. The information discussed was non-proprietary. Please direct any inquiries to me at 301-415-1122 or mrg3@nrc.gov.

Enclosure:

1. List of Attendees
2. Industry Presentation
3. NRC Presentation

J. Uhle A member of the public was present at the meeting. The information discussed was non-proprietary. Please direct any inquiries to me at 301-415-1122 or mrg3@nrc.gov.

Enclosure:

1. List of Attendees
2. Industry Presentation
3. NRC Presentation DISTRIBUTION:

DFERR r/f ME r/f MEvans RidsNrrDprPspb RidsNrrDciCpnb RidsOpaMail RidsNrrAdro RidsNrrDpr Tlupold RidsOgcMailCenter RidsNrrDe JGrobe TMensah WBateman Chai-Fu Sheng RidsACrsAcnwMailCenter RHardies ESullivan TChan G:¥DFERR¥Mauricio Gutierrez¥July 17 Meeting¥July 17 Meeting Summary.doc OAR in ADAMS? (Y or N) Y ADAMS ACCESSION NO.: ML072060132 TEMPLATE NO. RES- 006 Publicly Available? (Y or N) Y DATE OF RELEASE TO PUBLIC 07/31/07 SENSITIVE? N To receive a copy of this document, indicate in the box: "C" = Copy without enclosure "E" = Copy with enclosure AN" = No copy OFFICE RES/DFERR/CIB RES/DFERR/CIB BC:RES/DFERR/

CIB SUNSI Review Complete SUNSI Review Complete NAME MGutierrez ACsontos RHardies MGutierrez RHardies DATE 07/25/07 0724/07 07/24/07 07/25/07 07/25/07 OFFICIAL RECORD COPY

Nuclear Regulatory Commission Meeting with the Expert Panel for Wolf Creek Finite Element Analysis July 17, 2007 U.S. NUCLEAR REGULATORY COMMISSION Edmund Sullivan Aladar Csontos Tim Lupold Simon Sheung Dave Rudland (NRC Contractor)

Mauricio Gutierrez INDUSTRY Craig Harrington, EPRI Tim Gilman, Structural Integrity Glenn White, DEI John Broussard, DEI Jim Riley Guy DeBoo, Exelon Lee Goyette, DCCP Terry McAlister, VC Summer Warren Bamford, Westinghouse Doug Killian, AREVA Ken Yoon, AREVA PUBLIC Daniel Horner, Platts/McGraw Hill Enclosure 1

cc:

Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org Mr. Jack Roe, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036 gvine@epri.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Gary Welsh Institute of Nuclear Power Operations Suite 100 700 Galleria Parkway, SE Atlanta, GA 30339-5957 welshgc@inpo.org Mr. Alexander Marion, Executive Director Nuclear Operations & Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. Jay Thayer, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jkt@nei.org Mr. John Butler, Director Safety-Focused Regulation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org Mr. David J. Modeen Vice President and Chief Nuclear Officer EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 dmodeen@epri.com Mr. John Gaertner EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 jgaertner@epri.com Ms. Rosa Yang EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 ryang@epri.com

Mr. Kenneth Huffman EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 khuffman@epri.com