{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:February 14, 2008  
                                  NU CL EAR R E GU L AT OR Y C O M M I SS I O N
                                                    R E GI ON I V
                                        611 R YAN PLAZA D RI V E, SUITE 400
                                          AR LIN GTON, TEXAS 76011-4005
Rick A. Muench, President and
                                          February 14, 2008
   Chief Executive Officer  
Rick A. Muench, President and
Wolf Creek Nuclear Operating Corporation  
   Chief Executive Officer
P.O. Box 411  
Wolf Creek Nuclear Operating Corporation
Burlington, KS 66839  
P.O. Box 411
Burlington, KS 66839
SUBJECT:  
SUBJECT:       WOLF CREEK GENERATING STATION - NOTIFICATION OF INSPECTION
WOLF CREEK GENERATING STATION - NOTIFICATION OF INSPECTION  
                (NRC INSPECTION REPORT 05000482/2008003) AND REQUEST FOR
(NRC INSPECTION REPORT 05000482/2008003) AND REQUEST FOR  
                INFORMATION
INFORMATION  
Dear Mr. Muench:
From March 31 to April 11, 2008, reactor inspectors from the Nuclear Regulatory
Dear Mr. Muench:  
Commissions (NRC) Region IV office will perform the baseline inservice inspection at Wolf
Creek Generating Station using NRC Inspection Procedure 71111.08. Experience has shown
From March 31 to April 11, 2008, reactor inspectors from the Nuclear Regulatory  
that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.
Commissions (NRC) Region IV office will perform the baseline inservice inspection at Wolf  
In order to minimize the impact to your onsite resources and to ensure a productive inspection,
Creek Generating Station using NRC Inspection Procedure 71111.08. Experience has shown  
we have enclosed a request for documents needed for this inspection. These documents have
that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.
been divided into two groups. The first group (Section A of the enclosure) identified information
In order to minimize the impact to your onsite resources and to ensure a productive inspection,  
to be provided prior to the inspection to ensure that the inspectors are adequately prepared.
we have enclosed a request for documents needed for this inspection. These documents have  
The second group (Section B of the enclosure) identifies the information the inspectors will need
been divided into two groups. The first group (Section A of the enclosure) identified information  
upon arrival at the site. It is important that all of these documents are up to date and complete
to be provided prior to the inspection to ensure that the inspectors are adequately prepared.
in order to minimize the number of additional documents requested during the preparation
The second group (Section B of the enclosure) identifies the information the inspectors will need  
and/or the onsite portions of the inspection.
upon arrival at the site. It is important that all of these documents are up to date and complete  
We have discussed the schedule for these inspection activities with your staff and understand
in order to minimize the number of additional documents requested during the preparation  
that our regulatory contact for this inspection will be Mr. W. Muilenburg of your licensing
and/or the onsite portions of the inspection.  
organization. Our inspection dates are subject to change based on your updated schedule of
outage activities. If there are any questions about this inspection or the material requested,
We have discussed the schedule for these inspection activities with your staff and understand  
please contact the lead inspector Lee Ellershaw at (817) 860-8127 (lee1@nrc.gov).
that our regulatory contact for this inspection will be Mr. W. Muilenburg of your licensing  
organization. Our inspection dates are subject to change based on your updated schedule of  
outage activities. If there are any questions about this inspection or the material requested,  
please contact the lead inspector Lee Ellershaw at (817) 860-8127 (lee1@nrc.gov).
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON  I V
611 RYAN PLAZA DRIV E, SUITE 400
ARLINGTON, TEXAS 76011-4005


Wolf Creek Nuclear Operating Corp.           -2-
Wolf Creek Nuclear Operating Corp.  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
- 2 -  
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its  
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
enclosure will be available electronically for public inspection in the NRC Public Document  
rm/adams.html (the Public Electronic Reading Room).
Room or from the Publicly Available Records (PARS) component of NRCs document  
                                                        Sincerely,
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
                                                        /RA/
rm/adams.html (the Public Electronic Reading Room).  
                                                        Russell L. Bywater, Chief
                                                        Engineering Branch 1
                                                        Division of Reactor Safety
Sincerely,  
Docket:     50-482
License:     NPF-42
Enclosure:
/RA/  
Inservice Inspection Document Request
cc w/enclosure:
Vice President Operations/Plant Manager
Russell L. Bywater, Chief  
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
Engineering Branch 1  
Burlington, KS 66839
Jay Silberg, Esq.
Division of Reactor Safety  
Pillsbury Winthrop Shaw Pittman LLP
2300 N Street, NW
Docket:     50-482  
Washington, DC 20037
License:   NPF-42  
Supervisor Licensing
Wolf Creek Nuclear Operating Corp.
Enclosure:  
P.O. Box 411
Inservice Inspection Document Request  
Burlington, KS 66839
Chief Engineer
cc w/enclosure:  
Utilities Division
Vice President Operations/Plant Manager  
Kansas Corporation Commission
Wolf Creek Nuclear Operating Corp.  
1500 SW Arrowhead Road
P.O. Box 411  
Topeka, KS 66604-4027
Burlington, KS 66839  
Office of the Governor
State of Kansas
Jay Silberg, Esq.  
Topeka, KS 66612
Pillsbury Winthrop Shaw Pittman LLP  
Attorney General
2300 N Street, NW  
120 S.W. 10th Avenue, 2nd Floor
Washington, DC 20037  
Topeka, KS 66612-1597
Supervisor Licensing  
Wolf Creek Nuclear Operating Corp.  
P.O. Box 411  
Burlington, KS 66839  
Chief Engineer  
Utilities Division  
Kansas Corporation Commission  
1500 SW Arrowhead Road  
Topeka, KS 66604-4027  
Office of the Governor  
State of Kansas  
Topeka, KS 66612  
Attorney General  
120 S.W. 10th Avenue, 2nd Floor  
Topeka, KS 66612-1597  


Wolf Creek Nuclear Operating Corp. -3-
Wolf Creek Nuclear Operating Corp.  
County Clerk
- 3 -  
Coffey County Courthouse
110 South 6th Street
Burlington, KS 66839-1798
County Clerk  
Chief, Radiation and Asbestos
Coffey County Courthouse  
Control Section
110 South 6th Street  
Kansas Department of Health and
Burlington, KS 66839-1798  
Environment
Bureau of Air and Radiation
Chief, Radiation and Asbestos
1000 SW Jackson, Suite 310
  Control Section  
Topeka, KS 66612-1366
Kansas Department of Health and
Ronald L. McCabe, Chief
  Environment  
Technological Hazards Branch
Bureau of Air and Radiation  
National Preparedness Division
1000 SW Jackson, Suite 310  
DHS/FEMA
Topeka, KS 66612-1366  
9221 Ward Parkway
Suite 300
Ronald L. McCabe, Chief  
Kansas City, MO 64114-3372
Technological Hazards Branch  
National Preparedness Division  
DHS/FEMA  
9221 Ward Parkway  
Suite 300  
Kansas City, MO 64114-3372  


Wolf Creek Nuclear Operating Corp.       -4-
Wolf Creek Nuclear Operating Corp.  
Electronic distribution by RIV:
- 4 -  
Regional Administrator (EEC)
DRP Director (DDC)
DRS Director (RJC1)
Electronic distribution by RIV:  
DRS Deputy Director (ACC)
Regional Administrator (EEC)  
Senior Resident Inspector (SDC)
DRP Director (DDC)  
SRI, Callaway (DED)
DRS Director (RJC1)  
Branch Chief, DRP/B (VGG)
DRS Deputy Director (ACC)  
Senior Project Engineer, (RWD)
Senior Resident Inspector (SDC)  
Team Leader, DRP/TSS (CJP)
SRI, Callaway (DED)  
RITS Coordinator (MSH3)
Branch Chief, DRP/B (VGG)  
DRS STA (DAP)
Senior Project Engineer, (RWD)  
D. Pelton, OEDO RIV Coordinator (DLP1)
Team Leader, DRP/TSS (CJP)  
ROPreports
RITS Coordinator (MSH3)  
WC Site Secretary (SLA2)
DRS STA (DAP)  
SUNSI Review Completed: __RLB____ADAMS: Yes             G No   Initials: _RLB_____
D. Pelton, OEDO RIV Coordinator (DLP1)  
Publicly Available       G Non-Publicly Available  G Sensitive    Non-Sensitive
ROPreports  
RI:EB1               C:EB1
WC Site Secretary (SLA2)  
LEEllershaw:lar       RLBywater
/RA/                 /RA/
2/13/08               2/14/08
OFFICIAL RECORD COPY                               T=Telephone   E=E-mail     F=Fax
SUNSI Review Completed: __RLB____ADAMS: Yes  
G No           Initials: _RLB_____
  Publicly Available     G   Non-Publicly Available     G   Sensitive  
   Non-Sensitive  
RI:EB1  
C:EB1  
LEEllershaw:lar  
RLBywater  
/RA/  
/RA/  
2/13/08  
2/14/08  
OFFICIAL RECORD COPY
T=Telephone           E=E-mail       F=Fax  


                        INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates:           March 31, 2008 - April 11, 2008
Inspection Procedures:     IP 71111.08 Inservice Inspection (ISI) Activities
                            TI 2515/166 Pressurized Water Reactor Containment Sump
- 1 -
                                          Blockage
Enclosure
                            TI 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds
INSERVICE INSPECTION DOCUMENT REQUEST  
Inspectors:                 L. Ellershaw, Senior Reactor Inspector (Lead Inspector - ISI)
                            J. Drake, Senior Reactor Inspector
                            K. Clayton, Reactor Inspector
Inspection Dates:  
A.     Information Requested for the In-Office Preparation Week
March 31, 2008 - April 11, 2008  
      The following information should be sent to the Region IV office in hard copy or
      electronic format (ims.certrec.com preferred), in care of L. E. Ellershaw, by March 11,
Inspection Procedures:  
      2008, to facilitate the selection of specific items that will be reviewed during the onsite
IP 71111.08 Inservice Inspection (ISI) Activities  
      inspection week. The inspector will select specific items from the information requested
TI 2515/166 Pressurized Water Reactor Containment Sump  
      below and then request from your staff additional documents needed during the onsite
Blockage  
      inspection week (Section B of this enclosure). We ask that the specific items selected
TI 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds  
      from the lists be available and ready for review on the first day of inspection. *Please
      provide requested documentation electronically if possible. If requested documents are
Inspectors:  
      large and only hard copy formats are available, please inform the inspector(s), and
L. Ellershaw, Senior Reactor Inspector (Lead Inspector - ISI)  
      provide subject documentation during the first day of the onsite inspection. If you have
J. Drake, Senior Reactor Inspector  
      any questions regarding this information request, please call the inspector as soon as
K. Clayton, Reactor Inspector  
      possible.
A.1   ISI/Welding Programs and Schedule Information
A.  
      a)     A detailed schedule (including preliminary dates) of:
Information Requested for the In-Office Preparation Week  
              i)       Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
                        and containment, performed as part of your ASME Section XI, Risk
The following information should be sent to the Region IV office in hard copy or  
                        Informed (if applicable), and augmented ISI programs during the
electronic format (ims.certrec.com preferred), in care of L. E. Ellershaw, by March 11,  
                        upcoming outage.
2008, to facilitate the selection of specific items that will be reviewed during the onsite  
                        Provide a status summary of the NDE inspection activities vs. the
inspection week. The inspector will select specific items from the information requested  
                        required inspection period percentages for this Interval by category per
below and then request from your staff additional documents needed during the onsite  
                        ASME Section XI, IWX-2400 (Do not provide separately if other
inspection week (Section B of this enclosure). We ask that the specific items selected  
                        documentation requested contains this information)
from the lists be available and ready for review on the first day of inspection. *Please  
              ii)     Reactor pressure vessel head (RPVH) examinations planned for the
provide requested documentation electronically if possible. If requested documents are  
                        upcoming outage.
large and only hard copy formats are available, please inform the inspector(s), and  
              iii)     Examinations planned for Alloy 82/182/600 components that are not
provide subject documentation during the first day of the onsite inspection. If you have  
                        included in the Section XI scope. (If applicable)
any questions regarding this information request, please call the inspector as soon as  
                                            -1-                                        Enclosure
possible.  
A.1  
ISI/Welding Programs and Schedule Information  
a)  
A detailed schedule (including preliminary dates) of:  
i)
Nondestructive examinations (NDEs) planned for Class 1 & 2 systems  
and containment, performed as part of your ASME Section XI, Risk  
Informed (if applicable), and augmented ISI programs during the  
upcoming outage.  
Provide a status summary of the NDE inspection activities vs. the  
required inspection period percentages for this Interval by category per  
ASME Section XI, IWX-2400 (Do not provide separately if other  
documentation requested contains this information)  
ii)
Reactor pressure vessel head (RPVH) examinations planned for the  
upcoming outage.  
iii)  
Examinations planned for Alloy 82/182/600 components that are not  
included in the Section XI scope. (If applicable)  


          iv)     Examinations planned as part of your Boric Acid Corrosion Control
                  Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)
          v)       Welding activities that are scheduled to be completed during the
                  upcoming outage (ASME Class 1, 2, or 3 structures, systems, or
- 2 -
                  components (SSCs))
Enclosure
    b)   A copy of ASME Section XI Code Relief Requests and associated NRC Safety
          Evaluations applicable to the examinations identified above.
iv)  
    c)   A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,
Examinations planned as part of your Boric Acid Corrosion Control  
          Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)  
          Class 1 & 2 systems since the beginning of the last refueling outage. This should
          include the previous Section XI pressure test(s) conducted during start up and
v)  
          any evaluations associated with the results of the pressure tests. Also, include in
Welding activities that are scheduled to be completed during the  
          the list the NDE reports with relevant conditions in the RPVH penetration nozzles
upcoming outage (ASME Class 1, 2, or 3 structures, systems, or  
          which have been accepted for continued service. The list of NDE reports should
components (SSCs))  
          include a brief description of the SSC where the relevant condition was identified.
    d)   A list with a brief description (e.g., system, material, pipe size, weld number, and
b)  
          NDE performed) of the welds in Code Class 1 and 2 systems which have been
A copy of ASME Section XI Code Relief Requests and associated NRC Safety  
          fabricated due to component repair/replacement activities since the beginning of
Evaluations applicable to the examinations identified above.
          the last refueling outage, or are planned to be fabricated this refueling outage.
    e)   If reactor vessel weld examinations required by the ASME Code are scheduled to
          occur during the upcoming outage, provide a detailed description of the welds to
c)  
          be examined and the extent of the planned examination. Please also provide
A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,  
          reference numbers for applicable procedures that will be used to conduct these
Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code  
          examinations.
Class 1 & 2 systems since the beginning of the last refueling outage. This should  
    f)   Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
include the previous Section XI pressure test(s) conducted during start up and  
          Section XI of the ASME Code that have been identified since the beginning of the
any evaluations associated with the results of the pressure tests. Also, include in  
          last refueling outage.
the list the NDE reports with relevant conditions in the RPVH penetration nozzles  
    g)   A list of any temporary non-code repairs in service (e.g., pinhole leaks).
which have been accepted for continued service. The list of NDE reports should  
    h)   Please provide copies of the most recent self assessments for the ISI, Welding,
include a brief description of the SSC where the relevant condition was identified.  
          and Alloy 600 Programs.
A.2 Reactor Pressure Vessel Head (RPVH)
d)  
    a)   Provide the detailed scope of the planned NDE of the reactor vessel head which
A list with a brief description (e.g., system, material, pipe size, weld number, and  
          identifies the types of NDE methods to be used on each specific part of the
NDE performed) of the welds in Code Class 1 and 2 systems which have been  
          vessel head to fulfill commitments made in response to NRC Bulletin 2002-02
fabricated due to component repair/replacement activities since the beginning of  
          and NRC Order EA-03-009. Also, include examination scope expansion criteria
the last refueling outage, or are planned to be fabricated this refueling outage.  
          and planned expansion sample sizes if relevant conditions are identified. (If
          applicable)
e)  
                                        -2-                                        Enclosure
If reactor vessel weld examinations required by the ASME Code are scheduled to  
occur during the upcoming outage, provide a detailed description of the welds to  
be examined and the extent of the planned examination. Please also provide  
reference numbers for applicable procedures that will be used to conduct these  
examinations.  
f)  
Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of  
Section XI of the ASME Code that have been identified since the beginning of the  
last refueling outage.  
g)
A list of any temporary non-code repairs in service (e.g., pinhole leaks).  
h)  
Please provide copies of the most recent self assessments for the ISI, Welding,  
and Alloy 600 Programs.
A.2  
Reactor Pressure Vessel Head (RPVH)  
a)
Provide the detailed scope of the planned NDE of the reactor vessel head which  
identifies the types of NDE methods to be used on each specific part of the  
vessel head to fulfill commitments made in response to NRC Bulletin 2002-02  
and NRC Order EA-03-009. Also, include examination scope expansion criteria  
and planned expansion sample sizes if relevant conditions are identified. (If  
applicable)  


    b)     A list of the standards and/or requirements that will be used to evaluate
          indications identified during NDE of the reactor vessel head (e.g., the specific
          industry or procedural standards which will be used to evaluate potential leakage
          and/or flaw indications).
- 3 -
A.3 Boric Acid Corrosion Control Program (BACCP)
Enclosure
    a)     Copy of the procedures that govern the scope, equipment and implementation of
          the inspections required to identify boric acid leakage and the procedures for
b)
          boric acid leakage/corrosion evaluation.
A list of the standards and/or requirements that will be used to evaluate  
    b)     Please provide a list of leaks (including Code class of the components) that have
indications identified during NDE of the reactor vessel head (e.g., the specific  
          been identified since the last refueling outage and associated corrective action
industry or procedural standards which will be used to evaluate potential leakage  
          documentation. If during the last cycle, the Unit was shutdown, please provide
and/or flaw indications).  
          documentation of containment walkdown inspections performed as part of the
          BACCP.
A.3  
    c)     Please provide a copy of the most recent self-assessment performed for the
Boric Acid Corrosion Control Program (BACCP)  
          BACCP.
A.4 Steam Generator Tube (SGT) Inspections
a)
    a)     A detailed schedule of:
Copy of the procedures that govern the scope, equipment and implementation of  
          i)       SGT inspection, data analyses, and repair activities for the upcoming
the inspections required to identify boric acid leakage and the procedures for  
                    outage. (If occurring)
boric acid leakage/corrosion evaluation.  
          ii)     SG secondary side inspection activities for the upcoming outage. (If
                    occurring)
b)  
    b)     Please provide a copy of your SG ISI Inspection Program and Plan. Please
Please provide a list of leaks (including Code class of the components) that have  
          include a copy of the Operational Assessment from last outage and a copy of the
been identified since the last refueling outage and associated corrective action  
          following documents as they become available:
documentation. If during the last cycle, the Unit was shutdown, please provide  
          i)       Degradation Assessment
documentation of containment walkdown inspections performed as part of the  
          ii)     Condition Monitoring Assessment
BACCP.  
    c)     If you are planning on modifying your Technical Specifications such that they are
          consistent with TSTF-449, please provide copies of your correspondence with
c)  
          the NRC regarding deviations from the STS.
Please provide a copy of the most recent self-assessment performed for the  
    d)     Copy of SG history documentation given to vendors performing eddy current (ET)
BACCP.  
          testing of the SGs during the upcoming outage.
    e)     Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
A.4  
          Current Technique Specification Sheets (ETSS). Additionally, please provide a
Steam Generator Tube (SGT) Inspections  
          copy of EPRI Appendix H ETSS Qualification Records.
                                        -3-                                      Enclosure
a)  
A detailed schedule of:  
i)
SGT inspection, data analyses, and repair activities for the upcoming  
outage. (If occurring)  
ii)
SG secondary side inspection activities for the upcoming outage. (If  
occurring)  
b)  
Please provide a copy of your SG ISI Inspection Program and Plan. Please  
include a copy of the Operational Assessment from last outage and a copy of the  
following documents as they become available:
i)  
Degradation Assessment  
ii)  
Condition Monitoring Assessment  
c)  
If you are planning on modifying your Technical Specifications such that they are  
consistent with TSTF-449, please provide copies of your correspondence with  
the NRC regarding deviations from the STS.  
d)  
Copy of SG history documentation given to vendors performing eddy current (ET)  
testing of the SGs during the upcoming outage.  
e)  
Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy  
Current Technique Specification Sheets (ETSS). Additionally, please provide a  
copy of EPRI Appendix H ETSS Qualification Records.  


    f)     Identify and quantify any SGT leakage experienced during the previous operating
          cycle. Also provide documentation identifying which SG was leaking and
          corrective actions completed or planned for this condition (If applicable).
    g)     Provide past history of the condition and issues pertaining to the secondary side
- 4 -
          of the steam generators (including items such as loose parts, fouling, top of tube
Enclosure
          sheet condition, crud removal amounts, etc.)
    h)     Please provide copies of your most recent self assessments of the SG
f)  
          monitoring, loose parts monitoring, and secondary side water chemistry control
Identify and quantify any SGT leakage experienced during the previous operating  
          programs.
cycle. Also provide documentation identifying which SG was leaking and  
    i)     Please also indicate where the primary, secondary, and resolution analyses are
corrective actions completed or planned for this condition (If applicable).  
          scheduled to take place.
    j)     Please provide a summary of the scope of the SGT examinations, including
g)
          examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the
Provide past history of the condition and issues pertaining to the secondary side  
          percentage of tubes to be examined. *Do not provide these documents
of the steam generators (including items such as loose parts, fouling, top of tube  
          separately if already included in other information requested.
sheet condition, crud removal amounts, etc.)  
A.5 Materials Reliability (MRP-139) Program Activities
    a)     A list of, with verification, that the baseline inspections of all applicable Dissimilar
h)  
          Metal Butt Welds (DMBWs) have been completed by December 31, 2007.
Please provide copies of your most recent self assessments of the SG  
    b)     Verification that baseline inspection of hot leg and cold leg temperature DMBWs
monitoring, loose parts monitoring, and secondary side water chemistry control  
          have been included in the inspection program and that the schedules for the
programs.  
          baseline inspections are consistent with the baseline schedules in MRP-139.
    c)     A list and schedule (examination dates) of all DMBW examinations planned for
i)  
          the upcoming refueling outage. If none are scheduled, then data from previous
Please also indicate where the primary, secondary, and resolution analyses are  
          examinations should be available for review.
scheduled to take place.  
    d)     A list and schedule for any welding to be performed on DMBWs in the upcoming
          outage. If no welding will be performed then records of previous welding on
j)  
          DMBWs and postweld NDE documentation.
Please provide a summary of the scope of the SGT examinations, including  
    e)     A list and schedule of any stress improvement (SI) activities planned for the
examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the  
          upcoming refueling outage. If none are scheduled then have qualification reports
percentage of tubes to be examined. *Do not provide these documents  
          for any SIs previously performed.
separately if already included in other information requested.
    f)     Documentation and description of how the baseline and inservice inspection
          specifications in MRP-139 are satisfied at your facility.
A.5  
A.6 Additional information related to all ISI activities
Materials Reliability (MRP-139) Program Activities  
                                          -4-                                        Enclosure
a)  
A list of, with verification, that the baseline inspections of all applicable Dissimilar  
Metal Butt Welds (DMBWs) have been completed by December 31, 2007.  
b)  
Verification that baseline inspection of hot leg and cold leg temperature DMBWs  
have been included in the inspection program and that the schedules for the  
baseline inspections are consistent with the baseline schedules in MRP-139.  
c)  
A list and schedule (examination dates) of all DMBW examinations planned for  
the upcoming refueling outage. If none are scheduled, then data from previous  
examinations should be available for review.  
d)  
A list and schedule for any welding to be performed on DMBWs in the upcoming  
outage. If no welding will be performed then records of previous welding on  
DMBWs and postweld NDE documentation.  
e)  
A list and schedule of any stress improvement (SI) activities planned for the  
upcoming refueling outage. If none are scheduled then have qualification reports  
for any SIs previously performed.  
f)  
Documentation and description of how the baseline and inservice inspection  
specifications in MRP-139 are satisfied at your facility.  
A.6  
Additional information related to all ISI activities  


    a)     A list with a brief description of ISI, BACCP, and SGT inspection related issues
          (e.g., condition reports) entered into your corrective action program since the
          beginning of the last refueling outage (for Unit 2). For example, a list based upon
          data base searches using key words related to piping or SG tube degradation
- 5 -
          such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust,
Enclosure
          corrosion, boric acid, or errors in piping/SGT examinations.
a)
    b)     Please provide names and phone numbers for the following program leads:
A list with a brief description of ISI, BACCP, and SGT inspection related issues  
          ISI contacts (Examination, planning)
(e.g., condition reports) entered into your corrective action program since the  
          Containment Exams
beginning of the last refueling outage (for Unit 2). For example, a list based upon  
          RPVH Exams
data base searches using key words related to piping or SG tube degradation  
          Snubbers and Supports
such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust,  
          Repair and Replacement Program Manager
corrosion, boric acid, or errors in piping/SGT examinations.  
          Licensing Contact
          Site Welding Engineer
b)
          Boric Acid Corrosion Control Program
Please provide names and phone numbers for the following program leads:  
          SG Inspection Activities (site lead and vendor contact)
B. Information to be provided onsite to the inspector(s) at the entrance meeting (March 31,
ISI contacts (Examination, planning)  
    2008):
Containment Exams  
B.1 ISI / Welding Programs and Schedule Information
RPVH Exams  
    a)     Updated schedules for ISI/NDE activities, including SGT inspections, planned
Snubbers and Supports  
          welding activities, and schedule showing contingency repair plans, if available.
Repair and Replacement Program Manager  
    b)     For ASME Code Class 1 and 2 welds selected by the inspector from the lists
Licensing Contact  
          provided from section A of this enclosure, please provide copies of the following
Site Welding Engineer  
          documentation for each subject weld:
Boric Acid Corrosion Control Program  
          i)       Weld data sheet (traveler)
SG Inspection Activities (site lead and vendor contact)  
          ii)     Weld configuration and system location
          iii)     Applicable Code Edition and Addenda for weldment
B.  
          iv)     Applicable Code Edition and Addenda for welding procedures
Information to be provided onsite to the inspector(s) at the entrance meeting (March 31,  
          v)     Applicable weld procedures (WPS) used to fabricate the welds
2008):  
          vi)     Copies of procedure qualification records (PQRs) supporting the WPS
                  from B.1.b.v
B.1  
          vii)     Copies of mechanical test reports identified in the PQRs above
ISI / Welding Programs and Schedule Information  
          viii)   Copies of the nonconformance reports for the selected welds (If
                  applicable)
a)  
          ix)     Radiographs of the selected welds and access to equipment to allow
Updated schedules for ISI/NDE activities, including SGT inspections, planned  
                  viewing radiographs (If RT was performed)
welding activities, and schedule showing contingency repair plans, if available.  
          x)     Copies of the preservice examination records for the selected welds.
          xi)     Copies of welder performance qualifications records applicable to the
b)  
                  selected welds, including documentation that welder maintained
For ASME Code Class 1 and 2 welds selected by the inspector from the lists  
                  proficiency in the applicable welding processes specified in the WPS (at
provided from section A of this enclosure, please provide copies of the following  
                  least six months prior to the date of subject work)
documentation for each subject weld:  
                                          -5-                                      Enclosure
i)  
Weld data sheet (traveler)  
ii)  
Weld configuration and system location  
iii)  
Applicable Code Edition and Addenda for weldment  
iv)  
Applicable Code Edition and Addenda for welding procedures  
v)  
Applicable weld procedures (WPS) used to fabricate the welds  
vi)  
Copies of procedure qualification records (PQRs) supporting the WPS  
from B.1.b.v  
vii)  
Copies of mechanical test reports identified in the PQRs above  
viii)  
Copies of the nonconformance reports for the selected welds (If  
applicable)  
ix)  
Radiographs of the selected welds and access to equipment to allow  
viewing radiographs (If RT was performed)  
x)  
Copies of the preservice examination records for the selected welds.  
xi)  
Copies of welder performance qualifications records applicable to the  
selected welds, including documentation that welder maintained  
proficiency in the applicable welding processes specified in the WPS (at  
least six months prior to the date of subject work)  


          xii)     Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
    c)     For the ISI related corrective action issues selected by the inspector(s) from
          section A of this enclosure, provide a copy of the corrective actions and
          supporting documentation.
- 6 -
    d)     For the NDE reports with relevant conditions on Code Class 1 & 2 systems
Enclosure
          selected by the inspector from section A above, provide a copy of the
xii)  
          examination records, examiner qualification records, and associated corrective
Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable  
          action documents.
    e)     A copy of (or ready access to) most current revision of the ISI Program Manual
c)  
          and Plan for the current Interval.
For the ISI related corrective action issues selected by the inspector(s) from  
    f)     For the NDEs selected by the inspector from section A of this enclosure, provide
section A of this enclosure, provide a copy of the corrective actions and  
          copy of the NDE procedures used to perform the examinations (including
supporting documentation.  
          calibration and flaw characterization/sizing procedures). For ultrasonic
          examination procedures qualified in accordance with ASME Code, Section XI,
d)  
          Appendix VIII, provide documentation supporting the procedure qualification
For the NDE reports with relevant conditions on Code Class 1 & 2 systems  
          (e.g., the EPRI performance demonstration qualification summary sheets). Also,
selected by the inspector from section A above, provide a copy of the  
          include qualification documentation of the specific equipment to be used (e.g.,
examination records, examiner qualification records, and associated corrective  
          ultrasonic unit, cables, and transducers including serial numbers) and NDE
action documents.  
          personnel qualification records.
B.2 Reactor Pressure Vessel Head (RPVH)
e)  
    a)     Provide the NDE personnel qualification records for the examiners who will
A copy of (or ready access to) most current revision of the ISI Program Manual  
          perform examinations of the RPVH.
and Plan for the current Interval.
    b)     Provide drawings showing the following: (If a visual examination is planned for
          the upcoming refueling outage)
f)  
          i)       RPVH and CRDM nozzle configurations
For the NDEs selected by the inspector from section A of this enclosure, provide  
          ii)     RPVH insulation configuration
copy of the NDE procedures used to perform the examinations (including  
    The drawings listed above should include fabrication drawings for the nozzle attachment
calibration and flaw characterization/sizing procedures). For ultrasonic  
    welds as applicable.
examination procedures qualified in accordance with ASME Code, Section XI,  
    c)     Copy of NDE reports from the last RPVH examination.
Appendix VIII, provide documentation supporting the procedure qualification  
    d)     Copy of evaluation or calculation demonstrating that the scope of the visual
(e.g., the EPRI performance demonstration qualification summary sheets). Also,  
          examination of the upper head will meet the 95% minimum coverage required by
include qualification documentation of the specific equipment to be used (e.g.,  
          NRC Order EA-03-009 (If a visual examination is planned for the upcoming
ultrasonic unit, cables, and transducers including serial numbers) and NDE  
          refueling outage).
personnel qualification records.  
    e)     Provide a copy of the procedures that will be used to identify the source of any
          boric acid deposits identified on the RPVH. If no explicit procedures exist which
B.2  
                                        -6-                                        Enclosure
Reactor Pressure Vessel Head (RPVH)  
a)  
Provide the NDE personnel qualification records for the examiners who will  
perform examinations of the RPVH.
b)  
Provide drawings showing the following: (If a visual examination is planned for  
the upcoming refueling outage)  
i)  
RPVH and CRDM nozzle configurations
ii)  
RPVH insulation configuration
The drawings listed above should include fabrication drawings for the nozzle attachment  
welds as applicable.
c)  
Copy of NDE reports from the last RPVH examination.  
d)  
Copy of evaluation or calculation demonstrating that the scope of the visual  
examination of the upper head will meet the 95% minimum coverage required by  
NRC Order EA-03-009 (If a visual examination is planned for the upcoming  
refueling outage).  
e)  
Provide a copy of the procedures that will be used to identify the source of any  
boric acid deposits identified on the RPVH. If no explicit procedures exist which  


          govern this activity, provide a description of the process to be followed including
          personnel responsibilities and expectations.
    f)     Provide a copy of the updated calculation of effective degradation years (EDY)
          for the RPVH susceptibility ranking.
- 7 -
    g)     Provide copy of the vendor qualification report(s) that demonstrates the detection
Enclosure
          capability of the NDE equipment used for the RPVH examinations. Also, identify
govern this activity, provide a description of the process to be followed including  
          any changes in equipment configurations used for the RPVH examinations which
personnel responsibilities and expectations.
          differ from that used in the vendor qualification report(s).
B.3 Boric Acid Corrosion Control Program (BACCP)
f)
    a)     Please provide boric acid walkdown inspection results, an updated list of boric
Provide a copy of the updated calculation of effective degradation years (EDY)  
          acid leaks identified so far this outage, associated corrective action
for the RPVH susceptibility ranking.  
          documentation, and overall status of planned boric acid inspections.
    b)     Please provide any engineering evaluations completed for boric acid leaks
g)
          identified since the end of the last refueling outage. Please include a status of
Provide copy of the vendor qualification report(s) that demonstrates the detection  
          corrective actions to repair and/or clean these boric acid leaks. Please identify
capability of the NDE equipment used for the RPVH examinations. Also, identify  
          specifically which known leaks, if any, have remained in service or will remain in
any changes in equipment configurations used for the RPVH examinations which  
          service as active leaks.
differ from that used in the vendor qualification report(s).  
B.4 Steam Generator Tube (SGT) Inspections
    a)     Copies of the Examination Technique Specification Sheets (ETSS) and
B.3  
          associated justification for any revisions.
Boric Acid Corrosion Control Program (BACCP)  
    b)     Copy of the guidance to be followed if a loose part or foreign material is identified
          in the SGs.
a)  
    c)     Please provide a copy of the ET procedures used to perform the SGT
Please provide boric acid walkdown inspection results, an updated list of boric  
          inspections (specifically calibration and flaw characterization/sizing procedures,
acid leaks identified so far this outage, associated corrective action  
          etc.). Also include documentation for the specific equipment to be used.
documentation, and overall status of planned boric acid inspections.  
    d)     Please provide copies of your responses to NRC and industry operating
          experience communications such as Generic Letters, Information Notices, etc.
b)  
          (as applicable to SGT inspections) *Do not provide these documents separately if
Please provide any engineering evaluations completed for boric acid leaks  
          already included in other information requested such as the degradation
identified since the end of the last refueling outage. Please include a status of  
          assessment.
corrective actions to repair and/or clean these boric acid leaks. Please identify  
    e)     List of corrective action documents generated by the vendor and/or site with
specifically which known leaks, if any, have remained in service or will remain in  
          respect to SG inspection activities.
service as active leaks.
B.5 Codes and Standards
                                        -7-                                        Enclosure
B.4  
Steam Generator Tube (SGT) Inspections  
a)  
Copies of the Examination Technique Specification Sheets (ETSS) and  
associated justification for any revisions.  
b)  
Copy of the guidance to be followed if a loose part or foreign material is identified  
in the SGs.  
c)  
Please provide a copy of the ET procedures used to perform the SGT  
inspections (specifically calibration and flaw characterization/sizing procedures,  
etc.). Also include documentation for the specific equipment to be used.  
d)  
Please provide copies of your responses to NRC and industry operating  
experience communications such as Generic Letters, Information Notices, etc.  
(as applicable to SGT inspections) *Do not provide these documents separately if  
already included in other information requested such as the degradation  
assessment.  
e)  
List of corrective action documents generated by the vendor and/or site with  
respect to SG inspection activities.  
B.5  
Codes and Standards  


        a)       Ready access to (i.e., copies provided to the inspector(s) for use during the
                inspection at the onsite inspection location, or room number and location where
                available):
                i)     Applicable Editions of the ASME Code (Sections V, IX and XI) for the
- 8 -
                        inservice inspection program and the repair/replacement program.
Enclosure
                ii)     EPRI and industry standards referenced in the procedures used to
a)  
                        perform the SGT eddy current examination.
Ready access to (i.e., copies provided to the inspector(s) for use during the  
Inspector Contact Information:
inspection at the onsite inspection location, or room number and location where  
L. E. Ellershaw
available):  
Senior Reactor Inspector
817-860-8127
i)
lee1@nrc.gov
Applicable Editions of the ASME Code (Sections V, IX and XI) for the  
Mailing Address:
inservice inspection program and the repair/replacement program.
US NRC Region IV
Attn: L. E. Ellershaw
ii)
611 Ryan Plaza Drive, Suite 400
EPRI and industry standards referenced in the procedures used to  
perform the SGT eddy current examination.  
Inspector Contact Information:  
L. E. Ellershaw  
Senior Reactor Inspector  
817-860-8127  
lee1@nrc.gov  
Mailing Address:  
US NRC Region IV  
Attn: L. E. Ellershaw  
611 Ryan Plaza Drive, Suite 400  
Arlington, TX 76011
Arlington, TX 76011
                                              -8-                                      Enclosure
}}
}}

Latest revision as of 18:03, 14 January 2025

Notification of Inspection (NRC Inspection Report 05000482/2008003) and Request for Information
ML080450603
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/14/2008
From: Russ Bywater
Region 4 Engineering Branch 1
To: Muench R
Wolf Creek
References
IR-08-003
Download: ML080450603 (13)


See also: IR 05000482/2008003

Text

February 14, 2008

Rick A. Muench, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT:

WOLF CREEK GENERATING STATION - NOTIFICATION OF INSPECTION

(NRC INSPECTION REPORT 05000482/2008003) AND REQUEST FOR

INFORMATION

Dear Mr. Muench:

From March 31 to April 11, 2008, reactor inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inservice inspection at Wolf

Creek Generating Station using NRC Inspection Procedure 71111.08. Experience has shown

that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.

In order to minimize the impact to your onsite resources and to ensure a productive inspection,

we have enclosed a request for documents needed for this inspection. These documents have

been divided into two groups. The first group (Section A of the enclosure) identified information

to be provided prior to the inspection to ensure that the inspectors are adequately prepared.

The second group (Section B of the enclosure) identifies the information the inspectors will need

upon arrival at the site. It is important that all of these documents are up to date and complete

in order to minimize the number of additional documents requested during the preparation

and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. W. Muilenburg of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector Lee Ellershaw at (817) 860-8127 (lee1@nrc.gov).

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

611 RYAN PLAZA DRIV E, SUITE 400

ARLINGTON, TEXAS 76011-4005

Wolf Creek Nuclear Operating Corp.

- 2 -

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Russell L. Bywater, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-482

License: NPF-42

Enclosure:

Inservice Inspection Document Request

cc w/enclosure:

Vice President Operations/Plant Manager

Wolf Creek Nuclear Operating Corp.

P.O. Box 411

Burlington, KS 66839

Jay Silberg, Esq.

Pillsbury Winthrop Shaw Pittman LLP

2300 N Street, NW

Washington, DC 20037

Supervisor Licensing

Wolf Creek Nuclear Operating Corp.

P.O. Box 411

Burlington, KS 66839

Chief Engineer

Utilities Division

Kansas Corporation Commission

1500 SW Arrowhead Road

Topeka, KS 66604-4027

Office of the Governor

State of Kansas

Topeka, KS 66612

Attorney General

120 S.W. 10th Avenue, 2nd Floor

Topeka, KS 66612-1597

Wolf Creek Nuclear Operating Corp.

- 3 -

County Clerk

Coffey County Courthouse

110 South 6th Street

Burlington, KS 66839-1798

Chief, Radiation and Asbestos

Control Section

Kansas Department of Health and

Environment

Bureau of Air and Radiation

1000 SW Jackson, Suite 310

Topeka, KS 66612-1366

Ronald L. McCabe, Chief

Technological Hazards Branch

National Preparedness Division

DHS/FEMA

9221 Ward Parkway

Suite 300

Kansas City, MO 64114-3372

Wolf Creek Nuclear Operating Corp.

- 4 -

Electronic distribution by RIV:

Regional Administrator (EEC)

DRP Director (DDC)

DRS Director (RJC1)

DRS Deputy Director (ACC)

Senior Resident Inspector (SDC)

SRI, Callaway (DED)

Branch Chief, DRP/B (VGG)

Senior Project Engineer, (RWD)

Team Leader, DRP/TSS (CJP)

RITS Coordinator (MSH3)

DRS STA (DAP)

D. Pelton, OEDO RIV Coordinator (DLP1)

ROPreports

WC Site Secretary (SLA2)

SUNSI Review Completed: __RLB____ADAMS: Yes

G No Initials: _RLB_____

Publicly Available G Non-Publicly Available G Sensitive

Non-Sensitive

RI:EB1

C:EB1

LEEllershaw:lar

RLBywater

/RA/

/RA/

2/13/08

2/14/08

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax

- 1 -

Enclosure

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates:

March 31, 2008 - April 11, 2008

Inspection Procedures:

IP 71111.08 Inservice Inspection (ISI) Activities

TI 2515/166 Pressurized Water Reactor Containment Sump

Blockage

TI 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds

Inspectors:

L. Ellershaw, Senior Reactor Inspector (Lead Inspector - ISI)

J. Drake, Senior Reactor Inspector

K. Clayton, Reactor Inspector

A.

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of L. E. Ellershaw, by March 11,

2008, to facilitate the selection of specific items that will be reviewed during the onsite

inspection week. The inspector will select specific items from the information requested

below and then request from your staff additional documents needed during the onsite

inspection week (Section B of this enclosure). We ask that the specific items selected

from the lists be available and ready for review on the first day of inspection. *Please

provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and

provide subject documentation during the first day of the onsite inspection. If you have

any questions regarding this information request, please call the inspector as soon as

possible.

A.1

ISI/Welding Programs and Schedule Information

a)

A detailed schedule (including preliminary dates) of:

i)

Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400 (Do not provide separately if other

documentation requested contains this information)

ii)

Reactor pressure vessel head (RPVH) examinations planned for the

upcoming outage.

iii)

Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope. (If applicable)

- 2 -

Enclosure

iv)

Examinations planned as part of your Boric Acid Corrosion Control

Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)

v)

Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs))

b)

A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c)

A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

Class 1 & 2 systems since the beginning of the last refueling outage. This should

include the previousSection XI pressure test(s) conducted during start up and

any evaluations associated with the results of the pressure tests. Also, include in

the list the NDE reports with relevant conditions in the RPVH penetration nozzles

which have been accepted for continued service. The list of NDE reports should

include a brief description of the SSC where the relevant condition was identified.

d)

A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated this refueling outage.

e)

If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f)

Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g)

A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h)

Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2

Reactor Pressure Vessel Head (RPVH)

a)

Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the

vessel head to fulfill commitments made in response to NRC Bulletin 2002-02

and NRC Order EA-03-009. Also, include examination scope expansion criteria

and planned expansion sample sizes if relevant conditions are identified. (If

applicable)

- 3 -

Enclosure

b)

A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the reactor vessel head (e.g., the specific

industry or procedural standards which will be used to evaluate potential leakage

and/or flaw indications).

A.3

Boric Acid Corrosion Control Program (BACCP)

a)

Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b)

Please provide a list of leaks (including Code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the Unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

BACCP.

c)

Please provide a copy of the most recent self-assessment performed for the

BACCP.

A.4

Steam Generator Tube (SGT) Inspections

a)

A detailed schedule of:

i)

SGT inspection, data analyses, and repair activities for the upcoming

outage. (If occurring)

ii)

SG secondary side inspection activities for the upcoming outage. (If

occurring)

b)

Please provide a copy of your SG ISI Inspection Program and Plan. Please

include a copy of the Operational Assessment from last outage and a copy of the

following documents as they become available:

i)

Degradation Assessment

ii)

Condition Monitoring Assessment

c)

If you are planning on modifying your Technical Specifications such that they are

consistent with TSTF-449, please provide copies of your correspondence with

the NRC regarding deviations from the STS.

d)

Copy of SG history documentation given to vendors performing eddy current (ET)

testing of the SGs during the upcoming outage.

e)

Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy

Current Technique Specification Sheets (ETSS). Additionally, please provide a

copy of EPRI Appendix H ETSS Qualification Records.

- 4 -

Enclosure

f)

Identify and quantify any SGT leakage experienced during the previous operating

cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition (If applicable).

g)

Provide past history of the condition and issues pertaining to the secondary side

of the steam generators (including items such as loose parts, fouling, top of tube

sheet condition, crud removal amounts, etc.)

h)

Please provide copies of your most recent self assessments of the SG

monitoring, loose parts monitoring, and secondary side water chemistry control

programs.

i)

Please also indicate where the primary, secondary, and resolution analyses are

scheduled to take place.

j)

Please provide a summary of the scope of the SGT examinations, including

examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the

percentage of tubes to be examined. *Do not provide these documents

separately if already included in other information requested.

A.5

Materials Reliability (MRP-139) Program Activities

a)

A list of, with verification, that the baseline inspections of all applicable Dissimilar

Metal Butt Welds (DMBWs) have been completed by December 31, 2007.

b)

Verification that baseline inspection of hot leg and cold leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

c)

A list and schedule (examination dates) of all DMBW examinations planned for

the upcoming refueling outage. If none are scheduled, then data from previous

examinations should be available for review.

d)

A list and schedule for any welding to be performed on DMBWs in the upcoming

outage. If no welding will be performed then records of previous welding on

DMBWs and postweld NDE documentation.

e)

A list and schedule of any stress improvement (SI) activities planned for the

upcoming refueling outage. If none are scheduled then have qualification reports

for any SIs previously performed.

f)

Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

A.6

Additional information related to all ISI activities

- 5 -

Enclosure

a)

A list with a brief description of ISI, BACCP, and SGT inspection related issues

(e.g., condition reports) entered into your corrective action program since the

beginning of the last refueling outage (for Unit 2). For example, a list based upon

data base searches using key words related to piping or SG tube degradation

such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust,

corrosion, boric acid, or errors in piping/SGT examinations.

b)

Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

B.

Information to be provided onsite to the inspector(s) at the entrance meeting (March 31,

2008):

B.1

ISI / Welding Programs and Schedule Information

a)

Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b)

For ASME Code Class 1 and 2 welds selected by the inspector from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i)

Weld data sheet (traveler)

ii)

Weld configuration and system location

iii)

Applicable Code Edition and Addenda for weldment

iv)

Applicable Code Edition and Addenda for welding procedures

v)

Applicable weld procedures (WPS) used to fabricate the welds

vi)

Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii)

Copies of mechanical test reports identified in the PQRs above

viii)

Copies of the nonconformance reports for the selected welds (If

applicable)

ix)

Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

x)

Copies of the preservice examination records for the selected welds.

xi)

Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

proficiency in the applicable welding processes specified in the WPS (at

least six months prior to the date of subject work)

- 6 -

Enclosure

xii)

Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

c)

For the ISI related corrective action issues selected by the inspector(s) from

section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d)

For the NDE reports with relevant conditions on Code Class 1 & 2 systems

selected by the inspector from section A above, provide a copy of the

examination records, examiner qualification records, and associated corrective

action documents.

e)

A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f)

For the NDEs selected by the inspector from section A of this enclosure, provide

copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used (e.g.,

ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

B.2

Reactor Pressure Vessel Head (RPVH)

a)

Provide the NDE personnel qualification records for the examiners who will

perform examinations of the RPVH.

b)

Provide drawings showing the following: (If a visual examination is planned for

the upcoming refueling outage)

i)

RPVH and CRDM nozzle configurations

ii)

RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle attachment

welds as applicable.

c)

Copy of NDE reports from the last RPVH examination.

d)

Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95% minimum coverage required by

NRC Order EA-03-009 (If a visual examination is planned for the upcoming

refueling outage).

e)

Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the RPVH. If no explicit procedures exist which

- 7 -

Enclosure

govern this activity, provide a description of the process to be followed including

personnel responsibilities and expectations.

f)

Provide a copy of the updated calculation of effective degradation years (EDY)

for the RPVH susceptibility ranking.

g)

Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the NDE equipment used for the RPVH examinations. Also, identify

any changes in equipment configurations used for the RPVH examinations which

differ from that used in the vendor qualification report(s).

B.3

Boric Acid Corrosion Control Program (BACCP)

a)

Please provide boric acid walkdown inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and overall status of planned boric acid inspections.

b)

Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please identify

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4

Steam Generator Tube (SGT) Inspections

a)

Copies of the Examination Technique Specification Sheets (ETSS) and

associated justification for any revisions.

b)

Copy of the guidance to be followed if a loose part or foreign material is identified

in the SGs.

c)

Please provide a copy of the ET procedures used to perform the SGT

inspections (specifically calibration and flaw characterization/sizing procedures,

etc.). Also include documentation for the specific equipment to be used.

d)

Please provide copies of your responses to NRC and industry operating

experience communications such as Generic Letters, Information Notices, etc.

(as applicable to SGT inspections) *Do not provide these documents separately if

already included in other information requested such as the degradation

assessment.

e)

List of corrective action documents generated by the vendor and/or site with

respect to SG inspection activities.

B.5

Codes and Standards

- 8 -

Enclosure

a)

Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

i)

Applicable Editions of the ASME Code (Sections V, IX and XI) for the

inservice inspection program and the repair/replacement program.

ii)

EPRI and industry standards referenced in the procedures used to

perform the SGT eddy current examination.

Inspector Contact Information:

L. E. Ellershaw

Senior Reactor Inspector

817-860-8127

lee1@nrc.gov

Mailing Address:

US NRC Region IV

Attn: L. E. Ellershaw

611 Ryan Plaza Drive, Suite 400

Arlington, TX 76011