ML082800440: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML082800440
| number = ML082800440
| issue date = 10/06/2008
| issue date = 10/06/2008
| title = 2008/10/06-Commission Memorandum and Order (CLI-08-23)
| title = Commission Memorandum and Order (CLI-08-23)
| author name = Vietti-Cook A L
| author name = Vietti-Cook A
| author affiliation = NRC/SECY
| author affiliation = NRC/SECY
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION COMMISSIONERS:  
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION COMMISSIONERS:
 
Dale E. Klein, Chairman Gregory B. Jaczko Peter B. Lyons Kristine L. Svinicki  
Dale E. Klein, Chairman Gregory B. Jaczko Peter B. Lyons Kristine L. Svinicki  
)
 
In the Matter of  
_______________________________________________
)  
        )
)
In the Matter of       ) ) AMERGEN ENERGY COMPANY, LLC   ) Docket No.  
AMERGEN ENERGY COMPANY, LLC  
(Oyster Creek Nuclear Generating Station)   ) 50-219-LR  
)
 
Docket No.
__________________________________________ ) _______________________________________________ In the Matter of       ) ) ENTERGY NUCLEAR OPERATIONS, INC.   ) Docket Nos.  
(Oyster Creek Nuclear Generating Station)  
(Indian Point Nuclear Generating Unit   ) 50-247-LR Nos. 2 and 3)       ) and 50-286-LR  
)
 
50-219-LR  
)
In the Matter of  
)  
)
ENTERGY NUCLEAR OPERATIONS, INC.  
)
Docket Nos.
(Indian Point Nuclear Generating Unit  
)
50-247-LR Nos. 2 and 3)  
)
and 50-286-LR
_______________________________________________)
_______________________________________________)
_______________________________________________ In the Matter of       ) ) ENTERGY NUCLEAR OPERATIONS, INC.   ) Docket No. 50-293-LR (Pilgrim Nuclear Power Station)     )
In the Matter of  
)  
)
ENTERGY NUCLEAR OPERATIONS, INC.  
)
Docket No. 50-293-LR (Pilgrim Nuclear Power Station)  
)
_______________________________________________)
_______________________________________________)
_______________________________________________
In the Matter of  
In the Matter of       ) ) ENTERGY NUCLEAR OPERATIONS, INC.   ) Docket No. 50-271-LR (Vermont Yankee Nuclear Power Station)   )
)  
)
ENTERGY NUCLEAR OPERATIONS, INC.  
)
Docket No. 50-271-LR (Vermont Yankee Nuclear Power Station)  
)
_______________________________________________)
_______________________________________________)
CLI-08-23 MEMORANDUM AND ORDER This Memorandum and Order responds to four petitions 1 (Petition) filed jointly by a number of public interest groups, each of which is a party in one or more of the captioned 1 Identical petitions were filed in each of the four captioned proceedings.
CLI-08-23 MEMORANDUM AND ORDER This Memorandum and Order responds to four petitions1 (Petition) filed jointly by a number of public interest groups, each of which is a party in one or more of the captioned 1 Identical petitions were filed in each of the four captioned proceedings.  


2license renewal proceedings (hereinafter, Petitioners), 2 and to a Supplemental Petition filed by the same parties alleging illegal actions by the NRC Staff.
2 license renewal proceedings (hereinafter, Petitioners),2 and to a Supplemental Petition filed by the same parties alleging illegal actions by the NRC Staff.3 The Petition requests that the Commission suspend these proceedings until it has conducted a comprehensive overhaul of the manner in which the NRC Staff reviews license renewal applications.4 Petitioners base their request principally on an audit report issued by NRCs Office of the Inspector General (OIG)5 regarding the effectiveness of the agencys license renewal safety reviews. The Supplemental Petition was based on an OIG memorandum following up on its initial report, which focused on the extent of NRC Staff reviews of license renewal applications.6 2 Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; and New Jersey Environmental Federation are parties to the Oyster Creek proceeding. AmerGen Energy Co. (Oyster Creek Nuclear Generating Station), LBP-06-7, 63 NRC 188 (2006). Pilgrim Watch is a party to the Pilgrim proceeding. Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), LBP-06-23, 64 NRC 257 (2006). New England Coalition is a party to the Vermont Yankee proceeding. Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), LBP-06-20, 64 NRC 131 (2006). Riverkeeper is a party to the Indian Point license renewal proceeding. Entergy Nuclear Operations, Inc. (Indian Point Nuclear Power Station, Units 2 and 3), LBP-08-13, 68 NRC __ (slip op. July 30, 2008).
3 The Petition requests that the Commission suspend these proceedings until it has conducted a "comprehensive overhaul" of the manner in which the NRC Staff reviews license renewal applications.
4 Petitioners base their request principally on an audit report issued by NRC's Office of the Inspector General (OIG) 5 regarding the effectiveness of the agency's license renewal safety reviews. The Supplemental Petition was based on an OIG memorandum following up on its initial report, which focused on the "extent" of NRC Staff reviews of license renewal applications.
6 2 Nuclear Information and Resource Service; Je rsey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; and New Jersey Environmental Federation are parties to the Oyster Creek proceeding. AmerGen Energy Co. (Oyster Creek Nuclear Generating Station), LBP-06-7, 63 NRC 188 (2006). Pilgrim Watch is a party to the Pilgrim proceeding. Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), LBP-06-23, 64 NRC 257 (2006). New England Coalition is a party to the Vermont Yankee proceeding.
Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), LBP-06-20, 64 NRC 131 (2006). Riverkeeper is a party to the Indian Point license renewal proceeding. Entergy Nuclear Operations, Inc. (Indian Point Nuclear Power Station, Units 2 and 3), LBP-08-13, 68 NRC __ (slip op. July 30, 2008).
3 Supplemental Petition by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants (May 15, 2008)(Supplemental Petition). The Supplemental Petition was also served in all four captioned proceedings.
3 Supplemental Petition by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants (May 15, 2008)(Supplemental Petition). The Supplemental Petition was also served in all four captioned proceedings.
4 Petition by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition to Suspend License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim and Vermont Yankee Nuclear Power Plants Pending Investigation of NRC Staff Review Process and Correction of Deficiencies (Jan. 3, 2008).
4 Petition by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.;
5 Audit of NRC's License Renewal Program, OIG-07-A-15, (Sept. 6, 2007), available at ADAMS accession number ML072490486 (OIG Report).  
Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition to Suspend License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim and Vermont Yankee Nuclear Power Plants Pending Investigation of NRC Staff Review Process and Correction of Deficiencies (Jan. 3, 2008).
 
5 Audit of NRCs License Renewal Program, OIG-07-A-15, (Sept. 6, 2007), available at ADAMS accession number ML072490486 (OIG Report).
6 Memorandum from Hubert T. Bell to Dale E. Klein regarding NRC Staff Review of License Renewal Applications (May 2, 2008) (ADAMS ML081280227) (OIG Memorandum).
6 Memorandum from Hubert T. Bell to Dale E. Klein regarding NRC Staff Review of License Renewal Applications (May 2, 2008) (ADAMS ML081280227) (OIG Memorandum).  
3As explained below, the OIG did not determine, and we do not otherwise find, that past license renewal safety reviews were inadequate or that the license renewal review process requires a comprehensive revision. The OIG's recommendations do not undermine our general confidence in the Staff's safety review, and consequently we see no threat to the public health and safety or the common defense and security. There is, therefore, no need to delay the license renewal proceedings and we deny Petitioners' request. I. BACKGROUND A. The License Renewal Process Over several years, the NRC has developed a regulatory process to review power reactor license renewal applications that is efficient, thorough, and appropriately focused on certain aging effects that would not reveal themselves through performance indicators associated with active functions. The Staff's conduct of safety reviews for license renewal applications is governed by 10 C.F.R. Part 54, and principally guided by two documents: NUREG-1800,  Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, Rev. 1 (Sept. 2005) (SRP-LR), and NUREG-1801, Generic Aging Lessons Learned Report, Rev. 1 (Sept. 2005)
(GALL Report)
. Part 54 provides that each license renewal application must include an integrated plant assessment (IPA) identifying structures and components subject to aging management review, an evaluation of time-limited aging analyses, and a final safety analysis report (FSAR) supplement describing the plant's aging management programs.
7  The license renewal applicant identifies all plant systems, structures and components (SSCs) related to safety and regulatory 7 10 C.F.R. § 54.21. The application must be periodically amended to reflect any changes to the plant's current licensing basis made after the license renewal application was submitted. 10
 
C.F.R. § 54.21(b).  


4 compliance.
3 As explained below, the OIG did not determine, and we do not otherwise find, that past license renewal safety reviews were inadequate or that the license renewal review process requires a comprehensive revision. The OIGs recommendations do not undermine our general confidence in the Staffs safety review, and consequently we see no threat to the public health and safety or the common defense and security. There is, therefore, no need to delay the license renewal proceedings and we deny Petitioners request.
8  The aging management review covers "passive" structures and components, which perform their intended function without moving parts or without a change in configuration or properties, such as the reactor vessel, the steam generators, piping, component supports, and seismic Category I structures. Structures and components are not subject to an aging management review unless they are "long-lived."  A structure or component is long-lived if it is not subject to replacement based on a qualified life or specified time period. The application must demonstrate that the effects of aging will be managed in such a way that the intended functions of passive and long-lived structures and components will be maintained for the period
I.
 
BACKGROUND A.
of extended operation.
The License Renewal Process Over several years, the NRC has developed a regulatory process to review power reactor license renewal applications that is efficient, thorough, and appropriately focused on certain aging effects that would not reveal themselves through performance indicators associated with active functions. The Staffs conduct of safety reviews for license renewal applications is governed by 10 C.F.R. Part 54, and principally guided by two documents:
9  In contrast, the aging management review does not cover active components - such as motors, diesel generators, and switches - because routine surveillance and maintenance programs detect and manage the effects of aging on these
NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, Rev. 1 (Sept. 2005) (SRP-LR), and NUREG-1801, Generic Aging Lessons Learned Report, Rev. 1 (Sept. 2005) (GALL Report).
 
Part 54 provides that each license renewal application must include an integrated plant assessment (IPA) identifying structures and components subject to aging management review, an evaluation of time-limited aging analyses, and a final safety analysis report (FSAR) supplement describing the plants aging management programs.7 The license renewal applicant identifies all plant systems, structures and components (SSCs) related to safety and regulatory 7 10 C.F.R. § 54.21. The application must be periodically amended to reflect any changes to the plants current licensing basis made after the license renewal application was submitted. 10 C.F.R. § 54.21(b).  
components.
10  The evaluation of Time Limited Aging Analyses (TLAAs), which are calculations or analyses that involve systems, structures, and components within the scope of the rule, considers the effects of aging and involves assumptions based on the original 40-year operating term. For each TLAA, the applicant must demonstrate that (a) the analyses remain valid during the period of extended operation; (b) reanalysis (recalculation) bounds the period of extended 8 These are SSCs that are safety-related, or whose failure could affect safety-related functions, or that are relied on to demonstrate compliance with the NRC's regulations for fire protection, environmental qualification, pressurized thermal shock, anticipated transients without scram, and station blackout. 10 C.F.R. § 54.4(a).  


4 compliance.8 The aging management review covers passive structures and components, which perform their intended function without moving parts or without a change in configuration or properties, such as the reactor vessel, the steam generators, piping, component supports, and seismic Category I structures. Structures and components are not subject to an aging management review unless they are long-lived. A structure or component is long-lived if it is not subject to replacement based on a qualified life or specified time period. The application must demonstrate that the effects of aging will be managed in such a way that the intended functions of passive and long-lived structures and components will be maintained for the period of extended operation.9 In contrast, the aging management review does not cover active components such as motors, diesel generators, and switches because routine surveillance and maintenance programs detect and manage the effects of aging on these components.10 The evaluation of Time Limited Aging Analyses (TLAAs), which are calculations or analyses that involve systems, structures, and components within the scope of the rule, considers the effects of aging and involves assumptions based on the original 40-year operating term. For each TLAA, the applicant must demonstrate that (a) the analyses remain valid during the period of extended operation; (b) reanalysis (recalculation) bounds the period of extended 8 These are SSCs that are safety-related, or whose failure could affect safety-related functions, or that are relied on to demonstrate compliance with the NRC's regulations for fire protection, environmental qualification, pressurized thermal shock, anticipated transients without scram, and station blackout. 10 C.F.R. § 54.4(a).
9 10 C.F.R. § 54.21(a).
9 10 C.F.R. § 54.21(a).
10 10 C.F.R. § 54.21(a)(1).
10 10 C.F.R. § 54.21(a)(1). See also Final Rule, Nuclear Power Plant License Renewal; Revisions, 60 Fed. Reg. 22,461, 22,471-72 (May 8, 1995) (explaining the rationale for reliance on maintenance requirements to manage aging effects of active components). See generally Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 7-10 (2001).  
See also Final Rule, Nuclear Power Plant License Renewal; Revisions, 60 Fed. Reg. 22,461, 22,471-72 (May 8, 1995) (explaining the rationale for reliance on maintenance requirements to manage aging effects of active components).
See generally Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 7-10 (2001).  


5operation; or (c) the aging effects will be adequately managed for the period of extended operation.
5 operation; or (c) the aging effects will be adequately managed for the period of extended operation.11 In addition to the information supplied for the technical safety review, the license renewal applicant is required to submit a supplemental environmental report that complies with 10 C.F.R. Part 51.12 The SRP-LR provides guidance to the Staff reviewers for conducting license renewal reviews. It assigns review responsibilities among Staff technical organizations and describes methods for identifying those SSCs that are subject to aging effects within the scope of license renewal review. It defines ten program elements including scoping, acceptance criteria, corrective actions, monitoring, and operating experience that are essential to an effective aging management program.13 It also provides that for each of the SSCs identified, the license renewal applicant may rely on an aging management program that is consistent with the GALL Report, or may choose to use a plant-specific aging management program.14 The GALL Report identifies generic aging management programs that the Staff has determined to be acceptable, based on the experiences and analyses of existing programs at operating plants during the initial license period.15 The report describes each aging 11 10 C.F.R. § 54.21(c)(1).
11     In addition to the information supplied for the technical safety review, the license renewal applicant is required to submit a supplemental environmental report that complies with 10 C.F.R. Part 51.
12 See 10 C.F.R. § 54.23. Petitioners request here does not embrace environmental issues.
12   The SRP-LR provides guidance to the Staff reviewers for conducting license renewal reviews. It assigns review responsibilities among Staff technical organizations and describes methods for identifying those SSCs that are subject to aging effects within the scope of license renewal review. It defines ten program elements - including scoping, acceptance criteria, corrective actions, monitoring, and operating experience - that are essential to an effective aging management program.
13 It also provides that for each of the SSCs identified, the license renewal applicant may rely on an aging management program that is consistent with the GALL Report, or may choose to use a plant-specific aging management program.
14   The GALL Report identifies generic aging management programs that the Staff has determined to be acceptable, based on the experiences and analyses of existing programs at operating plants during the initial license period.
15 The report describes each aging 11 10 C.F.R. § 54.21(c)(1).
12 See 10 C.F.R. § 54.23. Petitioners' request here does not embrace environmental issues.
13 SRP-LR at A.1-3 through A.1-8.
13 SRP-LR at A.1-3 through A.1-8.
14 Id. at 3.0-2.
14 Id. at 3.0-2.
15 The GALL Report was developed because the Staff discovered, in reviewing the initial license renewal applications, that many of t he programs the licensee would rely on to manage aging effects during the renewal period were already in place during the initial license period.  
15 The GALL Report was developed because the Staff discovered, in reviewing the initial license renewal applications, that many of the programs the licensee would rely on to manage aging effects during the renewal period were already in place during the initial license period.
 
See SRP-LR, at 1.  
See SRP-LR, at 1.  


6management program with respect to the ten program elements defined in the SRP-LR.
6 management program with respect to the ten program elements defined in the SRP-LR.16 The report also includes a table summarizing various structures and components, the materials from which they are made, the environment to which they are exposed, the aging effect (e.g., loss of material through pitting, leaching or corrosion), the aging management program found to manage the particular aging effect in that component, and whether additional evaluation is necessary.17 An applicant for license renewal may reference the GALL Report to demonstrate that the programs at the applicants facility correspond to those reviewed and approved therein, and the applicant must ensure and certify that its programs correspond to those reviewed in the GALL Report.18 In other words, the license renewal applicants use of an aging management program identified in the GALL Report constitutes reasonable assurance that it will manage the targeted aging effect during the renewal period. If the applicant uses a different method for managing the effects of aging for particular SSCs at its plant, then the applicant should demonstrate to the Staff reviewers that its program includes the ten elements cited in the GALL Report and will likewise be effective. In addition, many plants will have plant-specific aging management programs for which there is no corresponding program in the GALL Report. For each aging management program, the application gives a brief description of the licensees operating experience in implementing that program.
16   The report also includes a table summarizing various structures and components, the materials from which they are made, the environment to which they are exposed, the aging effect (e.g., loss of material through pitting, leaching or corrosion), the aging management program found to manage the particular aging effect in that component, and whether additional evaluation is necessary.
The Staff then reviews the application and supporting documents and conducts inspections and onsite audits to verify the information in the application. License renewal inspections verify, on a sampling basis, that the applicant has properly scoped the aging 16 See GALL Report, Vol. 2, Rev. 1, sec. XI.
17 An applicant for license renewal "may reference the GALL Report - to demonstrate that the programs at the applicant's facility correspond to those reviewed and approved" therein, and the applicant must ensure and certify that its programs correspond to those reviewed in the  
 
GALL Report.
18 In other words, the license renewal applicant's use of an aging management program identified in the GALL Report constitutes reasonable assurance that it will manage the targeted aging effect during the renewal period. If the applicant uses a different method for managing the effects of aging for particular SSCs at its plant, then the applicant should demonstrate to the Staff reviewers that its program includes the ten elements cited in the GALL Report and will likewise be effective. In addition, many plants will have plant-specific aging management programs for which there is no corresponding program in the GALL Report. For each aging management program, the application gives a brief description of the licensee's operating experience in implementing that program. The Staff then reviews the application and supporting documents and conducts inspections and onsite audits to verify the information in the application. License renewal inspections verify, on a sampling basis, that the applicant has properly scoped the aging 16 See GALL Report, Vol. 2, Rev. 1, sec. XI.
17 See generally GALL Report, Vol. 2, Rev. 1.
17 See generally GALL Report, Vol. 2, Rev. 1.
18 Id., Vol. 1 at 3.
18 Id., Vol. 1 at 3.  
7management review; that the existing or planned aging management programs conform to the descriptions in the license renewal application; and that the documentation used to support the application is auditable, retrievable, and in fact does support the application.
19  The Staff produces a Safety Evaluation Report (SER) - usually first as an SER listing open items, then as a final SER (FSER) - summarizing its findings with respect to the licensees' programs for aging management. The Advisory Committee on Reactor Safeguards (ACRS) reviews the SER and makes its own recommendation to the Commission on whether the license should be renewed.      The Commission also offers a parallel hearing process where members of the public with a cognizable interest in the particular renewal application may obtain an independent adjudicatory review of their challenges to the application.
20  The Commission will issue a renewed license if it determines, among other things, that there is reasonable assurance that the plant will operate in accordance with its current licensing basis during the period of extended


operation.
7 management review; that the existing or planned aging management programs conform to the descriptions in the license renewal application; and that the documentation used to support the application is auditable, retrievable, and in fact does support the application.19 The Staff produces a Safety Evaluation Report (SER) - usually first as an SER listing open items, then as a final SER (FSER) - summarizing its findings with respect to the licensees programs for aging management. The Advisory Committee on Reactor Safeguards (ACRS) reviews the SER and makes its own recommendation to the Commission on whether the license should be renewed.
21 The renewed license takes effect immediately, with a term of up to 20 years plus the number of years remaining on the initial operating license.
The Commission also offers a parallel hearing process where members of the public with a cognizable interest in the particular renewal application may obtain an independent adjudicatory review of their challenges to the application.20 The Commission will issue a renewed license if it determines, among other things, that there is reasonable assurance that the plant will operate in accordance with its current licensing basis during the period of extended operation.21 The renewed license takes effect immediately, with a term of up to 20 years plus the number of years remaining on the initial operating license.22 To date, the NRC has completed the process for issuing renewed licenses for 48 existing reactors.
22 To date, the NRC has completed the process for issuing renewed licenses for 48 existing reactors.
B.
B. The OIG Report and OIG Memorandum The OIG Report on which Petitioners premise their argument was issued in September 2007, and reflects findings of the OIG's audit of the effectiveness of the Staff's license renewal safety reviews. The OIG concluded that the Staff has developed a "comprehensive license 19 NRC Inspection Manual, Inspection Procedure 71002 (Feb. 18, 2005).
The OIG Report and OIG Memorandum The OIG Report on which Petitioners premise their argument was issued in September 2007, and reflects findings of the OIGs audit of the effectiveness of the Staffs license renewal safety reviews. The OIG concluded that the Staff has developed a comprehensive license 19 NRC Inspection Manual, Inspection Procedure 71002 (Feb. 18, 2005).
20 See AEA Section 189.a, 42 U.S.C. §2239(a). See generally Baltimore Gas & Electric Co.
20 See AEA Section 189.a, 42 U.S.C. §2239(a). See generally Baltimore Gas & Electric Co.
(Calvert Cliffs Nuclear Power Plant, Units 1 and 2), CLI-98-25, 48 NRC 325, 349-50 (1998).
(Calvert Cliffs Nuclear Power Plant, Units 1 and 2), CLI-98-25, 48 NRC 325, 349-50 (1998).
21 10 C.F.R. § 54.29.
21 10 C.F.R. § 54.29.
22 10 C.F.R. § 54.31.
22 10 C.F.R. § 54.31.  
8renewal process" to evaluate license renewal applications.
23  The OIG also identified, however, areas that could be improved.
24  Primarily, the OIG Report found that the Staff should improve the transparency of its report writing so that a reader can more easily understand what materials the reviewers evaluated and how they reached conclusions. The OIG Report made eight specific recommendations for improving the effectiveness of the license renewal review programs in five general areas: A. License renewal reporting efforts need improvements. OIG found that the Staff does not consistently provide adequate descriptions of audit methodology or support for conclusions in "license renewal reports."  OIG recommended that the Executive Director for Operations (EDO) (1) establish report-writing standards, and (2) revise the "report quality assurance process for license renewal report review" by establishing management controls for NRR and DLR to gauge the effectiveness of team leader and peer group report reviews, and by implementing procedures to specify additional steps to be taken in the event that such team leader and peer group report reviews "fail to ensure report quality to management's expectations."
25 B. Guidance for removing licensee documents from audit sites could be clarified. OIG found inconsistencies in the guidance provided to license renewal auditors relative to the removal of licensee documents obtained at audit sites and recommended that the EDO clarify the relevant guidance and procedures.
26    C. Consistent evaluation of operating experience would improve license renewal reviews. OIG concluded that audit team members do not review operating experience consistently, and that most auditors do not conduct independent verification of a licensee's operating experience, relying instead on licensee-supplied information. OIG recommended that the EDO establish requirements and management controls to standardize the 23 OIG Report at 7. 24 Id. 25 Id. at 7-13. 26 For example, the OIG Report stated that Headquarters Staff, in conducting onsite audits, is hampered by a policy of not removing documents from a licensee site, even though regional Staff, in conducting inspections, may remove licensee documents.
Id. at 15-17.  


9conduct and depth of license renewal operating experience reviews.
8 renewal process to evaluate license renewal applications.23 The OIG also identified, however, areas that could be improved.24 Primarily, the OIG Report found that the Staff should improve the transparency of its report writing so that a reader can more easily understand what materials the reviewers evaluated and how they reached conclusions. The OIG Report made eight specific recommendations for improving the effectiveness of the license renewal review programs in five general areas:
27 D. More attention is needed to planning for post-renewal inspections.
A.
OIG concluded that planning for post-renewal inspections is incomplete because the agency has "only recently focused its attention on developing and overseeing the details associated with these inspections."
License renewal reporting efforts need improvements. OIG found that the Staff does not consistently provide adequate descriptions of audit methodology or support for conclusions in license renewal reports. OIG recommended that the Executive Director for Operations (EDO) (1) establish report-writing standards, and (2) revise the report quality assurance process for license renewal report review by establishing management controls for NRR and DLR to gauge the effectiveness of team leader and peer group report reviews, and by implementing procedures to specify additional steps to be taken in the event that such team leader and peer group report reviews fail to ensure report quality to managements expectations.25 B.
OIG recommended that the EDO expedite the revision of Inspection Procedure 71003 and to communicate the details of the revised procedure to affected Staff and stakeholders.
Guidance for removing licensee documents from audit sites could be clarified. OIG found inconsistencies in the guidance provided to license renewal auditors relative to the removal of licensee documents obtained at audit sites and recommended that the EDO clarify the relevant guidance and procedures. 26 C.
28   E. License Renewal Issues Need Evaluation for Backfit Application. OIG recommended that the EDO establish a review process to determine whether or not certain guidance meets the provisions of 10 C.F.R.
Consistent evaluation of operating experience would improve license renewal reviews. OIG concluded that audit team members do not review operating experience consistently, and that most auditors do not conduct independent verification of a licensees operating experience, relying instead on licensee-supplied information. OIG recommended that the EDO establish requirements and management controls to standardize the 23 OIG Report at 7.
§ 54.37(b), and that the Commission reconsider its previous policy decision that the backfit rule does not apply to license renewal applicants.
24 Id.
29 Of these recommendations, only those relating to A, license renewal reporting efforts, and C, evaluation of licensee operating experience, are central to the arguments in Petitioners' initial Petition. Petitioners' Supplemental Petition belatedly raises arguments related to B, the need to clarify guidance for removing licensee documents. The OIG Report did not question the use of the SRP-LR or the GALL Report as guidance for conducting license renewal safety reviews, nor did it suggest that these guidance documents would not provide a mechani sm to satisfy the safety requirements of 10 C.F.R. Part 54. On the contrary, the OIG Report cited these documents as authority on the proper conduct of reviews. Further, the OIG Report pointed to the GALL Report's inclusion of "operating experience" as one of ten key elements that should be present in an effective aging management program.
25 Id. at 7-13.
26 For example, the OIG Report stated that Headquarters Staff, in conducting onsite audits, is hampered by a policy of not removing documents from a licensee site, even though regional Staff, in conducting inspections, may remove licensee documents. Id. at 15-17.
 
9 conduct and depth of license renewal operating experience reviews.27 D.
More attention is needed to planning for post-renewal inspections. OIG concluded that planning for post-renewal inspections is incomplete because the agency has only recently focused its attention on developing and overseeing the details associated with these inspections.
OIG recommended that the EDO expedite the revision of Inspection Procedure 71003 and to communicate the details of the revised procedure to affected Staff and stakeholders.28 E.
License Renewal Issues Need Evaluation for Backfit Application. OIG recommended that the EDO establish a review process to determine whether or not certain guidance meets the provisions of 10 C.F.R.  
§ 54.37(b), and that the Commission reconsider its previous policy decision that the backfit rule does not apply to license renewal applicants.29 Of these recommendations, only those relating to A, license renewal reporting efforts, and C, evaluation of licensee operating experience, are central to the arguments in Petitioners initial Petition. Petitioners Supplemental Petition belatedly raises arguments related to B, the need to clarify guidance for removing licensee documents.
The OIG Report did not question the use of the SRP-LR or the GALL Report as guidance for conducting license renewal safety reviews, nor did it suggest that these guidance documents would not provide a mechanism to satisfy the safety requirements of 10 C.F.R. Part 54. On the contrary, the OIG Report cited these documents as authority on the proper conduct of reviews. Further, the OIG Report pointed to the GALL Reports inclusion of operating experience as one of ten key elements that should be present in an effective aging management program.
27 Id. at 18-23.
27 Id. at 18-23.
28 Id. at 24-30. Post-renewal inspections (that is, inspections performed after the agency has granted the renewed license) were not addressed in either petition, and therefore are not further discussed here.  
28 Id. at 24-30. Post-renewal inspections (that is, inspections performed after the agency has granted the renewed license) were not addressed in either petition, and therefore are not further discussed here.
29 Id. at 31-35. The backfit issue is not raised by the Petition or Supplemental Petition, and is not considered further here.  


29  Id. at 31-35. The backfit issue is not raised by the Petition or Supplemental Petition, and is not considered further here.
10 The OIG Reports conclusions regarding the Staffs review of licensee operating experience are central to Petitioners claims. The OIG Report found that audit team members did not approach reviews consistently and most did not independently verify plant-specific operating experience, for example, by searching the licensees corrective action databases.30 The OIG Report suggested that auditors may not be aware of all relevant operating experience, and further noted that there are no formally established requirements for verifying operating experience. As noted above, it recommended that requirements and management controls be implemented to standardize the conduct and depth of license renewal operating experience reviews.31 The Staff formally agreed to implement seven of the eight OIG recommendations.32 Relative to the issues raised in the Petition, the Staff committed to: (1) update report-writing guidance to include management expectations and report-writing standards (April 30, 2008); (2) enhance the report review process to enable peer reviewers to verify that Staff reports meet management expectations, including a method to gauge the effectiveness of team leader and peer group review (April 30, 2008); (3) develop consistent guidance for removal of applicant and licensee documents from applicant and licensee sites (September 30, 2008); and (4) establish additional guidance and management controls to standardize the conduct and depth of license renewal operating experience reviews (April 30, 2008).33 In a January 7, 2008 memorandum, 30 Id. at 19-20.
10The OIG Report's conclusions regarding the Staff's review of licensee operating experience are central to Petitioners' claims. The OIG Report found that audit team members did not approach reviews consistently and "most" did not independently verify plant-specific operating experience, for example, by searching the licensee's corrective action databases.
31 Id. at 23.
30 The OIG Report suggested that auditors may not be aware of all relevant operating experience, and further noted that there are no formally established requirements for verifying operating experience. As noted above, it recommended that requirements and management controls be implemented to "standardize the conduct and depth of license renewal operating experience reviews."31   The Staff formally agreed to implement seven of the eight OIG recommendations.
32 See Memorandum from William F. Kane to Stephen D. Dingbaum, Audit of NRCs License Renewal Program (Oct. 30, 2007)(ADAMS ML072630299)(Kane Memorandum). The Staff disagreed with the OIGs recommendation that the Commission affirm or, preferably, modify its decision not to apply the backfit rule to license renewal applicants.
32 Relative to the issues raised in the Petition, the Staff committed to: (1) update report-writing guidance to include management expectations and report-writing standards (April 30, 2008); (2) enhance the report review process to enable peer reviewers to verify that Staff reports meet management expectations, including a method to gauge the effectiveness of team leader and peer group review (April 30, 2008); (3) develop consistent guidance for removal of applicant and licensee documents from applicant and licensee sites (September 30, 2008); and (4) establish additional guidance and management controls to standardize the conduct and depth of license renewal operating experience reviews (April 30, 2008).
33 Id. at 1-2.
33 In a January 7, 2008 memorandum, 30 Id. at 19-20.
31 Id. at 23. 32 See Memorandum from William F. Kane to Stephen D. Dingbaum, "Audit of NRC's License Renewal Program" (Oct. 30, 2007)(ADAMS ML072630299)(Kane Memorandum). The Staff disagreed with the OIG's recommendation that the Commission affirm or, preferably, modify its decision not to apply the backfit rule to license renewal applicants.    


33 Id. at 1-2.
11 the OIG stated that it considered the seven recommendations resolved.34 Later, on May 2, the OIG issued an additional memorandum on the NRC Staffs license renewal review process.35 That memorandum stated that the NRC safety review process includes both technical reviews performed in NRC headquarters and on-site audits. The OIGs investigation found that the Staff's audit reports indicate that the Staff reviews approximately 280 applicant documents during each audit. The OIG's analysis of work hour data indicated that significant numbers of hours an average of approximately 10,582 per reactor unit are spent performing the NRC Staff reviews.36 The OIG Memorandum found, however, that the Staff does not preserve copies of all applicant documents reviewed during on-site audits. It also found that Staff reviewers prepare working papers, including checklists, during the audits, but the Staff reviewers typically dispose of their working papers after they use them to prepare the audit reports. The OIG noted that an agency Management Directive provides criteria as to what constitutes personally held non-record materials which may be retained or discarded at the authors sole discretion.37 The OIG did not suggest that the Staff disregarded the guidance in the Management Directive, but it did say that the Staffs failure to maintain copies of applicant documents reviewed and its own 34 See Memorandum from Stephen D. Dingbaum to Luis A. Reyes, Status of Recommendations: Audit of NRC s License Renewal Program (OIG-07-A-15) (ADAMS ML080070247).
11the OIG stated that it considered the seven recommendations resolved.
35 See n. 6, supra. In its follow-up review described in the OIG Memorandum, the OIG looked at the Staffs review of two aging management programs each at Browns Ferry, Brunswick, D.C.
34 Later, on May 2, the OIG issued an additional memorandum on the NRC Staff's license renewal review process.
Cook, and Oyster Creek.
35 That memorandum stated that the NRC safety review process includes both technical reviews performed in NRC headquarters and on-site audits. The OIG's investigation found that the Staff's audit reports indicate that the Staff reviews approximately 280 applicant documents during each audit. The OIG's analysis of work hour data indicated that significant numbers of hours - an average of approximately 10,582 per reactor unit - are spent performing the NRC Staff reviews.
36 Id. at 4.
36   The OIG Memorandum found, however, that the Staff does not preserve copies of all applicant documents reviewed during on-site audits. It also found that Staff reviewers prepare "working papers," including checklists, during the audits, but the Staff reviewers typically dispose of their working papers after they use them to prepare the audit reports. The OIG noted that an agency Management Directive "provides criteria as to what constitutes personally held non-record materials which may be retained or discarded at the author's sole discretion."
37 OIG Memorandum, at 3 n.7. See Handbook 1 of NRC Management Directive 3.53, NRC Records and Document Management Program (Rev. Mar. 15, 2007).  
37 The OIG did not suggest that the Staff disregarded the guidance in the Management Directive, but it did say that the Staff's failure to maintain copies of applicant documents reviewed and its own 34 See Memorandum from Stephen D. Dingbaum to Luis A. Reyes, "Status of Recommendations: Audit of NRC 's License Renewal Program (OIG-07-A-15)" (ADAMS ML080070247).
35 See n. 6, supra. In its follow-up review described in the OIG Memorandum, the OIG looked at the Staff's review of two aging management progr ams each at Browns Ferry, Brunswick, D.C. Cook, and Oyster Creek.
36 Id. at 4. 37 OIG Memorandum, at 3 n.7.
See Handbook 1 of NRC Management Directive 3.53, "NRC Records and Document Management Program" (Rev. Mar. 15, 2007).  


12working papers "made it difficult to verify specific details of staff on-site review activities."
12 working papers made it difficult to verify specific details of staff on-site review activities.38 The OIG Memorandum did not make further recommendations for improving the reporting for license renewal reviews.39 C.
38 The OIG Memorandum did not make further recommendations for improving the reporting for license renewal reviews.
Status of the Proceedings and Relationship to OIG Reports Each of the four license renewal adjudicatory proceedings that are the subject of Petitioners request is at a different stage. In Oyster Creek, the Atomic Safety and Licensing Board issued its Initial Decision and is considering on remand from the Commission an issue relating to the drywell liner,40 and the Boards decision rejecting a late-filed contention is on appeal to the Commission.41 In Pilgrim an evidentiary hearing was held on April 10, 2008, and a Board decision is pending.42 In Vermont Yankee, the Staff issued an FSER in February 2008,43 38 OIG Memorandum, at 3-4.
39 C. Status of the Proceedings and Relationship to OIG Reports Each of the four license renewal adjudicatory proceedings that are the subject of Petitioners' request is at a different stage. In Oyster Creek , the Atomic Safety and Licensing Board issued its Initial Decision and is considering on remand from the Commission an issue relating to the drywell liner, 40 and the Board's decision rejecting a late-filed contention is on appeal to the Commission.
39 On June 26, 2008, the NRC Staff provided a status update to the OIG. Memorandum from Eric J. Leeds, Director, Office of Nuclear Reactor Regulation, to Stephen D. Dingbaum, OIG, Status of Recommendations from Audit of NRCs License Renewal Program, (OIG-07-A-15)
41 In Pilgrim an evidentiary hearing was held on April 10, 2008, and a Board decision is pending.
(ADAMS ML081480064). Thereafter, the OIG responded to the Staff with its analysis and status of its initial recommendations. Based on the Staffs response, the OIG closed recommendations 1, 2, 5, 6, and 8 (no further action requested), and resolved recommendations 3, 4, and 7, subject to Staff updates in early 2009. Memorandum from Stephen D. Dingbaum, OIG, to R. William Borchardt, Status of Recommendations: Audit of NRCs License Renewal Program (OIG-07-A-15) (Sept. 11, 2008) (ADAMS ML082550627).
42 In Vermont Yankee, the Staff issued an FSER in February 2008, 43 38 OIG Memorandum, at 3-4.
Conclusions drawn by OIG in its September 11 memorandum do not alter the conclusions we reach today.
39 On June 26, 2008, the NRC Staff provided a status update to the OIG. Memorandum from Eric J. Leeds, Director, Office of Nuclear Reactor Regulation, to Stephen D. Dingbaum, OIG, "Status of Recommendations from 'Audit of NRC' s License Renewal Program,' (OIG-07-A-15)" (ADAMS ML081480064). Thereafter, the OIG responded to the Staff with its analysis and status of its initial recommendations. Based on the Staff's response, the OIG "closed" recommendations 1, 2, 5, 6, and 8 (no further action requested), and "resolved" recommendations 3, 4, and 7, subject to Staff updates in early 2009. Memorandum from Stephen D. Dingbaum, OIG, to R. William Borchardt, "Status of Recommendations: Audit of NRC's License Renewal Program (OIG-07-A-15)" (Sept. 11, 2008) (ADAMS ML082550627). Conclusions drawn by OIG in its September 11 memorandum do not alter the conclusions we reach today.
40 AmerGen Energy Co., L.L.C. (Oyster Creek Nuclear Generating Station), LBP-07-17, 66 NRC 327 (2007) (Initial Decision), referred to Board by order of the Secretary (Aug. 21, 2008)
40 AmerGen Energy Co., L.L.C. (Oyster Creek Nuclear Generating Station), LBP-07-17, 66 NRC 327 (2007) (Initial Decision), referred to Board by order of the Secretary (Aug. 21, 2008) (unpublished).
(unpublished).
41 See AmerGen Energy Co., L.L.C. (Oyster Creek Nuclear Generating Station), LBP-08-12, 68 NRC __ (slip op. July 24, 2008) (Denying Citizen's motion to reopen the record and to add a  
41 See AmerGen Energy Co., L.L.C. (Oyster Creek Nuclear Generating Station), LBP-08-12, 68 NRC __ (slip op. July 24, 2008) (Denying Citizens motion to reopen the record and to add a new contention).
42 See Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), Memorandum (Notice Pursuant to 10 C.F.R. § 2.309(i)) (Sept. 2, 2008)(unpublished).
43 Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station (Feb. 2008), ADAMS ML080560462.


new contention).
13 an evidentiary hearing was held in late July 2008, and a Board decision is pending. The Indian Point Board recently ruled on the majority of the various petitions for intervention and requests for hearing.44 According to the OIG Report, the OIG looked at the Oyster Creek SER with Open Items and at some information relating to Vermont Yankee, but did not review the Vermont Yankee SER with Confirmatory Items.45 The Pilgrim license renewal review was not included in the OIGs analysis. The OIG Report expressly notes that it does not extrapolate results from the sample to the entire universe of license renewal reviews.46 D.
42 See Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), Memorandum (Notice Pursuant to 10 C.F.R. § 2.309(i)) (Sept. 2, 2008)(unpublished). 
Petitioners Request The crux of the initial Petition is that the OIG Report shows that the license renewal process is so fatally flawed that the NRC cannot use the Staffs FSERs as a foundation for issuing renewed licenses. Petitioners argue that doing so would violate the Atomic Energy Act requirement that the Commission may issue a license only after finding that it is in accord with the common defense and security and will provide adequate protection to the health and safety of the public.47 In addition to the OIG Report, Petitioners argue that the Boards decisions in three early site permit cases completely unrelated to license renewal all show that the 44 Indian Point, LBP-08-13, 68 NRC __ (slip op. July 30, 2008). Previously, the Board rejected petitions from the City of New York and from the New York Affordable Reliable Electricity Alliance for failure to state any admissible contentions. Memorandum and Order (Denying the City of New Yorks Petition for Leave to Intervene) (Dec. 12, 2007), Memorandum and Order (Denying the New York Affordable Reliable Electricity Alliances Petition for Leave to Intervene)
 
(Dec. 12, 2007).
43 Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station (Feb. 2008), ADAMS ML080560462.
45 According to the OIG Report, there was no inspection report or safety evaluation report yet available for Vermont Yankee at the time of OIGs analysis. See Safety Evaluation Report with Confirmatory Items relating to the License Renewal of Vermont Yankee Nuclear Power Station (Mar. 2007). See OIG Report at 46 (Table 2).
13an evidentiary hearing was held in late July 2008, and a Board decision is pending. The Indian Point Board recently ruled on the majority of the various petitions for intervention and requests for hearing.
44   According to the OIG Report, the OIG looked at the Oyster Creek SER with Open Items and at some information relating to Vermont Yankee, but did not review the Vermont Yankee SER with Confirmatory Items.
45 The Pilgrim license renewal review was not included in the OIG's analysis. The OIG Report expressly notes that it "does not extrapolate results from the sample to the entire universe of license renewal reviews."
46     D. Petitioners' Request The crux of the initial Petition is that the OIG Report shows that the license renewal process is so fatally flawed that the NRC cannot use the Staff's FSERs as a foundation for issuing renewed licenses. Petitioners argue that doing so would violate the Atomic Energy Act requirement that the Commission may issue a license only after finding that it is "in accord with the common defense and security and will provide adequate protection to the health and safety of the public."
47 In addition to the OIG Report, Petitioners argue that the Boards' decisions in three early site permit cases - completely unrelated to license renewal - all show that the 44 Indian Point, LBP-08-13, 68 NRC __ (slip op. July 30, 2008). Previously, the Board rejected petitions from the City of New York and from the New York Affordable Reliable Electricity Alliance for failure to state any admissible contentions. Memorandum and Order (Denying the City of New York's Petition for Leave to Intervene) (Dec. 12, 2007), Memorandum and Order (Denying the New York Affordable Reliable Electricity Alliance's Petition for Leave to Intervene) (Dec. 12, 2007).
45 According to the OIG Report, "there was no inspection report or safety evaluation report yet available for Vermont Yankee at the time of OIG's analysis."
See Safety Evaluation Report with Confirmatory Items relating to the License Renewal of Vermont Yankee Nuclear Power Station (Mar. 2007).
See OIG Report at 46 (Table 2).
46 Id. at 45 n.24.
46 Id. at 45 n.24.
47 Atomic Energy Act of 1954, as amended, 42 U.S.C. § 2232(a).
47 Atomic Energy Act of 1954, as amended, 42 U.S.C. § 2232(a). See Petition at 9-10.  
See Petition at 9-10.
14Boards found the Staff's reviews to be lacking in some respect.
48  Petitioners directed their request to the Commission itself, rather than to the Atomic Safety and Licensing Board Panel, because, according to Petitioners, their complaint focuses on the adequacy of the Staff's review, rather than the license applications in the various proceedings. Petitioners ask us to consider their requests under our inherent supervisory authority over licensing proceedings, citing the general principle that the Board's jurisdiction does not extend to overseeing or directing the NRC Staff in its license reviews.
49  Petitioners ask that NRC suspend the four captioned license renewal proceedings  including both the Staff technical reviews and the pending adjudicatory proceedings in which Petitioners are parties  and perform a "complete overhaul" of the license renewal review process. They ask further that we initiate a second investigation, broader in scope than the OIG's, by a body "independent of the NRC Staff"; revise our standards for license renewal reviews; revise the SERs accordingly; and allow new contentions in all four proceedings based on the findings in the "new" SERs.
50 Petitioners' Supplemental Petition, filed in response to the OIG Memorandum, focuses on the documentation, rather than the conduct, of the reviews. The Supplemental Petition claims that the Staff's destruction of its working papers and its failure to retain and make public 48 Petition at 19-21. Petitioners refer to Dominion Nuclear North Anna, LLC (Early Site Permit for North Anna ESP Site), LBP-07-9, 65 NRC 539 (2007), aff'd, CLI-07-23, 66 NRC 35 (2007); System Energy Resources, Inc. (Early Site Permit for Grand Gulf ESP Site), LBP-07-1, 65 NRC 27 (2007), aff'd CLI-07-14, 65 NRC 216 (2007); and Exelon Generation Co., LLC (Early Site Permit for the Clinton ESP Site), LBP-06-28, 64 NRC 460 (2006), aff'd, CLI-07-12, 65 NRC 203 (2007). 
 
49 See Curators of the University of Missouri, CLI-95-1, 41 NRC 71, 121-22 (1995), citing Carolina Power and Light Co. (Shearon Harris Nuclear Power Plant, Units 1, 2, 3 and 4), CLI-80-12, 11 NRC 514, 516 (1980).  


14 Boards found the Staffs reviews to be lacking in some respect.48 Petitioners directed their request to the Commission itself, rather than to the Atomic Safety and Licensing Board Panel, because, according to Petitioners, their complaint focuses on the adequacy of the Staffs review, rather than the license applications in the various proceedings. Petitioners ask us to consider their requests under our inherent supervisory authority over licensing proceedings, citing the general principle that the Boards jurisdiction does not extend to overseeing or directing the NRC Staff in its license reviews.49 Petitioners ask that NRC suspend the four captioned license renewal proceedings including both the Staff technical reviews and the pending adjudicatory proceedings in which Petitioners are parties and perform a complete overhaul of the license renewal review process. They ask further that we initiate a second investigation, broader in scope than the OIGs, by a body independent of the NRC Staff; revise our standards for license renewal reviews; revise the SERs accordingly; and allow new contentions in all four proceedings based on the findings in the new SERs.50 Petitioners Supplemental Petition, filed in response to the OIG Memorandum, focuses on the documentation, rather than the conduct, of the reviews. The Supplemental Petition claims that the Staffs destruction of its working papers and its failure to retain and make public 48 Petition at 19-21. Petitioners refer to Dominion Nuclear North Anna, LLC (Early Site Permit for North Anna ESP Site), LBP-07-9, 65 NRC 539 (2007), affd, CLI-07-23, 66 NRC 35 (2007);
System Energy Resources, Inc. (Early Site Permit for Grand Gulf ESP Site), LBP-07-1, 65 NRC 27 (2007), affd CLI-07-14, 65 NRC 216 (2007); and Exelon Generation Co., LLC (Early Site Permit for the Clinton ESP Site), LBP-06-28, 64 NRC 460 (2006), affd, CLI-07-12, 65 NRC 203 (2007).
49 See Curators of the University of Missouri, CLI-95-1, 41 NRC 71, 121-22 (1995), citing Carolina Power and Light Co. (Shearon Harris Nuclear Power Plant, Units 1, 2, 3 and 4), CLI-80-12, 11 NRC 514, 516 (1980).
50 See Petition at 1-2. Petitioners request that the independent investigation be performed by the OIG, the Atomic Safety and Licensing Board Panel, or the ACRS.  
50 See Petition at 1-2. Petitioners request that the independent investigation be performed by the OIG, the Atomic Safety and Licensing Board Panel, or the ACRS.  


15copies of all licensee documents reviewed was "illegal."
15 copies of all licensee documents reviewed was illegal.51 Petitioners ask the Commission to order the Staff to conduct an investigation to determine how this illegal document destruction became standard practice52 and order the Staff to preserve such documents in the future.53 The Supplemental Petition also asks that the Commission go back to the applicants, determine which documents the Staff reviewed, and, for each aging management program, make a new independent determination of both whether the scope of the Staff review was adequate and whether the aging management program is sufficient to manage the effects of aging.54 The NRC Staff and Applicants oppose both Petitions.55 Principally, they argue that the Petition has no substantive basis because the OIG Report did not conclude that Staff generally neglected to conduct necessary reviews, audits, and inspections. Further, they argue that Petitioners did not show compelling grounds for the Commission to take the extraordinary action of suspending all proceedings. Both the NRC Staff and Applicants emphasize that the only issue appropriate for adjudication is the sufficiency of the license application, not the adequacy of the Staffs review. They point out that Petitioners all intervenors in the individual 51 Supplemental Petition at 14.
51 Petitioners ask the Commission to order the Staff to "conduct an investigation to determine how this illegal document destruction became standard practice" 52 and order the Staff to preserve such documents in the future.
52 Id.
53 The Supplemental Petition also asks that the Commission go back to the applicants, determine which documents the Staff reviewed, and, for each aging management program, make a new independent determination of both whether the scope of the Staff review was adequate and whether the aging management program is sufficient to manage the effects of aging.
53 Id. at 18.
54     The NRC Staff and Applicants oppose both Petitions.
54 Id. at 17.
55 Principally, they argue that the Petition has no substantive basis because the OIG Report did not conclude that Staff generally neglected to conduct necessary reviews, audits, and inspections. Further, they argue that Petitioners did not show "compelling" grounds for the Commission to take the extraordinary action of suspending all proceedings. Both the NRC Staff and Applicants emphasize that the only issue appropriate for adjudication is the sufficiency of the license application, not the adequacy of the Staff's review. They point out that Petitioners - all intervenors in the individual 51 Supplemental Petition at 14.
55 NRC Staff Answer to Petition for Suspension of License Renewal Reviews Pending Investigation of NRC Staff License Renewal Process (Jan. 18, 2008)(Staff Answer to Petition);
52 Id. 53 Id. at 18. 54 Id. at 17. 55 NRC Staff Answer to Petition for Suspension of License Renewal Reviews Pending Investigation of NRC Staff License Renewal Process (Jan. 18, 2008)(Staff Answer to Petition); Answer of Entergy Nuclear Operations, Inc. Opposing Petition to Suspend License Renewal Reviews and Proceedings (Jan. 18, 2008) (with respect to the Indian Point, Pilgrim and Vermont Yankee proceedings)(Entergy Answer to Petition); AmerGen's Answer Opposing Petition for Stay and to Reopen the Record (Jan. 15, 2008) (with respect to the Oyster Creek proceeding)(AmerGen Answer to Petition);
Answer of Entergy Nuclear Operations, Inc. Opposing Petition to Suspend License Renewal Reviews and Proceedings (Jan. 18, 2008) (with respect to the Indian Point, Pilgrim and Vermont Yankee proceedings)(Entergy Answer to Petition); AmerGens Answer Opposing Petition for Stay and to Reopen the Record (Jan. 15, 2008) (with respect to the Oyster Creek proceeding)(AmerGen Answer to Petition); NRC Staffs Answer to Supplemental Petition for Additional Investigation and Correction of Deficiencies in License Renewal Reviews (May 27, 2008)(Staff Answer to Supplemental Petition); Answer of Entergy Nuclear Operations, Inc.
NRC Staff's Answer to Supplemental Petition for Additional Investigation and Correction of Deficiencies in License Renewal Reviews (May 27, 2008)(Staff Answer to Supplemental Petition); Answer of Entergy Nuclear Operations, Inc. Opposing Supplemental Petition to Suspend License Renewal Proceedings (May 27, 2008)(Entergy Answer to Supplemental Petition); AmerGen's Answer Opposing Citizens' Supplemental Petition (May 23, 2008)(AmerGen's Answer to Supplemental Petition).
Opposing Supplemental Petition to Suspend License Renewal Proceedings (May 27, 2008)(Entergy Answer to Supplemental Petition); AmerGens Answer Opposing Citizens Supplemental Petition (May 23, 2008)(AmerGens Answer to Supplemental Petition).  
16license renewal proceedings - had the opportunity to raise contentions on the license renewal applications themselves. Staff and Applicants also raise issues regarding timeliness and service, and point to Petitioners' failure to certify that they attempted to contact the non-moving participants in order to resolve the dispute prior to filing a motion.
56  In addition, the NRC Staff and Applicants vigorously oppose the suggestion that the Staff was required to retain and make public the "working papers" mentioned in the OIG Memorandum. Petitioners filed replies 57 to the Staff's and Applicants' answers to both the initial Petition and the Supplemental Petition, together with motions for our approval to file a reply.
58  The Staff 56 See 10 C.F.R. § 2.323(b).
57 Replies were filed in each of the captioned dockets, identical except for certificates of service. Reply by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.;
Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition to Oppositions to Petition to Suspend License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim and Vermont Yankee Nuclear Power Plants Pending Investigation of NRC Staff Review Process and Correction of Deficiencies (Jan. 25, 2008); Reply by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition to NRC Staff Opposition to Supplemental Petition for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants (June 4, 2008).
58 Motion by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition for Leave to Reply to Oppositions to Petition to Suspend License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim and Vermont Yankee Nuclear Power Plants Pending Investigation of NRC Staff Review Process and Correction of Deficiencies (Jan. 25, 2008); Motion by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper, Inc.; Pilgrim Watch and New England Coalition for Leave to Reply to NRC Staff's Oppositions to Supplemental Petition for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants (June 4, 2008).  


17opposed the replies.
16 license renewal proceedings had the opportunity to raise contentions on the license renewal applications themselves. Staff and Applicants also raise issues regarding timeliness and service, and point to Petitioners failure to certify that they attempted to contact the non-moving participants in order to resolve the dispute prior to filing a motion.56 In addition, the NRC Staff and Applicants vigorously oppose the suggestion that the Staff was required to retain and make public the working papers mentioned in the OIG Memorandum.
59  In addition, the State of New York, a party to the Indian Point license renewal matter, filed a Response in support of the initial Petition.
Petitioners filed replies57 to the Staffs and Applicants answers to both the initial Petition and the Supplemental Petition, together with motions for our approval to file a reply.58 The Staff 56 See 10 C.F.R. § 2.323(b).
60  We have considered the replies but we see nothing in them that alters our analysis of the initial Petition or the Supplemental Petition, which we deny for the reasons set forth below.
57 Replies were filed in each of the captioned dockets, identical except for certificates of service.
II. DISCUSSION Petitioners' requests do not fit cleanly within any of the procedures described within our rules of practice.
Reply by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.;
61  We treat them here as general motions brought under the procedural requirements of 10 C.F.R. § 2.323. Notwithstanding the requirement that motions initially be addressed to the Presiding Officer when a proceeding is pending, 62 here we agree with Petitioners that their motions are best addressed by us pursuant to our inherent supervisory authority over agency proceedings.
Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition to Oppositions to Petition to Suspend License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim and Vermont Yankee Nuclear Power Plants Pending Investigation of NRC Staff Review Process and Correction of Deficiencies (Jan. 25, 2008); Reply by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.;
63 59 See NRC Staff's Response in Opposition to Motion for Leave to Reply (Feb. 4, 2008), and NRC Staff's Response to Joint Motion for Leave to Reply to NRC Staff Opposition to Supplemental Petition for Additional Investigation and Correction of Deficiencies in License Renewal Reviews (June 16, 2008).
Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition to NRC Staff Opposition to Supplemental Petition for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants (June 4, 2008).
See 10 C.F.R. § 2.323(c) ("The moving party has no right to reply except as permitted by the - presiding officer. Permission shall be granted only in compelling circumstances, such as where the moving party could not have anticipated the arguments to which it seeks leave to reply"). 
58 Motion by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.;
 
Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition for Leave to Reply to Oppositions to Petition to Suspend License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim and Vermont Yankee Nuclear Power Plants Pending Investigation of NRC Staff Review Process and Correction of Deficiencies (Jan. 25, 2008); Motion by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper, Inc.; Pilgrim Watch and New England Coalition for Leave to Reply to NRC Staffs Oppositions to Supplemental Petition for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants (June 4, 2008).  
60 State of New York's Response in Support of the Petition to Suspend License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants Pending Investigation of NRC Staff Review Process and Correction of Deficiencies (Jan. 18, 2008). The New York State Attorney General's office also sent a letter to the Commissioners in support of the Petition. Letter from Katherine Kennedy to the Commissioners (Jan. 18, 2008)
 
61 The Petitioners note at the outset that, in the context of this Petition, they do not seek enforcement action pursuant to 10 C.F.R. § 2.206, nor do they request rulemaking pursuant to
 
10 C.F.R. § 2.802. Petition at 7.  


17 opposed the replies.59 In addition, the State of New York, a party to the Indian Point license renewal matter, filed a Response in support of the initial Petition.60 We have considered the replies but we see nothing in them that alters our analysis of the initial Petition or the Supplemental Petition, which we deny for the reasons set forth below.
II.
DISCUSSION Petitioners requests do not fit cleanly within any of the procedures described within our rules of practice.61 We treat them here as general motions brought under the procedural requirements of 10 C.F.R. § 2.323. Notwithstanding the requirement that motions initially be addressed to the Presiding Officer when a proceeding is pending,62 here we agree with Petitioners that their motions are best addressed by us pursuant to our inherent supervisory authority over agency proceedings.63 59 See NRC Staffs Response in Opposition to Motion for Leave to Reply (Feb. 4, 2008), and NRC Staffs Response to Joint Motion for Leave to Reply to NRC Staff Opposition to Supplemental Petition for Additional Investigation and Correction of Deficiencies in License Renewal Reviews (June 16, 2008). See 10 C.F.R. § 2.323(c) (The moving party has no right to reply except as permitted by the presiding officer. Permission shall be granted only in compelling circumstances, such as where the moving party could not have anticipated the arguments to which it seeks leave to reply).
60 State of New Yorks Response in Support of the Petition to Suspend License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants Pending Investigation of NRC Staff Review Process and Correction of Deficiencies (Jan. 18, 2008). The New York State Attorney Generals office also sent a letter to the Commissioners in support of the Petition. Letter from Katherine Kennedy to the Commissioners (Jan. 18, 2008).
61 The Petitioners note at the outset that, in the context of this Petition, they do not seek enforcement action pursuant to 10 C.F.R. § 2.206, nor do they request rulemaking pursuant to 10 C.F.R. § 2.802. Petition at 7.
62 10 C.F.R. § 2.323(a).
62 10 C.F.R. § 2.323(a).
63 See Pacific Gas & Elec. Co. (Diablo Canyon Power Plant Independent Spent Fuel Storage Installation), CLI-02-23, 56 NRC 230, 237 (2002). As acknowledged by the Petition (at 7), our consideration of these petitions should not be read as tacit approval for participants in adjudicatory proceedings to bypass the Board by filing motions directly with us.  
63 See Pacific Gas & Elec. Co. (Diablo Canyon Power Plant Independent Spent Fuel Storage Installation), CLI-02-23, 56 NRC 230, 237 (2002). As acknowledged by the Petition (at 7), our consideration of these petitions should not be read as tacit approval for participants in adjudicatory proceedings to bypass the Board by filing motions directly with us.  


18A. Merits of the Petitions The purpose and scope of a licensing proceeding is to allow interested persons the right to challenge the sufficiency of the application. The NRC has not, and will not, litigate claims about the adequacy of the Staff's safety review in licensing adjudications.
18 A.
64 Each of Petitioners' pleadings, however, simply builds upon the fundamentally flawed premise that Petitioners do have that right. It is the applicant, not the Staff, that has the burden of proof in litigation.
Merits of the Petitions The purpose and scope of a licensing proceeding is to allow interested persons the right to challenge the sufficiency of the application. The NRC has not, and will not, litigate claims about the adequacy of the Staffs safety review in licensing adjudications.64 Each of Petitioners pleadings, however, simply builds upon the fundamentally flawed premise that Petitioners do have that right.
65 Our contention pleading rules emphasize that the petitioner must show that a "genuine dispute exists with the applicant/licensee on a material issue of law and fact."
It is the applicant, not the Staff, that has the burden of proof in litigation.65 Our contention pleading rules emphasize that the petitioner must show that a genuine dispute exists with the applicant/licensee on a material issue of law and fact.66 Petitioners have had ample opportunity to present such contentions during the course of these proceedings. Their request for a complete overhaul of the license renewal review process is largely, if not entirely, outside the scope of these adjudications.
66 Petitioners have had ample opportunity to present such contentions during the course of these proceedings. Their request for a complete overhaul of the license renewal review process is largely, if not entirely, outside the scope of these adjudications. Furthermore, neither the OIG Report nor the OIG Memorandum establishes a need for a complete overhaul of the license renewal process. For instance, the OIG does not question the comprehensive SRP-LR or the capability of the Staff to conduct the necessary reviews under 10 C.F.R. Part 54. The OIG identified certain weaknesses in the review process (which it illustrated with concrete examples), and made precise recommendations for addressing the identified areas of improvement. The Staff agreed with, and is in the process of implementing, 64 See Changes to Adjudicatory Process, Final Rule, 69 Fed. Reg. 2182; 2202 (Jan. 14, 2004) (citing Curators of the University of Missouri , CLI-95-1, 41 NRC at 121-122, and prior agency rulings holding same).
Furthermore, neither the OIG Report nor the OIG Memorandum establishes a need for a complete overhaul of the license renewal process. For instance, the OIG does not question the comprehensive SRP-LR or the capability of the Staff to conduct the necessary reviews under 10 C.F.R. Part 54. The OIG identified certain weaknesses in the review process (which it illustrated with concrete examples), and made precise recommendations for addressing the identified areas of improvement. The Staff agreed with, and is in the process of implementing, 64 See Changes to Adjudicatory Process, Final Rule, 69 Fed. Reg. 2182; 2202 (Jan. 14, 2004)
See also Duke Energy Corp. (Catawba Nuclear Station, Units 1 and 2), CLI-04-6, 59 NRC 62, 74 (2004);
(citing Curators of the University of Missouri, CLI-95-1, 41 NRC at 121-122, and prior agency rulings holding same). See also Duke Energy Corp. (Catawba Nuclear Station, Units 1 and 2),
Calvert Cliffs, CLI-98-25, 48 NRC at 349-50. An exception to this is the NRC staff's review under the National Environmental Policy Act (NEPA). NEPA places legal duties on the NRC, not on license applicants.
CLI-04-6, 59 NRC 62, 74 (2004); Calvert Cliffs, CLI-98-25, 48 NRC at 349-50. An exception to this is the NRC staffs review under the National Environmental Policy Act (NEPA). NEPA places legal duties on the NRC, not on license applicants.
65 See Curators of the University of Missouri, CLI-95-1, 41 NRC at 121.
65 See Curators of the University of Missouri, CLI-95-1, 41 NRC at 121.
66 10 C.F.R. § 2.309(f)(1)(vi) (emphasis added).
66 10 C.F.R. § 2.309(f)(1)(vi) (emphasis added).  
19all but one of these recommendations (Recommendation 8). The OIG did not characterize any of the findings as posing a risk - imminent or otherwise - to the public health and safety, or to the common defense and security. In sharp contrast to the OIG's specific recommendations, the initial Petition asserted generally that the entire license renewal process is inadequate and needs a complete "overhaul.Then, in response to the OIG Memorandum, which confirmed that Staff does indeed spend a significant amount of time and effort in the license renewal process, Petitioners shifted the focus of their complaint to the amount of documentation that is made publicly available. 1. No Need Shown to Overhaul the License Renewal Review Process Petitioners' fundamental concern appears to be that the NRC Staff is not faithfully carrying out the process that has been developed. But in support of their Petitions, Petitioners have offered nothing more than speculation that the Staff has simply copied the license renewal applications rather than conducting the audits and inspections described in the standard review plan.67 They argue that the OIG Report "shows" that the Staff "merely copied directly from the license renewal applications" 68 and that "the Staff may not have conducted any independent reviews at all."
 
69   As the Staff suggests, however, the Staff's reliance on program basis documents in some instances is part of an overall review that reflects independent Staff judgment in a variety of ways.70 For instance, the Staff notes that it propounded over a hundred requests for additional information and over 350 audit questions in the course of its review of the Oyster 67 See, e.g., Petition at 14.
19 all but one of these recommendations (Recommendation 8). The OIG did not characterize any of the findings as posing a risk imminent or otherwise to the public health and safety, or to the common defense and security.
68 Id. at 14. 69 Id. at 23. 70 NRC Staff Answer to Supplemental Petition at 13.
In sharp contrast to the OIGs specific recommendations, the initial Petition asserted generally that the entire license renewal process is inadequate and needs a complete overhaul. Then, in response to the OIG Memorandum, which confirmed that Staff does indeed spend a significant amount of time and effort in the license renewal process, Petitioners shifted the focus of their complaint to the amount of documentation that is made publicly available.
20 Creek license renewal application.
: 1. No Need Shown to Overhaul the License Renewal Review Process Petitioners fundamental concern appears to be that the NRC Staff is not faithfully carrying out the process that has been developed. But in support of their Petitions, Petitioners have offered nothing more than speculation that the Staff has simply copied the license renewal applications rather than conducting the audits and inspections described in the standard review plan.67 They argue that the OIG Report shows that the Staff merely copied directly from the license renewal applications68 and that the Staff may not have conducted any independent reviews at all.69 As the Staff suggests, however, the Staffs reliance on program basis documents in some instances is part of an overall review that reflects independent Staff judgment in a variety of ways.70 For instance, the Staff notes that it propounded over a hundred requests for additional information and over 350 audit questions in the course of its review of the Oyster 67 See, e.g., Petition at 14.
71 Furthermore, the OIG Report did not conclude that the Staff generally neglected to conduct necessary reviews, audits and inspections. Rather, the OIG Report identified one area where it might appear that the Staff may not be gathering facts independently, i.e., that portion of the application where the applicant describes its experience in implementing the aging management programs that are already in place. The OIG Report cites several examples in which the description in an SER of a licensee's operating experience seemingly was copied directly out of a license renewal application.
68 Id. at 14.
72  However, the OIG Report notes that the Staff may have independently investigated operating experience even where the SERs' description of operating experience is the same as in the license renewal application.
69 Id. at 23.
73  For example, the OIG Report cites a portion of the Oyster Creek SER with Open Items pertaining to the licensee's flow-accelerated corrosion program as an example where the Staff's discussion seems simply to repeat the licensee's description of its operating experience.
70 NRC Staff Answer to Supplemental Petition at 13.  
74  In that instance, the Staff states that it confirmed the application information through interviews with the licensee's technical staff.
75 The OIG Report did not opine that discussion with an applicant's staff was an "invalid" method of verifying experience, per se. Rather, the OIG Report recommended use of 71 Id. 72 OIG Report at 49.
73 Id. at 10. 74 Id. at 49. We note that the GALL Report only provided a brief and general description of operating experience on this aging management program, whereas the Oyster Creek application provided a lengthy description of that licensee's operating experience in the implementation of this program. Compare GALL Report at sec. XI.M17 (page XI M-62) with Oyster Creek Generating Station License Renewal Application, App. B at B-41 to B-42 (ADAMS


ML052080185)(July 22, 2005).  
20 Creek license renewal application.71 Furthermore, the OIG Report did not conclude that the Staff generally neglected to conduct necessary reviews, audits and inspections. Rather, the OIG Report identified one area where it might appear that the Staff may not be gathering facts independently, i.e., that portion of the application where the applicant describes its experience in implementing the aging management programs that are already in place. The OIG Report cites several examples in which the description in an SER of a licensees operating experience seemingly was copied directly out of a license renewal application.72 However, the OIG Report notes that the Staff may have independently investigated operating experience even where the SERs description of operating experience is the same as in the license renewal application.73 For example, the OIG Report cites a portion of the Oyster Creek SER with Open Items pertaining to the licensees flow-accelerated corrosion program as an example where the Staffs discussion seems simply to repeat the licensees description of its operating experience.74 In that instance, the Staff states that it confirmed the application information through interviews with the licensees technical staff. 75 The OIG Report did not opine that discussion with an applicants staff was an invalid method of verifying experience, per se. Rather, the OIG Report recommended use of 71 Id.
72 OIG Report at 49.
73 Id. at 10.
74 Id. at 49. We note that the GALL Report only provided a brief and general description of operating experience on this aging management program, whereas the Oyster Creek application provided a lengthy description of that licensees operating experience in the implementation of this program. Compare GALL Report at sec. XI.M17 (page XI M-62) with Oyster Creek Generating Station License Renewal Application, App. B at B-41 to B-42 (ADAMS ML052080185)(July 22, 2005).
75 See NUREG-1875, Vol. 2 at 3-15.  


75 See NUREG-1875, Vol. 2 at 3-15.
21 license applicants corrective action databases for spot checking operating experience and establishment of guidelines for doing so.76 It is also important to keep in mind that operating experience is only one element of ten considered essential in evaluating an aging management program, which in turn is only one of the matters the Staff must consider for license renewal. Petitioners, however, would have us assume that what the OIG found with respect to this one element is true with respect to the entire safety review. Petitioners have provided no examples from other portions of the pertinent SERs, where it appears that the Staff copied material from the license renewal applications.
21license applicants' corrective action databases for "spot checking" operating experience and establishment of guidelines for doing so.
Petitioners complaint that the Staff is merely parroting the license application, which is in turn merely parroting NRC Guidance documents, merits comment. 77 The portions of the SERs that the OIG Report referenced as not showing independent verification concerned the plants individual operating experience, but neither the OIG nor the Petitioners cited any example from any license renewal application where the applicants description of operating experience was copied from the GALL Report. With respect to other elements of the aging management programs in particular, Petitioners are mistaken that it is inappropriate for the applications to parrot the GALL Report. The purpose of the GALL Report is to identify and describe programs which have proved effective in managing aging effects in reactors.
76 It is also important to keep in mind that "operating experience" is only one element of ten considered essential in evaluating an aging management program, which in turn is only one of the matters the Staff must consider for license renewal. Petitioners, however, would have us assume that what the OIG found with respect to this one element is true with respect to the entire safety review. Petitioners have provided no examples from other portions of the pertinent SERs, where it appears that the Staff copied material from the license renewal applications. Petitioners' complaint that the Staff is merely "parroting" the license application, which is in turn merely "parroting" NRC Guidance documents, merits comment. 77 The portions of the SERs that the OIG Report referenced as not showing independent verification concerned the plant's individual operating experience, but neither the OIG nor the Petitioners cited any example from any license renewal application where the applicant's description of operating experience was "copied" from the GALL Report. With respect to other elements of the aging management programs in particular, Petitioners are mistaken that it is inappropriate for the applications to "parrot" the GALL Report. The purpose of the GALL Report is to identify and describe programs which have proved effective in managing aging effects in reactors.
Deviations from the generically approved programs must be individually justified by the license renewal applicant. The license renewal applicant would, therefore, naturally use similar wording to describe its own aging management programs in order to demonstrate that they are the same as the corresponding programs described in the GALL Report.
Deviations from the generically approved programs must be individually justified by the license renewal applicant. The license renewal applicant would, therefore, naturally use similar wording to describe its own aging management programs in order to demonstrate that they are the same as the corresponding programs described in the GALL Report. Significantly, the OIG Report did not suggest that the Staff should abandon all reliance 76 See OIG Report at 19-21.
Significantly, the OIG Report did not suggest that the Staff should abandon all reliance 76 See OIG Report at 19-21.
77 See Petition at 3.  
77 See Petition at 3.  


22on a license renewal applicant's regulatory obligation to submit complete and accurate information.
22 on a license renewal applicants regulatory obligation to submit complete and accurate information.78 Rather, it recommended that management should standardize the scope and depth to which the Staff verifies the facts with respect to operating experience.79 Importantly, the OIG Report did not suggest, as Petitioners have, that members of the NRC Staff represented that they conducted audits or inspections that they did not in fact perform.80 Petitioners have not shown a compelling basis for their demand for a complete license renewal overhaul. The OIG Report provides no basis for such an overhaul, as we have explained. Further, Petitioners have not demonstrated any other basis to comprehensively revisit the Staffs regulatory review process. Indeed, they have not pointed to any weakness in the SRP-LR or shown any reason why license renewal applicants should not be permitted to reference the GALL Report to show that their existing aging management programs will effectively maintain safety systems. They have not made any specific suggestions as to additional steps to be taken in addition to the procedures the Staff has developed for license renewal review.
78 Rather, it recommended that management should standardize the scope and depth to which the Staff verifies the facts with respect to operating experience.
Petitioners fail to make the important distinction between the entire license renewal review process including the Staffs document reviews, audits, and inspections and the final step, which is documentation of the Staffs review in an FSER. Many of the portions of the OIG Report to which Petitioners cite discuss the Staffs report-writing, not the substance of its review. For example, the OIG Report stated that the lack of precision in differentiating quoted and unquoted text makes it difficult for the reader to distinguish between the licensee-provided 78 See, e.g., 10 C.F.R. §§ 50.9, 54.13.
79 Importantly, the OIG Report did not suggest, as Petitioners have, that members of the NRC Staff represented that they conducted audits or inspections that they did not in fact perform.
80   Petitioners have not shown a compelling basis for their demand for a complete license renewal "overhaul.The OIG Report provides no basis for such an overhaul, as we have explained. Further, Petitioners have not demonstrated any other basis to comprehensively revisit the Staff's regulatory review process. Indeed, they have not pointed to any weakness in  
 
the SRP-LR or shown any reason why license renewal applicants should not be permitted to reference the GALL Report to show that their existing aging management programs will effectively maintain safety systems. They have not made any specific suggestions as to additional steps to be taken in addition to the procedures the Staff has developed for license renewal review. Petitioners fail to make the important distinction between the entire license renewal review process - including the Staff's document reviews, audits, and inspections - and the final step, which is documentation of the Staff's review in an FSER. Many of the portions of the OIG Report to which Petitioners cite discuss the Staff's report-writing, not the substance of its review. For example, the OIG Report stated that the "lack of precision in differentiating quoted and unquoted text makes it difficult for the reader to distinguish between the licensee-provided 78 See, e.g., 10 C.F.R. §§ 50.9, 54.13.
79 OIG Report at 11.
79 OIG Report at 11.
80 See, e.g., Petition at 14-15, 25, 29.  
80 See, e.g., Petition at 14-15, 25, 29.  
 
23data and NRC Staff's independent assessment and conclusions."
81  This is a question of effective documentation, not a question of whether Staff has verified an appropriate selection of facts. Similarly, the Report said that the Staff's "description of the methods used and the support they provided for their conclusions often lack substance."
82  As the Staff suggested in its brief, the recommendation could be implemented by adding "appropriately placed citations to the established methodologies in the SERs."
83  Similarly, the issue raised in the Supplemental Petition - whether the Staff reviewers should have kept their working papers as agency records - relates to documentation.      In addition, Petitioners' reference in their initial Petition to comments made by the licensing boards in three early site permit (ESP) cases adds no weight to Petitioners' insinuations that the Staff does a generally poor job of reviewing any sort of license application. First of all, we note that all three boards (and, in each case, the Commission) found that the


permit should be issued.
23 data and NRC Staffs independent assessment and conclusions.81 This is a question of effective documentation, not a question of whether Staff has verified an appropriate selection of facts. Similarly, the Report said that the Staffs description of the methods used and the support they provided for their conclusions often lack substance.82 As the Staff suggested in its brief, the recommendation could be implemented by adding appropriately placed citations to the established methodologies in the SERs.83 Similarly, the issue raised in the Supplemental Petition - whether the Staff reviewers should have kept their working papers as agency records
84 Even considering the Boards' comments in a light most favorable to Petitioners, they were insufficient to render invalid the Staff's ESP reviews, and do not support a determination that the Staff's review processes (be they license renewal or otherwise) are substantively flawed.         Indeed, in reviewing the Clinton ESP decision, we expressly rejected the idea that the Staff's review of that ESP application had not been adequate.
- relates to documentation.
85 There, we explicitly endorsed 81 Id. at 9. 82 OIG Report at 11.
In addition, Petitioners reference in their initial Petition to comments made by the licensing boards in three early site permit (ESP) cases adds no weight to Petitioners insinuations that the Staff does a generally poor job of reviewing any sort of license application.
First of all, we note that all three boards (and, in each case, the Commission) found that the permit should be issued.84 Even considering the Boards comments in a light most favorable to Petitioners, they were insufficient to render invalid the Staffs ESP reviews, and do not support a determination that the Staffs review processes (be they license renewal or otherwise) are substantively flawed.
Indeed, in reviewing the Clinton ESP decision, we expressly rejected the idea that the Staffs review of that ESP application had not been adequate.85 There, we explicitly endorsed 81 Id. at 9.
82 OIG Report at 11.
83 Staff Brief at 19.
83 Staff Brief at 19.
84 In any event, a Board's criticism of the Staff's review with respect to one application is in no way material to the review of another, wholly distinct application, absent an obvious and direct connection to the licensing action at issue. We see no such connection here.  
84 In any event, a Boards criticism of the Staffs review with respect to one application is in no way material to the review of another, wholly distinct application, absent an obvious and direct connection to the licensing action at issue. We see no such connection here.
 
85 Exelon Generation Co., LLC (Early Site Permit for Clinton ESP Site), CLI-07-12, 65 NRC 203, (Continued )  
85 Exelon Generation Co., LLC (Early Site Permit for Clinton ESP Site), CLI-07-12, 65 NRC 203, (Continued -)
24the Staff's "longstanding regulatory practice" of prioritizing which facts to verify and generally expecting the license applicants to provide correct and complete information in applications submitted under oath.
86  We take this opportunity to reiterate that it is neither possible nor necessary for the Staff to verify each and every factual assertion in complex license applications, including license renewal applications. The Staff's audit, or sampling, method of verifying a license renewal applicant's aging management programs, together with the other components of its review, enables the Staff to make the safety findings necessary for issuance of a renewed license.
87 In December, 2006, the NRC turned down a petition for rulemaking urging that deficiencies in the NRC Staff's safety reviews required fundamental changes in - and broadening the scope of - the license renewal process.
88  Lawsuits challenging the rulemaking denial, brought by some of the Oyster Creek intervenors (among others), were recently resolved in the NRC's favor.
89  For the reasons given in the NRC's rulemaking denial, we remain convinced that the agency's current license renewal approach and process are sensible and lawful. That is not to say that improvements cannot be made, as, for example, the transparency-driven enhancements OIG suggested in its recent report. But we are aware of nothing calling for the complete overhaul that Petitioners demand.                                                                                                                               


24 the Staffs longstanding regulatory practice of prioritizing which facts to verify and generally expecting the license applicants to provide correct and complete information in applications submitted under oath.86 We take this opportunity to reiterate that it is neither possible nor necessary for the Staff to verify each and every factual assertion in complex license applications, including license renewal applications. The Staffs audit, or sampling, method of verifying a license renewal applicants aging management programs, together with the other components of its review, enables the Staff to make the safety findings necessary for issuance of a renewed license.87 In December, 2006, the NRC turned down a petition for rulemaking urging that deficiencies in the NRC Staff's safety reviews required fundamental changes in and broadening the scope of the license renewal process.88 Lawsuits challenging the rulemaking denial, brought by some of the Oyster Creek intervenors (among others), were recently resolved in the NRCs favor.89 For the reasons given in the NRC's rulemaking denial, we remain convinced that the agency's current license renewal approach and process are sensible and lawful. That is not to say that improvements cannot be made, as, for example, the transparency-driven enhancements OIG suggested in its recent report. But we are aware of nothing calling for the complete overhaul that Petitioners demand.
207-08 (2007).
207-08 (2007).
86 Id. 87 See also 10 C.F.R. § 54.13 (requiring, among other things, that information provided to the Commission by a license renewal applicant for a renewed license must be complete and accurate in all material respects).
86 Id.
87 See also 10 C.F.R. § 54.13 (requiring, among other things, that information provided to the Commission by a license renewal applicant for a renewed license must be complete and accurate in all material respects).
88 Petition for Rulemaking: Denial, 71 Fed. Reg. 74,848 (Dec. 13, 2006).
88 Petition for Rulemaking: Denial, 71 Fed. Reg. 74,848 (Dec. 13, 2006).
89 Spano v. NRC, No. 07-0324-ag (L) (2d Cir. Sept. 19, 2008)(Summary order) (denying petitions for review).  
89 Spano v. NRC, No. 07-0324-ag (L) (2d Cir. Sept. 19, 2008)(Summary order) (denying petitions for review).  


25For these reasons, Petitioners have not demonstrated, nor do we otherwise find, a basis for conducting a "comprehensive overhaul" of the Staff's license renewal review process. With this in mind, we now turn to Petitioners' claims that the Staff improperly destroyed records. 2. Claims That Staff Illegally Destroyed Records Petitioners' claim that the NRC Staff improperly destroyed official agency records does not support their motion to suspend these particular license renewal proceedings or to overhaul the license renewal review process in general. As discussed above, the Petitioners are mistaken that they have a legal entitlement to scrutinize, second guess, and adjudicate the "quality" of the Staff's review per se. Further, this claim is based on a misinterpretation of an NRC Management Directive intended to clarify the agency's obligations under the Federal Records Act (FRA) 90 and regulations promulgated by the National Archives and Records Administration.
25 For these reasons, Petitioners have not demonstrated, nor do we otherwise find, a basis for conducting a comprehensive overhaul of the Staffs license renewal review process. With this in mind, we now turn to Petitioners claims that the Staff improperly destroyed records.
91       The focus of the license proceeding must be the sufficiency of the application, not the adequacy of the Staff's review. Petitioners' initial Petition acknowledged this principle.
: 2.
92 But their Supplemental Petition goes well beyond the initial Petition in proposing that the Commission investigate the Staff's review of each aging management program, determine whether that review was sufficient, and allow Petitioners an opportunity to file new contentions.
Claims That Staff Illegally Destroyed Records Petitioners claim that the NRC Staff improperly destroyed official agency records does not support their motion to suspend these particular license renewal proceedings or to overhaul the license renewal review process in general. As discussed above, the Petitioners are mistaken that they have a legal entitlement to scrutinize, second guess, and adjudicate the quality of the Staffs review per se. Further, this claim is based on a misinterpretation of an NRC Management Directive intended to clarify the agencys obligations under the Federal Records Act (FRA)90 and regulations promulgated by the National Archives and Records Administration.91 The focus of the license proceeding must be the sufficiency of the application, not the adequacy of the Staffs review. Petitioners initial Petition acknowledged this principle.92 But their Supplemental Petition goes well beyond the initial Petition in proposing that the Commission investigate the Staffs review of each aging management program, determine whether that review was sufficient, and allow Petitioners an opportunity to file new contentions.93 Even if the working files at issue should have been preserved as agency records, the Petitioners have made no argument regarding how destruction of these working files could meet the 90 The Federal Records Act is the common name of a series of statutes that govern the creation, management, and disposal of records by federal agencies. See 44 U.S.C. §§ 2101-18, 2901-09, 3101-07, 3301-24.
93 Even if the working files at issue should have been preserved as agency records, the Petitioners have made no argument regarding how destruction of these working files could meet the 90 The "Federal Records Act" is the common name of a series of statutes that govern the creation, management, and disposal of records by federal agencies.
See 44 U.S.C. §§ 2101-18, 2901-09, 3101-07, 3301-24.  
 
91 36 C.F.R. pt. 1220.
91 36 C.F.R. pt. 1220.
92 Petition at 6-7.
92 Petition at 6-7.
93 Supplemental Petition at 17-18.
93 Supplemental Petition at 17-18.  
26contention admissibility standards in our regulations. The Commission pointed out in Curators of the University of Missouri that it would be unfair to deny a meritorious application because the Staff's review was found lacking.
 
94 It would make even less sense to punish the applicant for the Staff's paperwork management practices. The FRA gives federal agencies some discretion in determining which documentary materials are appropriate for preservation as an agency "record.Agency "records" are defined as: all books, papers, maps, photographs, or other documentary materials - made or received by an agency - in connection with the transaction of public business and preserved or appropriate for preservation by that agency - as evidence of the organization functions, policies, decisions, procedures, operations or other activities of the government or because of the informational value of the data in them.
26 contention admissibility standards in our regulations. The Commission pointed out in Curators of the University of Missouri that it would be unfair to deny a meritorious application because the Staffs review was found lacking.94 It would make even less sense to punish the applicant for the Staffs paperwork management practices.
95   NRC's Management Directive 3.53 96 provides the Commission's interpretation of its obligations under the FRA, as well as the Commission's expectations for the Staff in fulfilling those obligations. It should be noted, however, that the Management Directive itself does not have the force of law. The pertinent section of the Management Directive provides that: Working files, such as preliminary drafts and rough notes and other similar materials, will be maintained and filed with the official record for purposes of adequate and proper documentation if they meet the following two conditions:
The FRA gives federal agencies some discretion in determining which documentary materials are appropriate for preservation as an agency record. Agency records are defined as:
* They were circulated or made available to employees, other than the creator, for official     purposes such as approval, comment, action, recommendation, followup, and to communicate with agency staff about agency business.
all books, papers, maps, photographs, or other documentary materials made or received by an agency in connection with the transaction of public business and preserved or appropriate for preservation by that agency as evidence of the organization functions, policies, decisions, procedures, operations or other activities of the government or because of the informational value of the data in them.95 NRCs Management Directive 3.5396 provides the Commissions interpretation of its obligations under the FRA, as well as the Commissions expectations for the Staff in fulfilling those obligations. It should be noted, however, that the Management Directive itself does not have the force of law. The pertinent section of the Management Directive provides that:
* They contain unique information, such as substantive annotations or comments, that       adds to a proper understanding of the agency's formulation and execution of basic 94 CLI-95-1, 41 NRC at 121-22.
Working files, such as preliminary drafts and rough notes and other similar materials, will be maintained and filed with the official record for purposes of adequate and proper documentation if they meet the following two conditions:
* They were circulated or made available to employees, other than the creator, for official purposes such as approval, comment, action, recommendation, followup, and to communicate with agency staff about agency business.
* They contain unique information, such as substantive annotations or comments, that adds to a proper understanding of the agencys formulation and execution of basic 94 CLI-95-1, 41 NRC at 121-22.
95 FRA, 44 U.S.C. § 3301; see also 36 C.F.R. § 1220.14 (same definition).
95 FRA, 44 U.S.C. § 3301; see also 36 C.F.R. § 1220.14 (same definition).
96 Handbook 1 of Management Directive 3.53, "NRC Records and Document Management Program," (Rev. Mar. 15, 2007).  
96 Handbook 1 of Management Directive 3.53, NRC Records and Document Management Program, (Rev. Mar. 15, 2007).  


27   policies, decisions, actions, or responsibilities.
27 policies, decisions, actions, or responsibilities.97 Petitioners interpret this provision as meaning any document that satisfies either condition must be preserved.98 They contend that the destroyed Staff working papers satisfy the second condition, because they contain unique information that adds to a proper understanding of [the reviewers] decision that a particular aging management program meets the criteria listed in the GALL report.
97       Petitioners interpret this provision as meaning any document that satisfies either condition must be preserved.
We disagree with that interpretation. The phrase if they meet the following two conditions clearly requires that both conditions be satisfied.99 Moreover, the provision in the Management Directive is taken almost word for word from National Archives and Records Administration regulations, with the exception that the Code of Federal Regulations provision uses the word and between the two conditions that must be present to qualify a working file as an agency record.100 So, to constitute an agency record, a working file must contain unique information that underlies an agency decision, and it must also have been made available to other agency employees for purposes of helping to reach or support that decision. Otherwise, materials created by an employee for the individuals own use in performing his or her job, and which are not circulated (and are not otherwise required by NRC policy to be maintained), may be discarded at the employees discretion.101 97 Handbook 1, Management Directive 3.53 (Rev. Mar. 2007), at 19-20.
98 They contend that the destroyed Staff working papers satisfy the second condition, because they contain "unique information - that adds to a proper understanding of [the reviewer's] decision" that a particular aging management program meets the criteria listed in the GALL report. We disagree with that interpretation. The phrase "if they meet the following two conditions" clearly requires that both conditions be satisfied.
99 Moreover, the provision in the Management Directive is taken almost word fo r word from National Archives and Records Administration regulations, with the exception that the Code of Federal Regulations provision uses the word "and" between the two conditions that must be present to qualify a "working file" as an agency record.
100 So, to constitute an agency record, a working file must contain unique information that underlies an agency decision, and it must also have been made available to other agency employees for purposes of helping to reach or support that decision. Otherwise, materials created by an employee for the individual's own use in performing his or her job, and which are not circulated (and are not otherwise required by NRC policy to be maintained), may be discarded at the employee's discretion.
101 97 Handbook 1, Management Directive 3.53 (Rev. Mar. 2007), at 19-20.
98 Supplemental Petition at 10.
98 Supplemental Petition at 10.
99 As with statutes, the plain meaning of a regulation controls its interpretation. See, e.g., Tesoro Hawaii Corp. v. United States, 405 F.3d 1339, 1346 (Fed. Cir. 2005); Time Warner Entertainment Co. L.P. v. Everest Midwest Licensee, L.L.C., 381 F.3d 438, 443 (10 th Cir. 2004); U.S. Department of Energy (High-Level Waste Repository), CLI-06-5, 63 NRC 143 (2006).
99 As with statutes, the plain meaning of a regulation controls its interpretation. See, e.g.,
Tesoro Hawaii Corp. v. United States, 405 F.3d 1339, 1346 (Fed. Cir. 2005); Time Warner Entertainment Co. L.P. v. Everest Midwest Licensee, L.L.C., 381 F.3d 438, 443 (10th Cir. 2004);
U.S. Department of Energy (High-Level Waste Repository), CLI-06-5, 63 NRC 143 (2006).
100 36 C.F.R. § 1222.34(c).
100 36 C.F.R. § 1222.34(c).
101 Management Directive 3.53, at 45, 62.
101 Management Directive 3.53, at 45, 62. See also 36 C.F.R. § 1228.24 (b)(5) (Non-records may be discarded in accordance with instructions in the agencys published records control (Continued )  
See also 36 C.F.R. § 1228.24 (b)(5) (Non-records may be discarded in accordance with instructions in the agency's published records control (Continued -)
28Petitioners make no concrete showing of the destruction of unique and significant documentary information. They also make only the faintest attempt to address the requirement of circulation for official purposes.
102  While the OIG observed that license renewal review audit team members do not keep all notes and working papers that they utilize in preparing formal audit reports, the OIG made no finding of a violation of law, regulation or agency policy regarding record retention, let alone wholesale violations warranting dramatic action.
103  We conclude, therefore, that there is no basis in the OIG Memorandum or in Petitioners' submission to find that Staff members improperly disposed of agency records. B. The Petition Does Not Support Adjudicatory Relief As discussed below, given that we find no basis to "completely overhaul" the license renewal process, there is no reason to "suspend" or otherwise stay the currently pending license renewal reviews or the associated adjudicatory proceedings. Nor have Petitioners justified                                                                                                                               


guidelines).
28 Petitioners make no concrete showing of the destruction of unique and significant documentary information. They also make only the faintest attempt to address the requirement of circulation for official purposes.102 While the OIG observed that license renewal review audit team members do not keep all notes and working papers that they utilize in preparing formal audit reports, the OIG made no finding of a violation of law, regulation or agency policy regarding record retention, let alone wholesale violations warranting dramatic action.103 We conclude, therefore, that there is no basis in the OIG Memorandum or in Petitioners submission to find that Staff members improperly disposed of agency records.
B.
The Petition Does Not Support Adjudicatory Relief As discussed below, given that we find no basis to completely overhaul the license renewal process, there is no reason to suspend or otherwise stay the currently pending license renewal reviews or the associated adjudicatory proceedings. Nor have Petitioners justified guidelines).
102 Supplemental Petition at 13.
102 Supplemental Petition at 13.
103 Even if the working papers should have been retained under the terms of MD 3.53 and applicable National Archives and Records Administration regulations, and thus constituted "agency records," Petitioners would not necessarily have been entitled to see them. The Freedom of Information Act (FOIA) protects intra-agency memoranda developed during the decisionmaking process under the deliberative process privilege. FOIA, 5 U.S.C. § 552(b)(5). If documents in the working papers were circulated for the purpose of reaching a decision on the adequacy of a particular aging management program, they would most likely fall under the deliberative process privilege. See, e.g., Mapother v. Dep't of Justice, 3 F.3d 1533, 1539 (D.C.
103 Even if the working papers should have been retained under the terms of MD 3.53 and applicable National Archives and Records Administration regulations, and thus constituted agency records, Petitioners would not necessarily have been entitled to see them. The Freedom of Information Act (FOIA) protects intra-agency memoranda developed during the decisionmaking process under the deliberative process privilege. FOIA, 5 U.S.C. § 552(b)(5). If documents in the working papers were circulated for the purpose of reaching a decision on the adequacy of a particular aging management program, they would most likely fall under the deliberative process privilege. See, e.g., Mapother v. Dept of Justice, 3 F.3d 1533, 1539 (D.C.
Cir. 1993) (deliberative process privilege protected summaries of information gathered to assist the agency in reaching a "complex" and "significant" policy decision, where the summaries reflected the judgment or opinion of their compiler);
Cir. 1993) (deliberative process privilege protected summaries of information gathered to assist the agency in reaching a complex and significant policy decision, where the summaries reflected the judgment or opinion of their compiler); see also Montrose Chemical Corp. v. Train, 491 F.2d 63, 70 (D.C. Cir. 1974)(deliberative process privilege purpose is not only to encourage frank intra-agency discussion of policy but also to ensure that the mental processes of decision-makers are not subject to public scrutiny). While this privilege is a qualified one, Petitioners would have to show that their need for the information outweighed potential harm to the agency from that disclosure. Redland Soccer Club v. Dept of the Army, 55 F.3d 827, 854 (3d Cir. 1995), cert. denied, 516 U.S. 1071 (1996); Chevron U.S.A. v. United States, 80 Fed.Cl.
see also Montrose Chemical Corp. v. Train, 491 F.2d 63, 70 (D.C. Cir. 1974)(deliberative process privilege purpose is "not only to encourage frank intra-agency discussion of policy but also to ensure that the mental processes of decision-makers are not subject to public scrutiny"). While this privilege is a qualified one, Petitioners would have to show that their need for the information outweighed potential harm to  
340, 356 (2008).


the agency from that disclosure. Redland Soccer Club v. Dep't of the Army, 55 F.3d 827, 854 (3d Cir. 1995), cert. denied , 516 U.S. 1071 (1996); Chevron U.S.A. v. United States, 80 Fed.Cl.
29 reopening the record in the Oyster Creek proceeding.
340, 356 (2008). 
: 1.
 
Suspension of the Ongoing Adjudicatory Proceedings The Commission considers suspension of licensing proceedings a drastic action that is not warranted absent immediate threats to public health and safety.104 While our regulations do not provide for a motion to suspend a proceeding, we have occasionally considered similar requests to suspend proceedings or hold them in abeyance in the exercise of our inherent supervisory powers over proceedings. For example, we considered similar motions presented to us in the wake of the September 11 terrorist attacks. We ultimately rejected such requests pending the Commissions comprehensive review of anti-terrorist measures at licensed facilities.105 We declined to suspend the Diablo Canyon independent spent fuel storage installation license proceeding pending the post-9/11 security review, citing the publics interest in expeditious resolution of adjudicatory matters.106 But we also reasoned that, should the review result in security enhancements for spent fuel storage facilities, those enhancements could be implemented at Diablo Canyon even after the license issued.107 Similarly, we expect licensees and license renewal applicants to adjust their aging management programs to reflect lessons learned in the future through individual and industry-104 Vermont Yankee Nuclear Power Corp. & AmerGen Vermont, LLC (Vermont Yankee Nuclear Power Station) CLI-00-20, 52 NRC 151, 173-74 (2000) (refusing request to suspend all license transfer proceedings involving a particular transferee while the Commission examined effects of ownership by limited liability companies).
29reopening the record in the Oyster Creek proceeding.  
105 See Private Fuel Storage, LLC, (Independent Spent Fuel Storage Installation), CLI-01-26, 54 NRC 376 (2001). See also Diablo Canyon, CLI-02-23, 56 NRC 230; Duke Cogema Stone &
: 1. Suspension of the Ongoing Adjudicatory Proceedings The Commission considers suspension of licensing proceedings a "drastic" action that is not warranted absent "immediate threats to public health and safety."
104 While our regulations do not provide for a "motion to suspend" a proc eeding, we have occasionally considered similar requests to suspend proceedings or hold them in abeyance in the exercise of our inherent supervisory powers over proceedings. For exam ple, we considered similar motions presented to us in the wake of the September 11 terrorist attacks. We ultimately rejected such requests pending the Commission's comprehensive review of anti-terrorist measures at licensed facilities.
105 We declined to suspend the Diablo Canyon independent spent fuel storage installation license proceeding pending the post-9/11 security review, citing the public's interest in expeditious resolution of adjudicatory matters.
106 But we also reasoned that, should the review result in security enhancements for spent fuel storage facilities, those enhancements could be implemented at Diablo Canyon even after the license issued.
107       Similarly, we expect licensees and license renewal applicants to adjust their aging management programs to reflect lessons learned in the future through individual and industry-104 Vermont Yankee Nuclear Power Corp. & AmerGen Vermont, LLC (Vermont Yankee Nuclear Power Station) CLI-00-20, 52 NRC 151, 173-74 (2000) (refusing request to suspend all license transfer proceedings involving a particular transferee while the Commission examined effects of ownership by limited liability companies).
105 See Private Fuel Storage, LLC, (Independent Spent Fuel Storage Installation), CLI-01-26, 54 NRC 376 (2001).
See also Diablo Canyon , CLI-02-23, 56 NRC 230; Duke Cogema Stone &
Webster (Savannah River Mixed Oxide Fuel Fabrication Facility), CLI-01-28, 54 NRC 393 (2001).
Webster (Savannah River Mixed Oxide Fuel Fabrication Facility), CLI-01-28, 54 NRC 393 (2001).
106 CLI-02-23, 56 NRC at 238.
106 CLI-02-23, 56 NRC at 238.
107 Id. at 239.
107 Id. at 239.  
30wide experiences. "The license renewal program is a living program" 108 that continues to evolve. As new insights or changes emerge over time, we expect the Staff to require, as appropriate, any modification to systems, structur es or components that is necessary to assure adequate protection of the public health and safety, or to bring the facility into compliance with a license, or the rules and orders of the Commission.
 
109   Finally, in all proceedings the stakeholders have an interest in "efficient and expeditious" resolution.
30 wide experiences. The license renewal program is a living program108 that continues to evolve. As new insights or changes emerge over time, we expect the Staff to require, as appropriate, any modification to systems, structures or components that is necessary to assure adequate protection of the public health and safety, or to bring the facility into compliance with a license, or the rules and orders of the Commission.109 Finally, in all proceedings the stakeholders have an interest in efficient and expeditious resolution.110 We see no reason to suspend the proceedings to await an overhaul, which we have found unnecessary, to the license review process.
110 We see no reason to suspend the proceedings to await an "overhaul," which we have found unnecessary, to the license review process.  
: 2.
: 2. Motion to Reopen the Record in Oyster Creek Petitioners in the Oyster Creek proceeding have not met the requirements for reopening the record, which closed on September 25, 2007.
Motion to Reopen the Record in Oyster Creek Petitioners in the Oyster Creek proceeding have not met the requirements for reopening the record, which closed on September 25, 2007.111 Reopening a closed record requires, among other things, a showing that the motion is timely. Petitioners motion was filed four months after the OIG Report on which it is based became available to the public.112 Next, such a motion must address a significant safety or environmental issue.113 Petitioners offer only the speculation that the Staff may have failed to identify such an issue because their review may have been insufficiently thorough.
111 Reopening a closed record requires, among other things, a showing that the motion is timely. Petitioners' motion was filed four months after the OIG Report on which it is based became available to the public.
112 Next, such a motion "must address a significant safety or environmental issue."
113 Petitioners offer only the speculation that the Staff may have failed to identify such an issue because their review may have been insufficiently thorough.
108 E.g., Oyster Creek FSER, NUREG-1875 at 1-6.
108 E.g., Oyster Creek FSER, NUREG-1875 at 1-6.
109 10 C.F.R. § 50.109.
109 10 C.F.R. § 50.109. See Diablo Canyon, CLI-02-23, 56 NRC at 240.
See Diablo Canyon , CLI-02-23, 56 NRC at 240.
110 See generally Statement of Policy on Conduct of Adjudicatory Proceedings, CLI-98-12, 48 NRC 18 (1998).
110 See generally Statement of Policy on Conduct of Adjudicatory Proceedings , CLI-98-12, 48 NRC 18 (1998).
111 See 10 C.F.R. § 2.326. An appeal is currently pending before the Commission on a request to reopen the record and admit a contention on an unrelated matter. See Oyster Creek, LBP-08-12, 68 NRC __ (slip op.) (denying Citizens motion to reopen the record and to add a new contention).
111 See 10 C.F.R. § 2.326. An appeal is currently pending before the Commission on a request to reopen the record and admit a contention on an unrelated matter. See Oyster Creek , LBP-08-12, 68 NRC __ (slip op.) (denying Citizen's motion to reopen the record and to add a new contention).
112 The OIG Report was released to the public on September 7, 2007.
112 The OIG Report was released to the public on September 7, 2007.
113 10 C.F.R. § 2.326(a)(2).
113 10 C.F.R. § 2.326(a)(2).  
31The moving party must show that a "materially different result - would have been likely" if the new information had been available to the Board.
114  In fact, the OIG Report was publicly available at the time of the hearing. But it could not have altered the result in the license renewal hearing in a "material" way, both because the OIG Report does not provide support for a substantive challenge to the license renewal application and because the Staff review is outside the scope of the hearing.
115    Finally, a motion to reopen must be supported by "affidavits setting forth the factual and/or technical basis for the movants' claim" that a significant and material safety or environmental issue exists.
116  Petitioners provided no affidavits -  only mere speculation that, if the Staff undertook another review of the Oyster Creek license renewal application starting after all of the OIG recommendations have been fully implemented, the conclusions in the FSER might be materially different - something, in other words, might turn up supporting Petitioners' concerns. This does not justify restarting the hearing process. For these reasons, the Oyster Creek Petitioners' motion to reopen the proceeding is denied.
117 114 10 C.F.R. § 2.326(a)(3).
115 Five of the Petitioners participated as intervenors in the Oyster Creek license renewal proceeding, and thus have had opportunity to be heard on litigable issues appropriately within the scope of the agency's license renewal review. After an evidentiary hearing, the Board ruled
 
in the applicant's favor. (See LBP-07-17, 66 NRC 327 (2007)). Although in response to Intervenors' Petition for Review, the Commission requested additional briefs (See CLI-08-10, 68 NRC __ (slip op. May 28, 2008)) and referred a single issue to the Board for consideration of additional evidence, (Order of the Secretary (Aug. 21, 2008) (unpublished)), it would be unfair to the applicant to delay this proceeding even further because of supposed deficiencies in the


Staff's review. Compare Curators of the University of Missouri, CLI-95-1, 41 NRC at 121 ("even assuming arguendo that Staff did conduct an insufficient review, a denial of a meritorious application on that ground would be grossly unfair - punishing the applicant for an error by Staff"). 116 10 C.F.R. § 2.326(b).
31 The moving party must show that a materially different result would have been likely if the new information had been available to the Board.114 In fact, the OIG Report was publicly available at the time of the hearing. But it could not have altered the result in the license renewal hearing in a material way, both because the OIG Report does not provide support for a substantive challenge to the license renewal application and because the Staff review is outside the scope of the hearing.115 Finally, a motion to reopen must be supported by affidavits setting forth the factual and/or technical basis for the movants claim that a significant and material safety or environmental issue exists.116 Petitioners provided no affidavits only mere speculation that, if the Staff undertook another review of the Oyster Creek license renewal application starting after all of the OIG recommendations have been fully implemented, the conclusions in the FSER might be materially different something, in other words, might turn up supporting Petitioners concerns. This does not justify restarting the hearing process. For these reasons, the Oyster Creek Petitioners motion to reopen the proceeding is denied.117 114 10 C.F.R. § 2.326(a)(3).
117 Petitioners also cite an incident pertaining to the Oyster Creek facility (Petition at 17-19), relevant to maintenance of certain equipment and the plant's commitment tracking system. It is (Continued -)
115 Five of the Petitioners participated as intervenors in the Oyster Creek license renewal proceeding, and thus have had opportunity to be heard on litigable issues appropriately within the scope of the agencys license renewal review. After an evidentiary hearing, the Board ruled in the applicants favor. (See LBP-07-17, 66 NRC 327 (2007)). Although in response to Intervenors Petition for Review, the Commission requested additional briefs (See CLI-08-10, 68 NRC __ (slip op. May 28, 2008)) and referred a single issue to the Board for consideration of additional evidence, (Order of the Secretary (Aug. 21, 2008) (unpublished)), it would be unfair to the applicant to delay this proceeding even further because of supposed deficiencies in the Staffs review. Compare Curators of the University of Missouri, CLI-95-1, 41 NRC at 121 (even assuming arguendo that Staff did conduct an insufficient review, a denial of a meritorious application on that ground would be grossly unfair - punishing the applicant for an error by Staff).
32 C. Other Matters As an alternative to completely overhauling the review process, Petitioners suggest that "if the problems identified by the OIG turn out to primarily concern reporting rather than a failure to perform the reviews", then the SERs should be "comprehensively revised."
116 10 C.F.R. § 2.326(b).
118  We would not call upon the Staff to undertake cumbersome and resource-intensive revisions of the already-completed Oyster Creek, Vermont Yankee, and Pilgrim FSERs, or of other previously-completed license renewal reviews, where we have no basis for concluding that the Staff's safety reviews were inadequate to assure that the licensees have appropriate aging management programs in place.
117 Petitioners also cite an incident pertaining to the Oyster Creek facility (Petition at 17-19),
119  As discussed above, we find no evidence, in either the OIG Report or the Petition, to require an "overhaul" of the license renewal review process. We base this conclusion on the fact that neither the Petition nor the OIG Report has identified any safety issue resulting from the OIG investigation.        It also bears noting that each license renewal application addressed by the Petition has been the subject of a hearing opportunity. In that context, Petitioners have had, or will have, the opportunity to ventilate litigable issues within the scope of license renewal. Substantive                                                                                                                               
relevant to maintenance of certain equipment and the plants commitment tracking system. It is (Continued )  


not clear that this issue would appropriately fall within the scope of license renewal review, and therefore, it does not support Petitioners' fundamental premise that the Staff's license renewal review process is flawed. To the extent that Petitioners are attempting to raise concerns regarding an ongoing operational issue at the Oyster Creek facility, the appropriate avenue for resolution of such a concern is via the 10 C.F.R. § 2.206 process.
32 C.
Other Matters As an alternative to completely overhauling the review process, Petitioners suggest that if the problems identified by the OIG turn out to primarily concern reporting rather than a failure to perform the reviews, then the SERs should be comprehensively revised.118 We would not call upon the Staff to undertake cumbersome and resource-intensive revisions of the already-completed Oyster Creek, Vermont Yankee, and Pilgrim FSERs, or of other previously-completed license renewal reviews, where we have no basis for concluding that the Staffs safety reviews were inadequate to assure that the licensees have appropriate aging management programs in place.119 As discussed above, we find no evidence, in either the OIG Report or the Petition, to require an overhaul of the license renewal review process.
We base this conclusion on the fact that neither the Petition nor the OIG Report has identified any safety issue resulting from the OIG investigation.
It also bears noting that each license renewal application addressed by the Petition has been the subject of a hearing opportunity. In that context, Petitioners have had, or will have, the opportunity to ventilate litigable issues within the scope of license renewal. Substantive not clear that this issue would appropriately fall within the scope of license renewal review, and therefore, it does not support Petitioners fundamental premise that the Staffs license renewal review process is flawed. To the extent that Petitioners are attempting to raise concerns regarding an ongoing operational issue at the Oyster Creek facility, the appropriate avenue for resolution of such a concern is via the 10 C.F.R. § 2.206 process.
118 Petition at 30.
118 Petition at 30.
119 We note that, with respect to the Indian Point review, the Staff has stated its intent to revise the schedule for completion of its review for a number of reasons, including to account for corrective actions stemming from the OIG recommendations. See letter from Brian Holian, Director, Division of License Renewal, Office of Nuclear Reactor Regulation, to Joseph E.
119 We note that, with respect to the Indian Point review, the Staff has stated its intent to revise the schedule for completion of its review for a number of reasons, including to account for corrective actions stemming from the OIG recommendations. See letter from Brian Holian, Director, Division of License Renewal, Office of Nuclear Reactor Regulation, to Joseph E.
Pollock (Vice President Operations, Entergy Nuclear Operations, Inc.) (Sept. 2, 2008) (ADAMS  
Pollock (Vice President Operations, Entergy Nuclear Operations, Inc.) (Sept. 2, 2008) (ADAMS ML082400214).


ML082400214).  
33 challenges to license renewal applications are appropriately made in that context.120 In summary, we find no basis to require the Staff to revisit any completed SERs for license renewal. We expect that such an exercise would not result in any change to the Staffs conclusions or recommendations and, therefore, is not warranted.121 III.
CONCLUSION For the foregoing reasons, the Petitions are denied.
IT IS SO ORDERED.
For the Commission (NRC SEAL)  
/RA/
Annette L. Vietti-Cook Secretary of the Commission Dated at Rockville, Maryland this _6th_ day of October, 2008 120 In addition, even though Petitioners expressly declined to seek enforcement action pursuant to 10 C.F.R. § 2.206, if they, or any other person, wish to institute a proceeding to modify, suspend, or revoke a license, or to request other action, that mechanism remains open to them.
121 Commissioner Jaczko, in his partial dissent, expresses the view that the Commission should require the Staff to supplement the record with information on whether Staff followed applicable guidance and to provide verifications with respect to its exercise of independent judgment and its documentation. For multiple reasons discussed above, the Commission majority does not find it necessary to do so. For instance, the Staffs safety and environmental findings are already reflected in its formal reports that are made part of the record, and the applications themselves have been subject to adjudicatory hearing opportunities. In addition, it bears repeating that it is appropriate for the Staff to exercise judgment in deciding which facts to verify and the extent of its audits, since applicants are expected to provide complete and accurate information in all material respects. The OIG, while identifying methods for improving the Staffs review and documentation, also found that the Staff in fact expended enormous effort in conducting its license renewal reviews, including its review of the Oyster Creek application.
Asking the Staff to provide verifications regarding completed reviews likely would subject the Staff to the task of replicating much of its prior work in order to complete a meaningful and thorough re-review - a task with no obvious end point.  


33challenges to license renewal applications are appropriately made in that context.
34 Commissioner Gregory B. Jaczko respectfully dissents, in part:
120    In summary, we find no basis to require the Staff to revisit any completed SERs for license renewal. We expect that such an exercise would not result in any change to the Staff's conclusions or recommendations and, therefore, is not warranted.
While I concur with a majority of this decision, I respectfully dissent, in part. The Office of Inspector General's (OIG) Audit of the License Renewal Program found that the staff did not consistently provide adequate descriptions of audit methodology or support for conclusions in license renewal reports. I agree with the majority that this does not necessarily mean that the staff's safety findings are invalid, but it certainly means that it is difficult in some instances to ascertain the basis for the staff's safety findings from the license renewal documentation. And as the OIG noted, "adequate documentation of review methodologies and support for staff conclusions in license renewal reports is important for supporting the sufficiency and rigor of NRC's review process." (OIG Audit of NRC's License Renewal Program, pg. 7).
121    III. CONCLUSION For the foregoing reasons, the Petitions are denied. IT IS SO ORDERED.       For the Commission (NRC SEAL)    /RA/      ___________________
Because of the importance of these license renewal reports and their role in establishing a complete and sound basis for the agency's ultimate license renewal decisions, I supported a version of the Order that would have required the staff in each of the cases before us to supplement the record with information as to whether staff followed applicable guidance and whether its review reflected an exercise of independent staff judgment. I want to be clear that this is not an issue about the integrity of the NRC Staff, but an issue about the integrity of the documents upon which the agency relies in making its decision. I believe requiring these documents to be clarified or supplemented as necessary, would have been a simple yet effective way to verify to the public that the staffs analysis and findings in each of these cases was the result of an independent staff judgment - something that the IG report does call into question and something that the current record neglects to address.
Annette L. Vietti-Cook      Secretary of the Commission 
I believe this is not only the obvious next step, but a necessary one if we intend to confirm what we think we know. After all, if this is, as we all assume, simply an issue with transparency of documentation, then it is a straightforward thing to resolve - request verification


Dated at Rockville, Maryland this _6 th_ day of October, 2008 
35 of the documentation. If it is more than that, there is only one way to find out - request verification of the documentation. In either instance, the answer is the same. Thus, I disagree with the majority's decision on this point and instead believe we should have required staff to supplement the record with this information. I can find no justification or benefit to leaving a record begging these obvious questions.
I also believe, similarly, that the issue raised in the supplemental petition - that the staff improperly destroyed documentation - could be resolved through verification of the documentation. While the Petitioners have not argued how this issue could meet the standards for an admissible contention in our regulations, verification of the documentation could provide a basis for the Commission to judge the significance of the staffs discarding field notes created during onsite audits. This would assist us not only in resolving the issues raised by the Petitioners, but would provide us with information that might lead us to direct the staff to change its practices with respect to documenting field audits, or to initiate additional OIG investigation, if either of these actions are warranted.
Finally, I believe that the majority order misses an opportunity to highlight the ongoing efforts aimed at improving reviews in the license renewal area, including staffs efforts to address the recommendations in the IGs original report. Whether one characterizes such efforts as an overhaul or not, I believe these changes will bring increased transparency to the hard work the staff does in reviewing license renewal applications and I look forward to their implementation.


120 In addition, even though Petitioners expressly declined to seek enforcement action pursuant to 10 C.F.R. § 2.206, if they, or any other person, wish to institute a proceeding to modify, suspend, or revoke a license, or to request other action, that mechanism remains open to them.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
121 Commissioner Jaczko, in his partial dissent, expresses the view that the Commission should require the Staff to supplement the record with information on whether Staff followed applicable guidance and to provide verifications with respect to its exercise of independent judgment and its documentation. For multiple reasons discussed above, the Commission majority does not find it necessary to do so. For instance, the Staff's safety and environmental findings are already reflected in its formal reports that are made part of the record, and the applications
)
 
)
themselves have been subject to adjudicatory hearing opportunities. In addition, it bears repeating that it is appropriate for the Staff to exercise judgment in deciding which facts to verify and the extent of its audits, since applicants are expected to provide complete and accurate information in all material respects. The OIG, while identifying methods for improving the Staff's review and documentation, also found that the Staff in fact expended enormous effort in conducting its license renewal reviews, including its review of the Oyster Creek application.
AMERGEN ENERGY COMPANY, LLC
Asking the Staff to provide verifications regarding completed reviews likely would subject the Staff to the task of replicating much of its prior work in order to complete a meaningful and thorough re-review - a task with no obvious end point.
)
 
Docket No. 50-219-LR
34  Commissioner Gregory B. Jaczko respectfully dissents, in part: While I concur with a majority of this decision, I respectfully dissent, in part. The Office of Inspector General's (OIG) Audit of the License Renewal Program found that the staff did not consistently provide adequate descriptions of audit methodology or support for conclusions in license renewal reports. I agree with the majority that this does not necessarily mean that the staff's safety findings are invalid, but it certainly means that it is difficult in some instances to ascertain the basis for the staff's safety findings from the license renewal documentation. And as the OIG noted, "adequate documentation of review methodologies and support for staff conclusions in license renewal reports is important for supporting the sufficiency and rigor of NRC's review process."  (OIG Audit of NRC's License Renewal Program, pg. 7). Because of the importance of these license renewal reports and their role in establishing a complete and sound basis for the agency's ultimate license renewal decisions, I supported a version of the Order that would have required the staff in each of the cases before us to supplement the record with information as to whether staff followed applicable guidance and whether its review reflected an exercise of independent staff judgment. I want to be clear that this is not an issue about the integrity of the NRC Staff, but an issue about the integrity of the documents upon which the agency relies in making its decision. I believe requiring these documents to be clarified or supplemented as necessary, would have been a simple yet effective way to verify to the public that the staff's analysis and findings in each of these cases was the result of an independent staff judgment - something that the IG report does call into question and something that the current record neglects to address. I believe this is not only the obvious next step, but a necessary one if we intend to confirm what we think we know. After all, if this is, as we all assume, simply an issue with transparency of documentation, then it is a straightforward thing to resolve - request verification 35of the documentation. If it is more than that, there is only one way to find out - request verification of the documentation. In either instance, the answer is the same. Thus, I disagree with the majority's decision on this point and instead believe we should have required staff to supplement the record with this information. I can find no justification or benefit to leaving a record begging these obvious questions. I also believe, similarly, that the issue raised in the supplemental petition - that the staff improperly destroyed documentation - could be resolved through verification of the documentation. While the Petitioners have not argued how this issue could meet the standards for an admissible contention in our regulations, verification of the documentation could provide a basis for the Commission to judge the significance of the staff's discarding field notes created during onsite audits. This would assist us not only in resolving the issues raised by the Petitioners, but would provide us with information that might lead us to direct the staff to change its practices with respect to documenting field audits, or to initiate additional OIG investigation, if either of these actions are warranted. Finally, I believe that the majority order misses an opportunity to highlight the ongoing efforts aimed at improving reviews in the license renewal area, including staff's efforts to address the recommendations in the IG's original report. Whether one characterizes such efforts as an "overhaul" or not, I believe these changes will bring increased transparency to the hard work the staff does in reviewing license renewal applications and I look forward to their implementation.
)
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSIONIn the Matter of)
)
)AMERGEN ENERGY COMPANY, LLC)Docket No. 50-219-LR ))(Oyster Creek Nuclear)
(Oyster Creek Nuclear
Generating Station))
)
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-08-23), dated October 6, 2008 have been served upon the following persons by electronic
Generating Station)
 
)
mail this date, followed by deposit of paper copies in the U.S. mail, first class, and NRC internal
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-08-23), dated October 6, 2008 have been served upon the following persons by electronic mail this date, followed by deposit of paper copies in the U.S. mail, first class, and NRC internal mail.
 
Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Administrative Judge E. Roy Hawkens, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: erh@nrc.gov Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: pba@nrc.gov Administrative Judge Anthony J. Baratta Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ajb5@nrc.gov Emily Krause, Law Clerk Atomic Safety and Licensing Board Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: Emily.Krause@nrc.gov Richard Webster, Esq.
mail.Office of Commission Appellate Adjudication
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: ocaamail@nrc.gov Administrative Judge E. Roy Hawkens, Chair
 
Atomic Safety and Licensing Board Panel
 
Mail Stop - T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: erh@nrc.gov Administrative Judge Paul B. Abramson
 
Atomic Safety and Licensing Board Panel
 
Mail Stop - T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: pba@nrc.gov Administrative Judge Anthony J. Baratta
 
Atomic Safety and Licensing Board Panel
 
Mail Stop - T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: ajb5@nrc.gov Emily Krause, Law Clerk Atomic Safety and Licensing Board
 
Mail Stop - T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: Emily.Krause@nrc.gov Richard Webster, Esq.
Julia LeMense, Esq.
Julia LeMense, Esq.
Eastern Environmental Law Center 744 Broad Street, Suite 1525 Newark, NJ 07102 E-mail: rwebster@easternenvironmental.org; jlemense@easternenvironmental.org


Eastern Environmental Law Center
2 Docket No. 50-219-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23)
 
744 Broad Street, Suite 1525
 
Newark, NJ  07102
 
E-mail: rwebster@easternenvironmental.org; jlemense@easternenvironmental.org 2 Docket No. 50-219-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23)
Mary C. Baty, Esq.
Mary C. Baty, Esq.
Marcia J. Simon, Esq.
Marcia J. Simon, Esq.
 
Brian Newell, Paralegal Office of the General Counsel Mail Stop - O-15 D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: mcb1@nrc.gov; jea1@nrc.gov; bpn1@nrc.gov Donald J. Silverman, Esq.
Brian Newell, Paralegal
 
Office of the General Counsel
 
Mail Stop - O-15 D21
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: mcb1@nrc.gov
; jea1@nrc.gov
;bpn1@nrc.gov Donald J. Silverman, Esq.
 
Kathryn M. Sutton, Esq.
Kathryn M. Sutton, Esq.
Alex S. Polonsky, Esq.
Alex S. Polonsky, Esq.
Raphael P. Kuyler, Esq.
Raphael P. Kuyler, Esq.
 
Morgan, Lewis & Bockius LLP 1111 Pennsyvlania Ave., NW Washington, DC 20004 E-mail: dsilverman@morganlewis.com; ksutton@morganlewis.com; apolonsky@morganlewis.com; rkuyler@morganlewis.com Paul Gunter, Reactor Oversight Kevin Kamps Beyond Nuclear Nuclear Policy Research Institute 6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912 E-mail: paul@beyondnuclear.org; kevin@beyondnuclear.org Jill Lipoti, Director New Jersey Department of Environmental Protection Division of Environmental Safety and Health P.O. Box 424 Trenton, NJ 08625-0424 E-mail: jill.lipoti@dep.state.nj.us Bradley M. Campbell, Commissioner New Jersey Department of Environmental Protection P.O. Box 402 Trenton, NJ 08625-0402 E-mail:
Morgan, Lewis & Bockius LLP
 
1111 Pennsyvlania Ave., NW
 
Washington, DC 20004
 
E-mail: dsilverman@morganlewis.com; ksutton@morganlewis.com; apolonsky@morganlewis.com
;rkuyler@morganlewis.com Paul Gunter, Reactor Oversight
 
Kevin Kamps
 
Beyond Nuclear
 
Nuclear Policy Research Institute
 
6930 Carroll Avenue, Suite 400
 
Takoma Park, MD 20912
 
E-mail: paul@beyondnuclear.org
;kevin@beyondnuclear.org Jill Lipoti, Director
 
New Jersey Department of  
 
Environmental Protection
 
Division of Environmental Safety and Health
 
P.O. Box 424
 
Trenton, NJ 08625-0424
 
E-mail: jill.lipoti@dep.state.nj.us Bradley M. Campbell, Commissioner New Jersey Department of  
 
Environmental Protection
 
P.O. Box 402
 
Trenton, NJ 08625-0402
 
E-mail:
commissionercampbell@dep.state.nj.us J. Bradley Fewell, Esq.
commissionercampbell@dep.state.nj.us J. Bradley Fewell, Esq.
Exelon Corporation 4300 Warrenville Road Warrenville, IL 60555 E-mail: bradley.fewell@exeloncorp.com Ron Zak New Jersey Department of Environmental Protection Nuclear Engineering P.O. Box 415 Trenton, NJ 08625-0415 E-mail: ron.zak@dep.state.nj.us Suzanne Leta NJPIRG 11 N. Willow St.
Trenton, NJ 08608 E-mail: sleta@njpirg.org


Exelon Corporation
3 Docket No. 50-219-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23)
 
4300 Warrenville Road
 
Warrenville, IL  60555
 
E-mail: bradley.fewell@exeloncorp.com Ron Zak New Jersey Department of
 
Environmental Protection
 
Nuclear Engineering
 
P.O. Box 415
 
Trenton, NJ  08625-0415
 
E-mail: ron.zak@dep.state.nj.us Suzanne Leta NJPIRG 11 N. Willow St.
 
Trenton, NJ  08608
 
E-mail: sleta@njpirg.org 3 Docket No. 50-219-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23)
John A. Covino, Esq.
John A. Covino, Esq.
Ellen Barney Balint, Esq.
Ellen Barney Balint, Esq.
Valerie Anne Gray, Esq.
Valerie Anne Gray, Esq.
Deputy Attorneys General New Jersey Office of the Attorney General Environmental Permitting &
Counseling Section, Division of Law Hughes Justice Complex P.O. Box 093 Trenton, NJ 08625 E-mail: john.covino@law.dol.lps.state.nj.us; ellen.balint@dol.lps.state.nj.us; valerie.gray@dol.lps.state.nj.us;
[Original signed by Christine M. Pierpoint]_
Office of the Secretary of the Commission Dated at Rockville, Maryland this 6th day of October, 2008


Deputy Attorneys General
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
 
)
New Jersey Office of the Attorney General
)
 
ENTERGY NUCLEAR OPERATIONS, INC. )
Environmental Permitting &
Docket Nos. 50-247/286-LR
 
)
Counseling Section, Division of Law
)
 
(Indian Point Nuclear Generating Station
Hughes Justice Complex
)
 
Units 2 and 3)
P.O. Box 093
)
 
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-08-23), dated October 6, 2008, have been served upon the following persons by electronic mail this date, followed by deposit of paper copies in the U.S. mail, first class, and NRC internal mail.
Trenton, NJ  08625
Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ocaamail@nrc.gov Administrative Judge Lawrence G. McDade, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 lgm1@nrc.gov Administrative Judge Richard E. Wardwell Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 rew@nrc.gov Administrative Judge Kaye D. Lathrop 190 Cedar Lane E.
 
Ridgway, CO 81432 Kaye.lathrop@nrc.gov
E-mail: john.covino@law.dol.lps.state.nj.us; ellen.balint@dol.lps.state.nj.us; valerie.gray@dol.lps.state.nj.us;
                      [Original signed by Christine M. Pierpoint]_
Office of the Secretary of the Commission Dated at Rockville, Maryland this 6th day of October, 2008 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSIONIn the Matter of   )
  )ENTERGY NUCLEAR OPERATIONS, INC.   )Docket Nos. 50-247/286-LR
  )
  )(Indian Point Nuclear Generating Station   )
Units 2 and 3)   )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-08-23), dated October 6, 2008, have been served upon the following persons by electronic
 
mail this date, followed by deposit of paper copies in the U.S. mail, first class, and NRC internal
 
mail. Office of Commission Appellate Adjudication
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
ocaamail@nrc.gov Administrative Judge
 
Lawrence G. McDade, Chair
 
Atomic Safety and Licensing Board Panel
 
Mail Stop - T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
lgm1@nrc.gov Administrative Judge
 
Richard E. Wardwell
 
Atomic Safety and Licensing Board Panel
 
Mail Stop - T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
rew@nrc.gov Administrative Judge
 
Kaye D. Lathrop
 
190 Cedar Lane E.
 
Ridgway, CO 81432
 
Kaye.lathrop@nrc.gov Docket Nos. 50-247/286-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 2 Sherwin E. Turk, Esq.


Docket Nos. 50-247/286-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 2 Sherwin E. Turk, Esq.
Beth N. Mizuno, Esq.
Beth N. Mizuno, Esq.
David E. Roth, Esq.
David E. Roth, Esq.
Jessica A. Bielecki, Esq.
Jessica A. Bielecki, Esq.
Marcia J. Simon, Esq.
Marcia J. Simon, Esq.
Karl Farrar, Esq.
Karl Farrar, Esq.
 
Brian Newell, Paralegal Office of the General Counsel Mail Stop - O-15 D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 set@nrc.gov bnm1@nrc.gov der@nrc.gov jab2@nrc.gov mjs5@nrc.gov klf@nrc.gov bpn1@nrc.gov Mylan L. Denerstein Executive Deputy Attorney General Social Justice Office of the Attorney General of the State of New York 120 Broadway, 25th Floor New York, NY 10271 Mylan.Denerstein@oag.state.ny.us Michael J. Delaney, Vice President - Energy New York City Economic Development Corporation 110 William Street New York, NY 10038 mdelaney@nycedc.com Arthur J. Kremer, Chairman New York AREA 347 Fifth Avenue, Suite 508 New York, NY 10016 kkremer@area-alliance.org Martin J. ONeill, Esq.
Brian Newell, Paralegal
 
Office of the General Counsel
 
Mail Stop - O-15 D21
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001 set@nrc.gov bnm1@nrc.gov der@nrc.gov jab2@nrc.gov mjs5@nrc.gov klf@nrc.gov bpn1@nrc.gov Mylan L. Denerstein Executive Deputy Attorney General
 
Social Justice
 
Office of the Attorney General
 
of the State of New York
 
120 Broadway, 25 th Floor New York, NY 10271
 
Mylan.Denerstein@oag.state.ny.us Michael J. Delaney, Vice President - Energy
 
New York City
 
Economic Development Corporation
 
110 William Street
 
New York, NY 10038
 
mdelaney@nycedc.com Arthur J. Kremer, Chairman
 
New York AREA
 
347 Fifth Avenue, Suite 508
 
New York, NY 10016
 
kkremer@area-alliance.org Martin J. O'Neill, Esq.
 
Kathryn M. Sutton, Esq.
Kathryn M. Sutton, Esq.
Paul M. Bessette, Esq.
Paul M. Bessette, Esq.
Mauri T. Lemoncelli, Esq.
Mauri T. Lemoncelli, Esq.
Counsel for Entergy Nuclear Operations, Inc.
Counsel for Entergy Nuclear Operations, Inc.
 
Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 martin.oneill@morganlewis.com ksutton@morganlewis.com pbessette@morganlewis.com mlemoncelli@morganlewis.com Manna Jo Greene, Director Hudson River Sloop Clearwater, Inc.
Morgan, Lewis & Bockius LLP
 
1111 Pennsylvania Avenue, NW
 
Washington, DC 20004
 
martin.o'neill@morganlewis.com ksutton@morganlewis.com pbessette@morganlewis.com mlemoncelli@morganlewis.com Manna Jo Greene, Director
 
Hudson River Sloop Clearwater, Inc.
 
112 Little Market St.
112 Little Market St.
Poughkeepsie, NY 12601 mannajo@clearwater.org


Poughkeepsie, NY 12601
Docket Nos. 50-247/286-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 3 Daniel E. ONeill, Mayor Village of Buchanan James Seirmarc, M.S., Liaison to Indian Point 236 Tate Avenue Buchanan, NY 10511 Robert D. Snook, Esq.
 
Assistant Attorney General of the State of Connecticut 55 Elm Street P.O. Box 120 Hartford, CT 06141-0120 robert.snook@po.state.ct.us Charlene M. Indelicato, Esq.
mannajo@clearwater.org Docket Nos. 50-247/286-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 3 Daniel E. O'Neill, Mayor
Westchester County Attorney Justin D. Pruyne, Esq.
 
Assistant County Attorney 148 Martine Avenue, 6th Floor White Plains, NY 10601 jdp3@westchestergov.com Thomas F. Wood, Esq.
Village of Buchanan
 
James Seirmarc, M.S., Liaison to Indian Point
 
236 Tate Avenue
 
Buchanan, NY 10511 Robert D. Snook, Esq.
Assistant Attorney General
 
of the State of Connecticut
 
55 Elm Street
 
P.O. Box 120
 
Hartford, CT 06141-0120
 
robert.snook@po.state.ct.us Charlene M. Indelicato, Esq.
 
Westchester County Attorney
 
Justin D. Pruyne, Esq.
 
Assistant County Attorney
 
148 Martine Avenue, 6 th Floor White Plains, NY 10601
 
jdp3@westchestergov.com Thomas F. Wood, Esq.
 
Daniel Riesel, Esq.
Daniel Riesel, Esq.
 
Counsel for the Town of Cortlandt Sive, Paget & Riesel, P.C.
Counsel for the Town of Cortlandt
460 Park Avenue New York, NY 10022 driesel@sprlaw.com Andrew M. Cuomo, Esq.
 
Attorney General of the State of New York John J. Sipos, Esq.
Sive, Paget & Riesel, P.C.
Assistant Attorney General The Capitol Albany, NY 12224-0341 john.sipos@oag.state.ny.us Nancy Burton 147 Cross Highway Redding Ridge, CT 06876 NancyBurtonCT@aol.com Riverkeeper, Inc.
 
460 Park Avenue
 
New York, NY 10022
 
driesel@sprlaw.com Andrew M. Cuomo, Esq.
 
Attorney General of the State of New York
 
John J. Sipos, Esq.
 
Assistant Attorney General
 
The Capitol
 
Albany, NY 12224-0341
 
john.sipos@oag.state.ny.us Nancy Burton
 
147 Cross Highway
 
Redding Ridge, CT 06876
 
NancyBurtonCT@aol.com Riverkeeper, Inc.
 
Phillip Musegaas, Esq.
Phillip Musegaas, Esq.
Victor Tafur, Esq.
Victor Tafur, Esq.
 
828 South Broadway Tarrytown, NY 10591 phillip@riverkeeper.org vtafur@riverkeeper.org Diane Curran, Esq.
828 South Broadway
 
Tarrytown, NY 10591
 
phillip@riverkeeper.org vtafur@riverkeeper.org Diane Curran, Esq.
 
Counsel for Riverkeeper, Inc.
Counsel for Riverkeeper, Inc.
Harmon, Curran, Spielberg, & Eisenberg, L.L.P.
Harmon, Curran, Spielberg, & Eisenberg, L.L.P.
1726 M. Street N.W., Suite 600 Washington, DC 20036 dcurran@harmoncurran.com Janice A. Dean, Assistant Attorney General Office of the Attorney General of the State of New York 120 Broadway, 26th Floor New York, NY 10271 janice.dean@oag.state.ny.us Elise N. Zoli, Esq.
Goodwin Procter, LLP Exchange Place 53 State Street Boston, MA 02109 ezoli@goodwinprocter.com


1726 M. Street N.W., Suite 600
Docket Nos. 50-247/286-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 4 Joan Leary Matthews, Esq.
 
Senior Counsel for Special Projects Office of General Counsel New York State Department of Environmental Conservation 625 Broadway Albany, NY 12224 jlmatthe@gw.dec.state.ny.us Westchester Citizens Awareness Network (WestCan), Citizens Awareness Network (CAN),
Washington, DC 20036
etc.
 
Susan H. Shapiro, Esq.
dcurran@harmoncurran.com Janice A. Dean, Assistant Attorney General
21 Perlman Drive Spring Valley, NY 10977 mbs@officeonline.ws Richard L. Brodsky Assemblyman 5 West Main Street Suite 205 Elmsford, NY 10523 richardbrodsky@msn.com Sarah L. Wagner, Esq.
 
Legislative Office Building, Room 422 Albany, NY 12248 sarahwagner@gmail.com FUSE USA Heather Ellsworth Burns-Demelo John Lekay Remy Chevalier Belinda J. Jaques Bill Thomas 351 Dyckman Street Peekskill, New York 10566 www.fuseusa.org fuse_usa@yahoo.com Stephen C. Filler, Board Member Hudson River Sloop Clearwater, Inc.
Office of the Attorney General
303 South Broadway, Suite 222 Tarrytown, NY 10591 sfiller@nylawline.com
 
of the State of New York
 
120 Broadway, 26 th Floor New York, NY  10271
 
janice.dean@oag.state.ny.us Elise N. Zoli, Esq.
 
Goodwin Procter, LLP
 
Exchange Place
 
53 State Street
 
Boston, MA  02109
 
ezoli@goodwinprocter.com Docket Nos. 50-247/286-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 4 Joan Leary Matthews, Esq.
 
Senior Counsel for Special Projects  
 
Office of General Counsel
 
New York State Department of  
 
Environmental Conservation  
 
625 Broadway
 
Albany, NY 12224
 
jlmatthe@gw.dec.state.ny.us Westchester Citizen's Awareness Network (WestCan), Citizens Awareness Network (CAN),
etc.Susan H. Shapiro, Esq.
21 Perlman Drive
 
Spring Valley, NY 10977
 
mbs@officeonline.ws Richard L. Brodsky Assemblyman
 
5 West Main Street
 
Suite 205 Elmsford, NY 10523
 
richardbrodsky@msn.com Sarah L. Wagner, Esq.
 
Legislative Office Building, Room 422
 
Albany, NY 12248
 
sarahwagner@gmail.com FUSE USA Heather Ellsworth Burns-Demelo
 
John Lekay
 
Remy Chevalier
 
Belinda J. Jaques  
 
Bill Thomas
 
351 Dyckman Street
 
Peekskill, New York 10566
 
www.fuseusa.org fuse_usa@yahoo.com Stephen C. Filler, Board Member
 
Hudson River Sloop Clearwater, Inc.
 
303 South Broadway, Suite 222
 
Tarrytown, NY 10591
 
sfiller@nylawline.com Docket Nos. 50-247/286-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 5         


                                                                              [Original signed by Christine M. Pierpoint]
Docket Nos. 50-247/286-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 5
Office of the Secretary of the Commission Dated at Rockville, Maryland this 6 th day of October, 2008
[Original signed by Christine M. Pierpoint]
Office of the Secretary of the Commission Dated at Rockville, Maryland this 6th day of October, 2008


UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of       )  
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of  
        )
)  
ENTERGY NUCLEAR GENERATION CO.   )
)
AND         )
ENTERGY NUCLEAR GENERATION CO. )
ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-293-LR         ) (Pilgrim Nuclear Power Station)     )  
AND  
 
)
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-08-23), dated October 6, 2008, have been served upon the following persons by electronic mail  
ENTERGY NUCLEAR OPERATIONS, INC. )
 
Docket No. 50-293-LR  
this date, followed by deposit of paper copies in the U.S. mail, first class, and NRC internal mail.
)
U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel  
(Pilgrim Nuclear Power Station)  
 
)
Mail Stop - T-3 F23 Washington, DC 20555-0001  
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-08-23), dated October 6, 2008, have been served upon the following persons by electronic mail this date, followed by deposit of paper copies in the U.S. mail, first class, and NRC internal mail.
 
U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 Washington, DC 20555-0001 Ann Marshall Young, Chair Administrative Judge E-mail: amy@nrc.gov Richard F. Cole Administrative Judge E-mail: rfc1@nrc.gov Paul B. Abramson Administrative Judge E-mail: pba@nrc.gov U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop: O-15 D21 Washington, DC 20555-0001 Susan L. Uttal, Esq.
Ann Marshall Young, Chair Administrative Judge E-mail: amy@nrc.gov
E-mail: slu@nrc.gov David Roth, Esq.
 
E-mail: der@nrc.gov Marcia J. Simon, Esq.
Richard F. Cole  
E-mail: mjs5@nrc.gov Brian Newell, Paralegal E-mail: bpn1@nrc.gov E-mail: OGCMailCenter@nrc.gov U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Mail Stop: O-16C1 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov U.S. Nuclear Regulatory Commission Office of Secretary of the Commission Mail Stop: O-16C1 Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop: O11-F1 Washington, DC 20555-0001 Perry H. Buckberg, Project Mgr, Plant Lic.
 
Branch I-I, Operating Reactor Licensing E-mail: phb1@nrc.gov  
Administrative Judge E-mail: rfc1@nrc.gov
 
Paul B. Abramson  
 
Administrative Judge  
 
E-mail: pba@nrc.gov U.S. Nuclear Regulatory Commission Office of the General Counsel  
 
Mail Stop: O-15 D21 Washington, DC 20555-0001  
 
Susan L. Uttal, Esq.
E-mail: slu@nrc.gov David Roth, Esq.  
 
E-mail: der@nrc.gov Marcia J. Simon, Esq.  
 
E-mail: mjs5@nrc.gov Brian Newell, Paralegal E-mail: bpn1@nrc.gov
 
E-mail: OGCMailCenter@nrc.gov U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Mail Stop: O-16C1 Washington, DC 20555-0001  
 
E-mail: ocaamail@nrc.gov U.S. Nuclear Regulatory Commission Office of Secretary of the Commission Mail Stop: O-16C1 Washington, DC 20555-0001  
 
E-mail: hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop: O11-F1 Washington, DC 20555-0001  
 
Perry H. Buckberg, Project Mgr, Plant Lic. Branch I-I, Operating Reactor Licensing E-mail: phb1@nrc.gov
 
Docket No. 50-293-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 2Entergy Nuclear 1340 Echelon Parkway Mail Stop M-ECH-62 Jackson, MS  39213
 
Terence A. Burke, Esq.
 
E-mail: tburke@entergy.com Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N. Street, N.W. Washington, DC 20037-1128
 
David R. Lewis, Esq.


Docket No. 50-293-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 2 Entergy Nuclear 1340 Echelon Parkway Mail Stop M-ECH-62 Jackson, MS 39213 Terence A. Burke, Esq.
E-mail: tburke@entergy.com Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N. Street, N.W.
Washington, DC 20037-1128 David R. Lewis, Esq.
E-mail: david.lewis@pillsburylaw.com Paul A. Gaukler, Esq.
E-mail: david.lewis@pillsburylaw.com Paul A. Gaukler, Esq.
E-mail: paul.gaukler@pillsburylaw.com Jason B. Parker, Esq.  
E-mail: paul.gaukler@pillsburylaw.com Jason B. Parker, Esq.
 
E-mail: jason.parker@pillsburylaw.com Duxbury Emergency Management Agency 668 Tremont Street Duxbury, MA 02332 Kevin M. Nord, Fire Chief & Director E-mail: nord@town.duxbury.ma.us Office of the Attorney General Environmental Protection Division One Ashburton Place, 18th Floor Boston, MA 02108 Matthew Brock, Assistant Attorney General E-mail: matthew.brock@ago.state.ma.us Pilgrim Watch 148 Washington Street Duxbury, MA 02332 Mary E. Lampert, Director E-mail: mary.lampert@comcast.net Town of Plymouth MA Town Managers Office 11 Lincoln Street Plymouth, MA 02360 Mark D. Sylvia, Town Manager E-mail: msylvia@townhall.plymouth.ma.us Duane Morris, LLP Town of Plymouth MA 505 9th Street, NW, Suite 1000 Washington, DC 20004-2166 Sheila Slocum Hollis, Esq.
E-mail: jason.parker@pillsburylaw.com Duxbury Emergency Management Agency
 
668 Tremont Street Duxbury, MA 02332  
 
Kevin M. Nord, Fire Chief & Director  
 
E-mail: nord@town.duxbury.ma.us Office of the Attorney General Environmental Protection Division One Ashburton Place, 18 th Floor Boston, MA 02108  
 
Matthew Brock, Assistant Attorney General  
 
E-mail: matthew.brock@ago.state.ma.us Pilgrim Watch 148 Washington Street  
 
Duxbury, MA 02332  
 
Mary E. Lampert, Director E-mail: mary.lampert@comcast.net Town of Plymouth MA Town Manager's Office 11 Lincoln Street Plymouth, MA 02360  
 
Mark D. Sylvia, Town Manager E-mail: msylvia@townhall.plymouth.ma.us Duane Morris, LLP  
 
Town of Plymouth MA  
 
505 9 th Street, NW, Suite 1000 Washington, DC 20004-2166 Sheila Slocum Hollis, Esq.  
 
E-mail: sshollis@duanemorris.com
E-mail: sshollis@duanemorris.com
[ Original signed by Linda Lewis ]
Office of the Secretary of the Commission Dated at Rockville, Maryland this 6TH day of October 2008


        [ Original signed by Linda Lewis ]
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
Office of the Secretary of the Commission Dated at Rockville, Maryland
)
)
ENTERGY NUCLEAR VERMONT YANKEE, LLC )
)
and
)
Docket No. 50-271-LR
)
ENTERGY NUCLEAR OPERATIONS, INC.
)
)
(Vermont Yankee Nuclear Power Station)
)
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-08-23) dated October 6, 2008, have been served upon the following persons by e-mail (and first class mail) or through NRC internal distribution in this license renewal proceeding.
Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ask2@nrc.gov Administrative Judge Richard E. Wardwell Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: rew@nrc.gov Administrative Judge William H. Reed Atomic Safety and Licensing Board Panel 1819 Edgewood Lane Charlottesville, VA 22902 E-mail: whrcville@embarqmail.com


this 6 TH day of October 2008
Docket No. 50-271-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 2 U.S. Nuclear Regulatory Commission Office of the Secretary of the Commission Mail Stop O-16C1 Washington, DC 20555-0001 Hearing Docket E-mail: hearingdocket@nrc.gov Lloyd B. Subin, Esq.
 
David E. Roth, Esq.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of        )          )
Mary C. Baty, Esq.
ENTERGY NUCLEAR VERMONT YANKEE, LLC ) 
Jessica A. Bielecki, Esq.
      )
Susan L. Utall, Esq.
and      ) Docket No. 50-271-LR  
Brian Newell, Paralegal Office of the General Counsel O-15D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: lbs3@nrc.gov ;der@nrc.gov; mcb1@nrc.gov; bpn1@nrc.gov;Jessica.Bielecki  
      ) ENTERGY NUCLEAR OPERATIONS, INC.  )          )
@nrc.gov;Susan.Utall@nrc.gov Ronald A. Shems, Esq.
(Vermont Yankee Nuclear Power Station)    )
 
CERTIFICATE OF SERVICE
 
I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-08-23) dated October 6, 2008, have been served upon the following persons by e-mail (and first class mail) or through NRC internal distribution in this license renewal proceeding.
Office of Commission Appellate 
 
Adjudication U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
E-mail: ocaamail@nrc.gov
 
Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
E-mail: ask2@nrc.gov Administrative Judge Richard E. Wardwell Atomic Safety and Licensing Board Panel
 
Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
E-mail: rew@nrc.gov
 
Administrative Judge William H. Reed Atomic Safety and Licensing Board Panel
 
1819 Edgewood Lane Charlottesville, VA  22902 E-mail: whrcville@embarqmail.com
 
Docket No. 50-271-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 2U.S. Nuclear Regulatory Commission Office of the Secretary of the Commission Mail Stop O-16C1 Washington, DC 20555-0001  
 
Hearing Docket  
 
E-mail: hearingdocket@nrc.gov Lloyd B. Subin, Esq. David E. Roth, Esq. Mary C. Baty, Esq.
Jessica A. Bielecki, Esq.  
 
Susan L. Utall, Esq.  
 
Brian Newell, Paralegal Office of the General Counsel O-15D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
 
E-mail: lbs3@nrc.gov
;der@nrc.gov; mcb1@nrc.gov; bpn1@nrc.gov;Jessica.Bielecki
@nrc.gov;Susan.Utall@nrc.gov Ronald A. Shems, Esq.
Karen Tyler, Esq.
Karen Tyler, Esq.
Andrew Raubvogel, Esq.
Andrew Raubvogel, Esq.
Shems Dunkiel Kassel & Saunders, PLLC 91 College Street Burlington, VT 05401 E-mail: rshems@sdkslaw.com ktyler@sdkslaw.com araubvogel@sdkslaw.com
Shems Dunkiel Kassel & Saunders, PLLC 91 College Street Burlington, VT 05401 E-mail: rshems@sdkslaw.com ktyler@sdkslaw.com araubvogel@sdkslaw.com Sarah Hofmann, Esq.
 
Director for Public Advocacy Department of Public Service 112 State Street - Drawer 20 Montpelier, VT 05620-2601 E-mail: sara.hoffman@state.vt.us Anthony Z. Roisman, Esq.
Sarah Hofmann, Esq. Director for Public Advocacy Department of Public Service 112 State Street - Drawer 20  
National Legal Scholars Law Firm 84 East Thetford Rd.
 
Lyme, NH 03768 E-mail: aroisman@nationallegalscholars.com James R. Milkey Assistant Attorney General Chief, Environmental Protection Division Office of the Attorney General One Ashburton Place, 18th Floor Boston, MA 02108 E-mail: Jim.milkey@state.ma.us Robert L. Stewart New England Coalition 229 Kibbee Ext.
Montpelier, VT 05620-2601 E-mail: sara.hoffman@state.vt.us Anthony Z. Roisman, Esq. National Legal Scholars Law Firm 84 East Thetford Rd. Lyme, NH 03768 E-mail: aroisman@nationallegalscholars.com James R. Milkey Assistant Attorney General Chief, Environmental Protection Division Office of the Attorney General One Ashburton Place, 18 th Floor Boston, MA 02108  
Brookfield, Vermont 05036 E-mail: Jakeskis@aol.com Callie B. Newton, Chair Gail MacArthur Lucy Gratwick Town of Marlboro Select Board P.O. Box 518 Marlboro, VT 05344 E-mail: cbnewton@sover.net  
 
E-mail: Jim.milkey@state.ma.us Robert L. Stewart New England Coalition 229 Kibbee Ext. Brookfield, Vermont 05036  
 
E-mail: Jakeskis@aol.com Callie B. Newton, Chair Gail MacArthur   Lucy Gratwick Town of Marlboro Select Board P.O. Box 518  
 
Marlboro, VT 05344  
 
E-mail: cbnewton@sover.net
 
Docket No. 50-271-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 3Dan MacArthur, Director Town of Marlboro Emergency Management  P.O. Box 30 Marlboro, VT  05344
 
E-mail: dmacarthur@igc.org David R. Lewis, Esq.
Matias F. Travieso-Diaz, Esq. Elina Teplinsky, Esq.


Docket No. 50-271-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 3 Dan MacArthur, Director Town of Marlboro Emergency Management P.O. Box 30 Marlboro, VT 05344 E-mail: dmacarthur@igc.org David R. Lewis, Esq.
Matias F. Travieso-Diaz, Esq.
Elina Teplinsky, Esq.
Blake J. Nelson, Esq.
Blake J. Nelson, Esq.
Pillsbury Winthrop Shaw Pittman LLP  
Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC 20037-1128 E-mail: david.lewis@pillsburylaw.com matias.travieso-diaz@pillsburylaw.com Elina.Teplinsky@pillsburylaw.com Blake.Nelson@pillsburylaw.com Peter C. L. Roth, Esq.
 
Senior Assistant Attorney General State of New Hampshire Office of the New Hampshire Attorney General 33 Capitol Street Concord, NH 03301 E-mail: peter.roth@doj.nh.gov Alan A. Pemberton, Esq.
2300 N Street, NW Washington, DC 20037-1128 E-mail: david.lewis@pillsburylaw.com matias.travieso-diaz@pillsburylaw.com Elina.Teplinsky@pillsburylaw.com Blake.Nelson@pillsburylaw.com Peter C. L. Roth, Esq.
Derron J. Blakely, Esq.
Senior Assistant Attorney General State of New Hampshire Office of the New Hampshire
Covington & Burling LLP Counsel for Electric Power Research Institute (EPRI) 1201 Pennsylvania Avenue, N.W.
 
Washington, DC 20004-2401 E-mail: apemberton@cov.com dblakely@cov.com
Attorney General  
[Original signed by Nancy Greathead]
 
Office of the Secretary of the Commission Dated at Rockville, Maryland this 6th day of October 2008}}
33 Capitol Street Concord, NH 03301 E-mail: peter.roth@doj.nh.gov
 
Alan A. Pemberton, Esq.
Derron J. Blakely, Esq.  
 
Covington & Burling LLP Counsel for Electric Power Research Institute (EPRI) 1201 Pennsylvania Avenue, N.W. Washington, DC 20004-2401  
 
E-mail: apemberton@cov.com dblakely@cov.com
  [Original signed by Nancy Greathead] __________________________________                                Office of the Secretary of the Commission Dated at Rockville, Maryland  
 
this 6 th day of October 2008}}

Latest revision as of 14:50, 14 January 2025

Commission Memorandum and Order (CLI-08-23)
ML082800440
Person / Time
Site: Indian Point, Oyster Creek, Pilgrim, Vermont Yankee
Issue date: 10/06/2008
From: Annette Vietti-Cook
NRC/SECY
To:
SECY RAS
References
50-219-LR, 50-247-LR, 50-271-LR, 50-286-LR, 50-293-LR, CLI-08-23, RAS E-186, RAS H-74, RAS J-160, RAS M-359
Download: ML082800440 (48)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION COMMISSIONERS:

Dale E. Klein, Chairman Gregory B. Jaczko Peter B. Lyons Kristine L. Svinicki

)

In the Matter of

)

)

AMERGEN ENERGY COMPANY, LLC

)

Docket No.

(Oyster Creek Nuclear Generating Station)

)

50-219-LR

)

In the Matter of

)

)

ENTERGY NUCLEAR OPERATIONS, INC.

)

Docket Nos.

(Indian Point Nuclear Generating Unit

)

50-247-LR Nos. 2 and 3)

)

and 50-286-LR

_______________________________________________)

In the Matter of

)

)

ENTERGY NUCLEAR OPERATIONS, INC.

)

Docket No. 50-293-LR (Pilgrim Nuclear Power Station)

)

_______________________________________________)

In the Matter of

)

)

ENTERGY NUCLEAR OPERATIONS, INC.

)

Docket No. 50-271-LR (Vermont Yankee Nuclear Power Station)

)

_______________________________________________)

CLI-08-23 MEMORANDUM AND ORDER This Memorandum and Order responds to four petitions1 (Petition) filed jointly by a number of public interest groups, each of which is a party in one or more of the captioned 1 Identical petitions were filed in each of the four captioned proceedings.

2 license renewal proceedings (hereinafter, Petitioners),2 and to a Supplemental Petition filed by the same parties alleging illegal actions by the NRC Staff.3 The Petition requests that the Commission suspend these proceedings until it has conducted a comprehensive overhaul of the manner in which the NRC Staff reviews license renewal applications.4 Petitioners base their request principally on an audit report issued by NRCs Office of the Inspector General (OIG)5 regarding the effectiveness of the agencys license renewal safety reviews. The Supplemental Petition was based on an OIG memorandum following up on its initial report, which focused on the extent of NRC Staff reviews of license renewal applications.6 2 Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; and New Jersey Environmental Federation are parties to the Oyster Creek proceeding. AmerGen Energy Co. (Oyster Creek Nuclear Generating Station), LBP-06-7, 63 NRC 188 (2006). Pilgrim Watch is a party to the Pilgrim proceeding. Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), LBP-06-23, 64 NRC 257 (2006). New England Coalition is a party to the Vermont Yankee proceeding. Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), LBP-06-20, 64 NRC 131 (2006). Riverkeeper is a party to the Indian Point license renewal proceeding. Entergy Nuclear Operations, Inc. (Indian Point Nuclear Power Station, Units 2 and 3), LBP-08-13, 68 NRC __ (slip op. July 30, 2008).

3 Supplemental Petition by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants (May 15, 2008)(Supplemental Petition). The Supplemental Petition was also served in all four captioned proceedings.

4 Petition by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.;

Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition to Suspend License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim and Vermont Yankee Nuclear Power Plants Pending Investigation of NRC Staff Review Process and Correction of Deficiencies (Jan. 3, 2008).

5 Audit of NRCs License Renewal Program, OIG-07-A-15, (Sept. 6, 2007), available at ADAMS accession number ML072490486 (OIG Report).

6 Memorandum from Hubert T. Bell to Dale E. Klein regarding NRC Staff Review of License Renewal Applications (May 2, 2008) (ADAMS ML081280227) (OIG Memorandum).

3 As explained below, the OIG did not determine, and we do not otherwise find, that past license renewal safety reviews were inadequate or that the license renewal review process requires a comprehensive revision. The OIGs recommendations do not undermine our general confidence in the Staffs safety review, and consequently we see no threat to the public health and safety or the common defense and security. There is, therefore, no need to delay the license renewal proceedings and we deny Petitioners request.

I.

BACKGROUND A.

The License Renewal Process Over several years, the NRC has developed a regulatory process to review power reactor license renewal applications that is efficient, thorough, and appropriately focused on certain aging effects that would not reveal themselves through performance indicators associated with active functions. The Staffs conduct of safety reviews for license renewal applications is governed by 10 C.F.R. Part 54, and principally guided by two documents:

NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, Rev. 1 (Sept. 2005) (SRP-LR), and NUREG-1801, Generic Aging Lessons Learned Report, Rev. 1 (Sept. 2005) (GALL Report).

Part 54 provides that each license renewal application must include an integrated plant assessment (IPA) identifying structures and components subject to aging management review, an evaluation of time-limited aging analyses, and a final safety analysis report (FSAR) supplement describing the plants aging management programs.7 The license renewal applicant identifies all plant systems, structures and components (SSCs) related to safety and regulatory 7 10 C.F.R. § 54.21. The application must be periodically amended to reflect any changes to the plants current licensing basis made after the license renewal application was submitted. 10 C.F.R. § 54.21(b).

4 compliance.8 The aging management review covers passive structures and components, which perform their intended function without moving parts or without a change in configuration or properties, such as the reactor vessel, the steam generators, piping, component supports, and seismic Category I structures. Structures and components are not subject to an aging management review unless they are long-lived. A structure or component is long-lived if it is not subject to replacement based on a qualified life or specified time period. The application must demonstrate that the effects of aging will be managed in such a way that the intended functions of passive and long-lived structures and components will be maintained for the period of extended operation.9 In contrast, the aging management review does not cover active components such as motors, diesel generators, and switches because routine surveillance and maintenance programs detect and manage the effects of aging on these components.10 The evaluation of Time Limited Aging Analyses (TLAAs), which are calculations or analyses that involve systems, structures, and components within the scope of the rule, considers the effects of aging and involves assumptions based on the original 40-year operating term. For each TLAA, the applicant must demonstrate that (a) the analyses remain valid during the period of extended operation; (b) reanalysis (recalculation) bounds the period of extended 8 These are SSCs that are safety-related, or whose failure could affect safety-related functions, or that are relied on to demonstrate compliance with the NRC's regulations for fire protection, environmental qualification, pressurized thermal shock, anticipated transients without scram, and station blackout. 10 C.F.R. § 54.4(a).

9 10 C.F.R. § 54.21(a).

10 10 C.F.R. § 54.21(a)(1). See also Final Rule, Nuclear Power Plant License Renewal; Revisions, 60 Fed. Reg. 22,461, 22,471-72 (May 8, 1995) (explaining the rationale for reliance on maintenance requirements to manage aging effects of active components). See generally Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 7-10 (2001).

5 operation; or (c) the aging effects will be adequately managed for the period of extended operation.11 In addition to the information supplied for the technical safety review, the license renewal applicant is required to submit a supplemental environmental report that complies with 10 C.F.R. Part 51.12 The SRP-LR provides guidance to the Staff reviewers for conducting license renewal reviews. It assigns review responsibilities among Staff technical organizations and describes methods for identifying those SSCs that are subject to aging effects within the scope of license renewal review. It defines ten program elements including scoping, acceptance criteria, corrective actions, monitoring, and operating experience that are essential to an effective aging management program.13 It also provides that for each of the SSCs identified, the license renewal applicant may rely on an aging management program that is consistent with the GALL Report, or may choose to use a plant-specific aging management program.14 The GALL Report identifies generic aging management programs that the Staff has determined to be acceptable, based on the experiences and analyses of existing programs at operating plants during the initial license period.15 The report describes each aging 11 10 C.F.R. § 54.21(c)(1).

12 See 10 C.F.R. § 54.23. Petitioners request here does not embrace environmental issues.

13 SRP-LR at A.1-3 through A.1-8.

14 Id. at 3.0-2.

15 The GALL Report was developed because the Staff discovered, in reviewing the initial license renewal applications, that many of the programs the licensee would rely on to manage aging effects during the renewal period were already in place during the initial license period.

See SRP-LR, at 1.

6 management program with respect to the ten program elements defined in the SRP-LR.16 The report also includes a table summarizing various structures and components, the materials from which they are made, the environment to which they are exposed, the aging effect (e.g., loss of material through pitting, leaching or corrosion), the aging management program found to manage the particular aging effect in that component, and whether additional evaluation is necessary.17 An applicant for license renewal may reference the GALL Report to demonstrate that the programs at the applicants facility correspond to those reviewed and approved therein, and the applicant must ensure and certify that its programs correspond to those reviewed in the GALL Report.18 In other words, the license renewal applicants use of an aging management program identified in the GALL Report constitutes reasonable assurance that it will manage the targeted aging effect during the renewal period. If the applicant uses a different method for managing the effects of aging for particular SSCs at its plant, then the applicant should demonstrate to the Staff reviewers that its program includes the ten elements cited in the GALL Report and will likewise be effective. In addition, many plants will have plant-specific aging management programs for which there is no corresponding program in the GALL Report. For each aging management program, the application gives a brief description of the licensees operating experience in implementing that program.

The Staff then reviews the application and supporting documents and conducts inspections and onsite audits to verify the information in the application. License renewal inspections verify, on a sampling basis, that the applicant has properly scoped the aging 16 See GALL Report, Vol. 2, Rev. 1, sec. XI.

17 See generally GALL Report, Vol. 2, Rev. 1.

18 Id., Vol. 1 at 3.

7 management review; that the existing or planned aging management programs conform to the descriptions in the license renewal application; and that the documentation used to support the application is auditable, retrievable, and in fact does support the application.19 The Staff produces a Safety Evaluation Report (SER) - usually first as an SER listing open items, then as a final SER (FSER) - summarizing its findings with respect to the licensees programs for aging management. The Advisory Committee on Reactor Safeguards (ACRS) reviews the SER and makes its own recommendation to the Commission on whether the license should be renewed.

The Commission also offers a parallel hearing process where members of the public with a cognizable interest in the particular renewal application may obtain an independent adjudicatory review of their challenges to the application.20 The Commission will issue a renewed license if it determines, among other things, that there is reasonable assurance that the plant will operate in accordance with its current licensing basis during the period of extended operation.21 The renewed license takes effect immediately, with a term of up to 20 years plus the number of years remaining on the initial operating license.22 To date, the NRC has completed the process for issuing renewed licenses for 48 existing reactors.

B.

The OIG Report and OIG Memorandum The OIG Report on which Petitioners premise their argument was issued in September 2007, and reflects findings of the OIGs audit of the effectiveness of the Staffs license renewal safety reviews. The OIG concluded that the Staff has developed a comprehensive license 19 NRC Inspection Manual, Inspection Procedure 71002 (Feb. 18, 2005).

20 See AEA Section 189.a, 42 U.S.C. §2239(a). See generally Baltimore Gas & Electric Co.

(Calvert Cliffs Nuclear Power Plant, Units 1 and 2), CLI-98-25, 48 NRC 325, 349-50 (1998).

21 10 C.F.R. § 54.29.

22 10 C.F.R. § 54.31.

8 renewal process to evaluate license renewal applications.23 The OIG also identified, however, areas that could be improved.24 Primarily, the OIG Report found that the Staff should improve the transparency of its report writing so that a reader can more easily understand what materials the reviewers evaluated and how they reached conclusions. The OIG Report made eight specific recommendations for improving the effectiveness of the license renewal review programs in five general areas:

A.

License renewal reporting efforts need improvements. OIG found that the Staff does not consistently provide adequate descriptions of audit methodology or support for conclusions in license renewal reports. OIG recommended that the Executive Director for Operations (EDO) (1) establish report-writing standards, and (2) revise the report quality assurance process for license renewal report review by establishing management controls for NRR and DLR to gauge the effectiveness of team leader and peer group report reviews, and by implementing procedures to specify additional steps to be taken in the event that such team leader and peer group report reviews fail to ensure report quality to managements expectations.25 B.

Guidance for removing licensee documents from audit sites could be clarified. OIG found inconsistencies in the guidance provided to license renewal auditors relative to the removal of licensee documents obtained at audit sites and recommended that the EDO clarify the relevant guidance and procedures. 26 C.

Consistent evaluation of operating experience would improve license renewal reviews. OIG concluded that audit team members do not review operating experience consistently, and that most auditors do not conduct independent verification of a licensees operating experience, relying instead on licensee-supplied information. OIG recommended that the EDO establish requirements and management controls to standardize the 23 OIG Report at 7.

24 Id.

25 Id. at 7-13.

26 For example, the OIG Report stated that Headquarters Staff, in conducting onsite audits, is hampered by a policy of not removing documents from a licensee site, even though regional Staff, in conducting inspections, may remove licensee documents. Id. at 15-17.

9 conduct and depth of license renewal operating experience reviews.27 D.

More attention is needed to planning for post-renewal inspections. OIG concluded that planning for post-renewal inspections is incomplete because the agency has only recently focused its attention on developing and overseeing the details associated with these inspections.

OIG recommended that the EDO expedite the revision of Inspection Procedure 71003 and to communicate the details of the revised procedure to affected Staff and stakeholders.28 E.

License Renewal Issues Need Evaluation for Backfit Application. OIG recommended that the EDO establish a review process to determine whether or not certain guidance meets the provisions of 10 C.F.R.

§ 54.37(b), and that the Commission reconsider its previous policy decision that the backfit rule does not apply to license renewal applicants.29 Of these recommendations, only those relating to A, license renewal reporting efforts, and C, evaluation of licensee operating experience, are central to the arguments in Petitioners initial Petition. Petitioners Supplemental Petition belatedly raises arguments related to B, the need to clarify guidance for removing licensee documents.

The OIG Report did not question the use of the SRP-LR or the GALL Report as guidance for conducting license renewal safety reviews, nor did it suggest that these guidance documents would not provide a mechanism to satisfy the safety requirements of 10 C.F.R. Part 54. On the contrary, the OIG Report cited these documents as authority on the proper conduct of reviews. Further, the OIG Report pointed to the GALL Reports inclusion of operating experience as one of ten key elements that should be present in an effective aging management program.

27 Id. at 18-23.

28 Id. at 24-30. Post-renewal inspections (that is, inspections performed after the agency has granted the renewed license) were not addressed in either petition, and therefore are not further discussed here.

29 Id. at 31-35. The backfit issue is not raised by the Petition or Supplemental Petition, and is not considered further here.

10 The OIG Reports conclusions regarding the Staffs review of licensee operating experience are central to Petitioners claims. The OIG Report found that audit team members did not approach reviews consistently and most did not independently verify plant-specific operating experience, for example, by searching the licensees corrective action databases.30 The OIG Report suggested that auditors may not be aware of all relevant operating experience, and further noted that there are no formally established requirements for verifying operating experience. As noted above, it recommended that requirements and management controls be implemented to standardize the conduct and depth of license renewal operating experience reviews.31 The Staff formally agreed to implement seven of the eight OIG recommendations.32 Relative to the issues raised in the Petition, the Staff committed to: (1) update report-writing guidance to include management expectations and report-writing standards (April 30, 2008); (2) enhance the report review process to enable peer reviewers to verify that Staff reports meet management expectations, including a method to gauge the effectiveness of team leader and peer group review (April 30, 2008); (3) develop consistent guidance for removal of applicant and licensee documents from applicant and licensee sites (September 30, 2008); and (4) establish additional guidance and management controls to standardize the conduct and depth of license renewal operating experience reviews (April 30, 2008).33 In a January 7, 2008 memorandum, 30 Id. at 19-20.

31 Id. at 23.

32 See Memorandum from William F. Kane to Stephen D. Dingbaum, Audit of NRCs License Renewal Program (Oct. 30, 2007)(ADAMS ML072630299)(Kane Memorandum). The Staff disagreed with the OIGs recommendation that the Commission affirm or, preferably, modify its decision not to apply the backfit rule to license renewal applicants.

33 Id. at 1-2.

11 the OIG stated that it considered the seven recommendations resolved.34 Later, on May 2, the OIG issued an additional memorandum on the NRC Staffs license renewal review process.35 That memorandum stated that the NRC safety review process includes both technical reviews performed in NRC headquarters and on-site audits. The OIGs investigation found that the Staff's audit reports indicate that the Staff reviews approximately 280 applicant documents during each audit. The OIG's analysis of work hour data indicated that significant numbers of hours an average of approximately 10,582 per reactor unit are spent performing the NRC Staff reviews.36 The OIG Memorandum found, however, that the Staff does not preserve copies of all applicant documents reviewed during on-site audits. It also found that Staff reviewers prepare working papers, including checklists, during the audits, but the Staff reviewers typically dispose of their working papers after they use them to prepare the audit reports. The OIG noted that an agency Management Directive provides criteria as to what constitutes personally held non-record materials which may be retained or discarded at the authors sole discretion.37 The OIG did not suggest that the Staff disregarded the guidance in the Management Directive, but it did say that the Staffs failure to maintain copies of applicant documents reviewed and its own 34 See Memorandum from Stephen D. Dingbaum to Luis A. Reyes, Status of Recommendations: Audit of NRC s License Renewal Program (OIG-07-A-15) (ADAMS ML080070247).

35 See n. 6, supra. In its follow-up review described in the OIG Memorandum, the OIG looked at the Staffs review of two aging management programs each at Browns Ferry, Brunswick, D.C.

Cook, and Oyster Creek.

36 Id. at 4.

37 OIG Memorandum, at 3 n.7. See Handbook 1 of NRC Management Directive 3.53, NRC Records and Document Management Program (Rev. Mar. 15, 2007).

12 working papers made it difficult to verify specific details of staff on-site review activities.38 The OIG Memorandum did not make further recommendations for improving the reporting for license renewal reviews.39 C.

Status of the Proceedings and Relationship to OIG Reports Each of the four license renewal adjudicatory proceedings that are the subject of Petitioners request is at a different stage. In Oyster Creek, the Atomic Safety and Licensing Board issued its Initial Decision and is considering on remand from the Commission an issue relating to the drywell liner,40 and the Boards decision rejecting a late-filed contention is on appeal to the Commission.41 In Pilgrim an evidentiary hearing was held on April 10, 2008, and a Board decision is pending.42 In Vermont Yankee, the Staff issued an FSER in February 2008,43 38 OIG Memorandum, at 3-4.

39 On June 26, 2008, the NRC Staff provided a status update to the OIG. Memorandum from Eric J. Leeds, Director, Office of Nuclear Reactor Regulation, to Stephen D. Dingbaum, OIG, Status of Recommendations from Audit of NRCs License Renewal Program, (OIG-07-A-15)

(ADAMS ML081480064). Thereafter, the OIG responded to the Staff with its analysis and status of its initial recommendations. Based on the Staffs response, the OIG closed recommendations 1, 2, 5, 6, and 8 (no further action requested), and resolved recommendations 3, 4, and 7, subject to Staff updates in early 2009. Memorandum from Stephen D. Dingbaum, OIG, to R. William Borchardt, Status of Recommendations: Audit of NRCs License Renewal Program (OIG-07-A-15) (Sept. 11, 2008) (ADAMS ML082550627).

Conclusions drawn by OIG in its September 11 memorandum do not alter the conclusions we reach today.

40 AmerGen Energy Co., L.L.C. (Oyster Creek Nuclear Generating Station), LBP-07-17, 66 NRC 327 (2007) (Initial Decision), referred to Board by order of the Secretary (Aug. 21, 2008)

(unpublished).

41 See AmerGen Energy Co., L.L.C. (Oyster Creek Nuclear Generating Station), LBP-08-12, 68 NRC __ (slip op. July 24, 2008) (Denying Citizens motion to reopen the record and to add a new contention).

42 See Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), Memorandum (Notice Pursuant to 10 C.F.R. § 2.309(i)) (Sept. 2, 2008)(unpublished).

43 Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station (Feb. 2008), ADAMS ML080560462.

13 an evidentiary hearing was held in late July 2008, and a Board decision is pending. The Indian Point Board recently ruled on the majority of the various petitions for intervention and requests for hearing.44 According to the OIG Report, the OIG looked at the Oyster Creek SER with Open Items and at some information relating to Vermont Yankee, but did not review the Vermont Yankee SER with Confirmatory Items.45 The Pilgrim license renewal review was not included in the OIGs analysis. The OIG Report expressly notes that it does not extrapolate results from the sample to the entire universe of license renewal reviews.46 D.

Petitioners Request The crux of the initial Petition is that the OIG Report shows that the license renewal process is so fatally flawed that the NRC cannot use the Staffs FSERs as a foundation for issuing renewed licenses. Petitioners argue that doing so would violate the Atomic Energy Act requirement that the Commission may issue a license only after finding that it is in accord with the common defense and security and will provide adequate protection to the health and safety of the public.47 In addition to the OIG Report, Petitioners argue that the Boards decisions in three early site permit cases completely unrelated to license renewal all show that the 44 Indian Point, LBP-08-13, 68 NRC __ (slip op. July 30, 2008). Previously, the Board rejected petitions from the City of New York and from the New York Affordable Reliable Electricity Alliance for failure to state any admissible contentions. Memorandum and Order (Denying the City of New Yorks Petition for Leave to Intervene) (Dec. 12, 2007), Memorandum and Order (Denying the New York Affordable Reliable Electricity Alliances Petition for Leave to Intervene)

(Dec. 12, 2007).

45 According to the OIG Report, there was no inspection report or safety evaluation report yet available for Vermont Yankee at the time of OIGs analysis. See Safety Evaluation Report with Confirmatory Items relating to the License Renewal of Vermont Yankee Nuclear Power Station (Mar. 2007). See OIG Report at 46 (Table 2).

46 Id. at 45 n.24.

47 Atomic Energy Act of 1954, as amended, 42 U.S.C. § 2232(a). See Petition at 9-10.

14 Boards found the Staffs reviews to be lacking in some respect.48 Petitioners directed their request to the Commission itself, rather than to the Atomic Safety and Licensing Board Panel, because, according to Petitioners, their complaint focuses on the adequacy of the Staffs review, rather than the license applications in the various proceedings. Petitioners ask us to consider their requests under our inherent supervisory authority over licensing proceedings, citing the general principle that the Boards jurisdiction does not extend to overseeing or directing the NRC Staff in its license reviews.49 Petitioners ask that NRC suspend the four captioned license renewal proceedings including both the Staff technical reviews and the pending adjudicatory proceedings in which Petitioners are parties and perform a complete overhaul of the license renewal review process. They ask further that we initiate a second investigation, broader in scope than the OIGs, by a body independent of the NRC Staff; revise our standards for license renewal reviews; revise the SERs accordingly; and allow new contentions in all four proceedings based on the findings in the new SERs.50 Petitioners Supplemental Petition, filed in response to the OIG Memorandum, focuses on the documentation, rather than the conduct, of the reviews. The Supplemental Petition claims that the Staffs destruction of its working papers and its failure to retain and make public 48 Petition at 19-21. Petitioners refer to Dominion Nuclear North Anna, LLC (Early Site Permit for North Anna ESP Site), LBP-07-9, 65 NRC 539 (2007), affd, CLI-07-23, 66 NRC 35 (2007);

System Energy Resources, Inc. (Early Site Permit for Grand Gulf ESP Site), LBP-07-1, 65 NRC 27 (2007), affd CLI-07-14, 65 NRC 216 (2007); and Exelon Generation Co., LLC (Early Site Permit for the Clinton ESP Site), LBP-06-28, 64 NRC 460 (2006), affd, CLI-07-12, 65 NRC 203 (2007).

49 See Curators of the University of Missouri, CLI-95-1, 41 NRC 71, 121-22 (1995), citing Carolina Power and Light Co. (Shearon Harris Nuclear Power Plant, Units 1, 2, 3 and 4), CLI-80-12, 11 NRC 514, 516 (1980).

50 See Petition at 1-2. Petitioners request that the independent investigation be performed by the OIG, the Atomic Safety and Licensing Board Panel, or the ACRS.

15 copies of all licensee documents reviewed was illegal.51 Petitioners ask the Commission to order the Staff to conduct an investigation to determine how this illegal document destruction became standard practice52 and order the Staff to preserve such documents in the future.53 The Supplemental Petition also asks that the Commission go back to the applicants, determine which documents the Staff reviewed, and, for each aging management program, make a new independent determination of both whether the scope of the Staff review was adequate and whether the aging management program is sufficient to manage the effects of aging.54 The NRC Staff and Applicants oppose both Petitions.55 Principally, they argue that the Petition has no substantive basis because the OIG Report did not conclude that Staff generally neglected to conduct necessary reviews, audits, and inspections. Further, they argue that Petitioners did not show compelling grounds for the Commission to take the extraordinary action of suspending all proceedings. Both the NRC Staff and Applicants emphasize that the only issue appropriate for adjudication is the sufficiency of the license application, not the adequacy of the Staffs review. They point out that Petitioners all intervenors in the individual 51 Supplemental Petition at 14.

52 Id.

53 Id. at 18.

54 Id. at 17.

55 NRC Staff Answer to Petition for Suspension of License Renewal Reviews Pending Investigation of NRC Staff License Renewal Process (Jan. 18, 2008)(Staff Answer to Petition);

Answer of Entergy Nuclear Operations, Inc. Opposing Petition to Suspend License Renewal Reviews and Proceedings (Jan. 18, 2008) (with respect to the Indian Point, Pilgrim and Vermont Yankee proceedings)(Entergy Answer to Petition); AmerGens Answer Opposing Petition for Stay and to Reopen the Record (Jan. 15, 2008) (with respect to the Oyster Creek proceeding)(AmerGen Answer to Petition); NRC Staffs Answer to Supplemental Petition for Additional Investigation and Correction of Deficiencies in License Renewal Reviews (May 27, 2008)(Staff Answer to Supplemental Petition); Answer of Entergy Nuclear Operations, Inc.

Opposing Supplemental Petition to Suspend License Renewal Proceedings (May 27, 2008)(Entergy Answer to Supplemental Petition); AmerGens Answer Opposing Citizens Supplemental Petition (May 23, 2008)(AmerGens Answer to Supplemental Petition).

16 license renewal proceedings had the opportunity to raise contentions on the license renewal applications themselves. Staff and Applicants also raise issues regarding timeliness and service, and point to Petitioners failure to certify that they attempted to contact the non-moving participants in order to resolve the dispute prior to filing a motion.56 In addition, the NRC Staff and Applicants vigorously oppose the suggestion that the Staff was required to retain and make public the working papers mentioned in the OIG Memorandum.

Petitioners filed replies57 to the Staffs and Applicants answers to both the initial Petition and the Supplemental Petition, together with motions for our approval to file a reply.58 The Staff 56 See 10 C.F.R. § 2.323(b).

57 Replies were filed in each of the captioned dockets, identical except for certificates of service.

Reply by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.;

Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition to Oppositions to Petition to Suspend License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim and Vermont Yankee Nuclear Power Plants Pending Investigation of NRC Staff Review Process and Correction of Deficiencies (Jan. 25, 2008); Reply by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.;

Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition to NRC Staff Opposition to Supplemental Petition for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants (June 4, 2008).

58 Motion by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.;

Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper; Pilgrim Watch and New England Coalition for Leave to Reply to Oppositions to Petition to Suspend License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim and Vermont Yankee Nuclear Power Plants Pending Investigation of NRC Staff Review Process and Correction of Deficiencies (Jan. 25, 2008); Motion by Nuclear Information and Resource Service; Jersey Shore Nuclear Watch, Inc.; Grandmothers, Mothers and More for Energy Safety; New Jersey Public Interest Research Group; New Jersey Sierra Club; New Jersey Environmental Federation; Riverkeeper, Inc.; Pilgrim Watch and New England Coalition for Leave to Reply to NRC Staffs Oppositions to Supplemental Petition for Additional Investigation and Correction of Deficiencies Regarding License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants (June 4, 2008).

17 opposed the replies.59 In addition, the State of New York, a party to the Indian Point license renewal matter, filed a Response in support of the initial Petition.60 We have considered the replies but we see nothing in them that alters our analysis of the initial Petition or the Supplemental Petition, which we deny for the reasons set forth below.

II.

DISCUSSION Petitioners requests do not fit cleanly within any of the procedures described within our rules of practice.61 We treat them here as general motions brought under the procedural requirements of 10 C.F.R. § 2.323. Notwithstanding the requirement that motions initially be addressed to the Presiding Officer when a proceeding is pending,62 here we agree with Petitioners that their motions are best addressed by us pursuant to our inherent supervisory authority over agency proceedings.63 59 See NRC Staffs Response in Opposition to Motion for Leave to Reply (Feb. 4, 2008), and NRC Staffs Response to Joint Motion for Leave to Reply to NRC Staff Opposition to Supplemental Petition for Additional Investigation and Correction of Deficiencies in License Renewal Reviews (June 16, 2008). See 10 C.F.R. § 2.323(c) (The moving party has no right to reply except as permitted by the presiding officer. Permission shall be granted only in compelling circumstances, such as where the moving party could not have anticipated the arguments to which it seeks leave to reply).

60 State of New Yorks Response in Support of the Petition to Suspend License Renewal Reviews for Oyster Creek, Indian Point, Pilgrim, and Vermont Yankee Nuclear Power Plants Pending Investigation of NRC Staff Review Process and Correction of Deficiencies (Jan. 18, 2008). The New York State Attorney Generals office also sent a letter to the Commissioners in support of the Petition. Letter from Katherine Kennedy to the Commissioners (Jan. 18, 2008).

61 The Petitioners note at the outset that, in the context of this Petition, they do not seek enforcement action pursuant to 10 C.F.R. § 2.206, nor do they request rulemaking pursuant to 10 C.F.R. § 2.802. Petition at 7.

62 10 C.F.R. § 2.323(a).

63 See Pacific Gas & Elec. Co. (Diablo Canyon Power Plant Independent Spent Fuel Storage Installation), CLI-02-23, 56 NRC 230, 237 (2002). As acknowledged by the Petition (at 7), our consideration of these petitions should not be read as tacit approval for participants in adjudicatory proceedings to bypass the Board by filing motions directly with us.

18 A.

Merits of the Petitions The purpose and scope of a licensing proceeding is to allow interested persons the right to challenge the sufficiency of the application. The NRC has not, and will not, litigate claims about the adequacy of the Staffs safety review in licensing adjudications.64 Each of Petitioners pleadings, however, simply builds upon the fundamentally flawed premise that Petitioners do have that right.

It is the applicant, not the Staff, that has the burden of proof in litigation.65 Our contention pleading rules emphasize that the petitioner must show that a genuine dispute exists with the applicant/licensee on a material issue of law and fact.66 Petitioners have had ample opportunity to present such contentions during the course of these proceedings. Their request for a complete overhaul of the license renewal review process is largely, if not entirely, outside the scope of these adjudications.

Furthermore, neither the OIG Report nor the OIG Memorandum establishes a need for a complete overhaul of the license renewal process. For instance, the OIG does not question the comprehensive SRP-LR or the capability of the Staff to conduct the necessary reviews under 10 C.F.R. Part 54. The OIG identified certain weaknesses in the review process (which it illustrated with concrete examples), and made precise recommendations for addressing the identified areas of improvement. The Staff agreed with, and is in the process of implementing, 64 See Changes to Adjudicatory Process, Final Rule, 69 Fed. Reg. 2182; 2202 (Jan. 14, 2004)

(citing Curators of the University of Missouri, CLI-95-1, 41 NRC at 121-122, and prior agency rulings holding same). See also Duke Energy Corp. (Catawba Nuclear Station, Units 1 and 2),

CLI-04-6, 59 NRC 62, 74 (2004); Calvert Cliffs, CLI-98-25, 48 NRC at 349-50. An exception to this is the NRC staffs review under the National Environmental Policy Act (NEPA). NEPA places legal duties on the NRC, not on license applicants.

65 See Curators of the University of Missouri, CLI-95-1, 41 NRC at 121.

66 10 C.F.R. § 2.309(f)(1)(vi) (emphasis added).

19 all but one of these recommendations (Recommendation 8). The OIG did not characterize any of the findings as posing a risk imminent or otherwise to the public health and safety, or to the common defense and security.

In sharp contrast to the OIGs specific recommendations, the initial Petition asserted generally that the entire license renewal process is inadequate and needs a complete overhaul. Then, in response to the OIG Memorandum, which confirmed that Staff does indeed spend a significant amount of time and effort in the license renewal process, Petitioners shifted the focus of their complaint to the amount of documentation that is made publicly available.

1. No Need Shown to Overhaul the License Renewal Review Process Petitioners fundamental concern appears to be that the NRC Staff is not faithfully carrying out the process that has been developed. But in support of their Petitions, Petitioners have offered nothing more than speculation that the Staff has simply copied the license renewal applications rather than conducting the audits and inspections described in the standard review plan.67 They argue that the OIG Report shows that the Staff merely copied directly from the license renewal applications68 and that the Staff may not have conducted any independent reviews at all.69 As the Staff suggests, however, the Staffs reliance on program basis documents in some instances is part of an overall review that reflects independent Staff judgment in a variety of ways.70 For instance, the Staff notes that it propounded over a hundred requests for additional information and over 350 audit questions in the course of its review of the Oyster 67 See, e.g., Petition at 14.

68 Id. at 14.

69 Id. at 23.

70 NRC Staff Answer to Supplemental Petition at 13.

20 Creek license renewal application.71 Furthermore, the OIG Report did not conclude that the Staff generally neglected to conduct necessary reviews, audits and inspections. Rather, the OIG Report identified one area where it might appear that the Staff may not be gathering facts independently, i.e., that portion of the application where the applicant describes its experience in implementing the aging management programs that are already in place. The OIG Report cites several examples in which the description in an SER of a licensees operating experience seemingly was copied directly out of a license renewal application.72 However, the OIG Report notes that the Staff may have independently investigated operating experience even where the SERs description of operating experience is the same as in the license renewal application.73 For example, the OIG Report cites a portion of the Oyster Creek SER with Open Items pertaining to the licensees flow-accelerated corrosion program as an example where the Staffs discussion seems simply to repeat the licensees description of its operating experience.74 In that instance, the Staff states that it confirmed the application information through interviews with the licensees technical staff. 75 The OIG Report did not opine that discussion with an applicants staff was an invalid method of verifying experience, per se. Rather, the OIG Report recommended use of 71 Id.

72 OIG Report at 49.

73 Id. at 10.

74 Id. at 49. We note that the GALL Report only provided a brief and general description of operating experience on this aging management program, whereas the Oyster Creek application provided a lengthy description of that licensees operating experience in the implementation of this program. Compare GALL Report at sec. XI.M17 (page XI M-62) with Oyster Creek Generating Station License Renewal Application, App. B at B-41 to B-42 (ADAMS ML052080185)(July 22, 2005).

75 See NUREG-1875, Vol. 2 at 3-15.

21 license applicants corrective action databases for spot checking operating experience and establishment of guidelines for doing so.76 It is also important to keep in mind that operating experience is only one element of ten considered essential in evaluating an aging management program, which in turn is only one of the matters the Staff must consider for license renewal. Petitioners, however, would have us assume that what the OIG found with respect to this one element is true with respect to the entire safety review. Petitioners have provided no examples from other portions of the pertinent SERs, where it appears that the Staff copied material from the license renewal applications.

Petitioners complaint that the Staff is merely parroting the license application, which is in turn merely parroting NRC Guidance documents, merits comment. 77 The portions of the SERs that the OIG Report referenced as not showing independent verification concerned the plants individual operating experience, but neither the OIG nor the Petitioners cited any example from any license renewal application where the applicants description of operating experience was copied from the GALL Report. With respect to other elements of the aging management programs in particular, Petitioners are mistaken that it is inappropriate for the applications to parrot the GALL Report. The purpose of the GALL Report is to identify and describe programs which have proved effective in managing aging effects in reactors.

Deviations from the generically approved programs must be individually justified by the license renewal applicant. The license renewal applicant would, therefore, naturally use similar wording to describe its own aging management programs in order to demonstrate that they are the same as the corresponding programs described in the GALL Report.

Significantly, the OIG Report did not suggest that the Staff should abandon all reliance 76 See OIG Report at 19-21.

77 See Petition at 3.

22 on a license renewal applicants regulatory obligation to submit complete and accurate information.78 Rather, it recommended that management should standardize the scope and depth to which the Staff verifies the facts with respect to operating experience.79 Importantly, the OIG Report did not suggest, as Petitioners have, that members of the NRC Staff represented that they conducted audits or inspections that they did not in fact perform.80 Petitioners have not shown a compelling basis for their demand for a complete license renewal overhaul. The OIG Report provides no basis for such an overhaul, as we have explained. Further, Petitioners have not demonstrated any other basis to comprehensively revisit the Staffs regulatory review process. Indeed, they have not pointed to any weakness in the SRP-LR or shown any reason why license renewal applicants should not be permitted to reference the GALL Report to show that their existing aging management programs will effectively maintain safety systems. They have not made any specific suggestions as to additional steps to be taken in addition to the procedures the Staff has developed for license renewal review.

Petitioners fail to make the important distinction between the entire license renewal review process including the Staffs document reviews, audits, and inspections and the final step, which is documentation of the Staffs review in an FSER. Many of the portions of the OIG Report to which Petitioners cite discuss the Staffs report-writing, not the substance of its review. For example, the OIG Report stated that the lack of precision in differentiating quoted and unquoted text makes it difficult for the reader to distinguish between the licensee-provided 78 See, e.g., 10 C.F.R. §§ 50.9, 54.13.

79 OIG Report at 11.

80 See, e.g., Petition at 14-15, 25, 29.

23 data and NRC Staffs independent assessment and conclusions.81 This is a question of effective documentation, not a question of whether Staff has verified an appropriate selection of facts. Similarly, the Report said that the Staffs description of the methods used and the support they provided for their conclusions often lack substance.82 As the Staff suggested in its brief, the recommendation could be implemented by adding appropriately placed citations to the established methodologies in the SERs.83 Similarly, the issue raised in the Supplemental Petition - whether the Staff reviewers should have kept their working papers as agency records

- relates to documentation.

In addition, Petitioners reference in their initial Petition to comments made by the licensing boards in three early site permit (ESP) cases adds no weight to Petitioners insinuations that the Staff does a generally poor job of reviewing any sort of license application.

First of all, we note that all three boards (and, in each case, the Commission) found that the permit should be issued.84 Even considering the Boards comments in a light most favorable to Petitioners, they were insufficient to render invalid the Staffs ESP reviews, and do not support a determination that the Staffs review processes (be they license renewal or otherwise) are substantively flawed.

Indeed, in reviewing the Clinton ESP decision, we expressly rejected the idea that the Staffs review of that ESP application had not been adequate.85 There, we explicitly endorsed 81 Id. at 9.

82 OIG Report at 11.

83 Staff Brief at 19.

84 In any event, a Boards criticism of the Staffs review with respect to one application is in no way material to the review of another, wholly distinct application, absent an obvious and direct connection to the licensing action at issue. We see no such connection here.

85 Exelon Generation Co., LLC (Early Site Permit for Clinton ESP Site), CLI-07-12, 65 NRC 203, (Continued )

24 the Staffs longstanding regulatory practice of prioritizing which facts to verify and generally expecting the license applicants to provide correct and complete information in applications submitted under oath.86 We take this opportunity to reiterate that it is neither possible nor necessary for the Staff to verify each and every factual assertion in complex license applications, including license renewal applications. The Staffs audit, or sampling, method of verifying a license renewal applicants aging management programs, together with the other components of its review, enables the Staff to make the safety findings necessary for issuance of a renewed license.87 In December, 2006, the NRC turned down a petition for rulemaking urging that deficiencies in the NRC Staff's safety reviews required fundamental changes in and broadening the scope of the license renewal process.88 Lawsuits challenging the rulemaking denial, brought by some of the Oyster Creek intervenors (among others), were recently resolved in the NRCs favor.89 For the reasons given in the NRC's rulemaking denial, we remain convinced that the agency's current license renewal approach and process are sensible and lawful. That is not to say that improvements cannot be made, as, for example, the transparency-driven enhancements OIG suggested in its recent report. But we are aware of nothing calling for the complete overhaul that Petitioners demand.

207-08 (2007).

86 Id.

87 See also 10 C.F.R. § 54.13 (requiring, among other things, that information provided to the Commission by a license renewal applicant for a renewed license must be complete and accurate in all material respects).

88 Petition for Rulemaking: Denial, 71 Fed. Reg. 74,848 (Dec. 13, 2006).

89 Spano v. NRC, No. 07-0324-ag (L) (2d Cir. Sept. 19, 2008)(Summary order) (denying petitions for review).

25 For these reasons, Petitioners have not demonstrated, nor do we otherwise find, a basis for conducting a comprehensive overhaul of the Staffs license renewal review process. With this in mind, we now turn to Petitioners claims that the Staff improperly destroyed records.

2.

Claims That Staff Illegally Destroyed Records Petitioners claim that the NRC Staff improperly destroyed official agency records does not support their motion to suspend these particular license renewal proceedings or to overhaul the license renewal review process in general. As discussed above, the Petitioners are mistaken that they have a legal entitlement to scrutinize, second guess, and adjudicate the quality of the Staffs review per se. Further, this claim is based on a misinterpretation of an NRC Management Directive intended to clarify the agencys obligations under the Federal Records Act (FRA)90 and regulations promulgated by the National Archives and Records Administration.91 The focus of the license proceeding must be the sufficiency of the application, not the adequacy of the Staffs review. Petitioners initial Petition acknowledged this principle.92 But their Supplemental Petition goes well beyond the initial Petition in proposing that the Commission investigate the Staffs review of each aging management program, determine whether that review was sufficient, and allow Petitioners an opportunity to file new contentions.93 Even if the working files at issue should have been preserved as agency records, the Petitioners have made no argument regarding how destruction of these working files could meet the 90 The Federal Records Act is the common name of a series of statutes that govern the creation, management, and disposal of records by federal agencies. See 44 U.S.C. §§ 2101-18, 2901-09, 3101-07, 3301-24.

91 36 C.F.R. pt. 1220.

92 Petition at 6-7.

93 Supplemental Petition at 17-18.

26 contention admissibility standards in our regulations. The Commission pointed out in Curators of the University of Missouri that it would be unfair to deny a meritorious application because the Staffs review was found lacking.94 It would make even less sense to punish the applicant for the Staffs paperwork management practices.

The FRA gives federal agencies some discretion in determining which documentary materials are appropriate for preservation as an agency record. Agency records are defined as:

all books, papers, maps, photographs, or other documentary materials made or received by an agency in connection with the transaction of public business and preserved or appropriate for preservation by that agency as evidence of the organization functions, policies, decisions, procedures, operations or other activities of the government or because of the informational value of the data in them.95 NRCs Management Directive 3.5396 provides the Commissions interpretation of its obligations under the FRA, as well as the Commissions expectations for the Staff in fulfilling those obligations. It should be noted, however, that the Management Directive itself does not have the force of law. The pertinent section of the Management Directive provides that:

Working files, such as preliminary drafts and rough notes and other similar materials, will be maintained and filed with the official record for purposes of adequate and proper documentation if they meet the following two conditions:

  • They were circulated or made available to employees, other than the creator, for official purposes such as approval, comment, action, recommendation, followup, and to communicate with agency staff about agency business.
  • They contain unique information, such as substantive annotations or comments, that adds to a proper understanding of the agencys formulation and execution of basic 94 CLI-95-1, 41 NRC at 121-22.

95 FRA, 44 U.S.C. § 3301; see also 36 C.F.R. § 1220.14 (same definition).

96 Handbook 1 of Management Directive 3.53, NRC Records and Document Management Program, (Rev. Mar. 15, 2007).

27 policies, decisions, actions, or responsibilities.97 Petitioners interpret this provision as meaning any document that satisfies either condition must be preserved.98 They contend that the destroyed Staff working papers satisfy the second condition, because they contain unique information that adds to a proper understanding of [the reviewers] decision that a particular aging management program meets the criteria listed in the GALL report.

We disagree with that interpretation. The phrase if they meet the following two conditions clearly requires that both conditions be satisfied.99 Moreover, the provision in the Management Directive is taken almost word for word from National Archives and Records Administration regulations, with the exception that the Code of Federal Regulations provision uses the word and between the two conditions that must be present to qualify a working file as an agency record.100 So, to constitute an agency record, a working file must contain unique information that underlies an agency decision, and it must also have been made available to other agency employees for purposes of helping to reach or support that decision. Otherwise, materials created by an employee for the individuals own use in performing his or her job, and which are not circulated (and are not otherwise required by NRC policy to be maintained), may be discarded at the employees discretion.101 97 Handbook 1, Management Directive 3.53 (Rev. Mar. 2007), at 19-20.

98 Supplemental Petition at 10.

99 As with statutes, the plain meaning of a regulation controls its interpretation. See, e.g.,

Tesoro Hawaii Corp. v. United States, 405 F.3d 1339, 1346 (Fed. Cir. 2005); Time Warner Entertainment Co. L.P. v. Everest Midwest Licensee, L.L.C., 381 F.3d 438, 443 (10th Cir. 2004);

U.S. Department of Energy (High-Level Waste Repository), CLI-06-5, 63 NRC 143 (2006).

100 36 C.F.R. § 1222.34(c).

101 Management Directive 3.53, at 45, 62. See also 36 C.F.R. § 1228.24 (b)(5) (Non-records may be discarded in accordance with instructions in the agencys published records control (Continued )

28 Petitioners make no concrete showing of the destruction of unique and significant documentary information. They also make only the faintest attempt to address the requirement of circulation for official purposes.102 While the OIG observed that license renewal review audit team members do not keep all notes and working papers that they utilize in preparing formal audit reports, the OIG made no finding of a violation of law, regulation or agency policy regarding record retention, let alone wholesale violations warranting dramatic action.103 We conclude, therefore, that there is no basis in the OIG Memorandum or in Petitioners submission to find that Staff members improperly disposed of agency records.

B.

The Petition Does Not Support Adjudicatory Relief As discussed below, given that we find no basis to completely overhaul the license renewal process, there is no reason to suspend or otherwise stay the currently pending license renewal reviews or the associated adjudicatory proceedings. Nor have Petitioners justified guidelines).

102 Supplemental Petition at 13.

103 Even if the working papers should have been retained under the terms of MD 3.53 and applicable National Archives and Records Administration regulations, and thus constituted agency records, Petitioners would not necessarily have been entitled to see them. The Freedom of Information Act (FOIA) protects intra-agency memoranda developed during the decisionmaking process under the deliberative process privilege. FOIA, 5 U.S.C. § 552(b)(5). If documents in the working papers were circulated for the purpose of reaching a decision on the adequacy of a particular aging management program, they would most likely fall under the deliberative process privilege. See, e.g., Mapother v. Dept of Justice, 3 F.3d 1533, 1539 (D.C.

Cir. 1993) (deliberative process privilege protected summaries of information gathered to assist the agency in reaching a complex and significant policy decision, where the summaries reflected the judgment or opinion of their compiler); see also Montrose Chemical Corp. v. Train, 491 F.2d 63, 70 (D.C. Cir. 1974)(deliberative process privilege purpose is not only to encourage frank intra-agency discussion of policy but also to ensure that the mental processes of decision-makers are not subject to public scrutiny). While this privilege is a qualified one, Petitioners would have to show that their need for the information outweighed potential harm to the agency from that disclosure. Redland Soccer Club v. Dept of the Army, 55 F.3d 827, 854 (3d Cir. 1995), cert. denied, 516 U.S. 1071 (1996); Chevron U.S.A. v. United States, 80 Fed.Cl.

340, 356 (2008).

29 reopening the record in the Oyster Creek proceeding.

1.

Suspension of the Ongoing Adjudicatory Proceedings The Commission considers suspension of licensing proceedings a drastic action that is not warranted absent immediate threats to public health and safety.104 While our regulations do not provide for a motion to suspend a proceeding, we have occasionally considered similar requests to suspend proceedings or hold them in abeyance in the exercise of our inherent supervisory powers over proceedings. For example, we considered similar motions presented to us in the wake of the September 11 terrorist attacks. We ultimately rejected such requests pending the Commissions comprehensive review of anti-terrorist measures at licensed facilities.105 We declined to suspend the Diablo Canyon independent spent fuel storage installation license proceeding pending the post-9/11 security review, citing the publics interest in expeditious resolution of adjudicatory matters.106 But we also reasoned that, should the review result in security enhancements for spent fuel storage facilities, those enhancements could be implemented at Diablo Canyon even after the license issued.107 Similarly, we expect licensees and license renewal applicants to adjust their aging management programs to reflect lessons learned in the future through individual and industry-104 Vermont Yankee Nuclear Power Corp. & AmerGen Vermont, LLC (Vermont Yankee Nuclear Power Station) CLI-00-20, 52 NRC 151, 173-74 (2000) (refusing request to suspend all license transfer proceedings involving a particular transferee while the Commission examined effects of ownership by limited liability companies).

105 See Private Fuel Storage, LLC, (Independent Spent Fuel Storage Installation), CLI-01-26, 54 NRC 376 (2001). See also Diablo Canyon, CLI-02-23, 56 NRC 230; Duke Cogema Stone &

Webster (Savannah River Mixed Oxide Fuel Fabrication Facility), CLI-01-28, 54 NRC 393 (2001).

106 CLI-02-23, 56 NRC at 238.

107 Id. at 239.

30 wide experiences. The license renewal program is a living program108 that continues to evolve. As new insights or changes emerge over time, we expect the Staff to require, as appropriate, any modification to systems, structures or components that is necessary to assure adequate protection of the public health and safety, or to bring the facility into compliance with a license, or the rules and orders of the Commission.109 Finally, in all proceedings the stakeholders have an interest in efficient and expeditious resolution.110 We see no reason to suspend the proceedings to await an overhaul, which we have found unnecessary, to the license review process.

2.

Motion to Reopen the Record in Oyster Creek Petitioners in the Oyster Creek proceeding have not met the requirements for reopening the record, which closed on September 25, 2007.111 Reopening a closed record requires, among other things, a showing that the motion is timely. Petitioners motion was filed four months after the OIG Report on which it is based became available to the public.112 Next, such a motion must address a significant safety or environmental issue.113 Petitioners offer only the speculation that the Staff may have failed to identify such an issue because their review may have been insufficiently thorough.

108 E.g., Oyster Creek FSER, NUREG-1875 at 1-6.

109 10 C.F.R. § 50.109. See Diablo Canyon, CLI-02-23, 56 NRC at 240.

110 See generally Statement of Policy on Conduct of Adjudicatory Proceedings, CLI-98-12, 48 NRC 18 (1998).

111 See 10 C.F.R. § 2.326. An appeal is currently pending before the Commission on a request to reopen the record and admit a contention on an unrelated matter. See Oyster Creek, LBP-08-12, 68 NRC __ (slip op.) (denying Citizens motion to reopen the record and to add a new contention).

112 The OIG Report was released to the public on September 7, 2007.

113 10 C.F.R. § 2.326(a)(2).

31 The moving party must show that a materially different result would have been likely if the new information had been available to the Board.114 In fact, the OIG Report was publicly available at the time of the hearing. But it could not have altered the result in the license renewal hearing in a material way, both because the OIG Report does not provide support for a substantive challenge to the license renewal application and because the Staff review is outside the scope of the hearing.115 Finally, a motion to reopen must be supported by affidavits setting forth the factual and/or technical basis for the movants claim that a significant and material safety or environmental issue exists.116 Petitioners provided no affidavits only mere speculation that, if the Staff undertook another review of the Oyster Creek license renewal application starting after all of the OIG recommendations have been fully implemented, the conclusions in the FSER might be materially different something, in other words, might turn up supporting Petitioners concerns. This does not justify restarting the hearing process. For these reasons, the Oyster Creek Petitioners motion to reopen the proceeding is denied.117 114 10 C.F.R. § 2.326(a)(3).

115 Five of the Petitioners participated as intervenors in the Oyster Creek license renewal proceeding, and thus have had opportunity to be heard on litigable issues appropriately within the scope of the agencys license renewal review. After an evidentiary hearing, the Board ruled in the applicants favor. (See LBP-07-17, 66 NRC 327 (2007)). Although in response to Intervenors Petition for Review, the Commission requested additional briefs (See CLI-08-10, 68 NRC __ (slip op. May 28, 2008)) and referred a single issue to the Board for consideration of additional evidence, (Order of the Secretary (Aug. 21, 2008) (unpublished)), it would be unfair to the applicant to delay this proceeding even further because of supposed deficiencies in the Staffs review. Compare Curators of the University of Missouri, CLI-95-1, 41 NRC at 121 (even assuming arguendo that Staff did conduct an insufficient review, a denial of a meritorious application on that ground would be grossly unfair - punishing the applicant for an error by Staff).

116 10 C.F.R. § 2.326(b).

117 Petitioners also cite an incident pertaining to the Oyster Creek facility (Petition at 17-19),

relevant to maintenance of certain equipment and the plants commitment tracking system. It is (Continued )

32 C.

Other Matters As an alternative to completely overhauling the review process, Petitioners suggest that if the problems identified by the OIG turn out to primarily concern reporting rather than a failure to perform the reviews, then the SERs should be comprehensively revised.118 We would not call upon the Staff to undertake cumbersome and resource-intensive revisions of the already-completed Oyster Creek, Vermont Yankee, and Pilgrim FSERs, or of other previously-completed license renewal reviews, where we have no basis for concluding that the Staffs safety reviews were inadequate to assure that the licensees have appropriate aging management programs in place.119 As discussed above, we find no evidence, in either the OIG Report or the Petition, to require an overhaul of the license renewal review process.

We base this conclusion on the fact that neither the Petition nor the OIG Report has identified any safety issue resulting from the OIG investigation.

It also bears noting that each license renewal application addressed by the Petition has been the subject of a hearing opportunity. In that context, Petitioners have had, or will have, the opportunity to ventilate litigable issues within the scope of license renewal. Substantive not clear that this issue would appropriately fall within the scope of license renewal review, and therefore, it does not support Petitioners fundamental premise that the Staffs license renewal review process is flawed. To the extent that Petitioners are attempting to raise concerns regarding an ongoing operational issue at the Oyster Creek facility, the appropriate avenue for resolution of such a concern is via the 10 C.F.R. § 2.206 process.

118 Petition at 30.

119 We note that, with respect to the Indian Point review, the Staff has stated its intent to revise the schedule for completion of its review for a number of reasons, including to account for corrective actions stemming from the OIG recommendations. See letter from Brian Holian, Director, Division of License Renewal, Office of Nuclear Reactor Regulation, to Joseph E.

Pollock (Vice President Operations, Entergy Nuclear Operations, Inc.) (Sept. 2, 2008) (ADAMS ML082400214).

33 challenges to license renewal applications are appropriately made in that context.120 In summary, we find no basis to require the Staff to revisit any completed SERs for license renewal. We expect that such an exercise would not result in any change to the Staffs conclusions or recommendations and, therefore, is not warranted.121 III.

CONCLUSION For the foregoing reasons, the Petitions are denied.

IT IS SO ORDERED.

For the Commission (NRC SEAL)

/RA/

Annette L. Vietti-Cook Secretary of the Commission Dated at Rockville, Maryland this _6th_ day of October, 2008 120 In addition, even though Petitioners expressly declined to seek enforcement action pursuant to 10 C.F.R. § 2.206, if they, or any other person, wish to institute a proceeding to modify, suspend, or revoke a license, or to request other action, that mechanism remains open to them.

121 Commissioner Jaczko, in his partial dissent, expresses the view that the Commission should require the Staff to supplement the record with information on whether Staff followed applicable guidance and to provide verifications with respect to its exercise of independent judgment and its documentation. For multiple reasons discussed above, the Commission majority does not find it necessary to do so. For instance, the Staffs safety and environmental findings are already reflected in its formal reports that are made part of the record, and the applications themselves have been subject to adjudicatory hearing opportunities. In addition, it bears repeating that it is appropriate for the Staff to exercise judgment in deciding which facts to verify and the extent of its audits, since applicants are expected to provide complete and accurate information in all material respects. The OIG, while identifying methods for improving the Staffs review and documentation, also found that the Staff in fact expended enormous effort in conducting its license renewal reviews, including its review of the Oyster Creek application.

Asking the Staff to provide verifications regarding completed reviews likely would subject the Staff to the task of replicating much of its prior work in order to complete a meaningful and thorough re-review - a task with no obvious end point.

34 Commissioner Gregory B. Jaczko respectfully dissents, in part:

While I concur with a majority of this decision, I respectfully dissent, in part. The Office of Inspector General's (OIG) Audit of the License Renewal Program found that the staff did not consistently provide adequate descriptions of audit methodology or support for conclusions in license renewal reports. I agree with the majority that this does not necessarily mean that the staff's safety findings are invalid, but it certainly means that it is difficult in some instances to ascertain the basis for the staff's safety findings from the license renewal documentation. And as the OIG noted, "adequate documentation of review methodologies and support for staff conclusions in license renewal reports is important for supporting the sufficiency and rigor of NRC's review process." (OIG Audit of NRC's License Renewal Program, pg. 7).

Because of the importance of these license renewal reports and their role in establishing a complete and sound basis for the agency's ultimate license renewal decisions, I supported a version of the Order that would have required the staff in each of the cases before us to supplement the record with information as to whether staff followed applicable guidance and whether its review reflected an exercise of independent staff judgment. I want to be clear that this is not an issue about the integrity of the NRC Staff, but an issue about the integrity of the documents upon which the agency relies in making its decision. I believe requiring these documents to be clarified or supplemented as necessary, would have been a simple yet effective way to verify to the public that the staffs analysis and findings in each of these cases was the result of an independent staff judgment - something that the IG report does call into question and something that the current record neglects to address.

I believe this is not only the obvious next step, but a necessary one if we intend to confirm what we think we know. After all, if this is, as we all assume, simply an issue with transparency of documentation, then it is a straightforward thing to resolve - request verification

35 of the documentation. If it is more than that, there is only one way to find out - request verification of the documentation. In either instance, the answer is the same. Thus, I disagree with the majority's decision on this point and instead believe we should have required staff to supplement the record with this information. I can find no justification or benefit to leaving a record begging these obvious questions.

I also believe, similarly, that the issue raised in the supplemental petition - that the staff improperly destroyed documentation - could be resolved through verification of the documentation. While the Petitioners have not argued how this issue could meet the standards for an admissible contention in our regulations, verification of the documentation could provide a basis for the Commission to judge the significance of the staffs discarding field notes created during onsite audits. This would assist us not only in resolving the issues raised by the Petitioners, but would provide us with information that might lead us to direct the staff to change its practices with respect to documenting field audits, or to initiate additional OIG investigation, if either of these actions are warranted.

Finally, I believe that the majority order misses an opportunity to highlight the ongoing efforts aimed at improving reviews in the license renewal area, including staffs efforts to address the recommendations in the IGs original report. Whether one characterizes such efforts as an overhaul or not, I believe these changes will bring increased transparency to the hard work the staff does in reviewing license renewal applications and I look forward to their implementation.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

AMERGEN ENERGY COMPANY, LLC

)

Docket No. 50-219-LR

)

)

(Oyster Creek Nuclear

)

Generating Station)

)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-08-23), dated October 6, 2008 have been served upon the following persons by electronic mail this date, followed by deposit of paper copies in the U.S. mail, first class, and NRC internal mail.

Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Administrative Judge E. Roy Hawkens, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: erh@nrc.gov Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: pba@nrc.gov Administrative Judge Anthony J. Baratta Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ajb5@nrc.gov Emily Krause, Law Clerk Atomic Safety and Licensing Board Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: Emily.Krause@nrc.gov Richard Webster, Esq.

Julia LeMense, Esq.

Eastern Environmental Law Center 744 Broad Street, Suite 1525 Newark, NJ 07102 E-mail: rwebster@easternenvironmental.org; jlemense@easternenvironmental.org

2 Docket No. 50-219-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23)

Mary C. Baty, Esq.

Marcia J. Simon, Esq.

Brian Newell, Paralegal Office of the General Counsel Mail Stop - O-15 D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: mcb1@nrc.gov; jea1@nrc.gov; bpn1@nrc.gov Donald J. Silverman, Esq.

Kathryn M. Sutton, Esq.

Alex S. Polonsky, Esq.

Raphael P. Kuyler, Esq.

Morgan, Lewis & Bockius LLP 1111 Pennsyvlania Ave., NW Washington, DC 20004 E-mail: dsilverman@morganlewis.com; ksutton@morganlewis.com; apolonsky@morganlewis.com; rkuyler@morganlewis.com Paul Gunter, Reactor Oversight Kevin Kamps Beyond Nuclear Nuclear Policy Research Institute 6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912 E-mail: paul@beyondnuclear.org; kevin@beyondnuclear.org Jill Lipoti, Director New Jersey Department of Environmental Protection Division of Environmental Safety and Health P.O. Box 424 Trenton, NJ 08625-0424 E-mail: jill.lipoti@dep.state.nj.us Bradley M. Campbell, Commissioner New Jersey Department of Environmental Protection P.O. Box 402 Trenton, NJ 08625-0402 E-mail:

commissionercampbell@dep.state.nj.us J. Bradley Fewell, Esq.

Exelon Corporation 4300 Warrenville Road Warrenville, IL 60555 E-mail: bradley.fewell@exeloncorp.com Ron Zak New Jersey Department of Environmental Protection Nuclear Engineering P.O. Box 415 Trenton, NJ 08625-0415 E-mail: ron.zak@dep.state.nj.us Suzanne Leta NJPIRG 11 N. Willow St.

Trenton, NJ 08608 E-mail: sleta@njpirg.org

3 Docket No. 50-219-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23)

John A. Covino, Esq.

Ellen Barney Balint, Esq.

Valerie Anne Gray, Esq.

Deputy Attorneys General New Jersey Office of the Attorney General Environmental Permitting &

Counseling Section, Division of Law Hughes Justice Complex P.O. Box 093 Trenton, NJ 08625 E-mail: john.covino@law.dol.lps.state.nj.us; ellen.balint@dol.lps.state.nj.us; valerie.gray@dol.lps.state.nj.us;

[Original signed by Christine M. Pierpoint]_

Office of the Secretary of the Commission Dated at Rockville, Maryland this 6th day of October, 2008

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

ENTERGY NUCLEAR OPERATIONS, INC. )

Docket Nos. 50-247/286-LR

)

)

(Indian Point Nuclear Generating Station

)

Units 2 and 3)

)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-08-23), dated October 6, 2008, have been served upon the following persons by electronic mail this date, followed by deposit of paper copies in the U.S. mail, first class, and NRC internal mail.

Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ocaamail@nrc.gov Administrative Judge Lawrence G. McDade, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 lgm1@nrc.gov Administrative Judge Richard E. Wardwell Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 rew@nrc.gov Administrative Judge Kaye D. Lathrop 190 Cedar Lane E.

Ridgway, CO 81432 Kaye.lathrop@nrc.gov

Docket Nos. 50-247/286-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 2 Sherwin E. Turk, Esq.

Beth N. Mizuno, Esq.

David E. Roth, Esq.

Jessica A. Bielecki, Esq.

Marcia J. Simon, Esq.

Karl Farrar, Esq.

Brian Newell, Paralegal Office of the General Counsel Mail Stop - O-15 D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 set@nrc.gov bnm1@nrc.gov der@nrc.gov jab2@nrc.gov mjs5@nrc.gov klf@nrc.gov bpn1@nrc.gov Mylan L. Denerstein Executive Deputy Attorney General Social Justice Office of the Attorney General of the State of New York 120 Broadway, 25th Floor New York, NY 10271 Mylan.Denerstein@oag.state.ny.us Michael J. Delaney, Vice President - Energy New York City Economic Development Corporation 110 William Street New York, NY 10038 mdelaney@nycedc.com Arthur J. Kremer, Chairman New York AREA 347 Fifth Avenue, Suite 508 New York, NY 10016 kkremer@area-alliance.org Martin J. ONeill, Esq.

Kathryn M. Sutton, Esq.

Paul M. Bessette, Esq.

Mauri T. Lemoncelli, Esq.

Counsel for Entergy Nuclear Operations, Inc.

Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 martin.oneill@morganlewis.com ksutton@morganlewis.com pbessette@morganlewis.com mlemoncelli@morganlewis.com Manna Jo Greene, Director Hudson River Sloop Clearwater, Inc.

112 Little Market St.

Poughkeepsie, NY 12601 mannajo@clearwater.org

Docket Nos. 50-247/286-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 3 Daniel E. ONeill, Mayor Village of Buchanan James Seirmarc, M.S., Liaison to Indian Point 236 Tate Avenue Buchanan, NY 10511 Robert D. Snook, Esq.

Assistant Attorney General of the State of Connecticut 55 Elm Street P.O. Box 120 Hartford, CT 06141-0120 robert.snook@po.state.ct.us Charlene M. Indelicato, Esq.

Westchester County Attorney Justin D. Pruyne, Esq.

Assistant County Attorney 148 Martine Avenue, 6th Floor White Plains, NY 10601 jdp3@westchestergov.com Thomas F. Wood, Esq.

Daniel Riesel, Esq.

Counsel for the Town of Cortlandt Sive, Paget & Riesel, P.C.

460 Park Avenue New York, NY 10022 driesel@sprlaw.com Andrew M. Cuomo, Esq.

Attorney General of the State of New York John J. Sipos, Esq.

Assistant Attorney General The Capitol Albany, NY 12224-0341 john.sipos@oag.state.ny.us Nancy Burton 147 Cross Highway Redding Ridge, CT 06876 NancyBurtonCT@aol.com Riverkeeper, Inc.

Phillip Musegaas, Esq.

Victor Tafur, Esq.

828 South Broadway Tarrytown, NY 10591 phillip@riverkeeper.org vtafur@riverkeeper.org Diane Curran, Esq.

Counsel for Riverkeeper, Inc.

Harmon, Curran, Spielberg, & Eisenberg, L.L.P.

1726 M. Street N.W., Suite 600 Washington, DC 20036 dcurran@harmoncurran.com Janice A. Dean, Assistant Attorney General Office of the Attorney General of the State of New York 120 Broadway, 26th Floor New York, NY 10271 janice.dean@oag.state.ny.us Elise N. Zoli, Esq.

Goodwin Procter, LLP Exchange Place 53 State Street Boston, MA 02109 ezoli@goodwinprocter.com

Docket Nos. 50-247/286-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 4 Joan Leary Matthews, Esq.

Senior Counsel for Special Projects Office of General Counsel New York State Department of Environmental Conservation 625 Broadway Albany, NY 12224 jlmatthe@gw.dec.state.ny.us Westchester Citizens Awareness Network (WestCan), Citizens Awareness Network (CAN),

etc.

Susan H. Shapiro, Esq.

21 Perlman Drive Spring Valley, NY 10977 mbs@officeonline.ws Richard L. Brodsky Assemblyman 5 West Main Street Suite 205 Elmsford, NY 10523 richardbrodsky@msn.com Sarah L. Wagner, Esq.

Legislative Office Building, Room 422 Albany, NY 12248 sarahwagner@gmail.com FUSE USA Heather Ellsworth Burns-Demelo John Lekay Remy Chevalier Belinda J. Jaques Bill Thomas 351 Dyckman Street Peekskill, New York 10566 www.fuseusa.org fuse_usa@yahoo.com Stephen C. Filler, Board Member Hudson River Sloop Clearwater, Inc.

303 South Broadway, Suite 222 Tarrytown, NY 10591 sfiller@nylawline.com

Docket Nos. 50-247/286-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 5

[Original signed by Christine M. Pierpoint]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 6th day of October, 2008

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

ENTERGY NUCLEAR GENERATION CO. )

AND

)

ENTERGY NUCLEAR OPERATIONS, INC. )

Docket No. 50-293-LR

)

(Pilgrim Nuclear Power Station)

)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-08-23), dated October 6, 2008, have been served upon the following persons by electronic mail this date, followed by deposit of paper copies in the U.S. mail, first class, and NRC internal mail.

U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 Washington, DC 20555-0001 Ann Marshall Young, Chair Administrative Judge E-mail: amy@nrc.gov Richard F. Cole Administrative Judge E-mail: rfc1@nrc.gov Paul B. Abramson Administrative Judge E-mail: pba@nrc.gov U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop: O-15 D21 Washington, DC 20555-0001 Susan L. Uttal, Esq.

E-mail: slu@nrc.gov David Roth, Esq.

E-mail: der@nrc.gov Marcia J. Simon, Esq.

E-mail: mjs5@nrc.gov Brian Newell, Paralegal E-mail: bpn1@nrc.gov E-mail: OGCMailCenter@nrc.gov U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Mail Stop: O-16C1 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov U.S. Nuclear Regulatory Commission Office of Secretary of the Commission Mail Stop: O-16C1 Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop: O11-F1 Washington, DC 20555-0001 Perry H. Buckberg, Project Mgr, Plant Lic.

Branch I-I, Operating Reactor Licensing E-mail: phb1@nrc.gov

Docket No. 50-293-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 2 Entergy Nuclear 1340 Echelon Parkway Mail Stop M-ECH-62 Jackson, MS 39213 Terence A. Burke, Esq.

E-mail: tburke@entergy.com Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N. Street, N.W.

Washington, DC 20037-1128 David R. Lewis, Esq.

E-mail: david.lewis@pillsburylaw.com Paul A. Gaukler, Esq.

E-mail: paul.gaukler@pillsburylaw.com Jason B. Parker, Esq.

E-mail: jason.parker@pillsburylaw.com Duxbury Emergency Management Agency 668 Tremont Street Duxbury, MA 02332 Kevin M. Nord, Fire Chief & Director E-mail: nord@town.duxbury.ma.us Office of the Attorney General Environmental Protection Division One Ashburton Place, 18th Floor Boston, MA 02108 Matthew Brock, Assistant Attorney General E-mail: matthew.brock@ago.state.ma.us Pilgrim Watch 148 Washington Street Duxbury, MA 02332 Mary E. Lampert, Director E-mail: mary.lampert@comcast.net Town of Plymouth MA Town Managers Office 11 Lincoln Street Plymouth, MA 02360 Mark D. Sylvia, Town Manager E-mail: msylvia@townhall.plymouth.ma.us Duane Morris, LLP Town of Plymouth MA 505 9th Street, NW, Suite 1000 Washington, DC 20004-2166 Sheila Slocum Hollis, Esq.

E-mail: sshollis@duanemorris.com

[ Original signed by Linda Lewis ]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 6TH day of October 2008

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

ENTERGY NUCLEAR VERMONT YANKEE, LLC )

)

and

)

Docket No. 50-271-LR

)

ENTERGY NUCLEAR OPERATIONS, INC.

)

)

(Vermont Yankee Nuclear Power Station)

)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-08-23) dated October 6, 2008, have been served upon the following persons by e-mail (and first class mail) or through NRC internal distribution in this license renewal proceeding.

Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ask2@nrc.gov Administrative Judge Richard E. Wardwell Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: rew@nrc.gov Administrative Judge William H. Reed Atomic Safety and Licensing Board Panel 1819 Edgewood Lane Charlottesville, VA 22902 E-mail: whrcville@embarqmail.com

Docket No. 50-271-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 2 U.S. Nuclear Regulatory Commission Office of the Secretary of the Commission Mail Stop O-16C1 Washington, DC 20555-0001 Hearing Docket E-mail: hearingdocket@nrc.gov Lloyd B. Subin, Esq.

David E. Roth, Esq.

Mary C. Baty, Esq.

Jessica A. Bielecki, Esq.

Susan L. Utall, Esq.

Brian Newell, Paralegal Office of the General Counsel O-15D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: lbs3@nrc.gov ;der@nrc.gov; mcb1@nrc.gov; bpn1@nrc.gov;Jessica.Bielecki

@nrc.gov;Susan.Utall@nrc.gov Ronald A. Shems, Esq.

Karen Tyler, Esq.

Andrew Raubvogel, Esq.

Shems Dunkiel Kassel & Saunders, PLLC 91 College Street Burlington, VT 05401 E-mail: rshems@sdkslaw.com ktyler@sdkslaw.com araubvogel@sdkslaw.com Sarah Hofmann, Esq.

Director for Public Advocacy Department of Public Service 112 State Street - Drawer 20 Montpelier, VT 05620-2601 E-mail: sara.hoffman@state.vt.us Anthony Z. Roisman, Esq.

National Legal Scholars Law Firm 84 East Thetford Rd.

Lyme, NH 03768 E-mail: aroisman@nationallegalscholars.com James R. Milkey Assistant Attorney General Chief, Environmental Protection Division Office of the Attorney General One Ashburton Place, 18th Floor Boston, MA 02108 E-mail: Jim.milkey@state.ma.us Robert L. Stewart New England Coalition 229 Kibbee Ext.

Brookfield, Vermont 05036 E-mail: Jakeskis@aol.com Callie B. Newton, Chair Gail MacArthur Lucy Gratwick Town of Marlboro Select Board P.O. Box 518 Marlboro, VT 05344 E-mail: cbnewton@sover.net

Docket No. 50-271-LR COMMISSION MEMORANDUM AND ORDER (CLI-08-23) 3 Dan MacArthur, Director Town of Marlboro Emergency Management P.O. Box 30 Marlboro, VT 05344 E-mail: dmacarthur@igc.org David R. Lewis, Esq.

Matias F. Travieso-Diaz, Esq.

Elina Teplinsky, Esq.

Blake J. Nelson, Esq.

Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC 20037-1128 E-mail: david.lewis@pillsburylaw.com matias.travieso-diaz@pillsburylaw.com Elina.Teplinsky@pillsburylaw.com Blake.Nelson@pillsburylaw.com Peter C. L. Roth, Esq.

Senior Assistant Attorney General State of New Hampshire Office of the New Hampshire Attorney General 33 Capitol Street Concord, NH 03301 E-mail: peter.roth@doj.nh.gov Alan A. Pemberton, Esq.

Derron J. Blakely, Esq.

Covington & Burling LLP Counsel for Electric Power Research Institute (EPRI) 1201 Pennsylvania Avenue, N.W.

Washington, DC 20004-2401 E-mail: apemberton@cov.com dblakely@cov.com

[Original signed by Nancy Greathead]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 6th day of October 2008