| issue date = 09/03/2008 | | issue date = 09/03/2008 | ||
| title = IR 05000133-08-401, 072000072-08-401, on 08/12/2008, Humboldt Bay Power Plant - NRC Security Inspector | | title = IR 05000133-08-401, 072000072-08-401, on 08/12/2008, Humboldt Bay Power Plant - NRC Security Inspector | ||
| author name = Shannon M | | author name = Shannon M | ||
| author affiliation = NRC/RGN-IV/DRS/PSB | | author affiliation = NRC/RGN-IV/DRS/PSB | ||
| addressee name = Conway J | | addressee name = Conway J | ||
| addressee affiliation = Pacific Gas & Electric Co | | addressee affiliation = Pacific Gas & Electric Co | ||
| docket = 05000133, 07200027 | | docket = 05000133, 07200027 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:September 3, 2008 | ||
==SUBJECT:== | |||
HUMBOLDT BAY POWER PLANT - NRC SECURITY INSPECTION REPORT 05000133/2008401; 07200027/2008401 | |||
==Dear Mr. Conway:== | |||
On August 12, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Humboldt Bay Power Plant, Independent Spent Fuel Storage Installation. | |||
The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 12, 2008, with Mr. Loren Sharp, Director, Humboldt Bay Power Plant Nuclear, and other members of your staff. | |||
This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | |||
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
No findings of significance were identified. | No findings of significance were identified. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS. | ||
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. | |||
UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 Pacific Gas and Electric Company | |||
- 2 - In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). | |||
Sincerely, | |||
/RA/ | |||
Michael P. Shannon, Chief | |||
Plant Support Branch | |||
Division of Reactor Safety | |||
Docket No.: 50-133/72-027 License No.: DPR-7/SNM-2514 | |||
Enclosure: | |||
NRC Inspection Report 50-133/20008401; 72-027/20008401 | |||
cc w/enclosure: | |||
Donna Jacobs Vice President Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 | |||
J. Loren Sharp, Director and Plant Manager Humboldt Bay Nuclear 1000 King Salmon Avenue Eureka, CA 95505 | |||
}} | }} | ||
Latest revision as of 15:20, 14 January 2025
| ML082470762 | |
| Person / Time | |
|---|---|
| Site: | Humboldt Bay |
| Issue date: | 09/03/2008 |
| From: | Shannon M Plant Support Branch Region IV |
| To: | Conway J Pacific Gas & Electric Co |
| References | |
| IR-08-401 | |
| Download: ML082470762 (2) | |
Text
September 3, 2008
SUBJECT:
HUMBOLDT BAY POWER PLANT - NRC SECURITY INSPECTION REPORT 05000133/2008401; 07200027/2008401
Dear Mr. Conway:
On August 12, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Humboldt Bay Power Plant, Independent Spent Fuel Storage Installation.
The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 12, 2008, with Mr. Loren Sharp, Director, Humboldt Bay Power Plant Nuclear, and other members of your staff.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 Pacific Gas and Electric Company
- 2 - In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael P. Shannon, Chief
Plant Support Branch
Division of Reactor Safety
Docket No.: 50-133/72-027 License No.: DPR-7/SNM-2514
Enclosure:
NRC Inspection Report 50-133/20008401; 72-027/20008401
cc w/enclosure:
Donna Jacobs Vice President Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424
J. Loren Sharp, Director and Plant Manager Humboldt Bay Nuclear 1000 King Salmon Avenue Eureka, CA 95505