=Text= | =Text= | ||
{{#Wiki_filter:- Survey Unit Release Record | {{#Wiki_filter:- | ||
Survey Unit Release Record Survey Unit Ws) document camtitUte "Specirrl Methods" and the survey design used in the acquisition of survey measuremeas. | |||
EP-CRT-8 CRT-8 1) Embedded Pipe (EP) Survey Unit CRT-8 meets the -tion of embedded pipe for Phrn Brook Reactor Facility (PBRF). 2) EP CXT-8 is a Class 1, Group 1 survey unit as per the PBRF Find Status Survey Plan (FSSP) and Technical Basis Document ('I'BD)-M-OoQ. | 5 ) Instrument N~ciency detamhtions are developed in accordance with the BSXVS-002, WEP 05-006, these determinations are appropriate for the types of radiation involved and the media being surveyed. | ||
: 3) Surveys in EP CRT-8 were performed using a scintillation detector optimized to measure gamma energies representative of C040. Sample #EP 3- 9 from Survey Request (SR)-13 was referenced fbr this decision. | EP-CRT-8 CRT-8 | ||
: 4) Survey Instructions for this survey unit are incorpo-rated into and @med in accardance with (MW) the Babcock SerJices Incorporated | : 1) Embedded Pipe (EP) Survey Unit CRT-8 meets the -tion of embedded pipe for Phrn Brook Reactor Facility (PBRF). | ||
@Sr)/LVS-002, Work Excution Package (WEP) 05-006. Survey instructions described in this Revision # | : 2) EP CXT-8 is a Class 1, Group 1 survey unit as per the PBRF Find Status Survey Plan (FSSP) and Technical Basis Document ('I'BD)-M-OoQ. | ||
: 3) Surveys in EP CRT-8 were performed using a scintillation detector optimized to measure gamma energies representative of C040. Sample #EP 3-9 from Survey Request (SR)-13 was referenced fbr this decision. | |||
: 4) Survey Instructions for this survey unit are incorpo-rated into and @med in accardance with (MW) the Babcock SerJices Incorporated @Sr)/LVS-002, Work Excution Package (WEP) 05-006. Survey instructions described in this Revision # | |||
Original Page 1 of 3 | |||
SECTION 7 ATTACHMENT 2 z PAGE(S) | FSS Design # EP CRT-8 Sutvey Unit: CRT-8 1.0 EGstory/Description 1.1 The subject pipe system is a 2.5" diameter p e n d o n located on the CllT plate within the Sub Pile Room. The system access point is located on the | ||
BSETVSPipeCrawler-002 Revision 5 Pipe Interior Radiologkal | -34' el. of the Rx building. | ||
a.sN Access Po& Area: Building: | 1.2 EP CRT-8 mnsists of 2.5" diameter piping that is approximately 3 feet in 2 0 Survey Design Information 2.1 FLP CRT-8 was ameyed IAW Prodwe #BSVLVS-002. | ||
2.2 100% of the piping was m s i b l e for survey. The accessible pipe was surveyed by static meamment at m e foot increments, for a total of 3 m e y measurements. | |||
-34' System: Type of Survey Investigation Final Survey ..%+ Other Gross C060 CS Detector ID# / Sled ID# \ 1kv5-\ / h)~ SU Detector Cal Date: 1- \\ - | The total surf= | ||
@ No . (if no, adjwt sample count time and recalculate mCLC) comments: | area h r the piping system is approximately 1,824 cm2 (0.2 m2) for the entire length of (3') of pip'-. | ||
Po %+ | 3.0 Survey Unit Measurement Locationdllata 3.1 Pipe interior radiological survey forms are pravided in Attachment 2 of this release record. | ||
SECTION 7 ATTACHMENT 3 1 PAGE(S) p}} | 4.0 Survey Unit T n v e s t i ~ t i o ~ b 4.1 None 5.0 Data Assessment Results 5.1 Data asmment results are provided in the EPIBuried Pipe (BP) | ||
S w e y Report provided in Attachment 1. | |||
5 2 All measurement results are less than the Dwived Concernstion Guiddine Level @CGL) for donuclide specific EP tbat camponds to the 1 mremlyr dose goal established in Table 3-3 of the: FSSP. | |||
When implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide F d o n (NF), provided in TBM5004, the survey unit that is constituted by EP CRT-8 passes FSS. | |||
5.4 Background was not subtracted h m the survey measurements and the. | |||
Elevated Measurement Comparison W C ) | |||
was not employed for this m e y unit. | |||
Revision # Original Page 2 of 3 | |||
FSS Design # EP CRT-8 Revision # Origmal Page 3 of 3 S m y Unit: CRT-8 5.5 Statistid Surnmary Table 6.0 Documentation of evduations pertaining to compliance with the unrestricted use limit of 25 me* | |||
d dose contributions from Embedded Pipe and r;tdionuclid.es contributing 10% in aggregate of the total dose fix both mctural scenarios and soils. | |||
6.1 A review of the survey resuIts has shown that the dose contribution for EP CRT-8 to be less than 1 mredyr. The dose contribution is estimated to be 0.03 0 W y r based on the average of the a d | |||
p s s counts m e a d. | |||
Attachments - BSX EPBP Sumey Report Atkdumt 2 -Pipe interior Radiological S w e y Form - DQA Worksheet -Disc containing RR fbr EP CRT-8 & Spreadsheet | |||
SECTION 7 ATTACHMENT 1 2 | |||
PAGE(S) | |||
B S I EPlBP SURVEY REPORT COMMENTS: | |||
ACTIVITY VALUES NOT BACKGROUND CORRECTED RPElrgb#erlm | |||
SECTION 7 ATTACHMENT 2 z PAGE(S) | |||
BSETVSPipeCrawler-002 Revision 5 Pipe Interior Radiologkal S m e y Form Time: | |||
Pipe ID#: ( R T - ~ | |||
PipeDiameter: | |||
a.sN Access Po& Area: | |||
Building: | |||
L d Elevation: | |||
-34' System: | |||
Type of Survey Investigation Final Survey..%+ Other Gross C060 CS Detector ID# / Sled ID# | |||
\\ | |||
1kv5-\\ | |||
/ | |||
h ) ~ SU Detector Cal Date: | |||
1- \\ \\ - 0 7 Detector Cal Due Date: | |||
I -\\]-oL. | |||
Ins tmment: | |||
235U- \\ | |||
Instrument ID #: | |||
199 04") | |||
Instrument Cal Date: | |||
A - | |||
InstrumentCalDueDate: | |||
- I 1 4 6 From the Daily Pipc Survey Detector Control Form for the Selected Detector Background Value 3.+. cpm MDCKtstio | |||
) 9 C | |||
P | |||
~ | |||
Efficiency Factor for Pipe Diameter 0.0.0'03.3 (fiom detector efficiency determination) m c s b t i c 3 4 2 7 d p d 10 an2 Is the MDCSmic acceptable? @ No | |||
. (if no, adjwt sample count time and recalculate mCLC) comments: Po %+ | |||
Q b o n PD b 7, ~, o m&,&A-, | |||
Technician Signature Pipe Interior Radiological Survey REFERENCE COPY Package Page 1 of 3, Page 1 | |||
REFERENCECOPY n | |||
SECTION 7 ATTACHMENT 3 1 | |||
PAGE(S) p}} | |||
Latest revision as of 19:46, 14 January 2025
| ML073330612 | |
| Person / Time | |
|---|---|
| Site: | Plum Brook File:National Aeronautics and Space Administration icon.png |
| Issue date: | 11/15/2007 |
| From: | US National Aeronautics & Space Admin (NASA) |
| To: | NRC/RGN-III/DNMS/DB |
| References | |
| EP-CRT-8 | |
| Download: ML073330612 (12) | |
Text
-
Survey Unit Release Record Survey Unit Ws) document camtitUte "Specirrl Methods" and the survey design used in the acquisition of survey measuremeas.
5 ) Instrument N~ciency detamhtions are developed in accordance with the BSXVS-002, WEP 05-006, these determinations are appropriate for the types of radiation involved and the media being surveyed.
EP-CRT-8 CRT-8
- 1) Embedded Pipe (EP) Survey Unit CRT-8 meets the -tion of embedded pipe for Phrn Brook Reactor Facility (PBRF).
- 2) EP CXT-8 is a Class 1, Group 1 survey unit as per the PBRF Find Status Survey Plan (FSSP) and Technical Basis Document ('I'BD)-M-OoQ.
- 3) Surveys in EP CRT-8 were performed using a scintillation detector optimized to measure gamma energies representative of C040. Sample #EP 3-9 from Survey Request (SR)-13 was referenced fbr this decision.
- 4) Survey Instructions for this survey unit are incorpo-rated into and @med in accardance with (MW) the Babcock SerJices Incorporated @Sr)/LVS-002, Work Excution Package (WEP)05-006. Survey instructions described in this Revision #
Original Page 1 of 3
FSS Design # EP CRT-8 Sutvey Unit: CRT-8 1.0 EGstory/Description 1.1 The subject pipe system is a 2.5" diameter p e n d o n located on the CllT plate within the Sub Pile Room. The system access point is located on the
-34' el. of the Rx building.
1.2 EP CRT-8 mnsists of 2.5" diameter piping that is approximately 3 feet in 2 0 Survey Design Information 2.1 FLP CRT-8 was ameyed IAW Prodwe #BSVLVS-002.
2.2 100% of the piping was m s i b l e for survey. The accessible pipe was surveyed by static meamment at m e foot increments, for a total of 3 m e y measurements.
The total surf=
area h r the piping system is approximately 1,824 cm2 (0.2 m2) for the entire length of (3') of pip'-.
3.0 Survey Unit Measurement Locationdllata 3.1 Pipe interior radiological survey forms are pravided in Attachment 2 of this release record.
4.0 Survey Unit T n v e s t i ~ t i o ~ b 4.1 None 5.0 Data Assessment Results 5.1 Data asmment results are provided in the EPIBuried Pipe (BP)
S w e y Report provided in Attachment 1.
5 2 All measurement results are less than the Dwived Concernstion Guiddine Level @CGL) for donuclide specific EP tbat camponds to the 1 mremlyr dose goal established in Table 3-3 of the: FSSP.
When implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide F d o n (NF), provided in TBM5004, the survey unit that is constituted by EP CRT-8 passes FSS.
5.4 Background was not subtracted h m the survey measurements and the.
Elevated Measurement Comparison W C )
was not employed for this m e y unit.
Revision # Original Page 2 of 3
FSS Design # EP CRT-8 Revision # Origmal Page 3 of 3 S m y Unit: CRT-8 5.5 Statistid Surnmary Table 6.0 Documentation of evduations pertaining to compliance with the unrestricted use limit of 25 me*
d dose contributions from Embedded Pipe and r;tdionuclid.es contributing 10% in aggregate of the total dose fix both mctural scenarios and soils.
6.1 A review of the survey resuIts has shown that the dose contribution for EP CRT-8 to be less than 1 mredyr. The dose contribution is estimated to be 0.03 0 W y r based on the average of the a d
p s s counts m e a d.
Attachments - BSX EPBP Sumey Report Atkdumt 2 -Pipe interior Radiological S w e y Form - DQA Worksheet -Disc containing RR fbr EP CRT-8 & Spreadsheet
SECTION 7 ATTACHMENT 1 2
PAGE(S)
B S I EPlBP SURVEY REPORT COMMENTS:
ACTIVITY VALUES NOT BACKGROUND CORRECTED RPElrgb#erlm
SECTION 7 ATTACHMENT 2 z PAGE(S)
BSETVSPipeCrawler-002 Revision 5 Pipe Interior Radiologkal S m e y Form Time:
Pipe ID#: ( R T - ~
PipeDiameter:
a.sN Access Po& Area:
Building:
L d Elevation:
-34' System:
Type of Survey Investigation Final Survey..%+ Other Gross C060 CS Detector ID# / Sled ID#
\\
1kv5-\\
/
h ) ~ SU Detector Cal Date:
1- \\ \\ - 0 7 Detector Cal Due Date:
I -\\]-oL.
Ins tmment:
235U- \\
Instrument ID #:
199 04")
Instrument Cal Date:
A -
InstrumentCalDueDate:
- I 1 4 6 From the Daily Pipc Survey Detector Control Form for the Selected Detector Background Value 3.+. cpm MDCKtstio
) 9 C
P
~
Efficiency Factor for Pipe Diameter 0.0.0'03.3 (fiom detector efficiency determination) m c s b t i c 3 4 2 7 d p d 10 an2 Is the MDCSmic acceptable? @ No
. (if no, adjwt sample count time and recalculate mCLC) comments: Po %+
Q b o n PD b 7, ~, o m&,&A-,
Technician Signature Pipe Interior Radiological Survey REFERENCE COPY Package Page 1 of 3, Page 1
REFERENCECOPY n
SECTION 7 ATTACHMENT 3 1
PAGE(S) p