IR 05000458/2008007: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
{{Adams|number = ML082760765}} | {{Adams | ||
| number = ML082760765 | |||
| issue date = 10/02/2008 | |||
| title = IR 05000458-08-007, on 08/21/2008, for River Bend, Inspection Site-Specific Implementation of B.5.B Phase 2 and 3, Mitigating Strategies Temporary Instruction | |||
| author name = Lantz R | |||
| author affiliation = NRC/RGN-IV/DRS/OB | |||
| addressee name = Perito M | |||
| addressee affiliation = Entergy Operations, Inc | |||
| docket = 05000458 | |||
| license number = NPF-047 | |||
| contact person = Lynn berger | |||
| document report number = IR-08-007 | |||
| document type = Letter, Inspection Report | |||
| page count = 3 | |||
}} | |||
{{IR-Nav| site = 05000458 | year = 2008 | report number = 007 }} | {{IR-Nav| site = 05000458 | year = 2008 | report number = 007 }} | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:October 2, 2008 | ||
==SUBJECT:== | |||
RIVER BEND STATION - NRC INSPECTION SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION REPORT 05000458/2008007 | |||
==Dear Mr. Perito:== | |||
On August 21, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your River Bend Station. The enclosed report documents the teams results, which were discussed on August 21, 2008, with you and other members of your staff. | |||
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the Commissions rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. | |||
Based on the results of this inspection, no findings of significance were identified. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. | |||
UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc. | |||
2 If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1). | |||
Sincerely, | |||
/RA/ | |||
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety | |||
Docket: | |||
50-458 License: | |||
NPF-47 | |||
cc w/o enclosure: | |||
Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 | |||
Senior Vice President and COO Entergy Operations, Inc. | |||
P.O. Box 31995 Jackson, MS 39286-1995 | |||
Vice President, Oversight Entergy Operations, Inc. | |||
P.O. Box 31995 Jackson, MS 39286-1995 | |||
Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 | |||
Manager, Licensing Entergy Operations, Inc. | |||
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Entergy Operations, Inc. | |||
3 Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 | |||
}} | }} | ||
Latest revision as of 14:51, 14 January 2025
| ML082760765 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 10/02/2008 |
| From: | Ryan Lantz Operations Branch IV |
| To: | Mike Perito Entergy Operations |
| Lynn berger | |
| References | |
| IR-08-007 | |
| Download: ML082760765 (3) | |
Text
October 2, 2008
SUBJECT:
RIVER BEND STATION - NRC INSPECTION SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION REPORT 05000458/2008007
Dear Mr. Perito:
On August 21, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your River Bend Station. The enclosed report documents the teams results, which were discussed on August 21, 2008, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the Commissions rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.
Based on the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc.
2 If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety
Docket:
50-458 License:
cc w/o enclosure:
Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
Senior Vice President and COO Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995
Vice President, Oversight Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995
Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
Manager, Licensing Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Entergy Operations, Inc.
3 Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995