ML080310073: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (5 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML080310073 | | number = ML080310073 | ||
| issue date = 02/28/2008 | | issue date = 02/28/2008 | ||
| title = | | title = Technical Specifications, Issuance of Amendments Safety Limit Minimum Critical Power Ratio | ||
| author name = | | author name = | ||
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2 | | author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2 | ||
| Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:SLs 2.0 Quad Cities 1 and 2 2.0-1 Amendment No. | {{#Wiki_filter:SLs 2.0 Quad Cities 1 and 2 2.0-1 Amendment No. | ||
2.0 | 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow: | ||
THERMAL POWER shall be 25% RTP. | |||
2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow: | 2.1.1.2 With the reactor steam dome pressure 785 psig and core flow 10% rated core flow: | ||
THERMAL POWER shall be | For two recirculation loop operation, MCPR shall be 1.11, or for single recirculation loop operation, MCPR shall be 1.13. | ||
2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel. | |||
2.1.1.2 With the reactor steam dome pressure | 2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be 1345 psig. | ||
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hours: | |||
For two recirculation loop operation, MCPR shall be | 2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.}} | ||
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be | |||
2.2 SL Violations | |||
With any SL violation, the following actions shall be completed within 2 hours: | |||
2.2.2 Insert all insertable control rods.}} | |||
Latest revision as of 18:27, 14 January 2025
| ML080310073 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 02/28/2008 |
| From: | NRC/NRR/ADRO/DORL/LPLIII-2 |
| To: | |
| Wiebe, J | |
| Shared Package | |
| ML080280231 | List: |
| References | |
| TAC MD7374, TAC MD7375 | |
| Download: ML080310073 (1) | |
Text
SLs 2.0 Quad Cities 1 and 2 2.0-1 Amendment No.
2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:
THERMAL POWER shall be 25% RTP.
2.1.1.2 With the reactor steam dome pressure 785 psig and core flow 10% rated core flow:
For two recirculation loop operation, MCPR shall be 1.11, or for single recirculation loop operation, MCPR shall be 1.13.
2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be 1345 psig.
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.