IR 05000327/2008001: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:March 3, 2008 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 37: | Line 34: | ||
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. | The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. | ||
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public | In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public | ||
TVA | |||
Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4530 with any questions you may have regarding this letter or the inspection plan. | If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4530 with any questions you may have regarding this letter or the inspection plan. | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Rebecca L. Nease, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 Enclosure: Sequoyah Inspection/Activity Plan (03/01/08 - 06/30/09) | |||
Rebecca L. Nease, Chief Reactor Projects Branch 6 Division of Reactor Projects | |||
Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 | |||
Enclosure: Sequoyah Inspection/Activity Plan (03/01/08 - 06/30/09) | |||
cc w/encl.: (See page 2) | cc w/encl.: (See page 2) | ||
_________________________ | _________________________ | ||
OFFICE RII:DRP RII:DRP SIGNATURE /RA/ /RA/ | OFFICE RII:DRP RII:DRP | ||
NAME JBaptist RNease DATE | |||
SIGNATURE | |||
/RA/ | |||
/RA/ | |||
NAME JBaptist RNease | |||
DATE 3/308 3/3/08 | |||
E-MAIL COPY? | |||
YES NO YES NO YES NO YES NO YES NO YES NO YES NO | |||
TVA | |||
cc w/encl: | |||
Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority Electronic Mail Distribution | |||
William R. Campbell, Jr. | |||
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 | |||
Christopher R. Church Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution | |||
James R. Douet Vice President Nuclear Support Tennessee Valley Authority Electronic Mail Distribution | |||
H. Rick Rogers Vice President Nuclear Engineering and Technical Services Tennessee Valley Authority Electronic Mail Distribution | |||
Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution | |||
John C. Fornicola General Manager Nuclear Assurance Tennessee Valley Authority Electronic Mail Distribution | |||
General Counsel Tennessee Valley Authority Electronic Mail Distribution | |||
Beth A. Wetzel Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority Electronic Mail Distribution | |||
James D. Smith Manager Licensing and Industry Affairs Tennessee Valley Authority Electronic Mail Distribution | |||
Lawrence E. Nanney Director TN Dept. of Environment & Conservation Electronic Mail Distribution | |||
Larry E. Nicholson General Manager Performance Improvement Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 | |||
Michael A. Purcell Senior Technical Advisor Nuclear Power Group Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 | |||
James H. Bassham Director Tennessee Emergency Management Agency Electronic Mail Distribution | |||
Senior Resident Inspector Sequoyah Nuclear Plant U.S. NRC 2600 Igou Ferry Road Soddy Daisy, TN 37379-3624 | |||
TVA | |||
Letter to William R. Campbell, Jr. from Rebecca L. Nease dated March 3, 2008 | |||
SUBJECT: | |||
ANNUAL ASSESSMENT LETTER - SEQUOYAH NUCLEAR PLANT NRC | |||
INSPECTION REPORT 05000327/2008001 AND 05000328/2008001 | |||
Distribution w/encl: | |||
C. Evans, RII EICS (Part 72 Only) | C. Evans, RII EICS (Part 72 Only) | ||
L. Slack, RII EICS OE Mail (email address if applicable) | L. Slack, RII EICS OE Mail (email address if applicable) | ||
RIDSNRRDIRS PUBLIC R. Pascarelli, NRR ((Regulatory Conferences Only)) | RIDSNRRDIRS PUBLIC R. Pascarelli, NRR ((Regulatory Conferences Only)) | ||
B. Moroney, NRR | B. Moroney, NRR | ||
Sequoyah Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 06:32:43 Report 22 | |||
PSB1-RP | |||
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 03/10/2008 03/12/2008 1, 2 7112101 IP | |||
PSB1-RP | |||
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 04/07/2008 04/11/2008 1, 2 7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 04/07/2008 04/11/2008 1, 2 7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 04/07/2008 04/11/2008 1, 2 7112203 IP Baseline Inspections RETS/ODCM Radiological Effluent 04/07/2008 04/11/2008 1, 2 71151-PR01 IP | |||
PSB1-RP | |||
- RADIATION PROTECTION - ACCESS CONTROLS Baseline Inspections Access Control to Radiologically Significant Areas 04/28/2008 05/02/2008 1, 2 7112101 IP Baseline Inspections Occupational Exposure Control Effectiveness 04/28/2008 05/02/2008 1, 2 71151-OR01 IP | |||
EB2-TFP | |||
- TRIENNIAL FIRE PROTECTION Baseline Inspections Fire Protection [Triennial] | |||
06/09/2008 06/13/2008 1, 2 7111105T IP Baseline Inspections Fire Protection [Triennial] | |||
06/23/2008 06/27/2008 1, 2 7111105T IP | |||
EB3-ISI | |||
- UNIT 2 - ISI Baseline Inspections Inservice Inspection Activities - PWR 05/12/2008 05/16/2008 | |||
7111108P IP | |||
EB3SGISI | |||
- U2 SG ISI Baseline Inspections Inservice Inspection Activities - PWR 05/19/2008 05/23/2008 | |||
7111108P IP | |||
EB3TI172 | |||
- TI-172 Generic Safety Inspection Reactor Coolant System Dissimiliar Metal Butt Welds 09/08/2008 09/12/2008 1, 2 2515/172 IP | |||
TI-171 | |||
- B.5.B PHASE 2&3 Generic Safety Inspection Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/06/2008 10/10/2008 1, 2 2515/171 IP | |||
PSB1-EP | |||
- EP EXERCISE EP Baseline Inspection Exercise Evaluation 10/13/2008 10/17/2008 1, 2 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 10/13/2008 10/17/2008 1, 2 7111404 IP Baseline Inspections Drill/Exercise Performance 10/13/2008 10/17/2008 1, 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 10/13/2008 10/17/2008 1, 2 71151-EP02 IP Baseline Inspections Alert & Notification System 10/13/2008 10/17/2008 1, 2 71151-EP03 IP | |||
OL RQ | |||
- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 12/01/2008 12/05/2008 1, 2 7111111B IP | |||
EB1-MODS - MODIFICATIONS-10CFR50.59 Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 12/01/2008 12/12/2008 1, 2 7111117B IP | |||
OL EXAM | |||
- INITIAL EXAM PREP Not Applicable SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES 01/05/2009 01/09/2009 | |||
V23307 | |||
OL EXAM | |||
- INITIAL EXAM - WEEK 1 Not Applicable SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES 01/26/2009 01/31/2009 | |||
V23307 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | This report shows only on-site and announced inspection procedures. | ||
Sequoyah Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 06:32:43 Report 22 | |||
OL EXAM | |||
- INITIAL EXAM - WEEK 2 Not Applicable SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES 02/02/2009 02/06/2009 | |||
V23307 | |||
PSB1-RP | |||
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 02/17/2009 02/19/2009 1, 2 7112101 IP | |||
PSB1-RP | |||
- RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections Access Control to Radiologically Significant Areas 03/30/2009 04/03/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 03/30/2009 04/03/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 03/30/2009 04/03/2009 1, 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 03/30/2009 04/03/2009 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 03/30/2009 04/03/2009 1, 2 71151-PR01 IP | |||
EB3ISI | |||
- UNIT 1 ISI Baseline Inspections Inservice Inspection Activities - PWR 04/06/2009 04/10/2009 | |||
7111108P IP | |||
PSB1-RP | |||
- RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections Access Control to Radiologically Significant Areas 04/13/2009 04/19/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 04/13/2009 04/19/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/13/2009 04/19/2009 1, 2 7112202 IP This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | This report shows only on-site and announced inspection procedures. | ||
}} | }} | ||
Latest revision as of 17:53, 14 January 2025
| ML080630502 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 03/03/2008 |
| From: | Nease R Reactor Projects Region 2 Branch 6 |
| To: | Campbell W Tennessee Valley Authority |
| References | |
| IR-08-001 | |
| Download: ML080630502 (7) | |
Text
March 3, 2008
SUBJECT:
ANNUAL ASSESSMENT LETTER - SEQUOYAH NUCLEAR PLANT (NRC INSPECTION REPORT 05000327/2008001 AND 05000328/2008001)
Dear Mr. Campbell:
On February 7, 2008, the NRC staff completed its performance review of the Sequoyah Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only-Security-Related Information" will include the security cornerstone review and resultant inspection plan.
Overall, Sequoyah operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include TI 2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies; TI 2515/172, Reactor Coolant System Dissimilar Metal; and TI 2515/174, Hydrogen Igniter Backup Power Verification.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4530 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Rebecca L. Nease, Chief Reactor Projects Branch 6 Division of Reactor Projects
Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79
Enclosure: Sequoyah Inspection/Activity Plan (03/01/08 - 06/30/09)
cc w/encl.: (See page 2)
_________________________
OFFICE RII:DRP RII:DRP
SIGNATURE
/RA/
/RA/
NAME JBaptist RNease
DATE 3/308 3/3/08
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
cc w/encl:
Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority Electronic Mail Distribution
William R. Campbell, Jr.
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
Christopher R. Church Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution
James R. Douet Vice President Nuclear Support Tennessee Valley Authority Electronic Mail Distribution
H. Rick Rogers Vice President Nuclear Engineering and Technical Services Tennessee Valley Authority Electronic Mail Distribution
Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution
John C. Fornicola General Manager Nuclear Assurance Tennessee Valley Authority Electronic Mail Distribution
General Counsel Tennessee Valley Authority Electronic Mail Distribution
Beth A. Wetzel Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority Electronic Mail Distribution
James D. Smith Manager Licensing and Industry Affairs Tennessee Valley Authority Electronic Mail Distribution
Lawrence E. Nanney Director TN Dept. of Environment & Conservation Electronic Mail Distribution
Larry E. Nicholson General Manager Performance Improvement Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
Michael A. Purcell Senior Technical Advisor Nuclear Power Group Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801
James H. Bassham Director Tennessee Emergency Management Agency Electronic Mail Distribution
Senior Resident Inspector Sequoyah Nuclear Plant U.S. NRC 2600 Igou Ferry Road Soddy Daisy, TN 37379-3624
Letter to William R. Campbell, Jr. from Rebecca L. Nease dated March 3, 2008
SUBJECT:
ANNUAL ASSESSMENT LETTER - SEQUOYAH NUCLEAR PLANT NRC
INSPECTION REPORT 05000327/2008001 AND 05000328/2008001
Distribution w/encl:
C. Evans, RII EICS (Part 72 Only)
L. Slack, RII EICS OE Mail (email address if applicable)
RIDSNRRDIRS PUBLIC R. Pascarelli, NRR ((Regulatory Conferences Only))
B. Moroney, NRR
Sequoyah Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 06:32:43 Report 22
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 03/10/2008 03/12/2008 1, 2 7112101 IP
PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 04/07/2008 04/11/2008 1, 2 7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 04/07/2008 04/11/2008 1, 2 7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 04/07/2008 04/11/2008 1, 2 7112203 IP Baseline Inspections RETS/ODCM Radiological Effluent 04/07/2008 04/11/2008 1, 2 71151-PR01 IP
PSB1-RP
- RADIATION PROTECTION - ACCESS CONTROLS Baseline Inspections Access Control to Radiologically Significant Areas 04/28/2008 05/02/2008 1, 2 7112101 IP Baseline Inspections Occupational Exposure Control Effectiveness 04/28/2008 05/02/2008 1, 2 71151-OR01 IP
EB2-TFP
- TRIENNIAL FIRE PROTECTION Baseline Inspections Fire Protection [Triennial]
06/09/2008 06/13/2008 1, 2 7111105T IP Baseline Inspections Fire Protection [Triennial]
06/23/2008 06/27/2008 1, 2 7111105T IP
EB3-ISI
- UNIT 2 - ISI Baseline Inspections Inservice Inspection Activities - PWR 05/12/2008 05/16/2008
7111108P IP
EB3SGISI
- U2 SG ISI Baseline Inspections Inservice Inspection Activities - PWR 05/19/2008 05/23/2008
7111108P IP
EB3TI172
- TI-172 Generic Safety Inspection Reactor Coolant System Dissimiliar Metal Butt Welds 09/08/2008 09/12/2008 1, 2 2515/172 IP
TI-171
- B.5.B PHASE 2&3 Generic Safety Inspection Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/06/2008 10/10/2008 1, 2 2515/171 IP
PSB1-EP
- EP EXERCISE EP Baseline Inspection Exercise Evaluation 10/13/2008 10/17/2008 1, 2 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 10/13/2008 10/17/2008 1, 2 7111404 IP Baseline Inspections Drill/Exercise Performance 10/13/2008 10/17/2008 1, 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 10/13/2008 10/17/2008 1, 2 71151-EP02 IP Baseline Inspections Alert & Notification System 10/13/2008 10/17/2008 1, 2 71151-EP03 IP
- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 12/01/2008 12/05/2008 1, 2 7111111B IP
EB1-MODS - MODIFICATIONS-10CFR50.59 Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 12/01/2008 12/12/2008 1, 2 7111117B IP
OL EXAM
- INITIAL EXAM PREP Not Applicable SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES 01/05/2009 01/09/2009
V23307
OL EXAM
- INITIAL EXAM - WEEK 1 Not Applicable SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES 01/26/2009 01/31/2009
V23307 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Sequoyah Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 06:32:43 Report 22
OL EXAM
- INITIAL EXAM - WEEK 2 Not Applicable SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES 02/02/2009 02/06/2009
V23307
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 02/17/2009 02/19/2009 1, 2 7112101 IP
PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections Access Control to Radiologically Significant Areas 03/30/2009 04/03/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 03/30/2009 04/03/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 03/30/2009 04/03/2009 1, 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 03/30/2009 04/03/2009 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 03/30/2009 04/03/2009 1, 2 71151-PR01 IP
EB3ISI
- UNIT 1 ISI Baseline Inspections Inservice Inspection Activities - PWR 04/06/2009 04/10/2009
7111108P IP
PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections Access Control to Radiologically Significant Areas 04/13/2009 04/19/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 04/13/2009 04/19/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/13/2009 04/19/2009 1, 2 7112202 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.