{{#Wiki_filter:April 7, 2008  
{{#Wiki_filter:April 7, 2008 Mr. Robert J. Agasie Reactor Director Nuclear Reactor Laboratory 1513 University Avenue, Room 141ME University of Wisconsin Madison, WI 53706-1687  
 
Mr. Robert J. Agasie Reactor Director Nuclear Reactor Laboratory 1513 University Avenue, Room 141ME University of Wisconsin Madison, WI 53706-1687  


==SUBJECT:==
==SUBJECT:==
Line 25: Line 23:


==Dear Mr. Agasie:==
==Dear Mr. Agasie:==
During the week of March 17, 2008, the NRC administered an operator licensing examination at your University of Wisconsin TRIGA Reactor. The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors,"
During the week of March 17, 2008, the NRC administered an operator licensing examination at your University of Wisconsin TRIGA Reactor. The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors,"
Revision 2. Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.  
Revision 2. Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.
 
In accordance with Title 10 of the Code of Federal Regulations Section 2.390, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Mr. Paul V. Doyle Jr. at (301) 415-1058 or via internet e-mail pvd@nrc.gov.
In accordance with Title 10 of the Code of Federal Regulations Section 2.390, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Mr. Paul V. Doyle Jr. at (301) 415-1058 or via internet e-mail pvd@nrc.gov.  
Sincerely,  
 
/RA/
Sincerely,
Johnny Eads, Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-156  
 
    /RA/
 
Johnny Eads, Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation  
 
Docket No. 50-156  


==Enclosures:==
==Enclosures:==
: 1. Initial Examination Report No. 50-156/OL-08-01
: 1. Initial Examination Report No. 50-156/OL-08-01
: 2. Written examination with facility comments incorporated  
: 2. Written examination with facility comments incorporated cc without enclosures: See next page


cc without enclosures:  See next page
April 7, 2008 Mr. Robert J. Agasie Reactor Director Nuclear Reactor Laboratory 1513 University Avenue, Room 141ME University of Wisconsin Madison, WI 53706-1687  
 
April 7, 2008 Mr. Robert J. Agasie Reactor Director Nuclear Reactor Laboratory 1513 University Avenue, Room 141ME University of Wisconsin Madison, WI 53706-1687  


==SUBJECT:==
==SUBJECT:==
Line 51: Line 40:


==Dear Mr. Agasie:==
==Dear Mr. Agasie:==
During the week of March 17, 2008, the NRC administered an operator licensing examination at your University of Wisconsin TRIGA Reactor. The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors,"
During the week of March 17, 2008, the NRC administered an operator licensing examination at your University of Wisconsin TRIGA Reactor. The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors,"
Revision 2. Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.  
Revision 2. Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.
 
In accordance with Title 10 of the Code of Federal Regulations Section 2.390, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Mr. Paul V. Doyle Jr. at (301) 415-1058 or via internet e-mail pvd@nrc.gov.
In accordance with Title 10 of the Code of Federal Regulations Section 2.390, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Mr. Paul V. Doyle Jr. at (301) 415-1058 or via internet e-mail pvd@nrc.gov.  
Sincerely,  
 
/RA/
Sincerely,
Johnny Eads, Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-156  
    /RA/     Johnny Eads, Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-156  


==Enclosures:==
==Enclosures:==
: 1. Initial Examination Report No. 50-156/OL-08-01
: 1. Initial Examination Report No. 50-156/OL-08-01
: 2. Written examination  
: 2. Written examination cc without enclosures: See next page DISTRIBUTION w/ encls.:
PUBLIC PRTB r/f RidsNRRDPRPRTA RidsNRRDPRPRTB Facility File (CHart) O-12 G-15 ADAMS ACCESSION #: ML080910416 TEMPLATE #:NRR-074 OFFICE PRTB:CE IOLB:LA E
PRTB:SC NAME PDoyle pvd CHart cah JEads jhe DATE 4/4/08 4/1/08 4/7/08 OFFICIAL RECORD COPY


cc without enclosures: See next page
University of Wisconsin Docket No. 50-156 cc:
Mayor of Madison City Hall 210 Martin Luther King, Jr. Boulevard, Room 403 Madison, Wisconsin 53703 Chairman, Public Service Commission of Wisconsin 610 North Whitney Way P.O. Box 7854 Madison, WI 53707-7854 Manager Radiation Protection Section Division of Public Health Dept of Health and Family Services P.O. Box 2659 Madison, WI 53701-2659 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611 Victor Goretsky Assistant Director & Radiation Safety Officer Department Environmental Health & Safety 530 Environmental Protection And Safety Bldg 30 N Murray St Madison, WI 53715


DISTRIBUTION w/ encls.: PUBLIC    PRTB r/f    RidsNRRDPRPRTA RidsNRRDPRPRTB  Facility File (CHart) O-12 G-15  ADAMS ACCESSION #: ML080910416 TEMPLATE #:NRR-074 OFFICE  PRTB:CE    IOLB:LA E  PRTB:SC  NAME  PDoyle pvd  CHart cah  JEads jhe DATE 4/4/08 4/1/08 4/7/08  OFFICIAL RECORD COPY
U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.:
 
50-156/OL-08-01 FACILITY DOCKET NO.:
University of Wisconsin Docket No. 50-156 cc:  Mayor of Madison City Hall 210 Martin Luther King, Jr. Boulevard, Room 403 Madison, Wisconsin  53703 Chairman, Public Service  Commission of Wisconsin 610 North Whitney Way P.O. Box 7854 Madison, WI  53707-7854 Manager  Radiation Protection Section  Division of Public Health Dept of Health and Family Services  P.O. Box 2659  Madison, WI 53701-2659 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL  32611
50-156 FACILITY LICENSE NO.:
 
R-74 FACILITY:
Victor Goretsky Assistant Director & Radiation Safety Officer Department Environmental Health & Safety 530 Environmental Protection And Safety Bldg 30 N Murray St Madison, WI 53715
University of Wisconsin TRIGA Reactor EXAMINATION DATES:
 
March 17 - 20, 2008 SUBMITTED BY:
U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT
__________/RA/_____________
 
___4/1/08 Paul V. Doyle Jr., Chief Examiner Date  
REPORT NO.:   50-156/OL-08-01
 
FACILITY DOCKET NO.: 50-156  
 
FACILITY LICENSE NO.: R-74  
 
FACILITY:   University of Wisconsin TRIGA Reactor  
 
EXAMINATION DATES: March 17 - 20, 2008  
 
SUBMITTED BY: __________/RA/_____________ ___4/1/08       Paul V. Doyle Jr., Chief Examiner       Date  


==SUMMARY==
==SUMMARY==
:
During the week of March 17, 2008, the NRC administered licensing examinations to four reactor operator and one senior reactor operator (upgrade) candidates. All five candidates passed all portions of their examinations.
 
During the week of March 17, 2008, the NRC administered licensing examinations to four reactor operator and one senior reactor operator (upgrade) candidates. All five candidates passed all portions of their examinations.  
 
REPORT DETAILS
REPORT DETAILS
: 1. Examiners:
: 1.
Examiners:
Paul V. Doyle Jr., Chief Examiner
Paul V. Doyle Jr., Chief Examiner
: 2. Results:
: 2.
RO PASS/FAILSRO PASS/FAIL TOTAL PASS/FAIL Written 4/0 0/0 4/0 Operating Tests 4/0 1/0 5/0 Overall 4/0 1/0 5/0
Results:
: 3. Exit Meeting:
RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 4/0 0/0 4/0 Operating Tests 4/0 1/0 5/0 Overall 4/0 1/0 5/0
Paul V. Doyle Jr., NRC, Examiner Robert Agasie, University of Wisconsin, Reactor Director Michele Blanchard, University of Wisconsin, Reactor Supervisor The NRC examiner thanked the facility management for their support in the administration of the examinations. The facility pointed out a few comments on the written examination question B.01 had two correct answers, b or a, and question B.06 part b also had two correct answers 2 or 3. Also question C.03 is no longer valid due to installation of a new ventilation system, and has been deleted. The examination included with this report has been updated for all comments.  
: 3.
Exit Meeting:
Paul V. Doyle Jr., NRC, Examiner Robert Agasie, University of Wisconsin, Reactor Director Michele Blanchard, University of Wisconsin, Reactor Supervisor The NRC examiner thanked the facility management for their support in the administration of the examinations. The facility pointed out a few comments on the written examination question B.01 had two correct answers, b or a, and question B.06 part b also had two correct answers 2 or 3. Also question C.03 is no longer valid due to installation of a new ventilation system, and has been deleted. The examination included with this report has been updated for all comments.
ENCLOSURE 1


ENCLOSURE 1 OPERATOR LICENSING EXAMINATION With Answer Key
OPERATOR LICENSING EXAMINATION With Answer Key UNIVERSITY OF WISCONSIN March 17, 2008


UNIVERSITY OF WISCONSIN March 17, 2008 Section A L Theory, Thermo & Facility Operating Characteristics Page 1   QUESTION A.01 [2.0 points, 0.5 each]
Section A L Theory, Thermo & Facility Operating Characteristics Page 1 QUESTION A.01 [2.0 points, 0.5 each]
Using the drawing of the Integral Rod Worth Curve provided, identify each of the following reactivity worths.
Using the drawing of the Integral Rod Worth Curve provided, identify each of the following reactivity worths.
Column A           Column B
Column A Column B
: a. Total Rod Worth         1. B - A
: a. Total Rod Worth
: b. Actual Shutdown Margin       2. C - A
: 1. B - A
: c. Technical Specification Shutdown Margin Limit   3. C - B
: b. Actual Shutdown Margin
: d. Excess Reactivity         4. D - C
: 2. C - A
: c. Technical Specification Shutdown Margin Limit
: 3. C - B
: d. Excess Reactivity
: 4. D - C
: 5. E - C
: 5. E - C
: 6. E - D
: 6. E - D
: 7. E - A  
: 7. E - A QUESTION A.02 [1.0 point]
 
QUESTION A.02 [1.0 point]
Reactor power is rising on a 30 second period. Approximately how long will it take for power to double?
Reactor power is rising on a 30 second period. Approximately how long will it take for power to double?
: a. 35 seconds
: a. 35 seconds
: b. 50 seconds
: b. 50 seconds
: c. 70 seconds
: c. 70 seconds
: d. 100 seconds  
: d. 100 seconds QUESTION A.03 [2 points, 1/2 each]
 
Match the description of plant conditions in column A with resulting xenon conditions in column B.
QUESTION A.03 [2 points, 1/2 each] Match the description of plant conditions in column A with resulting xenon conditions in column B.  
Column A Column B
 
: a. 4 hours after a power increase
Column A         Column B
: 1. Xenon concentration is increasing to a peak
: a. 4 hours after a power increase   1. Xenon concentration is increasing to a peak
: b. 2 hours after a power decrease
: b. 2 hours after a power decrease   2. Xenon concentration is decreasing to a trough
: 2. Xenon concentration is decreasing to a trough
: c. 16 hours after a "clean" startup   3. Xenon concentration is approximately zero (reactor is "clean")
: c. 16 hours after a clean startup
: d. 72 hours after a shutdown   4. Xenon concentration is "relatively" steady at a "non-zero" value  
: 3. Xenon concentration is approximately zero (reactor is clean)
 
: d. 72 hours after a shutdown
QUESTION A.04 [1.0 point]
: 4. Xenon concentration is relatively steady at a non-zero value QUESTION A.04 [1.0 point]
The number of neutrons passing through a one square centimeter of target material per second is the definition of which one of the following?
The number of neutrons passing through a one square centimeter of target material per second is the definition of which one of the following?
: a. Neutron Population (np)
: a. Neutron Population (np)
Line 134: Line 116:
: d. Neutron Density (nd)  
: d. Neutron Density (nd)  


Section A L Theory, Thermo & Facility Operating Characteristics Page 2   QUESTION A.05 [1.0 point]
Section A L Theory, Thermo & Facility Operating Characteristics Page 2 QUESTION A.05 [1.0 point]
The neutron microscopic cross-section for absorption ( a) of an isotope generally Y a. increases as neutron energy increases
The neutron microscopic cross-section for absorption (a) of an isotope generally Y
: a. increases as neutron energy increases
: b. decreases as neutron energy increases
: b. decreases as neutron energy increases
: c. increases as target nucleus mass increases
: c. increases as target nucleus mass increases
: d. decreases as target nucleus mass increases  
: d. decreases as target nucleus mass increases QUESTION A.06 [1.0 point]
 
QUESTION A.06 [1.0 point]
A reactor contains three safety rods and a control rod. Which one of the following would result in a determination of the excess reactivity of this reactor?
A reactor contains three safety rods and a control rod. Which one of the following would result in a determination of the excess reactivity of this reactor?
: a. The reactor is critical at a low power level, with all safety rods full out and the control rod at some position. The reactivity remaining in the control rod (i.e. its rod worth from its present position to full out) is the excess reactivity.
: a. The reactor is critical at a low power level, with all safety rods full out and the control rod at some position. The reactivity remaining in the control rod (i.e. its rod worth from its present position to full out) is the excess reactivity.
Line 152: Line 133:
: c. 525 Mw
: c. 525 Mw
: d. 1485 Mw QUESTION A.08 [1.0 point]
: d. 1485 Mw QUESTION A.08 [1.0 point]
With the reactor on a constant period, which of the following changes in reactor power would take the LONGEST time?   a. 5% - from 1% to   6%
With the reactor on a constant period, which of the following changes in reactor power would take the LONGEST time?
: b. 15% - from 20% to 35%
: a. 5% from 1% to 6%
: c. 20% - from 40% to 60%
: b. 15% from 20% to 35%
: d. 25% from 75% to 100%
: c. 20% from 40% to 60%
: d. 25% from 75% to 100%  


Section A L Theory, Thermo & Facility Operating Characteristics Page 3   NegativePoint B P o in t APositiveQUESTION A.09 [1.0 point]
Section A L Theory, Thermo & Facility Operating Characteristics Page 3 Negative Point B Point A Positive QUESTION A.09 [1.0 point]
You are assigned to check the operation of a new nuclear instrumentation channel. You know that the reactor will stabilize with a - 80 second period shortly after shutdown. To check the channel you measure the time for power to decrease by a factor of 10. This time should be approximately-
You are assigned to check the operation of a new nuclear instrumentation channel. You know that the reactor will stabilize with a - 80 second period shortly after shutdown. To check the channel you measure the time for power to decrease by a factor of 10. This time should be approximately
: a. 45 seconds (3/4 minute)
: a. 45 seconds (3/4 minute)
: b. 90 seconds (1-1/2 minutes)
: b. 90 seconds (1-1/2 minutes)
: c. 135 seconds (2-1/4 minutes)
: c. 135 seconds (2-1/4 minutes)
: d. 180 seconds (3 minutes)  
: d. 180 seconds (3 minutes)
 
QUESTION A.10 [1.0 point]
QUESTION A.10 [1.0 point] Which one of the following statements best describes the difference between a moderator and a reflector. A reflector -
Which one of the following statements best describes the difference between a moderator and a reflector. A reflector
: a. increases the neutron production factor and a moderator increases the fast fission factor.
: a. increases the neutron production factor and a moderator increases the fast fission factor.
: b. increases the neutron production factor and a moderator decreases the fast fission factor.
: b. increases the neutron production factor and a moderator decreases the fast fission factor.
: c. increases the fast non-leakage factor and a moderator increases the thermal utilization factor.
: c. increases the fast non-leakage factor and a moderator increases the thermal utilization factor.
: d. decreases the fast non-leakage factor and a moderator increases the thermal utilization factor.
: d. decreases the fast non-leakage factor and a moderator increases the thermal utilization factor.
 
QUESTION A.11 [1.0 point]
QUESTION A.11 [1.0 point]
Shown below is a trace of reactor period as a function of time. Between points A and B reactor power is:
Shown below is a trace of reactor period as a function of time. Between points A and B reactor power is:
Line 175: Line 156:
: b. continually decreasing.
: b. continually decreasing.
: c. increasing, then decreasing.
: c. increasing, then decreasing.
: d. constant.  
: d. constant.
 
QUESTION A.12 [1.0 point]
QUESTION A.12 [1.0 point]
A thin foil target of 10% copper and 90% aluminum is in a thermal neutron beam. Given a Cu = 3.79 barns, a Al = 0.23 barns, s Cu = 7.90 barns, and s Al =1.49 barns, which ONE of the following reactions has the highest probability of occurring? A neutron Y a. scattering reaction with aluminum
A thin foil target of 10% copper and 90% aluminum is in a thermal neutron beam. Given a Cu = 3.79 barns, a Al = 0.23 barns, s Cu = 7.90 barns, and s Al =1.49 barns, which ONE of the following reactions has the highest probability of occurring? A neutron Y
: a. scattering reaction with aluminum
: b. scattering reaction with copper
: b. scattering reaction with copper
: c. absorption in aluminum
: c. absorption in aluminum
: d. absorption in copper  
: d. absorption in copper  


Section A L Theory, Thermo & Facility Operating Characteristics Page 4   QUESTION A.13 [1.0 point]
Section A L Theory, Thermo & Facility Operating Characteristics Page 4 QUESTION A.13 [1.0 point]
Which ONE of the reactions below is an example of a PHOTONEUTRON source? a. 1 H 2 + 00 1 H 1 + 0 n 1  b. 92 U 238  35 Br 87+ 57 La148 + 3 0 n 1+ 00 c. 51 Sb123 + 0 n 1  1 H 1 + 00 d. 4 Be 9 + 24 6 C 12 + 0 n 1  QUESTION A.14 [1.0 point]
Which ONE of the reactions below is an example of a PHOTONEUTRON source?
ELASTIC SCATTERING is the process by which a neutron collides with a nucleus and -
: a.
1H2 + 00 v 1H1 + 0n1
: b.
92U238 v 35Br87+ 57La148 + 30n1+ 00
: c.
51Sb123 + 0n1 v 1H1 + 00
: d.
4Be9 + 24 v 6C12 + 0n1 QUESTION A.14 [1.0 point]
ELASTIC SCATTERING is the process by which a neutron collides with a nucleus and
: a. recoils with the same kinetic energy it had prior to the collision
: a. recoils with the same kinetic energy it had prior to the collision
: b. recoils with less kinetic energy than it had prior to the collision with the nucleus emitting a gamma ray.
: b. recoils with less kinetic energy than it had prior to the collision with the nucleus emitting a gamma ray.
Line 191: Line 180:
: d. recoils with a higher kinetic energy than it had prior to the collision with the nucleus emitting a gamma ray.
: d. recoils with a higher kinetic energy than it had prior to the collision with the nucleus emitting a gamma ray.
QUESTION A.15 [1.0 point]
QUESTION A.15 [1.0 point]
Which one of the following statements details the effect of fuel temperature on core operating characteristics? As fuel temperature -
Which one of the following statements details the effect of fuel temperature on core operating characteristics? As fuel temperature
: a. increases, Doppler peaks will become higher.
: a. increases, Doppler peaks will become higher.
: b. decreases, resonance escape probability will increase.
: b. decreases, resonance escape probability will increase.
: c. decreases, U 238 and Erbium will absorb more neutrons.
: c. decreases, U238 and Erbium will absorb more neutrons.
: d. increases, the fast non-leakage probability will decrease.
: d. increases, the fast non-leakage probability will decrease.
QUESTION A.16 [1.0 point]
QUESTION A.16 [1.0 point]
Line 203: Line 192:
: d. The neutron source has been removed from the core.  
: d. The neutron source has been removed from the core.  


Section A L Theory, Thermo & Facility Operating Characteristics Page 5   QUESTION A.17 [1.0 point]
Section A L Theory, Thermo & Facility Operating Characteristics Page 5 QUESTION A.17 [1.0 point]
When compared to , eff is: a. smaller, because delayed neutrons are born at lower energies than prompt neutrons.
When compared to, eff is:
: a. smaller, because delayed neutrons are born at lower energies than prompt neutrons.
: b. larger, because delayed neutrons are born at lower energies than prompt neutrons.
: b. larger, because delayed neutrons are born at lower energies than prompt neutrons.
: c. smaller, because delayed neutrons are born at higher energies than prompt neutrons.
: c. smaller, because delayed neutrons are born at higher energies than prompt neutrons.
: d. larger, because delayed neutrons are born at higher energies than prompt neutrons.  
: d. larger, because delayed neutrons are born at higher energies than prompt neutrons.
 
QUESTION A.18 [1.0 point]
QUESTION A.18 [1.0 point]
Xenon is produced in the reactor by two methods. One is directly from fission; the other is from the following decay chain Tellurium-_________-Xenon. Which ONE of the following is the isotope that goes in the blank?
Xenon is produced in the reactor by two methods. One is directly from fission; the other is from the following decay chain Tellurium-_________-Xenon. Which ONE of the following is the isotope that goes in the blank?
Line 216: Line 205:
: d. Promethium  
: d. Promethium  


Section B Normal, Emergency and Radiological Control Procedures Page 6 QUESTION B.01 [1.0 point] Which ONE of the following situations would illustrate a time when the reactor is secured?
Section B Normal, Emergency and Radiological Control Procedures Page 6 QUESTION B.01 [1.0 point]
: a. One of the control rod drives is removed for inspection; the rod is decoupled and is fully inserted into the core, all other rods are fully inserted and the console key is in the 'off' position and removed.
Which ONE of the following situations would illustrate a time when the reactor is secured?
: b. All control rods are fully inserted; the console key is in the 'off' position and removed, while fuel is being rearranged in the fuel storage racks.
: a. One of the control rod drives is removed for inspection; the rod is decoupled and is fully inserted into the core, all other rods are fully inserted and the console key is in the off position and removed.
: c. The control rods are withdrawn to a subcritical position, the core is subcritical by 0.02% K/K. d. An experiment having a reactivity of 0.07% K/K is being installed in the reactor with all control rods fully inserted and the key removed.
: b. All control rods are fully inserted; the console key is in the off position and removed, while fuel is being rearranged in the fuel storage racks.
QUESTION B.02 [2.0 points, 0.5 each] Match the type of radiation in column A with its associated Quality Factor (10CFR20) from column B.  
: c. The control rods are withdrawn to a subcritical position, the core is subcritical by 0.02% )K/K.
: d. An experiment having a reactivity of 0.07% )K/K is being installed in the reactor with all control rods fully inserted and the key removed.
QUESTION B.02 [2.0 points, 0.5 each]
Match the type of radiation in column A with its associated Quality Factor (10CFR20) from column B.
Column A Column B
: a. alpha 1
: b. beta 2
: c. gamma 5
: d. neutron (unknown energy) 10 20 QUESTION B.03 [2.0 points, 0.5 each]
Match the terms in column A with their respective definitions in column B.
Column A Column B
: a. Radioactivity
: 1. The thickness of a material which will reduce a gamma flux by a factor of two.
: b. Contamination
: 2. An impurity which pollutes or adulterates another substance. In radiological safety, contamination refers to the radioactive materials which are the sources of ionizing radiations.
: c. Dose
: 3. The quantity of radiation absorbed per unit mass by the body or by any portion of the body.
: e. Half-thickness
: 4. That property of a substance which causes it to emit ionizing radiation. This property is the spontaneous transmutation of the atoms of the substance.  


Column A        Column B
Section B Normal, Emergency and Radiological Control Procedures Page 7 QUESTION B.04 [2.0 points, b each]
: a. alpha          1
Match each of the Technical Specification Limits in Column A with its corresponding value in Column B. (Each limit has only one answer, values in Column B may be used once, more than once or not at all.)
: b. beta          2
Column A Column B
: c. gamma          5
: a. Each Unsecured Experiment 0.2% )K/K
: d. neutron (unknown energy)    10
: b. Each Secured Experiment 0.7% )K/K
 
: c. Minimum Shutdown Margin 1.4% )K/K 2.0% )K/K QUESTION B.05 [1.0 point]
20 
Many research reactors use different methods to reduce the dose due to N16 at the pool top. If the method used keeps the N16 ten (10) feet below the surface of the water, and a half-thickness for the N16 gamma(s) is one foot for water, then the dose due to N16 is reduced (approximately) by a factor of (Note: Neglect any reduction in dose rate due to half-life.)
 
QUESTION B.03 [2.0 points, 0.5 each] Match the terms in column A with their respective definitions in column B.
 
Column A        Column B
: a. Radioactivity        1. The thickness of a material which will reduce a gamma flux by a factor of two.
: b. Contamination      2. An impurity which pollutes or adulterates another substance. In radiological safety, contamination refers to the radioactive materials which are the sources of ionizing radiations.
: c. Dose        3. The quantity of radiation absorbed per unit mass by the body or by any portion of the body.
: e. Half-thickness      4. That property of a substance which causes it to emit ionizing radiation. This property is the spontaneous transmutation of the atoms of the substance.
 
Section B Normal, Emergency and Radiological Control Procedures Page 7 QUESTION B.04 [2.0 points, b each] Match each of the Technical Specification Limits in Column A with its corresponding value in Column B. (Each limit has only one answer, values in Column B may be used once, more than once or not at all.)  
 
Column A         Column B a. Each Unsecured Experiment   0.2% K/K b. Each Secured Experiment     0.7% K/K c. Minimum Shutdown Margin   1.4% K/K             2.0% K/K   QUESTION B.05 [1.0 point]
Many research reactors use different methods to reduce the dose due to N 16 at the pool top. If the method used keeps the N 16 ten (10) feet below the surface of the water, and a half-thickness for the N 16 gamma(s) is one foot for water, then the dose due to N 16 is reduced (approximately) by a factor of (Note: Neglect any reduction in dose rate due to half-life.)
: a. 20
: a. 20
: b. 100 c. 200
: b. 100
: c. 200
: d. 1000 QUESTION B.06 [2.0 points, 1/2 each]
: d. 1000 QUESTION B.06 [2.0 points, 1/2 each]
Match type of radiation (a thru d) with the proper penetrating power (1 thru 4)
Match type of radiation (a thru d) with the proper penetrating power (1 thru 4)
: a. Gamma   1. Stopped by thin sheet of paper
: a. Gamma
: b. Beta   2. Stopped by thin sheet of metal
: 1. Stopped by thin sheet of paper
: c. Alpha   3. Best shielded by light material
: b. Beta
: d. Neutron   4. Best shielded by dense material
: 2. Stopped by thin sheet of metal
 
: c. Alpha
QUESTION B.07 [1.0 point] Based on the Requalification Plan for licensed personnel, each licensed operator must complete a minimum of
: 3. Best shielded by light material
: d. Neutron
: 4. Best shielded by dense material QUESTION B.07 [1.0 point]
Based on the Requalification Plan for licensed personnel, each licensed operator must complete a minimum of
______ significant reactivity change(s) during each quarter.
______ significant reactivity change(s) during each quarter.
: a. 1
: a. 1
Line 258: Line 256:
: d. 10  
: d. 10  


Section B Normal, Emergency and Radiological Control Procedures Page 8 QUESTION B.08 [1.0 point, 1/4 each]
Section B Normal, Emergency and Radiological Control Procedures Page 8 QUESTION B.08 [1.0 point, 1/4 each]
Identify the PRIMARY source (irradiation of air, irradiation of water, or fission product) of EACH of the radioisotopes listed.
Identify the PRIMARY source (irradiation of air, irradiation of water, or fission product) of EACH of the radioisotopes listed.
: a. 1 H 3
: a.
: b. 18 Ar 41
1H3
: c. 7 N 16  d. 54 Xe 135 QUESTION B.09 [1.0 point]
: b.
"The reactor power level shall not exceed 1500 kW under any conditions of operation." This is an example of a:
18Ar41
: c.
7N16
: d.
54Xe135 QUESTION B.09 [1.0 point]
The reactor power level shall not exceed 1500 kW under any conditions of operation. This is an example of a:
: a. safety limit.
: a. safety limit.
: b. limiting safety system setting.
: b. limiting safety system setting.
: c. limiting condition for operation.
: c. limiting condition for operation.
: d. surveillance requirement.  
: d. surveillance requirement.
 
QUESTION B.10 [1.0 point]
QUESTION B.10 [1.0 point]
The CURIE content of a radioactive source is a measure of -
The CURIE content of a radioactive source is a measure of
: a. the number of radioactive atoms in the source.
: a. the number of radioactive atoms in the source.
: b. the amount of energy emitted per unit time by the source
: b. the amount of energy emitted per unit time by the source
: c. the amount of damage to soft body tissue per unit time.
: c. the amount of damage to soft body tissue per unit time.
: d. the number of nuclear disintegrations per unit time.
: d. the number of nuclear disintegrations per unit time.
 
QUESTION B.11 [1.0 point]
QUESTION B.11 [1.0 point]
According to the Emergency Plan, the Emergency Planning Zone (EPZ) is
According to the Emergency Plan, the Emergency Planning Zone (EPZ) is
Line 283: Line 284:
: d. Mechanical Engineering Building and the adjacent Fenced Area.  
: d. Mechanical Engineering Building and the adjacent Fenced Area.  


Section B Normal, Emergency and Radiological Control Procedures Page 9 QUESTION B.12 [1.0 point]
Section B Normal, Emergency and Radiological Control Procedures Page 9 QUESTION B.12 [1.0 point]
Which ONE of the following statements correctly describes the relationship between the Safety Limit (SL) and the Limiting Safety System Setting (LSSS)?
Which ONE of the following statements correctly describes the relationship between the Safety Limit (SL) and the Limiting Safety System Setting (LSSS)?
: a. The SL is a maximum operationally limiting value that prevents exceeding the LSSS during normal operations.
: a. The SL is a maximum operationally limiting value that prevents exceeding the LSSS during normal operations.
Line 294: Line 295:
: b. the Reactor Safety Committee
: b. the Reactor Safety Committee
: c. a Senior Reactor Operator
: c. a Senior Reactor Operator
: d. the Reactor Supervisor  
: d. the Reactor Supervisor QUESTION B.14 [1.0 point]
 
10CFR50.54(x) states: A licensee may take reasonable action that departs from a license condition or a technical specification (contained in a license issued under this part) in an emergency when this action is immediately needed to protect the public health and safety and no action consistent with license conditions and technical specifications that can provide adequate or equivalent protection is immediately apparent. 10CFR50.54(y) states that the minimum level of management which may authorize this action is
QUESTION B.14 [1.0 point]
10CFR50.54(x) states: "A licensee may take reasonable action that departs from a license condition or a technical specification (contained in a license issued under this part) in an emergency when this action is immediately needed to protect the public health and safety and no action consistent with license conditions and technical specifications that can provide adequate or equivalent protection is immediately apparent.10CFR50.54(y) states that the minimum level of management which may authorize this action is -
: a. any Reactor Operator licensed at facility.
: a. any Reactor Operator licensed at facility.
: b. any Senior Reactor Operator licensed at facility.
: b. any Senior Reactor Operator licensed at facility.
: c. Facility Manager (or equivalent at facility).
: c. Facility Manager (or equivalent at facility).
: d. NRC Project Manager.  
: d. NRC Project Manager.
 
QUESTION B.15 [1.0 point]
QUESTION B.15 [1.0 point]
The CURIE content of a source is a measure of:
The CURIE content of a source is a measure of:
Line 310: Line 308:
: d. the number of disintegrations of source nuclei each second.  
: d. the number of disintegrations of source nuclei each second.  


Section B Normal, Emergency and Radiological Control Procedures Page 10   QUESTION B.16 [1.0 point]
Section B Normal, Emergency and Radiological Control Procedures Page 10 QUESTION B.16 [1.0 point]
You initially remove a sample from the pool reading 1 R/hr at 30 cm from the source. You then replace the sample in the pool. An hour later you remove the sample and the reading is now 390 mR/hr at 30 cm. You again replace the sample back in the pool. Which one of the following is the minimum amount of time you should wait to be able to bring out the sample without generating a high radiation area?
You initially remove a sample from the pool reading 1 R/hr at 30 cm from the source. You then replace the sample in the pool. An hour later you remove the sample and the reading is now 390 mR/hr at 30 cm. You again replace the sample back in the pool. Which one of the following is the minimum amount of time you should wait to be able to bring out the sample without generating a high radiation area?
: a. 1/2 hour
: a. 1/2 hour
: b. 1 hour
: b. 1 hour
: c. 11/2 hours
: c. 11/2 hours
: d. 2 hours
: d. 2 hours  
 
Section C  Facility and Radiation Monitoring Systems Page 11  QUESTION  C.01 [2.0 points, 1/2 each]
Match the purification system conditions listed in column A with their respective causes listed in column B. Each choice is used only once.
 
Column A              Column B
: a. High Radiation Level at demineralizer.      1. Channeling in demineralizer.
: b. High Radiation Level downstream of demineralizer. 2. Fuel element failure.
: c. High flow rate through demineralizer.      3. High temperature in demineralizer system
: d. High pressure upstream of demineralizer. 4. Clogged demineralizer


QUESTION C.02 [1.0 point]
Section C Facility and Radiation Monitoring Systems Page 11 QUESTION C.01 [2.0 points, 1/2 each]
WHICH ONE of the following detectors is used primarily to measure Ar 41 released to the environment?
Match the purification system conditions listed in column A with their respective causes listed in column B. Each choice is used only once.
: a. NONE, Ar 41 has too short a half-life to require environmental monitoring.
Column A Column B
: a. High Radiation Level at demineralizer.
: 1. Channeling in demineralizer.
: b. High Radiation Level downstream of demineralizer.
: 2. Fuel element failure.
: c. High flow rate through demineralizer.
: 3. High temperature in demineralizer system
: d. High pressure upstream of demineralizer.
: 4. Clogged demineralizer QUESTION C.02 [1.0 point]
WHICH ONE of the following detectors is used primarily to measure Ar41 released to the environment?
: a. NONE, Ar41 has too short a half-life to require environmental monitoring.
: b. Stack Gas Monitor
: b. Stack Gas Monitor
: c. Stack Particulate Monitor
: c. Stack Particulate Monitor
: d. Area Radiation Monitor above pool  
: d. Area Radiation Monitor above pool QUESTION C.03 [1.0 point]
 
This question deleted per facility comment, due to new ventilation system.
QUESTION C.03 [1.0 point] This question deleted per facility comment, due to new ventilation system.
Which ONE of the following describes how the ventilation system responds on receipt of an evacuation alarm?
Which ONE of the following describes how the ventilation system responds on receipt of an evacuation alarm?
: a. Room exhaust fan continues to operate, emergency exhaust fan must be started manually
: a. Room exhaust fan continues to operate, emergency exhaust fan must be started manually
: b. Room exhaust fan continues to operate, emergency exhaust fan starts automatically
: b. Room exhaust fan continues to operate, emergency exhaust fan starts automatically
: c. Room exhaust fan must be secured, emergency exhaust fan must be started manually
: c. Room exhaust fan must be secured, emergency exhaust fan must be started manually
: d. Room exhaust fan must be secured, emergency exhaust fan starts automatically
: d. Room exhaust fan must be secured, emergency exhaust fan starts automatically QUESTION C.04 [1.0 point]
 
QUESTION C.04 [1.0 point]
Which ONE of the following is the main function performed by the DISCRIMINATOR circuit in the Startup Channel?
Which ONE of the following is the main function performed by the DISCRIMINATOR circuit in the Startup Channel?
: a. To generate a current signal equal and of opposite polarity as the signal due to gammas generated within the Startup Channel Detector.
: a. To generate a current signal equal and of opposite polarity as the signal due to gammas generated within the Startup Channel Detector.
Line 347: Line 343:
: d. To convert the logarithmic output of the metering circuit to a t (delta time) output for period metering purposes.  
: d. To convert the logarithmic output of the metering circuit to a t (delta time) output for period metering purposes.  


Section C Facility and Radiation Monitoring Systems Page 12 QUESTION C.05 [1.0 point] During reactor operation, a leak develops in the primary to intermediate heat exchanger. Which ONE of the following conditions correctly describes how the system will react? Pool level will -
Section C Facility and Radiation Monitoring Systems Page 12 QUESTION C.05 [1.0 point]
During reactor operation, a leak develops in the primary to intermediate heat exchanger. Which ONE of the following conditions correctly describes how the system will react? Pool level will
: a. increase, the automatic level control will Pool maintain level within an 1 and 1/2 inches of normal.
: a. increase, the automatic level control will Pool maintain level within an 1 and 1/2 inches of normal.
: b. increase, an alarm will occur at the Security and Police Headquarters two inches above normal
: b. increase, an alarm will occur at the Security and Police Headquarters two inches above normal
: c. decrease, the reactor will scram if level decreases by two inches.
: c. decrease, the reactor will scram if level decreases by two inches.
: d. decrease, the intermediate loop pump will trip due to low pressure.  
: d. decrease, the intermediate loop pump will trip due to low pressure.
 
QUESTION C.06 [1.0 point]
QUESTION C.06 [1.0 point]
For a safety blade, the out limit light is ON, the in limit light is OFF, and magnet engaged light is OFF. What is the configuration of the system?
For a safety blade, the "out" limit light is ON, the "in" limit light is OFF, and "magnet engaged" light is OFF. What is the configuration of the system?
: a. the drive is full out and the blade is full in.
: a. the drive is full out and the blade is full in.
: b. the blade is full out and the drive is full in.
: b. the blade is full out and the drive is full in.
: c. the blade and drive are both full out.
: c. the blade and drive are both full out.
: d. the blade and drive are both full in.
: d. the blade and drive are both full in.
 
QUESTION C.07 [1.0 point]
QUESTION C.07 [1.0 point]
The normal rods use electric drive motors for positioning. The transient rod is moved by
The normal rods use electric drive motors for positioning. The transient rod is moved by
: a. pneumatics (air)
: a. pneumatics (air)
: b. pneumatics (Nitrogen)
: b. pneumatics (Nitrogen)
: c. hydraulics (Water)
: c. hydraulics (Water)
: d. hydraulics (Oil)  
: d. hydraulics (Oil)
 
QUESTION C.08 [1.0 point]
QUESTION C.08 [1.0 point]
WHICH ONE of the following is the purpose of the diffuser pump?
WHICH ONE of the following is the purpose of the diffuser pump?
: a. increase heat transfer rate due to increased mixing within the core
: a. increase heat transfer rate due to increased mixing within the core
: b. decrease the activation rate of O 16 to N 16 due to reduced time in core
: b. decrease the activation rate of O16 to N16 due to reduced time in core
: c. increase transport time for N 16 to reach surface of pool
: c. increase transport time for N16 to reach surface of pool
: d. break up of O 16 bubbles in pool, thereby decreasing production of N 16 
: d. break up of O16 bubbles in pool, thereby decreasing production of N16


Section C Facility and Radiation Monitoring Systems Page 13 QUESTION C.09 [1.0 point]
Section C Facility and Radiation Monitoring Systems Page 13 QUESTION C.09 [1.0 point]
Which ONE of the following will cause an Annunciator Alarm?
Which ONE of the following will cause an Annunciator Alarm?
: a. pneumatic tube blower off.
: a. pneumatic tube blower off.
: b. air particulate activity less than 1 10-14 ci/ml. c. 12 second reactor period.
: b. air particulate activity less than 1H 10-14 ci/ml.
: c. 12 second reactor period.
: d. core inlet temperature at 128°F.
: d. core inlet temperature at 128°F.
QUESTION C.10 [2.0 points, 1/2 each]
QUESTION C.10 [2.0 points, 1/2 each]
Match the reactor power instrumentation listed in column A with its corresponding detector type from column B. (Choices from column B may be used more than once or not at all.)  
Match the reactor power instrumentation listed in column A with its corresponding detector type from column B.
 
(Choices from column B may be used more than once or not at all.)
Column A         Column B a. Log Count Rate     1. Gamma Ionization Chamber
Column A Column B
: b. Log N       2. Boron Lined Compensated Ionization Chamber
: a. Log Count Rate
: c. Picoammeter     3. Fission Chamber
: 1. Gamma Ionization Chamber
: d. Pulse Channel     4. Kanne Ionization Chamber
: b. Log N
 
: 2. Boron Lined Compensated Ionization Chamber
QUESTION C.11 [1.0 point]
: c. Picoammeter
The neutron source in use in the core is made of -
: 3. Fission Chamber
: d. Pulse Channel
: 4. Kanne Ionization Chamber QUESTION C.11 [1.0 point]
The neutron source in use in the core is made of
: a. americium-beryllium
: a. americium-beryllium
: b. californium
: b. californium
: c. plutonium-beryllium
: c. plutonium-beryllium
: d. radium-beryllium  
: d. radium-beryllium QUESTION C.12 [1.0 point]
 
QUESTION C.12 [1.0 point]
Which of the following scrams is NOT available in PULSE MODE?
Which of the following scrams is NOT available in PULSE MODE?
: a. High fuel temperature.
: a. High fuel temperature.
Line 401: Line 397:
: d. Pool Level  
: d. Pool Level  


Section C Facility and Radiation Monitoring Systems Page 14 QUESTION C.13 [1.0 point]
Section C Facility and Radiation Monitoring Systems Page 14 QUESTION C.13 [1.0 point]
Which ONE of the following is the main reason for pressurizing the intermediate loop water?
Which ONE of the following is the main reason for pressurizing the intermediate loop water?
: a. To prevent water from the primary loop leaking into the intermediate loop.
: a. To prevent water from the primary loop leaking into the intermediate loop.
Line 407: Line 403:
: c. To attenuate radiation from primary loop water in the primary heat exchanger floor area.
: c. To attenuate radiation from primary loop water in the primary heat exchanger floor area.
: d. To prevent intermediate pump cavitations.
: d. To prevent intermediate pump cavitations.
QUESTION C.14 [1.0 point]
QUESTION C.14 [1.0 point]
When the Bridge Area Radiation Monitor reads 50 mrem/hour, which ONE of following actions occurs?
When the Bridge Area Radiation Monitor reads 50 mrem/hour, which ONE of following actions occurs?
: a. an alarm sounds
: a. an alarm sounds
: b. the reactor scrams
: b. the reactor scrams
: c. the building exhaust fans are turned off
: c. the building exhaust fans are turned off
: d. Emergency Venting Mode initiates QUESTION C.15 [1.0 point]
: d. Emergency Venting Mode initiates QUESTION C.15 [1.0 point]
When the "Experimental Facility Radiation Level High" annunciator alarms:
When the Experimental Facility Radiation Level High annunciator alarms:
: a. an evacuation alarm sounds after 20 seconds.
: a. an evacuation alarm sounds after 20 seconds.
: b. the reactor scrams.
: b. the reactor scrams.
: c. the emergency exhaust fan is started.
: c. the emergency exhaust fan is started.
: d. no automatic actions occur.
: d. no automatic actions occur.
QUESTION C.16 [1.0 point]
QUESTION C.16 [1.0 point]
The Safety Channels (picoammeters):
The Safety Channels (picoammeters):
: a. supply a period signal for use in the Automatic mode.
: a. supply a period signal for use in the Automatic mode.
Line 425: Line 421:
: d. provide a insertion inhibit signal to the fission counter drive circuit  
: d. provide a insertion inhibit signal to the fission counter drive circuit  


Section C Facility and Radiation Monitoring Systems Page 15 QUESTION C.17 [2.0 points, 1/2 each]
Section C Facility and Radiation Monitoring Systems Page 15 QUESTION C.17 [2.0 points, 1/2 each]
Match the system listed in column A with the proper piping color code listed in Column B.  
Match the system listed in column A with the proper piping color code listed in Column B.
Column A Column B
: a. City water
: 1. Red
: b. Air
: 2. Blue
: c. Contaminated water
: 3. Green
: d. Softened water
: 4. Black


Column A         Column B
Section A L Theory, Thermo & Facility Operating Characteristics Page 16 A.01 a, 7; b, 2; c, 1; d, 5 REF:
: a. City water        1. Red
Standard NRC Question A.02 c
: b. Air          2. Blue
REF:
: c. Contaminated water    3. Green
P = P0 et/T --> ln(2) = time ÷ 100 seconds -> time = ln (2) x 100 sec. 0.693 x 100 0.7 x 100 70 sec.
: d. Softened water      4. Black 
A.03 a, 2; b, 1; c, 4; d, 3 REF:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 3, Enabling Objectives 4.3 through 4.7.
A.04 c
REF:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.1b.
A.05 b
REF:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.3.
A.06 a
REF:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 3, Control Rod Effectiveness A.07:
a REF:
Peak power is proportional to )$prompt 2 P1/D2 2 = P2/D1 2 1050/0.52 = P2/12 (1050/4)
* 1 = P2 62.5 = P2, NEEP 234, Reactor Pulsing p. 144.
A.08
: a.
REF:
P = P0 et/ ln(P/P0) = t/ Since you are looking for which would take the longest time it is obvious to the most casual of observers that the ratio P/P0 must be the largest. Also DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.6.
A.09 d
REF:
P/P0 = e-T/
ln(0.1) = - T(time)/(-80sec)
Time = ln (0.1) x -80 sec = 184 seconds 3 minutes. Also DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.6.
A.10 c
REF:
NEEP 234, p. 87. Facility Supplied Examination Bank.
A.11 a
REF:
Standard NRC Question1 A.12 a
0.1 H 3.79 = 0.379 0.9 H 0.23 = 0.207 0.1 H 7.9 = 0.79 0.9 H 1.49 = 1.34 REF:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.7.
A.13 a
REF:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 1.3.
A.14 a
REF:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 1, Enabling Objective 5.2.
A.15 b
REF:
NEEP 234, p.A.15 Also facility supplied Examination Bank A question 222.
A.16 c
REF:
Standard NRC question A.17 b
REF:
(NRC99) UWNR OTM, Reactor Physics II. Facility supplied Examination Bank A, question 215.
A.18 c
REF:
UWNR OTM, Reactor Physics I. Rewrite of facility supplied examination question bank A, question 202.


Section A L Theory, Thermo & Facility Operating Characteristics Page 16  A.01 a, 7; b, 2; c, 1; d, 5 REF: Standard NRC Question  
Section B Normal, Emergency and Radiological Control Procedures Page 17 B.01 b or a 2nd correct answer added per facility comment REF:
Technical Specifications § 1 Definitions.
B.02 a, 20; b, 1; c, 1; d, 10 REF:
10CFR20.100x B.03 a, 4; b, 2; c, 3; d, 1 REF:
Standard NRC question B.04 a, 0.7%;
b, 1.4%;
c, 0.2%
REF:
(NRC2001) Technical Specifications, §§ 3.1, 3.6, (a) and (b)
B.05 d
REF:
Basic Radiological Controls knowledge: Half-Thickness and Tenth-Thickness". 210 = 1024 B.06 a, 4; b, 2 or 3; c, 1; d, 3 2nd correct answer for part b added per facility comment. Using a light material will result in less Bremsstrahlung radiation.
REF:
Standard NRC Health Physics Question B.07 a
REF:
UNWR 004 Reactor Operator Proficiency Maintenance Program § B 3rd ¶.
B.08 a, Water; b, Air; c, Water; d, Fission REF:
Standard NRC question.
B.09 a
REF:
(NRC2000) Technical Specifications, Section 2.1 (SAR, p.14-7).
B.10 d
REF:
Standard Health Physics Definition.
B.11 a
REF:
UNWR 006 Emergency Plan § 8.0 Facilities and Equipment B.12 b
REF:
B.13 b
REF:
Technical Specifications, Section 6.4 (SAR, p.14-36)
B.14 b
REF:
10CFR50.54(y)
B.15 d
REF:
(NRC99) UWNR OTM, Health Physics I & II, Section I, Definitions, letter a, Radioactivity B.16 c
REF:
It = I0 e-t 390 mR/hr ÷ 1000 mR/hr = e-1hr ln(0.39) = -
* 1 hr.
= 0.9416 hour-1 SOLVING for additional time:
If = It e-t 100mR/hr = 390 mR/hr e-0.9416 (time) ln (0.25) = -0.9163
* time time = 1.4454


A.02 c REF: P = P 0 et/T  --> ln(2) = time ÷ 100 seconds -> time = ln (2) x 100 sec. 0.693 x 100  0.7 x 100  70 sec.
Section C Facility and Radiation Monitoring Systems Page 18 C.01 a, 2; b, 3; c, 1; d, 4 Ref:
A.03 a, 2; b, 1; c, 4; d, 3 REF: DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume  3, Enabling Objectives 4.3 through 4.7.  
Standard NRC cleanup loop question.
C.02 b
REF:
SAR § 2.5.9, pages 2-54, 2-55.
C.03 a
Question deleted per facility comment, new ventilation system REF: (NRC99, NRC2001) UWNR 155; SAR, Section 9.1 Facility supplied examination bank.
C.04 b
REF: NEEP 234, Controls & Instrumentation II, Nuclear Instrumentation, Discriminator, page 4 of 13.
C.05 b
REF:
UWNR Reactor Cooling System Description (from addendum to 2003-2004 Annual Report); UWNR SAR2000 Section 7.6 Control Console and Display Instruments C.06 a
REF:
(NRC95) SAR, Section 7.3, p.7-7 C.07 a
REF:
UWNR Safety Analysis Report Rev.1, 8/2004 C.08 c
REF:
(NRC99) SAR, Section 4.4, p.4-25; SAR, Section 5.6, p.5-5.
C.09 d
REF:
Facility supplied examination bank. a: SAR, Section 10.2, p.10-6; b: UWNR OTM, Health Physics I & II, UWNR OTM, Controls & Instrumentation VI, Particulate Activity Monitor; SAR, Section 11.1.1.1; c: UWNR OTM, Controls &
Instrumentation I & II, Log N Channel Alarms and Interlocks; d: UWNR OTM, Controls & Instrumentation VII, Temperature Measurements, SAR, Section 7.6, p.7-12 (no preset level given)
C.10 a, 3; b, 2; c, 2; d, 1 REF:
NEEP 234 pages 160 - 177, page 181 and 2000 SAR, § 7.2.3 C.11 d
REF:
2000 SAR Chapter 4, § 4.2.4, page 4-16 C.12 c
REF:
Control & Instrumentation IV, Table of Technical Specification Required Scrams and Setpoints vs. Mode.
C.13 a
REF:
Facility supplied question bank C, question # 53 C.14 a
REF:
UWNR OTM, Controls & Instrumentation VI, Area Radiation Monitor System, System: Area Radiation Monitors - Auto Actions at Alarm Point C.15 d
REF: (NRC2000) UWNR OTM, Controls & Instrumentation VI, Area Radiation Monitor SystemC.16, also facility supplied question C.16 c
REF: NEEP 234, Controls and Instrumentation I & II figure 29 page 177.
C.17 a, 3; b, 4; c, 1; d, 2 REF: (NRC99) UWNR OTM, Reactor Water Systems III, Demineralizer; posted on wall near demineralizer


A.04 c REF: DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.1b.
U. S. NUCLEAR REGULATORY COMMISSION NON-POWER INITIAL REACTOR LICENSE EXAMINATION FACILITY:
A.05 b REF: DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.3.  
University of Wisconsin REACTOR TYPE:
TRIGA DATE ADMINISTERED:
03/17/2008 CANDIDATE:
INSTRUCTIONS TO CANDIDATE:
Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination.
Points for each question are indicated in brackets for each question. A 70% in each section is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.  
% of Category
% of Candidates Category Value Total Score Value Category 20.00 33.3 A.
L Theory, Thermodynamics and Facility Operating Characteristics 20.00 33.3 B.
Normal, Emergency and Radiological Controls Procedures 20.00 33.3 C.
Facility and Radiation Monitoring Systems 60.00 TOTALS FINAL GRADE All work done on this examination is my own. I have neither given nor received aid.
Candidate's Signature


A.06 a REF: DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 3, Control Rod Effectiveness 
NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:
 
: 1.
A.07:  a REF: Peak power is proportional to $prompt 2  P 1/2 2  = P 2/1 2  1050/0.5 2 = P 2/1 2  (1050/4)
Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
* 1 = P 2  62.5 = P 2, NEEP 234, Reactor Pulsing p. 144. A.08 a. REF: P = P 0 e t/  ln(P/P 0) = t/  Since you are looking for which would take the longest time it is obvious to the most casual of observers that the ratio P/P 0 must be the largest. Also DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.6.
: 2.
A.09 d REF: P/P 0 = e-T/ ln(0.1) = - T(time)/(-80sec) Time = ln (0.1) x -80 sec = 184 seconds  3 minutes. Also DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.6.
After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.
 
: 3.
A.10 c REF: NEEP 234, p. 87. Facility Supplied Examination Bank.  
Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
: 4.
Use black ink or dark pencil only to facilitate legible reproductions.
: 5.
Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.
: 6.
Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
: 7.
The point value for each question is indicated in [brackets] after the question.
: 8.
If the intent of a question is unclear, ask questions of the examiner only.
: 9.
When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition turn in all scrap paper.
: 10.
Ensure all information you wish to have evaluated as part of your answer is on your answer sheet.
Scrap paper will be disposed of immediately following the examination.
: 11.
To pass the examination you must achieve a grade of 70 percent or greater in each category.
: 12.
There is a time limit of three (3) hours for completion of the examination.
: 13.
When you have completed and turned in you examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked.  


A.11 a REF: Standard NRC Question 1
EQUATION SHEET DR - Rem, Ci - curies, E - Mev, R - feet 1 Curie = 3.7 x 1010 dis/sec 1 kg = 2.21 lbm 1 Horsepower = 2.54 x 103 BTU/hr 1 Mw = 3.41 x 106 BTU/hr 1 BTU = 778 ft-lbf
A.12 a  0.1 3.79 = 0.379  0.9 0.23 = 0.207  0.1  7.9 = 0.79  0.9  1.49 = 1.34 REF: DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.7.
°F = 9/5 °C + 32 1 gal (H2O) 8 lbm
A.13 a REF: DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 1.3.
°C = 5/9 (°F - 32) cP = 1.0 BTU/hr/lbm/°F cp = 1 cal/sec/gm/°C
(
)
(
)
l


A.14  a REF: DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 1, Enabling Objective 5.2.
2 2
max


A.15 b REF: NEEP 234, p.A.15 Also facility supplied Examination Bank A question 222.
=
A.16 c REF: Standard NRC question
P 1
sec 1.0


A.17 b REF:  (NRC99) UWNR OTM, Reactor Physics II. Facility supplied Examination Bank A, question 215.
=
eff


A.18 c REF:  UWNR OTM, Reactor Physics I. Rewrite of facility supplied examination question bank A, question 202.
=
Section B  Normal, Emergency and Radiological Control Procedures Page 17  B.01 b or a 2 nd correct answer added per facility comment REF: Technical Specifications § 1 Definitions.
te P
B.02 a, 20; b, 1; c, 1; d, 10 REF: 10CFR20.100x
P 0
eff K
S S
SCR


B.03 a, 4; b, 2; c, 3; d, 1 REF: Standard NRC question B.04 a, 0.7%;  b, 1.4%;  c, 0.2%
=
REF: (NRC2001) Technical Specifications, §§ 3.1, 3.6, (a) and (b) 
1
 
B.05 d REF: Basic Radiological Controls knowledge: "Half-Thickness and Tenth-Thickness". 2 10 = 1024  B.06 a, 4; b, 2 or 3; c, 1; d, 3 2 nd correct answer for part b added per facility comment. Using a light material will result in less Bremsstrahlung radiation.
REF: Standard NRC Health Physics Question B.07 a REF: UNWR 004 Reactor Operator Proficiency Maintenance Program § B 3 rd ¶. B.08 a, Water;  b, Air;  c, Water;  d, Fission REF: Standard NRC question.
B.09 a REF: (NRC2000) Technical Specifications, Section 2.1 (SAR, p.14-7).
 
B.10 d REF: Standard Health Physics Definition.
B.11 a REF: UNWR 006 Emergency Plan § 8.0 Facilities and Equipment B.12 b REF:  B.13 b REF: Technical Specifications, Section 6.4 (SAR, p.14-36)
 
B.14 b REF: 10CFR50.54(y)
 
B.15 d REF: (NRC99) UWNR OTM, Health Physics I & II, Section I, "Definitions," letter a, "Radioactivity"
 
B.16 c REF: I t = I 0 e-t  390 mR/hr ÷ 1000 mR/hr = e
-1hr  ln(0.39) = -
* 1 hr.    = 0.9416 hour
-1  SOLVING for additional time:  If = I t e-t    100mR/hr = 390 mR/hr e-0.9416 (time)  ln (0.25) = -0.9163
* time  time = 1.4454 Section C  Facility and Radiation Monitoring Systems Page 18  C.01 a, 2; b, 3; c, 1; d, 4 Ref: Standard NRC cleanup loop question.
C.02 b REF: SAR § 2.5.9, pages 2-54, 2-55.
 
C.03 a Question deleted per facility comment, new ventilation system REF:  (NRC99, NRC2001) UWNR 155; SAR, Section 9.1 Facility supplied examination bank.
C.04 b REF:  NEEP 234, Controls & Instrumentation II, Nuclear Instrumentation, Discriminator, page 4 of 13.
C.05 b REF: UWNR Reactor Cooling System Description (from addendum to 2003-2004 Annual Report); UWNR SAR2000 Section 7.6 Control Console and Display Instruments
 
C.06 a REF: (NRC95) SAR, Section 7.3, p.7-7
 
C.07 a REF: UWNR Safety Analysis Report Rev.1, 8/2004
 
C.08 c REF: (NRC99) SAR, Section 4.4, p.4-25; SAR, Section 5.6, p.5-5.
 
C.09 d REF: Facility supplied examination bank.
a: SAR, Section 10.2, p.10-6;  b: UWNR OTM, Health Physics I & II, UWNR OTM, Controls & Instrumentation VI, "Particulate Activity Monitor"; SAR, Section 11.1.1.1;  c: UWNR OTM, Controls & Instrumentation I & II, "Log N Channel Alarms and Interlocks";  d: UWNR OTM, Controls & Instrumentation VII, "Temperature Measurements", SAR, Section 7.6, p.7-12 (no "preset level" given)  C.10 a, 3; b, 2; c, 2; d, 1 REF: NEEP 234 pages 160 - 177, page 181 and 2000 SAR, § 7.2.3
 
C.11 d REF: 2000 SAR Chapter 4, § 4.2.4, page 4-16 C.12 c REF: Control & Instrumentation IV, Table of Technical Specification Required Scrams and Setpoints vs. Mode.
 
C.13  a REF: Facility supplied question bank C, question # 53
 
C.14 a REF: UWNR OTM, Controls & Instrumentation VI, "Area Radiation Monitor System," "System: Area Radiation Monitors - Auto Actions at Alarm Point" C.15 d REF:  (NRC2000) UWNR OTM, Controls & Instrumentation VI, "Area Radiation Monitor System"C.16, also facility supplied question
 
C.16 c REF:  NEEP 234, Controls and Instrumentation I & II figure 29 page 177.
C.17 a, 3; b, 4; c, 1; d, 2 REF:  (NRC99) UWNR OTM, Reactor Water Systems III, "Demineralizer"; posted on wall near demineralizer U. S. NUCLEAR REGULATORY COMMISSION NON-POWER INITIAL REACTOR LICENSE EXAMINATION FACILITY:  University of Wisconsin REACTOR TYPE:  TRIGA DATE ADMINISTERED: 03/17/2008 CANDIDATE:
INSTRUCTIONS TO CANDIDATE:
Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in brackets for each question. A 70% in each section is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.
% of Category % of Candidates Category Value  Total  Score      Value  Category 20.00  33.3                          A. L Theory, Thermodynamics and Facility Operating Characteristics 20.00  33.3                          B. Normal, Emergency and Radiological Controls Procedures
 
20.00  33.3                          C. Facility and Radiation Monitoring Systems 60.00                          %  TOTALS        FINAL GRADE
 
All work done on this examination is my own. I have neither given nor received aid.
______________________________________    Candidate's Signature
 
NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:
: 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
: 2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.
: 3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
: 4. Use black ink or dark pencil only to facilitate legible reproductions.
: 5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.
: 6. Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
: 7. The point value for each question is indicated in [brackets] after the question.
: 8. If the intent of a question is unclear, ask questions of the examiner only.
: 9. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition turn in all scrap paper.
: 10. Ensure all information you wish to have evaluated as part of your answer is on your answer sheet. Scrap paper will be disposed of immediately following the examination.
: 11. To pass the examination you must achieve a grade of 70 percent or greater in each category.
: 12. There is a time limit of three (3) hours for completion of the examination.
: 13. When you have completed and turned in you examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked.
EQUATION SHEET


DR - Rem, Ci - curies, E - Mev, R - feet
sec 10 1
4


1 Curie = 3.7 x 10 10 dis/sec    1 kg = 2.21 lbm 1 Horsepower = 2.54 x 10 3 BTU/hr  1 Mw = 3.41 x 10 6 BTU/hr 1 BTU = 778 ft-lbf      °F = 9/5 °C + 32
x
=
l


1 gal (H 2O)  8 lbm    °C = 5/9 (°F - 32) c P = 1.0 BTU/hr/lbm/°F    c p = 1 cal/sec/gm/°C
+
()()2 2 max=P 1 sec 1.0=eff=t e P P 0 eff K S S SCR=1sec 10 1 4*x=+=eff SUR 06.26 ()()2 1 1 1 2 1 eff eff K CR K CR=()()2 2 1 1=CR CR 2 1 1 1 eff eff K K M=1 2 1 1 CR CR K M eff==)(0 10 t SUR P P=()0 1 P P=eff eff K K SDM=1=*++= eff*2 1 1 2 eff eff eff eff K K K K=693.0 2 1=T eff eff K K 1=t e DR DR=0 ()2 6 R n E Ci DR=2 2 2 2 1 1 d DR d DR=()()1 2 1 2 2 2 Peak Peak=T UA H m T c m Q P===
=
Section A:
L Theory, Thermodynamics, and Facility Operating Characteristics Page 22    A.01a 1  2  3  4  5  6  7  ___    A.07 a  b  c  d  ___
A.01b 1  2  3  4  5  6  7  ___    A.08 a  b  c  d  ___


A.01c 1   2  3  4  5  6  7  ___    A.09 a  b  c  d  ___
eff SUR 06 26
A.01d 1   2   3  4  5  6  7  ___    A.10  a  b  c  d  ___
(
)
(
)
2 1
1 1
2 1
eff eff K
CR K
CR


A.02 a  b  c  d  ___        A.11  a  b  c  d  ___
=
A.03a 1  2  3  4  ___        A.12  a  b  c  d  ___


A.03b 1  2   3  4  ___        A.13 a  b  c  d  ___
(
A.03c 1   2  3  4  ___        A.14 a  b  c  d  ___
)
A.03d 1   2  3  4  ___        A.15 a  b  c  d  ___
(
)
2 2
1 1


A.04  a  b  c  d  ___        A.16 a  b  c  d  ___
=
A.05  a  b  c  d  ___        A.17 a  b  c  d  ___


A.06  a  b  c  d  ___        A.18 a  b  c  d  ___
CR CR 2
1 1
1 eff eff K
K M


Section B:  Normal, Emergency & Radiological Controls Procedures Page 23    B.01 a  b  c  d    ___      B.06c  1   2   3  4    ___ 
=
1 2
1 1
CR CR K
M eff
=


B.02a  1  2  5  10   20  ___    B.06d  1   2  3  4    ___
=
B.02b  1  2  5  10  20  ___    B.07  a  b  c  d    ___
)
(
0 10 t
SUR P
P=
(
)
0 1
P P


B.02c  1  2  5  10  20  ___    B.08a  Air  Water  Fission  ___
=
B.02d  1  2  5  10  20  ___    B.08b  Air  Water  Fission  ___  B.03a  1  2  3  4    ___      B.08c  Air  Water  Fission  ___
eff eff K
B.03b  1  2  3  4    ___      B.08d  Air  Water  Fission  ___
K SDM
B.03c  1  2  3  4    ___      B.09  a  b  c  d  ___


B.03d  1   2  3  4    ___      B.10  a  b  c  d  ___
=1
B.04a    0.2%  0.7%  1.4%  2.0%    ___    B.11  a  b  c  d  ___


B.04b    0.2%  0.7%  1.4%  2.0%    ___    B.12  a  b  c  d  ___
=
* l


B.04c    0.2%  0.7%  1.4%  2.0%    ___    B.13  a  b  c  d  ___
+
B.05 a  b  c  d  ___        B.14  a  b  c  d  ___


B.06a  1  2  3  4    ___      B.15  a  b  c  d  ___
+
=


B.06b  1   2   3  4    ___      B.16  a  b  c  d  ___
l eff 2
1 1
2 eff eff eff eff K
K K
K


Section C:  Facility and Radiation Monitoring Systems Page 24    C.01a  1  2  3  4  ___        C.10b  1  2  3  4  ___
=


C.01b  1   2  3  4  ___        C.10c  1   2  3  4  ___
693
.0 2
1 =
T eff eff K
K 1


C.01c  1  2  3  4  ___        C.10d  1  2  3  4  ___
=


C.01d  1  2  3  4  ___        C.11  a  b  c  d  ___
t e
DR DR


C.02  a  b  c  d   ___        C.12  a  b  c  d   ___
=
0
( )
2 6
R n
E Ci DR=
2 2
2 2
1 1
d DR d
DR
=
(
)
(
)
1 2
1 2
2 2
Peak Peak


C.03  a  b  c  d    ___        C.13  a  b  c  d  ___
=


C.04  a  b  c   d  ___        C.14  a  b  c  d  ___
T UA H
m T
c m
Q P


C.05  a  b  c  d  ___        C.15  a  b  c  d  ___
=


C.06 a  b  c  d  ___        C.16  a  b  c  d  ___
=


C.07 a  b  c  d  ___        C.17a  1  2  3  4  ___
=


C.08 a   b   c   d ___         C.17b  1   2   3   4   ___  
Section A: L Theory, Thermodynamics, and Facility Operating Characteristics Page 22 A.01a 1 2 3 4 5 6 7 ___
A.07 a b c d ___
A.01b 1 2 3 4 5 6 7 ___
A.08 a b c d ___
A.01c 1 2 3 4 5 6 7 ___
A.09 a b c d ___
A.01d 1 2 3 4 5 6 7 ___
A.10 a b c d ___
A.02 a b c d ___
A.11 a b c d ___
A.03a 1 2 3 4 ___
A.12 a b c d ___
A.03b 1 2 3 4 ___
A.13 a b c d ___
A.03c 1 2 3 4 ___
A.14 a b c d ___
A.03d 1 2 3 4 ___
A.15 a b c d ___
A.04 a b c d ___
A.16 a b c d ___
A.05 a b c d ___
A.17 a b c d ___
A.06 a b c d ___
A.18 a b c d ___  


C.09 a   b   c   d ___         C.17c  1   2   3   4   ___  
Section B: Normal, Emergency & Radiological Controls Procedures Page 23 B.01 a b c d ___
B.06c 1 2 3 4 ___
B.02a 1 2 5 10 20 ___
B.06d 1 2 3 4 ___
B.02b 1 2 5 10 20 ___
B.07 a b c d ___
B.02c 1 2 5 10 20 ___
B.08a Air Water Fission ___
B.02d 1 2 5 10 20 ___
B.08b Air Water Fission ___
B.03a 1 2 3 4 ___
B.08c Air Water Fission ___
B.03b 1 2 3 4 ___
B.08d Air Water Fission ___
B.03c 1 2 3 4 ___
B.09 a b c d ___
B.03d 1 2 3 4 ___
B.10 a b c d ___
B.04a 0.2% 0.7% 1.4% 2.0% ___
B.11 a b c d ___
B.04b 0.2% 0.7% 1.4% 2.0% ___
B.12 a b c d ___
B.04c 0.2% 0.7% 1.4% 2.0% ___
B.13 a b c d ___
B.05 a b c d ___
B.14 a b c d ___
B.06a 1 2 3 4 ___
B.15 a b c d ___
B.06b 1 2 3 4 ___
B.16 a b c d ___  


C.10a   1   2   3   4   ___       C.17d   1   2   3   4   ___  
Section C: Facility and Radiation Monitoring Systems Page 24 C.01a 1 2 3 4 ___
C.10b 1 2 3 4 ___
C.01b 1 2 3 4 ___
C.10c 1 2 3 4 ___
C.01c 1 2 3 4 ___
C.10d 1 2 3 4 ___
C.01d 1 2 3 4 ___
C.11 a b c d ___
C.02 a b c d ___
C.12 a b c d ___
C.03 a b c d ___
C.13 a b c d ___
C.04 a b c d ___
C.14 a b c d ___
C.05 a b c d ___
C.15 a b c d ___
C.06 a b c d ___
C.16 a b c d ___
C.07 a b c d ___
C.17a 1 2 3 4 ___
C.08 a b c d ___
C.17b 1 2 3 4 ___
C.09 a b c d ___
C.17c 1 2 3 4 ___
C.10a 1 2 3 4 ___
C.17d 1 2 3 4 ___  


Critical Rod HeightRod fully outIntegral RodWorth Curve H C HCMax A BWorth of Most Reactive Control ElementWorth of Most Reactive Control Element D C E}}
Critical Rod Height Rod fully out Integral Rod Worth Curve HC H
C Max A
B Worth of Most Reactive Control Element Worth of Most Reactive Control Element D
C E}}

Latest revision as of 17:25, 14 January 2025

Initial Examination Report No. 05000156/OL-08-01, University of Wisconsin Triga Reactor
ML080910416
Person / Time
Site: University of Wisconsin
Issue date: 04/07/2008
From: Johnny Eads
NRC/NRR/ADRA/DPR/PRTB
To: Agasie R
Univ of Wisconsin - Madison
Doyle P, NRC/NRR/DPR/PRT, 415-1058
Shared Package
ml073321036 List:
References
50-156/OL-08-01
Download: ML080910416 (30)


Text

April 7, 2008 Mr. Robert J. Agasie Reactor Director Nuclear Reactor Laboratory 1513 University Avenue, Room 141ME University of Wisconsin Madison, WI 53706-1687

SUBJECT:

INITIAL EXAMINATION REPORT NO. 50-156/OL-08-01, UNIVERSITY OF WISCONSIN TRIGA REACTOR

Dear Mr. Agasie:

During the week of March 17, 2008, the NRC administered an operator licensing examination at your University of Wisconsin TRIGA Reactor. The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors,"

Revision 2. Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.

In accordance with Title 10 of the Code of Federal Regulations Section 2.390, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Mr. Paul V. Doyle Jr. at (301) 415-1058 or via internet e-mail pvd@nrc.gov.

Sincerely,

/RA/

Johnny Eads, Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-156

Enclosures:

1. Initial Examination Report No. 50-156/OL-08-01
2. Written examination with facility comments incorporated cc without enclosures: See next page

April 7, 2008 Mr. Robert J. Agasie Reactor Director Nuclear Reactor Laboratory 1513 University Avenue, Room 141ME University of Wisconsin Madison, WI 53706-1687

SUBJECT:

INITIAL EXAMINATION REPORT NO. 50-156/OL-08-01, UNIVERSITY OF WISCONSIN TRIGA REACTOR

Dear Mr. Agasie:

During the week of March 17, 2008, the NRC administered an operator licensing examination at your University of Wisconsin TRIGA Reactor. The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors,"

Revision 2. Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.

In accordance with Title 10 of the Code of Federal Regulations Section 2.390, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Mr. Paul V. Doyle Jr. at (301) 415-1058 or via internet e-mail pvd@nrc.gov.

Sincerely,

/RA/

Johnny Eads, Chief Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-156

Enclosures:

1. Initial Examination Report No. 50-156/OL-08-01
2. Written examination cc without enclosures: See next page DISTRIBUTION w/ encls.:

PUBLIC PRTB r/f RidsNRRDPRPRTA RidsNRRDPRPRTB Facility File (CHart) O-12 G-15 ADAMS ACCESSION #: ML080910416 TEMPLATE #:NRR-074 OFFICE PRTB:CE IOLB:LA E

PRTB:SC NAME PDoyle pvd CHart cah JEads jhe DATE 4/4/08 4/1/08 4/7/08 OFFICIAL RECORD COPY

University of Wisconsin Docket No. 50-156 cc:

Mayor of Madison City Hall 210 Martin Luther King, Jr. Boulevard, Room 403 Madison, Wisconsin 53703 Chairman, Public Service Commission of Wisconsin 610 North Whitney Way P.O. Box 7854 Madison, WI 53707-7854 Manager Radiation Protection Section Division of Public Health Dept of Health and Family Services P.O. Box 2659 Madison, WI 53701-2659 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611 Victor Goretsky Assistant Director & Radiation Safety Officer Department Environmental Health & Safety 530 Environmental Protection And Safety Bldg 30 N Murray St Madison, WI 53715

U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.:

50-156/OL-08-01 FACILITY DOCKET NO.:

50-156 FACILITY LICENSE NO.:

R-74 FACILITY:

University of Wisconsin TRIGA Reactor EXAMINATION DATES:

March 17 - 20, 2008 SUBMITTED BY:

__________/RA/_____________

___4/1/08 Paul V. Doyle Jr., Chief Examiner Date

SUMMARY

During the week of March 17, 2008, the NRC administered licensing examinations to four reactor operator and one senior reactor operator (upgrade) candidates. All five candidates passed all portions of their examinations.

REPORT DETAILS

1.

Examiners:

Paul V. Doyle Jr., Chief Examiner

2.

Results:

RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 4/0 0/0 4/0 Operating Tests 4/0 1/0 5/0 Overall 4/0 1/0 5/0

3.

Exit Meeting:

Paul V. Doyle Jr., NRC, Examiner Robert Agasie, University of Wisconsin, Reactor Director Michele Blanchard, University of Wisconsin, Reactor Supervisor The NRC examiner thanked the facility management for their support in the administration of the examinations. The facility pointed out a few comments on the written examination question B.01 had two correct answers, b or a, and question B.06 part b also had two correct answers 2 or 3. Also question C.03 is no longer valid due to installation of a new ventilation system, and has been deleted. The examination included with this report has been updated for all comments.

ENCLOSURE 1

OPERATOR LICENSING EXAMINATION With Answer Key UNIVERSITY OF WISCONSIN March 17, 2008

Section A L Theory, Thermo & Facility Operating Characteristics Page 1 QUESTION A.01 [2.0 points, 0.5 each]

Using the drawing of the Integral Rod Worth Curve provided, identify each of the following reactivity worths.

Column A Column B

a. Total Rod Worth
1. B - A
b. Actual Shutdown Margin
2. C - A
c. Technical Specification Shutdown Margin Limit
3. C - B
d. Excess Reactivity
4. D - C
5. E - C
6. E - D
7. E - A QUESTION A.02 [1.0 point]

Reactor power is rising on a 30 second period. Approximately how long will it take for power to double?

a. 35 seconds
b. 50 seconds
c. 70 seconds
d. 100 seconds QUESTION A.03 [2 points, 1/2 each]

Match the description of plant conditions in column A with resulting xenon conditions in column B.

Column A Column B

a. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after a power increase
1. Xenon concentration is increasing to a peak
b. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after a power decrease
2. Xenon concentration is decreasing to a trough
c. 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> after a clean startup
3. Xenon concentration is approximately zero (reactor is clean)
d. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after a shutdown
4. Xenon concentration is relatively steady at a non-zero value QUESTION A.04 [1.0 point]

The number of neutrons passing through a one square centimeter of target material per second is the definition of which one of the following?

a. Neutron Population (np)
b. Neutron Impact Potential (nip)
c. Neutron Flux (nv)
d. Neutron Density (nd)

Section A L Theory, Thermo & Facility Operating Characteristics Page 2 QUESTION A.05 [1.0 point]

The neutron microscopic cross-section for absorption (a) of an isotope generally Y

a. increases as neutron energy increases
b. decreases as neutron energy increases
c. increases as target nucleus mass increases
d. decreases as target nucleus mass increases QUESTION A.06 [1.0 point]

A reactor contains three safety rods and a control rod. Which one of the following would result in a determination of the excess reactivity of this reactor?

a. The reactor is critical at a low power level, with all safety rods full out and the control rod at some position. The reactivity remaining in the control rod (i.e. its rod worth from its present position to full out) is the excess reactivity.
b. The reactor is shutdown. Two safety rods are withdrawn until the reactor becomes critical. The total rod worth withdrawn is the excess reactivity.
c. The reactor is at full power. The total worth of all rods withdrawn is the excess reactivity.
d. The reactor is at full power. The total worth remaining in all the safety rods and the control rod (i.e. their worth from their present positions to full out) is the excess reactivity. page 50.

QUESTION A.07 [1.0 point]

The first of two pulses had a reactivity worth $2.00 and a peak power of 1050 Mw. If the second pulse had a reactivity worth $1.50, what was the peak power of the second?

a. 263 Mw
b. 653 Mw
c. 525 Mw
d. 1485 Mw QUESTION A.08 [1.0 point]

With the reactor on a constant period, which of the following changes in reactor power would take the LONGEST time?

a. 5% from 1% to 6%
b. 15% from 20% to 35%
c. 20% from 40% to 60%
d. 25% from 75% to 100%

Section A L Theory, Thermo & Facility Operating Characteristics Page 3 Negative Point B Point A Positive QUESTION A.09 [1.0 point]

You are assigned to check the operation of a new nuclear instrumentation channel. You know that the reactor will stabilize with a - 80 second period shortly after shutdown. To check the channel you measure the time for power to decrease by a factor of 10. This time should be approximately

a. 45 seconds (3/4 minute)
b. 90 seconds (1-1/2 minutes)
c. 135 seconds (2-1/4 minutes)
d. 180 seconds (3 minutes)

QUESTION A.10 [1.0 point]

Which one of the following statements best describes the difference between a moderator and a reflector. A reflector

a. increases the neutron production factor and a moderator increases the fast fission factor.
b. increases the neutron production factor and a moderator decreases the fast fission factor.
c. increases the fast non-leakage factor and a moderator increases the thermal utilization factor.
d. decreases the fast non-leakage factor and a moderator increases the thermal utilization factor.

QUESTION A.11 [1.0 point]

Shown below is a trace of reactor period as a function of time. Between points A and B reactor power is:

a. continually increasing.
b. continually decreasing.
c. increasing, then decreasing.
d. constant.

QUESTION A.12 [1.0 point]

A thin foil target of 10% copper and 90% aluminum is in a thermal neutron beam. Given a Cu = 3.79 barns, a Al = 0.23 barns, s Cu = 7.90 barns, and s Al =1.49 barns, which ONE of the following reactions has the highest probability of occurring? A neutron Y

a. scattering reaction with aluminum
b. scattering reaction with copper
c. absorption in aluminum
d. absorption in copper

Section A L Theory, Thermo & Facility Operating Characteristics Page 4 QUESTION A.13 [1.0 point]

Which ONE of the reactions below is an example of a PHOTONEUTRON source?

a.

1H2 + 00 v 1H1 + 0n1

b.

92U238 v 35Br87+ 57La148 + 30n1+ 00

c.

51Sb123 + 0n1 v 1H1 + 00

d.

4Be9 + 24 v 6C12 + 0n1 QUESTION A.14 [1.0 point]

ELASTIC SCATTERING is the process by which a neutron collides with a nucleus and

a. recoils with the same kinetic energy it had prior to the collision
b. recoils with less kinetic energy than it had prior to the collision with the nucleus emitting a gamma ray.
c. is absorbed, with the nucleus emitting a gamma ray.
d. recoils with a higher kinetic energy than it had prior to the collision with the nucleus emitting a gamma ray.

QUESTION A.15 [1.0 point]

Which one of the following statements details the effect of fuel temperature on core operating characteristics? As fuel temperature

a. increases, Doppler peaks will become higher.
b. decreases, resonance escape probability will increase.
c. decreases, U238 and Erbium will absorb more neutrons.
d. increases, the fast non-leakage probability will decrease.

QUESTION A.16 [1.0 point]

You enter the control room and note that all nuclear instrumentation channels show a steady neutron level, and no rods are in motion. Which ONE of the following conditions CANNOT be true?

a. The reactor is critical.
b. The reactor is subcritical.
c. The reactor is supercritical.
d. The neutron source has been removed from the core.

Section A L Theory, Thermo & Facility Operating Characteristics Page 5 QUESTION A.17 [1.0 point]

When compared to, eff is:

a. smaller, because delayed neutrons are born at lower energies than prompt neutrons.
b. larger, because delayed neutrons are born at lower energies than prompt neutrons.
c. smaller, because delayed neutrons are born at higher energies than prompt neutrons.
d. larger, because delayed neutrons are born at higher energies than prompt neutrons.

QUESTION A.18 [1.0 point]

Xenon is produced in the reactor by two methods. One is directly from fission; the other is from the following decay chain Tellurium-_________-Xenon. Which ONE of the following is the isotope that goes in the blank?

a. Barium
b. Gadolinium
c. Iodine
d. Promethium

Section B Normal, Emergency and Radiological Control Procedures Page 6 QUESTION B.01 [1.0 point]

Which ONE of the following situations would illustrate a time when the reactor is secured?

a. One of the control rod drives is removed for inspection; the rod is decoupled and is fully inserted into the core, all other rods are fully inserted and the console key is in the off position and removed.
b. All control rods are fully inserted; the console key is in the off position and removed, while fuel is being rearranged in the fuel storage racks.
c. The control rods are withdrawn to a subcritical position, the core is subcritical by 0.02% )K/K.
d. An experiment having a reactivity of 0.07% )K/K is being installed in the reactor with all control rods fully inserted and the key removed.

QUESTION B.02 [2.0 points, 0.5 each]

Match the type of radiation in column A with its associated Quality Factor (10CFR20) from column B.

Column A Column B

a. alpha 1
b. beta 2
c. gamma 5
d. neutron (unknown energy) 10 20 QUESTION B.03 [2.0 points, 0.5 each]

Match the terms in column A with their respective definitions in column B.

Column A Column B

a. Radioactivity
1. The thickness of a material which will reduce a gamma flux by a factor of two.
b. Contamination
2. An impurity which pollutes or adulterates another substance. In radiological safety, contamination refers to the radioactive materials which are the sources of ionizing radiations.
c. Dose
3. The quantity of radiation absorbed per unit mass by the body or by any portion of the body.
e. Half-thickness
4. That property of a substance which causes it to emit ionizing radiation. This property is the spontaneous transmutation of the atoms of the substance.

Section B Normal, Emergency and Radiological Control Procedures Page 7 QUESTION B.04 [2.0 points, b each]

Match each of the Technical Specification Limits in Column A with its corresponding value in Column B. (Each limit has only one answer, values in Column B may be used once, more than once or not at all.)

Column A Column B

a. Each Unsecured Experiment 0.2% )K/K
b. Each Secured Experiment 0.7% )K/K
c. Minimum Shutdown Margin 1.4% )K/K 2.0% )K/K QUESTION B.05 [1.0 point]

Many research reactors use different methods to reduce the dose due to N16 at the pool top. If the method used keeps the N16 ten (10) feet below the surface of the water, and a half-thickness for the N16 gamma(s) is one foot for water, then the dose due to N16 is reduced (approximately) by a factor of (Note: Neglect any reduction in dose rate due to half-life.)

a. 20
b. 100
c. 200
d. 1000 QUESTION B.06 [2.0 points, 1/2 each]

Match type of radiation (a thru d) with the proper penetrating power (1 thru 4)

a. Gamma
1. Stopped by thin sheet of paper
b. Beta
2. Stopped by thin sheet of metal
c. Alpha
3. Best shielded by light material
d. Neutron
4. Best shielded by dense material QUESTION B.07 [1.0 point]

Based on the Requalification Plan for licensed personnel, each licensed operator must complete a minimum of

______ significant reactivity change(s) during each quarter.

a. 1
b. 4
c. 7
d. 10

Section B Normal, Emergency and Radiological Control Procedures Page 8 QUESTION B.08 [1.0 point, 1/4 each]

Identify the PRIMARY source (irradiation of air, irradiation of water, or fission product) of EACH of the radioisotopes listed.

a.

1H3

b.

18Ar41

c.

7N16

d.

54Xe135 QUESTION B.09 [1.0 point]

The reactor power level shall not exceed 1500 kW under any conditions of operation. This is an example of a:

a. safety limit.
b. limiting safety system setting.
c. limiting condition for operation.
d. surveillance requirement.

QUESTION B.10 [1.0 point]

The CURIE content of a radioactive source is a measure of

a. the number of radioactive atoms in the source.
b. the amount of energy emitted per unit time by the source
c. the amount of damage to soft body tissue per unit time.
d. the number of nuclear disintegrations per unit time.

QUESTION B.11 [1.0 point]

According to the Emergency Plan, the Emergency Planning Zone (EPZ) is

a. Room 130 (Reactor Laboratory).
b. that portion of the center and east wings of the Mechanical Engineering Building south of the lobby, plus the portion of Engineering Drive south of the designated areas of the building.
c. the area within a 500 foot radius from the centerline of the reactor laboratory ventilation exhaust.
d. Mechanical Engineering Building and the adjacent Fenced Area.

Section B Normal, Emergency and Radiological Control Procedures Page 9 QUESTION B.12 [1.0 point]

Which ONE of the following statements correctly describes the relationship between the Safety Limit (SL) and the Limiting Safety System Setting (LSSS)?

a. The SL is a maximum operationally limiting value that prevents exceeding the LSSS during normal operations.
b. The SL is a parameter that assures the integrity of the fuel cladding. The LSSS initiates protective actions to preclude reading the SL.
c. The LSSS is a parameter that assures the integrity of the fuel cladding. The SL initiates protective action to preclude reaching the LSSS.
d. The SL is a maximum setpoint for instrumentation response. The LSSS is the minimum number of channels required to be operable.

QUESTION B.13 [1.0 point]

Which ONE of the following is the LOWEST level of management who may approve substantive written operating procedure changes?

a. the Reactor Director
b. the Reactor Safety Committee
c. a Senior Reactor Operator
d. the Reactor Supervisor QUESTION B.14 [1.0 point]

10CFR50.54(x) states: A licensee may take reasonable action that departs from a license condition or a technical specification (contained in a license issued under this part) in an emergency when this action is immediately needed to protect the public health and safety and no action consistent with license conditions and technical specifications that can provide adequate or equivalent protection is immediately apparent. 10CFR50.54(y) states that the minimum level of management which may authorize this action is

a. any Reactor Operator licensed at facility.
b. any Senior Reactor Operator licensed at facility.
c. Facility Manager (or equivalent at facility).
d. NRC Project Manager.

QUESTION B.15 [1.0 point]

The CURIE content of a source is a measure of:

a. the number of radioactive atoms in the source.
b. the amount of energy emitted per second by the source.
c. the capability of the source to cause damage to the body.
d. the number of disintegrations of source nuclei each second.

Section B Normal, Emergency and Radiological Control Procedures Page 10 QUESTION B.16 [1.0 point]

You initially remove a sample from the pool reading 1 R/hr at 30 cm from the source. You then replace the sample in the pool. An hour later you remove the sample and the reading is now 390 mR/hr at 30 cm. You again replace the sample back in the pool. Which one of the following is the minimum amount of time you should wait to be able to bring out the sample without generating a high radiation area?

a. 1/2 hour
b. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
c. 11/2 hours
d. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

Section C Facility and Radiation Monitoring Systems Page 11 QUESTION C.01 [2.0 points, 1/2 each]

Match the purification system conditions listed in column A with their respective causes listed in column B. Each choice is used only once.

Column A Column B

a. High Radiation Level at demineralizer.
1. Channeling in demineralizer.
b. High Radiation Level downstream of demineralizer.
2. Fuel element failure.
c. High flow rate through demineralizer.
3. High temperature in demineralizer system
d. High pressure upstream of demineralizer.
4. Clogged demineralizer QUESTION C.02 [1.0 point]

WHICH ONE of the following detectors is used primarily to measure Ar41 released to the environment?

a. NONE, Ar41 has too short a half-life to require environmental monitoring.
b. Stack Gas Monitor
c. Stack Particulate Monitor
d. Area Radiation Monitor above pool QUESTION C.03 [1.0 point]

This question deleted per facility comment, due to new ventilation system.

Which ONE of the following describes how the ventilation system responds on receipt of an evacuation alarm?

a. Room exhaust fan continues to operate, emergency exhaust fan must be started manually
b. Room exhaust fan continues to operate, emergency exhaust fan starts automatically
c. Room exhaust fan must be secured, emergency exhaust fan must be started manually
d. Room exhaust fan must be secured, emergency exhaust fan starts automatically QUESTION C.04 [1.0 point]

Which ONE of the following is the main function performed by the DISCRIMINATOR circuit in the Startup Channel?

a. To generate a current signal equal and of opposite polarity as the signal due to gammas generated within the Startup Channel Detector.
b. To filter out small pulses due to gamma interactions, passing only pulses due to neutron events within the Startup Channel Detector.
c. To convert the linear output of the Startup Channel Detector to a logarithmic signal for metering purposes.
d. To convert the logarithmic output of the metering circuit to a t (delta time) output for period metering purposes.

Section C Facility and Radiation Monitoring Systems Page 12 QUESTION C.05 [1.0 point]

During reactor operation, a leak develops in the primary to intermediate heat exchanger. Which ONE of the following conditions correctly describes how the system will react? Pool level will

a. increase, the automatic level control will Pool maintain level within an 1 and 1/2 inches of normal.
b. increase, an alarm will occur at the Security and Police Headquarters two inches above normal
c. decrease, the reactor will scram if level decreases by two inches.
d. decrease, the intermediate loop pump will trip due to low pressure.

QUESTION C.06 [1.0 point]

For a safety blade, the out limit light is ON, the in limit light is OFF, and magnet engaged light is OFF. What is the configuration of the system?

a. the drive is full out and the blade is full in.
b. the blade is full out and the drive is full in.
c. the blade and drive are both full out.
d. the blade and drive are both full in.

QUESTION C.07 [1.0 point]

The normal rods use electric drive motors for positioning. The transient rod is moved by

a. pneumatics (air)
b. pneumatics (Nitrogen)
c. hydraulics (Water)
d. hydraulics (Oil)

QUESTION C.08 [1.0 point]

WHICH ONE of the following is the purpose of the diffuser pump?

a. increase heat transfer rate due to increased mixing within the core
b. decrease the activation rate of O16 to N16 due to reduced time in core
c. increase transport time for N16 to reach surface of pool
d. break up of O16 bubbles in pool, thereby decreasing production of N16

Section C Facility and Radiation Monitoring Systems Page 13 QUESTION C.09 [1.0 point]

Which ONE of the following will cause an Annunciator Alarm?

a. pneumatic tube blower off.
b. air particulate activity less than 1H 10-14 ci/ml.
c. 12 second reactor period.
d. core inlet temperature at 128°F.

QUESTION C.10 [2.0 points, 1/2 each]

Match the reactor power instrumentation listed in column A with its corresponding detector type from column B.

(Choices from column B may be used more than once or not at all.)

Column A Column B

a. Log Count Rate
1. Gamma Ionization Chamber
b. Log N
2. Boron Lined Compensated Ionization Chamber
c. Picoammeter
3. Fission Chamber
d. Pulse Channel
4. Kanne Ionization Chamber QUESTION C.11 [1.0 point]

The neutron source in use in the core is made of

a. americium-beryllium
b. californium
c. plutonium-beryllium
d. radium-beryllium QUESTION C.12 [1.0 point]

Which of the following scrams is NOT available in PULSE MODE?

a. High fuel temperature.
b. High Voltage (Loss to Nuclear Instrumentation).
c. Power Level (pA 1 & 2)
d. Pool Level

Section C Facility and Radiation Monitoring Systems Page 14 QUESTION C.13 [1.0 point]

Which ONE of the following is the main reason for pressurizing the intermediate loop water?

a. To prevent water from the primary loop leaking into the intermediate loop.
b. To increase heat transfer through the heat exchangers.
c. To attenuate radiation from primary loop water in the primary heat exchanger floor area.
d. To prevent intermediate pump cavitations.

QUESTION C.14 [1.0 point]

When the Bridge Area Radiation Monitor reads 50 mrem/hour, which ONE of following actions occurs?

a. an alarm sounds
b. the reactor scrams
c. the building exhaust fans are turned off
d. Emergency Venting Mode initiates QUESTION C.15 [1.0 point]

When the Experimental Facility Radiation Level High annunciator alarms:

a. an evacuation alarm sounds after 20 seconds.
b. the reactor scrams.
c. the emergency exhaust fan is started.
d. no automatic actions occur.

QUESTION C.16 [1.0 point]

The Safety Channels (picoammeters):

a. supply a period signal for use in the Automatic mode.
b. provide a 1 kW inhibit for the pulse or square wave modes.
c. provide a zero output, fail safe, trip signal to scram the reactor.
d. provide a insertion inhibit signal to the fission counter drive circuit

Section C Facility and Radiation Monitoring Systems Page 15 QUESTION C.17 [2.0 points, 1/2 each]

Match the system listed in column A with the proper piping color code listed in Column B.

Column A Column B

a. City water
1. Red
b. Air
2. Blue
c. Contaminated water
3. Green
d. Softened water
4. Black

Section A L Theory, Thermo & Facility Operating Characteristics Page 16 A.01 a, 7; b, 2; c, 1; d, 5 REF:

Standard NRC Question A.02 c

REF:

P = P0 et/T --> ln(2) = time ÷ 100 seconds -> time = ln (2) x 100 sec. 0.693 x 100 0.7 x 100 70 sec.

A.03 a, 2; b, 1; c, 4; d, 3 REF:

DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 3, Enabling Objectives 4.3 through 4.7.

A.04 c

REF:

DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.1b.

A.05 b

REF:

DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.3.

A.06 a

REF:

DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 3, Control Rod Effectiveness A.07:

a REF:

Peak power is proportional to )$prompt 2 P1/D2 2 = P2/D1 2 1050/0.52 = P2/12 (1050/4)

  • 1 = P2 62.5 = P2, NEEP 234, Reactor Pulsing p. 144.

A.08

a.

REF:

P = P0 et/ ln(P/P0) = t/ Since you are looking for which would take the longest time it is obvious to the most casual of observers that the ratio P/P0 must be the largest. Also DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.6.

A.09 d

REF:

P/P0 = e-T/

ln(0.1) = - T(time)/(-80sec)

Time = ln (0.1) x -80 sec = 184 seconds 3 minutes. Also DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.6.

A.10 c

REF:

NEEP 234, p. 87. Facility Supplied Examination Bank.

A.11 a

REF:

Standard NRC Question1 A.12 a

0.1 H 3.79 = 0.379 0.9 H 0.23 = 0.207 0.1 H 7.9 = 0.79 0.9 H 1.49 = 1.34 REF:

DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 2.7.

A.13 a

REF:

DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 2, Enabling Objective 1.3.

A.14 a

REF:

DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, Volume 1, Enabling Objective 5.2.

A.15 b

REF:

NEEP 234, p.A.15 Also facility supplied Examination Bank A question 222.

A.16 c

REF:

Standard NRC question A.17 b

REF:

(NRC99) UWNR OTM, Reactor Physics II. Facility supplied Examination Bank A, question 215.

A.18 c

REF:

UWNR OTM, Reactor Physics I. Rewrite of facility supplied examination question bank A, question 202.

Section B Normal, Emergency and Radiological Control Procedures Page 17 B.01 b or a 2nd correct answer added per facility comment REF:

Technical Specifications § 1 Definitions.

B.02 a, 20; b, 1; c, 1; d, 10 REF:

10CFR20.100x B.03 a, 4; b, 2; c, 3; d, 1 REF:

Standard NRC question B.04 a, 0.7%;

b, 1.4%;

c, 0.2%

REF:

(NRC2001) Technical Specifications, §§ 3.1, 3.6, (a) and (b)

B.05 d

REF:

Basic Radiological Controls knowledge: Half-Thickness and Tenth-Thickness". 210 = 1024 B.06 a, 4; b, 2 or 3; c, 1; d, 3 2nd correct answer for part b added per facility comment. Using a light material will result in less Bremsstrahlung radiation.

REF:

Standard NRC Health Physics Question B.07 a

REF:

UNWR 004 Reactor Operator Proficiency Maintenance Program § B 3rd ¶.

B.08 a, Water; b, Air; c, Water; d, Fission REF:

Standard NRC question.

B.09 a

REF:

(NRC2000) Technical Specifications, Section 2.1 (SAR, p.14-7).

B.10 d

REF:

Standard Health Physics Definition.

B.11 a

REF:

UNWR 006 Emergency Plan § 8.0 Facilities and Equipment B.12 b

REF:

B.13 b

REF:

Technical Specifications, Section 6.4 (SAR, p.14-36)

B.14 b

REF:

10CFR50.54(y)

B.15 d

REF:

(NRC99) UWNR OTM, Health Physics I & II,Section I, Definitions, letter a, Radioactivity B.16 c

REF:

It = I0 e-t 390 mR/hr ÷ 1000 mR/hr = e-1hr ln(0.39) = -

  • 1 hr.

= 0.9416 hour-1 SOLVING for additional time:

If = It e-t 100mR/hr = 390 mR/hr e-0.9416 (time) ln (0.25) = -0.9163

  • time time = 1.4454

Section C Facility and Radiation Monitoring Systems Page 18 C.01 a, 2; b, 3; c, 1; d, 4 Ref:

Standard NRC cleanup loop question.

C.02 b

REF:

SAR § 2.5.9, pages 2-54, 2-55.

C.03 a

Question deleted per facility comment, new ventilation system REF: (NRC99, NRC2001) UWNR 155; SAR, Section 9.1 Facility supplied examination bank.

C.04 b

REF: NEEP 234, Controls & Instrumentation II, Nuclear Instrumentation, Discriminator, page 4 of 13.

C.05 b

REF:

UWNR Reactor Cooling System Description (from addendum to 2003-2004 Annual Report); UWNR SAR2000 Section 7.6 Control Console and Display Instruments C.06 a

REF:

(NRC95) SAR, Section 7.3, p.7-7 C.07 a

REF:

UWNR Safety Analysis Report Rev.1, 8/2004 C.08 c

REF:

(NRC99) SAR, Section 4.4, p.4-25; SAR, Section 5.6, p.5-5.

C.09 d

REF:

Facility supplied examination bank. a: SAR, Section 10.2, p.10-6; b: UWNR OTM, Health Physics I & II, UWNR OTM, Controls & Instrumentation VI, Particulate Activity Monitor; SAR, Section 11.1.1.1; c: UWNR OTM, Controls &

Instrumentation I & II, Log N Channel Alarms and Interlocks; d: UWNR OTM, Controls & Instrumentation VII, Temperature Measurements, SAR, Section 7.6, p.7-12 (no preset level given)

C.10 a, 3; b, 2; c, 2; d, 1 REF:

NEEP 234 pages 160 - 177, page 181 and 2000 SAR, § 7.2.3 C.11 d

REF:

2000 SAR Chapter 4, § 4.2.4, page 4-16 C.12 c

REF:

Control & Instrumentation IV, Table of Technical Specification Required Scrams and Setpoints vs. Mode.

C.13 a

REF:

Facility supplied question bank C, question # 53 C.14 a

REF:

UWNR OTM, Controls & Instrumentation VI, Area Radiation Monitor System, System: Area Radiation Monitors - Auto Actions at Alarm Point C.15 d

REF: (NRC2000) UWNR OTM, Controls & Instrumentation VI, Area Radiation Monitor SystemC.16, also facility supplied question C.16 c

REF: NEEP 234, Controls and Instrumentation I & II figure 29 page 177.

C.17 a, 3; b, 4; c, 1; d, 2 REF: (NRC99) UWNR OTM, Reactor Water Systems III, Demineralizer; posted on wall near demineralizer

U. S. NUCLEAR REGULATORY COMMISSION NON-POWER INITIAL REACTOR LICENSE EXAMINATION FACILITY:

University of Wisconsin REACTOR TYPE:

TRIGA DATE ADMINISTERED:

03/17/2008 CANDIDATE:

INSTRUCTIONS TO CANDIDATE:

Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination.

Points for each question are indicated in brackets for each question. A 70% in each section is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.

% of Category

% of Candidates Category Value Total Score Value Category 20.00 33.3 A.

L Theory, Thermodynamics and Facility Operating Characteristics 20.00 33.3 B.

Normal, Emergency and Radiological Controls Procedures 20.00 33.3 C.

Facility and Radiation Monitoring Systems 60.00 TOTALS FINAL GRADE All work done on this examination is my own. I have neither given nor received aid.

Candidate's Signature

NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:

1.

Cheating on the examination means an automatic denial of your application and could result in more severe penalties.

2.

After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.

3.

Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.

4.

Use black ink or dark pencil only to facilitate legible reproductions.

5.

Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.

6.

Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.

7.

The point value for each question is indicated in [brackets] after the question.

8.

If the intent of a question is unclear, ask questions of the examiner only.

9.

When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition turn in all scrap paper.

10.

Ensure all information you wish to have evaluated as part of your answer is on your answer sheet.

Scrap paper will be disposed of immediately following the examination.

11.

To pass the examination you must achieve a grade of 70 percent or greater in each category.

12.

There is a time limit of three (3) hours for completion of the examination.

13.

When you have completed and turned in you examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked.

EQUATION SHEET DR - Rem, Ci - curies, E - Mev, R - feet 1 Curie = 3.7 x 1010 dis/sec 1 kg = 2.21 lbm 1 Horsepower = 2.54 x 103 BTU/hr 1 Mw = 3.41 x 106 BTU/hr 1 BTU = 778 ft-lbf

°F = 9/5 °C + 32 1 gal (H2O) 8 lbm

°C = 5/9 (°F - 32) cP = 1.0 BTU/hr/lbm/°F cp = 1 cal/sec/gm/°C

(

)

(

)

l

2 2

max

=

P 1

sec 1.0

=

eff

=

te P

P 0

eff K

S S

SCR

=

1

sec 10 1

4

x

=

l

+

=

eff SUR 06 26

(

)

(

)

2 1

1 1

2 1

eff eff K

CR K

CR

=

(

)

(

)

2 2

1 1

=

CR CR 2

1 1

1 eff eff K

K M

=

1 2

1 1

CR CR K

M eff

=

=

)

(

0 10 t

SUR P

P=

(

)

0 1

P P

=

eff eff K

K SDM

=1

=

  • l

+

+

=

l eff 2

1 1

2 eff eff eff eff K

K K

K

=

693

.0 2

1 =

T eff eff K

K 1

=

t e

DR DR

=

0

( )

2 6

R n

E Ci DR=

2 2

2 2

1 1

d DR d

DR

=

(

)

(

)

1 2

1 2

2 2

Peak Peak

=

T UA H

m T

c m

Q P

=

=

=

Section A: L Theory, Thermodynamics, and Facility Operating Characteristics Page 22 A.01a 1 2 3 4 5 6 7 ___

A.07 a b c d ___

A.01b 1 2 3 4 5 6 7 ___

A.08 a b c d ___

A.01c 1 2 3 4 5 6 7 ___

A.09 a b c d ___

A.01d 1 2 3 4 5 6 7 ___

A.10 a b c d ___

A.02 a b c d ___

A.11 a b c d ___

A.03a 1 2 3 4 ___

A.12 a b c d ___

A.03b 1 2 3 4 ___

A.13 a b c d ___

A.03c 1 2 3 4 ___

A.14 a b c d ___

A.03d 1 2 3 4 ___

A.15 a b c d ___

A.04 a b c d ___

A.16 a b c d ___

A.05 a b c d ___

A.17 a b c d ___

A.06 a b c d ___

A.18 a b c d ___

Section B: Normal, Emergency & Radiological Controls Procedures Page 23 B.01 a b c d ___

B.06c 1 2 3 4 ___

B.02a 1 2 5 10 20 ___

B.06d 1 2 3 4 ___

B.02b 1 2 5 10 20 ___

B.07 a b c d ___

B.02c 1 2 5 10 20 ___

B.08a Air Water Fission ___

B.02d 1 2 5 10 20 ___

B.08b Air Water Fission ___

B.03a 1 2 3 4 ___

B.08c Air Water Fission ___

B.03b 1 2 3 4 ___

B.08d Air Water Fission ___

B.03c 1 2 3 4 ___

B.09 a b c d ___

B.03d 1 2 3 4 ___

B.10 a b c d ___

B.04a 0.2% 0.7% 1.4% 2.0% ___

B.11 a b c d ___

B.04b 0.2% 0.7% 1.4% 2.0% ___

B.12 a b c d ___

B.04c 0.2% 0.7% 1.4% 2.0% ___

B.13 a b c d ___

B.05 a b c d ___

B.14 a b c d ___

B.06a 1 2 3 4 ___

B.15 a b c d ___

B.06b 1 2 3 4 ___

B.16 a b c d ___

Section C: Facility and Radiation Monitoring Systems Page 24 C.01a 1 2 3 4 ___

C.10b 1 2 3 4 ___

C.01b 1 2 3 4 ___

C.10c 1 2 3 4 ___

C.01c 1 2 3 4 ___

C.10d 1 2 3 4 ___

C.01d 1 2 3 4 ___

C.11 a b c d ___

C.02 a b c d ___

C.12 a b c d ___

C.03 a b c d ___

C.13 a b c d ___

C.04 a b c d ___

C.14 a b c d ___

C.05 a b c d ___

C.15 a b c d ___

C.06 a b c d ___

C.16 a b c d ___

C.07 a b c d ___

C.17a 1 2 3 4 ___

C.08 a b c d ___

C.17b 1 2 3 4 ___

C.09 a b c d ___

C.17c 1 2 3 4 ___

C.10a 1 2 3 4 ___

C.17d 1 2 3 4 ___

Critical Rod Height Rod fully out Integral Rod Worth Curve HC H

C Max A

B Worth of Most Reactive Control Element Worth of Most Reactive Control Element D

C E