{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:April 21, 2008  
                                  NU CLE AR RE GU LATOR Y C O M M I S S I O N
                                                      R EGI ON I V
                                          611 R YAN PLAZA D R IV E, SU ITE 400
                                            AR LI N GTON , TEXAS 76011-4005
D. J. Bannister  
                                                April 21, 2008
Vice President and CNO  
D. J. Bannister
Omaha Public Power District  
Vice President and CNO
Fort Calhoun Station FC-2-4 Adm.  
Omaha Public Power District
P.O. Box 550  
Fort Calhoun Station FC-2-4 Adm.
Fort Calhoun, NE 68023-0550  
P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT:  
SUBJECT:         FORT CALHOUN STATION - NOTIFICATION OF AN NRC TRIENNIAL FIRE
FORT CALHOUN STATION - NOTIFICATION OF AN NRC TRIENNIAL FIRE  
                PROTECTION BASELINE INSPECTION 05000285/2008006
PROTECTION BASELINE INSPECTION 05000285/2008006  
Dear Mr. Bannister:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
Dear Mr. Bannister:  
Region IV staff will conduct a triennial fire protection baseline inspection at your Fort Calhoun
Station in July and August of 2008. The inspection team will be comprised of reactor inspectors
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),  
from the NRC Region IV office and a contractor. The team will conduct the inspection in
Region IV staff will conduct a triennial fire protection baseline inspection at your Fort Calhoun  
accordance with the baseline Inspection Procedure 71111.05T, "Fire Protection (Triennial)."
Station in July and August of 2008. The inspection team will be comprised of reactor inspectors  
The schedule for the inspection is as follows:
from the NRC Region IV office and a contractor. The team will conduct the inspection in  
        *       Information gathering visit: July 8-10, 2008
accordance with the baseline Inspection Procedure 71111.05T, "Fire Protection (Triennial)."
        *       Onsite inspection:               July 28-August 1, 2008
                                                  August 11-15, 2008
The schedule for the inspection is as follows:  
The team will visit the Fort Calhoun Station on July 8-10, 2008, to gather information, select the
fire areas for evaluation, identify documents needed to support the inspection, obtain
*  
unescorted access, and to become familiar with your fire protection program. The enclosure to
Information gathering visit: July 8-10, 2008  
this letter provides an initial list of the documents the team will want to review. The team leader
*  
will request that you transmit copies of some of the documents to the NRC Region IV office for
Onsite inspection:  
team use in preparation for the inspection. We would appreciate it if you could send this
July 28-August 1, 2008  
information so that it will arrive in our office in Arlington, Texas, by the dates listed in the
enclosure.
We request that during the onsite inspection weeks, you ensure that copies of analyses,
evaluations, or documentation regarding the implementation and maintenance of the fire
August 11-15, 2008  
protection program, including post-fire safe shutdown capability, be readily accessible to the
team for their review. Of specific interest are those documents that establish that your fire
The team will visit the Fort Calhoun Station on July 8-10, 2008, to gather information, select the  
protection program satisfies NRC regulatory requirements and conforms to applicable NRC and
fire areas for evaluation, identify documents needed to support the inspection, obtain  
unescorted access, and to become familiar with your fire protection program. The enclosure to  
this letter provides an initial list of the documents the team will want to review. The team leader  
will request that you transmit copies of some of the documents to the NRC Region IV office for  
team use in preparation for the inspection. We would appreciate it if you could send this  
information so that it will arrive in our office in Arlington, Texas, by the dates listed in the  
enclosure.  
We request that during the onsite inspection weeks, you ensure that copies of analyses,  
evaluations, or documentation regarding the implementation and maintenance of the fire  
protection program, including post-fire safe shutdown capability, be readily accessible to the  
team for their review. Of specific interest are those documents that establish that your fire  
protection program satisfies NRC regulatory requirements and conforms to applicable NRC and  
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON  I V
611 RYAN PLAZA DRIV E, SUITE 400
ARLINGTON, TEXAS 76011-4005


Omaha Public Power District                 -2-
Omaha Public Power District  
industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) plant
- 2 -  
systems required to achieve and maintain safe shutdown conditions from inside and outside the
control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant
fire protection systems, and (4) the fire protection program and its implementation should be
industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) plant  
available to support the team at the site during the inspection.
systems required to achieve and maintain safe shutdown conditions from inside and outside the  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant  
enclosure will be available electronically for public inspection in the NRC Public Document
fire protection systems, and (4) the fire protection program and its implementation should be  
Room or from the Publicly Available Records (PARS) component of NRCs document system
available to support the team at the site during the inspection.  
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its  
Your cooperation and support during this inspection will be appreciated. If you have questions
enclosure will be available electronically for public inspection in the NRC Public Document  
concerning this inspection or the inspection team's information or logistical needs, please
Room or from the Publicly Available Records (PARS) component of NRCs document system  
contact Greg Pick at 817-860-8270.
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
                                              Sincerely,
rm/adams.html (the Public Electronic Reading Room).  
                                                /RA/
                                              Linda J. Smith, Chief
Your cooperation and support during this inspection will be appreciated. If you have questions  
                                              Engineering Branch 2
concerning this inspection or the inspection team's information or logistical needs, please  
                                              Division of Reactor Safety
contact Greg Pick at 817-860-8270.  
Docket: 50-285
License: DPR-40
Enclosure: Triennial Fire Protection
   Inspection Supporting Documentation
cc:
Joe l. McManis,
Manager - Nuclear Licensing
Omaha Public Power District
Sincerely,
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550
/RA/  
Fort Calhoun, NE 68023-0550
Winston & Strawn
Attn: James R. Curtiss
1700 K Street NW
Washington, DC 20006-3817
Chairman
Washington County Board of Supervisors
P.O. Box 466
Linda J. Smith, Chief  
Blair, NE 68008
Engineering Branch 2  
Division of Reactor Safety  
Docket:   50-285  
License: DPR-40  
Enclosure: Triennial Fire Protection
   Inspection Supporting Documentation  
cc:  
Joe l. McManis,
Manager - Nuclear Licensing  
Omaha Public Power District  
Fort Calhoun Station FC-2-4 Adm.  
P.O. Box 550  
Fort Calhoun, NE 68023-0550  
Winston & Strawn  
Attn: James R. Curtiss  
1700 K Street NW  
Washington, DC 20006-3817  
Chairman  
Washington County Board of Supervisors  
P.O. Box 466  
Blair, NE 68008  


Omaha Public Power District           -3-
Omaha Public Power District  
Julia Schmitt, Manager
- 3 -  
Radiation Control Program
Nebraska Health & Human Services
Julia Schmitt, Manager  
Dept. of Regulation & Licensing
Radiation Control Program  
Division of Public Health Assurance
Nebraska Health & Human Services  
301 Centennial Mall, South
Dept. of Regulation & Licensing  
P.O. Box 95007
Division of Public Health Assurance  
Lincoln, NE 68509-5007
301 Centennial Mall, South  
Melanie Rasmussen
P.O. Box 95007  
Bureau of Radiological Health
Lincoln, NE 68509-5007  
Iowa Department of Public Health
Lucas State Office Building, 5th Floor
Melanie Rasmussen  
321 East 12th Street
Bureau of Radiological Health  
Des Moines, IA 50319
Iowa Department of Public Health  
Ronald L. McCabe, Chief
Lucas State Office Building, 5th Floor  
Technological Hazards Branch
321 East 12th Street  
National Preparedness Division
Des Moines, IA 50319  
DHS/FEMA
9221 Ward Parkway
Ronald L. McCabe, Chief  
Suite 300
Technological Hazards Branch  
Kansas City, MO 64114-3372
National Preparedness Division  
DHS/FEMA  
9221 Ward Parkway  
Suite 300  
Kansas City, MO 64114-3372  


Omaha Public Power District             -4-
Omaha Public Power District  
Electronic distribution by RIV:
- 4 -  
Regional Administrator (Elmo.Collins@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
Electronic distribution by RIV:  
DRS Director (Roy.Caniano@nrc.gov)
Regional Administrator (Elmo.Collins@nrc.gov)  
DRS Deputy Director (Troy.Pruett@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)  
Senior Resident Inspector (John.Hanna@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)  
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)  
Senior Project Engineer, DRP/E (George.Replogle@nrc.gov)
Senior Resident Inspector (John.Hanna@nrc.gov)  
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)
Senior Project Engineer, DRP/E (George.Replogle@nrc.gov)  
SUNSI Review Completed: _GAP__ADAMS: X Yes                 Initials: __GAP____
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)  
X Publicly Available           X Non-Sensitive
RITS Coordinator (Marisa.Herrera@nrc.gov)  
S:\DRS\REPORTS\FC2008006-GAP                               ML081120496
SRI:DRS/EB2         C: EB2
GAP/tek             LJSmith
04/   /08           04/   /08
OFFICIAL RECORD COPY T=Telephone               E=E-mail F=Fax
SUNSI Review Completed: _GAP__ ADAMS: X Yes  
            Initials: __GAP____
X   Publicly Available      
X   Non-Sensitive  
S:\\DRS\\REPORTS\\FC2008006-GAP  
ML081120496  
SRI:DRS/EB2  
C: EB2  
GAP/tek  
LJSmith  
04/     /08  
04/     /08  
OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax  


                                            ENCLOSURE
                Triennial Fire Protection Inspection Documentation Requested
ENCLOSURE  
Please provide the following documentation prior to the onsite information-gathering trip,
preferably no later than June 23, 2008. Where practical, please provide copies electronically.
1.       The current version of your fire protection program and fire hazards analysis.
Triennial Fire Protection Inspection Documentation Requested  
2.       Post-fire safe shutdown analysis and the supporting calculations that demonstrate
        acceptable plant response.
3.       Copies of the licensing basis documents for fire protection (Safety Evaluation Reports,
Please provide the following documentation prior to the onsite information-gathering trip,  
        pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters
preferably no later than June 23, 2008. Where practical, please provide copies electronically.
        to/from the NRC regarding fire protection/fire safe shutdown, etc.).
4.       The Fire PRA or portions of the plants IPEEE addressing fire events.
1.  
Please provide the following documentation during the information-gathering visit or by
The current version of your fire protection program and fire hazards analysis.  
July 18, 2008, in order to support inspection preparation. Where practical, please provide
copies electronically. However, drawings should be provided as paper copies of sufficient size
2.  
that all details are legible.
Post-fire safe shutdown analysis and the supporting calculations that demonstrate  
5.       Fire protection program implementing procedures (e.g., administrative controls, operator
acceptable plant response.
        response procedures for fires, fire fighting procedures, etc.).
6.       Operating procedures used for achieving and maintaining hot and cold shutdown
3.  
        conditions from the control room in the event of a fire outside the control room (III.G.2
Copies of the licensing basis documents for fire protection (Safety Evaluation Reports,  
        areas).
pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters  
7.       Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)
to/from the NRC regarding fire protection/fire safe shutdown, etc.).  
        capability with or without control room evacuation.
8.       Pre-fire plans for the selected fire areas (areas to be selected by the team during the
4.  
        information-gathering trip).
The Fire PRA or portions of the plants IPEEE addressing fire events.  
9.       A list of equipment used to achieve and maintain hot standby and cold shutdowns in the
        event of a fire (safe shutdown equipment lists).
Please provide the following documentation during the information-gathering visit or by  
10.     Piping and instrumentation (flow) diagrams showing the components used to achieve
July 18, 2008, in order to support inspection preparation. Where practical, please provide  
        and maintain hot standby and cold shutdowns for fires outside the control room and
copies electronically. However, drawings should be provided as paper copies of sufficient size  
        those components used for those areas requiring alternative shutdown capability. Two
that all details are legible.
        copies of the piping and instrumentation (flow) diagrams for these systems of a size
        sufficient to read all details. These should include the systems used for RCS makeup,
5.  
        RCS pressure control, decay heat removal, and reactivity control, including the essential
Fire protection program implementing procedures (e.g., administrative controls, operator  
        support systems.
response procedures for fires, fire fighting procedures, etc.).  
6.  
Operating procedures used for achieving and maintaining hot and cold shutdown  
conditions from the control room in the event of a fire outside the control room (III.G.2  
areas).  
7.  
Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)  
capability with or without control room evacuation.  
8.  
Pre-fire plans for the selected fire areas (areas to be selected by the team during the  
information-gathering trip).
9.  
A list of equipment used to achieve and maintain hot standby and cold shutdowns in the  
event of a fire (safe shutdown equipment lists).  
10.  
Piping and instrumentation (flow) diagrams showing the components used to achieve  
and maintain hot standby and cold shutdowns for fires outside the control room and  
those components used for those areas requiring alternative shutdown capability. Two  
copies of the piping and instrumentation (flow) diagrams for these systems of a size  
sufficient to read all details. These should include the systems used for RCS makeup,  
RCS pressure control, decay heat removal, and reactivity control, including the essential  
support systems.  


11. Plant layout and equipment drawings for the selected fire areas that identify (a) the
    physical plant locations of major hot standby and cold shutdown equipment; (b) plant fire
11.  
    area and/or fire zone delineation; and (c) the locations of fire protection equipment, such
Plant layout and equipment drawings for the selected fire areas that identify (a) the  
    as detection, suppression, and post-fire emergency lighting units, and (d) fire area
physical plant locations of major hot standby and cold shutdown equipment; (b) plant fire  
    boundaries.
area and/or fire zone delineation; and (c) the locations of fire protection equipment, such  
12. A listing of design change packages, which were determined to impact fire protection
as detection, suppression, and post-fire emergency lighting units, and (d) fire area  
    and post-fire safe shutdowns, performed in the last 3 years.
boundaries.
13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.
14. A listing of open and closed corrective action documents initiated in the last 3 years,
12.  
    which relate to the fire protection program or equipment. Include corrective action
A listing of design change packages, which were determined to impact fire protection  
    document number, date, and subject.
and post-fire safe shutdowns, performed in the last 3 years.  
15. A listing of the applicable codes and standards (with the versions) related to the design
    of plant fire protection features and evaluations of any code deviations.
13.  
16. Drawings of the portions of the emergency lighting system which support fire response.
Copies of Generic Letter 86-10 evaluations performed in the last 3 years.  
17. Procedures used to remove smoke from safety-related areas and the engineering
    studies or calculations which support the design basis.
14.  
18. Drawings of communication systems credited in the license basis for firefighting and
A listing of open and closed corrective action documents initiated in the last 3 years,  
    plant operations during fires where control room is occupied and/or evacuated.
which relate to the fire protection program or equipment. Include corrective action  
19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
document number, date, and subject.  
20. A listing of maintenance and surveillance testing procedures for alternative shutdown
    capability and fire barriers, detectors, pumps and suppression systems.
15.  
21. Maintenance Rule performance criteria and a summary of the last 3 years performance
A listing of the applicable codes and standards (with the versions) related to the design  
    history for fire protection program systems or functions monitored within the
of plant fire protection features and evaluations of any code deviations.  
    Maintenance Rule program.
22. A copy of fire protection program requirements (e.g. limiting conditions for operation,
16.  
    surveillance test requirements) covered by Technical Specifications, Technical
Drawings of the portions of the emergency lighting system which support fire response.
    Requirements Manual, UFSAR, or similar documents.
23. Copies of internal and external self-assessments, audits, peer-assessments or similar
17.  
    reviews related to post-fire safe shutdown capability or the fire protection program
Procedures used to remove smoke from safety-related areas and the engineering  
    completed since July 1, 2005.
studies or calculations which support the design basis.  
24. A list of manual actions taken outside the control room which are credited to mitigate the
    consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should
18.  
    group actions by the initiating fire area or zone and indicate where the action must take
Drawings of communication systems credited in the license basis for firefighting and  
    place.
plant operations during fires where control room is occupied and/or evacuated.  
25. Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design
    basis documents that describe the purpose/function/operating characteristics of the safe
19.  
Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.  
20.  
A listing of maintenance and surveillance testing procedures for alternative shutdown  
capability and fire barriers, detectors, pumps and suppression systems.  
21.  
Maintenance Rule performance criteria and a summary of the last 3 years performance  
history for fire protection program systems or functions monitored within the  
Maintenance Rule program.  
22.  
A copy of fire protection program requirements (e.g. limiting conditions for operation,  
surveillance test requirements) covered by Technical Specifications, Technical  
Requirements Manual, UFSAR, or similar documents.  
23.  
Copies of internal and external self-assessments, audits, peer-assessments or similar  
reviews related to post-fire safe shutdown capability or the fire protection program  
completed since July 1, 2005.  
24.  
A list of manual actions taken outside the control room which are credited to mitigate the  
consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should  
group actions by the initiating fire area or zone and indicate where the action must take  
place.  
25.  
Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design  
basis documents that describe the purpose/function/operating characteristics of the safe  


    shutdown systems (RCS makeup, RCS pressure control, decay heat removal, and
    reactivity control, including the essential support systems).
shutdown systems (RCS makeup, RCS pressure control, decay heat removal, and  
26. Two copies of one-line diagrams of the electrical distribution system. These should
reactivity control, including the essential support systems).  
    depict how power gets from the switchyard to ESF loads (480V and 4160V). Also,
    include the vital DC distribution system one-line diagrams.
26.  
27. A list of automatic and manually initiated gaseous fire suppression systems in the plant,
Two copies of one-line diagrams of the electrical distribution system. These should  
    giving location and the key equipment being protected.
depict how power gets from the switchyard to ESF loads (480V and 4160V). Also,  
28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or
include the vital DC distribution system one-line diagrams.
    maintain hot shutdown and b) reach and/or maintain cold shutdown.
29. A list of high to low pressure interface valves.
27.  
30. A copy of procedures governing the training and operation of the fire brigade.
A list of automatic and manually initiated gaseous fire suppression systems in the plant,  
31. Organization charts of site personnel down to the level of fire protection staff personnel.
giving location and the key equipment being protected.  
32. A contact list of key site personnel who will be supporting this inspection, giving location
    of their office and phone number onsite.
28.  
33. The team would like to observe a fire brigade drill in the plant, if possible, during the
A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or  
    week of August 11, 2008. Please put us in contact with the appropriate personnel for
maintain hot shutdown and b) reach and/or maintain cold shutdown.  
    planning drills during the onsite information gathering trip.
34. The team would like to perform a walkthrough of the procedure for control room due to
29.  
    fire with qualified operators in the plant during the week of July 28, 2008. Please put us
A list of high to low pressure interface valves.  
    in contact with the appropriate personnel for planning the walkthrough during the onsite
    information gathering trip.
30.  
A copy of procedures governing the training and operation of the fire brigade.  
31.  
Organization charts of site personnel down to the level of fire protection staff personnel.  
32.  
A contact list of key site personnel who will be supporting this inspection, giving location  
of their office and phone number onsite.  
33.  
The team would like to observe a fire brigade drill in the plant, if possible, during the  
week of August 11, 2008. Please put us in contact with the appropriate personnel for  
planning drills during the onsite information gathering trip.  
34.  
The team would like to perform a walkthrough of the procedure for control room due to  
fire with qualified operators in the plant during the week of July 28, 2008. Please put us  
in contact with the appropriate personnel for planning the walkthrough during the onsite  
information gathering trip.
}}
}}

Latest revision as of 17:07, 14 January 2025

Notification of an NRC Triennial Fire Protection Baseline Inspection 05000285-08-006
ML081120496
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/21/2008
From: Laura Smith
NRC/RGN-IV/DRS/EB2
To: Bannister D
Omaha Public Power District
References
IR-08-006
Download: ML081120496 (7)


See also: IR 05000285/2008006

Text

April 21, 2008

D. J. Bannister

Vice President and CNO

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550

Fort Calhoun, NE 68023-0550

SUBJECT:

FORT CALHOUN STATION - NOTIFICATION OF AN NRC TRIENNIAL FIRE

PROTECTION BASELINE INSPECTION 05000285/2008006

Dear Mr. Bannister:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at your Fort Calhoun

Station in July and August of 2008. The inspection team will be comprised of reactor inspectors

from the NRC Region IV office and a contractor. The team will conduct the inspection in

accordance with the baseline Inspection Procedure 71111.05T, "Fire Protection (Triennial)."

The schedule for the inspection is as follows:

Information gathering visit: July 8-10, 2008

Onsite inspection:

July 28-August 1, 2008

August 11-15, 2008

The team will visit the Fort Calhoun Station on July 8-10, 2008, to gather information, select the

fire areas for evaluation, identify documents needed to support the inspection, obtain

unescorted access, and to become familiar with your fire protection program. The enclosure to

this letter provides an initial list of the documents the team will want to review. The team leader

will request that you transmit copies of some of the documents to the NRC Region IV office for

team use in preparation for the inspection. We would appreciate it if you could send this

information so that it will arrive in our office in Arlington, Texas, by the dates listed in the

enclosure.

We request that during the onsite inspection weeks, you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest are those documents that establish that your fire

protection program satisfies NRC regulatory requirements and conforms to applicable NRC and

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

611 RYAN PLAZA DRIV E, SUITE 400

ARLINGTON, TEXAS 76011-4005

Omaha Public Power District

- 2 -

industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) plant

systems required to achieve and maintain safe shutdown conditions from inside and outside the

control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant

fire protection systems, and (4) the fire protection program and its implementation should be

available to support the team at the site during the inspection.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection team's information or logistical needs, please

contact Greg Pick at 817-860-8270.

Sincerely,

/RA/

Linda J. Smith, Chief

Engineering Branch 2

Division of Reactor Safety

Docket: 50-285

License: DPR-40

Enclosure: Triennial Fire Protection

Inspection Supporting Documentation

cc:

Joe l. McManis,

Manager - Nuclear Licensing

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550

Fort Calhoun, NE 68023-0550

Winston & Strawn

Attn: James R. Curtiss

1700 K Street NW

Washington, DC 20006-3817

Chairman

Washington County Board of Supervisors

P.O. Box 466

Blair, NE 68008

Omaha Public Power District

- 3 -

Julia Schmitt, Manager

Radiation Control Program

Nebraska Health & Human Services

Dept. of Regulation & Licensing

Division of Public Health Assurance

301 Centennial Mall, South

P.O. Box 95007

Lincoln, NE 68509-5007

Melanie Rasmussen

Bureau of Radiological Health

Iowa Department of Public Health

Lucas State Office Building, 5th Floor

321 East 12th Street

Des Moines, IA 50319

Ronald L. McCabe, Chief

Technological Hazards Branch

National Preparedness Division

DHS/FEMA

9221 Ward Parkway

Suite 300

Kansas City, MO 64114-3372

Omaha Public Power District

- 4 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (John.Hanna@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (George.Replogle@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

SUNSI Review Completed: _GAP__ ADAMS: X Yes

Initials: __GAP____

X Publicly Available

X Non-Sensitive

S:\\DRS\\REPORTS\\FC2008006-GAP

ML081120496

SRI:DRS/EB2

C: EB2

GAP/tek

LJSmith

04/ /08

04/ /08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

ENCLOSURE

Triennial Fire Protection Inspection Documentation Requested

Please provide the following documentation prior to the onsite information-gathering trip,

preferably no later than June 23, 2008. Where practical, please provide copies electronically.

1.

The current version of your fire protection program and fire hazards analysis.

2.

Post-fire safe shutdown analysis and the supporting calculations that demonstrate

acceptable plant response.

3.

Copies of the licensing basis documents for fire protection (Safety Evaluation Reports,

pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters

to/from the NRC regarding fire protection/fire safe shutdown, etc.).

4.

The Fire PRA or portions of the plants IPEEE addressing fire events.

Please provide the following documentation during the information-gathering visit or by

July 18, 2008, in order to support inspection preparation. Where practical, please provide

copies electronically. However, drawings should be provided as paper copies of sufficient size

that all details are legible.

5.

Fire protection program implementing procedures (e.g., administrative controls, operator

response procedures for fires, fire fighting procedures, etc.).

6.

Operating procedures used for achieving and maintaining hot and cold shutdown

conditions from the control room in the event of a fire outside the control room (III.G.2

areas).

7.

Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)

capability with or without control room evacuation.

8.

Pre-fire plans for the selected fire areas (areas to be selected by the team during the

information-gathering trip).

9.

A list of equipment used to achieve and maintain hot standby and cold shutdowns in the

event of a fire (safe shutdown equipment lists).

10.

Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdowns for fires outside the control room and

those components used for those areas requiring alternative shutdown capability. Two

copies of the piping and instrumentation (flow) diagrams for these systems of a size

sufficient to read all details. These should include the systems used for RCS makeup,

RCS pressure control, decay heat removal, and reactivity control, including the essential

support systems.

11.

Plant layout and equipment drawings for the selected fire areas that identify (a) the

physical plant locations of major hot standby and cold shutdown equipment; (b) plant fire

area and/or fire zone delineation; and (c) the locations of fire protection equipment, such

as detection, suppression, and post-fire emergency lighting units, and (d) fire area

boundaries.

12.

A listing of design change packages, which were determined to impact fire protection

and post-fire safe shutdowns, performed in the last 3 years.

13.

Copies of Generic Letter 86-10 evaluations performed in the last 3 years.

14.

A listing of open and closed corrective action documents initiated in the last 3 years,

which relate to the fire protection program or equipment. Include corrective action

document number, date, and subject.

15.

A listing of the applicable codes and standards (with the versions) related to the design

of plant fire protection features and evaluations of any code deviations.

16.

Drawings of the portions of the emergency lighting system which support fire response.

17.

Procedures used to remove smoke from safety-related areas and the engineering

studies or calculations which support the design basis.

18.

Drawings of communication systems credited in the license basis for firefighting and

plant operations during fires where control room is occupied and/or evacuated.

19.

Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.

20.

A listing of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps and suppression systems.

21.

Maintenance Rule performance criteria and a summary of the last 3 years performance

history for fire protection program systems or functions monitored within the

Maintenance Rule program.

22.

A copy of fire protection program requirements (e.g. limiting conditions for operation,

surveillance test requirements) covered by Technical Specifications, Technical

Requirements Manual, UFSAR, or similar documents.

23.

Copies of internal and external self-assessments, audits, peer-assessments or similar

reviews related to post-fire safe shutdown capability or the fire protection program

completed since July 1, 2005.

24.

A list of manual actions taken outside the control room which are credited to mitigate the

consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should

group actions by the initiating fire area or zone and indicate where the action must take

place.

25.

Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design

basis documents that describe the purpose/function/operating characteristics of the safe

shutdown systems (RCS makeup, RCS pressure control, decay heat removal, and

reactivity control, including the essential support systems).

26.

Two copies of one-line diagrams of the electrical distribution system. These should

depict how power gets from the switchyard to ESF loads (480V and 4160V). Also,

include the vital DC distribution system one-line diagrams.

27.

A list of automatic and manually initiated gaseous fire suppression systems in the plant,

giving location and the key equipment being protected.

28.

A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or

maintain hot shutdown and b) reach and/or maintain cold shutdown.

29.

A list of high to low pressure interface valves.

30.

A copy of procedures governing the training and operation of the fire brigade.

31.

Organization charts of site personnel down to the level of fire protection staff personnel.

32.

A contact list of key site personnel who will be supporting this inspection, giving location

of their office and phone number onsite.

33.

The team would like to observe a fire brigade drill in the plant, if possible, during the

week of August 11, 2008. Please put us in contact with the appropriate personnel for

planning drills during the onsite information gathering trip.

34.

The team would like to perform a walkthrough of the procedure for control room due to

fire with qualified operators in the plant during the week of July 28, 2008. Please put us

in contact with the appropriate personnel for planning the walkthrough during the onsite

information gathering trip.