ML081280003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:May 9, 2008 Vice President, Operations Entergy Operations, Inc.
{{#Wiki_filter:May 9, 2008 Vice President, Operations Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093  


==SUBJECT:==
==SUBJECT:==
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REVIEW OF THE 180-DAY STEAM GENERATOR TUBE INSPECTION REPORT FOR THE 14TH REFUELING OUTAGE - (TAC NO. MD5950)
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REVIEW OF THE 180-DAY STEAM GENERATOR TUBE INSPECTION REPORT FOR THE 14TH REFUELING OUTAGE - (TAC NO. MD5950)  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
 
By {{letter dated|date=June 21, 2007|text=letter dated June 21, 2007}} ((Agencywide Documents Access and Management System (ADAMS) Accession No. ML071730476), Entergy Operations, Inc. (the licensee) submitted information, pursuant to Technical Specification (TS) 6.9.1.5, summarizing the scope, methods, and results of the Fall 2006 steam generator (SG) tube inspections (during Refueling Outage 14) at Waterford Steam Electric Station, Unit 3 (Waterford 3). Additional details of these inspections are documented in a conference call summary dated February 7, 2007 (ADAMS Accession No. ML070520209).
By letter dated June 21, 2007 ((Agencywide Documents Access and Management System (ADAMS) Accession No. ML071730476), Entergy Operations, Inc. (the licensee) submitted information, pursuant to Technical Specification (TS) 6.9.1.5, summarizing the scope, methods, and results of the Fall 2006 steam generator (SG) tube inspections (during Refueling Outage 14) at Waterford Steam Electric Station, Unit 3 (Waterford 3). Additional details of these inspections are documented in a conference call summary dated February 7, 2007 (ADAMS Accession No. ML070520209).
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensees June 21, 2007 report and concludes that the licensee provided the information required by their TS. The NRC staff review of this report did not identify any new technical issues that warrant follow-up action. The NRC staff will continue to monitor the licensees efforts to manage the damaged batwing supports and to ensure that no significant consequential damage of the SG tubing is occurring. The licensee met with the NRC staff on February 12, 2008 (ADAMS Accession No. ML080510251) to discuss the status of its batwing management program and their plans for inspecting the batwings and tubes during the spring 2008 refueling outage. In addition, the licensee will brief the NRC staff by phone on the inspection results when the results become available.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensees June 21, 2007 report and concludes that the licensee provided the information required by their TS. The NRC staff review of this report did not identify any new technical issues that warrant follow-up action. The NRC staff will continue to monitor the licensees efforts to manage the damaged batwing supports and to ensure that no significant consequential damage of the SG tubing is occurring. The licensee met with the NRC staff on February 12, 2008 (ADAMS Accession No. ML080510251) to discuss the status of its batwing management program and their plans for inspecting the batwings and tubes during the spring 2008 refueling outage. In addition, the licensee will brief the NRC staff by phone on the inspection results when the results become available.
Sincerely,
Sincerely,  
                                            /RA/
/RA/
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc w/encl: See next page
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc w/encl: See next page  


ML070520209).
ML070520209).
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensees June 21, 2007 report and concludes that the licensee provided the information required by their TS. The NRC staff review of this report did not identify any new technical issues that warrant follow-up action. The NRC staff will continue to monitor the licensees efforts to manage the damaged batwing supports and to ensure that no significant consequential damage of the SG tubing is occurring. The licensee met with the NRC staff on February 12, 2008 (ADAMS Accession No. ML080510251) to discuss the status of its batwing management program and their plans for inspecting the batwings and tubes during the spring 2008 refueling outage. In addition, the licensee will brief the NRC staff by phone on the inspection results when the results become available.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensees June 21, 2007 report and concludes that the licensee provided the information required by their TS. The NRC staff review of this report did not identify any new technical issues that warrant follow-up action. The NRC staff will continue to monitor the licensees efforts to manage the damaged batwing supports and to ensure that no significant consequential damage of the SG tubing is occurring. The licensee met with the NRC staff on February 12, 2008 (ADAMS Accession No. ML080510251) to discuss the status of its batwing management program and their plans for inspecting the batwings and tubes during the spring 2008 refueling outage. In addition, the licensee will brief the NRC staff by phone on the inspection results when the results become available.
Sincerely,
Sincerely,  
                                            /RA/
/RA/
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc w/encl: See next page DISTRIBUTION:
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc w/encl: See next page DISTRIBUTION:
PUBLIC                               LPLIV Reading               RidsNrrDorlDpr RidsNrrDorlLpl4                       RidsNrrPMNKalyanam           RidsNrrLAGLappert RidsOgcRp                             RidsRgn4MailCenter           RidsNrrDciCsgb JAdams, EDO RIV                       RidsAcrsAcnwMailCenter ADAMS Accession No. ML081280003                     *Concurrence via memorandum OFFICE         NRR/LPL4/PM       NRR/LPL4/LA         NRR/DCI/CSGB     NRR/LPL4/BC NAME           NKalyanam         GLappert           AHiser*           THiltz DATE           5/7/08             5/7/08             5/5/08           5/9/08 Waterford Steam Electric Station, Unit 3                               (2/25/08) cc:
PUBLIC LPLIV Reading RidsNrrDorlDpr RidsNrrDorlLpl4 RidsNrrPMNKalyanam RidsNrrLAGLappert RidsOgcRp RidsRgn4MailCenter RidsNrrDciCsgb JAdams, EDO RIV RidsAcrsAcnwMailCenter ADAMS Accession No. ML081280003  
Mr. Timothy Pflieger Senior Vice President                   Environmental Scientist - Supervisor Entergy Nuclear Operations               REP&R-CAP-SPOC P.O. Box 31995                           Louisiana Department of Environmental Jackson, MS 39286-1995                   Quality P.O. Box 4312 Vice President, Oversight                Baton Rouge, LA 70821-4312 Entergy Nuclear Operations P.O. Box 31995                           Parish President Council Jackson, MS 39286-1995                   St. Charles Parish P.O. Box 302 Senior Manager, Nuclear Safety          Hahnville, LA 70057
*Concurrence via memorandum OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DCI/CSGB NRR/LPL4/BC NAME NKalyanam GLappert AHiser*
& Licensing Entergy Nuclear Operations              Chairman P.O. Box 31995                          Louisiana Public Services Commission Jackson, MS 39286-1995                  P.O. Box 91154 Baton Rouge, LA 70825-1697 Senior Vice President
THiltz DATE 5/7/08 5/7/08 5/5/08 5/9/08  
  & Chief Operating Officer              Mr. Richard Penrod, Senior Environmental Entergy Operations, Inc.                  Scientist/State Liaison Officer P.O. Box 31995                          Office of Environmental Services Jackson, MS 39286-1995                  Northwestern State University Russell Hall, Room 201 Associate General Counsel                Natchitoches, LA 71497 Entergy Nuclear Operations P.O. Box 31995                          Resident Inspector Jackson, MS 39286-1995                  Waterford NPS P.O. Box 822 Manager, Licensing                      Killona, LA 70057-0751 Entergy Operations, Inc.
 
Waterford Steam Electric Station, Unit 3 Regional Administrator, Region IV 17265 River Road                        U.S. Nuclear Regulatory Commission Killona, LA 70057-3093                  611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011}}
Waterford Steam Electric Station, Unit 3 (2/25/08) cc:
Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Oversight Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Manager, Nuclear Safety
& Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President  
& Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093 Mr. Timothy Pflieger Environmental Scientist - Supervisor REP&R-CAP-SPOC Louisiana Department of Environmental Quality P.O. Box 4312 Baton Rouge, LA 70821-4312 Parish President Council St. Charles Parish P.O. Box 302 Hahnville, LA 70057 Chairman Louisiana Public Services Commission P.O. Box 91154 Baton Rouge, LA 70825-1697 Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497 Resident Inspector Waterford NPS P.O. Box 822 Killona, LA 70057-0751 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011}}

Latest revision as of 16:53, 14 January 2025

Review of the 180-Day Steam Generator Tube Inspection Report for the 14th Refueling Outage
ML081280003
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/09/2008
From: Kalyanam N
NRC/NRR/ADRO/DORL/LPLIV
To:
Entergy Operations
Kalyanam N, NRR/DORL/LPL4, 415-1480
References
TAC MD5950
Download: ML081280003 (3)


Text

May 9, 2008 Vice President, Operations Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REVIEW OF THE 180-DAY STEAM GENERATOR TUBE INSPECTION REPORT FOR THE 14TH REFUELING OUTAGE - (TAC NO. MD5950)

Dear Sir or Madam:

By letter dated June 21, 2007 ((Agencywide Documents Access and Management System (ADAMS) Accession No. ML071730476), Entergy Operations, Inc. (the licensee) submitted information, pursuant to Technical Specification (TS) 6.9.1.5, summarizing the scope, methods, and results of the Fall 2006 steam generator (SG) tube inspections (during Refueling Outage 14) at Waterford Steam Electric Station, Unit 3 (Waterford 3). Additional details of these inspections are documented in a conference call summary dated February 7, 2007 (ADAMS Accession No. ML070520209).

The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensees June 21, 2007 report and concludes that the licensee provided the information required by their TS. The NRC staff review of this report did not identify any new technical issues that warrant follow-up action. The NRC staff will continue to monitor the licensees efforts to manage the damaged batwing supports and to ensure that no significant consequential damage of the SG tubing is occurring. The licensee met with the NRC staff on February 12, 2008 (ADAMS Accession No. ML080510251) to discuss the status of its batwing management program and their plans for inspecting the batwings and tubes during the spring 2008 refueling outage. In addition, the licensee will brief the NRC staff by phone on the inspection results when the results become available.

Sincerely,

/RA/

N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc w/encl: See next page

ML070520209).

The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensees June 21, 2007 report and concludes that the licensee provided the information required by their TS. The NRC staff review of this report did not identify any new technical issues that warrant follow-up action. The NRC staff will continue to monitor the licensees efforts to manage the damaged batwing supports and to ensure that no significant consequential damage of the SG tubing is occurring. The licensee met with the NRC staff on February 12, 2008 (ADAMS Accession No. ML080510251) to discuss the status of its batwing management program and their plans for inspecting the batwings and tubes during the spring 2008 refueling outage. In addition, the licensee will brief the NRC staff by phone on the inspection results when the results become available.

Sincerely,

/RA/

N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc w/encl: See next page DISTRIBUTION:

PUBLIC LPLIV Reading RidsNrrDorlDpr RidsNrrDorlLpl4 RidsNrrPMNKalyanam RidsNrrLAGLappert RidsOgcRp RidsRgn4MailCenter RidsNrrDciCsgb JAdams, EDO RIV RidsAcrsAcnwMailCenter ADAMS Accession No. ML081280003

  • Concurrence via memorandum OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DCI/CSGB NRR/LPL4/BC NAME NKalyanam GLappert AHiser*

THiltz DATE 5/7/08 5/7/08 5/5/08 5/9/08

Waterford Steam Electric Station, Unit 3 (2/25/08) cc:

Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Oversight Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Manager, Nuclear Safety

& Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President

& Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093 Mr. Timothy Pflieger Environmental Scientist - Supervisor REP&R-CAP-SPOC Louisiana Department of Environmental Quality P.O. Box 4312 Baton Rouge, LA 70821-4312 Parish President Council St. Charles Parish P.O. Box 302 Hahnville, LA 70057 Chairman Louisiana Public Services Commission P.O. Box 91154 Baton Rouge, LA 70825-1697 Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497 Resident Inspector Waterford NPS P.O. Box 822 Killona, LA 70057-0751 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011