IR 05000338/2008007: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/01/2008
| issue date = 04/01/2008
| title = IR 05000338-08-007; 05000339-08-007; and 07200056-08-001 on 02/18 Through 02/21/08 for North Anna, Units 1 and 2
| title = IR 05000338-08-007; 05000339-08-007; and 07200056-08-001 on 02/18 Through 02/21/08 for North Anna, Units 1 and 2
| author name = Vias S J
| author name = Vias S
| author affiliation = NRC/RGN-II/DRP
| author affiliation = NRC/RGN-II/DRP
| addressee name = Christian D A
| addressee name = Christian D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000338, 05000339, 07200056
| docket = 05000338, 05000339, 07200056
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 April 1, 2008 Virginia Electric and Power Company ATTN: Mr. David Sr. Vice President and Chief Nuclear Officer Innsbrook Technical Center - 2SW 5000 Dominion Boulevard Glen Allen, VA 23060-6711
{{#Wiki_filter:April 1, 2008


SUBJECT: NORTH ANNA POWER STATION - INSPECTION REPORT NOS. 050-00338/08-007; 050-00339/08-007; AND 072-00056/08-001
==SUBJECT:==
NORTH ANNA POWER STATION - INSPECTION REPORT NOS.
 
050-00338/08-007; 050-00339/08-007; AND 072-00056/08-001


==Dear Mr. Christian:==
==Dear Mr. Christian:==
This inspection report covers an inspection made by the United States Nuclear Regulatory Commission (NRC) at your North Anna Power Station Independent Spent Fuel Storage Installation (ISFSI) on February 18-21, 2008. The purpose of the inspection was to evaluate the North Anna Power Station readiness to load spent fuel from wet storage in the spent fuel pool to dry storage at the ISFSI. The enclosed inspection report documents the results of the inspection, which were discussed on February 21, 2008 with Mr. Dan Stoddard and other members of your staff. There were no violations or findings of significance.
This inspection report covers an inspection made by the United States Nuclear Regulatory Commission (NRC) at your North Anna Power Station Independent Spent Fuel Storage Installation (ISFSI) on February 18-21, 2008. The purpose of the inspection was to evaluate the North Anna Power Station readiness to load spent fuel from wet storage in the spent fuel pool to dry storage at the ISFSI. The enclosed inspection report documents the results of the inspection, which were discussed on February 21, 2008 with Mr. Dan Stoddard and other members of your staff. There were no violations or findings of significance.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its attachments, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its attachments, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic reading Room).
 
Sincerely,
/RA/
 
Steven J. Vias, Chief
 
Technical Support Branch


Sincerely,/RA/  Steven J. Vias, Chief Technical Support Branch Division of Reactor Projects  
Division of Reactor Projects  


Docket Nos.: 50-338; 50-339; 72-056 License Nos.: NPF-4; NPF-7  
Docket Nos.: 50-338; 50-339; 72-056 License Nos.: NPF-4; NPF-7  


===Enclosure:===
===Enclosure:===
North Anna Power Station - Independent Spent Fuel Storage Installation (ISFSI) Pre-Operational Inspection Report  
North Anna Power Station - Independent Spent Fuel Storage Installation (ISFSI)
Pre-Operational Inspection Report  
 
w/Attachments: 1. Supplemental Information
 
2. Inspector Notes
 
_________________________
OFFICE RIV:DNMS:RSFS HQ:DNMS:SFST HQ:DNMS:SFST HQ:DNMS:SFST C:TSB/DRP


===w/Attachments:===
SIGNATURE SPA ECL MMS JJP SJV
1. Supplemental Information 2. Inspector Notes
 
NAME SPAtwater EC Love MMSampson JJPearson SJVias
 
DATE 03/31/2008 03/27/2008 03/24/2008 03/24/2008 04/01/2008
 
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
 
VEPCO
 
REGION IV==
Docket Nos.:
50-338, 50-339, 72-056
 
License:
 
NPF-4, NPF-7 Report No:
050-00338/08-007; 050-00339/08-007; and 072-00056/08-001
 
Licensee:
Virginia Electric and Power Company (VEPCO)
 
Facility:
North Anna Power Station, Units 1 & 2  
 
Location:
1024 Haley Drive Mineral, VA 23117


_________________________ OFFICE RIV:DNMS:RSFS HQ:DNMS:SFST HQ:DNMS:SFST HQ:DNMS:SFST C:TSB/DRP SIGNATURE SPA ECL MMS JJP SJV NAME SPAtwater EC Love MMSampson JJPearson SJVias DATE 03/31/2008 03/27/2008 03/24/2008 03/24/2008 04/01/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO VEPCO 2 cc w/encl:
Dates:
Chris L. Funderburk Director Nuclear Licensing and Operations Support Virginia Electric and Power Company Electronic Mail Distribution D. G. Stoddard Site Vice President North Anna Power Station Electronic Mail Distribution Executive Vice President Old Dominion Electric Cooperative Electronic Mail Distribution County Administrator Louisa County P.O. Box 160 Louisa, VA 23093 Lillian M. Cuoco, Esq. Senior Counsel Dominion Resources Services, Inc. Millstone Power Station Electronic Mail Distribution
February 18 through 21, 2008


VEPCO 3Letter to David from Steven J. Vias dated April 1, 2008
Inspectors:
Scott Atwater


SUBJECT: NORTH ANNA POWER STATION - INSPECTION REPORT NOS. 050-00338/08- 007; 050-00339/08-007; AND 072-00056/08-001 Distribution w/encl:
Region IV DNMS Inspector - Team Leader James Pearson


S. P. Lingam, NRR C. Evans L. Slack, RII EICS B. Spitzberg, RIV R. Temps, NMSS/SFST E. Love, NMSS/SFST J. Pearson, NMSS/SFST M. Sampson, NMSS/SFST E. Ziegler, NMSS/SFST J. Reece, Senior Resident Inspector OE Mail (email address if applicable) RIDSNRRDIRS PUBLIC
SFST Senior Safety Inspector Earl Love


Enclosure ENCLOSURE U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket Nos.: 50-338, 50-339, 72-056 License: NPF-4, NPF-7 Report No: 050-00338/08-007; 050-00339/08-007; and 072-00056/08-001 Licensee: Virginia Electric and Power Company (VEPCO)
SFST Safety Inspector Michelle Sampson
Facility: North Anna Power Station, Units 1 & 2 Location: 1024 Haley Drive Mineral, VA 23117


Dates: February 18 through 21, 2008 Inspectors: Scott Atwater Region IV DNMS Inspector - Team Leader James Pearson SFST Senior Safety Inspector Earl Love SFST Safety Inspector Michelle Sampson SFST Safety Inspector  
SFST Safety Inspector  


Approved By: Steven Vias, Chief Technical Support Branch 7 Division of Reactor Projects  
Approved By:
Steven Vias, Chief Technical Support Branch 7 Division of Reactor Projects  


===Attachments:===
Attachments:
1. Supplemental Information 2. Inspector Notes  
1. Supplemental Information 2. Inspector Notes  


2 Enclosure EXECUTIVE SUMMARY North Anna Power Station NRC Inspection Report 050-00338/08-007; 050-00339/08-007; and 072-00056/08-001 Virginia Electric and Power Company (VEPCO) had selected the NUHOMS-HD Horizontal Modular Storage System for dry storage of spent nuclear fuel at the North Anna Power Station. The Nuclear Regulatory Commission (NRC) had certified the NUHOMS-HD cask system for storage of irradiated fuel under Certificate of Compliance No. 72-1030 on January 10, 2007.
Enclosure  
 
EXECUTIVE SUMMARY  
 
North Anna Power Station NRC Inspection Report 050-00338/08-007; 050-00339/08-007; and 072-00056/08-001  
 
Virginia Electric and Power Company (VEPCO) had selected the NUHOMS-HD Horizontal Modular Storage System for dry storage of spent nuclear fuel at the North Anna Power Station.
 
The Nuclear Regulatory Commission (NRC) had certified the NUHOMS-HD cask system for storage of irradiated fuel under Certificate of Compliance No. 72-1030 on January 10, 2007.


On February 18-21, 2008, a team of four inspectors performed two evaluations. The first evaluation was to determine if the ISFSI personnel had been trained, the equipment had been tested, and the procedures had been developed to the extent necessary to safely load spent fuel into dry storage at the ISFSI. The second evaluation was to determine if the North Anna Power Station programs were adequate for continued maintenance and operation of the ISFSI once it was loaded. The results of these two evaluations were discussed during an exit meeting on February 21, 2008 with Mr. Dan Stoddard and other members of the staff.
On February 18-21, 2008, a team of four inspectors performed two evaluations. The first evaluation was to determine if the ISFSI personnel had been trained, the equipment had been tested, and the procedures had been developed to the extent necessary to safely load spent fuel into dry storage at the ISFSI. The second evaluation was to determine if the North Anna Power Station programs were adequate for continued maintenance and operation of the ISFSI once it was loaded. The results of these two evaluations were discussed during an exit meeting on February 21, 2008 with Mr. Dan Stoddard and other members of the staff.
Line 64: Line 117:


Spent Fuel Cask Crane  
Spent Fuel Cask Crane  
$ The crane design features for load control were intact, operable, and properly rated for the application. The design features evaluated included the hoist brakes, trolley brakes, and hoist wire rope rating (Attachment 2, Crane Design, Pages 1-2).


$ The crane bridge and trolley, hoists, hooks, and wire ropes were inspected and maintained in accordance with the American Society of Mechanical Engineers (ASME) Code and the crane manufacturer's instructions (Attachment 2, Crane Inspection/Maintenance, Pages 2-5).
$ The crane design features for load control were intact, operable, and properly rated for the application. The design features evaluated included the hoist brakes, trolley brakes, and hoist wire rope rating (Attachment 2, Crane Design, Pages 1-2).
 
$ The crane bridge and trolley, hoists, hooks, and wire ropes were inspected and maintained in accordance with the American Society of Mechanical Engineers (ASME) Code and the crane manufacturers instructions (Attachment 2, Crane Inspection/Maintenance, Pages 2-5).


$ The crane was operated, and the crane operators were qualified, in accordance with the requirements of the ASME code (Attachment 2, Crane Operation, Pages 6-7).
$ The crane was operated, and the crane operators were qualified, in accordance with the requirements of the ASME code (Attachment 2, Crane Operation, Pages 6-7).


Canister Drying and Helium Backfill Operations
Canister Drying and Helium Backfill Operations  


$ The canister was vacuum dried and backfilled with helium to the pressures specified by technical specifications. The technical specification time limits for drying and backfilling operations were accurately incorporated into the procedures (Attachment 2, Drying/Helium Backfill, Pages 7-9).
$ The canister was vacuum dried and backfilled with helium to the pressures specified by technical specifications. The technical specification time limits for drying and backfilling operations were accurately incorporated into the procedures (Attachment 2, Drying/Helium Backfill, Pages 7-9).


Emergency Planning
Emergency Planning  
$ The Emergency Plan had been expanded to include the ISFSI. Emergency Action Levels (EALs) had been developed for accidents involving the ISFSI (Attachment 2, Emergency Planning, Pages 9-10).
 
$ The Emergency Plan had been expanded to include the ISFSI. Emergency Action Levels (EALs) had been developed for accidents involving the ISFSI (Attachment 2, Emergency Planning, Pages 9-10).
 
Enclosure


Enclosure 3 Fire Protection
Fire Protection  
$ The Fire Protection Plan had been expanded to include the ISFSI. Emergency response training had been provided for off-site responders (Attachment 2, Fire Protection, Pages 10-11).


Fuel Selection and Verification
$ The Fire Protection Plan had been expanded to include the ISFSI. Emergency response training had been provided for off-site responders (Attachment 2, Fire Protection, Pages 10-11).
$ The spent fuel assemblies selected for loading met the technical specification requirements for assembly type, decay heat load, and physical design characteristics (Attachment 2, Fuel Selection/Verification, Pages 11-14).
 
Fuel Selection and Verification  
 
$ The spent fuel assemblies selected for loading met the technical specification requirements for assembly type, decay heat load, and physical design characteristics (Attachment 2, Fuel Selection/Verification, Pages 11-14).


$ A canister loading plan had been developed based on the combination of spent fuel assembly enrichment, burnup, cooling time and decay heat. The loading plan met technical specification requirements (Attachment 2, Fuel Selection/Verification, Pages 11-14).
$ A canister loading plan had been developed based on the combination of spent fuel assembly enrichment, burnup, cooling time and decay heat. The loading plan met technical specification requirements (Attachment 2, Fuel Selection/Verification, Pages 11-14).
Line 89: Line 148:
$ The technical specification actions required for spent fuel mis-loading had been incorporated into the loading procedure (Attachment 2, Fuel Selection/Verification, Pages 11-14).
$ The technical specification actions required for spent fuel mis-loading had been incorporated into the loading procedure (Attachment 2, Fuel Selection/Verification, Pages 11-14).


General License Conditions
General License Conditions  
$ The NUHOMS-HD cask design was compatible with the North Anna Power Station 10 CFR Part 50 requirements. There were no items identified that required NRC review or approval prior to use of the cask system (Attachment 2, General License, Pages 14-20).
 
$ The NUHOMS-HD cask design was compatible with the North Anna Power Station 10 CFR Part 50 requirements. There were no items identified that required NRC review or approval prior to use of the cask system (Attachment 2, General License, Pages 14-20).


$ The licensee had calculated the dose to the public at the site boundary from a worst case accident during ISFSI operations. The dose was within the limits allowed by 10 CFR 72.106 (Attachment 2, General License, Pages 14-20).
$ The licensee had calculated the dose to the public at the site boundary from a worst case accident during ISFSI operations. The dose was within the limits allowed by 10 CFR 72.106 (Attachment 2, General License, Pages 14-20).
Line 102: Line 162:
$ The NUHOMS-HD cask system design parameters were bounded by the North Anna Power Station reactor site parameters (Attachment 2, General License, Pages 14-20).
$ The NUHOMS-HD cask system design parameters were bounded by the North Anna Power Station reactor site parameters (Attachment 2, General License, Pages 14-20).


Enclosure 4Heavy Loads and Rigging
Enclosure  
 
Heavy Loads and Rigging  


$ A safe load path had been established for transfer cask movements, meeting the requirements of NUREG 0612 (Attachment 2, Heavy Loads and Rigging, Pages 20-21).
$ A safe load path had been established for transfer cask movements, meeting the requirements of NUREG 0612 (Attachment 2, Heavy Loads and Rigging, Pages 20-21).
Line 110: Line 172:
$ Transfer cask lifting height restrictions had been established to ensure that a drop would not result in dose rates at the site boundary in excess of the 10 CFR Part 100 limits. These lifting heights were consistently monitored and adhered to during the inspection (Attachment 2, Heavy Loads and Rigging, Pages 20-21).
$ Transfer cask lifting height restrictions had been established to ensure that a drop would not result in dose rates at the site boundary in excess of the 10 CFR Part 100 limits. These lifting heights were consistently monitored and adhered to during the inspection (Attachment 2, Heavy Loads and Rigging, Pages 20-21).


Procedures and Technical Specifications
Procedures and Technical Specifications  
$ Procedures were established to ensure that the NUHOMS-HD cask storage system technical specification requirements for inspection, operation and surveillance were implemented (Attachment 2, Procedures and Tech Specs, Pages 22-24).
 
$ Procedures were established to ensure that the NUHOMS-HD cask storage system technical specification requirements for inspection, operation and surveillance were implemented (Attachment 2, Procedures and Tech Specs, Pages 22-24).
 
Quality Assurance
 
$ The licensee had applied their 10 CFR Part 50 Quality Assurance Program to the ISFSI.


Quality Assurance
Measures had been established to ensure that purchased material, equipment and services conformed to procurement documents (Attachment 2, Quality Assurance, Pages 24-25).


$ The licensee had applied their 10 CFR Part 50 Quality Assurance Program to the ISFSI. Measures had been established to ensure that purchased material, equipment and services conformed to procurement documents (Attachment 2, Quality Assurance, Pages 24-25).
Radiation Protection


Radiation Protection
$ The canister unloading procedure contained provisions to minimize radiation exposure to workers, and radiological releases to the environment, during canister gas sampling (Attachment 2, Radiation Protection, Pages 25-28).
$ The canister unloading procedure contained provisions to minimize radiation exposure to workers, and radiological releases to the environment, during canister gas sampling (Attachment 2, Radiation Protection, Pages 25-28).


$ The canister unloading procedure minimized the potential for overpressurizing the canister during reflooding. During the inspection, the Vacuum Drying System (VDS) was operated to confirm it's capability to control the reflooding flow rate to less than 4.0 gpm, as described in the NUHOMS FSAR (Attachment 2, Radiation Protection, Pages 25-28).
$ The canister unloading procedure minimized the potential for overpressurizing the canister during reflooding. During the inspection, the Vacuum Drying System (VDS) was operated to confirm its capability to control the reflooding flow rate to less than 4.0 gpm, as described in the NUHOMS FSAR (Attachment 2, Radiation Protection, Pages 25-28).


$ The canister loading procedure required a contamination survey of the area below the transfer cask annulus seal, in order to evaluate the seal's effectiveness. Radiation Protection personnel performed this survey during the inspection (Attachment 2, Radiation Protection, Pages 25-28).
$ The canister loading procedure required a contamination survey of the area below the transfer cask annulus seal, in order to evaluate the seals effectiveness. Radiation Protection personnel performed this survey during the inspection (Attachment 2, Radiation Protection, Pages 25-28).


$ Criticality prevention and monitoring during cask loading was implemented. The minimum spent fuel pool boron concentration required by Technical Specifications was established.
$ Criticality prevention and monitoring during cask loading was implemented. The minimum spent fuel pool boron concentration required by Technical Specifications was established.
Line 128: Line 194:
Criticality monitoring and alarm systems were installed in all areas where spent fuel was handled (Attachment 2, Radiation Protection, Pages 25-28).
Criticality monitoring and alarm systems were installed in all areas where spent fuel was handled (Attachment 2, Radiation Protection, Pages 25-28).


Enclosure 5 Records  
Enclosure  
 
Records  
 
$ The licensee was maintaining a current copy of the 10 CFR 72.212 Evaluation Report, Certificate of Compliance, and related documents as required by 10 CFR 72.212 (Attachment 2, Records, Page 28).
$ The licensee was maintaining a current copy of the 10 CFR 72.212 Evaluation Report, Certificate of Compliance, and related documents as required by 10 CFR 72.212 (Attachment 2, Records, Page 28).


$ The licensee had made the required 90 day notification to the NRC prior to loading their first cask, as required by 10 CFR 72.212 (Attachment 2, Records, Page 28).
$ The licensee had made the required 90 day notification to the NRC prior to loading their first cask, as required by 10 CFR 72.212 (Attachment 2, Records, Page 28).


Special Lifting Devices
Special Lifting Devices  
$ The licensee had incorporated all dry fuel storage special lifting devices into their 10-year In-Service Inspection (ISI) program in order to ensure continuing compliance with the ANSI standard and license commitments (Attachment 2, Special Lifting Devices, Pages 29-30).
 
$ The licensee had incorporated all dry fuel storage special lifting devices into their 10-year In-Service Inspection (ISI) program in order to ensure continuing compliance with the ANSI standard and license commitments (Attachment 2, Special Lifting Devices, Pages 29-30).


$ The transfer cask trunnions had been load tested by the fabricator to the minimum weight required by the American National Standards Institute (ANSI) standard. The load testing had been followed by non-destructive testing and no anomalies were identified (Attachment 2, Special Lifting Devices, Pages 29-30).
$ The transfer cask trunnions had been load tested by the fabricator to the minimum weight required by the American National Standards Institute (ANSI) standard. The load testing had been followed by non-destructive testing and no anomalies were identified (Attachment 2, Special Lifting Devices, Pages 29-30).
Line 140: Line 210:
$ The licensee had established procedures to ensure that all dry fuel storage special lifting devices were inspected prior to use (Attachment 2, Special Lifting Devices, Pages 29-30).
$ The licensee had established procedures to ensure that all dry fuel storage special lifting devices were inspected prior to use (Attachment 2, Special Lifting Devices, Pages 29-30).


Training $ The training program for ISFSI certification was developed using the Systematic Approach To Training (SAT) process. The knowledge requirements for each task were identified and incorporated into the classroom training. The skill requirements for each task were identified and incorporated into Job Performance Measures (JPMs). The training program was approved by the North Anna Supervisor, Operations Support (Attachment 2, Training, Pages 30-33).
Training  
 
$ The training program for ISFSI certification was developed using the Systematic Approach To Training (SAT) process. The knowledge requirements for each task were identified and incorporated into the classroom training. The skill requirements for each task were identified and incorporated into Job Performance Measures (JPMs). The training program was approved by the North Anna Supervisor, Operations Support (Attachment 2, Training, Pages 30-33).


$ The NUHOMS-HD vendor (AREVA) and the Vacuum Drying System vendor (EMS Solutions) provided training to the North Anna Power Station ISFSI personnel. North Anna had reviewed and accepted the vendor training under their NRC approved 10 CFR Part 50 Training Program. Only those personnel who had completed all phases of the training were certified to operate the ISFSI equipment and systems (Attachment 2, Training, Pages 30-33).
$ The NUHOMS-HD vendor (AREVA) and the Vacuum Drying System vendor (EMS Solutions)
provided training to the North Anna Power Station ISFSI personnel. North Anna had reviewed and accepted the vendor training under their NRC approved 10 CFR Part 50 Training Program. Only those personnel who had completed all phases of the training were certified to operate the ISFSI equipment and systems (Attachment 2, Training, Pages 30-33).


$ The ISFSI field training was provided during the system checks and the dry run training exercises. The operations that were trained met the requirements of the Certificate of Compliance (Attachment 2, Training, Pages 30-33).
$ The ISFSI field training was provided during the system checks and the dry run training exercises. The operations that were trained met the requirements of the Certificate of Compliance (Attachment 2, Training, Pages 30-33).


Attachment 1 Attachment 1 Supplemental Information LIST OF PERSONS CONTACTED North Anna Power Station Personnel M. Bradley Supervisor, Health Physics K. Breeden Health Physics Technician B. Campbell Fuel Handler Operations Support (NLO) B. Carlin Fuel Handler Operations Support (NLO) B. Carr Fuel Handler Operations Support (NLO) B. Carroll Engineering Project Manager for ISFSI S. Clements Fuel Handler Operations Support (Licensed)
Attachment 1 Attachment 1 Supplemental Information  
B. Copeland System Engineer D. Donovan Health Physics Technician R. Evans, Jr. Manager, Radiation Protection and Chemistry T. Huber Director, Nuclear Engineering P. Kemp Supervisor, Licensing N. Lane Plant Manager G. Lear Manager, Organizational Effectiveness J. Leberstien Licensing Engineer B. Miller Health Physicist II, Radiation Protection F. Mladen Director Safety and Licensing F. Motley Senior Quality Specialist III H. Myers Training Specialist R. Scanlan Manager, Nuclear Oversight Department J. Slattery Supervisor, Operations Support B. Speckine Supervisor, Fuel Handling D. Stoddard Site Vice President  
 
LIST OF PERSONS CONTACTED  
 
North Anna Power Station Personnel  
 
M. Bradley  
 
Supervisor, Health Physics K. Breeden  
 
Health Physics Technician B. Campbell  
 
Fuel Handler Operations Support (NLO)
B. Carlin  
 
Fuel Handler Operations Support (NLO)
B. Carr  
 
Fuel Handler Operations Support (NLO)
B. Carroll  
 
Engineering Project Manager for ISFSI S. Clements  
 
Fuel Handler Operations Support (Licensed)
B. Copeland System Engineer D. Donovan  
 
Health Physics Technician R. Evans, Jr.
 
Manager, Radiation Protection and Chemistry T. Huber  
 
Director, Nuclear Engineering P. Kemp  
 
Supervisor, Licensing N. Lane  
 
Plant Manager G. Lear  
 
Manager, Organizational Effectiveness J. Leberstien Licensing Engineer B. Miller  
 
Health Physicist II, Radiation Protection F. Mladen  
 
Director Safety and Licensing F. Motley  
 
Senior Quality Specialist III H. Myers  
 
Training Specialist R. Scanlan  
 
Manager, Nuclear Oversight Department J. Slattery  
 
Supervisor, Operations Support B. Speckine Supervisor, Fuel Handling D. Stoddard  
 
Site Vice President  
 
Corporate Personnel
 
T. Brookmire Supervisor, Nuclear Spent Fuel B. Wakeman Engineer III, Nuclear Spent Fuel Engineer K. Wietharn Engineer III, Nuclear Spent Fuel Engineer C. Zalesiak
 
Engineer III, Corporate Civil Engineering
 
Surry Power Station Personnel
 
A. Ewell
 
Supervisor, Fuel Handling T. Xenakis
 
Fuel Handler Operations Support (Licensed)
J. Lyons
 
Fuel Handler Operations Support (NLO)
T. Keating
 
Fuel Handler Operations Support (Licensed)
 
Attachment 1 Contractors
 
J. Sheffield
 
Transnuclear R. Simonich
 
EMS Solutions P. Gillespie
 
Health Physics Technician, Bartlett
 
Attachment 1 INSPECTION PROCEDURES USED
 
60854.1 Pre-operational Testing of Independent Spent Fuel Storage Installations at Operating Plants
 
60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
 
60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants
 
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
 
Opened
 
None.
 
Closed
 
None.
 
Discussed
 
None.
 
Attachment 1 LIST OF ACRONYMS USED
 
ANSI
 
American National Standards Institute ASME
 
American Society of Mechanical Engineers BPRA
 
Burnable Poison Rod Assembly CFR
 
Code of Federal Regulations CoC
 
Certificate of Compliance dpm
 
Disintegrations Per Minute EAL
 
Emergency Action Level EPIP
 
Emergency Plan Implementing Procedure gpm
 
Gallons per minute GWD/MTU
 
Gigawatt Days per Metric Ton Uranium HSM
 
Horizontal Storage Module ISFSI
 
Independent Spent Fuel Storage Installation ISI
 
In-Service Inspection JPM
 
Job Performance Measure kW
 
Kilowatt msl
 
Mean Sea Level NFAH
 
Non Fuel Assembly Hardware NRC
 
Nuclear Regulatory Commission ppm
 
Parts Per Million psf
 
Pounds Per Square Foot psi
 
Pounds Per Square Inch QA
 
Quality Assurance SAR
 
Safety Analysis Report SAT
 
Systematic Approach to Training SER
 
Safety Evaluation Report SNCR
 
Supplier Non-Conformance Report SSE
 
Safe Shutdown Earthquake SSI
 
Soil Structure Interaction TEDE
 
Total Effective Dose Equivalent TRB
 
Training Review Board TPA


Corporate Personnel T. Brookmire Supervisor, Nuclear Spent Fuel B. Wakeman Engineer III, Nuclear Spent Fuel Engineer K. Wietharn Engineer III, Nuclear Spent Fuel Engineer C. Zalesiak Engineer III, Corporate Civil Engineering Surry Power Station Personnel A. Ewell Supervisor, Fuel Handling T. Xenakis Fuel Handler Operations Support (Licensed) J. Lyons Fuel Handler Operations Support (NLO) T. Keating Fuel Handler Operations Support (Licensed)
Thimble Plug Assembly UFSAR


Attachment 1 Contractors J. Sheffield Transnuclear R. Simonich EMS Solutions P. Gillespie Health Physics Technician, Bartlett Attachment 1 INSPECTION PROCEDURES USED 60854.1 Pre-operational Testing of Independent Spent Fuel Storage Installations at Operating Plants 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants
Updated Final Safety Analysis Report VDS


LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED Opened None. Closed None.
Vacuum Drying System VPI


Discussed None.
Vibration Suppression Insert wt. % U-235


Attachment 1 LIST OF ACRONYMS USED ANSI American National Standards Institute ASME American Society of Mechanical Engineers BPRA Burnable Poison Rod Assembly CFR Code of Federal Regulations CoC Certificate of Compliance dpm Disintegrations Per Minute EAL Emergency Action Level EPIP Emergency Plan Implementing Procedure gpm Gallons per minute GWD/MTU Gigawatt Days per Metric Ton Uranium HSM Horizontal Storage Module ISFSI Independent Spent Fuel Storage Installation ISI In-Service Inspection JPM Job Performance Measure kW Kilowatt msl Mean Sea Level NFAH Non Fuel Assembly Hardware NRC Nuclear Regulatory Commission ppm Parts Per Million psf Pounds Per Square Foot psi Pounds Per Square Inch QA Quality Assurance SAR Safety Analysis Report SAT Systematic Approach to Training SER Safety Evaluation Report SNCR Supplier Non-Conformance Report SSE Safe Shutdown Earthquake SSI Soil Structure Interaction TEDE Total Effective Dose Equivalent TRB Training Review Board TPA Thimble Plug Assembly UFSAR Updated Final Safety Analysis Report VDS Vacuum Drying System VPI Vibration Suppression Insert wt. % U-235 Weight Percent Uranium 235
Weight Percent Uranium 235
}}
}}

Latest revision as of 17:21, 14 January 2025

IR 05000338-08-007; 05000339-08-007; and 07200056-08-001 on 02/18 Through 02/21/08 for North Anna, Units 1 and 2
ML080980139
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/01/2008
From: Vias S
Division Reactor Projects II
To: Christian D
Virginia Electric & Power Co (VEPCO)
Shared Package
ML080980136 List:
References
IR-08-001, IR-08-007
Download: ML080980139 (13)


Text

April 1, 2008

SUBJECT:

NORTH ANNA POWER STATION - INSPECTION REPORT NOS.

050-00338/08-007; 050-00339/08-007; AND 072-00056/08-001

Dear Mr. Christian:

This inspection report covers an inspection made by the United States Nuclear Regulatory Commission (NRC) at your North Anna Power Station Independent Spent Fuel Storage Installation (ISFSI) on February 18-21, 2008. The purpose of the inspection was to evaluate the North Anna Power Station readiness to load spent fuel from wet storage in the spent fuel pool to dry storage at the ISFSI. The enclosed inspection report documents the results of the inspection, which were discussed on February 21, 2008 with Mr. Dan Stoddard and other members of your staff. There were no violations or findings of significance.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its attachments, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic reading Room).

Sincerely,

/RA/

Steven J. Vias, Chief

Technical Support Branch

Division of Reactor Projects

Docket Nos.: 50-338; 50-339;72-056 License Nos.: NPF-4; NPF-7

Enclosure:

North Anna Power Station - Independent Spent Fuel Storage Installation (ISFSI)

Pre-Operational Inspection Report

w/Attachments: 1. Supplemental Information

2. Inspector Notes

_________________________

OFFICE RIV:DNMS:RSFS HQ:DNMS:SFST HQ:DNMS:SFST HQ:DNMS:SFST C:TSB/DRP

SIGNATURE SPA ECL MMS JJP SJV

NAME SPAtwater EC Love MMSampson JJPearson SJVias

DATE 03/31/2008 03/27/2008 03/24/2008 03/24/2008 04/01/2008

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

VEPCO

REGION IV==

Docket Nos.:

50-338, 50-339,72-056

License:

NPF-4, NPF-7 Report No:

050-00338/08-007; 050-00339/08-007; and 072-00056/08-001

Licensee:

Virginia Electric and Power Company (VEPCO)

Facility:

North Anna Power Station, Units 1 & 2

Location:

1024 Haley Drive Mineral, VA 23117

Dates:

February 18 through 21, 2008

Inspectors:

Scott Atwater

Region IV DNMS Inspector - Team Leader James Pearson

SFST Senior Safety Inspector Earl Love

SFST Safety Inspector Michelle Sampson

SFST Safety Inspector

Approved By:

Steven Vias, Chief Technical Support Branch 7 Division of Reactor Projects

Attachments:

1. Supplemental Information 2. Inspector Notes

Enclosure

EXECUTIVE SUMMARY

North Anna Power Station NRC Inspection Report 050-00338/08-007; 050-00339/08-007; and 072-00056/08-001

Virginia Electric and Power Company (VEPCO) had selected the NUHOMS-HD Horizontal Modular Storage System for dry storage of spent nuclear fuel at the North Anna Power Station.

The Nuclear Regulatory Commission (NRC) had certified the NUHOMS-HD cask system for storage of irradiated fuel under Certificate of Compliance No. 72-1030 on January 10, 2007.

On February 18-21, 2008, a team of four inspectors performed two evaluations. The first evaluation was to determine if the ISFSI personnel had been trained, the equipment had been tested, and the procedures had been developed to the extent necessary to safely load spent fuel into dry storage at the ISFSI. The second evaluation was to determine if the North Anna Power Station programs were adequate for continued maintenance and operation of the ISFSI once it was loaded. The results of these two evaluations were discussed during an exit meeting on February 21, 2008 with Mr. Dan Stoddard and other members of the staff.

The following provides a summary of the results of the inspection. Details are provided in the Inspector Notes contained in Attachment 2 to this report.

Spent Fuel Cask Crane

$ The crane design features for load control were intact, operable, and properly rated for the application. The design features evaluated included the hoist brakes, trolley brakes, and hoist wire rope rating (Attachment 2, Crane Design, Pages 1-2).

$ The crane bridge and trolley, hoists, hooks, and wire ropes were inspected and maintained in accordance with the American Society of Mechanical Engineers (ASME) Code and the crane manufacturers instructions (Attachment 2, Crane Inspection/Maintenance, Pages 2-5).

$ The crane was operated, and the crane operators were qualified, in accordance with the requirements of the ASME code (Attachment 2, Crane Operation, Pages 6-7).

Canister Drying and Helium Backfill Operations

$ The canister was vacuum dried and backfilled with helium to the pressures specified by technical specifications. The technical specification time limits for drying and backfilling operations were accurately incorporated into the procedures (Attachment 2, Drying/Helium Backfill, Pages 7-9).

Emergency Planning

$ The Emergency Plan had been expanded to include the ISFSI. Emergency Action Levels (EALs) had been developed for accidents involving the ISFSI (Attachment 2, Emergency Planning, Pages 9-10).

Enclosure

Fire Protection

$ The Fire Protection Plan had been expanded to include the ISFSI. Emergency response training had been provided for off-site responders (Attachment 2, Fire Protection, Pages 10-11).

Fuel Selection and Verification

$ The spent fuel assemblies selected for loading met the technical specification requirements for assembly type, decay heat load, and physical design characteristics (Attachment 2, Fuel Selection/Verification, Pages 11-14).

$ A canister loading plan had been developed based on the combination of spent fuel assembly enrichment, burnup, cooling time and decay heat. The loading plan met technical specification requirements (Attachment 2, Fuel Selection/Verification, Pages 11-14).

$ The non-fuel assembly hardware (NFAH) selected for loading met the technical specification requirements for burnup and cooling times (Attachment 2, Fuel Selection/Verification, Pages 11-14).

$ The technical specification actions required for spent fuel mis-loading had been incorporated into the loading procedure (Attachment 2, Fuel Selection/Verification, Pages 11-14).

General License Conditions

$ The NUHOMS-HD cask design was compatible with the North Anna Power Station 10 CFR Part 50 requirements. There were no items identified that required NRC review or approval prior to use of the cask system (Attachment 2, General License, Pages 14-20).

$ The licensee had calculated the dose to the public at the site boundary from a worst case accident during ISFSI operations. The dose was within the limits allowed by 10 CFR 72.106 (Attachment 2, General License, Pages 14-20).

$ The licensee had calculated the dose to the public at the site boundary from normal ISFSI operations. The dose was within the limits allowed by 10 CFR 72.104 (Attachment 2, General License, Pages 14-20).

$ The soil structure under the ISFSI pad was evaluated and was not subject to liquefaction during a Safe Shutdown Earthquake (Attachment 2, General License, Pages 14-20).

$ The Horizontal Storage Modules (HSMs) were placed on the ISFSI pad in an array that was consistent with the technical specifications (Attachment 2, General License, Pages 14-20).

$ The NUHOMS-HD cask system design parameters were bounded by the North Anna Power Station reactor site parameters (Attachment 2, General License, Pages 14-20).

Enclosure

Heavy Loads and Rigging

$ A safe load path had been established for transfer cask movements, meeting the requirements of NUREG 0612 (Attachment 2, Heavy Loads and Rigging, Pages 20-21).

$ The loading procedure required an engineering analysis of the transfer cask and canister following any cask drop greater than 15 inches. The analysis was required by technical specifications to ensure the canister and transfer cask were still capable of performing their design functions of confinement and shielding (Attachment 2, Heavy Loads and Rigging, Pages 20-21).

$ Transfer cask lifting height restrictions had been established to ensure that a drop would not result in dose rates at the site boundary in excess of the 10 CFR Part 100 limits. These lifting heights were consistently monitored and adhered to during the inspection (Attachment 2, Heavy Loads and Rigging, Pages 20-21).

Procedures and Technical Specifications

$ Procedures were established to ensure that the NUHOMS-HD cask storage system technical specification requirements for inspection, operation and surveillance were implemented (Attachment 2, Procedures and Tech Specs, Pages 22-24).

Quality Assurance

$ The licensee had applied their 10 CFR Part 50 Quality Assurance Program to the ISFSI.

Measures had been established to ensure that purchased material, equipment and services conformed to procurement documents (Attachment 2, Quality Assurance, Pages 24-25).

Radiation Protection

$ The canister unloading procedure contained provisions to minimize radiation exposure to workers, and radiological releases to the environment, during canister gas sampling (Attachment 2, Radiation Protection, Pages 25-28).

$ The canister unloading procedure minimized the potential for overpressurizing the canister during reflooding. During the inspection, the Vacuum Drying System (VDS) was operated to confirm its capability to control the reflooding flow rate to less than 4.0 gpm, as described in the NUHOMS FSAR (Attachment 2, Radiation Protection, Pages 25-28).

$ The canister loading procedure required a contamination survey of the area below the transfer cask annulus seal, in order to evaluate the seals effectiveness. Radiation Protection personnel performed this survey during the inspection (Attachment 2, Radiation Protection, Pages 25-28).

$ Criticality prevention and monitoring during cask loading was implemented. The minimum spent fuel pool boron concentration required by Technical Specifications was established.

Criticality monitoring and alarm systems were installed in all areas where spent fuel was handled (Attachment 2, Radiation Protection, Pages 25-28).

Enclosure

Records

$ The licensee was maintaining a current copy of the 10 CFR 72.212 Evaluation Report, Certificate of Compliance, and related documents as required by 10 CFR 72.212 (Attachment 2, Records, Page 28).

$ The licensee had made the required 90 day notification to the NRC prior to loading their first cask, as required by 10 CFR 72.212 (Attachment 2, Records, Page 28).

Special Lifting Devices

$ The licensee had incorporated all dry fuel storage special lifting devices into their 10-year In-Service Inspection (ISI) program in order to ensure continuing compliance with the ANSI standard and license commitments (Attachment 2, Special Lifting Devices, Pages 29-30).

$ The transfer cask trunnions had been load tested by the fabricator to the minimum weight required by the American National Standards Institute (ANSI) standard. The load testing had been followed by non-destructive testing and no anomalies were identified (Attachment 2, Special Lifting Devices, Pages 29-30).

$ The licensee had established procedures to ensure that all dry fuel storage special lifting devices were inspected prior to use (Attachment 2, Special Lifting Devices, Pages 29-30).

Training

$ The training program for ISFSI certification was developed using the Systematic Approach To Training (SAT) process. The knowledge requirements for each task were identified and incorporated into the classroom training. The skill requirements for each task were identified and incorporated into Job Performance Measures (JPMs). The training program was approved by the North Anna Supervisor, Operations Support (Attachment 2, Training, Pages 30-33).

$ The NUHOMS-HD vendor (AREVA) and the Vacuum Drying System vendor (EMS Solutions)

provided training to the North Anna Power Station ISFSI personnel. North Anna had reviewed and accepted the vendor training under their NRC approved 10 CFR Part 50 Training Program. Only those personnel who had completed all phases of the training were certified to operate the ISFSI equipment and systems (Attachment 2, Training, Pages 30-33).

$ The ISFSI field training was provided during the system checks and the dry run training exercises. The operations that were trained met the requirements of the Certificate of Compliance (Attachment 2, Training, Pages 30-33).

Attachment 1 Attachment 1 Supplemental Information

LIST OF PERSONS CONTACTED

North Anna Power Station Personnel

M. Bradley

Supervisor, Health Physics K. Breeden

Health Physics Technician B. Campbell

Fuel Handler Operations Support (NLO)

B. Carlin

Fuel Handler Operations Support (NLO)

B. Carr

Fuel Handler Operations Support (NLO)

B. Carroll

Engineering Project Manager for ISFSI S. Clements

Fuel Handler Operations Support (Licensed)

B. Copeland System Engineer D. Donovan

Health Physics Technician R. Evans, Jr.

Manager, Radiation Protection and Chemistry T. Huber

Director, Nuclear Engineering P. Kemp

Supervisor, Licensing N. Lane

Plant Manager G. Lear

Manager, Organizational Effectiveness J. Leberstien Licensing Engineer B. Miller

Health Physicist II, Radiation Protection F. Mladen

Director Safety and Licensing F. Motley

Senior Quality Specialist III H. Myers

Training Specialist R. Scanlan

Manager, Nuclear Oversight Department J. Slattery

Supervisor, Operations Support B. Speckine Supervisor, Fuel Handling D. Stoddard

Site Vice President

Corporate Personnel

T. Brookmire Supervisor, Nuclear Spent Fuel B. Wakeman Engineer III, Nuclear Spent Fuel Engineer K. Wietharn Engineer III, Nuclear Spent Fuel Engineer C. Zalesiak

Engineer III, Corporate Civil Engineering

Surry Power Station Personnel

A. Ewell

Supervisor, Fuel Handling T. Xenakis

Fuel Handler Operations Support (Licensed)

J. Lyons

Fuel Handler Operations Support (NLO)

T. Keating

Fuel Handler Operations Support (Licensed)

Attachment 1 Contractors

J. Sheffield

Transnuclear R. Simonich

EMS Solutions P. Gillespie

Health Physics Technician, Bartlett

Attachment 1 INSPECTION PROCEDURES USED

60854.1 Pre-operational Testing of Independent Spent Fuel Storage Installations at Operating Plants

60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened

None.

Closed

None.

Discussed

None.

Attachment 1 LIST OF ACRONYMS USED

ANSI

American National Standards Institute ASME

American Society of Mechanical Engineers BPRA

Burnable Poison Rod Assembly CFR

Code of Federal Regulations CoC

Certificate of Compliance dpm

Disintegrations Per Minute EAL

Emergency Action Level EPIP

Emergency Plan Implementing Procedure gpm

Gallons per minute GWD/MTU

Gigawatt Days per Metric Ton Uranium HSM

Horizontal Storage Module ISFSI

Independent Spent Fuel Storage Installation ISI

In-Service Inspection JPM

Job Performance Measure kW

Kilowatt msl

Mean Sea Level NFAH

Non Fuel Assembly Hardware NRC

Nuclear Regulatory Commission ppm

Parts Per Million psf

Pounds Per Square Foot psi

Pounds Per Square Inch QA

Quality Assurance SAR

Safety Analysis Report SAT

Systematic Approach to Training SER

Safety Evaluation Report SNCR

Supplier Non-Conformance Report SSE

Safe Shutdown Earthquake SSI

Soil Structure Interaction TEDE

Total Effective Dose Equivalent TRB

Training Review Board TPA

Thimble Plug Assembly UFSAR

Updated Final Safety Analysis Report VDS

Vacuum Drying System VPI

Vibration Suppression Insert wt. % U-235

Weight Percent Uranium 235