ML082490720: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 09/03/2008 | | issue date = 09/03/2008 | ||
| title = SNC Letter to Phil Niebaum Cracked Coupling | | title = SNC Letter to Phil Niebaum Cracked Coupling | ||
| author name = Johnson G | | author name = Johnson G | ||
| author affiliation = Southern Nuclear Operating Co, Inc | | author affiliation = Southern Nuclear Operating Co, Inc | ||
| addressee name = Niebaum P | | addressee name = Niebaum P | ||
| addressee affiliation = NRC/RGN-II/DRP/RPB2 | | addressee affiliation = NRC/RGN-II/DRP/RPB2 | ||
| docket = 05000321, 05000366 | | docket = 05000321, 05000366 | ||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:G. L. Johnson (Greg) Site Engineering Director Plant Edwin I. Hatch 1 1028 Hatch Parkway North Baxley, GA 31 51 3 Tel. 912.537.5874 September 3,2008 \ SOUTHERN li COMPANY Phillip K. Niebaum NRC Resident Inspector Nuclear Regulatory Commission Plant Edwin I. Hatch Baxley, GA 3 15 13 | {{#Wiki_filter:G. L. Johnson (Greg) | ||
Site Engineering Director Plant Edwin I. Hatch 1 1028 Hatch Parkway North Baxley, GA 31 51 3 Tel. 912.537.5874 September 3,2008 | |||
\\ | |||
SOUTHERN li COMPANY Phillip K. Niebaum NRC Resident Inspector Nuclear Regulatory Commission Plant Edwin I. Hatch Baxley, GA 3 15 13 | |||
==Dear Mr. Niebaum:== | ==Dear Mr. Niebaum:== | ||
It is my understanding that you wish to use three photographs of the failed coupling for the swing diesel generator and one of the replacement coupling in the NRC inspection report soon to be issued that resulted from the recent special NRC inspection that was conducted. It is also my understanding that the attached pictures were taken by the resident inspector during the course of Plant Hatch's troubleshooting/repair efforts associated with the degraded coupling for the swing diesel generator. I have confirmed that these are pictures of the Hatch swing diesel generator degraded and replacement couplings. | |||
You have permission to use these pictures for the purpose of adding value to the special inspection report and to provide needed perspective in understanding the technical issues involved. | |||
G. L. Johnson - | |||
Site ~ n g i n e e w i r e c t o r xc: S. B. Tipps File | |||
Crack in rubber gland of the failed 1B EDG coupling viewed from diesel (Photo 1) | |||
Close up of above crack along inner rim when viewed from diesel (Photo 2) | |||
Another crack around inner rim on 1B EDG coupling viewed from generator (Photo 3 Replacement coupling for the 1B EDG awaiting installation (Photo 4}} | |||
Close up of above crack along inner rim when viewed from diesel (Photo 2) | |||
Another crack around inner rim on 1B EDG coupling viewed from generator (Photo 3 | |||
Latest revision as of 15:17, 14 January 2025
| ML082490720 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/03/2008 |
| From: | Johnson G Southern Nuclear Operating Co |
| To: | Phil Niebaum NRC/RGN-II/DRP/RPB2 |
| References | |
| Download: ML082490720 (3) | |
Text
G. L. Johnson (Greg)
Site Engineering Director Plant Edwin I. Hatch 1 1028 Hatch Parkway North Baxley, GA 31 51 3 Tel. 912.537.5874 September 3,2008
\\
SOUTHERN li COMPANY Phillip K. Niebaum NRC Resident Inspector Nuclear Regulatory Commission Plant Edwin I. Hatch Baxley, GA 3 15 13
Dear Mr. Niebaum:
It is my understanding that you wish to use three photographs of the failed coupling for the swing diesel generator and one of the replacement coupling in the NRC inspection report soon to be issued that resulted from the recent special NRC inspection that was conducted. It is also my understanding that the attached pictures were taken by the resident inspector during the course of Plant Hatch's troubleshooting/repair efforts associated with the degraded coupling for the swing diesel generator. I have confirmed that these are pictures of the Hatch swing diesel generator degraded and replacement couplings.
You have permission to use these pictures for the purpose of adding value to the special inspection report and to provide needed perspective in understanding the technical issues involved.
G. L. Johnson -
Site ~ n g i n e e w i r e c t o r xc: S. B. Tipps File
Crack in rubber gland of the failed 1B EDG coupling viewed from diesel (Photo 1)
Close up of above crack along inner rim when viewed from diesel (Photo 2)
Another crack around inner rim on 1B EDG coupling viewed from generator (Photo 3 Replacement coupling for the 1B EDG awaiting installation (Photo 4