{{#Wiki_filter:January 5, 2009
{{#Wiki_filter:January 5, 2009  
Mr. Larry Meyer
Site Vice President
Mr. Larry Meyer  
FPL Energy Point Beach, LLC
Site Vice President  
6610 Nuclear Road
FPL Energy Point Beach, LLC  
Two Rivers, WI 54241
6610 Nuclear Road  
SUBJECT:         POINT BEACH NUCLEAR PLANT-NOTIFICATION OF AN NRC TRIENNIAL
Two Rivers, WI 54241  
                HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR
                INFORMATION-INSPECTION REPORT 05000266/2009002;
SUBJECT:  
                05000301/2009002(DRS)
POINT BEACH NUCLEAR PLANT-NOTIFICATION OF AN NRC TRIENNIAL  
Dear Mr. Meyer:
HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR  
On February 23, 2009, the NRC will begin the onsite portion of the Triennial Heat Sink
INFORMATION-INSPECTION REPORT 05000266/2009002;  
Performance Inspection at your Point Beach Nuclear Power Plant. This inspection will be
05000301/2009002(DRS)  
performed in accordance with NRC baseline inspection procedure (IP) 71111.07.
Dear Mr. Meyer:  
In order to minimize the impact that the inspection has on the site and to ensure a productive
On February 23, 2009, the NRC will begin the onsite portion of the Triennial Heat Sink  
inspection, we have enclosed a request for documents needed for the inspection. The
Performance Inspection at your Point Beach Nuclear Power Plant. This inspection will be  
documents have been divided into three groups.
performed in accordance with NRC baseline inspection procedure (IP) 71111.07.  
*   The first group lists information necessary for our initial inspection scoping activities. This
In order to minimize the impact that the inspection has on the site and to ensure a productive  
    information should be available to the lead inspector no later than January 19, 2009. By
inspection, we have enclosed a request for documents needed for the inspection. The  
    January 26, 2009, the inspector will communicate the initial selected set of approximately
documents have been divided into three groups.  
    2-3 risk significant heat exchangers.
*  
*   The second group of documents requested includes those items needed to support our
The first group lists information necessary for our initial inspection scoping activities. This  
    in-office preparation activities. This set of documents, including the calculations associated
information should be available to the lead inspector no later than January 19, 2009. By  
    with the selected heat exchangers, should be available at the Regional Office no later than
January 26, 2009, the inspector will communicate the initial selected set of approximately  
    February 9, 2009. This information should be separated for each selected component,
2-3 risk significant heat exchangers.  
    especially if provided electronically (e.g., folder with component name that includes
*  
    calculations, condition reports, maintenance history, etc.). During the in-office preparation
The second group of documents requested includes those items needed to support our  
    activities, the inspector may identify additional information needed to support the inspection.
in-office preparation activities. This set of documents, including the calculations associated  
*   The last group includes the additional information above, as well as plant specific
with the selected heat exchangers, should be available at the Regional Office no later than  
    reference material. This information should be available onsite to the inspector on
February 9, 2009. This information should be separated for each selected component,  
    February 23, 2009. It is also requested that corrective action documents and/or questions
especially if provided electronically (e.g., folder with component name that includes  
    developed during the inspection be provided to the inspector as the documents are
calculations, condition reports, maintenance history, etc.). During the in-office preparation  
    generated.
activities, the inspector may identify additional information needed to support the inspection.  
The lead inspector for this inspection is Nestor Feliz-Adorno. If there are questions about the
*  
material requested, or the inspection, please call him at (630) 829-9739. Please send the
The last group includes the additional information above, as well as plant specific  
information to the following e-mail address Nestor.Feliz-Adorno@nrc.gov. A hard-copy with the
reference material. This information should be available onsite to the inspector on  
required information is also an acceptable option. It is important that these documents be as
February 23, 2009. It is also requested that corrective action documents and/or questions  
complete as possible, in order to minimize the number of documents requested during the
developed during the inspection be provided to the inspector as the documents are  
generated.  
The lead inspector for this inspection is Nestor Feliz-Adorno. If there are questions about the  
material requested, or the inspection, please call him at (630) 829-9739. Please send the  
information to the following e-mail address Nestor.Feliz-Adorno@nrc.gov. A hard-copy with the  
required information is also an acceptable option. It is important that these documents be as  
complete as possible, in order to minimize the number of documents requested during the  
preparation week or during the onsite inspection.
preparation week or during the onsite inspection.


L. Meyer                                       -2-
L. Meyer  
All requested documents are to be for the time period from the onsite inspection period back to
the last Heat Sink Performance Inspection. If no actions addressing a request were performed
in that time period, then the request applies to the last applicable document in the previous time
period.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
-2-  
enclosure will be available electronically for public inspection in the NRC Public Document
All requested documents are to be for the time period from the onsite inspection period back to  
Room or from the Publicly Available Records (PARS) component of NRC's document system
the last Heat Sink Performance Inspection. If no actions addressing a request were performed  
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
in that time period, then the request applies to the last applicable document in the previous time  
Public Electronic Reading Room).
period.
                                              Sincerely,
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
                                                /RA/
enclosure will be available electronically for public inspection in the NRC Public Document  
                                              Ann Marie Stone, Chief
Room or from the Publicly Available Records (PARS) component of NRC's document system  
                                              Engineering Branch 2
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the  
                                              Division of Reactor Safety
Public Electronic Reading Room).  
Docket No. 50-266; 50-301
Sincerely,  
License No. DPR-24; DPR-27
/RA/  
Enclosure:     TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT
Ann Marie Stone, Chief  
                REQUEST
Engineering Branch 2  
cc w/encl:     M. Nazar, Senior Vice President and Nuclear
Division of Reactor Safety
                Chief Operating Officer
Docket No. 50-266; 50-301  
                J. Stall, Executive Vice President, Nuclear and
License No. DPR-24; DPR-27  
                Chief Nuclear Officer
Enclosure:  
                A. Khanpour, Vice President, Engineering Support
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT  
                Licensing Manager, Point Beach Nuclear Plant
REQUEST  
                R. Hughes, Director, Licensing and Performance Improvement
cc w/encl:  
                M. Ross, Managing Attorney
M. Nazar, Senior Vice President and Nuclear  
                A. Fernandez, Senior Attorney
                T. O. Jones, Vice President, Nuclear Operations,
                Mid-West Region
  Chief Operating Officer  
                P. Wells, (Acting) Vice President, Nuclear
                Training and Performance Improvement
                J. McCarthy, Vice President, Point Beach Recovery
J. Stall, Executive Vice President, Nuclear and  
                J. Bjorseth, Plant General Manager
                K. Duveneck, Town Chairman, Town of Two Creeks
                Chairperson, Public Service Commission of Wisconsin
  Chief Nuclear Officer  
                J. Kitsembel, Electric Division, Public Service Commission of Wisconsin
                P. Schmidt, State Liaison Officer
A. Khanpour, Vice President, Engineering Support  
Licensing Manager, Point Beach Nuclear Plant  
R. Hughes, Director, Licensing and Performance Improvement  
M. Ross, Managing Attorney  
A. Fernandez, Senior Attorney  
T. O. Jones, Vice President, Nuclear Operations,  
  Mid-West Region  
P. Wells, (Acting) Vice President, Nuclear  
  Training and Performance Improvement  
J. McCarthy, Vice President, Point Beach Recovery  
J. Bjorseth, Plant General Manager  
K. Duveneck, Town Chairman, Town of Two Creeks  
Chairperson, Public Service Commission of Wisconsin  
J. Kitsembel, Electric Division, Public Service Commission of Wisconsin  
P. Schmidt, State Liaison Officer  


L. Meyer                                                                       -2-
All requested documents are to be for the time period from the onsite inspection period back to the last
Heat Sink Performance Inspection. If no actions addressing a request were performed in that time
L. Meyer  
period, then the request applies to the last applicable document in the previous time period.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure
will be available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-2-  
                                                                                Sincerely,
All requested documents are to be for the time period from the onsite inspection period back to the last  
                                                                                  /RA/
Heat Sink Performance Inspection. If no actions addressing a request were performed in that time  
                                                                                Ann Marie Stone, Chief
period, then the request applies to the last applicable document in the previous time period.
                                                                                Engineering Branch 2
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure  
                                                                                Division of Reactor Safety
will be available electronically for public inspection in the NRC Public Document Room or from the  
Docket No. 50-266; 50-301
Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the  
License No. DPR-24; DPR-27
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Enclosure:                 TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
Sincerely,  
cc w/encl:                 M. Nazar, Senior Vice President and Nuclear
/RA/  
                            Chief Operating Officer
Ann Marie Stone, Chief  
                            J. Stall, Executive Vice President, Nuclear and
Engineering Branch 2  
                            Chief Nuclear Officer
Division of Reactor Safety
                            A. Khanpour, Vice President, Engineering Support
Docket No. 50-266; 50-301  
                            Licensing Manager, Point Beach Nuclear Plant
License No. DPR-24; DPR-27  
                            R. Hughes, Director, Licensing and Performance Improvement
Enclosure:  
                            M. Ross, Managing Attorney
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
                            A. Fernandez, Senior Attorney
cc w/encl:  
                            T. O. Jones, Vice President, Nuclear Operations,
M. Nazar, Senior Vice President and Nuclear  
                            Mid-West Region
                            P. Wells, (Acting) Vice President, Nuclear
                            Training and Performance Improvement
  Chief Operating Officer  
                            J. McCarthy, Vice President, Point Beach Recovery
                            J. Bjorseth, Plant General Manager
                            K. Duveneck, Town Chairman, Town of Two Creeks
J. Stall, Executive Vice President, Nuclear and  
                            Chairperson, Public Service Commission of Wisconsin
                            J. Kitsembel, Electric Division, Public Service Commission of Wisconsin
                            P. Schmidt, State Liaison Officer
  Chief Nuclear Officer  
DOCUMENT NAME: G:\Engineering Branch 2\Work in Progress\PB 2009 HS RFI.doc
9 Publicly Available                     9 Non-Publicly Available                       9 Sensitive               9 Non-Sensitive
To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy
A. Khanpour, Vice President, Engineering Support  
OFFICE                             RIII                                 RIII
NAME                               NFeliz-Adorno:ls                     AMStone
DATE                               01/02/09                             01/05/09
Licensing Manager, Point Beach Nuclear Plant  
                                                            OFFICIAL RECORD COPYY
R. Hughes, Director, Licensing and Performance Improvement  
M. Ross, Managing Attorney  
A. Fernandez, Senior Attorney  
T. O. Jones, Vice President, Nuclear Operations,  
  Mid-West Region  
P. Wells, (Acting) Vice President, Nuclear  
  Training and Performance Improvement  
J. McCarthy, Vice President, Point Beach Recovery  
J. Bjorseth, Plant General Manager  
K. Duveneck, Town Chairman, Town of Two Creeks  
Chairperson, Public Service Commission of Wisconsin  
J. Kitsembel, Electric Division, Public Service Commission of Wisconsin  
P. Schmidt, State Liaison Officer  
DOCUMENT NAME: G:\\Engineering Branch 2\\Work in Progress\\PB 2009 HS RFI.doc  
9 Publicly Available  
9 Non-Publicly Available       9 Sensitive       9   Non-Sensitive  
To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy  
OFFICE  
RIII  
RIII  
NAME  
NFeliz-Adorno:ls  
AMStone  
DATE  
01/02/09  
01/05/09  
OFFICIAL RECORD COPYY


Letter to Mr. Larry Meyer from Ms. A. M. Stone dated January 5, 2009.
SUBJECT:       POINT BEACH NUCLEAR PLANT - NOTIFICATION OF AN NRC TRIENNIAL
                HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR
Letter to Mr. Larry Meyer from Ms. A. M. Stone dated January 5, 2009.  
                INFORMATION - INSPECTION REPORT 05000266/2009002;
SUBJECT:  
                05000301/2009002(DRS)
POINT BEACH NUCLEAR PLANT - NOTIFICATION OF AN NRC TRIENNIAL  
DISTRIBUTION:
HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR  
Tamara Bloomer
INFORMATION - INSPECTION REPORT 05000266/2009002;  
RidsNrrDorlLpl3-1
05000301/2009002(DRS)  
RidsNrrPMPointBeach
DISTRIBUTION:  
RidsNrrDirsIrib Resource
Tamara Bloomer  
Mark Satorius
RidsNrrDorlLpl3-1  
Kenneth Obrien
RidsNrrPMPointBeach  
Jared Heck
RidsNrrDirsIrib Resource  
Carole Ariano
Mark Satorius  
Linda Linn
Kenneth Obrien  
DRPIII
Jared Heck  
DRSIII
Carole Ariano  
Patricia Buckley
Linda Linn  
Tammy Tomczak
DRPIII  
ROPreports@nrc.gov
DRSIII  
Patricia Buckley  
Tammy Tomczak  
ROPreports@nrc.gov


                                INFORMATION REQUEST FOR
INFORMATION REQUEST FOR  
                    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
Inspection Report:           05000266/2009002; 05000301/2009002
Inspection Dates:             February 23-27, 2009
Inspection Procedure:         IP 71111.07, Triennial AHeat Sink Performance Inspection@
Enclosure
Lead Inspector:               Nestor Feliz-Adorno
1
                              (630) 829-9739, Nestor.Feliz-Adorno@nrc.gov
Inspection Report:
I.     Information Requested By January 19, 2009
05000266/2009002; 05000301/2009002  
      1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
Inspection Dates:  
          Safety-Related Equipment, heat exchangers in order of risk significance.
      2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
February 23-27, 2009  
          exchanger.
Inspection Procedure:  
      3. List of corrective action program documents (with a short description) associated
IP 71111.07, Triennial AHeat Sink Performance Inspection@  
          with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat
Lead Inspector:  
          exchanger testing, for the previous two years, or since the last heat sink performance
          inspection.
Nestor Feliz-Adorno  
      4. Copy of any self-assessment of GL 89-13 heat exchangers conducted since last
(630) 829-9739, Nestor.Feliz-Adorno@nrc.gov  
          heat sink performance inspection.
I.  
      5. System health report(s) and maintenance rule system notebooks for all the GL 89-13
Information Requested By January 19, 2009  
          heat exchangers.
1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting  
      6. Copy of your responses for GL 89-13.
Safety-Related Equipment, heat exchangers in order of risk significance.  
II.   Information Requested By February 9, 2009
2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat  
      1. For the specific heat exchangers selected:
exchanger.  
          a. Copies of the two most recent completed tests confirming thermal performance
3. List of corrective action program documents (with a short description) associated  
              for those heat exchangers, which are performance tested.
with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat  
          b. Copy of system description and design basis document for the heat exchangers
exchanger testing, for the previous two years, or since the last heat sink performance  
              (as applicable).
inspection.  
          c. Copy of any operability determinations or other documentation of degradation
4. Copy of any self-assessment of GL 89-13 heat exchangers conducted since last  
              associated with the heat exchangers or the systems that support the operation
heat sink performance inspection.  
              for the selected heat exchangers.
5. System health report(s) and maintenance rule system notebooks for all the GL 89-13  
                                                1                                      Enclosure
heat exchangers.  
6. Copy of your responses for GL 89-13.  
II.  
Information Requested By February 9, 2009
1. For the specific heat exchangers selected:  
a. Copies of the two most recent completed tests confirming thermal performance  
for those heat exchangers, which are performance tested.  
b. Copy of system description and design basis document for the heat exchangers  
(as applicable).  
c. Copy of any operability determinations or other documentation of degradation  
associated with the heat exchangers or the systems that support the operation  
for the selected heat exchangers.  


                              INFORMATION REQUEST FOR
INFORMATION REQUEST FOR  
                  TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
        d. Copy of the Updated Final Safety Analysis Report (UFSAR) sections applicable
            for each heat exchanger.
        e. Provide a list of calculations with a description, which currently apply to each
Enclosure
            heat exchanger.
2
    2. A schedule of all inspections, cleanings, maintenance, or testing of any plant heat
d. Copy of the Updated Final Safety Analysis Report (UFSAR) sections applicable  
        exchanger to be done during the onsite portion of the inspection.
for each heat exchanger.  
    3. Copies of procedures developed to implement the recommendations of GL 89-13,
e. Provide a list of calculations with a description, which currently apply to each  
        (e.g., the GL 89-13 Heat Exchanger Program) description.
heat exchanger.  
    4. Pages from the UFSAR for the GL 89-13 Heat Exchanger Program.
2. A schedule of all inspections, cleanings, maintenance, or testing of any plant heat  
    5. Maximum GL 89-13 heat exchanger inlet temperatures that still allow full licensed
exchanger to be done during the onsite portion of the inspection.  
        power operation of the nuclear reactor. Please provide the documents that state
3. Copies of procedures developed to implement the recommendations of GL 89-13,  
        these limits (e.g., UFSAR or Technical Requirements Manual (TRM)) and the
(e.g., the GL 89-13 Heat Exchanger Program) description.  
        operating procedures that ensure these limits are not exceeded.
4. Pages from the UFSAR for the GL 89-13 Heat Exchanger Program.  
III. Information Requested to be Available on First Day of Inspection,
5. Maximum GL 89-13 heat exchanger inlet temperatures that still allow full licensed  
    February 23, 2009
power operation of the nuclear reactor. Please provide the documents that state  
    1. For the specific heat exchangers selected:
these limits (e.g., UFSAR or Technical Requirements Manual (TRM)) and the  
        a. Provide the Design Basis Documents and Updated Final Safety Analysis Report
operating procedures that ensure these limits are not exceeded.  
            pages for the selected heat exchangers.
III.  
        b. Copy of the design specification and heat exchanger data sheets for each heat
Information Requested to be Available on First Day of Inspection,  
            exchanger.
February 23, 2009
        c. Copy of the vendor manuals including component drawings for each heat
1. For the specific heat exchangers selected:  
            exchanger.
a. Provide the Design Basis Documents and Updated Final Safety Analysis Report  
        d. Copy of the calculation which establishes the limiting (maximum) design basis
pages for the selected heat exchangers.  
            heat load, which is required to be removed by each of these heat exchangers.
b. Copy of the design specification and heat exchanger data sheets for each heat  
        e. Copy of the calculation which correlates surveillance testing results from these
exchanger.  
            heat exchangers with design basis heat removal capability (e.g., basis for
c. Copy of the vendor manuals including component drawings for each heat  
            surveillance test acceptance criteria).
exchanger.  
        f. Copy of the calculations or documents, which evaluate the potential for water
d. Copy of the calculation which establishes the limiting (maximum) design basis  
            hammer or excessive tube vibration in the heat exchanger or associated piping.
heat load, which is required to be removed by each of these heat exchangers.  
        g. List of engineering-related Operator Workarounds/Temporary Modifications for
e. Copy of the calculation which correlates surveillance testing results from these  
            these heat exchangers since the last Heat Sink Performance Inspection.
heat exchangers with design basis heat removal capability (e.g., basis for  
                                              2                                        Enclosure
surveillance test acceptance criteria).  
f. Copy of the calculations or documents, which evaluate the potential for water  
hammer or excessive tube vibration in the heat exchanger or associated piping.  
g. List of engineering-related Operator Workarounds/Temporary Modifications for  
these heat exchangers since the last Heat Sink Performance Inspection.


                        INFORMATION REQUEST FOR
INFORMATION REQUEST FOR  
            TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
  h. Copy of the evaluations of data for the two most recent completed tests
      confirming the thermal performance of each heat exchanger.
  i. Documentation and procedures that identify the types, accuracy, and location of
Enclosure
      any special instrumentation used for the two most recent completed thermal
3
      performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow
h. Copy of the evaluations of data for the two most recent completed tests  
      instruments or temperature instruments). Include calibration records for the
confirming the thermal performance of each heat exchanger.  
      instruments used during these tests.
i.  
  j. Copies of those documents that describe the methods taken to control water
Documentation and procedures that identify the types, accuracy, and location of  
      chemistry in the heat exchangers.
any special instrumentation used for the two most recent completed thermal  
  k. Copies of the documents that verify the structural integrity of the heat exchanger,
performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow  
      (e.g., eddy current summary sheets, ultrasonic testing results, and visual
instruments or temperature instruments). Include calibration records for the  
      inspection results).
instruments used during these tests.  
  l. The cleaning and inspection maintenance schedule for each heat exchanger for
j.  
      the next 5 years.
Copies of those documents that describe the methods taken to control water  
  m. Copy of the document describing the inspection results for the last two cleaning
chemistry in the heat exchangers.  
      and inspection activities completed on each heat exchanger.
k. Copies of the documents that verify the structural integrity of the heat exchanger,  
  n. Copy of the document which identifies the current number of tubes in service for
(e.g., eddy current summary sheets, ultrasonic testing results, and visual  
      each heat exchanger and the supporting calculation, which establishes the
inspection results).  
      maximum number of tubes which can be plugged in each heat exchanger.
l.  
  o. Copy of the document establishing the repair criteria (plugging limit) for degraded
The cleaning and inspection maintenance schedule for each heat exchanger for  
      tubes, which are identified in each heat exchanger.
the next 5 years.  
  p. Information regarding any alarms, which monitor on-line performance.
m. Copy of the document describing the inspection results for the last two cleaning  
2. For the ultimate heat sink:
and inspection activities completed on each heat exchanger.  
  a.   Maintenance or inspection of inaccessible below-water portions of the UHS
n. Copy of the document which identifies the current number of tubes in service for  
        system including results of underwater diving inspections and assessments of
each heat exchanger and the supporting calculation, which establishes the  
        sediment intrusion and/or removal of sediment.
maximum number of tubes which can be plugged in each heat exchanger.  
  b.   Inspections and/or maintenance-related to preventing macrofouling (silt, dead
o. Copy of the document establishing the repair criteria (plugging limit) for degraded  
        mussel shells, debris, etc.), and aquatic life such as fish, algae, grass or kelp;
tubes, which are identified in each heat exchanger.  
  c.   inspections and/or maintenance-related to preventing biotic fouling;
p. Information regarding any alarms, which monitor on-line performance.  
  d.   Copies of chemistry procedures and surveillances that monitor for pH, calcium
2. For the ultimate heat sink:  
        hardness, etc.
a.  
  e.   Copies of any design change performed on the system.
Maintenance or inspection of inaccessible below-water portions of the UHS  
                                        3                                          Enclosure
system including results of underwater diving inspections and assessments of  
sediment intrusion and/or removal of sediment.  
b.  
Inspections and/or maintenance-related to preventing macrofouling (silt, dead  
mussel shells, debris, etc.), and aquatic life such as fish, algae, grass or kelp;  
c.  
inspections and/or maintenance-related to preventing biotic fouling;  
d.  
Copies of chemistry procedures and surveillances that monitor for pH, calcium  
hardness, etc.  
e.  
Copies of any design change performed on the system.  


                        INFORMATION REQUEST FOR
INFORMATION REQUEST FOR  
            TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
  f.   Copies of procedures for a loss of UHS.
  g.   Copies of procedures associated with operating during adverse weather
        conditions, (e.g., icing or high temperatures or low levels).
Enclosure
  h.   Copies of calculations and surveillances that determine the UHS reservoir
4
        capacity and heat transfer capability.
f.  
  i.   Copies of surveillance procedures and testing results conducted on the level
Copies of procedures for a loss of UHS.  
        instrumentation relied upon to determine UHS reservoir capability.
g.  
3. For the safety-related service water system (or equivalent):
Copies of procedures associated with operating during adverse weather  
  a. Last two performance tests, such as the ASME inservice test, for all pumps, all
conditions, (e.g., icing or high temperatures or low levels).  
      valves and the cooling towers, if applicable, in the safety-related service water
h.  
      system. If the components are not performance tested, please provide
Copies of calculations and surveillances that determine the UHS reservoir  
      documentation verifying performance by the methods actually used.
capacity and heat transfer capability.  
  b. Copies of the documents that verify flow testing was done at maximum design flow
i.  
      during the last two years or since the last time it was done. Copies of the
Copies of surveillance procedures and testing results conducted on the level  
      documents that verify maximum design flow testing will continue to be periodically
instrumentation relied upon to determine UHS reservoir capability.  
      done in the future.
3. For the safety-related service water system (or equivalent):  
  c. Copies of any design changes performed on the system.
a. Last two performance tests, such as the ASME inservice test, for all pumps, all  
  d. Copies of procedures for a loss of service water system.
valves and the cooling towers, if applicable, in the safety-related service water  
  e. Copies of inspections and/or maintenance-related to macrofouling (silt, dead
system. If the components are not performance tested, please provide  
      mussel shells, debris, etc.), and aquatic life such as fish, algae, grass, or kelp.
documentation verifying performance by the methods actually used.  
  f. Copies of inspections and/or maintenance-related to preventing biotic fouling.
b. Copies of the documents that verify flow testing was done at maximum design flow  
  g. Copies of chemistry procedures and surveillances that monitor for pH, calcium
during the last two years or since the last time it was done. Copies of the  
      hardness, etc.
documents that verify maximum design flow testing will continue to be periodically  
  h. Copies of procedures and/or test results to survey or monitor interface
done in the future.  
      valves between the safety-related section of the service water system and the
c. Copies of any design changes performed on the system.  
      non-safety-related section.
d. Copies of procedures for a loss of service water system.  
  i. Copies of the pipe testing and/or inspection program procedures and surveillances.
e. Copies of inspections and/or maintenance-related to macrofouling (silt, dead  
  j. Copies of the documents that verify the structural integrity of the heat exchanger,
mussel shells, debris, etc.), and aquatic life such as fish, algae, grass, or kelp.  
      (e.g., eddy current summary sheets, ultrasonic testing results, and visual
f. Copies of inspections and/or maintenance-related to preventing biotic fouling.  
      inspection results).
g. Copies of chemistry procedures and surveillances that monitor for pH, calcium  
  k. History of any through wall pipe leak on the system.
hardness, etc.  
                                          4                                      Enclosure
h. Copies of procedures and/or test results to survey or monitor interface  
valves between the safety-related section of the service water system and the  
non-safety-related section.  
i.  
Copies of the pipe testing and/or inspection program procedures and surveillances.  
j.  
Copies of the documents that verify the structural integrity of the heat exchanger,  
(e.g., eddy current summary sheets, ultrasonic testing results, and visual  
inspection results).  
k. History of any through wall pipe leak on the system.


                                  INFORMATION REQUEST FOR
INFORMATION REQUEST FOR  
                    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
            l. Copies of the procedures to monitor assess and disposition active through wall
                pipe leaks, including structural evaluations, and/or planned corrective actions.
If the information requested above will not be available, please contact Nestor Feliz-Adorno as
Enclosure
5
l.  
Copies of the procedures to monitor assess and disposition active through wall  
pipe leaks, including structural evaluations, and/or planned corrective actions.  
If the information requested above will not be available, please contact Nestor Feliz-Adorno as  
soon as possible at (630) 829-9739 or email him at Nestor.Feliz-Adorno@nrc.gov.
soon as possible at (630) 829-9739 or email him at Nestor.Feliz-Adorno@nrc.gov.
                                                  5                                      Enclosure
}}
}}

Latest revision as of 13:48, 14 January 2025

IR 05000266-09-002, IR 05000301-09-002, on 02/23/2009, for Point Beach, NRC Triennial Heat Sink Performance Inspection and Request for Information
ML090050450
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/05/2009
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Meyer L
Florida Power & Light Energy Point Beach
References
IR-09-002
Download: ML090050450 (9)


See also: IR 05000266/2009002

Text

January 5, 2009

Mr. Larry Meyer

Site Vice President

FPL Energy Point Beach, LLC

6610 Nuclear Road

Two Rivers, WI 54241

SUBJECT:

POINT BEACH NUCLEAR PLANT-NOTIFICATION OF AN NRC TRIENNIAL

HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR

INFORMATION-INSPECTION REPORT 05000266/2009002;

05000301/2009002(DRS)

Dear Mr. Meyer:

On February 23, 2009, the NRC will begin the onsite portion of the Triennial Heat Sink

Performance Inspection at your Point Beach Nuclear Power Plant. This inspection will be

performed in accordance with NRC baseline inspection procedure (IP) 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than January 19, 2009. By

January 26, 2009, the inspector will communicate the initial selected set of approximately

2-3 risk significant heat exchangers.

The second group of documents requested includes those items needed to support our

in-office preparation activities. This set of documents, including the calculations associated

with the selected heat exchangers, should be available at the Regional Office no later than

February 9, 2009. This information should be separated for each selected component,

especially if provided electronically (e.g., folder with component name that includes

calculations, condition reports, maintenance history, etc.). During the in-office preparation

activities, the inspector may identify additional information needed to support the inspection.

The last group includes the additional information above, as well as plant specific

reference material. This information should be available onsite to the inspector on

February 23, 2009. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated.

The lead inspector for this inspection is Nestor Feliz-Adorno. If there are questions about the

material requested, or the inspection, please call him at (630) 829-9739. Please send the

information to the following e-mail address Nestor.Feliz-Adorno@nrc.gov. A hard-copy with the

required information is also an acceptable option. It is important that these documents be as

complete as possible, in order to minimize the number of documents requested during the

preparation week or during the onsite inspection.

L. Meyer

-2-

All requested documents are to be for the time period from the onsite inspection period back to

the last Heat Sink Performance Inspection. If no actions addressing a request were performed

in that time period, then the request applies to the last applicable document in the previous time

period.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-266; 50-301

License No. DPR-24; DPR-27

Enclosure:

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT

REQUEST

cc w/encl:

M. Nazar, Senior Vice President and Nuclear

Chief Operating Officer

J. Stall, Executive Vice President, Nuclear and

Chief Nuclear Officer

A. Khanpour, Vice President, Engineering Support

Licensing Manager, Point Beach Nuclear Plant

R. Hughes, Director, Licensing and Performance Improvement

M. Ross, Managing Attorney

A. Fernandez, Senior Attorney

T. O. Jones, Vice President, Nuclear Operations,

Mid-West Region

P. Wells, (Acting) Vice President, Nuclear

Training and Performance Improvement

J. McCarthy, Vice President, Point Beach Recovery

J. Bjorseth, Plant General Manager

K. Duveneck, Town Chairman, Town of Two Creeks

Chairperson, Public Service Commission of Wisconsin

J. Kitsembel, Electric Division, Public Service Commission of Wisconsin

P. Schmidt, State Liaison Officer

L. Meyer

-2-

All requested documents are to be for the time period from the onsite inspection period back to the last

Heat Sink Performance Inspection. If no actions addressing a request were performed in that time

period, then the request applies to the last applicable document in the previous time period.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the

NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-266; 50-301

License No. DPR-24; DPR-27

Enclosure:

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

cc w/encl:

M. Nazar, Senior Vice President and Nuclear

Chief Operating Officer

J. Stall, Executive Vice President, Nuclear and

Chief Nuclear Officer

A. Khanpour, Vice President, Engineering Support

Licensing Manager, Point Beach Nuclear Plant

R. Hughes, Director, Licensing and Performance Improvement

M. Ross, Managing Attorney

A. Fernandez, Senior Attorney

T. O. Jones, Vice President, Nuclear Operations,

Mid-West Region

P. Wells, (Acting) Vice President, Nuclear

Training and Performance Improvement

J. McCarthy, Vice President, Point Beach Recovery

J. Bjorseth, Plant General Manager

K. Duveneck, Town Chairman, Town of Two Creeks

Chairperson, Public Service Commission of Wisconsin

J. Kitsembel, Electric Division, Public Service Commission of Wisconsin

P. Schmidt, State Liaison Officer

DOCUMENT NAME: G:\\Engineering Branch 2\\Work in Progress\\PB 2009 HS RFI.doc

9 Publicly Available

9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive

To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy

OFFICE

RIII

RIII

NAME

NFeliz-Adorno:ls

AMStone

DATE

01/02/09

01/05/09

OFFICIAL RECORD COPYY

Letter to Mr. Larry Meyer from Ms. A. M. Stone dated January 5, 2009.

SUBJECT:

POINT BEACH NUCLEAR PLANT - NOTIFICATION OF AN NRC TRIENNIAL

HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR

INFORMATION - INSPECTION REPORT 05000266/2009002;

05000301/2009002(DRS)

DISTRIBUTION:

Tamara Bloomer

RidsNrrDorlLpl3-1

RidsNrrPMPointBeach

RidsNrrDirsIrib Resource

Mark Satorius

Kenneth Obrien

Jared Heck

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

ROPreports@nrc.gov

INFORMATION REQUEST FOR

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

Enclosure

1

Inspection Report: 05000266/2009002; 05000301/2009002

Inspection Dates:

February 23-27, 2009

Inspection Procedure:

IP 71111.07, Triennial AHeat Sink Performance Inspection@

Lead Inspector:

Nestor Feliz-Adorno

(630) 829-9739, Nestor.Feliz-Adorno@nrc.gov

I.

Information Requested By January 19, 2009

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of corrective action program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous two years, or since the last heat sink performance

inspection.

4. Copy of any self-assessment of GL 89-13 heat exchangers conducted since last

heat sink performance inspection.

5. System health report(s) and maintenance rule system notebooks for all the GL 89-13

heat exchangers.

6. Copy of your responses for GL 89-13.

II.

Information Requested By February 9, 2009

1. For the specific heat exchangers selected:

a. Copies of the two most recent completed tests confirming thermal performance

for those heat exchangers, which are performance tested.

b. Copy of system description and design basis document for the heat exchangers

(as applicable).

c. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

INFORMATION REQUEST FOR

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

Enclosure

2

d. Copy of the Updated Final Safety Analysis Report (UFSAR) sections applicable

for each heat exchanger.

e. Provide a list of calculations with a description, which currently apply to each

heat exchanger.

2. A schedule of all inspections, cleanings, maintenance, or testing of any plant heat

exchanger to be done during the onsite portion of the inspection.

3. Copies of procedures developed to implement the recommendations of GL 89-13,

(e.g., the GL 89-13 Heat Exchanger Program) description.

4. Pages from the UFSAR for the GL 89-13 Heat Exchanger Program.

5. Maximum GL 89-13 heat exchanger inlet temperatures that still allow full licensed

power operation of the nuclear reactor. Please provide the documents that state

these limits (e.g., UFSAR or Technical Requirements Manual (TRM)) and the

operating procedures that ensure these limits are not exceeded.

III.

Information Requested to be Available on First Day of Inspection,

February 23, 2009

1. For the specific heat exchangers selected:

a. Provide the Design Basis Documents and Updated Final Safety Analysis Report

pages for the selected heat exchangers.

b. Copy of the design specification and heat exchanger data sheets for each heat

exchanger.

c. Copy of the vendor manuals including component drawings for each heat

exchanger.

d. Copy of the calculation which establishes the limiting (maximum) design basis

heat load, which is required to be removed by each of these heat exchangers.

e. Copy of the calculation which correlates surveillance testing results from these

heat exchangers with design basis heat removal capability (e.g., basis for

surveillance test acceptance criteria).

f. Copy of the calculations or documents, which evaluate the potential for water

hammer or excessive tube vibration in the heat exchanger or associated piping.

g. List of engineering-related Operator Workarounds/Temporary Modifications for

these heat exchangers since the last Heat Sink Performance Inspection.

INFORMATION REQUEST FOR

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

Enclosure

3

h. Copy of the evaluations of data for the two most recent completed tests

confirming the thermal performance of each heat exchanger.

i.

Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recent completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests.

j.

Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

k. Copies of the documents that verify the structural integrity of the heat exchanger,

(e.g., eddy current summary sheets, ultrasonic testing results, and visual

inspection results).

l.

The cleaning and inspection maintenance schedule for each heat exchanger for

the next 5 years.

m. Copy of the document describing the inspection results for the last two cleaning

and inspection activities completed on each heat exchanger.

n. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation, which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

o. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes, which are identified in each heat exchanger.

p. Information regarding any alarms, which monitor on-line performance.

2. For the ultimate heat sink:

a.

Maintenance or inspection of inaccessible below-water portions of the UHS

system including results of underwater diving inspections and assessments of

sediment intrusion and/or removal of sediment.

b.

Inspections and/or maintenance-related to preventing macrofouling (silt, dead

mussel shells, debris, etc.), and aquatic life such as fish, algae, grass or kelp;

c.

inspections and/or maintenance-related to preventing biotic fouling;

d.

Copies of chemistry procedures and surveillances that monitor for pH, calcium

hardness, etc.

e.

Copies of any design change performed on the system.

INFORMATION REQUEST FOR

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

Enclosure

4

f.

Copies of procedures for a loss of UHS.

g.

Copies of procedures associated with operating during adverse weather

conditions, (e.g., icing or high temperatures or low levels).

h.

Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

i.

Copies of surveillance procedures and testing results conducted on the level

instrumentation relied upon to determine UHS reservoir capability.

3. For the safety-related service water system (or equivalent):

a. Last two performance tests, such as the ASME inservice test, for all pumps, all

valves and the cooling towers, if applicable, in the safety-related service water

system. If the components are not performance tested, please provide

documentation verifying performance by the methods actually used.

b. Copies of the documents that verify flow testing was done at maximum design flow

during the last two years or since the last time it was done. Copies of the

documents that verify maximum design flow testing will continue to be periodically

done in the future.

c. Copies of any design changes performed on the system.

d. Copies of procedures for a loss of service water system.

e. Copies of inspections and/or maintenance-related to macrofouling (silt, dead

mussel shells, debris, etc.), and aquatic life such as fish, algae, grass, or kelp.

f. Copies of inspections and/or maintenance-related to preventing biotic fouling.

g. Copies of chemistry procedures and surveillances that monitor for pH, calcium

hardness, etc.

h. Copies of procedures and/or test results to survey or monitor interface

valves between the safety-related section of the service water system and the

non-safety-related section.

i.

Copies of the pipe testing and/or inspection program procedures and surveillances.

j.

Copies of the documents that verify the structural integrity of the heat exchanger,

(e.g., eddy current summary sheets, ultrasonic testing results, and visual

inspection results).

k. History of any through wall pipe leak on the system.

INFORMATION REQUEST FOR

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

Enclosure

5

l.

Copies of the procedures to monitor assess and disposition active through wall

pipe leaks, including structural evaluations, and/or planned corrective actions.

If the information requested above will not be available, please contact Nestor Feliz-Adorno as

soon as possible at (630) 829-9739 or email him at Nestor.Feliz-Adorno@nrc.gov.