| number = ML080310073
| number = ML080310073
| issue date = 02/28/2008
| issue date = 02/28/2008
| title = Quad Cities Units 1 and 2, Technical Specifications, Issuance of Amendments Safety Limit Minimum Critical Power Ratio (TAC MD7374 and MD7375)
| title = Technical Specifications, Issuance of Amendments Safety Limit Minimum Critical Power Ratio
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:SLs 2.0 Quad Cities 1 and 2 2.0-1 Amendment No.
{{#Wiki_filter:SLs 2.0 Quad Cities 1 and 2 2.0-1 Amendment No.
2.0 SAFETY LIMITS (SLs)  
2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:
 
THERMAL POWER shall be 25% RTP.
2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:
2.1.1.2 With the reactor steam dome pressure 785 psig and core flow 10% rated core flow:
THERMAL POWER shall be 25% RTP.  
For two recirculation loop operation, MCPR shall be 1.11, or for single recirculation loop operation, MCPR shall be 1.13.
 
2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
2.1.1.2 With the reactor steam dome pressure 785 psig and core flow 10% rated core flow:  
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be 1345 psig.
 
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hours:
For two recirculation loop operation, MCPR shall be       1.11, or for single recirculation loop operation, MCPR shall be 1.13. 2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.  
2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.}}
 
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be 1345 psig.  
 
2.2 SL Violations  
 
With any SL violation, the following actions shall be completed within 2 hours: 2.2.1 Restore compliance with all SLs; and  
 
2.2.2 Insert all insertable control rods.}}

Latest revision as of 18:27, 14 January 2025

Technical Specifications, Issuance of Amendments Safety Limit Minimum Critical Power Ratio
ML080310073
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 02/28/2008
From:
NRC/NRR/ADRO/DORL/LPLIII-2
To:
Wiebe, J
Shared Package
ML080280231 List:
References
TAC MD7374, TAC MD7375
Download: ML080310073 (1)


Text

SLs 2.0 Quad Cities 1 and 2 2.0-1 Amendment No.

2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:

THERMAL POWER shall be 25% RTP.

2.1.1.2 With the reactor steam dome pressure 785 psig and core flow 10% rated core flow:

For two recirculation loop operation, MCPR shall be 1.11, or for single recirculation loop operation, MCPR shall be 1.13.

2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.

2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be 1345 psig.

2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:

2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.