IR 05000237/2008009: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:December 1, 2008 Mr. Charles President and Chief Nuclear Officer (CNO), Exelon Nuclear Chief Nuclear Officer (CNO), AmerGen Energy Company, LLC 4300 Winfield Road Warrenville IL 60555
{{#Wiki_filter:December 1, 2008


SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000237/2008009(DRS); 05000249/2008009(DRS)
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3  
 
TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000237/2008009(DRS);
05000249/2008009(DRS)


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==
On October 24, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection at your Dresden Nuclear Power Station, Units 2 and 3. The enclosed report documents the results of the inspection, which were discussed on October 24, 2008, with Mr. Hanley and other members of your staff.
On October 24, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection at your Dresden Nuclear Power Station, Units 2 and 3. The enclosed report documents the results of the inspection, which were discussed on October 24, 2008, with Mr. Hanley and other members of your staff.


The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission's rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.


Based on the results of the inspection, there were no NRC-identified findings.
Based on the results of the inspection, there were no NRC-identified findings.
Line 31: Line 35:
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Enclosures Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Enclosures Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


Sincerely,
Sincerely,
/RA/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25  
/RA/  
 
Hironori Peterson, Chief Operations Branch Division of Reactor Safety  
 
Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25  
 
Nonpublic Enclosure: Inspection Report 05000237/2008009(DRS);
 
05000249/2008009(DRS)
 
w/Attachment: Supplemental Information
 
cc w/encl:
C. Symonds, Security Director, Dresden
 
J. Klinger, State Liaison Officer,
 
Illinois Emergency Management Agency
 
cc w/o encl:
Site Vice President - Dresden Nuclear Power Station
 
Plant Manager - Dresden Nuclear Power Station
 
Regulatory Assurance Manager - Dresden Nuclear Power Station
 
Chief Operating Officer and Senior Vice President
 
Senior Vice President - Midwest Operations
 
Senior Vice President - Operations Support
 
Vice President - Licensing and Regulatory Affairs
 
Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities
 
Associate General Counsel
 
Document Control Desk - Licensing
 
Assistant Attorney General


Nonpublic Enclosure: Inspection Report 05000237/2008009(DRS); 05000249/2008009(DRS) w/Attachment: Supplemental Information cc w/encl: C. Symonds, Security Director, Dresden J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Chairman, Illinois Commerce Commission
Chairman, Illinois Commerce Commission
}}
}}

Latest revision as of 14:05, 14 January 2025

IR 05000237-08-009 (DRS) & 05000249-08-009 (DRS) on 10/20/08 - 10/24/08 for Dresden, Ti 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2 and 3 Mitigating Strategies - Cover Letter
ML083400486
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/01/2008
From: Hironori Peterson
Operations Branch I
To: Pardee C
AmerGen Energy Co, Exelon Nuclear
References
IR-08-009
Download: ML083400486 (4)


Text

December 1, 2008

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3

TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000237/2008009(DRS);

05000249/2008009(DRS)

Dear Mr. Pardee:

On October 24, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection at your Dresden Nuclear Power Station, Units 2 and 3. The enclosed report documents the results of the inspection, which were discussed on October 24, 2008, with Mr. Hanley and other members of your staff.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.

Based on the results of the inspection, there were no NRC-identified findings.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Enclosures Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety

Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25

Nonpublic Enclosure: Inspection Report 05000237/2008009(DRS);

05000249/2008009(DRS)

w/Attachment: Supplemental Information

cc w/encl:

C. Symonds, Security Director, Dresden

J. Klinger, State Liaison Officer,

Illinois Emergency Management Agency

cc w/o encl:

Site Vice President - Dresden Nuclear Power Station

Plant Manager - Dresden Nuclear Power Station

Regulatory Assurance Manager - Dresden Nuclear Power Station

Chief Operating Officer and Senior Vice President

Senior Vice President - Midwest Operations

Senior Vice President - Operations Support

Vice President - Licensing and Regulatory Affairs

Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities

Associate General Counsel

Document Control Desk - Licensing

Assistant Attorney General

Chairman, Illinois Commerce Commission