ML080660067: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML080660067
| number = ML080660067
| issue date = 03/05/2008
| issue date = 03/05/2008
| title = Donald C. Cook, Units 1 and 2 - Tech Spec Page for Amendments 302 & 285 to Revise a Specification Inadvertently Omitted by Previous Amendments Power Range Neutron Flux High Negative Rate Trip Function
| title = Tech Spec Page for Amendments 302 & 285 to Revise a Specification Inadvertently Omitted by Previous Amendments Power Range Neutron Flux High Negative Rate Trip Function
| author name = Tam P S
| author name = Tam P
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
| addressee name = Rencheck M W
| addressee name = Rencheck M
| addressee affiliation = Indiana Michigan Power Co
| addressee affiliation = Indiana Michigan Power Co
| docket = 05000315, 05000316
| docket = 05000315, 05000316
| license number = DPR-058, DPR-074
| license number = DPR-058, DPR-074
| contact person = tam P S, NRR/ADRO/DORL, 415-1451
| contact person = tam P, NRR/ADRO/DORL, 415-1451
| case reference number = TAC MD7551, TAC MD7552
| case reference number = TAC MD7551, TAC MD7552
| package number = ML080520355
| package number = ML080520355
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:RTS Instrumentation
{{#Wiki_filter:RTS Instrumentation 3.3.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME 0.. Required Action and 0.1 Reduce THERMAL POWER 6 hours associated Completion to < P-8.
Time of Condition D not met for Function 16.a or 16.b.
P. Required Action and P.1 Be in MODE 2.
6 hours associated Completion Time of Condition L not met for Function 18.b, 18.c, or 18.e.
Q. Required Action and associated Completion Time of Condition B, J, K, or M not met in MODE 1 or 2.
OR Required Action and associated Completion Time of Condition C not met.
OR Required Action and associated Completion Time of Condition D not met for Function 2.b, 3, 6, 7, 8.b, 14, or 15.
OR Required Action and associated Completion Time of Condition L not met for Function 18.a or 18.d.
Q.1 Be in MODE 3.
6 hours 11 Cook Nuclear Plant Unit 2 3.3.1-5 CookNucearPlat Unt 23.31-5Amendment No. 2-69, 2-7-8, 285


====3.3.1 ACTIONS====
RTS Instrumentation 3.3.1 ACTIONS (continued)
(continued)
CONDITION REQUIRED ACTION COMPLETION TIME
CONDITION REQUIRED ACTION COMPLETION TIME 0.. Required Action and 0.1 Reduce THERMAL POWER 6 hours associated Completion to < P-8.Time of Condition D not met for Function 16.a or 16.b.P. Required Action and P.1 Be in MODE 2. 6 hours associated Completion Time of Condition L not met for Function 18.b, 18.c, or 18.e.Q. Required Action and associated Completion Time of Condition B, J, K, or M not met in MODE 1 or 2.OR Required Action and associated Completion Time of Condition C not met.OR Required Action and associated Completion Time of Condition D not met for Function 2.b, 3, 6, 7, 8.b, 14, or 15.OR Required Action and associated Completion Time of Condition L not met for Function 18.a or 18.d.Q.1 Be in MODE 3.6 hours 11 Cook Nuclear Plant Unit 2 3.3.1-5 CookNucearPlat Unt 23.31-5Amendment No. 2-69, 2-7-8, 285 RTS Instrumentation
: 0. Required Action and 0.1 Reduce THERMA L POWER 6 hours associated Completion to < P-8.
 
Time of Condition D not met for Function 1 6.a or 16.b.
====3.3.1 ACTIONS====
P. Required Action and P. 1 Be in MODE 2.
(continued)
6 hours associated Completion Time of Condition L not met for Function 18.b, 18.c, or 18.e.
CONDITION REQUIRED ACTION COMPLETION TIME 0. Required Action and 0.1 Reduce THERMA L POWER 6 hours associated Completion to < P-8.Time of Condition D not met for Function 1 6.a or 16.b.P. Required Action and P. 1 Be in MODE 2. 6 hours associated Completion Time of Condition L not met for Function 18.b, 18.c, or 18.e.Q. Required Action and Q. 1 Be in MODE 3. 6 hours associated Completion Time of Condition B, J, K, or M not met in MODE 1 or 2.OR Required Action and associated Completion Time of Condition C not met.OR Required Action and associated Completion Time of Condition D not met for Function 2.b, 3, 6, 7, 8.b, 14, or 15.OR Required Action and associated Completion Time of Condition L not met for Function 18.a or 18.d.r Cook Nuclear Plant Unit 1 3.3.1-5 CookNucearPlat Unt 13.31-5Amendment No. 297, 2-97, 302}}
Q. Required Action and Q. 1 Be in MODE 3.
6 hours associated Completion Time of Condition B, J, K, or M not met in MODE 1 or 2.
OR Required Action and associated Completion Time of Condition C not met.
OR Required Action and associated Completion Time of Condition D not met for Function 2.b, 3, 6, 7, 8.b, 14, or 15.
OR Required Action and associated Completion Time of Condition L not met for Function 18.a or 18.d.
r Cook Nuclear Plant Unit 1 3.3.1-5 CookNucearPlat Unt 13.31-5Amendment No. 297, 2-97, 302}}

Latest revision as of 17:50, 14 January 2025

Tech Spec Page for Amendments 302 & 285 to Revise a Specification Inadvertently Omitted by Previous Amendments Power Range Neutron Flux High Negative Rate Trip Function
ML080660067
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/05/2008
From: Tam P
NRC/NRR/ADRO/DORL/LPLIII-1
To: Rencheck M
Indiana Michigan Power Co
tam P, NRR/ADRO/DORL, 415-1451
Shared Package
ML080520355 List:
References
TAC MD7551, TAC MD7552
Download: ML080660067 (1)


Text

RTS Instrumentation 3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME 0.. Required Action and 0.1 Reduce THERMAL POWER 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion to < P-8.

Time of Condition D not met for Function 16.a or 16.b.

P. Required Action and P.1 Be in MODE 2.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition L not met for Function 18.b, 18.c, or 18.e.

Q. Required Action and associated Completion Time of Condition B, J, K, or M not met in MODE 1 or 2.

OR Required Action and associated Completion Time of Condition C not met.

OR Required Action and associated Completion Time of Condition D not met for Function 2.b, 3, 6, 7, 8.b, 14, or 15.

OR Required Action and associated Completion Time of Condition L not met for Function 18.a or 18.d.

Q.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 11 Cook Nuclear Plant Unit 2 3.3.1-5 CookNucearPlat Unt 23.31-5Amendment No. 2-69, 2-7-8, 285

RTS Instrumentation 3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

0. Required Action and 0.1 Reduce THERMA L POWER 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion to < P-8.

Time of Condition D not met for Function 1 6.a or 16.b.

P. Required Action and P. 1 Be in MODE 2.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition L not met for Function 18.b, 18.c, or 18.e.

Q. Required Action and Q. 1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B, J, K, or M not met in MODE 1 or 2.

OR Required Action and associated Completion Time of Condition C not met.

OR Required Action and associated Completion Time of Condition D not met for Function 2.b, 3, 6, 7, 8.b, 14, or 15.

OR Required Action and associated Completion Time of Condition L not met for Function 18.a or 18.d.

r Cook Nuclear Plant Unit 1 3.3.1-5 CookNucearPlat Unt 13.31-5Amendment No. 297, 2-97, 302