IR 05000400/2007404: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:September 13, 2007 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 30: | Line 30: | ||
On the basis of the sample selected for review, the team concluded that in general, problems were properly identified, evaluated, and corrected. This report documents one finding a finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). Additionally, one licensee-identified violation which was determined to be of very low security significance is listed in this report. The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. | On the basis of the sample selected for review, the team concluded that in general, problems were properly identified, evaluated, and corrected. This report documents one finding a finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). Additionally, one licensee-identified violation which was determined to be of very low security significance is listed in this report. The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. | ||
DOCUMENT CONTAINS | DOCUMENT CONTAINS CP&L | ||
DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED The NRC is treating these findings as non-cited violations (NCVs) consistent with Section VI.A.1 of the NRC Enforcement Policy, because of the very low security significance of the violations and because they were entered into your corrective action program. If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial to the Nuclear Regulatory Commission, ATTN.: | |||
Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Harris Nuclear Station. | Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Harris Nuclear Station. | ||
| Line 45: | Line 45: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-400 License No: NPF-63 Enclosure: NRC Inspection Report No. 05000400/2007404 w/Attachment: Supplemental Information cc w/encl: (See page 3) | Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: | ||
50-400 License No: | |||
NPF-63 Enclosure: | |||
NRC Inspection Report No. 05000400/2007404 w/Attachment: Supplemental Information cc w/encl: (See page 3) | |||
CP&L | DOCUMENT CONTAINS CP&L | ||
Regulatory Affairs CPB 9 | DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED cc w/encl: | ||
Paul Fulford, Manager Performance Evaluation and Regulatory Affairs CPB 9 Carolina Power & Light Company P. O. Box 1551 Raleigh, NC 27602-1551 cc w/o encl: | |||
Chris L. Burton Director of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165 MC: Zone 1 New Hill, NC 27562-0165 Christos Kamilaris Manager, Nuclear Assessment Progress Energy Carolinas, Inc. | |||
Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 3 New Hill, NC 27562-0165 Eric McCartney Plant General Manager--Harris Plant Progress Energy Carolinas, Inc. | |||
Shearon Harris Nuclear Power Plant | Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 3 New Hill, NC 27562-0165 Thomas Natale, Manager Support Services Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 J. Wayne Gurganious Training Manager-Harris Progress Energy Carolinas, Inc. | ||
CP&L | Harris Energy & Environmental Center P. O. Box 327 New Hill, NC 27562-0327 David H. Corlett, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 David T. Conley Associate General Counsel - Legal Department Progress Energy Service Company, LLC P. O. Box 1551 Raleigh, NC 27602-1551 John H. O'Neill, Jr. | ||
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Beverly Hall, Chief, Radiation Protection Section N. C. Department of Environmental Commerce & Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721 Peggy Force Assistant Attorney General State of North Carolina P. O. Box 629 Raleigh, NC 27602 | |||
DOCUMENT CONTAINS CP&L | |||
DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 Chairman of the North Carolina Utilities Commission P. O. Box 29510 Raleigh, NC 27626-0510 Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Herb Council, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, NC 27602 Tommy Emerson, Chair Board of County Commissioners of Chatham County 186 Emerson Road Siler City, NC 27344 | |||
}} | }} | ||
Latest revision as of 21:59, 14 January 2025
| ML072570119 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/13/2007 |
| From: | Joel Munday NRC/RGN-II/DRS/PSB2 |
| To: | Duncan R Carolina Power & Light Co |
| References | |
| IR-07-404 | |
| Download: ML072570119 (4) | |
Text
September 13, 2007
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT - NRC PHYSICAL SECURITY PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000400/2007404
Dear Mr. Duncan:
On August 17, the U. S. Nuclear Regulatory Commission (NRC) completed a Problem Identification and Resolution inspection at the Shearon Harris Nuclear Power Plant. The enclosed report documents the security-related inspection results, which were discussed with you and other members of your staff. Additionally, a telephone re-exit was conducted with Mr. M. Findley on September 11, 2007.
This inspection examined activities conducted under your license as they relate to problem and identification of security related issues, compliance with the Commissions rules and regulations and conditions of your license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel. Inspection Report 05000400/2007006, dated September 14, 2007, documents the non-security results of the Problem Identification and Resolution inspection.
On the basis of the sample selected for review, the team concluded that in general, problems were properly identified, evaluated, and corrected. This report documents one finding a finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). Additionally, one licensee-identified violation which was determined to be of very low security significance is listed in this report. The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site.
DOCUMENT CONTAINS CP&L
DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED The NRC is treating these findings as non-cited violations (NCVs) consistent with Section VI.A.1 of the NRC Enforcement Policy, because of the very low security significance of the violations and because they were entered into your corrective action program. If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial to the Nuclear Regulatory Commission, ATTN.:
Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Harris Nuclear Station.
The findings were NRC identified and licensee identified.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390 a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
Should you have any questions concerning this letter, please contact us.
Sincerely,
/RA/
Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.:
50-400 License No:
NPF-63 Enclosure:
NRC Inspection Report No. 05000400/2007404 w/Attachment: Supplemental Information cc w/encl: (See page 3)
DOCUMENT CONTAINS CP&L
DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED cc w/encl:
Paul Fulford, Manager Performance Evaluation and Regulatory Affairs CPB 9 Carolina Power & Light Company P. O. Box 1551 Raleigh, NC 27602-1551 cc w/o encl:
Chris L. Burton Director of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165 MC: Zone 1 New Hill, NC 27562-0165 Christos Kamilaris Manager, Nuclear Assessment Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 3 New Hill, NC 27562-0165 Eric McCartney Plant General Manager--Harris Plant Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 3 New Hill, NC 27562-0165 Thomas Natale, Manager Support Services Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 J. Wayne Gurganious Training Manager-Harris Progress Energy Carolinas, Inc.
Harris Energy & Environmental Center P. O. Box 327 New Hill, NC 27562-0327 David H. Corlett, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 David T. Conley Associate General Counsel - Legal Department Progress Energy Service Company, LLC P. O. Box 1551 Raleigh, NC 27602-1551 John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Beverly Hall, Chief, Radiation Protection Section N. C. Department of Environmental Commerce & Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721 Peggy Force Assistant Attorney General State of North Carolina P. O. Box 629 Raleigh, NC 27602
DOCUMENT CONTAINS CP&L
DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 Chairman of the North Carolina Utilities Commission P. O. Box 29510 Raleigh, NC 27626-0510 Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Herb Council, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, NC 27602 Tommy Emerson, Chair Board of County Commissioners of Chatham County 186 Emerson Road Siler City, NC 27344