{{Adams|number = ML083120370}}
{{Adams
| number = ML083120370
| issue date = 11/02/2008
| title = IR 05000341-08-007, on 10/20/2008 - 10/24/2008, Fermi Power Plant, Unit 2, Ti 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2 and 3, Mitigating Strategies - Cover Letter
| author name = Peterson H
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name = Davis J
| addressee affiliation = Detroit Edison
| docket = 05000341
| license number = NPF-043
| contact person =
| document report number = IR-08-007
| document type = Letter, Inspection Report
| page count = 4
}}


{{IR-Nav| site = 05000341 | year = 2008 | report number = 007 }}
{{IR-Nav| site = 05000341 | year = 2008 | report number = 007 }}


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:November 2, 2008
[[Issue date::November 2, 2008]]


Mr. Jack Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
==SUBJECT:==
FERMI POWER PLANT, UNIT 2  


SUBJECT: FERMI POWER PLANT, UNIT 2 TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000341/2008007(DRS)
TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000341/2008007(DRS)


==Dear Mr. Davis:==
==Dear Mr. Davis:==
On October 24, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection at your Fermi Power Plant. The enclosed report documents the results of the inspection, which were discussed on October 24, 2008, with Mr. J. Plona and other members of your staff. The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission=s rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel. Based on the results of this inspection, no findings of significance were identified. The team concluded that, in general, you had implemented the Site Specific B.5.b Phase 2 and 3 Mitigating Strategies as described in your submittals and the associated Safety Evaluation Report. Enclosures Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
On October 24, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection at your Fermi Power Plant. The enclosed report documents the results of the inspection, which were discussed on October 24, 2008, with Mr. J. Plona and other members of your staff.


Sincerely,/RA/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission=s rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.


===Enclosure:===
Based on the results of this inspection, no findings of significance were identified. The team concluded that, in general, you had implemented the Site Specific B.5.b Phase 2 and 3 Mitigating Strategies as described in your submittals and the associated Safety Evaluation Report.
Inspection Report 05000341/2008007(DRS)


===w/Attachment:===
Enclosures Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Supplemental Information cc w/encl: D. Nelson, NRR/DPR/PSPB E. Bowman, NRR/DPR/PSPB cc w/o encl: J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality G. Williams, Director, Monroe County Emergency Management Division Supervisor - Electric Operators T. Strong, State Liaison Officer Wayne County Emergency Management Division
 
Sincerely,
/RA/
 
Hironori Peterson, Chief Operations Branch Division of Reactor Safety
 
Docket No. 50-341 License No. NPF-43
 
Nonpublic Enclosure: Inspection Report 05000341/2008007(DRS)
 
w/Attachment: Supplemental Information  
 
cc w/encl:
D. Nelson, NRR/DPR/PSPB  
 
E. Bowman, NRR/DPR/PSPB  
 
cc w/o encl:
J. Plona, Vice President,  
 
Nuclear Generation  
 
K. Hlavaty, Plant Manager  
 
R. Gaston, Manager, Nuclear Licensing  
 
D. Pettinari, Legal Department  
 
Michigan Department of Environmental Quality  
 
G. Williams, Director, Monroe County  
 
Emergency Management Division  
 
Supervisor - Electric Operators  
 
T. Strong, State Liaison Officer  
 
Wayne County Emergency Management Division
}}
}}

Latest revision as of 14:25, 14 January 2025

IR 05000341-08-007, on 10/20/2008 - 10/24/2008, Fermi Power Plant, Unit 2, Ti 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2 and 3, Mitigating Strategies - Cover Letter
ML083120370
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/02/2008
From: Hironori Peterson
Operations Branch III
To: Jennifer Davis
Detroit Edison
References
IR-08-007
Download: ML083120370 (4)


Text

November 2, 2008

SUBJECT:

FERMI POWER PLANT, UNIT 2

TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000341/2008007(DRS)

Dear Mr. Davis:

On October 24, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection at your Fermi Power Plant. The enclosed report documents the results of the inspection, which were discussed on October 24, 2008, with Mr. J. Plona and other members of your staff.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission=s rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.

Based on the results of this inspection, no findings of significance were identified. The team concluded that, in general, you had implemented the Site Specific B.5.b Phase 2 and 3 Mitigating Strategies as described in your submittals and the associated Safety Evaluation Report.

Enclosures Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety

Docket No. 50-341 License No. NPF-43

Nonpublic Enclosure: Inspection Report 05000341/2008007(DRS)

w/Attachment: Supplemental Information

cc w/encl:

D. Nelson, NRR/DPR/PSPB

E. Bowman, NRR/DPR/PSPB

cc w/o encl:

J. Plona, Vice President,

Nuclear Generation

K. Hlavaty, Plant Manager

R. Gaston, Manager, Nuclear Licensing

D. Pettinari, Legal Department

Michigan Department of Environmental Quality

G. Williams, Director, Monroe County

Emergency Management Division

Supervisor - Electric Operators

T. Strong, State Liaison Officer

Wayne County Emergency Management Division